HomeMy WebLinkAboutReso 1977-8540RESOLUTION NO. 8540
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA
VISTA APPROVING THE 1976-78 FEDERAL AID URBAN PROGRAM
The City Council of the City of Chula Vista does hereby
resolve as follows:
WHEREAS, the FAU Advisory Committee has developed as re-
quired, a proposed FAU Program List prioritizing project applications
for the expenditure of FAU funds within the urbanized area, and
WHEREAS, it is now required that a majority of the juris-
dictions within the urbanized area approve said 1976-78 FAU Multi-
year Program List, which is marked as Exhibit "A", attached hereto
and incorporated herein by reference as if set forth in full, and
WHEREAS, the Director of Public Works has recommended that
the City Council now approve said 1976-78 FAU Multi-Year Program List.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the
City of Chula Vista that the 1976-78 D4ulti-Year Program List be, and
the same is hereby approved.
BE IT FURTHER RESOLVED that the City Clerk of the City of
Chula Vista be, and she is hereby authorized and directed to forward
a certified copy of this resolution to the FAU Advisory Committee.
Presented by
' ~ ~`" ,~
,.
W. J. Robens Director o
Public Works
Approved as to form by
~ ~
George= Lin erg, City Attdrney
ADOPTED AND APPROVED by the CITY COUNCIL of the CITY OF
CHULA VISTA, CALIFORNIA, this 15th day of March , 1977 ,
by the following vote, to-wit:
AYES: Councilmen Egdahl, Hobel, Hyde, Cox, Scott
NAYES: Councilmen None
ABSENT; Councilmen None
~i
~ Mayor of the City of hula Vista
ATTES
City C er
STATE OF CALIFORNIA)
COUNTY OF SAN DIEGO) ss.
CITY OF CHULA VISTA)
I, , City Clerk of the
City of Chula Vista, Cali ornia, DO HEREBY CERTIFY that the above is
a full, true and correct copy of Resolution No. and that the
same has not been amended or repealed. DATED .
i y er
~,
ect
CALTRANS
(33-1/3% _ $4,= 08,767)
R/W Protection
Carpool
SR 252y
Sub Total
Agency Total
San Diego
R/W Protection
Carpool
SR 252'
Pomerado Rd.
Imperial Ave.
Pacific Hwy. Recap.
Division St.
Friars-Mission G.
Recap
Clair. Mesa T.S.
Cont. ~iod.
Clair/Doliva T.S.
Clair. Dr./Clair. Mesa
T.s. rtod.
Grape/Hawthorn T.S.
-, _
1976-7 8 Federal Aid Urban Program ~~-- ~' ~ ~ ~ ti ~ ~ ~~
January 13, 1977
Funded Project List
Regional Regional Total
Road Recaps/T.S. Transit Local Accum
$5,722,521 $1,430,630 $3,576,575 $3,576,575 $14,306,3.01
$1,509,508
I $ 116,667
See City of San Diego
$1,509,508 0 $ 116,667 0
$4,768,767 (include all R/W protection, carpool & S'
$ 490,492
$ 153,333
2,498,767
391,000
832,754
$ 252,000
$ 469,246
$1,509,508
1,626,175
Z 252)
$2,116,667
2,270,000
4,768,767
5,159,767
6,461,767
6,713,767
6,746,767
33,000
110,000
192,000
55,000
65,000
80,000
6,856,767
7,048,767
7,103,767 !
7,168,767
7,248,767
'Project Partially Funded
'
Agency/Project Regional
Road
$5,722,521 Regional
Recaps/T.S.
$1,430,630
Transit
$3,576,575 ~ ~
Local
$3,576,575 Total
Accum
$14,306,301
pan Diego (Cont.)
CBD T.S. Cont. Mod. $1,631,000 $8,879,767
Caminoes Way T.O. $ 23,000 8,902,767
Jackson Drive - 433,000 9,335,767
Coronado Ave. 295,000 .9,630,767
Grand/Ingraham
T.S. Mod.x 6,936 ( 9,637,703
Sub Total $4,213,013 $ 674,000 $ 176,333 $2,948,182
Agency Total ~ $8,011,528
San Diego Coun~.~
Broadway Recap ~ $ 123,000 $9,760,703
Friars-Mission G.
