HomeMy WebLinkAboutAgenda Statement 1988/06/14 Item 9• COUNCIL AGENDA STATEMENT Item g Meeting Date 6/14/88 ITEM TITLE: Resolution,~~d~ Accepting bids and awarding contract for "Construction of Central Basin Drainage Channel East and West of Fifth Avenue between 'F' and 'G' Streets in the .City of Chula Vista, CA"G~ SUBMITTED BY: Director of Public Works REVIEWED BY: City Manager (4/5ths Vote: Yes No X ) At 2:00 p.m. on May 11, 1988, in Conference Room 2 in the Public Services Building, the Director of Public Works received sealed bids for "Construction of Central Basin Drainage Channel East and West of Fifth Avenue between 'F' and 'G' Streets in the City of Chula Vista, CA." The project involves removal and disposal of existing improvements, clearing and grubbing, drainage control, catch basins, various sizes of pipe, transition structure, chain link fencing and gate, A.C. berm and Alternate A (reinforced concrete rectangular channel) and/or Alternate B (10'x4-1/2' reinforced concrete box), and other miscellaneous work shown on the plans. Funds for this project were budgeted " FY 1984-85. ttached is a sketch showing the general location of the work to be accomplished. RECOMMENDATION: That Council accept bids and award contract to Commercial Contractors, Inc. for the construction of Alternate A (reinforced concrete rectangular channel) in the amount of $218,184.73. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: Bids were received from six contractors as follows: Alt. A Reinforced Alt. B concrete Reinforced rectangular concrete Bidder channel box culvert 1. Commercial Contractors, Inc. - San Diego $218,184.73 $251,176.60 2. Carolyn E. Scheidel Contractor - La Mesa 225,968.00 290,396.00 3. Erreca's Inc. - Spring Valley 227,000.00 No bid 4. Stone Construction - Yucca Valley 248,824.00 293,502.00 5. Roca Construction Inc. - Chula Vista 274,853.20 341,280.00 • Sapper Construction Co. - San Diego 299,153.00 354,800.00 /~3 ~ ~~ Page 2, Item 9 . Meeting Date$ Staff bid two alternates on this project, both of which satisfactorily handle the expected drainage flows. If there had only been a slight difference in the cost between Alternate A and B, staff would have recommended the construction of a reinforced concrete box culvert. However, the minor savings in maintenance costs for a box culvert does not justify the added expenditure of approximately $33,000 in construction cost. Therefore, staff recommends that Alternate A (reinforced concrete rectangular channel) be constructed. The Deputy Director of Public Works/Operations concurs with this recommendation. It may be advantageous to cover the channel for use by property owners. Where feasible, staff will be contacting property owners to see if they want the box culvert versus the open channel. If so, a change order will be prepared for the difference in cost between the open channel section and the box culvert with the property owner paying the difference. The low bid by Commercial Contractors Inc. for Alternate A is below the Engineer's estimate of $230,336.00 by $12,151.27 or 5 percent. We have reviewed the low bid and believe it to be satisfactory and recommend awarding the contract to Commercial Contractors Inc. This project is being funded by Community Block Grant Funds and included in e specification documents are goals for meeting the City of Chula Vista firmative Action Program. The pre-award conference was held with the ontractor on Friday, May 20 to review his employment and contracting plan for meeting the goals in this program. Staff believes the contractor has made a satisfactory effort for meeting the Affirmative Action Program of the City of Chula Vista. The Department of Housing and Urban Development has reviewed this contractor's eligibility to perform the work. We have received assurances that this contractor is eligible. Attached is a copy of the Contractor's disclosure statement. FINANCIAL STATEMENT: Funds ReQUired for Construction a. Contract Amount $218,184.73 b. Contingencies (approx. 5~) 10,866.42 Total Funds Required for Construction $229,051.15 Funds Available for Construction a. Central Drainage Basin Channel $229,051.15 /3 CF`.~~ ~SCAL IMPACT: None. WPC 3776E the City Council of Chula Vista, Ca 'fornia Dated ~ -- ~~~ ~j ~~ • CIN OF CHULA VISTA DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION September 14, 1988 File # AO-043 Commercial Contractors, Inc. P.O. Box 23076 San Diego, CA 92123 Attention: Mr. Bill Zondorak CENTRAL BASIN DRAINAGE CHANNEL - CHANGE ORDER NO. 1 Enclosed is a fully executed copy of change order no. 1 for the Central Basin Drainage Channel project. We appreciate your cooperation. If you have any questions regarding this matter please call Mr. Roberto Saucedo of my staff • at 6~/~~3.