HomeMy WebLinkAboutAgenda Statement 1986/11/25 Item 07COUNCIL AGENDA STATEMENT Item 7 Meeting Date 11/25/86 ITEM TITLE: Resolution /L,7~!~~ Authorizing staff to prepare plans and specifications and to bid the work for rehabilitation and pavement overlay of Third Avenue between Moss Street and Oxford Street and the east side of Broadway between Naples Street and Oxford Street SUBMITTED BY: Director of Public Works/City Engineer REVIEWED BY: City Manager j~ ~ `~ (4/5ths Vote: Yes X No ) In the 1986-87 budget, three projects were approved for the pavement overlay of various streets within the City. Total funds budgeted was $638,000. Approximately $319,000 of these budgeted funds will remain unspent upon completion of the current projects under construction. A portion of the $319,000 is budgeted for the overlay of Moss Avenue between Third Avenue and Naples Street. Staff is currently considering various design alternatives for the realignment of Moss Street near the intersection with Naples Street. On the completion of this study and approval thereof by the Council, we will proceed with the preparation of plans and perform the work. A rough estimate for the work on Moss Street is approximately $50,000. This will leave approximately $269,000 of these budgeted funds unspent. RECOMMENDATION: That Council authorize staff to prepare plans and specifications and to bid work for the rehabilitation and pavement overlay of Third Avenue between Moss Street and Oxford Street and also the easterly portion of Broadway between Naples Street and Oxford Street. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: For the period between January 2, 1986, and September 30, 1987, the City must spend $1,345,475 on street maintenance to be in compliance with Section 2126 and 2127 of the Street and Nighway Code which relates to the SB-300 funds. So far we have spent approximately $846,000 (see table below). Utilization of the unencumbered funds budgeted in the three overlay projects will ensure that the City will meet its street maintenance requirements for SB-300 funds. Third Avenue between Moss Street and Oxford Street is in need of immediate repair. The overhead utilities within Third Avenue were recently converted to underground. Required work includes construction of missing curb and/or broken curb and gutter, sidewalk, new concrete curb returns, reconstruction of poor pavement areas and placement of asphalt concrete overlay with pavement fabric. The estimated cost of this work is $232,000. In addition, on the east side of Broadway between Naples Street and Oxford Street, there is Page 2, Item 7 Meeting Date 11 25 86 existing ponding of water in several locations. The ponding is caused by missing street improvements and by some newly constructed curb, gutter, and sidewalk which was designed incorrectly and installed while this portion of the street was still in the County. The existing situation is a traffic and pedestrian hazard and should be corrected. Staff has received several complaints by adjacent property owners. The estimated cost for the improvements on the east side of Broadway is $25,000. The following is a summary of the expenditures proposed to meet the City's "maintenance of effort" requirements for the S6300 funds. Required Expenditures by September 30, 1987 Monies Spent to Date 1. Chip Seal - City personnel 2. A.C. Overlay - 1985-86 Program 3. Chip Seal - Contract Subtotal 4. ~entract awarded for 1986-87 Pavement Overlay Program - Expected Expenditure Total Expenditure requirements remaining to meet S6300 requirement Unspent Funds in Three Budgeted Overlay Project in 1 - Budget Proaosed Use of These Unspent Funds: 1. Overlay Moss between Third & ~~aples 2. Rehabilitation and pavement overlay - Third Ave. - Moss to Oxford 3. Rehabilitation & pavement overlay east side of Broadway - Naples to Oxfored Total Expenditure remaining to meet S6300 requirement after construction of proposed project $1,345,475 $163,517 213,051 230,236 $606,804 $239,196+ $499,475 $319,000 $ 50,000 232,000 25,000 $307,000 $192,475 Construction of the current CIP projects will meet the requirement of spending the remaining $192,475. f Page 3, Item 7 Meeting Date 11 2 6 Adequate funds are available for both the improvements on Third Avenue and Broadway from the unspent portions of the three budgeted overlay projects. It is staff's recommendation that the Council authorize the use of these funds for design and construction of these two additional projects. Council's approval will help provide staff the required lead time to ensure that the SB-300 funds will be spent prior to September 30, 1987. FISCAL IMPACT: Unspent funds, approximately $319,000, remaining in the current budgeted overlay projects will be authorized to be spent for the rehabilitation and pavement overlay of Third Avenue between Moss Street and Oxford Street and also the easterly portion of Broadway between PJaples Street and Oxford Street. Unencumbered funds would otherwise be returned to the Gas Tax unappropriated reserves at the close of the three budgeted overlay projects. SLH:fp/AX091 WPC 2426E . ~ ,~ ~ ~' by~ty Council of Chula Vista, California Dated ,,~ i