HomeMy WebLinkAboutReso 1976-8429Farm No. 342
Rev, 2/76
RESOLUTION NO. 84=29
RESOLUTION OF THE CITY COUNCIL OF THE-C3~'TY OF CHULA
VISTA, APPROVING AGREEMENT BETWEEN THE CITY OF CHULA
VISTA AND SWEETHEART CONSTRUCTION COMPANY FOR CON-
STRUCTION OF TELEGRAPH CANYON CHANNEL IMPROVEMENTS,
AUTHORIZING THE NECESSARY EXPENDITURES,
AND AUTHORIZING THE MAYOR TO EXECUTE SAID AGREEMENT
The City Council of the City of Chula Vista does hereby
resolve as follows:
NOW, THEREFORE, BE IT RESOLVED that that certain agreement
between THE CITY OF CHULA VISTA, a municipal corporation, and
SWEETHEART CONSTRUCTION COMPANY, for construction of Telegraph
Canyon channel improvements,
dated the 3rd day of November 1976 a copy of
which is attached hereto and incorporated herein, the same as though
fully set forth herein be, and the same is hereby approved.
BE IT FURTHER RESOLVED that the sum of $5,325 is hereby autho-
rized to be transferred from Account 100-1460-5568 to C.I.P. Project
GF-22 for expenditure for the purposes set forth hereinabove.
BE IT FURTHER RESOLVED that the Mayor of the City of Chula
Vista be, and he is hereby authorized and directed to execute said
agreement for and on behalf of the City of Chula Vista.
Presented by
Approved as to form by
L%~G/~
W. J. Robens, Director of
Public Works
~,~
=,-
Georg ~D. Lindberg, City At ney
ADOPTED AND APPROVED by the CITY COUNCIL of the CITY OF CHULA
VISTA, CALIFORNIA, this 23rdday of _ November 19~r, by
AYES: Councilmen Egdahl, Hobel, Hyde, Cox, Hamilton
NAYES: Councilmen None
ABSENT: Councilmen
ATTEST ~ t ~f ~~~;
c
City Clerk
STATE OF CALIFORNIA)
COUNTY OF SAN DIEGO) ss .
CITY OF CHULA VISTA)
I' City Clerk of the City
of Chula Vista, California, DO HEREBY CERTIFY that the above is a full,
true and correct copy of Resolution No. and that tree same has
not been amended or repealed. DATED
City Clerk
Item 1 - 6" P.C.C. Swale $2813
Item 5 - Excavation 375
Item. 6 - Embankment 562
Contingency 375
Engineering 1200
TOTAL $5325
2. Developer agrees to undertake the improvements as set
forth herein above in conjunction with the construction of Homes along
Telegraph Canyon Road, east of Hilltop Drive.
3. It is understood by and between the City and Developer
that the amounts being paid pursuant to this agreement are based upon
estimated costs, and said actual costs to City, which may be either
more or less than the estimated costs, shall be adjusted upon the
completion of the project.
IN WITNESS WHEREOF, the parties hereto have caused this agree-
ment to be executed the day and year first hereinabove set forth.
THE CITY OF CHULA VISTA
.~ "'
Mayor o ~ he Cit of Chula Vis _~
ATTEST '
City Clerk ;,
''
Approved as to form by
City Attorney
Attach Notary Acknowledgment.
SWEETHEART CONSTRUCTION CO.
AGREEP'iENT FOR PARTICIPATION BY THE CITY OF CHULA
VISTA IN THE CONSTRUCTION OF CONCRETE BOTTOM IN
THE DRAINAGE CHANNEL SOUTH OF TELEGRAPH CANYON
ROAD AND EAST OF HILLTOP DRIVE
THIS AGREEP~IENT, made and entered into this 3rd day of
November , 1976, by and between THE CITY OF CHULA VISTA, a
municipal corporation, hereinafter called "City", and SWEETHEART
CONSTRUCTIONd COD~LPANY, 865 Fairway Court, Chula Vista, California,
92011, hereinafter called "Developer";
hT I T N E S S E T H
WHEREAS, the City has determined that the most desirable
means of improving the existing natural drainage channel south of
Telegraph Canyon Road and east of Hilltop Drive in conjunction with
the construction of certain houses adjacent to said channel by
Developer, would be the installation of a concrete bottom in the
channel and straightening the channel to eliminate the present
meandering alignment, and
WHEREAS, the City has agreed to participate in such con-
struction to the extent of bearing one-half the cost of the instal-
lation of the six foot wide concrete swale as well as participating
in one-half the cost of the engineering services, and
WHEREAS, the following cost estimate has been submitted
by Sweetheart Construction Company's engineering firm for the pro-
posed work:
Item Description Quantity Cost Total
1 6" P.C.C. Swale 3,750 S.F. 1.50 $ 5,625
2 Hydromulch 75,000 S.F. 0.04 3,000
3 Sand Bagged Entrance L.S. 2,500
4 Rip Rap Entrance L.S. 1,500
5 Excavation 1,500 C.Y. 0.50 750
6 Embankment 1,500 C.Y. 0.75 1,125
$14,500
Contingency 1,500
16,000
Engineering Cost 2,400
Total $18,400
WHEREAS, Developer is willing to undertake such improvement
project utilizing his engineering and contracting services upon the
payment by the City of one-half of the costs of the swale, the excava-
tion and embankment work and one-half of the engineering costs.
NOW, THEREFORE, IT IS MUTUALLY UNDERSTOOD AND AGREED AS
FOLLOWS:
1. City agrees to pay Developer, upon completion of th
improvements as set forth hereinabove and submission of invoices
showing actual costs, the sum of $5325 being one-half of the cos s
set forth hereinabove in the following amounts:
- 1 -