HomeMy WebLinkAboutAgenda Statement 1978/12/19 Item 29CITY OF CHULA VISTA COUNCIL AGENDA STATEMENT Item No. 29 For meeting of 12/19/78 Resolution 9433 Rejecting Bids for the Construction of a ITEM TITLE Storm Drain System from Alvarado Place to and Beyond "H" Street, Chula Vista, California SUBMITTED BY City Engineer via Director of Public Works ITEM EXPLANATION (4/5TH'S VOTE REQUIRED YES NO x ) At 11:00 a.m. on November 16, 1978, in the Engineering Conference Room, the City Engineer recieved sealed bids far "The Construction of a Storm Drain System From Alvarado Place to and Beyond "H" Street, Chula Vista, California." The scope of the work included installation of storm drain pipe, inlets, curb, gutter, sidewalk, drainage channel connection, asphalt paving, property restoration and other miscellaneous related work. Bids were received from two contractors as follows: 1. Thibodo Construction Co., Inc. 2. Cameron Brothers Construction Co., Inc. $126,912.83 $157,690.80 The low bid submitted by Thibodo Construction Co., Inc. is above the Engineer's estimate by $41,525.83. This low bid is above the Engineer's estimate of $85,387 by 48.60. Engineering staff finds that the bids are unacceptable because we believe they are too high and recommend that the bids be rejected. The high cost we believe is due to lack of competitive bids and can be attributed to 1. the present construction activity in the private sector 2. construction of the project in the winter months and rainy season. SLH:nr/AN-004 rv~irnr-rn (continued on supplemental page) CRll1Dl I J Agreement Resolution Ordinance Plat Notification List Other ENVIRONMENTAL DOCUMENT: Attached Submitted on FINANCIAL IMPACT None STAFF RECOMMENDATION City Council reject the bids and direct staff to re-advertise at a later date when conditions are appropriate. BOARD/COMMISSION RECOMMENDATION COUNCTL ACTION Agenda Item No. 29 For Meeting of 12/19/78 Supplemental Page Two Engineering staff recommends that the project be rescheduled so that construction occurs during the summer months and construction activity slackens to a point where contractors will be interested in bidding the project. Next time staff plans to bid alternative solutions to the drainage problem. These solutions vary from providing drainage protection as recommended in the Fogg report (a 10-year storm) to that of making the present storm drain system work to its maximum efficiency. ''-s ~J,i T~oesr~ber 20, 1978 ~l~ibodo Construction Co. P.O. Hax 697 Vista, CA 92083 You will find enclosed a certified oapy of Resolution No. 9433 accepted by the Chula Vista City Council on Dec~nber I9, 2978 rejecting bids for the c~struction of a storm drain system from Alvarado Place to and beyond "I~i" Street, Chula Vista, California. Jennie M. Flxlasz Q+3C City Clerk Encl. Resolutioa~ 9433 y~3 December 20, l9?8 Ca2Tt0roii BrC~. Cc~struc~io~l Co. , inc. 7766 BaL. A,ve. San Diego, CA 92111 You wi11 find enclosed a certified cxapy of Resolution 1~. 9433 adopted by the Chula Vista City Council ari Deoen~er 19, 1978 re~ect~xig bids for the of a stone drain system fmttt Alvarado Plaee to and ~y~ n~" Street, Chula Vlsta, Califprnia. Jennie M. Fulasz C[~ City Clerk F~xxl. Resolution 9433 y3 3