Loading...
HomeMy WebLinkAboutAgenda Statement 1977/07/26 Item 15CITY OF CHULA VISTA ' ~ COUNCIL AGENDA STATEMENT ~ ~ Item No. is For meeting of 7/26/77 ITEM TITLE Resolution 0 ~/~!, Approving Encroachment Permit to RIHA Construction Company for Construction of a Haul Road Across City Property. SUBMITTED BY Director of Public Works/City Engineer ~~ ITEM EXPLANATION (4/5TH'S VOTE REQUIRED YES NO_~) The Unified Port District has awarded a 2 year contract for the dredging of the Chula Vista Boat basin at the foot of "J" Street and the construction of a wildlife reserve. The wildlife reserve is to be constructed with the dredged material from the Boat basin. The contractor, RIHA Construction Co., will haul this dredged material in large rear end dump trucks to the site of the wildlife reserve through .the San Diego Gas & Electric Company's South Bay Plant. RIHA Construction Co. is requesting permission from the City of Chula Vista to construct a 20 foot wide haul road across the "J" Street Park. The haul road would be constructed along the southerly edge of the park adjacent to the existing drainage channel. The reason for the Contractor's request is that he would prefer to not drive heavy trucks on "J" Street. For the weight of the loads that these trucks will be carrying and for the number of anticipated trips these trucks will be making, it is very probable that the existing pavement would be damaged beyond its useful and serviceable life. It is anticipated that a certain amount of dredged material would fall upon the street, if "J" Street was used as the haul road, and this would represent a continuous maintenance problem to the contractor over a two year period and an inconvenience to motorists using the street. The use of "J" Street by the contractor would also require that normal two-way vehicular traffic be detoured to the north half. of the street to avoid conflict between vehicular traffic and the. heavy trucks.. The Director of Parks and Recreation has reviewed the request for an encroach- ment permit. Construction of the haul road will require the removal of seven EXHIBITS continued on suAn!Pmentai naQe Agreement Resolution x Ordinance Platte Notification List Other ENVIRONMENTAL DOCUMENT: Attached Submitted on FINANCIAL IMPACT None. The contractor will assume any financial obligation to maintain and restore park to its present state upon completion of the wildlife reserve. STAFF RECOMMENDATION City Council approve resolution. BOARD/COMMISSION RECOMMENDATION COUNCTL ACTION APPROVED by the City Council o~ Chula Vista, Calmornia ,,aG- ~at~a..~,__~...~~ .__._~.__~....._........ ~ • AGENDA ITEM 15 • Supplemental page 2 irrigation heads and relocating them 20 feet north of their present location. The haul road will also mean the temporary loss of approximately 20 feet of turf for-the entire length of the -park along its southerly boundary. It will not be necessary to move the existing ramaaas since there is ample clearance between them and the southerly edge of the drain- age ditch. The Director of Public Works and the Director of Parks and Recreation recommend the granting of the encroachment permit for the following reasons: 1. It is preferable and more economical to repair damage done to the turf area within the park than to repair and restore damage to the street resulting from the heavy trucks. 2. Placement of the haul road along the southerly 20 feet of the park would be less disruptive to persons using the park. If the City Council approves the Contractor's request for the issuance of an encroachment permit for the construction of a 20 foot wide haul road along the southerly 20 feet of the park, the encroachment permit should be issued with the following conditions: 1. The contractor shall pay all costs for the relocation of the existing sprinkler heads. 2. The contractor shall construct a temporary 6 foot high wire fence along the northerly boundary of the haul road. This is to prevent any conflict between users of the park and the heavy truck traffic. 3. Hauling of dredged material will not be permitted on Saturday or Sunday. 4. The contractor shall restore the park site to its present state upon completion of the wildlife reserve. 5. The contractor shall post a $5,000 bond which guarantees the restora- tion of the park site. 6. The contractor shall maintain the restored park area for a minimum period of 90 days and until accepted by the Director of Parks and Recreation. 7. All other conditions as contianed on the encroachment permit, form PW-E-15. The applicant, RIHA Construction Company, has no objections to these conditions. A transparency is available for Council viewing. KJG/rl FY 005 ,. - ~ - ~ ~ o ~ ' ~ ~ e'. _ ~ Q ~ ~ -~ 0- f . ~ ~ i ~J' ~ . J ~ ~ ~ i A y Q .., ... r _. ~ N i ~ .y Q ~' ~ ~~, ~ _ ~ 3 ~ ..~,~ ~ N ~ j: .oaf. !,.~ S w ~ .:.,_-:~ rc.:c..v . c.r.. e-. ~„. ~,-... ~: ..,. _, r: ...». .-s.:,.. .,. c. - .~...,-.: ,.,.. _ r. ->ro~ _..-~: .,s 1 . ,_.+ ,x....-r. r srn.r....~ r~^vs-rm. ,.._., .. v_ ,e. .. DATE -~ yea ` ,r,' „~ ~ ~S U ~.. ~ ~ A. ~ C..1'J ~ ~_ C'_7 ems. C. L-4 M f~,t~1 T ......._. _.~ ~.,._ ._. __ .._ _. _... r ~o« ~„