Loading...
HomeMy WebLinkAboutAgenda Statement 1979/09/04 Item 10CITY OF CHULA VISTA COUNCIL AGENDA STATEMENT Resolution / 7.~ /Accepting Bids Construction of~Retaining Vr'alls ITEM TITLE Rejecting Bids for Construction (Division 2) at Public Works Ya Item.No. 10 For meeting of 9/4/79 for the (Division 1) and of Material Slab rd, 707 "F" Street SUBMITTED BY City Engineer ITEM EXPLANATION (4/5TH'S VOTE REQUIRED YES NO X ) In the 1978--79 budget, the City Council approved funding for the construction of a materials slab and walls at the Public Works Center. The purpose of the slab and walls is for storage of chips for the chip seal program and also for storage of sand, A.C. cold mix, and. crusher run aggregate. Construction of the slab will conserve the limited space available in the already overcrowded yard. At 2:00 p.m, on August 8, 1979, in Conference Room 5 of the Public Services Building the City Engineer received sealed bids for ttie "Construction of a Material Slab and Retaining Walls at the Public Works Yard, 707 "F" Street." (See the attached sketch for location and extent of work.) This project was actually bid as two separate projects. Each of the projects can be individually awarded to the lowest responsible bidder for each division. The divisions are: DIVISION 1 - MASONRY CONCRETE BLOCK RETAINING WALLS This work includes the preparation of the site, placement of footings, construction of masonry concrete block retaining walls, and miscellaneous related work as required by the plans. SLH:nr/JN005 r.....,,,.,-,. (continued on supplemental page) t1~li l tS 1 I J Agreement Resolution x Ordinance Plat x Notification List Other ENVIRONMENTAL DOCUMENT: Attached Submitted on FINANCIAL IMPACT Cost of this project is being financed with revenue sharing funds. City will continue maintenance of facility after completion of the project. STAFF RECOMMENDATION See supplemental page three. BOARD/COMMISSION RECOMMENDATION v .AP~'ROVED ~° COUNCIL ACTION by the City Council ~U of G `~ _ I 'Chula vista, California 1 /~~,L • .. fat e ~ 7 ..................._..._.._. Agenda Item No. 10 For Meeting of 97~T7z3 Supplemental Page Two DIVISION ?_ - ~i" THICK P.C.C. SLAB This work includes preparation of the site, furnishing of all Labor, materials, tools, equipment and incidentals required to construct an 8--inch thick P.C.C. slab. Bids were received from seven contractors as follows: DIVISION 1 - MASONRY CONCRETE BLOCK RETAINING [MALLS AMOUNT Callahan Bros., San Diego $1a,847.25 Joel P. Shandrick, Fallbrook 19,923.37 L. R. Hubbard, Jr., San Diego 20,401.00 T. B. Penick & Sons, Inc., San Diego 25,589.4 Sapper Construction Co., San Diego 31,374.80 Engineer's Estimate $20,105.00 DIVISION 2 -- 8-INCH THICK P.C.C. SLAB AMOUNT L. R. Hubbard, Jr., San Diego S?_7,313.55 Joel P. Shandrick, Fallbrook 7,418.30 Callahan Bros., San Diego 23,778.75 G. Spikes, San Diego 28,883.40 Mesa-Hab Construction Co, Chula Vista 7.9,302.00 T. B. Penick & Sons, Inc., San Diego 33,801.95 Sapper Construction Co., San Diego 33,905.50 Engineer"s Estimate $31,395.00 The low bid submitted by Callahan Bros, for Division 1 (retaining walls) is below the Engineer's Estimate by $7.57.75 or 1.3%. The low bid submitted by L. R. Hubbard, Jr. for Division 2 (8-inch thick P.C.C. slab) is below the Engineer°s Estimate by $4,081.35 or 13%. We have reviewed the low bids for both Division 1 and 2 and find them to be acceptable. However, insufficient funds are available to construct the entire project. I have reviewed this matter with the Public Works Street Superintendent and I am making the following recommendations: 1. That we award the contract for the construction of the retaining walls. 7_. That we reject the bids for the construction of the fl- inch thick P.C.C. slab. ~~5~1 Agenda Item No. ZO , For Meeting of9 4/79 Supplemental Page Three DISCUSSION: We believe it is important to construct the walls at this time because they retain the construction materials in a limited section of the yard. The purpose of the 8" concrete slab is to reduce maintenance problems that were anticipated witYi an asphalt floor. We do not consider it appropriate at this time to appropriate an additional $23,000- for construction of the slab floor. We propose to install the slab floor if maintenance problems occur with City forces on an as needed basis. FINANCIAL STATEMENT: Unencumbered funds available for this project = $31,000.00 Contract Amount for Division 1 = 13,847.25 10~ Contingencies (approximate) = 2,152.75 Total Estimated Construction Cost = $22,000.00 Subtotal = $ 9,000.00 Monies for Engineering Salaries = 2,00.00 BALANCE $ 7,000.00 STAFF RECOMMENDATION: 1. The City Council authorize the expenditure of $22,000 from Account No. 500-5000--RS-15 (Material Slab-Public Works Center) for Division 1. 2. City Council accept the bids and award the contract to Callahan Bros, in the amount of 519,847.25 for Division 1, Retaining Walls. 3. City Council reject the bids for Division 2, 8-Inch Thick Material Slab. 4. City Council authorize the transfer of 52,000 from Account No. 600-5000-RS--1~ to the General Fund to cover Engineering salaries for design, surveying, and inspection of this project. ~~s9 Form No. F-229 jJ , 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose set forth in the attached resolution is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated. Amount $ Fund Purpose Bidder Director of Finance The City of Chula Vista Date Certification of Unencumbered Balance X00 6000 RS 16 ~~5q I HEREBY CERTIFY that the indebtedness and obligation to be incurred by the contract or agreement authorized by the attached resolution can be incurred without the violation of any of the provisions of the Charter of the City of Chula Vista, or the Constitution or the laws of the State of California, that sufficient monies have been appropriated for the purpose of said contract, that sufficient monies to meet the obligations of the contract are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn, and that said monies now actually in the Treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered. Amount Not to Exceed $24,000.00 By Acting Director of Finance The City of Chula Vista Date 8/24/79 By Fund C.I.P. Dept./Activity C.I,P, Concrete Block Retaining Walls - Public Works Center/ Purpose -~1~Y Engineering Staff Costs Bidder Callaham Brothers $22,000/City General Fund $2,000 ~- i 7s Certificate No. 16