Loading...
HomeMy WebLinkAboutAgenda Statement 1988/02/02 Item 18• COUNCIL AGENDA STATEMENT ~~, Item ~ a ,2 ', Meeting Date 1 f-~fi{~88 ITEM TITLE: Public Hearing - PCS-88-1 Tentative Residential Subdivision Map for Rancho Del Rey, Chula Vista Tract 88-1 - Rancho Del Rey Partnership Resolution /~ ~/yoZ Approving Tentative Residential Subdivision Map for Rancho del Rey, Chula Vista Tract 88-1 - Rancho del Rey Partnership SUBMITTED BY: Director of Planning ~~` REVIEWED BY: City Manager (4/5ths Vote: Yes No X ) The proposed subdivision of the residential and open space areas lying within the Rancho Del Rey SPA I area consists of 716 acres located in the eastern portion of the City of Chul a Vista east of I-805. The project i s bounded on the north and east by Otay Lakes Road to the south by "H" Street and the proposed industrial subdivision which is being con sidered on this same agenda. Residential development borders the site to the west. The • Subdivision Map includes open space, multiple family school sites as well as single family parcels. lots, park sites and The City Council has previously adopted EIR-87-1 covering the Ran cho Del Rey SPA area including all of the area proposed to be subdivided. RECOMMENDATION: Based on the findings contained in this report approve the subdivision map for Rancho Del Rey CVT 88-1 subject to the following: 1. The approval of all final maps by the City Council will require the compliance with the City's adopted threshold standards to the satisfaction of the City's Director of Planning. 2. Ttie grading for park lot "D" shall be revised to be consistent with the revised SPA plan and the approved park plan. 3. The developer shall enter into an agreement with the Otay Water District to provide for terminal water storage as well as other major facilities used to serve the area. 4. The adopted CC&R's shall contain a disclosure to buyers regarding future construction of above-ground and below-ground facilities planned by SDG~E for the right-of-way area. 5. The developer shall request the formation of an Open Space Maintenance • District. 6. Copies of the proposed CC&R's shall be filed with the City. ~ ,T LLj 7. PAD and RCT shall be waived or modified as provided in the adopted financing plan for Rancho Del Rey. ,~ • Page 2, Item ~~- Meeti ng DateT-- 8. The maintenance of all drainage, walls, trails, signs, and landscaping within identified open space lots shall be the open space district's responsibility. 9. Acoustical barrier section as well as housing construction and design for any residential areas identified within a 65 dBA contour or greater shall be subject to review and approval by the Chul a Vista Bui 1 di ng Director to ensure interior noise limits of 45 dBA. In addition, the Planning Director shall review and have approval authority for barrier and/or building design to ensure line of site acoustical protection for all exterior areas subject to 65 dBA contours or greater. lU. Public improvements as described in this resolution shall include, but not be limited to: A.C. pavement and base, concrete curb, gutter, sidewalk, traffic signals, street lights, signs, street trees, fire hydrants, sanitary sewer, water and drainage facilities. All improvements shall be designed and constructed in accordance with City standards. 11. The developer shall be responsible for the construction of East "H" Street in accordance with Chula Vista Drawings 87-386 through 87-426. The extent of the improvements shall be as identified in the Public Facilities Plan. • 12. The developer shall be responsible for the construction of full public improvements for all streets shown on the Tentative Map within the Subdivision. All improvements required for each unit shall be guaranteed prior to approval of any Final Subdivision Map for said unit. A temporary turn around conforming to City standards shall be provided at the interim end of any streets having a length greater than 150 feet, measured from the centerline of the nearest intersecting street. 13. Lot #235 in Unit #2 (Phase 3) shall be eliminated to provide a minimum 4U' wide landscaped area between the subdivision and Otay Lakes Road. 14. The developer shall be responsible for construction of a four lane roadway for Otay Lakes Road. Horizontal and vertical alignment shall conform to Chula Vista Prime Arterial standards, except as approved by the City Engineer. The extent of required improvements shall be as identified in the Public Facilities Plan. Said improvements shall be guaranteed prior to approval of any Final Map, for Phase 3 as identified on the Tentative Map date IJovember 23, 1987. The owners shall dedicate sufficient right of way to install a road as shown on the typical section on the Tentative Map and shall offer for dedication sufficient right-of-way to construct a prime arterial roadway as shown on said typical section. 