Recap - 139,000 9,899,703
weetwater Rd.
Recap' 67,279 9,966,982
i,a Mesa P&R $ 325,000 10,291,982
Del Mar Multimodal 5~ 700,000 10,991,982
Bus Stop Improve. 18,000 11,009,98?
Sub Total 0 $ 329,279 $1,043,000 0
Agency Total $1,372,279
Escondido
Hwy. 395/13th T.S. $ 70,500 11,080,482
Grand/Date T.S. 21,455 11,101,937
Sub Total 0 $ 91,955 0 0
Agency Total $ 91,955
*Project Partially Funded
A~enc Pro'ect Regional
Road
$5,722,521 Regional
Recaps/T.S.
$1,430,630
Transit
$3 576,575
Local
$3 576 575 Total
Accum
$14 306 3C
~l Cajon
-~
Jamacha/Lexington T.S. $ 29,631 $11,131,56
Avocado/Lexington T.S. 29,299 11,160,86
Sub Total 0 $ 58,930 0 0
Agency Total $ 58,930
Chula Vista
Telegraph/Halecrest
T.S. $ 95,000
$11,255,86
girt St. Recap 49, 036 lI, 304, 90
Bus ylaint. Fac. &
Trans. Center $ 442,800 11,747,70
Sub Total 0 $ 144,036 $ 442,800 0
Agency Total. $ 586,836
,iista
E.. Vista Wy /L.A. T.S. $ 50 630
~
$11,798,33
~. Santa Fe/L.A. T.S. 49,800 11,848,13
Sub Total 0 $ 100,430 0 0
Agency Total $ 100,430
Del liar
Cam. Del Mar/Car. Val.
T.S. $ 32,000
$11,880,13
Sub Total 0 $ 32,000 0 0
Agency Total $ 32,000
`CTDB
Eastern Facility $ 241,000 $12,121,13:
Lus Stop Improve. 52,000 12,173,13:
Sub Total 0 0 $ 293,000 0
Agency Total $ 293,000
?ency/Fro'ect Regional
Road
$5,722,521 Regional
Recaps/T.S.
$1,430,630
Transit
$3,576,575
Local
$3,576,575 Total
ACCLIIII
$14,306,301
National City
Bus Turnout $ 22,410 $12,195,543
Sub Total 0 0 $ 22,410
Agency Total $ 22,410
Coronado
Vanpools $ 10,782 $12,206,325
Sub Total 0 0 $ 10,782 0
Agency Total $ 10,782
RAND TOTAL $5,722,521 $1,430,630 $2,009,992 $3,043,182
remaining Local Fur.~~ $2,099,976
__
FAU REGIONAL ROAD & TRANSIT PROJECT SUBMITTALS C~ ~-~M C ~j ~"
by Agency
January 13, 1977
Carlsbad
Rating Total Local
Project Points Cost Match FAU
Carlsbad Blvd. 106 $1,500,000 $465,000 $1,035,000
Carlsbad Blvd. Bike Lanes 63 200,000 34,000 166,000
Elm Avenue .91 1,000,000 310,000 690,000
Palomar Airport Rd. 50 3,300,000 562,980 2,737,020
Tamarack Ave. 56 1,620,000 326,372 1,293,628
Elm Ave /Pio Pico/I-5 T.S. 13 180,000 30,710 149,290
Elm Ave /Roosevelt St. T.S. 16 50,000 8,530 41,470
$7,850,000 $1,737,592 $6,112,408
C}inl a Vic+a
Rating Total Local
Project Points Cost Tiatch FAU
Broadway 60 $ 23,000 $ 4,140 $ 18,860
Fourth Ave'. (recap) 100 125,350 22,563 102,787
rrErr St. (recap) 105 18,745 3,374 15,371
rrHrr St. (recap) 125 59,800 10,764 49,036
East 'rLr' St. 55 19,519 3,513 16,006
Telegraph Canyon 96 2,059,017 370,623 1,688,394
Tidelands 101 1,171,71.0 210,908 960,802
~~illotia St. Bridge 81 725,040 130,507 594,533
E. Orange/Hilltop T.S. 21 46,000 8,000 38,000
Otay Lakes/Telegraph T.S. 20 40,000 7,000 33,000
