HomeMy WebLinkAboutAgenda statement 1988/03/22 Item 5COUNCIL AGENDA STATEMENT
• Item 5
Meeting Date 3/22/88
ITEM TITLE: Resolution~,3y~/ Amend Contract to Compensate
Shorn/Kaminski Architects for Extra Services in
the Development of Plans to Remodel Police Building
/~ ~c/ ~ ,,
SUBMITTED BY: Director of ~'ublic Safety (4j5ths Vote• Yes_NoXX)
REVIEWED BY: City Manager ~~ ~1
On March 3, 1987, the City entered into an agreement with
Shorn/Kaminski Architects to develop plans for the
construction of a new Public Safety Communications Center
and the remodeling of the main floor of the Police
Facility (Resolution #12919). As the project has
progressed, staff has identified several factors which
require a change in the original scope of the project.
These changes will require the expenditure of additional
funds for architectural and engineering services.
RECOMMENDATION: Adopt Resolution Amending Contract
BOARDS/COMMISSION RECOMMENDATION: N/A
• DISCUSSION:
In developing the plans for the remodeling project, staff
has identified several areas of work that were not
included in the original contract. Staff feels that this
work must be included in the project and to do so will
require that extra compensation be paid to the architect
as noted in Section II (D) of the agreement. The specific
areas are as follows:
1. Movement of Computer and Related Equipment to the
RaGamant
The key area in the remodeling project is the Public
Safety Communications Center. The initial recommendation
called for an allocation of at least 1,200 square feet
for the Communications Center. This space was to be
occupied by: five dispatch consoles; three phone
answering positions; a logging recorder; computers for
the Computer Aided Dispatch System (CAD); the Management
Information System (MIS); the equipment associated with
the computers such as disk and tape drives; printers;
Uninterruptible Power Supply (UPS). As the plans were
developed and staff learned more about the equipment
needs, it became apparent that the 1,200 square feet was
not sufficient to house all of the equipment and still
• supply sufficient needed work space for today and
particularly for the future. It is proposed to solve
the space problem by moving the computers, computer auxil-
Page 2 , Item 5
Meeting Date 3/22/88
• iary equipment and the UPS System to a 450 square foot
area in the basement next to the City's Data Processing
Equipment. This leaves the original 1,200 square feet
for the Communications Center on the main floor for the
consoles and working space as shown in Diagram A.
Specific Tasks and Cost
a) Redesign of Communciations Center to include
revised electrical calculations, dedicated
receptacles and design document changes
24 hours X $70 per hour = $1,680
b) Relocation of the Computer Equipment Room
to the basement requiring new electrical
load calculations, a survey of existing
systems in the basement, design document
changes to provide for demolition plans,
revise existing mechanical, plumbing and
electrical layouts and provide new mechan-
ical, electrical and plumbing layouts as
well as schedules, drafting and new cost
estimates. This work does not include
revising the previously approved plans
for the Crime/Photo Laboratory.
• 168 hours X $70 per hour = $11,760
2. Provision of an Uninterruptible Power System (UPS)
For the City's Main Frame Computer in the Basement
The main frame Burroughs computer is not served by a UPS
system and this has resulted in frequent power stoppages
which create the following problems:
a) Damage to disk drives and the data they contain; b)
electronic components of the system are weakened which
can result in later computer failure; c) data loss ranges
from mini,lnal to total; d) these disruptions to operations
frequently total days and even weeks of staff time to
correct the problems they have caused.
Staff is recommending the UPS System for the Burroughs
Computer as a part of the remodeling project. This action
will not only solve the power interruption problem, but
purchasing the equipment and developing the design as
part of the remodeling project will be much more cost
effective than proceeding with a UPS System for the main
frame computer as a separate project in the future.
Management Services had planned to include a UPS System
in their 1988-89 budget request.
•
.: --
Page 3, Item 5
Meeting Date 3/22/88
• Specific Task and Cost
Revise electrical load calculations, make design
document changes and additional drafting.
22 hours X $70 per hour - $1,540
3. Additional Engineering Services for UPS Study_ and
Revision of Console RFP Specifications
A study was provided to evaluate various UPS and emergency
power options both as to operational and cost
implications. The study results were used in making
decisions concerning the movement of the computer
equipment to the basement and the provision of a UPS
System for the main frame. The engineers were also asked
to review and alter the specifications written for the
new communication consoles so that they would be
integrated properly into all of the electrical systems
in the building remodeling project.
40 hours X $65 per hour = $2,600
4. Additions to the Design Area of the Remodeling Project
• As this project developed, staff identified the need to
redesign additional space on the main floor of the
facility. These additions were primarily intended to make
better use of "vacant" space in the current plan. The
department will continue to grow in the next few years
and it will be cost effective to make all reasonable
changes for future growth at this time. The specific
areas involved in additional design were the
Administrative wing, the north end of the Investigative
Division, the hallway adjacent to the south end of the
public lobby and the provision of an office for the
Communications Systems Manager adjacent to the
Communications Center. The initial remodeling plan is
shown on- Diagram B with the additions noted. Diagram
C shows the new plan as altered to include the additions.
$2,500 architectural services
Summary of Costs
Redesign of Communications Center $1,680
Movement of Computer and Related
Equipment to basement 11,760
•
~._~ ;~
Page 4, Item 5
Meeting Date 3/22/88
Provision of UPS for main frame
• $1,540
Additional engineering services
for UPS study and revision of
console RFP specification 2,600
Additions to the design area of
the remodeling project 2,500
Architectural coordination costs 700
$20,780
An update of the funding of the Public Safety
Communications Center/Police Building Remodeling Project
is as follows:
The Police Building remodeling, the replacement of radio
equipment and the purchase of dispatch and phone answering
consoles have been funded in the current and previous
budgets. The Computer Aided Dispatch System (CAD), the
Mobile Digital Terminals (MDT) and the Management Informa-
tion System (MIS) will be recommended for funding in the
1988-89 and 1989-90 budgets. The estimated costs of these
three projects are CAD $270,000, MDT $260,000 and MIS
$250,000.
• FISCAL IMPACT:
Funds are available in the Public Safety Communications
Center Project PS-102.
•
_~~
. ... ~ J
y ~~~:, ~;~~~~ ~. ...,?cii of
Chula Vl~id, Cu;ifornia
Dated l~ ~ 2 ~~-