15. Access rights to East "H" Street, Otay Lakes Road, Street "A", and Street "DD", shall be relinquished on all lots abutting on said streets, except that access to lots 168 and 169 of Phase 5 and lot 165 of Phase 6 will be reviewed on a case-by-case basis when development plans are available. • • Page 3, Item .1-~-~a Meeting Dater- ' 16. Graded access shall be provided to all storm drain structures including inlet and outlet structures as required by the City Engineer. Paved access shall be provided to drainage structures located in the rear yard of any residential lot. 17. The developer shall obtain and grant to the City easements for all off site storm drains prior to approval of any Final Map requiring those facilities. 18. Specific methods of handling storm drainage are subject to detailed approval by the City. Engineer at the time of submission of improvement and grading plans. Design shall be accomplished on the basis of the requirements of the Subdivision P~anual and the Grading Ordinance (#1797 as amended). 19. The developer shall submit calculations to demonstrate compliance with all drainage requirements of the Subdivision Manual to include, but not be limited to, drylane requirements. Calculations shall also be provided to demonstrate the adequacy of downstream drainage structures, pipes and inlets. 20. Lots shall be so graded as to drain to the street or to an approved drainage system. Drainage shall not be permitted to flow over slopes. • 21. The developer shall obtain notarized letters of permission for all off site grading work prior to issuance of grading permit for work requiring said offsite grading. 22. Sewer manholes shall be provided at all changes of alignment and grade. Sewers serving 10 or less equivalent dwelling units shall have a minimum grade of 1~. 23. The subject property is within the boundaries of the proposed Assessment uistrict 87-1 (East "H" Street Assessment District). The developer shall agree to not protest formation of the Assessment District 87-1 and to not protest inclusion of the subject property in said District. The developer shall be responsible for all costs associated with reapportionment of assessments as a result of subdivision of lands within the project boundary. 24. The developer shall pay "Eastern Area Development Impact Fees" prior to issuance of building permits. The amount of said fees to be paid shall be that in effect at the time of issuance of building permits. 25. The developer shall be responsible for the installation of traffic signals at the following intersections: East "H" Street and "B" Street, East "H" Street and Paseo Ranchero, Otay Lakes Road and Ridgeback, Otay Lakes Road and "DD" Street. Installation shall include appurtenances required, detector loops, controllers, telemetry, and service locations. • i~ • Page 4, Item _LA-a Meeting Date 1-~5~~--- 26. The developer shall be responsible for repayment of construction costs for the Rice Canyon Sewer in accordance with Resolution 11574 until such time as repayment in accordance with said resolution is completed. 27. The developer shall comply with all relevant Federal, state and local regulations, including the Clean Water Act. The developer shall be responsible for providing all required testing and documentation to demonstrate said compliance as required by the City Engineer. 2d. An access road with a minimum width of 12 feet shall be provided to all sanitary sewer manholes. The roadway shall be designed for an H-2U wheel load or other loading as approved by the City Engineer. 29. Tale developer shall grant easements for all off site public storm drains prior to approval of any final map requiring those facilities. Easements shall be a minimum width of six feet greater than pipe size, but in no case, less than 10 feet. 30. An erosion and sedimentation control plan shall be included as part of the grading plans. 31. The developer shall grant to the City street tree planting and maintenance • easements along all public streets within the Subdivision as required by the City Engineer. 32. Sewer main and access road in Rice Canyon shall be constructed in conjunction with Phase 2. Sewer main shall be concrete encased where the depth exceeds 25 feet. 33. All grading and improvements shall be done in conformance with the Rancho del Rey design guidelines. 34. The developer shall guarantee maintenance of the siltation basin westerly of the subject property until such time as all grading has been completed and the City accepts the responsibility for said basin. 35. Subsequent to approval of Final Subdivision Maps, building permits for development of the subject property may be withheld if any of the following occur: a) The public facilities monitoring program in the Public Facilities Plan indicates that facilities are operating beyond the identified level of service. b) Traffic volumes on East "H" Street exceeds 56,500 vehicles per day measured immediately easterly of Hidden Vista Drive. c) Regional building permits exceed thresholds identified in the Public • Facilities Plan. / ~' • Page 5, Item lg_.