~I /1 /~~ (L\CONTRACTS\CHNGODR.DOC.) cc: City Clerk (Resolution No. 13609) Lyman Christopher (P.O. 185923) Tomme Lutz, Project Inspector • /~~G~j~~ 276 FOURTH AVENUE/CHULA VISTA, CALIFORNIA 92010/(619) 691-5021 Enclosure R • CHANGE IN CONTRACT ORDER N0. One DATE: August 16, 1988 FILE: AO-0043 CONTRACT: Central Basin Drainage Channel East and West of Fifth Avenue Between "F" and "G" Streets CONTRACTOR: Commercial Contractors, Inc. The following change shall be made to increase the contract dated August 1, 1988, between the City of Chula Vista and Commerical Contractors, Inc., Contractor. REMARKS AND DETAILS: Change in plans and specifications requested by the City at an agreed cost (shown below) to cover the open channel between stations 0+00 and 0+87.02 (West of Fifth Avenue) and between Stations 0+80 +/- (East of Fifth Avenue). I - West of Fifth Avenue (J. E. Whittingham's property) a) delete item 16 - • 87 LF of 10'x5' Reinforced Rectanguler Channel at $ 207.59/LF = - $ 18,060.33 b) Add item 22 - 87 LF of 10'x4.5' RCB per RSD D-76 at $ 325.29 (original bid of $ 286.00/LF plus $ 3,417.82 per letter dated 28, July 88) _ + $ 28,299.82 Subtotal I = + $ 10,239.49 II. East of Fifth Avenue (D.B. Stanley's property) a) Revise bid item 15 Subtract 80 LF of 10'x5'4" Reinforced Rectangular Channel at $ 208.50/LF = - $ 16,680.00 b) Add item 23 80 LF of 10'x4.5' RCB per RSD D-76 at $326.86 (original bid of $ 286.00/LF plus $3268.80 per letter dated 28, July 88) _ + $ 26,148.80 c) add item 24 Remove block wall and place fill to level ground at lump sum of $ 1808. • Subtotal II + $ 11,276.80 Total Net Change + $ 21,516.29 / ~~~. 4 • ORIGINAL CONTRACT PRICE $ 218,184.73 Previous Change Order Nos. $ - 0 - Revised Total Contract Price $ 218,184.73 This Change Order No. 1 $ 21,516.29 It is agreed by the undersigned that all extra work shall be performed and materials labor and equipment furnished in accordance with the original contract and in accordance with the statement, if any, attached hereto. Contract shall be extended 60 working days to provide sufficient time for the completion of the work. TOTAL CONTRACT APPROVED BY: $ 239,701.02 ORDERED BY: ~bIRECTOR OF PUBLIC COMMERCIAL CONTRACTORS D,~. DIR. OF . WORKS INCORPORATED PUBLIC WORKS/ CITY ENGINEER (L\CONTRACT\CHNGODRI.DOC) ., ,. ~~~ /~ ~~~~ • CITY OF CHULA VISTA DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION October 14, 1988 File # AO-043 Commercial Contractors, Inc. P.O. Box 23076 San Diego, CA 92123 Attention: Mr. Bill Zondorak CENTRAL BASIN DRAINAGE CHANNEL - CHANGE ORDER NO. 2 Enclosed is a fully executed copy of change order no. 2 for the Central Basin Drainage Channel project. We appreciate your cooperation. If you have any questions regarding this matter please call Mr. Roberto Saucedo of my staff at 691-5023. • /A ~ //~^ KENNETH J. GOLDKAMP SENIOR CIVIL ENGINEER RS:ljr Enclosure (L\CONTRACTS\CHNGODR.DOC.) cc: City Clerk (Resolution No. 13609) Lyman Christopher (P.O. 185923) Tomme Lutz, Project Inspector • 276 FOURTH AVENUE/CHULA VISTA, CALIFORNIA 92010/(619) 691-5021 ~. ! ~, ..., • CHANGE IN CONTRACT ORDER NO. Two DATE: September 29, 1988 FILE: AO-043 CONTRACT: Central Basin Drainage Channel East and West of Fifth Avenue between F and G Streets CONTRACTOR: Commercial Contractor's Inc. The following change shall be made to increase the contract dated August 1, 1988, between the City of Chula Vista and Commercial Contractors, Inc., Contractor. REMARKS AND DETAILS: Change in plans and specifications requested by the City of Chula Vista at our agreed cost: 1. Place 1 1/2" rock in areas over excavated due to poor subgrade material at an agreed unit cost of $22.42/cubic yard. Amount placed totaled 126.34 tons of 1 1/2" rock, or 90.5 cubic yards (126.34 tons/1.4 cubic yards/ton). Total cost for this work amounts to $ 2,029.00 ($22.42/CY x 90.5 CY). • The agreed price of $2,029.00 is considered to be full cost for furnishing all tools, labor, material and equipment for doing the above work and no additional compensation will be due. ORIGINAL CONTRACT PRICE $ 218,184.73 Previous Change Order Nos. $ 1 Revised Total Contract Price $ 239,701.02 This Change Order No. 2 $ 2029.00 It is agreed by the undersigned that all extra work shall be performed and materials furnished in accordance with the original contract and in accordance with the statement, if any, attached hereto. TOTAL CONTRACT $ 241 30.02 A~ ROVED B~: ` ~f2SL~p~ED~w ~/ ORDERED~~Y: • DIRECTOR OF PUBLIC COMMERCIAL CONTRACTORS ~. DIR. OF WORKS INCORPORATED PUBLIC WORKS/ CITY ENGINEER (L\CONTRACT\CHNGODIO.DOC)