HomeMy WebLinkAboutAgenda Statement 1977/01/27 Item 00'• CITY OF CHULA VISTA ITEM NO. y COUNCIL AGENDA STATEMENT FOR MEETING OF: ' 1/27/77 ITEM TITLE: Report on the Completion of the Design Development Phase of the Civic Center Renovation Project. SUBMITTED BY~ Director of Public Works/City Engineer VV ITEM EXPLANATION: The Council Conference on January 27, 1977 will consider two separate aspects of the Civic Center Renovation Project. The first is an evaluation of the Design Development phase of the project, and the second is the con- sideration of amendments to the contract with Donald Goldman, Architect. Completion of the Design Development Phase At a Council Conference on September 1, 1976, C-,ty Council authorized the staff to proceed with the Design Developme~~. of the Civic Center Renovation Project. The Design Development plans have been completed and will be presented to City Council by City staff and the Architect. The anticipated schedule for the completion of the renovation project has been revised as follows: Completion of Design Development Phase 1/27/77 Completion of Construction Drawings 3/27/77 Advertise for Bids 4/28/77 Receive Bids 5/26/77 Award Contract 6/9/77 Begin Construction 6/23/77 Complete Construction 1/23/78 r\/1 II P11Tl~ ATTA/'~1 ern ~Arnai i J ,~ i i H~ncu Agreement Resolution Ordinance Plat Other Environmental Document: Attached Submitted on STAFF RECOMMENDATION: 1. Approve plans for the Design Development Phase and authorize Architect to proceed with construction drawings. 2. Approve contract amendments. BOARD/ COMMISSION RECOMMENDATION COUNCIL ACTION Form A-113 (Rev. 5-75) Item No. Supplemental Page 2. A detailed construction cost estimate Design Development Phase. A summary a total project cost of $1,596,840: has been completed as part of the of the construction estimate shows General Construction Costs $ 792,294 Mechanical Costs 201,000 Electrical Costs 159,645 Subtotal $1,152,939 General Conditions & Expenses (6 o) 69,176 $1,222,115 Design Contingency (50) 61,106 $1,283,221 Contractor's Mark-up & Fee (6.50) 83,409 $1,366,630 Construction Bond (1.5%) 20,499 $1,387,129 Site Improvements 97,158 $1,484,287 Professional Fees 117,553 $1,596,840 The estimate for site improvements includes landscaping, parking lot construction, site plumbing, and site electrical. It does not include the decorative plaza or fountain. It is requested that Council consider the plans developed for the Design Development Phase and authorize the architect to proceed with construction drawings. Consideration of Contract Amendments On December 7, 1976, a report was submitted to City Council concerning the status of the contract for architectural and engineering services for this project. That status report indicated that it would be necessary, within a short period of time, to renegotiate the contract. That renego- tiation has been completed and contract amendments have been drawn up for your consideration. The original contract amount of $94,000 was based on the scope of the project as it was defined in May of 1976. Since that time, the scope of the project has increased considerably and the consultants have been required to perform additional tasks that were not included in the origi- nal contract. City staff had indicated to the consultant that the City is willing to compensate the consultant for all reasonable charges on work performed that is beyond the scope of the original contract. The report submitted on December 7 indicated that there are two major reasons for additional charges - increased scope of the renovation project and additional tasks performed by the architect. The increased scope will require an additional construction cost of $397,463. The negotiated fee to implement these changes is $18,500. This contract increase represents 4.7% of the construction increase. It is staff's opinion that this contract increase is a reasonable charge. Continued on Supplemental Page 3 Item No. Supplemental Page 3 The consultants have also assisted the City staff in the preparation .of two grant applications - a solar energy grant for $3,061.34 and a Public Works application bill for $1,680. The only other additional task was the preparation of a detailed construction estimate at the completion of the preliminary design phase. This detailed construction estimate cost $312. The total contractural obligations for professional services for this renovation project is detailed as follows: Original contract Negotiated increase l0a contingency Subtotal Subtotal Solar energy application Public Works Bill application Detailed construction estimate TOTAL Rounded to $ 94,000.00 18,500.00 $112,500.00 11,250.00 $123,750.00 3,061.34 1,680.00 312.00 $128,803.34 $128,800.00 City Council has already appropriated $103,400 ($94,000 original contract plus 10%) for professional services for the renovation project. In order to meet contractural obligations for the renovation project, an additional $25,400 is required ($128,800 minus $103,400). It is requested that City Council approve contract amendments for pro- fessional services for the Civic Center Renovation project and authorize the transfer of the required funds within construction account 635.