HomeMy WebLinkAboutAgenda Statement 1988/06/21 Item 11• COUNCIL AGENDA STATEMENT Item 11 Meeting Date 6/21/88 • • ITEM TITLE: SUBMITTED BY: REVIEWED BY: On February contract for Vista, CA. Qo~~i~~+;~-, ~3(0~~ Anorovin4 Change Order No. 2 for construction of a new fire station at 80 E. J Street, Chula Vista; authorizing the Director of Public Works to execute the change order on behalf of the City, and appropriating funds from the Unappropriated Ge eral Fu d Reserves Director of Public Work Director of Public Safet' ~~ City Manager (4/5ths Vote: Yes X No ) 23, 1988, the City Council by Resolution No. 13467 awarded a construction of a new fire station at 80 E. J Street, Chula To date, one change order has been approved. Change Order No. 1. Approval Date April 6, 1988 Amount $4,920.00 The net result increased the contract amount from $299,800 to $304,720. Proposed Change Order No. 2 is for the inclusion of additional materials and labor to provide a 6 in. drain for excess water, additional concrete apron for driveway, soils engineering, transformer and trenching for electrical service, various changes in floor coverings requested by the Fire Department, fiberglass fuel tanks rather than steel tanks as per the original specifications and revisions to the patio and west side yard of the new structure. This change order has the net result of increasing the contract amount $19,994 to a revised amount of $324,714. The contractor can accomplish the various items listed without increasing the duration of the original contract which is tentatively scheduled to be completed by September 30, 1988. This is ahead of the contract completion date. RECOMMENDATION: That Council adopt the resolution approving Change Order No. 2; and authorize the Director of Public Works to execute it on behalf of the City, and appropriate funds from the unappropriated balance of the General Fund Reserves to complete this change order. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. l ~ ~~ ~ j ~~ Page 2, Item 11 • Meeting Date 6/21/88 DISCUSSION: Proposed Change Order No. 2 would amend the contract to: A. Add a 12'0" concrete apron at south entrance. The cost of this work totals $2,405. This change is the result of having to raise the elevation of the station which was the subject of Change Order No. 1. B. Add site drainage and a 6" pvc line at the west side of structure. The cost of this work totals $831. This change is the result of having to raise the elevation of the station which was the subject of Change Order No. 1. C. Add a communication system and amplifier which was overlooked during plan check. The cost of this work is $2,208. D. Power and telephone re-route from compressor building to service for new building. This work includes trenching, conduit and the transformer required to step down the existing SDG&E power which is 120/240 volt to the required 208/120 volt system. A 208/120 volt system is required to accommodate usage of existing equipment at the station. The cost of this work is $6,855. ~.~ • E. Add four scuppers to drain the flat roof and install two 1 in. conduits from the gas island into the building. The cost of this work is $360. F. Add concrete pad on west sideyard of property and extend patio area. The cost of this work totals $1,086. A portion of this change is the result of having to raise the elevation of the station which was the subject of Change Order No. 1. G. Change fuel tanks from steel to fiberglass. The cost of this work totals $3,141. H. Additional costs for soils testing. The cost of this work totals $886. This change is the result of having to raise the elevation of the station which was the subject of Change Order No. 1. I. Per request from Fire personnel to change vinyl the to carpet in hallways. The cost of this work totals $225. Also, monthly costs for inspections and as-built drawing fees for the architect for balance of the contract. The cost of this work is anticipated to be $1,500. Also, we are including a provision for a lOq contingency. This would total $1,800. All previously budgeted contingency amounts have been expended. • Items A - I Total Architect Fees Contingency TOTALS (Change Order No. 2) $17,997.00 1,500.00 1,800.00 $21,297.00 • Page 3, Item 11 Meeting Date 6 2 88 Many of these items appear to be errors on the part of the Architect. We have him on notice that we intend to recover any of our additional costs that are the result of his negligence. FISCAL IMPACT: The contract will be increased by $17,997 plus architectural fees and contingency for a revised total amount of $326,017 required for the project. Funds for the original contract are provided in: Account 600-6000-GF32 $162,504.69 Account 600-6000-RC42 144,728.05 TOTAL AVAILABLE $307,232.74 TOTAL AMOUNT REQUIRED $326,017 ADDITIONAL APPROPRIATION $ 18,785 The additional $18,785 should be made available from the General Fund Reserve to cover the cost of this change order. The Planning Department has indicated • that landscaping needs to be accomplished in a later contract estimated at $10,000. There will be a later report to Council seeking authorization for this landscaping project and additional appropriation. WPC 3806E ~y t'r ~~,~,~ Co:~nrll of ', Chula 1,'icta, C?1=~~c~rriia Dated ~~~ a ~ r ~ ~ • ~'. ~~~,