Telegraph /Brandyw~.ne T.S. 5 40,000 7,000 33,000
Telegraph /1{alecrest T.S. ~ 40 115,000 20,000 95,000
*Pedestrian Indicators - 64,768 11,659 53,109
'~T.S. Control Modifications - 28,750 5,175 23,575
Bus Maint. Fac. & Transit Ctr. (Transit) 93 540,000 97,200 442,800
$5,076,699 $912,426 $4,164,273
~~Project not rated
~\
Coronado
Rating Total Local
Pro ect Points Cost Match FA U
"H" Ave /Third & Fourth Sts. T.S. 12 $ 138,000 $ 24,000 $ 114,000
Vanpools (Transit) 77 13,000 2,218 10,782
$ 151,000 $ 26,218 $ 124,782
Del Mar
Jimmy Durante Bridge 88 $ 47,000 $ 14,700
$
32,300
Camino Del rtar/Carmel Val. T.S. 35 39,000 7,000 32,000
$ 86,000 $ 21,700 $ 64,300
E1 Cajon
Ballantyne St.. 106 $1,180,000 $366,000 $ 814,000
Chase Ave. 106 2,700,000 837,000 1,863,000
Fanita Dr. 87 860,000 267,000 593,000
Avocado /Lexington T.S. 35 35,300 6,001 29,299
Jamacha /Lexington T.S. 45 35,700 6,069 29,631
*Jamacha /E. Main Sig. Mod. - 51,400 8,738 42,662
*Main/Magnolia Sig. Mod. - 55,100 9,367 45,733
?~ Sig. Controller/Opticom - 97,000 17,000 80,000
$5,014,500 $1,517,175 $3,497,325
Escondido
Mission Ave. 93 $ 640,728 $300,000 $ 340,728
Valley Parkway 123 573,000 263,000 310,000
Grand/Date T.S. 35 40,000 6,826 33,174
Grand/Fig T. S . ~ 3'L ~1U, 000 6, 826 33,174
Mission/Fig T.S. 3`l 80,000 6,826 33,174
Highway 395/13th T.S. 47 85,000 14,500 70,500
$1,418,728 $597,978 $ 820,750
Imperial Beach
No projects sulxnitted
*Proj ect not rated -2-
__
La 1•~t~a
Rating Total Local -
. Project Points Cost Match FAU
La Mesa Blvd. 115 $2,910,000 $495,600 $2,414,400
*Fletcher /Baltimore Sig. Mod. - 17,000 3.,000 14,000
$2,927,000 $498,600 $2,428,400
National City
Euclid Ave. I 121 $ 458,650 $183,460 $ 275,190
Euclid Ave. II 125 157,750 63,100 94,650
Euclid Ave. III 121 486,000 194,400 291,600
Bus Turnout (Transit) 77 27,000 4,590 22,410
Valley /Sweetwater T.S. 25 _ __27,000 13,000 14,000
$1,156,400 $458,550 $ 697,,850
Oceanside
SR 76 122 $1,050,000 $179,130 $ 870,870
$1,050,000 $179,130 $ 870,870
San Diego (City)
Friars/Mission (Recap) 123 $ 133,000 $ 23,000 $ 110,000
Imperial Ave. 86 1,573,000 271,000 1,302,000
Jackson Dr. 56 976,000 543,000 433,000
Pacific Highway (Recap) 87 341,000 89,000 252,000
Pomerado.Rd. 95 843,000 452,000 391,000
Clairemont Mesa/Doliva T.S. 43 77,000 22,000 55,000
Camiones Wy. T.O. (Transit) 80 32,000 9,000 23,000
~°Clair Dr /Claire. Mesa Sign. Mod. - 91,000 26,000 65,000
*CBD Sig. Control System - 2,127,000 496,000 1,631,000
*Clair. Mesa Sig. Control System - 270,000 78,000 192,000
$6,463,000 $2,009,000 $4,454,000
*Project not rated
-3-
San '~•~arcos
Pro 'ect
Mission Rd.
Twin Oaks Valley Rd.
San Marcos Blvd.
SR 78 Ramps
Vista
E. Vista Way
Melrose Dr.
