COUNCIL AGENDA STATEMENT
Item 7
Meeting Date 2-16-82
IT TITLE: Resolution /0,,, Accepting bids and awarding
contract for construction of sidewalk, ramp and
curb im provements 1981-82 program, in the Mueller
and Vista Square areas in the City of Chula
Vista, California
SUBMITTED BY: City Engineer
(4/5ths Vote: Yes No x )
At 2:00 p.m. on January 27, 1982 in Conference Room 3 of the
Pub
f is Services Building, the City Engineer received sealed bids
or construction of sidewalk, ramp and curb im provements 1981-82
pro
Chu ram, in the
a Vista, Cal Mueller and
ifornia. Vista Square areas in the City of
The scope of the project consists of the removal and construction
of urbs, g utter, side walks, side walk ramps, pavement, portions
of ross gutter segments, and other miscellaneous work. It is my
REC(
1.
2.
3.
BOAR
DISC
Bids
1.
2.
3.
4.
5.
6.
7.
8.
9.
ENDATION: Tha t Co unc i 1
Authorize the transfer of $8,312.10 from budgeted project
"Local Option" - account no. 630-6300-BG106 to "project
Wheelchair Ramps 1981-82" - account no. 630-6300-BG99.
Authorize the expenditure of 515,300.00 from budgeted
project "Wheelchair Ramps 1981-82" - account no. 630-G300-
BG99.
Accept bids and award contract to G. Spikes Masonry & Cement
Contractor, San Diego in the amount of $13,844.35.
~/COMMISSION RECOMMENDATION: Not applicable.
)SSION:
were received from nine contractors as follows:
G. Spikes Masonry & Cement Contractor -San Diego $13,844.35
Silver Strand Contractors - San Diego 18 475.72
American Construction - Buena Park 18,753.55
W.H. Ledbetter & Sons, Inc . - San Diego 19, 954.50
T.B. Penick & Sons, Inc. - San Diego 25,521.00
H.L. Foster Construction Co. - San Diego 26 000.00
Ted L. Vance & Sons - Poway 29492.50
Sapper Construction Co. - San Diego 30902.55
Dyno Construction Inc. - Lemon Grove 32,998.05
Page 2, Item ~
Meeting Date 2-16-82
Th.
Enc
hat
low bid by G. Spikes Masonry & Cement Contractor is below the
ineer's estimate of $22,328.50 by $8,484.15 or 38 percent. We
e reviewed the bid and find it be acceptable.
Th Federal Department of Housing and Urban Development has
ap roved the low bidder's eligibility to participate in a
Federally financed Block Grant project.
In the current budget, Block Grant funds had been appropriated
fo the construction of sidewalk ramps in several neighborhood
strategy areas. To serve the Mueller School area, we proposed to
co plete the construction of ramps on "I" Street between Mueller
Sc ool and Broadway thus utilizing most of the funds budgeted.
The a request by the Human Relations Commission brought to our
at ention the need for ramps on "F" Street to serve the
Collingwood convalescent home on the north side of "F" Street
be weep Ash Avenue and Beech Avenue. There are several people
wi hin this convalescent home in wheelchairs and with other
walking disabilities who make trips to the Civic Center, Library
an commercial areas on Third Avenue and Broadway. To serve
th se people, it is appropriate to install ramps on the north
side of "F" Street.
The City Council at its m eeting on September 22, 1981, accepted a
re ort which authorized the staff to expand the scope of the
bud eted project to include construction of additional ramps on
"F" Street and a cross gutter at the intersection of Fifth and
"F" Street. The cost of constructing these additional
im rovements were to be financed from Block Grant (local option)
funds. Based on the unit prices of the low bid, the cost of the
additional improvements of "F" Street amounted to $10,887.00.
A slide is available for Council vie wing sho wing the location of
the wheelchair ramps to be constructed.
FISCAL IMPACT:
Ade uate funds are available for construction of this project if
the Council authorizes the transfer of monies from Block Grant
(lo al option) fund .
S
SLH;
arv:
Contract amount
Contingency (approx. 10$)
Total funds required to construct project
Funds available in project account
wheelchair ramps 1981-82
Additional funds required to construct
project ( funds to come from Local Option
funds account no. 630-6300-BG106)
i~»>
fpw/A0023
$13,844.35
1,455.65
15,300.00
6, 987.90
8,312.10
Form No. F-229
12/73 '
CERTIFICATE OF CITY/DIRECTOR OF FINANCE
Certification of Unappropriated Balance
I HEREBY CERTIFY that the money required for the
appropriation of funds for the purpose set forth in the attached
resolution is available in the Treasury, or is anticipated to
come into the Treasury, and is otherwise unappropriated.