-~ Meeting Date-~- d) Traffic volumes, levels of service, utilities and/or services exceed the adopted City threshold standards. 36. A vehicle turnout line 10 feet wide shall be provided along the school site frontage in phase 5, unless the school district determines that the student drop-off/pick-up point will not be located on the loop road. 37. Approval of the width of "DD" Street may be subject to change, pending Council approval of the Circulation Element of the General Plan. The roadway design for "DD" Street shall conform to the standards for the roadway designation contained in the approved Circulation Element. 38. The developer shall agree to form a Mello-Roos public facilities district or an acceptable alternative financing program subject to the approval of both the Chula Vista Elementary and Sweetwater School Districts. 39. The paleontologist monitor shall be present during the grading of the site. The monitor shall have the authority temporarily direct, divert or halt grading to allow recovery of fossil remains (primarily marine mammals). At the discretion of the monitor, recovery may include washing an picking of soil samples for micro-vertebrate bone and teeth. • The developer shall authorize the deposit of any resources found on the project site in an institution staffed by qualified paleontologists, such as the Natural History P~useum (operated by the San Diego Society of Natural History). The developer should be aware of the random nature of fossil occurrences and the possibility of a discovery of remains of such scientific and/or educational importance which might warrant a long term salvage operation. BOARD/COMMISSION RECOMMENDATION: At their meeting of December 16, 1987, the Planning Commission voted 5-1, with one member absent, to approve the subdivision subject to the conditions recommended by staff. DISCUSSION: General Lotting of Area Aside from four lots which relate to the 55 acres of active park area, there are seven open space lots totaling over 273 acres which includes a trail system as outlined in the SPA Plan. The remainder of the site is divided into eight residential lot or dwelling types. They area as follows: 1. Estate Lots. Areas R-1 and R-2 (Reference Sheet #1 of map) are located near the northwest corner of the proposed subdivision provides for 63 estate lots which vary i n average size from 20,000-21 ,000 sq. ft. with a pad area between 10,000-12,000 sq. ft. Approximately half of the units in • the area identified as R-1 which takes its access off the main loop road will utilize a private street entry with a possible gate guarded entry. The R-2 area which is located somewhat below and closer to Otay Lakes Road will have slightly smaller pads utilizing the public street system. /' Page 6, Item -~-~-~~" • Meeting Date 1 ~ - ~~= 2. Standard Lots. The area identified as R-3 involves 284 lots located on the south side of the loop road south of estate lots abutting the main open space leg of Rice Canyon as well as the small subdivision area identified as R-4 located just south of "H" Street. The minimum pad size for these areas is 5,000 sq. ft. with the average lot size varying between 7,400 and 7,700. These lots represent the more traditional subdivision lot sizes used in the Chula Vista area in the past with the exception that the minimum lot width is 50 feet as opposed to the traditional R-1 zoning which carried a 60 foot minimum lot width. The development standards that are outlined in the PC regulations call for a floor area ratio of .5 for these lots. 3. Small Lots. The next classifications of lots is identified in the R-5, R-6, and R-8 areas with R-5 and R-6 1 ocated along the south edge of the loop road adjacent to the small neighborhood park set adjacent to the main open space leg of Rice Canyon as well as the R-8 area which is located near the corner of the loop road and the connection to Ridgeback at the east end of the lots abutting Qonita Vista Junior High School. All three areas have an average lot size of between 5,500 and 6,400 sq. ft. with the minimum pad size set at 4,200 sq. ft. and the typical lot dimension of 44'x95'. It is indicated that these particular areas are planned for housing sizes between 1,500 and 2,000 sq. ft. with the development • standards calling for floor area ratio of .55. There a total of 226 lots listed in this particular category. 