Loading...
HomeMy WebLinkAboutAgenda Statement 1988/05/03 Item 17COUNCIL AGENDA STATEMENT • Item 17 Meeting Date 5/3/88 ITEM TITLE: Public Hearing: Consideration of Coastal Development Permit Number 11(a) for Marina Gateway Parcel 1 Lot Split Resolution/~~ss~°ng Coastal Development Permit Number 11(a) SUBMITTED BY: Community Development Directo REVIEWED BY: City Manager ~~ ~ Q~ 4/5ths Vote: Yes No X ) On April 14, 1987, the City Council approved a Coastal Development Permit for the development of Marina Gateway Parcel 1. The project consisted of construction of two buildings, one industrial building, and one industrial office/warehouse building on a single parcel. The owner now wishes to subdivide the property into two parcels which will result in each building being located on an individual parcel. The lot split was reviewed and the findings are contained in the following report. RECOMMENDATION: That the City Council conduct a public hearing and consider and adopt the attached resolution and findings therein: • 1. Adopting Negative Declaration IS-85-5A; 2. Finding that the proposed project, subject to listed conditions, is consistent with the policies of the certified Local Coastal Program; and 3. Issuing Coastal Development Permit Number 11(a) as conditioned. BOARDS/COMMISSIONS RECOMMENDATION: Not applicable. DISCUSSION: The proposed lot split has been reviewed relative to existing on-site development. The setbacks, building lot coverage, and floor area ratio as shown on the plan submitted have been evaluated and found to be in compliance with the standards set forth in the certified Local Coastal Program. Parking for 660 Bay Boulevard (the southerly of the two buildings) does not meet the required standard, however, and is deficient by 20 spaces. Since the northerly building has an excess of parking (145 spaces provided, only 51 required), the applicant has proposed to provide an easement granting 20 plus parking spaces to the southerly building. These spaces are located near the southerly building (see attached drawing) and will fulfill the building's parking needs. • Page 2, Item 1~ • Meeting Date~7$~ Also, a reciprocal driveway access easement is proposed for joint use of the main parking lot access from Bay Boulevard which will avoid construction of an additional curb cut into the parking lots. It is recommended that the access and parking easements be required to run with the land and be recorded with the final map. FINDINGS Based on the application and plans submitted, and subject to conditions in the attached resolution, the proposed lot split is found to be consistent with the policies of the certified Local Coastal Program in accordance with the following findings: 1. The proposed project consists of the subdivision of currently developed land. Subject to conditions listed in the attached resolution, the resulting parcels and on site developments will conform to the certified Local Bayfront Coastal Program development criteria. 2. The project site is not located adjacent to any wetland or coastal resource and the proposed lot split will not affect any such resource. • 3. The proposed lot split involves property located at the eastern boundary of the coastal zone which does not provide access to the bay or water frontage, therefore, the project will not impact water related recreational or visitor serving marine resources. FISCAL IMPACT: None. WPC 3547H the City Council of Chula Vista, California Dated V ~ ~~