HomeMy WebLinkAboutAgenda Statement 1987/09/22 Item 10• COUNCIL AGENDA STATEMENT
Item to
Meeting Date 9/22/87
ITEM TITLE: Resolution~~~Z ~ SfReconveyance of real property from the
City of Chula Vista to Southwestern Community College District
Report: Analysis of alternative sites for a botanical garden
.~%
SUBMITTED BY: Director of Parks and Recreation
REVIEWED BY: City Manager (4/5ths Vote: Yes No X )
On May 7, 1987, the Southwestern Community College District requested a
reconveyance of the botanical garden real property ownership on the college
campus. Action was postponed to allow the City to consider whether there are
feasible alternative site locations for a botanical garden before reconveying
property back to the College District.
RECOMMENDATION: Adopt resolution reverting real property to Southwestern
Community College District, authorize Mayor to execute grant deed, and accept
report on alternative botanical gardens sites.
•ARDS/COMMISSIONS RECOMMENDATION: Not applicable.
DISCUSSION:
In September 1986, Southwestern College requested that ownership of the real
property deeded to the City in 1977 for a botanical garden on the college
campus revert back to the College District. The College felt the time period
for developing the site as a "botanical garden" had long passed and was no
longer appropriate for this area. On May 7, 1987, Council continued action on
this request to allow its representatives to meet with the Board of Trustees.
As a result of this meeting, the City was given an extension to reconsider its
interest in developing a garden park at the College site. Council on Piay 28th
requested that alternative sites be considered and a report returned in
September. Staff has surveyed six (6) areas within the City and identified
several possible alternate sites. These areas are:
1. Bayfront
2. E1 Rancho Del Rey
3. Rohr-Sweetwater Park
4. Eastlake
5. Sweetwater Valley
6. Otay Valley
All areas considered are within the City's incorporated limits, with the
exception of the Sweetwater Valley site.
I. MATRIX
• To objectively evaluate and determine the viability of each potential
site, an evaluation matrix (attachment A) was developed and used. Six
"site desirability factors" were used to grade each site. A grading
scale of one (1) to five (5) was used, with one (1) determined to be a
low desirable factor of the site and five (5) a high desirable factor
for the site. The factors used in this evaluation matrix were:
• Page 2, Item to
Meeting Date~~2 87
A. Size
The "size" factor is defined as the total acreage of the studied
site. The botanical garden master planned at Southwestern was 20
acres i n size. In comparison with the College site, each site was
graded accordingly, with parcels larger in size receiving a higher
grade.
B. Accessibili
Public roads in and around the site were evaluated. High
desirability was assigned to sites with a greater traffic capacity
on the roadway system visitors could use.
C. Availability
Availability is defined as the difficulty or lack of difficulty in
acquiring ownership of a potential site or parcel. It refers to
the parcel or site being readily available to purchase. Parcels
under City ownership were graded a five (5) or a high desirability
because of the relative ease in acquiring. In contrast, potential
sites under private ownership were graded a one (1), or a low
• desirability.
D. Topography
Topography is defined as the existing surface features or existing
contours of each site, including the shape of the land (i.e.
rectangular, lineal, et cetera). Generally speaking, a site with
some elevation changes and relief is deemed a highly desirable site
in contrast to a flat site which received a low desirability rating.
E. Soil Condition
The diversity of vegetation in a botanical garden demands that soil
conditions be conducive to a variety of plant species. There were
no soil surveys taken or available for review on each alternate
site studied; however, enough general soil characteristics were
known to evaluate and assign a grade. Obvious restricting soil
factors ended up being the determining factor. A high desirability
rating was given to those sites that were non-restricting to plant
growth and a low rating was given to sites that would restrict a
varied palette of plant material.
F. Agency Involvement
Agency involvement is defined as the responsiveness of the
• controlling property owner to develop the site into a garden park.
"Outside ownership" refers to any private or public entity that
owns the site being considered. Those areas where outside owners
would be interested in cooperating in developing a botanical garden
received a high desirability rating.
•
II. POTENTIAL SITES
Page 3, Item 10
Meeting Date 9/22/87
A summary of each proposed botanical garden site and this department's
findings has been prepared. Included for your information is a site map
for identifying the proposed locations (Attachment "B").
1. Bayfront Area
As part of the Bayfront Specific Plan, there are three parcels of
land that could be considered for garden park development. One of
the parcels, which is seven (7) acres in size, is adjacent to the
existing Nature Interpretive Center. The second parcel, 11.6 acres
in size, is adjacent to the tidelands. The third sit,
approximately 9.0 acres in size, is adjacent to a designated public
open space area.
All three parcels are considerably smaller than the ideal size of
20 acres and are flat and void of natural topographic relief. The
natural vistas to the bayfront would be interrupted by tree
plantings on these sites. All sites on the Bayfront received a low
desirability rating due to their flatness, high salinity content in
the soil and their location in an environmentally sensitive area.
It is expected that there would be environmental problems
• associated with development of a garden park on the Bayfront and
its introduction of non-native plants to this area.