4. Small Lots (Cont.) The next category of lots is identified by areas R-7, R-9, and R-1 U with R-7 and R-9 1 ocated along the south 1 oop adjacent to the main open space areas of both legs of Rice Canyon with the R-10 area located in the northeast corner adjacent to the open space area provided adjacent to Otay Lakes Road. These three sub-areas which encompass over 400 lots provide the smallest detached lot size within the Rancho Del Rey area consisting of an average minimum lot size of between 5,100 and 5,700 sq. ft. with the more typical lot being 40'x90' or approximately a 3,600 sq. ft. pad area. The proposed buildings for these lots call for a 1,200 to 1,600 sq. ft. house. In addition, the PC regulations stipulate that the lot sizes will vary between 40 and 45 ft. in width to provide for flexibility with development plans consisting of one and two-story units. All three areas have a number of view lots with orientation to the various open space corridors within either Rice Canyon or Otay Lakes Road. The developer provided various alternatives to the R-10 area to ensure that the design now proposed offering a series of cul-de-sacs and loop roads towards the Otay Lakes area will provide a variety of views from the road looking towards the subdivision that will show a combination of side and rear view of homes as opposed to a continuous rear-view look that would be provided with a continuous road system backing up to Otay Lakes Road. It should be noted that the development standards established for the Rancho Uel Rey area require the submittal of a development package including building elevations and proposed addition standards for all lots that are • under 5,000 sq. ft. in area. Thus, we would see the subdivision approval of the smaller lot areas reference R-5 thru R-10 as only the first step in the development package. f"~ • Page 7, Item 7~--~r Meeting Date 1~--~~ 5. Attached Product Lots. R-11A. R-11A is a 22+ acre site located immediately east and north of the proposed elementary school site situated on the loop road which is planned for duplex construction. However, because of staff concern over the proposed lot width planned as a minimum 32 ft. wide lot product, the developers are withholding subdivision of the area at this point until a development package or further information can be provided to satisfy staff's concerns. 6. Wide-Shallow Lots. Area R-116 is 12+ acre site located on the east side of the loop road adjacent to Ridgeback Road connection which was planned for a wide shallo-v lot product approximately 55'x64'. However, again the applicant is retaining this area as a single lot until they are able to develop the full development package in conjunction with the lotting pattern to satisfy staff concerns. 7. Townhouse & Multiple Family Lots. Area R-12. This is a 15 acre site located at the extreme west end of the project adjacent to the proposed industrial development and the westerly access to the loop road which is planned for some 18U townhouse units which will be submitted at a later date as a development package and will be processed through the Design Review Committee. Areas R-13, R-14, and R-15 are various apartment sites that will accommodate nearly $00 units maximum as outlined in the Rancho • Del Rey SPA. Each of these areas will be processed through the Design Review Committee as well unless further subdivision of the property is required which would then receive Planning Commission and/or City Council review as well. Phasing The residential portion of Rancho Del Rey SPA I is divided into five phases with various units provided within each phase. The first phase of development for the residential area will involve the construction of multiple family units located along "H" Street lying east of the loop road in addition to the single-family detached area identified as R-4 which will take its access off of the existing Calle Santiago Road located within Encore Bonita area. The first phase of the residential development will be preceded by Phase 1 construction of the employment area located immediately to the west which will also include various improvements to "H" Street, primarily the widening to six lanes, extending f rom the existing Terra Nova development to the west to existing improvements near the Buena Vista entry. The first phase of the residential development involving the multiple family area will involve the completion of various road stubbing off of "H" Street as well as the extension of Ridgeback Road. Specific improvements to the trunk sewer system as well as the drainage system in Rice Canyon will also be completed along with various park improvements fur the community park located adjacent to "H" Street. Phase 3 will involve moving into the primary area of single family detached home lots located west and north of Bonita Vista Junior High School and will provide the link between Otay Lakes Road and the loop road back to "H" Street • at the east end of the project. This phase will also include the completion of various park facilities located within the linear park lying east of the • Page 8, Item 1 Meeting Date- loop road area. Phase 4 will follow immediately to the west and will involve completion of the estate lots as well as additional single-family detached product and the extension of the loop road system. Phases 5 and 6 will follow on the south portion of the loop road extending it in a westerly direction encompassing the various single family tracts as well as the neighborhood park located in that area. The completion of Phase 6 will also involve the tie with the westerly end of the loop road connecting it back