Loading...
HomeMy WebLinkAboutReso 2010-273RESOLUTION N0.2010-273 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING THE REPORT ESTABLISHING EACH ELEMENT OF CALIFORNIA PUBLIC CONTRACTS CODE SECTION 5103, RELIEVING PAL ENGINEERING FROM THEIR BID PURSUANT TO CALIFORNIA PUBLIC CONTRACTS CODE SECTION 5101, ACCEPTING THE REMAINING BIDS, AWARDING THE CONTRACT FOR THE "ADA CURB RAMPS FISCAL YEAR 2009/2010 (STL352)" TO BLAIR RASMUSSEN CONSTRUCTION, INC. IN THE AMOUNT OF $528,963.80, AND AUTHORIZING THE DIRECTOR OF PUBLIC WORKS TO EXPEND ALL AVAILABLE FUNDS IN THE PROJECT, INCLUDING SUFFICIENT ELIGIBLE FUNDS AVAILABLE IN THE "ADA CURB RAMP FISCAL YEAR 2010/2011" (STL374) WHEREAS, the project consists of the installation of ADA pedestrian ramps and associated improvements at various intersections in the City; and WHEREAS, the work also includes some removal and replacement of displaced curbs, gutters, sidewalks and portions of cross gutters in order to assure compliance with current ADA standards for pedestrian ramp construction; and WHEREAS, the pedestrian ramp locations selected for this project were based on a comprehensive priority list that is maintained by the Public Works Department, and WHEREAS, in an effort to ensure that all project funds are exhausted in STL352, the project scope intentionally exceeds the available funds. Sufficient eligible funds are available in the "ADA Curb Ramp Fiscal Year 2010/2011" (STL374) project account to complete construction without impact to the General Fund, and WHEREAS, City staff prepared specifications for the "ADA CURB RAMPS FY 2009/2010" in the City of Chula Vista, California (STL352)" project; and WHEREAS, on October 13, 2010, five (5) bids were received as follows: CONTRACTOR BID AMOUNT 1. PAL General Engineering, Inc. -San Diego, CA $488,829.00 2. Blair Rasmussen Construction, Inc. -San Diego, CA $528.963.80 3. New Century Construction, Ina -Lakeside, CA $621,280.00 4. HTA Engineering and Construction, Inc. -Poway, CA $635,480.00 5. Palm Engineering -San Diego, CA $671,740.00 Resolution No. 2010-273 Page 2 WHEREAS, on October 14, 2010, the City received a letter from the appazent low bidder, PAL General Engineering, Inc., requesting to be relieved of their bid on the basis of clerical error, pursuant to Section 5103 of the State of California Public Contract Code; and WHEREAS, staff has reviewed the evidence provided by PAL Engineering substantiating the clerical error, and because the request was submitted within the timeframe required by law, staff recommends consenting to the requested relief of PAL General Engineering, Inc.'s bid and awazding a contract to the second lowest bidder; and WHEREAS, Blair Rasmussen Construction, Inc. which was second appazent low-bidder upon bid opening, met the regulations and guidelines presented in the bid package and is declared to be responsive; and WHEREAS, the second low bid by Blair Rasmussen Construction, Inc.of $528.963.80 is $31,036.20 (6%) below the Engineer's estimate of $560,000.00; and WHEREAS, staff has reviewed the second low bid and recommends awazding a contract in the amount of $528.963.80 to Blair Rasmussen Construction, Inc. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept the report establishing each element of California Public Contracts Code section 5103, relieve PAL Engineering from their bid pursuant to California Public Contracts Code section 5101, accept the remaining bids, awazd the contract for the "ADA Curb Ramps Fiscal Yeaz 2009/2010 (STL352)" to Blair Rasmussen Construction, Inc. in the amount of $528,963.80, and authorize the Director of Public Works to expend all available funds in the project including sufficient eligible funds available in the "ADA Curb Ramp Fiscal Yeaz 2010/2011" (STL374). Presented by Approved as to form by Richazd og n ~ B . Miesfe Director of Public orks ty Attorney Resolution No. 2010-273 Page 3 PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 23rd day of November 2010 by the following vote: AYES: Councilmembers: NAYS: Councilmembers: ABSENT: Councilmembers: ABSTAIN: Councilmembers: Castaneda, McCann, Ramirez and Cox None None Bensoussan ~; kk.~..X~l,e-~ Cheryl Cox, ayor ATTEST: i ~~ Donna R. Norris, CMC, City Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO CITY OF CHULA VISTA I, Donna R. Norris, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2010-273 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 23rd day of November 2010. Executed this 23rd day of November 2010. Donna R. Norris, CMC, City Clerk