Loading...
HomeMy WebLinkAboutAgenda Statement 1977/11/15 Item 08CITY OF CHULA VISTA COUNCIL AGENDA STATEMENT Item No. 8 For meeting of 11/15/77 ITEM TITLE Resolution #8887: Setting Date for Public Hearing to Consider the Deferral of Undergrounding Existing Utilities Along the 250 Foot Easement of S.D.G.& E. Co. Within E1 Rancho Del Rey Unit No. 5 Subdivision SUBMITTED BY Director of Public Works/City Engineer a ~' ITEM EXPLANATION (4/STN'S VOTE REQUIRED YES NO X ) The City Council by Resolution No. 8419 on November 16, 1976 approved the tentative map of E1 Rancho del Rey, Unit No. 5. Within the subdivision, there are two overhead distribution lines of 12KV each traversing the subdivision. These existing overhead lines are shown on attached sketch as line A-B and C-E. Another distribution line is located on the south side of Telegraph Canyon Road and designated as line B-C. Chapter 15.32 of the Chula Vista Municipal Code requires that subdividers underground existing overhead distribution facilities within the boundaries of any subdivision. On October 17, 1977, Mr. D. L. Clemens, President of Utility Consultants, Inc., on behalf of his client, E1 Rancho del Rey Corporation, submitted an application for deferral of undergrounding the existing overhead dis- tribution lines along the 250 foot easement of S.D.G.& E. Co. shown as Line C-E on the plat. The subdivider is to remove the overhead line A-B and convert to underground by a route along the proposed streets in the subdivision as shown as line D-A. To convert the overhead to underground as shown as Line C-E, the estimated cost is approximately $50 per foot for 1400 lineal feet which amounts to $70,000. With 340 lots in the subdivi- sion, the cost per lot to underground the existing overhead line is approxi- mately $206. The overhead transmission facilities along the south side of Telegraph Canyon Road shown as line B-C is exempt from the requirements of undergrounding because its location is not contiguous to the boundary of the subdivision. Section 15.32.040 of the Chula Vista Municipal Code requires that a public hearing be held to hear persons speaking in favor of or objecting to the APM/rl EY 060/FY 009 EXHIBITS (continued on supplemental page two Agreement Resolutions Ordinance_ Platte Notification List! Other ENVIRONMENTAL DOCUMENT: Attached Submitted on FINANCIAL IMPACT None STAFF RECOMMENDATION City Council set November 29, 1977 at 7:00 pm in the Council Chambers as the time and place for public hearing to consider the deferral of undergrounding overhead facilities along the 250 foot easement of S.D.G.& E. Co. within the E1 Rancho del Rey, Unit No. 5 Subdivision. BOARD/COMMISSION RECOMMENDATION COUNCIL ACTION A p p R 0 V E D b; the ,., ,., ; a ,,..~.,.., /~_ / ~, .~ 7.......... AGENDA ITEM N0. 8 Supplemental Page Two November 15, 1977 deferral of undergrounding overhead facilities as referenced to in the application for deferral. At the public hearing the Council may defer the requirements to underground existing overhead facilities if they find from the evidence presented in the hearing that all the following facts exist: a. That extraordinary conditions exist to the extent that enforce- ment of this subsection would result in unnecessary hardship to the subdivider or the utility company. b. That such deferral will not, under the circumstances of the par- ticular case, be detrimental to the health, safety or general welfare of the neighborhood. A transparency is available for Council viewing. DRAWN BY G.L/._------- DATE J_/O- 77 _ _ _ _ _ I T l E DEFERRAL OF UNDERGROUND/NG EX/ST/N6 /2 KV EL RANCHO DEL REY UN/T N0.5