N. Melrose Dr.
N. Santa Fe Ave.
S. Santa Fe Ave.
E. Vista/L.A. Dr. T.S.
E. Vista/Arcadia T.S.
N. Santa Fe /L.A. Dr. T.S.
CALTRANS
SR 76
SR 252
Carpool Project (Transit )_
Ramp Metering (Transit)
*R/W Protection
SDMTDB
No projects suh-nitted
*Project not rated
Rating Total Local
Points Cost Match FAU
101 $3,322,510 $1,653,700 $1,b68,810
85 571,140 184,000 387,140
89 1,331,080 809,400 521,680
98 423,500 134,500 289,000
$5,648,230 $2,781,600 $2,866,630
72 $ 647,000 $110,000 $ 537,000
75 1,745,000 297,000 1,448,000
43 510,000 87,000 423,000
102 1,202,000 204,000 998,000
73 199,000 34,000 165,000
39 61,000 10,370 50,630
34 42,000 7,140 34,860
36 60,000 10,200 49,800
$4,466,000 $759,710 $3,70b,290
121 $2,950,000 $503,270 $2,446,730
131 18,400,000 14,600,000 3,800,000
79 394,500 124,500 270,000
77 750,000 350,000 400,000
2,411,382 411,382 2,000,000
$24,905,882 $15,989,152 $8,916,730
-4-
NCTDB
Project
Bus Stop Improv. (Transit)
Eastern Facility (Transit)
San Diego Count
Bancroft Dr. (I)
Bancroft Dr. (II)
Bonita Rd. Bridge
Broadway
Broadway (recap)
College Ave.
Encinitas Blvd. (recap)
Espola Rd. (recap)
Jamacha Blvd. (recap)
. Jamacha Blvd. (II)
riagnolia. Ave.
Mast Blvd. (II)
Melrose Dr. Ext.
.Mission Rd. (II)
Mission Gorge Rd. (recap)
Orange Ave .
Palomar Airport Rd. (recap)
Pomerado Rd. Bridge
Poway Rd. (recap)
S. Bay Freeway (recap)
S. Santa Fe (I)
Sweetwater Rd.
Sweetwater Rd. (recap)
Sweetwater Rd . ( ]:V )
Troy St.
Wintergardens Blvd.
Woodside Ave.
Rating Total Local
Points Cost Match FAU
77 $ 63,000 $ 11,000 $ 52,000
97 290,000 49,000 241,000
$ 353,000 $ 60,000 $ 293,000
53 $ 469,000 $141,000 $ 328,000
67 725,000 218,000 507,000
60 2,031,000 610,000 1,421,000
125 163,000 49,000 114,000
140 176,000 53,000 123,000
106 1,382,000 .415,000 967,000
51 299,000 90,000 209,000
108 223,000 67,000 156,000
76 104,000 32,000 72,000
82 499,000 150,000 349,000
95 183,000 55,000 128,000
72 845,000 254,000 591,000
60 968,000 291,000 677,000
99 477,000 143,000 334,000
123 167,000 28;000 139,000
35 716,000 215,000 501,000
58 168,000 51,000 117,000
92 420,000 126,000 294,000
110 259,000 78,000 181,000
68 322,000 97,000 225,000
71 891,000 268,000 623,000
108 460,000 138,000 322,000
115 22`1,000 67,000 155,000
61 1,077,000 324,000 753,000
60 233,000 70,000 163,000
65 349,000 105,000 244,000
98 226,000 68,000 158,000
-5-
San Diego County (Cont.)
Project
Bradley/Cuyamaca T.S.
Broadway /Oxford T.S.
Central/Imperial T.S.
College/Federal T.S.
Encinitas/Rancho S.F. T.S.
'Encinitas/Vulcan/Pac. t[wy Sig. Mod.
Espola /Vain Peaks T. S .
Hill/Harbor T.S.. .
Hilltop/Main T.S.
'tiImperial/Palm Sig. Mod.
.Mission/Stage Coach T.S.
Pacific Hwy /La Costa T.S.
Paradise Val./Worthington
~Peper /Wintergardens Sig. Mod.
