HomeMy WebLinkAboutAgenda Statement 1982/06/15 Item 15r COUNCIL AGENDA STATEMENT Item 15 Meeting Date 6/15/82 ITEM TI LE: Resolution /D ~~~Approving Change Orders 2 and 3 Third Avenue Improvements "F" Street to "G" Sjt~reet SUBMITT D BY: City Engineer ~" (4/5ths Vate: Yes x No L. R. H bbard Construction Co., by Resolution 10802 was awarded the contract dated April 7, 1982 for the construction of street improvements on Third Avenue between "F" Street nd "G" Street. We are submitting change orders numbers 2 and 3 which will increas the contract work by $4,189. It is my RECOMME DAYTON: That Council approve the resolution authorizing the City Engineer to execute change orders numbers 2 and 3 which will increase the contract cost to $492,51 .50. BOARDS/ OMMISSIONS RECOMMENDATIONS: Not applicable. DISCUSS ON: CHANGE RDER NUMBER 2 - CHANGE IN STREET LIGHTS SYSTEMS The cost of this Change Order is $2,337.00. Under t e contract the City is to furnish the ornamental street light standards and luminai es for Third Avenue, "F" Street to "G" Street and luminaire conversion for Third A enue, "F" Street to "G" Street and luminaire conversion kits for the street lights rom "E" Street to "F" Street. The o n final design for street lights called for 100 watt 240 volt high pressure sodium vapor 1 minaires with regulator ballasts. Subsequent to the award of contract, we have re eived the latest San Diego Gas & Electric Company rate schedule which. provides for a $ .02 per month reduction in the cost of energy for each 100 watt 120 volt high pressur sodium vapor luminaire with a reactor ballast.. To take advantage of the rate reduction, we ordered the more efficient luminaires with reacto ballasts. The cost of Change Order #2 is balanced by the savings from purchasing the 120 volt luminaire with a reactor ballast and the reduction in energy costs r the first year. The luminaire with reactor ballast is $20.67 cheaper for a total s vings in material costs of $1,529.58. The savings in energy costs for using the lu inaire with reactor ballast during the first year is $905,76, The table below illust tes-the cash flow. Savingslfrom Reduction in Material Costs 74 luminaires @ $20.67 Savings) in Energy Costs During First Year 74 luminaires @ $12.24 Total Savings First Year Cost o Change Order #2 Net Savings First Year aving Each Subsequent Year $ 1529,58 $ 9.05,76 $ 2435,34 ($2337.00} $ 98.34 $ 905.76 Form A-~13 (Rev. 11/79) Page 2, Item 15 Meeting Date 6/15/82 Change and lat the si ~ operatE order #2 covers the cost of changing one of the "hot" conductors to a neutral sling for the existing street lights from "E" to "F" Streets and increasing of the conductors for the street lights from "F" to "G" so that they will on 120 volts with the reactor ballasts. CHANGE~ORDER NUMBER 3 - EXISTING MEDIAN ISLAND IRRIGATION SYSTEM The colt of this change order is $1,852. Community Development has completed an underground district within the Town Centre Focus Area w st of Third Avenue between "F" Street and Madrona. Due to this work it has been found hat the irrigation controllers for the Third Avenue median between "F" Street and Madron Due to this work it has been found that the irrigation controllers for the Third venue median between "F" Street and Madrona has been left without electrical power. The it igation system is presently under manual control. The Parks and Recreation Depar ent has requested Community Development to provide a new source of power to the median island irrigation systems. We hav requested a proposal from L. R. Hubbard Company to install electrical conductors from t e control panel being installed on the south side of Madrona Street to the point of con ection in the median island. We have received a quotation from L. R. Hubbard to install an additional #14 gauge 6-conductor wire from the panel to the median island, an app oximate distance of 600 lineal feet using 1-1/4" PUC conduit, pull boxes and the necess ry other materials and labor. The co t of $1,852 has been reviewed by our Traffic Engineering Division and recommended for ap royal. We have reviewed this proposal with Community Development and they have approv d the expenditure for this work from Bond Fund Account #995-9950-BF02. FINANCllAL STATEMENT: Contra t Cost $ 487,324.50 Change Order #1 - Inlet Structure 999.00 Change Order #2 - Street Light Modification 2,337.00 Change Order #3 - Median Island Irrigation System 1,852.00 Total gonstruction Cost $ 550,000.00 FISCAL~IMPACT: The City will accept the cost of maintaining the improvements after comple ion of the project. DH:dI WPC 00 OE ,, r~~~~~