HomeMy WebLinkAboutAgenda Statement 1986/10/14 Item 04a: COUNCIL AGENDA STATEMENT Item 4 Meeting Date 10/14/86 ITEM TITLE: Resolution la 7 ~`'~ Rejecting bids for "J" Street Median Reconstruction between Broadway and I-5 Freeway in the City of Chula Vista, California SUBMITTED BY: Director of public Works/City Engineer Director of planning ~ ~- REVIEWED BY: City Manage (4/5ths Vote: Yes No X ) L The work proposed for this project includes demolition, salvage, irrigation and planting, and concrete flatwork in the existing median island between Broadway and I-5 Freeway. RECOMMENDATION: That Council reject the bids. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The proposal was put out to bid three times. The first time was on February 26, 1986, and only one bid by L. R. Hubbard Construction Co., San Diego, for $127,797 was received. This was analyzed by staff as too high and rejected. The second time the project was put out to bid, three bids were received on June 11, 1986, as follows: Sapper Construction, San Diego $169,950.00 Valley Crest Landscape, San Diego $143,186.00 Silver Strand Masonry and Cement Contractors, San Diego $ 62,435.70 While the Silver Strand Masonry bid of $62,435 was below the Engineer's estimate of $74,500, they subsequently indicated that they had made a major error in their bid price regarding PCC pavement. Their quoted price was $23,239 too low; the correct total bid then should have been $85,674. Staff reviewed the quantity of concrete and agreed on the error amount. Council rejected all the bids. The third time bids were received on July 30, 1986, as follows: Valley Crest Landscape, San Uiego Lindo Engineering Co., La Mesa $143,186.00 $131,772.00 Both of these bids still well exceed the Engineer's estimate of $74,500. Page 2, Item 4 Meeting Date~TT47$6 Staff is proceeding to do two things to facilitate the project in an acceptable fashion at a reasonable price. First, a revised plan is being prepared to reduce the forming and labor costs of the hardscape and the landscape plant materials. Second, a better bid price can probably be achieved if the project is combined with other smaller jobs resulting in one larger overall bid contract. We are evaluating the possibility of combining this job with the "E," "H" and "J" Street entry medians and the Marina Vista Park entry at Bay Boulevard and "J" Street which total about another $76,000. In conclusion, we recommend that the bids be rejected, plans revised and the project combined with other landscape proposals. FISCAL IMPACT: Sufficient monies were budgeted and carried over in the FY 83-84 and FY 84-85 Capital Improvement Program for this project. WPC 3213P by the City Council of Chula Vista, California Dated ~ ~ - ~ `~ ~~____-