Loading...
HomeMy WebLinkAboutAgenda Statement 1988/06/07 Item 7COUNCIL AGENDA STATEMENT • Item ~ Meeting Date 6/7/88 ITEM TITLE: Resolution ~,3 5 ~ ~v Accepting bids, transferring funds, and awarding contract for Paving, security lighting, and other miscellaneous improvements at Rienstra Sports Complex and Lauderbach Community Center in the City of Chula Vista, CA" SUBMITTED BY: Director of Public Works ~~'~'~ Director of Parks and Recreatio Community Development Director REVIEWED BY: City Manager ~G d~ (4/5ths Vote: Yes No X ) At 2:00 p.m. on April 27, 1988, in Conference Rooms 2 and 3 in the Public Services Building, the Director of Public Works received sealed bids for "Paving, security lighting, and other miscellaneous improvements at Rienstra Sports Complex and Lauderbach Community Center in the City of Chula Vista, CA. The work includes removal and disposal of existing improvements, excavation and grading, asphalt concrete paving, curbs, sidewalks, wheel stops, processed miscellaneous base, security lighting system, repair of bleachers and other miscellaneous work shown on the plans. Funds must be • transferred to pay for all needed improvements. RECOMMENDATION: That Council: 1. Transfer $16,160.35 from the unencumbered balance of the budgeted project accounts for Chula Vista Junior High School Drainage to Parking and Security Lights, Lauderbach Center. 2. Transfer $33,238.35 from the unencumbered balance of budgeted project East "J" Street median to two new accounts for Parking and Security Lights, Lauderbach Center, and Renovate Rienstra Sports Complex II. 3. Accept bids and award contract to Odell Construction Co., Inc. in the amount of $123,469.80. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: This project combined two separate CIP projects with similar type of work under one contract. The two projects were as follows: 1. Lauderbach Community Center - This project included the installation of a parking lot and security lighting at the Community Center. • 2. Rienstra Sports Complex II - This project included installation of security lighting, paving around the ballfields, and replacement of bleachers. 1.F~~, .~1,~~ ';~ r~ Page 2, Item 7 Meeting Date~']Tj$~ Bids were received from two contractors as follows: Bidder Bid Amount 1. Odell Construction Co., Inc. - San Diego $123,469.80 2. L. R. Hubbard Construction Co., Inc. - San Diego 136,745.99 The low bid by Odell Construction Co., Inc. is above the engineer's estimate of $117,540 by $5,929.80 or 5 percent. We have reviewed the low bid and recommend awarding the contract to Odell Construction, Inc. Transferring of additional funds to construct the improvements is required, in part, due to increased scope of work on both projects. The Lauderbach Park project was an old County Block-Grant funded project which was turned over to the City when Montgomery annexed. The original project involved installation of nine security lights similar to the ones in the existing parking lot and paving of an existing dirt lot used for overflow parking. The City revised the scope to include installation of 10 upgraded security light fixtures, installation of four new lighting fixtures on existing poles in the parking lot, resurfacing of the existing parking lot, installation of • curbs and sidewalk, installation of wheel stops in the original parking lot and new lot, installation of a gate at the entrance to the new lot, staff time for administration and inspection and survey work. The scope was revised to reflect City standards for parking lots (curbs, wheel stops) and to increase security in the form of more and better lighting fixtures to increase visibility. The upgraded lighting fixtures are the standard ones used in all City parks. • The original scope and cost estimates for Rienstra Sports Complex were developed in FY 1982-83. The original scope did not include the lighting or paving around the bleachers. These items were added to enhance security and appearance and to eliminate the muddy or dusty conditions around the bleachers. The bleacher work was also enhanced, in that all of the wood bleachers are to be replaced with aluminum and the concrete blocks on which the bleachers are sitting are to be repaired. The original scope involved replacing only some of these bleachers with wood replacements. All of the bleachers are in disrepair, wood requires much more maintenance than aluminum and aluminum bleachers have a much better appearance. Since the Lauderbach Park project is funded with Block Grant monies, additional Block Grant funds are being sought to transfer to this project. Excess Block Grant funds are available in the recently completed Chula Vista Jr. High School drainage project. Page 3, Item 7 Meeting Date~J~T~$~ 1. Parking & Security Lights, Lauderbach Center $ 51,901.30 2. Renovate Rienstra Sports Complex 36,426.53 3. Unencumbered Balance in Chula Vista Jr. High 16,160.35 School Drainage . 4. Unencumbered Balance in East "J" Street Median 36,128.67 Total Funds Available $140,616.85 The Rienstra project is funded with State Grant funds and no additional State monies are available to transfer to this project. Therefore, it is requested that excess PAD funds be transferred from the East "J" Street median renovation project, which is completed. Attached is a copy of the Contractor's Disclosure Statement. FINANCIAL STATEMENT: Funds Required for Construction 1. Contract amount $123,469.80 2. Contingencies (approx. 5%) 6,130.20 3. Staff costs (engineering, surveying & inspection) 6,700.00 Total Funds for Construction of Project $136,300.00 Funds Available for Construction FISCAL IMPACT: None. • the Ci-~y C~~~ncii of Chula Viva, C~.ii-sornia Dated WPC 3750E