2. E1 Rancho Del Rey
The E1 Rancho Del Rey development is located between I-805 and Otay
Lakes Road on the north and south side of East "H" Street. The
Rancho Del Rey SPA I Plan has designated a neighborhood park of 6.0
acres, to be located adjacent to East "H" Street and the proposed
Employment Park. The "H" Street park is to be a passive park
primarily for employees of the Employment Park. Currently, the
City is discussing with the developer how this site should be
developed. The conceptual plan for the "H" Street park site show
it as a developed park site adjacent to a proposed library and fire
training center. Proposed amenities for this area are picnic
facilities, a par course, and a large turfed area. A garden park
could be master planned for this area as part of the developers
responsibility. The site received a high rating overall. While
the size of parcel is less than the 20 acres, it received high
ratings in all other categories. It should be noted that
accessibility to this location is better than at the Southwestern
College site.
3. Rohr-Sweetwater Park
• The Rohr-Sweetwater Park is owned in fee title by the City. The
area encompasses over 67 acres with varied topography. The Master
Plan developed and approved in 1986 for the Parks and Recreation
Department includes a small botanical garden. The garden is 3/4
~~.
• Page 4, Item l0
Meeting Date g/22/87
acres in size. The creation of a large botanical garden would
impact the approved Master Plan for the park. There is, however,
one element to the master plan that could be developed into a
botanical garden area. Located along the most westerly portion of
the park site, a "memorial tree grove" is planned. A botanical
garden element could be developed in this area. There is
approximately 3 acres available for developing a garden here.
4. Eastlake
The planned community of Eastlake is located approximately 1 mile
east of Otay Lakes Road and will comprise a total of 3,073 acres
upon completion of development. As part of Eastlake I, Route 125
will intersect the Eastlake Hills and Shores projects on the west
and the Eastlake Business Center on the east. A lineal thematic
corridor is planned along the Route 125 right-of-way and will serve
as a connecting link between all neighborhoods and activity
centers. There is approximately 26 acres within this right-of-way
and it is intended to be developed into a City Urban Forestry
Program. This corridor is currently included in the Eastlake
Master Homeowners Association and is designated as open space.
• A lineal garden park could be located adjacent to the community
center at Eastlake Shores in the right-of-way corridor. The park
would reflect positively on Eastlake and the surrounding business
centers. The garden could be master planned and plans prepared by
Eastlake. Eastlake would probably request credit for master
planning this park.
There are, however, several low rated site desirability factors
about this site. This site received a low grade in accessibility
since there currently are no access roads to this site and the
completion of I-125 is expected to be a minimum of 5 years away.
Upon construction of I-125, a frontage road would be required to
provide vehicular access to the property.
The site topography also received a low desirability grade.
Basically the corridor will be primarily sloping upward from
roadway to the homes above.
5. Sweetwater Valley Park
Discussion between County and City officials have been held
regarding developing botanical elements in the County of San Diego
regional park corridor along Bonita Road. Mr. Robert Copper,
Director of Parks and Recreation for the County of San Diego,
believes that a full-scale botanical garden would not be possible
in the area because the regional park area has been designated as a
• native riparian habitat, inhabited by the least Bell Virio, an
endangered bird species. The introduction of non-native plant
material would probably not be allowed in any environmental review
study.
d ,
.~ ::
• Page 5, Item to
Meeting Date g 22 87
This site also received low desirability in size, availability due
to ecological restraints and low rating in topography and agency
involvement. The County is currently focusing its resources on the
campground development above the Sweetwater Reservoir. To receive
any cooperative efforts from the County on developing this
alternate site, a change in County priorities would be necessary.
6. Otay Valley
Most of the land in the study area of the Otay Valley is currently
under private ownership. Usable land has been zoned for industrial
and commercial uses and the cost of developable land in this region
is relatively expensive. There is, however, vacant marginal
territory located in the Otay River floodplain and associated
wetlands that might be considered as an alternate garden park
site. There are physical and regulatory constraints associated
with development in this area however. The Otay River floodplain
has been designated as a major wildlife and riparian habitat. It
is subject to both Federal and State regulations which severely
limit its use. Any specific plan proposal for the floodplain would
require close coordination with the State and Federal authorities.
Developing this area into parkland would be consistent with the
purposes and goals outlined in the Montgomery Specific Plan (Draft)
for thi s area.
III. SUMMARY
In analyzing the funding of the various sites identified above, there
appears to be only two areas that would be conducive for a botanical
garden site. These two sites are the E1 Rancho Del Rey area and the
Rohr-Sweetwater Park which are owned by the City. Title to property
would facilitate efforts to obtain state and federal grants for the
development of the project. The E1 Rancho Del Rey location would
probably be the most visible site from a main arterial roadway.
In comparison to the Southwestern College site, the E1 Rancho Del Rey
site would probably be rated slightly lower. The site at Southwestern
has several of the elements desirable for creation of a botanical
garden. The existing site at Southwestern would be rated high in size,
topography and soil conditions on the rating matrix. Accessibility to
the site is not as good due to the development of residential homes
adjacent to the site. An access road to the site would transverse a
condominium development. If this site was to be developed, the question
of public access and parking would have to be resolved with the College
District.
There is a feasible alternative site so reversion of college property
could take place without damaging the City future options future if it
• desired to pursue the creation of a Botanical Garden.
FISCAL IMPACT: Not applicable.
WPC 0836R
~,.