Loading...
HomeMy WebLinkAboutAgenda Statement 1978/10/17 Item 25~iir ur I,HULH V151A COUNCIL AGENDA STATEMENT Item No.25 For meeting of 10/17/78 ITEM TIT~E Res C SUBMITTEp BY C ITEM EXPLANATION At 11:00 a. the ity En 1978 79 - F fro Third The cope o on t e exis stre ts. lution 9.~.3~ Accepting Bids and Awarding Contract for nstruction of the 1978-79 Street Overlay Program; Authorizing crease in Scope of Work ty Engineer (4/5TH'S VOTE REQUIRED YES NO_ x) ~. on September 28, 1978, in the Engineering Conference Room, ineer received sealed bids for "Street Overlay Program fth Avenue from "J" Street to "L" Street, Naples Street .venue to Tobias Drive, "E" Street from I-5 to Broadway." the project involves the placing of a 1-1/2" overlay ing pavement. After paving City forces will restripe the Bids were r ceived from four contractors as follows: 1. R. D nnis Construction Co. $66,834.66 2. aley C rporation $75,279.00 3. riffit Company $76,915.50 4. sphalt Inc. $81,792.27 The ow bid submitted by V. R. Dennis Construction Co. is below the Engi eer's stimate by $5,429.34. This low bid is below the Engineer's esti ate of $72,264 by 7.5%. We have reviewed the low bid and find it t be ac eptable. Subs quent o the approval of the "Street Overlay Program 1978-79" by t e City Council when they approved the FY78-79 Capital Improvement Prog am, tw additional alleys/streets have been referred to staff whit are i immediate need of extensive maintenance repair: a) ~he all~ys immediately located east and west of Third Avenue etween "E" and "F" Streets. KJG:~r/AX-0~2 Agreement Resolution EXHIBITS (continued on supplemental page) Ordinance Plat x Notification List Othe~ ENVIRONMENTAL DOCUMENT: Attached Submitted on FINANCIAL IMPACT Cost of pro ect is being financed with Gas Tax funds and Third Avenue Proj ct Dev lopment Funds. City will assume maintenance of the impr vement upon completion of the project. STAFF REC MMENDAT ON 1. ity Co ncil authorize the expenditure of $78,700 from Street Overlay rogram 1978-79, Project GT-86, account #250-2501-GT86 and $6,700 rom Third Avenue Street Improvement, Project Account #621-6211-5569. 2. ity Co ncil accept bids and award contract to V. R. Dennis onstru tion Co. in the amount of $66,834.66. 3, ity Coun it authorize the City Engineer tc execute any necessary change orders o accomp ish the added scope of the work (paving alleys and Oleander Avenue). COUNCIL AC ION b e C'tY Cr;Ur,~ii of ~ula V .;t~ Ct~ i C:ii;ur; i;a tec+ /0 - / _ --------7---- ~'~ ~: - --.~.. Agenda Item For Meeting Supplemental b) Alle At t me rc meet Proj cons ingr City of i back No . 25 of 10/17/78 Page Two leander Avenue between Telegraph Canyon Road and 100 feet south f Manz nita Street. s e Coun it meeting of August 22, 1978, Mayor Hyde reported that the .ants i attendance at the Town Centre Business & Professional ng exp essed their concern with the Third Avenue Improvement ct bet een "E" and "F" Streets. The merchants proposed that derati n be given to improving and using the alleyways for ss and egress at the time Third Avenue is under construction. Counci adopted a motion directing staff to determine a means provin the appearance and conditions of the alleys and come with a proposal to the City Council. Engi eering and Public Works staff have examined the alleys and made the ollowi g recommendations: a) ity Fo ces repair major areas of distress and pavement failure b) 1-inc thick asphalt concrete overlay be placed on alleys c) he sco e of the "Street Overlay Program 1978-79 Project" be 'ncreas d to include the alleys and inclued in the contract with . R. D nnis Construction Company. Engi eering staff