Loading...
HomeMy WebLinkAboutReso 1988-13780A RESOLUTION NO. 13780A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROPRIATING FUNDS FROM THE GENERAL FUND RESERVE FOR COSTS TO PREPARE A HYDROGEOLOGIC ASSESSMENT REPORT FOR THE STATE WATER QUALITY CONTROL BOARD ON THE CORPORATION YARD PAINT PIT The City Council of the City of Chula Vista does hereby resolve as follows: WHEREAS, in November 1987, Public Works solicited proposals for a subsurface investigation of the old paint pit disposal area at the Corporation Yard to determine the extent of any contamination problem that may be exist and the costs associated with its correction, and WHEREAS, it was the intent that once this was done the paint pits would be removed and any and all corrective action that needed to be taken would be completed, and WHEREAS, in January 1988, a contract in the amount of $9,480 was awarded to Applied Hydrogeologic Consultants to prepare the study including preparing a hydrogeological assessment report for the California Regional Water Quality Control Board, and WHEREAS, based on a review of the initial draft by the California Regional Water Quality Control Board, additional work over and above the scope of the original contract needs to be done and additional funds in the amount of $5,000 are needed to do that work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby appropriate $5,000 from the General Fund Reserve for costs to complete the hydrogeologic assessment report for the California Regional Water Quality Control Board. Presented by Approved as to form by ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 20th dOy Of. September ~9 88 , by the following vote, to-wit: AYES: Counci]members Malcolm, Cox, Moore, McCandliss, Nader NAYES: Counci ]members None ABSTAIN: Counci ]members None ABSENT: Counc i 1 members ~ ATTEST ~ ~' ~ //"' City Clerl~ STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) I, JENNIE M. FULASZ, CMC, CITY CLERK of the City of Chulo Visto, Colifornio, DO HEREBY CERTIFY thor the obove ond foregoing is 0 full, true ond correct copy of RESOLUTION N0. 13780A ,ond that the some hos not been omendedor repeoled. DATED ,~ ~ :~i~T:' ~"= "~ City Clerk CC-660 consultants 15 August 19C8 ..... >Zr. C!if£ Swanson City of Chu]_a ?ista 25'5 Fourth AvehuG Chula Vista California Subject: Proposal To Perform Hazardous Materials Assessment Services. D~ar ~r, Swanson: In accordance with your request, we have prepaEed this proposal to perform a portion c~ the contaminant e×Dloration services :ut!in~d ~y the ~ali~o~nia S~ate Regional Water Quality Control Board at the P~'; Public Works yard located at the northwest corner o~ "F" Street and Woodlawn Avenue, Chula Vista, California. The objectives o~ this study are to: I) Determine the constituency o~ the contents o~ the disposal ~* located at the site. Evaluation o~ the site will consist o~ the ~ollowin~ steps: !) Obtain two samples at specified intervals ~rom the disposal ~t 2) Submit samples to a state certified !abo:atory ~cr analysis. B) Determine ~urthcr action required, based upon ~esu!ts. Water and solid waste samples will be submitted to A_nalytical T~cb~o].ogie~ Zncorpor~t~d, ~ ~tate ce:tl~i~d laboratory, in ~ccordancQ with ~ecommended testin~ methods applicable to the hazardous waste materials sussected. Their services will include acceptance o~ the samples throu!~h chain-o~-custody p~ccedures, preparation samples ~or the EPA certi~iad tests, and per~orminq the test procedures ~or the designated analysis. It is our understandinq that the tests required ~o~ this ~'~\'e~t~n '.'~ be the Priority Poilutant Scan test in ~hich the samples are analyzed £o~ Chlorinated ~esticides ~nd PCBs, Volatile Organics, Semivolatile Orqan~cs, Cynnid~, Total Pheno!s and Priority Po!lutant ;~etals. 3052 Clairemont Drive. Suilee,Sanaiego. CA 92117 , (619) 275-6577 ~"~'] ~'C) Time Line For Study Weeks to Completion I 2 3 4 6 7 8 9 10 I1 Fieldwork --- Sample Analysis Report Preparation --- Project Costinq Anticipated costs for the proposed study are as follows: I) Project Hydrogeologist 8 hours @ $65.00/hr. $ 520.00 Sample Testing Water $ 1175.00 Solid Waste $ 1445.00 Subtotal $ 3140.00 III) Analysis Report Preparation Project Hydrogeologist 10hrs. @ $60.00/hr. $ 600.00 Total for Investigation $ 3740.00 The opportunity to prepare this proposal is greatly appreciated. Please feel free to call our office if you have any questions. Sincerely~ Bern rd JJ er~ CEG f356 q J Pres~ ' ADOPTED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF CHULA VISTA, CALIFORNIA, this 10th day of. November 19 87 , by the following vote, to-wit: AYES: Councilmembers cox, Moore, Nader, Malcolm, McCandliss NAYES: Counci 1 members None ABSTAIN: Counci lmembers None ABSENT: ' Counci lmembers None ~of the City of Chula Vista ~" City Clerk ...... . ....... STATE OF CALIFORNIA ) COUNTY OF SAN DIEGO ) ss. CITY OF CHULA VISTA ) I, JENNIE M. FULASZ, CMC, CITY CLERK of the City of Chula Vista, California, DO HEREBY CERTIFY that the above and foregoing is o full, true and correct copy of RESOLUTION N0. 13328 ,and that the some hos not been amended or repealed. DATED -: City Clerk CiTY OF CHULA CC-660