_Bus Stop Improv. (Transit)
La Mesa Park and Ride (Transit)
Del Mar Multimodal Station (Transit)
Rating Total Local
Points Cost Match FA U
25 $ 45,000 $ 8,000 $ 37,000
24 45,000 8,000 37,000
26 45,000 8,000 37,000
25 45,000 8,000 37,000
15 45,000 8,000 37,000
- 79,000 13,000 66,000
3 48,000 8,000 40,.000
5 50,000 9,000 41,000
7 33,000 6,000 27,000
- 45,000 8,000 37,000
13 33,000 6,000 27,000
6 35,000 6,000 29,000
2 43,000 7,000 36,000
41,000 7,000 ~ 34,000
77 22,000 4,000 18,000
91 391,000 66,000 325,000
91 843,000 143,000 700,000
$15,942,000 $4,526,000 $11,416,000
GRAND TOTAL
*Project not rated
$82,508,439 $32,074,831 $50,433,608
-G-
1976-78 Federal Aid Urban Program
January 13, 1977
Distribution of Local Portion
Jurisdiction Population's % Pop. Allocation
Carlsbad 20,000 3.0 $ 62,99.9
Cha?a Vista 75,900 11.4 239,397
Coronado 20,100 3.0. 63,000
Del Mar 4,900 0.7 14,700.