to "H" Street just west of the industrial development. Well it's important to note the various road systems that will be required concurrent with the applicant's desire to move into each phasing program, it is the applicant's intention to start product types in Phase 2 and move into construction in Phase 3 prior to completion of al l of the units wi thi n Phase I I which are primari ly earmarked for rnulti-family construction. In doing so, the applicant will Le obligated to complete the various public improvements outlined in the public facilities plan as they move through each phase. Street Names The applicant has submitted a list of street the various City departments. Final approval by the Planning Commission, therefore, the date for your consideration. • Low and Moderate Income Housing names which is being reviewed by of the street names i s requi red names will come back at a later While the Housing Element of the Chula Vista General Plan requires that each developer address the question of providing low and moderate income housing, said requirement was deleted by the City Council on the Rancho Del Rey Specific Plan several years back. The variety of lot sizes and housing types planned for the SPA I area of Rancho Del Rey, will in staff's opinion, meet the intent of the General Plan Housing Element by providing a variety of housing types and prices in a relatively wide spectrum. Circulation and Street Improvements Approval of this subdivision which will provide housing for approximately 2,200 dwelling units involves a variety of on-site and off-site street improvements which are linked to the Rancho Del Rey Facilities Financing Plan and thus, are covered in that document. As indicated earlier in the phasing section, the Development of the Industrial Area immediately west of the subject residential property which is earmarked as the first phase of development for the Rancho Del Rey project will involve the widening of "H" Street which is the major circulation element serving this project. The various phases that will follow will link other units of the development with the construction of the easterly portion of the loop road providing the linkage between "H" Street and Otay Lakes Road and as noted with the final phase of development, providing for the extension of the southerly portion of • r 4f Page 9, Item 19 • Meeting Date-~~ ~' ' the loop road which will tie the residential area back to "H" Street near the extreme west end of SPA I. This development is also obligated for regional road improvements in line with the development impact fees as outlined in the public facilities plan with the estimated responsibility for SPA I placed at nearly $5 million. Other Required Facilities The project is obligated to provide an elementary school to be financed through the Mello Roos process as well as contributing funding for a fire station, library, junior high and high school. Under the City's Subdivision Park Ordinance requirement, the development of 2,200 units in a combination of single family and multiple family development would obligate the developer for approximately 15 acres of developed parkland. In this instance, the developer has committed to approximately 55 acres of neighborhood and community park as well as another 45 acres devoted to canyon park and hiking trails for a total of 100 acres devoted to active and semi-active recreational use with the total open space being provided in SPA I equal to approximately 273 acres. Landscaping The general landscaping requirements for the subdivision were clearly outlined in the SPA regulations addressing not only the park planting but the • enhancement of the natural area, addressment of the major entry areas and accent planting that would be accomplished at key points along the loop road as well as planting of the loop road itself. For the most part, the loop road is designed as an 84 ft. right-of-way. The travel lane itself has been limited to 40 ft. in width that will allow some 34 ft. of planting to be interspersed with the sidewalks on either side which will be designed to meander rather than the traditional monolithic design which is laid parallel to the curb line. While individual property owners will be responsible for the maintenance of landscaping within their privately owned areas and homeowners associations will be responsible for various areas within proposed condominium developments, an Open Space Maintenance District will for formed to provide for common maintenance areas such as the major canyon systems as well as parkways and highly visible areas along "H" Street. FINDINGS 1. Pursuant to Section 66473.5 of the Subdivision Map Act, Tentative Subdivision Map for Rancho Del Rey CVT 88-1 is found to be consistent with the Rancho Del Rey Sectional Planning Area Plan and the Rancho Del Rey General Development Plan as adopted by the Chula Vista City Council and the c;ty's General Plan based on the following findings: a. Land Use Element The Specific Plan