Loading...
HomeMy WebLinkAboutAgenda Statement 1982/04/13 Item 9 COUNCIL AGENDA STATEMENT Item 9 Meeting Date 4-13-82 I S The re pc and imp con: TITLE: Resolution ~~ b,3o Authorizing staff to close Woodlawn Avenue for a period of two weeks north of "H" Street next to the transit center to facilitate construction of street improvements ITTED BY: City Engineer, a ~ ~ (4/5ths Vote: Yes No x ) ~ ~. ;~ City Council at its meeting on March 9, 1982 accepted a rt on the needed improvements at the intersection of Woodlawn "H" and authorized the staff to advertise for bids for ovement of the intersection. Staff has prepared plans for truction of this project. It is my REC MMENDATION: That City Council authorize the City Engineer to all w the closure of Woodlawn Avenue for up to a two week period of ime during the construction of the improvements. BOA~D/COMMISSION RECOMMENDATION: Not applicable. DIS(IUSSION: Sin e the opening of the transit center at the northwest corner of H" Street and Woodlawn Avenue, the pavement on Woodlawn Ave ue has broken up and failed due to the heavy bus traffic. The existing subgrade and structural street section (pavement) is not adequate to sustain these type of wheel loadings. On March 9, 982, the City Council accepted a report about the needed imp ovements at the intersection of Woodlawn and "H" Street. Cou cil at this time, authorized staff to prepare plans and adv rtise for bids. Eng neering staff has completed the design for the reconstruction of he pavement in Woodlawn Avenue. The major scope of the pro ect involves the removal of existing pavement, excavation and pre aration of subgrade to receive 14 inches of deep lift asphalt con rete. The new structural street section will be adequate to sus ain the loads placed upon the pavement by the buses. Th e on i the woo shop of reconstruction of the pavement will be disruptive to traffic oodlawn Avenue. The question arises whether or not to divide project into phases of construction to maintain traffic on pawn Avenue or to close Woodlawn Avenue to traffic for a t period of tim e for the purpose of expediting the completion he project and decrease total contract cost. Page 2, Item 9 Meeting Date 4-13-82 Eng'neering staff is recommending that Woodlawn Avenue be closed to hru traffic at the intersection of "H" Street for a maximum per od of two weeks. If Woodlawn Avenue is closed to thru tra fic and the contractor has good weather during this period, it s reasonable to expect the contractor to complete the paving por ion of work in Woodlawn Avenue within 5 working days. All wing for unforeseen circumstances, staff feels that a maximum per od of 2 weeks for the closing of Woodlawn Avenue would be ade uate. Staff is recommending the closure of Woodlawn Avenue for several reasons: 1. Closing of Woodlawn Avenue will shorten the total contract time. Thus, decreasing the time that vehicular and bus traffic will be disrupted. 2. The closing of Woodlawn Avenue will decrease the total construction costs for the project. The contractor will be able to do the paving work in one operation, he will be able to work faster and do a better job, and he will not have to be concerned with handling traffic on Woodlawn Avenue during the pavement reconstruction phase of the project. If the contractor has to phase his contruction in order to acc mmodate traffic on Woodlawn Avenue, then staff estimates that it ill take the contractor at least 2 weeks longer to complete the project than it would if Woodlawn Avenue were closed. The Transit Coordinator has indicated that it would be possible to e-route the buses in such a fashion that Woodlawn Avenue wou d not have to be used during the closure. He has also con acted the San Diego Transit District and has received ass rances from them that they also could operate with the clo ure of Woodlawn Avenue for a short period of time. Spe ial wording will be placed in the specifications to ensure tha adequate signing for the motoring public will be placed as nee ed to ensure access to the Park and Ride parking lot and to the residents along Woodlawn Avenue. Strict timing requirements wil be placed in the specifications regarding the length of time for which Woodlawn Avenue may be closed. Acc ss to the Park and Ride facility at the transit center and to the apartments along Woodlawn Avenue will be provided via Bro d way, Oaklawn Avenue and "G" Street. A plat is attached whi h shows these routes. FIS Av e pro SLH ~, ~AL IMPACT: It is expected that sue will result in lower bid prices ec t . ~ ,,..~~.~,..,~..__ _. fpw/AS001 a ~? y - ~_ ~ .. .... . ~~~~ the closing of Woodlawn for construction of the BROADWAY ~ ~_ F- ~o,~ F- LiJ do Tti W W ~C 11.) q~F OAKLAWN AVE _ ~ _ WOODLAWN AVE. _ ~ PA,ex .. ~ 1 AND ,P/DE -._ TROLLEY STAT/ON h ~ J a ~ ~ A~PEA TD BE CLOSED ® ~O~R D - AWN BY - `'~ ~'~ - - - - TITLE PROPOSED TEM/~o/~A /P Y S7"lzEE T CL O SANG D T 4 _ ~ _82 WOODLAWN AVE, AT %N' ST~PEET