EI Cajon 61,300 9.2 193,198
Escondido 51,300 7.7 161,698
Imperial Beach 20,500 3.1 65,099
La Mesa 43,100 6.5 136,498
National City 44,900 6.7 140,698
Oceanside 59,000 8.9 186,898
San Marcos 10,400 1.6 33,600
Vista 29,100 4.4 92,399
S. D. County 225,200 33.8 709,792
665,700 100 $2,099,976
.%
--~
FAU Funding Distribution
by Jurisdiction
Regional & Local
Jurisdiction Transit Projects Projects Total FAU
Carlsbad 0 $ 62,999 $ 62,999 0.4
Chula Vista $586,836 239,397 826,233 5.8
Coronado 10,782 63,000 73,782 0.5
Del afar 32, 000 14, 700 46, 700 0.3
El Cajon 58,930 193,198 252,128 1.8
Escondido 91,955 161,698 253,653 1.8
Imperial Beach 0 65,099 65,099 0.5
La riesa 0 136,498 136,498 1.0
National City 22,410 140,698 163,108 1.1
Oceanside 0 186,898 186,898 1.3
San Diego City 8,011,528 0 8,011,528 56.0
San :Marcos 0 33,600 33,600 0.2
Vista 100,430 92,399 192,829 1.3
Comity of S.D. 1,372,279 709,792 2,082,071 14.6
CALTRANS* 1,626,175 0 1,626,175 11.4
NCTDB 293,000 0 293,000 2.0
S DMTD B 0 0 0 0
TOTAL $12,206,325 $2,099,976 $14,306,301 100
* Total Combination of CALTRANS project = $4,768,767 or 33-1 /3%
FINAL 1976-78 ~j tit ~~ /~ /-~ r} •n a nj~
-~ FAU REGIONAL ROAD & TRANSIT PROJECT SUBMITTALS
by Rating Score
January 13, 1977
Regional Road
Rating Requested FAU
Points Pro'ect S op nsor FAU Accumulated
131 SR 252 CALTRANS $ 3,800,000 $ 3,800,000
125 Euclid Ave. (II) Nat. City 94,650 3,894,650
125 Broadway S.D. County 114,000 4,008,650
123 Valley Parkway Escondido 310,000 4,318,650
122 SR 76 Oceanside 870,870 5,189,520
121 SR 76 CALTRANS 2,446,730 7,636,250
121 Euclid Ave. (I) Nat. City 275,190 7,911,440
121 Euclid Ave. (III) Nat. City 291,600 8,203,040
115 La Mesa Blvd. La Mesa 2,414,400 10,617,440
108 Sweetwater Rd. S.D. County 322,000 10,939,440
106 Ballantyne St. E1 Cajon 814,000 11,753,440
106 Carlsbad Blvd. Carlsbad 1,035,000 12,788,440
106 Chase Ave. E1 Cajon 1,863,000 14,651,440
106 College Ave. S.D. County 967,000 15,618,440
102 N. Sante.Fe Vista 998,000 16,616,440
101 Mission Rd. San Marcos 1,668,810 18,285,250
101 Tidelands Chula Vista 960,802 19,246,052
99 Mission Rd. (II) S.D. County 334,000 19,580,052
98 SR-78 Ramps San Marcos 289,000 19,869,052
98 Woodside Ave. S.D. County 158,000 20,027,052
96 Telegraph Canyon Chula Vista 1,688,394 21,715,446
~~ 95 Magnolia Ave. S.D. County 128,000 21,843,446
95 Pomerado Rd. S.D. City 391,000 22,234,446
I
Regional Road - Cont'd
Rating
Points Pro'ect
93 Mission Ave.
92 Pomerado Rd. Bridge
91 Elm Ave.
89 San Marcos Blvd.
88 Jimmy Durante Bridge
87 Fanita Dr.
86 Imperial Ave.
85 Twin Oaks Valley Rd.
82 Jamacha Blvd. (II)
81 Willow St. Bridge
75 Melrose Ave.
73 S. Santa Fe
72 E. Vista Way
72 Mast Blvd. (II)
71 S. Santa Fe (I)
67 Bancroft Dr. (II)
65 Wintergardens Blvd.
63 Carlsbad Blvd. Bk. Lanes
61 Sweetwater Rd. (IV)
60 Bonita Rd. Bridge
60 Broadway
60 Melrose Dr. Ext.
60 Troy St.
56 Jackson Or.
= 56 Tamarack Ave.
55 East "L" St.
Requested FAU
S onsor FAU Accumulated
Escondido $ 340,728 $22,575,174
S.D. County 294,000 22,869,174
Carlsbad 690,000 23,559,174
San Marcos 521,680 24,080,854
Del Mar 32,300 24,113,154
E1 Cajon 593,000 24,706,154
S.D. City 1,302,000 26,008,154
San Marcos 387,140 26,395,294
S.D. County 349,000 26,744,294
Chula Vista 594,533 27,338,827
Vista 1,448,000 28,786,827
Vista 165,000 28,951,827
Vista 537,000 29,488,827
S.D. County 591,000 30,079,827
S.D. County 623,000 30,702,827
S.D. County 507,000 31,209,827
S.D. County 244,000 31,453,827
Carlsbad 166,000 31,619,827
S.D. County 753,000 32,372,827
S.D. County 1,421,000 33,793,827
Chula Vista 18,860 33,812,687
S.D. County 677,000 34,489,687
S.D. County 163,000 34,652,687
S.D. City 433,000 35,085,687
Carlsbad 1,293,628 36,379,315
Chula Vista 16,006 36,395,321
Regional
-~ Rating
Points
53
50
43
35
Road - Cont'd
Prod ect
Bancroft Dr. (I)
Palomar Airport Rd.
N. Melrose
Orange Ave.
S onsor
S.Q. county
Carlsbad
Vista
S.D. County
Requested
FAU
$ 328,000
2,737,020
423,000
501,000
$ 40,384,341
FAU
Accumulated
$36,723,321
39,460,341
39,883,341
40,3x4,341
i
Regional .Recaps
~ Rating
Points Project
140 Broadway
125 "H" St.
123 Friars Rd/Mission
123
115
110
108
105
100
87
76
68
58
51
Gorge Rd.
Mission Gorge Rd.
Sweetwater Rd.
Poway Rd.
Espola Rd.
"E" St.
4th Ave.
Pacific Hwy.
Jamacha Blvd.
S. Bay Freeway
Palomar Airport Rd.
Encinitas B]vd.
S onsor
S.D. County
Chula Vista
S.D. City
S.D. County
S.D. County
S.D. County
S.D. County
Chula Vista
Chula Vista
S.D. City
S.D. County
S.D. County
S.D. County
S.D. County
Requested
FAU
$ 123,000
49,036
110,000
139,000
155,000
18i ,000
156,000
15.,371
102,787
252,000
72,000
225,000
117,000
209,000
$ 1,906,194
FAU
Accumulated
$ 123,000
172,036
282,036
421,036
576,036
757,036
913,036
928,407
1,031,194
7.,283,194
1,355,194
1,580,194
1,697,194.
