ITEM EXPLANATION (4/5TH'S VOTE REQUIRED YES NO X )
In the 1978--79 budget, the City Council approved funding for
the construction of a materials slab and walls at the Public
Works Center. The purpose of the slab and walls is for
storage of chips for the chip seal program and also for
storage of sand, A.C. cold mix, and. crusher run aggregate.
Construction of the slab will conserve the limited space
available in the already overcrowded yard.
At 2:00 p.m, on August 8, 1979, in Conference Room 5 of the
Public Services Building the City Engineer received sealed
bids for ttie "Construction of a Material Slab and Retaining
Walls at the Public Works Yard, 707 "F" Street." (See the
attached sketch for location and extent of work.)
This project was actually bid as two separate projects.
Each of the projects can be individually awarded to the
lowest responsible bidder for each division. The divisions
are:
DIVISION 1 - MASONRY CONCRETE BLOCK RETAINING WALLS
This work includes the preparation of the site, placement of
footings, construction of masonry concrete block retaining
walls, and miscellaneous related work as required by the
plans.
SLH:nr/JN005
r.....,,,.,-,. (continued on supplemental page)
t1~li l tS 1 I J
Agreement Resolution x Ordinance Plat x Notification List
Other ENVIRONMENTAL DOCUMENT: Attached Submitted on
FINANCIAL IMPACT
Cost of this project is being financed with revenue sharing
funds. City will continue maintenance of facility after
completion of the project.
STAFF RECOMMENDATION
See supplemental page three.
BOARD/COMMISSION RECOMMENDATION
v
.AP~'ROVED ~°
COUNCIL ACTION by the
City Council
~U of
G `~ _ I 'Chula vista, California
1 /~~,L •
..
fat e ~ 7 ..................._..._.._.
Agenda Item No. 10
For Meeting of 97~T7z3
Supplemental Page Two
DIVISION ?_ - ~i" THICK P.C.C. SLAB
This work includes preparation of the site, furnishing of
all Labor, materials, tools, equipment and incidentals
required to construct an 8--inch thick P.C.C. slab.
Bids were received from seven contractors as follows:
DIVISION 1 -
MASONRY CONCRETE BLOCK RETAINING [MALLS AMOUNT
Callahan Bros., San Diego $1a,847.25
Joel P. Shandrick, Fallbrook 19,923.37
L. R. Hubbard, Jr., San Diego 20,401.00
T. B. Penick & Sons, Inc., San Diego 25,589.4
Sapper Construction Co., San Diego 31,374.80
Engineer's Estimate $20,105.00
DIVISION 2 --
8-INCH THICK P.C.C. SLAB AMOUNT
L. R. Hubbard, Jr., San Diego S?_7,313.55
Joel P. Shandrick, Fallbrook 7,418.30
Callahan Bros., San Diego 23,778.75
G. Spikes, San Diego 28,883.40
Mesa-Hab Construction Co, Chula Vista 7.9,302.00
T. B. Penick & Sons, Inc., San Diego 33,801.95
Sapper Construction Co., San Diego 33,905.50
Engineer"s Estimate $31,395.00
The low bid submitted by Callahan Bros, for Division 1
(retaining walls) is below the Engineer's Estimate by
$7.57.75 or 1.3%. The low bid submitted by L. R. Hubbard,
Jr. for Division 2 (8-inch thick P.C.C. slab) is below the
Engineer°s Estimate by $4,081.35 or 13%.
We have reviewed the low bids for both Division 1 and 2 and
find them to be acceptable. However, insufficient funds are
available to construct the entire project. I have reviewed
this matter with the Public Works Street Superintendent and
I am making the following recommendations:
1. That we award the contract for the construction of the
retaining walls.
7_. That we reject the bids for the construction of the fl-
inch thick P.C.C. slab.
~~5~1
Agenda Item No. ZO ,
For Meeting of9 4/79
Supplemental Page Three
DISCUSSION:
We believe it is important to construct the walls at this
time because they retain the construction materials in a
limited section of the yard.
The purpose of the 8" concrete slab is to reduce maintenance
problems that were anticipated witYi an asphalt floor. We do
not consider it appropriate at this time to appropriate an
additional $23,000- for construction of the slab floor. We
propose to install the slab floor if maintenance problems
occur with City forces on an as needed basis.
FINANCIAL STATEMENT:
Unencumbered funds available for this project = $31,000.00
Contract Amount for Division 1 = 13,847.25
10~ Contingencies (approximate) = 2,152.75
Total Estimated Construction Cost = $22,000.00
Subtotal = $ 9,000.00
Monies for Engineering Salaries = 2,00.00
BALANCE $ 7,000.00
STAFF RECOMMENDATION:
1. The City Council authorize the expenditure of $22,000
from Account No. 500-5000--RS-15 (Material Slab-Public
Works Center) for Division 1.
2. City Council accept the bids and award the contract to
Callahan Bros, in the amount of 519,847.25 for Division
1, Retaining Walls.
3. City Council reject the bids for Division 2, 8-Inch
Thick Material Slab.
4. City Council authorize the transfer of 52,000 from
Account No. 600-5000-RS--1~ to the General Fund to cover
Engineering salaries for design, surveying, and
inspection of this project.
~~s9
Form No. F-229 jJ ,
12/73
CERTIFICATE OF CITY/DIRECTOR OF FINANCE
Certification of Unappropriated Balance
I HEREBY CERTIFY that the money required for the
appropriation of funds for the purpose set forth in the attached
resolution is available in the Treasury, or is anticipated to
come into the Treasury, and is otherwise unappropriated.
Amount $ Fund
Purpose
Bidder
Director of Finance
The City of Chula Vista
Date
Certification of Unencumbered Balance
X00 6000 RS 16
~~5q
I HEREBY CERTIFY that the indebtedness and obligation
to be incurred by the contract or agreement authorized by the
attached resolution can be incurred without the violation of any
of the provisions of the Charter of the City of Chula Vista, or
the Constitution or the laws of the State of California, that
sufficient monies have been appropriated for the purpose of said
contract, that sufficient monies to meet the obligations of the
contract are actually in the Treasury, or are anticipated to come
into the Treasury to the credit of the appropriation from which
the same are to be drawn, and that said monies now actually in
the Treasury, together with the monies anticipated to come into
the Treasury, to the credit of said appropriation are otherwise
unencumbered.
Amount Not to Exceed $24,000.00
By
Acting Director of Finance
The City of Chula Vista
Date 8/24/79 By
Fund C.I.P. Dept./Activity C.I,P,
Concrete Block Retaining Walls - Public Works Center/
Purpose -~1~Y Engineering Staff Costs
Bidder Callaham Brothers $22,000/City General Fund $2,000
~- i 7s
Certificate No. 16