estimates that it will take approximately 300 tons of a phalti concrete to overlay the alleys at an estimated cost of $ 700. he Community Development Department supports staff's reco endat~on and would make available the required funds to overlay the lleys. Funds are available in the Third Avenue Street Improvement Proj ct "E" to "F" Streets. Repa~r and verlaying of these two alleys under normal circumstances woul be co trary to City Council Policy 200-01 adopted by Resolution 2801 and re ommendations contained in engineering report S-76-9 acce ted by City Council. Because of the disruptive effect the Third Aven e Proj ct will have upon business activity and goals of the Town Cent e Focu Area, staff believes that it is appropriate to do some hing t improve the appearance and conditions of these two alle s as a interim measure. To o erlay he alleys would only be a expe ded wo ld in all probability not impr vement because of the inadequacy sect on. F r the present time this is alle s are econstructed in accordance Oleander Avenue stop gap solution and funds be utilized for a permanent of the existing structural the best solution until the with City Council Policy. The ortion of Oleander Avenue between Telegraph Canyon Road and 100 feet south f Manzanita Street was constructed in 1967-68. The pave ent wa constructed with portland cement concrete in accordance with City S andards because this portion of the street is on a grade in a cess o 12 percent. Since construction we have experienced a co tinuin problem with this portion of the street being undermined by r nning ater from rain. Water gets under the pavement by entering thro gh exp nsion joints at the surface of the pavement. The expansion join s have continued to open up over the years (get wider apart) beca se the pavement is slowly creeping down the hill. Public Work forces have made interim repairs over the years. These repairs hav included cutting holes in the pavement and filling large void benea h with a cement-sand slurry, filling and sealing joints and racks nd replacing pavement. 3.~ Agenda Item No. 25 For Meeting of 10/17/78 Supplemental Page Three Duri have be p ig the been e ~rforme st several months, some major failures of the pavement erienced. Staff is recommending that the following work to correct the situation. a) oids u der existing pavement be located, exposed, and filled ith ce ent-sand slurry by City Forces, b) ajor p vement failures be removed and replaced by City Forces, c) ravers pavement cutoff walls be installed by City Forces as ecomme ded by engineering staff, d) 11 joi is and cracks be properly sealed, e) ortlan Cement Concrete pavement be overlayed with 1-1/2" of sphalt 'c concrete overlay to smooth out irregularities and seal urface of existing pavement, f) he sco e of the "Street Overlay Program 1978-79 Project" be 'ncreas d to include Oleander Avenue and included in the contract ith V. R. Dennis Construction Company. Engi Bering staff estimates that it will take approximately 230 tons of a phalti concrete to overlay Oleander Avenue at an estimated cost of $52 0 including contingencies. The pecial Provisions contained in the contract with V. R. Dennis Cons ructio Company allows the City to increase the amount of the cont act up to 25% without having to execute a supplemental written agre ment w th the contractor although a contract change order incr asing uantities/costs will be required. The ropose increases in the scope of the contract are within these limi s. Th overlaying of the alleys and Oleander Avenue will increase the ontrac by 17 percent. A tr~nspare~cy is available for Council viewing. Financial