Loading...
HomeMy WebLinkAboutAgenda Statement 1982/03/16 Item 13CITY COUNCIL AGENDA STATEMENT Item 13 Meeting Date 3-16-82 I EM TITLE: Resolution /~0~~ Accepting bids and awarding contract for construction of street improvements, Third Avenue from "F" Street to "G" Street in the City of Chula Vista, California S EMITTED BY: City Engineer ~~ (4/5ths e: Yes No x ) Director of Community Development A 2:00 p.m. on February 17, 1982, in Conference Room 3 in the P blic Services Building, the City Engineer received sealed bids f r "Street improvements, Third Avenue from "F" Street to "G" S reet in the City of Chula Vista, California". The scope of the project includes construction of curbs, gutters, sidewalks, d costive concrete, split pavers or stamped concrete, sidewalk r m ps, driveways, asphalt concrete pavement, cement treated base, p anter boxes, drainage facilites, traffic signal modifications, i stallation of grate, frame and tree guards, irrigation system, e ectrical work and street tree planning. It is my RECOMMENDATION: That City Council award the contract for a ternate B utilizing stamped concrete. With this alternative, I recommend the Council: Authorize the expenditure of $550,000 from the following four accounts: a. Third Avenue improvements - account no. 630-6300-BG10 3 $125,000.00 b. Third Avenue im provements - account no. 633-6330-BG86 $ 6,000.00 c. Third Avenue improvements - account no. 634-6340-BG86 $211,101.32 d. Third Avenue improvements, " F" to "G" - account no. - 995-9950-BF02 $207,898.68 . Accept bids and award contract to L.R. Hubbard Construction Co., Inc., San Diego in the amount of $487,324.50. ~wever, should the City Council prefer to use the pavers, Lternate A, to be constructed, I recommend the following: Page 2, Item 13 Meeting Date 3--I6-82 11 Authorize the expenditure of $630,000 from the following four accounts : a. Third Avenue improvements - account no. 630-6300-BG10 3 $125,000.00 b. Third Avenue improvements - account no. 633-6330-BG86 $ 6,000.00 c. Third Avenue improvements - account no. 634-6340-BG86 $211,101.32 d. Third Avenue improvements, "F" to "G" - account no. 9 95-9950-BG02 $287,898.68 21 Accept bids and award contract to L.R. Hubbard Construction Co., Inc. in the amount of $560,139.90. COMMISSION RECOMMENDATION: Not applicable. SCUSSION: ds were received from four contractors as follows: Alternate A Alternate B ntractor (Tile Pavers) (Stamped Concrete) L.R. Hubbard Construction $560,139.90 Co., Inc. - San Diego T.B. Penick & Sans , Inc . - 575 , 173.60 San Diego Daley Corporation - San Diego 627,312.22 Dyno Contruction, Inc. - 687,205.48 Lemon Grove $487,324.50 533,409.00 566,285.98 567,580.18 he low bid by L.R. Hubbard Construction Co., Inc. for Alternate is below the engineer's estimate of $595,864 by $35,724.10 or 6 ~rcent. The low bid for Alternate B was also submitted by L.R. ubbard Construction Co., Inc. and is belo w the engineer's stimate of $554,255 by $56,930.50 or 12 percent. We have eviewed the low bids for both alternate A and Band find them to e acceptable. ederal Department of Housing & Urban Development has approved he to w bidder's eligibility to participate in a Federally financed block grant project. he City Landscape Architect, Principal Planner and Project ngineer toured sites that have been constructed by the uccessful bidder of Alternate A & B (tile pavers and stamped ~ncrete). Slides of bath contractors work will be available at -/~~0~ Page 3 , Item 13 Meeting Date 3-16-82 t a H A c ie meeting. They were impressed with both the stamped concrete id the the pavers. Both contractors do beautiful work. -wever, due to the difference of $73,000 in cost between ternates A & B, we recommend the lower cost alternate (stamped -ncrete) . ie construction of the stamped concrete on this project differs ~om that installed on Third Avenue between "E" and "F" Street in ~veral aspects: f s 1 The color is integral throughout the thickness of the concrete rather than just on the surface. If it is chipped the white concrete color will not show. 2. The crosswalks are being constructed with steel reinforcement. The concrete bands on the sides and a concrete slab under the stamped concrete is one integral unit. On the previous project the concrete bands were placed separately and not tied together with steel reinforcement to the stamped concrete. This has allowed some movement of the concrete and has caused some of the cracking which has occurred. We visited four sites where the subcontractor doing the stamped c ncrete work for Hubbard Construction has performed the work. T ese sites were Heritage Park in Old Town, the entry road to C ronado Cays, Coronado Shores, and some work in Presidio Place - c ndo complex. We also visited two sites where the subcontractor d ing the pavers has performed the work. These were at Fashion V lley Shopping Center and the Town Centre Building here in Chula ista. Color slides of the work at these sites were taken and a e available for Council viewing. FINANCIAL STATEMENT: Adequate funds are available for c nstruction of either Alternate A (tile pavers) or Alternate B ( tamped concrete). Below is a summary of project funding. Alternate A Alternate B I em (Tile Pavers) (Stamped Concrete) C ntract cost 5560,139.90 $487,324.50 ter facility relocation costs 12,847.50 12,847.50 C nting encies (approx. 10~) 57,012.60 49,828.00 incl. engineering T tal construction cost 530,000.00 550,000.00 then project costs include: Street lights (approx.) 53,400.00 53,400.00 Street furniture (benches, 22,600.00 22,600.00 tree frames, grates, ash urns, waste containters)(approx.) Phone booths 4,000.00 4,000.00 timated total project cost $710,000.00 $630,000.00 /a~~~ Page 4 , Item 13 Meeting Date 3-16-82 F nds are available for either alternative in the following p of ect accounts : T ird Avenue improvements, account n 630-6300-BG103 $125,000.00 T ird Avenue improvements, account n 633-6330-BG86 6,000.00 T ird Avenue improvements, account n 634-6340-BG86 211,101.32 T ird Avenue improvements, "F" to "G" a count no. 995-9950-BF02 $566,400.92 F SCAL IMPACT: City will accept the cost of maintaining the i provements after completion of the project. S~H:fpw/A0022 ._ _ . .,.., ~ F ~.. ~.. i.a 1~,4 __,a~..c..er. Form No. F-229 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose set forth in the attached resolution is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated. Amount $ Purpose Bidder Fund Director of Finance The City of Chula Vista Date By Certification of Unencumbered Balance I HEREBY CERTIFY that the indebtedness and obligation to be incurred by the contract or agreement authorized by the attached resolution can be incurred without the violation of any of the provisions of the Charter of the City of Chula Vista, or the Constitution or the laws of the State of California, that sufficient monies have been appropriated for the purpose of said contract, that sufficient monies to meet the obligations of the contract are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn, and that said monies now actually in the Treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered. Amount Not to Exceed $ 9~~3,~~~ ~4 630-6 633-6 634-6 995-9 100-BG103 130-BG86 $125,000.00 6,000.00 `~ ,y '~~~~~, ,~~~ ~C / r_ ~ 140-BG86 211,101.32' Director of Finance 150-BF02 566,400.92 The City of Chula vista Date 3/16/82 By Fund See AbOVe Dept./Activity Purpose ~',ons-r~rtion of street improvements 3rd from F St. to G_ Street Bidder ~ D La~ihF,arrl f nnctriirtinn CO ~nC Certificate No. 34 .., ~~ ~a