HomeMy WebLinkAboutReso 1988-13780A RESOLUTION NO. 13780A
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA APPROPRIATING FUNDS FROM THE
GENERAL FUND RESERVE FOR COSTS TO PREPARE A
HYDROGEOLOGIC ASSESSMENT REPORT FOR THE STATE
WATER QUALITY CONTROL BOARD ON THE CORPORATION
YARD PAINT PIT
The City Council of the City of Chula Vista does hereby
resolve as follows:
WHEREAS, in November 1987, Public Works solicited
proposals for a subsurface investigation of the old paint pit
disposal area at the Corporation Yard to determine the extent of
any contamination problem that may be exist and the costs
associated with its correction, and
WHEREAS, it was the intent that once this was done the
paint pits would be removed and any and all corrective action
that needed to be taken would be completed, and
WHEREAS, in January 1988, a contract in the amount of
$9,480 was awarded to Applied Hydrogeologic Consultants to
prepare the study including preparing a hydrogeological
assessment report for the California Regional Water Quality
Control Board, and
WHEREAS, based on a review of the initial draft by the
California Regional Water Quality Control Board, additional work
over and above the scope of the original contract needs to be
done and additional funds in the amount of $5,000 are needed to
do that work.
NOW, THEREFORE, BE IT RESOLVED that the City Council of
the City of Chula Vista does hereby appropriate $5,000 from the
General Fund Reserve for costs to complete the hydrogeologic
assessment report for the California Regional Water Quality
Control Board.
Presented by Approved as to form by
ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
CHULA VISTA, CALIFORNIA, this 20th dOy Of. September
~9 88 , by the following vote, to-wit:
AYES: Counci]members Malcolm, Cox, Moore, McCandliss, Nader
NAYES: Counci ]members None
ABSTAIN: Counci ]members None
ABSENT: Counc i 1 members ~
ATTEST ~ ~' ~
//"' City Clerl~
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO ) ss.
CITY OF CHULA VISTA )
I, JENNIE M. FULASZ, CMC, CITY CLERK of the City of Chulo Visto, Colifornio,
DO HEREBY CERTIFY thor the obove ond foregoing is 0 full, true ond correct copy of
RESOLUTION N0. 13780A ,ond that the some hos not been omendedor repeoled.
DATED
,~ ~ :~i~T:' ~"= "~ City Clerk
CC-660
consultants 15 August 19C8 .....
>Zr. C!if£ Swanson
City of Chu]_a ?ista
25'5 Fourth AvehuG
Chula Vista California
Subject: Proposal To Perform Hazardous Materials Assessment
Services.
D~ar ~r, Swanson:
In accordance with your request, we have prepaEed this proposal
to perform a portion c~ the contaminant e×Dloration services
:ut!in~d ~y the ~ali~o~nia S~ate Regional Water Quality Control
Board at the P~'; Public Works yard located at the northwest
corner o~ "F" Street and Woodlawn Avenue, Chula Vista,
California.
The objectives o~ this study are to:
I) Determine the constituency o~ the contents o~ the disposal
~* located at the site.
Evaluation o~ the site will consist o~ the ~ollowin~ steps:
!) Obtain two samples at specified intervals ~rom the disposal
~t
2) Submit samples to a state certified !abo:atory ~cr analysis.
B) Determine ~urthcr action required, based upon
~esu!ts.
Water and solid waste samples will be submitted to
A_nalytical T~cb~o].ogie~ Zncorpor~t~d, ~ ~tate ce:tl~i~d
laboratory, in ~ccordancQ with ~ecommended
testin~ methods applicable to the hazardous waste materials
sussected. Their services will include acceptance o~ the
samples throu!~h chain-o~-custody p~ccedures, preparation
samples ~or the EPA certi~iad tests, and per~orminq the test
procedures ~or the designated analysis.
It is our understandinq that the tests required ~o~ this
~'~\'e~t~n '.'~ be the Priority Poilutant Scan test in
~hich the samples are analyzed £o~ Chlorinated ~esticides
~nd PCBs, Volatile Organics, Semivolatile Orqan~cs, Cynnid~,
Total Pheno!s and Priority Po!lutant ;~etals.
3052 Clairemont Drive. Suilee,Sanaiego. CA 92117 , (619) 275-6577 ~"~'] ~'C)
Time Line For Study
Weeks to Completion I 2 3 4 6 7 8 9 10 I1
Fieldwork ---
Sample Analysis
Report Preparation ---
Project Costinq
Anticipated costs for the proposed study are as follows:
I) Project Hydrogeologist 8 hours @ $65.00/hr. $ 520.00
Sample Testing
Water $ 1175.00
Solid Waste $ 1445.00
Subtotal $ 3140.00
III) Analysis Report Preparation
Project Hydrogeologist 10hrs. @ $60.00/hr. $ 600.00
Total for Investigation $ 3740.00
The opportunity to prepare this proposal is greatly appreciated.
Please feel free to call our office if you have any questions.
Sincerely~
Bern rd JJ er~ CEG f356 q J
Pres~ '
ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF
CHULA VISTA, CALIFORNIA, this 10th day of. November
19 87 , by the following vote, to-wit:
AYES: Councilmembers cox, Moore, Nader, Malcolm, McCandliss
NAYES: Counci 1 members None
ABSTAIN: Counci lmembers None
ABSENT: ' Counci lmembers None
~of the City of Chula Vista
~" City Clerk ...... . .......
STATE OF CALIFORNIA )
COUNTY OF SAN DIEGO ) ss.
CITY OF CHULA VISTA )
I, JENNIE M. FULASZ, CMC, CITY CLERK of the City of Chula Vista, California,
DO HEREBY CERTIFY that the above and foregoing is o full, true and correct copy of
RESOLUTION N0. 13328 ,and that the some hos not been amended or repealed.
DATED
-:
City Clerk