S$atement Gas ax fun s have been budgeted for the "Street Overlay Program 1978 79" Pr ject GT-86. Gas Tax funds will be used for the additional over ay of leander Avenue. Thir Avenu Project Development Funds which have been budgeted for the Thir Avenu Street Improvement Project, "E" to "F" Streets will be used to ove lay the alleys east and west of Third Avenue between "E" and F" Str ets. Estimated Construction Cost Fift Avenu Naples Street and "E" Street $66,834.66 Olea der Av nue 4,695.34 Alle s 6,170.00 $77,700.00 onting ncies 100 7,700.00 Tota Estim ted Contract/Construction Cost $85,400.00 Unen umbere funds in Street Overlay Program, $93,513.76 Pr ject G -86 Esti ated e penditure from Project GT-86 78,700.00 in luding contingencies Bala ce in roject GT-86 $14,813.76 Unen umbere funds in Third Avenue Street $509,031.25 Im roveme t Project Esti ated e penditure from Third Avenue Project 6,700.00 in luding contingencies Balance in 'third Avenue Project $502,331.25 X33 ~_ ~~~ °~ v 7 ~ ~ .-1 - ~i I I ~ ~ ~ ~ k ..~-. 14tr ~~ I ~ ~ ~-~. ~ i " ~ ~ ~_. e it 1 ..7 ~ ~~ ~ -I ''.~.J ~ ~~ I .. i _ s . F - ~ '~~ ~~ ~ i~ ~ I ~ C ~~ k- L ~~ = L L ~~ ~ .~u ~~ Lu J ~ E,.E ~ ~ 1 ~ ~ ~ ~ ~ ~ _ ~ ~ ri . r ~ f__._~~ ~T I I ~ ~ ~~ ~ ~ s oo ~-I ~ ~' ~~ _ _ ~._ if : 1' -i _ _ W 1 '---rf i ~I ~ ~ .-. ~~. k _. - __ _ - ~~ -- ~ i `.- ~ I E ~ _ '~_ ._ . ~E r_f____~ ~-~;~ r-, ~ ~_ - _ ~ o~ - - ~ ~ ~~~ ~ ~! I- ,,~I ~ _ .._ .~.~... ~ •_ ' - I =~ _ r i _ _ ~ ~ ~~ ~l1 I ~ i ~I -~ p~~ _- _ - ~ '• t _ _ ~ - .~ W ~ .-J ~ ' - F' ~ - - ~~ ~ a ~~ ~ f L' J ` ~ . • ~ -- - ,; ~ .. . -~ --- - _ __ _. ',''~~ _ - _ - - ter- ~, ''~ y. ~+ ~ ~ 4 r~. - ~,l ~ ~ 1 _ J _#.~- _ fir ., -. . - --~ ~ o AwS~Y --__- T I T S EPROPOSED STREETS ~, ALLEYS o TE~o _~ -78_ _ TO BE OVERLAID sNE~T ~oFz ~ ~ ~~- ~ ~ V_ ~ I --- -- _ - - ~ / -._ _.... i _ ~ \\ ~ ~ __ ~ ~I E ii T - - ~ ~~. c - ~ III ' l ~~` ~ ~ ~ _ _ _ ^____.- _..._.... ~ t + x ~ 1 .., I I - -. 1 ~ - t 1 ~.,.._ ~J ~ t. ~ ~ ~ LJ - ~ t ~ 5i. •~ ~ .. ~~ .t ~_, _ y ~_ ,~ r i ~r " _ ~ ~ r I . ~~ - a~ _. E.,, ~E ~ii` ~ ' ~ ~~'~ i ~~ i _ . __. _ _ .,. ~... .~ - - _ r-'a~ ~_ ~ _ r ~ ~ , I ' .w. ,~ 0 - AWN BY -~ ~- -- - - T I T L E .PROPOSED STREETS ~, ALL.EYS D T EIO_' _?s - - TO QE OvERLAtD sHFET z oFz ~P Form No. F-229 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance 250 2501 621 6211 re I HEREBY CERTIFY that the money required for the opriation of funds for the purpose set forth in the attached lution is available in the Treasury, or is anticipated to into the Treasury, and is otherwise unappropriated. $ 85,400 Fund Gas Tax/ 3rd Avenue Project Pur~ose 1978-79 Street Overlay Program Bid er V.R. Dennis Construction Co, 86 7 ,700 9 , 700 Director of Finance The City of Chula Vista Date 10/17/78 By Certification of Unencumbered Balance to att of the suf con con into the the the I HEREBY CERTIFY that the indebtedness and obligation incurred by the contract or agreement authorized by the hed resolution can be incurred without the violation of any e provisions of the Charter of the City of Chula Vista, or onstitution or the laws of the State of California, that cient monies have been appropriated for the purpose of said act, that sufficient monies to meet the obligations of the act are actually in the Treasury, or are anticipated to come the Treasury to the credit of the appropriation from which ame are to be drawn, and that said monies now actually in reasury, together with the monies anticipated to come into reasury, to the credit of said appropriation are otherwise umbered. Zt Not to Exceed S Director of Finance The City of Chula Vista Date Fund Purpc Bidde By Dept./Activity se Certificate No. 22