Amount $ Fund
Purpose
Bidder
Director of Finance
The City of Chula Vista
Date By
Certification of Unencumbered Balance
I HEREBY CERTIFY that the indebtedness and obligation
to be incurred by the contract or agreement authorized by the
attached resolution can be incurred without the violation of any
of the provisions of the Charter of the City of Chula Vista, or
the Constitution or the laws of the State of California, that
sufficient monies have been appropriated for the purpose of said
contract, that sufficient monies to meet the obligations of the
contract are actually in the Treasury, or are anticipated to come
into the Treasury to the credit of the appropriation from which
the same are to be drawn, and that said monies now actually in
the Treasury, together with the monies anticipated to come into
the Treasury, to the credit of said appropriation are otherwise
unencumbered.
Amount Not to Exceed $
,!~~~~ ~
Director of Finance
The City of Chula Vista
Date 2/16/82 By
Fund 630-6300-BG99 Dept./Activity Engineering
Purpose Construction of sidewalk, ramp and curb improvements
Bidder G. Spikes Masonry & Cement Contractor - San Diego
Certificate No. 27
1~-/a ~~7
CHANGE IP1 CONTRACT
Construe ion of sidewalks, ramp
and r_urb improvements, 1981-82
program n the Mueller and Vista
Square A eas CONTRACT
G. Spi ke~ Masonry & Cement ContractorCONTRACTOR
The fo lowing change
contra t dated March 26,
G. S kes Ma~sonr & men
AND DETAILS:
QRDEF, N0. One
DATy Ma.y 14 , 1982
Joi3 A0023
shall be made to i ncrease the
982 between the City of Chula Vista and
Contractors Contractor.
Constru t two (2) sidewalk ramps at the east side of Broadway at "F"' Street.
Lump su for the removal, traffic control and replacement as per sketch for
2 sidewalk ramps on the east side of Broadway, north and south side of "F"
Street. his price includes all labor and materials needed to complete the job.
Five wor ing days may be extended on the contract if necessary by this work.
ORIGINAL C02JTRACT PRICE $ 13,844.35
Previous Change Order Nos. $ -0-
Revised Total Contract Price $ -0-
This Change Order No. 1 $ 700.00
It is
and ma
accord
reed by the undersigned that all extra work shall be performed
rials furnished in accordance with the original contract and in
ce with the statement, if any attached hereto.
TOTAL CONTRACT $ 14 , 544.35
AP ROVED BY: ACCEPTED BY: ORDERED BY:
John Lip itt G. Spikes Masonry & Cement ~ Kenne~k~,J G ~~gqkam
City FnnInPPN r,._L.___~_.__ 11 A 9Y`•1 p 1
09-~0~ ~
PW-E-44
11 -~.~ . r
~,: C7 ~ '~
J by c- ~ 2
,, ..
./, '' ~
/~/ _ ~ '' "~" ~ _ r
`\ a{--. 3 ` _ ~
'~--A vL V 1 V T
~./ ~ ~ =
o °~ ~ ~' 9
~ ~ -~~~
o .~_ 1 ~ 1
~ ~ ~~ c:
~~
0 0- _
r'
~a~ o
~N~ ~.~
V 4J q~t~a4i
n¢t Q J
C~ 0
Y
l~
.'~ h..•
• .• e
7 \ _..- I
:y~~ ~ J '
xS X ~'~ ;t ~ ~ _ P_t
~`- ~ ~`
~ `y~~`
M v ~ ~.
~~
~~
,~- ".
1.1.
W
z
o
U
b ~d
..: F.:
. ~r
,. ~~ f~+,
1`
r ~~at
c/~
z
.~
^~
~V ~
~_
W
Z
U
~-` ~
,9
~~f
w
~""
2
a
_0.
Y
u
v c~ ~L' _
~
~;
v "
' w
~
. +
_
YJ ~
. n7
:,` ~,
_ :y _
~.
~:.. --
w, ~
- v.
-.
l- - i `'~_ _
G
~- S`+
:
:.
e ,y ` ,.
t9 ~
2 0
V GO - +
a
~ O p
O O~
'Q Q'
~,~,.
~ QJ
!,'~'
~~` ..
s
,.. ,
• i
' H~
_ '~
`y., 1
4 F~
r. \. ea:
'..+
D
~~~~i
~o ~ v
cgi
y
o
co 0
~o .
mor
aQd
V4J
rat
tV
.~