1,906,194
Regional Traffic Si4nals
-~ Rating Requested
_ Points Project S onsor FAU
47 395/13th Escondido $ 70,500
45 Jamacha & Lexington E1 Cajon 29,631
43 Clar. Mesa/Doliva S.D. City 55,000
40 Telegraph/Halecrest Chula Vista 95,000
39 E. Vista Way/L.A. Dr. Vista 50,630
36 N. Santa Fe/L.A. Dr. Vista 49,800
35 Avocado/Lexington E1 Cajon 29,299
35 Camino Del Mar/Car. Val. Del Mar 32,000
35 Grand/Date Escondido 33,174
34 E. Vista Way/Arcadia Vista 34,860
32 Grand/Fig Escondido 33,174
32 Mission/Fig Escondido 33,174
26 Central/Imperial S.D. County 37,000
25 Bradley/Cuyamaca S.D. County 37,000
25 College/Federal S.D. County 37,000
25 Valley/Sweetwater Nat. City 14,000
24 Broadway/Oxford S.D. County 37,000
21 E. Orange/Hilltop Chula Vista 38,000
20 Otay Lakes/Telegraph Chula Vista 33,000
16 Elm/Roosevelt Carlsbad 41,470
15 Encinitas/Rancho S.F. S.D. County 37,000
13 Eim/Pio Pico/I-5 Carlsbad 149,290
13 Mission/Stage Coach S.D. County 27,000
12 "H"/3rd & 4th Coronado 114,000
7 Hilltop/Main S.D. County 27,000
6 Pacific Hwy/La Costa S.D. County 29,000_
FAU
Accumulated
$ 70,500
100,131
155,131
250,131
300,761
350,561
379,860
411 ,860
445,034
479,894
513,068
546,242
583,242
620,242
657,242
671,242
708,242
746,242
779,242
820,712
857,712
1,007,002
1,034,002
1,148,002
1,175,002
1,204,002
Regional Traffic Signals - Cont'd
-~ Rating
Points Pro'ect
5 Hill/ Harbor
5 Telegraph/Brandywine
3 Espola/Twin Peaks
2 Paradise Valley/Worth-
ington
S onsor
S.D. County
Chula Vista
S.D. County
S.D. County
Requested
FAU
$ 41,000
33,000
40,000
36,000
$ 1,354,002
FAU
Accumulated
$ 1,245,002
1,278,002
1,318,002
1,354,002
Project S op nsor
Easter Facility NCTDB
Bus Maint. Fac. & Chula Vista
Transit Ctr.
La Mesa P & R S.D. County
Del Mar Multimodal Sta. S.D. County
Camiones Way. T.O. S.D. City
Carpool Project CALTRANS
Bus Stop Improvements ~ S.D. County
Bus Stop Improvements NCTDB
Bus Turnout Nat. City
Ramp Metering CALTRANS
Vanpools Coronado
Requested FAU
FAU Accumulated
$ 241,000 $ 241,000
442,800 683,800
325,000 1,008,800
700,000 1,708,800
23,000 1,731,800
270,000 2,001,800
18,000 2,019,800
52,000 2,071,800
22,410 2,094,210
400,000 2,494,210
10,782 2,504,992
$ 2,504,992
., .
Projects That Were Not Rated
'~ Rating
Points Project S onsor
- - - CBD Sig. Control Sys. S.D. City
- - - Clair. Mesa Sig. Cont. Sys S.D. City
- - - Clair. Dr/Clair. Mesa S.D. City
Sig. Mod.
- - - Fletcher/Baltimore Sig. La Mesa
Mod.
- - - Jamacha/E. Main Sig. Mod. E1 Cajon
- - - Sig. Controller/Opticom E1 Cajon
- - - Main/Magnolia Sig. Mod. E1 Cajon
- - - Pedestrian Indicators Chula Vista
- - - R/W Protection CALTRANS
- - - T.S. Control Mod. Chula Vista
- - - Pepper/Wintergardens S.D. County
Sig. Mod.
- - - Encinitas/Vulcan/Pac Hwy S.D. County
Sig. Mod.
- - - Imperial/Palm Sig. Mod. S.D. County
Requested
FAU
$ 1,631,000
192,000
65,000
14,000
42,662
80,000
45,733
53,109
2,000,000
23,575
34,000
66,000
37,000
$ 4,284,079
FAU
Accumulated
$ 1,631,000
1,823,000
1,888,000
1,902,000
1,944,662
2,024,662
2,070,395
2,123,504
4,123,504
4,147,079
4,181,079
4,247,079
4,284,079
GRAND TOTAL $50.433,608 $50,433,608