designates the area for various residential • densities as well as parks and open space which is consistent with this subdivision map. The 2,200 dwelling units identified in the Subdivision Map conform to the density range established in that specific plan. `f Page 10, Item • Meeting Date ~~_ ~-- b. Circulation Element All of the on-site and off-site public road improvements will be installed in accordance with the public facilities and SPA Plan for Rancho Del Rey including the widening of "H" Street and the contribution towards various regional facilities in compliance with the Chula Vista General Plan. c. Housing Element The proposed project will provide for a mixture of housing types and lot sizes that will provide for single family detached and attached as well as various apartment and condominium densities that will provide housing for a wide spectrum of income ranges. d. Parks and Recreation and Open Space Elements The subdivision will result in the retention of a substantial amount of natural amount of open space and develop parkland well in excess of City standards and in compliance with the City's General Plan. Manufactured slopes will be planted and placed within common or private open space areas to ensure quality. • e. Seismic Safety Element Although the project site is considered to be seismically an active area with no known active faults on or adjacent to the property. The nearest major active fault is identified as the Coronado Banks Fault located approximately 20 miles to the west. Several of the potentially active La Nacion fault crosses the subject site, however, seismic risk was judged in the environmental document to be low with specific mitigation measures identified in the environmental document taken into consideration with the design of the subdivision map. Other specific mitigation relating to slope stability and techniques dealing with fill slopes will be incorporated in the grading of the project. All dwelling units within the project will be required to be designed so as to no exceed the interior noise level of 45 dBA. Additionally, all exterior private open space will be shielded by a combination of earth, berm, wall, and/or buildings to achieve a 65 dBA for outside private areas. Subsequent noise studies will be proposed when the precise plans for specific development plans are submitted. f. Scenic Highway Element Manufactured slopes adjacent to "H" Street will be planted consistent with the adopted design guidelines and be subject to City landscape architectural review. Building locations, design, and signing will • be controlled through the use of development standards as incorporated in the PC regulations and the development design guidelines adopted for the Rancho del Rey employment area. 4 P Page 11, Item .~A-~~" Meeting Date h g. Bicycle Routes All of the major roads including the loop road, "H" Street, Otay Lakes Road, and the connecting roads thereto have been designed to accommodate bicycle movement and will provide links to the elementary schools as well as the various parks within the development. "H" Street is identified on the bicycle routes element as a major bicycle link. h. Public Buildings Element The applicant has identified an offer for dedication as well as construction of various parks and school facilities identified within the subdivision. In addition, contributions for fire facilities as well as libraries are included as part of the subdivision obligation of the public facilities financing document. Pursuant to Section 66412.2 of the Subdivision Map Act, the Commission certifies it has considered the effect of this approval on the housing needs of the region and has balanced those needs against the public service needs of the residents of the City and available fiscal environmental resources. • WPC 47U8P • y t`~e City Cc!'ncil of Chula ~~iSla, G-~iifo/rnia u ------ Dated __ • ITEM TITLE: SUBMITTED BY: REVIEWED BY: COUNCIL AGENDA STATEMENT Item ,]A~''r Meeting Date 1LZbf88- Resolution ~~ ~7 ~ Adopting the design guidelines for Rancho del Rey Sectional Planning Area (SPA-I) Director of Planning ~(~ City Managerl~ (4/5ths Vote: Yes No X ) There will be no formal staff report on this item since the City Council received a detailed report and presentation on the Rancho del Rey SPA-I Plan on December 15, 1987. Staff will make a detailed verbal presentation on the Residential and Employment Park Design Guidelines at the meeting of the 26th. For the meeting of the 26th, your copy of the Rancho del Rey SPA-I Plan has been updated to include the latest set of design guidelines. Please bring the plan and guidelines to the meeting for reference purposes. Your review of the guidelines before the meeting will be necessary to our discussion. RECOMMENDATION: Adopting design guidelines for Rancho del Rey Sectional Planning Area (SPA-I). • BOARDS/COMMISSIONS RECOMMENDATION: PJot applicable. FISCAL IMPACT: Not applicable. WPC 4727P • Council of b the City Chula Vista, California dated