HomeMy WebLinkAboutAgenda Statement 1988/04/05 Item 17COUNCIL AGENDA STATEMENT
• Item 17
Meeting Date 4/5/88
ITEM TITLE: Resolution ~3 ~Q~ Approving the FY 1988-89 claims for the
FY 88-89 2q Non-motorized Transportation Development Act Fund
SUBMITTED BY: Director of Public Work
REVIEWED BY: City Manager, ~ ~ ~,
.+ (4/5ths Vote: Yes No )
On January 15, 1988, staff sent an informational memo to Council (attached for
reference) via the City Manager regarding the update of the Non-motorized
Element of the Regional Transportation Improvement Program (RTIP) which
included a list of proposed bicycle projects within the City. Staff has
prepared claims for funding those projects proposed for FY 88-89. Prior to
submittal of the claims for funding, Council must pass a resolution
authorizing official submittal of the claims to the San Diego Association of
Governments (SANDAG) Board.
RECOMMENDATION: That Council approve the resolution authorizing official
submittal of the FY 88-89 bicycle project claims for FY 88-89 TDA and 1/2¢
sales tax funds.
BOARDS/COMMISSIONS RECOMMENDATION: Not applicable.
DISCUSSION:
Each year, agencies in the San Diego region have the opportunity to apply for
2q non-motorized Transportation Development Act (TDA) funds. This year an
additional $1 million will be available from revenue from the recent 1/2¢
sales tax increase. The process for distribution/allocation of these funds
involves two recommending bodies and two decision-making bodies. The
recommending bodies are City/County staff and the SANDAG Bicycle Facilities
Committee. The decision-making bodies are the City Council/Board of
Supervisors and the SANDAG Board of Directors. All claim submittals must be
authorized by the originating agency through adoption of a resolution.
The following is a listing of the project claims to be submitted:
Cost
Bike Lockers - Citywide 19
950
Bike
Bike Lane
Rest - Bonita Road, "E" Street to I-805
Area - Bonita Road & "E" Street ,
153,300
Bike
Lane
- "C" Street, Broadway to "D" Street 52,200
3
445
Bike
Bike Lane
Lane - East "H" Street, Hilltop Drive to Ridggeback Road
- East Orange Ave., Hilltop Drive to E/0 Brand
wine ,
6,426
4
8
Bike
Bike
Lane
Route y
- "F" Street, Fourth Ave. to Third Ave.
- "G" Street
MTDB t
Hi ,
30
40,300
•
Bike
Route ,
o
lltop Drive
- "F" Street, Third Ave. to Hilltop Drive and 2 630
Hilltop
Update - B Drive, "F" Street to "J" Street
icycle Route Facilities Report 2,520
39,500
325,101
Page 2, Item 1 7
• Meeting Date~j57$£~
The bicycle projects recommended for TDA funding during the 1988-89 fiscal
year include construction/striping of bike lanes, signing for bike routes, and
purchase of bike lockers to be installed at various locations throughout the
City. Projects to install bike lanes include widening of the street if
necessary.
Bicycle projects recommended for funding with TDA funds must meet the
following requirements established by SANDAG:
1. The project must be included in an adopted regional, county, city, or
community plan;
2. If the project abuts other jurisdictions, it must be shown on the adopted
plans of the adjacent jurisdiction;
3. Other sources of funding for cooperative projects must be identified;
4. Projects must follow CALTRANS Bike Route Standards from the CALTRANS
Highway Design Planual.
The projects will also be subject to the following criteria:
1. Elimination of problem areas on routes which would provide relatively safe
• travel use;
2. Service to high activity centers;
3. Connection to and continuity of longer routes;
4. Identification of local effort in providing pedestrian and bicycle routes.
5. Development in conjunction with adopted scenic highways route.
Each submittal includes a checklist addressing the above criteria.
In 1983 the Bicycle Route Facilities Report was revised and adopted as an
update to the Bike Element of the City's General Plan. The report recommended
locations for installation of bicycle lanes and routes based on the City's
needs and SANDAG's requirements for bicycle facilities projects. The proposed
bicycle lanes and route installation projects are included in the
recommendations of the subject report.
A project for acquisition of 30 bicycle lockers is included in the
submittals. The lockers will be installed at the "E" Street, "H" Street and
Palomar Street trolley stations, and the Civic Center. A recent bicycle
locker use survey prepared by SANDAG indicates these locations are near, or
at, 100 percent utilization. Therefore, it is necessary to install additional
lockers to accommodate existing and anticipated demand.
•
•
•
Also included is a claim to perform a
Facilities Report. Since the last
development has occurred in eastern
Montgomery has taken place. An update
will incorporate these areas into a new
Page 3, Item 1 7
Meeting Date 4 5/88
The FY 88-89 claims total an estimated $325,100. Claims will be submitted to
SANDAG to review eligibility of each claim. The claims are then prioritized
by the Bicycle Facilities Committee which is composed of representatives from
each member agency. Based on the Committee's recommendations, the SANDAG
Board of Directors will determine allocation of the available TDA and 1/2¢
sales tax funds.
FISCAL IMPACT: Costs to implement the proposed projects are estimated at
approximately $325,100. Funds for the projects will be requested from the FY
88-89 Transportation Development Act Fund and the portion of Proposition A
revenue allocated for bicycle improvements.
LMC:nr/KY036
WPC 3667E
~~t~~
study and to prepare a Bicycle Route
report update in 1983, extensive
Chula Vista and annexation of the
to the Bi cycl a Route Faci 1 i ti es Report
bicycle facilities plan.