HomeMy WebLinkAboutAgenda Statement 1987/08/25 Item 7 COUNCIL AGENDA STATEMENT Item 7 Meeting Date 8/25/87 ITEM TITLE: a) Resolution,~~ Q / Accepting contract work, construction of 5 Mg steel reservoir and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract I), approving Change Order No. 2 to the contract, and authorizing the City Engineer to execute the change order on behalf of the c; ty b) Resolution Accepting contract work, construction of 20 inch off-site water pipeline, telemetry conduit system and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract IIIB) c) Resolution Accepting contract work, construction of Otay Lakes Road, sewer and water lines, and all appurtenances in the City of Chula Vista (Eastlake Assessment District No. 85-2, Contract IIIA) d) Resolution Approving Change Order No. 9 for construction of 980 zone pump stations and appurtenances (Eastlake Assessment District 85-2, Contract II), authorizing • the City Engineer to execute the change• order on behalf of the City and extending the contract time for this project SUBMITTED BY: Director of Public Works/City Engineer REVIEWED BY: City Manager~~ (4/5ths Vote: Yes No X ) RECOMMENDATION: That Council adopt the resolution. DISCUSSION: In 1 ate 1986 and early 1987, the City Counci 1 awarded four contracts for the construction of the water improvement infrastructure needed to serve the Eastlake Planned Development. The contracts are: 1. Phase 1, 5 Mg Steel Reservoir, Trusco Co., Contractor, awarded December 17, 1986 by Resolution No. 12292. 2. Phase 2, 980 Zone Pump Station, Olson Construction Co., Contractor, awarded April 18, 1986 by Resolution No. 12442. 3. Phase 3A, Construction of Otay Lakes Road, sewer and water lines and all appurtenances, Olson Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • 4. Phase 36, 20-inch off-site water pipeline, Thibodo Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • Page 2, Item ~ Meeting Date-$7~7$T Contracts 1, 3 & 4 above are now completed to the satisfaction of both the Otay Water District and the City Engineer. Contract 1 required extra work amounting to $13,121.29 to make it acceptable to the Otay Water District. The work was completed at the direction of the District on July 8, 1987. The extra work increased the contract cost to $916,328.29. Contract 2, the 980 Zone pump station, has minor work to be accomplished before it can be accepted by the Otay Water District, the ultimate owner and operator of the facility. The Otay Water District has requested the contractor for the pump station project to install/modify several items that were not shown or correctly detailed on the plans or specifications. These items amount to $21,900 and will require about 2-3 weeks to complete. There are sufficient funds in the project's fund balance to cover this increase. It is, therefore, recommended that Council approve the change order (No. 9) authorizing the extra work and extending the contract to October 6, 1987. FINANCIAL STATEMENT Authorized Expenditures a) 5 Mg Reservoir Contract ($905,845 original contract & contingencies) b) 20-inch off-site water pipeline ($688,518.10 original contract & contingencies c) Otay Lakes Road, sewer and waterline contract ($2,532,556 original contract & contingencies Sub-Total Final Expenditures a) 5 Mg Reservoir contract b) 20-inch off-site water pipeline c) Otay Lakes Rd., sewer and waterline Sub-Total Balance of Authorized Expenditures a) 5 Mg Reservoir contract b) 20-inch off-site water pipeline c) Otay Lakes Rd., sewer and waterline Sub-Total Staff time from point of inception to July 16, 1987 $28,866.09 X 2.238 (full cost recovery factor) FISCAL IMPACT: In addition to the construction in which the City is reimbursed by the developer, the sewer and surface improvements provided by the • Road. RS/mag WPC 3117E $ 996,000.00 757,000.00 2,786,000.00 $ 916,328.29 689,91b.10 2,623,942.47 $~;'Z31TT$~8~, $ 79,671.71 67,081.90 162,057.53 $ 64,602.31 costs summarized above the City will maintain developer on Otay Lakes i3~~,r COUNCIL AGENDA STATEMENT • Item 7 Meeting Date 8/25/87 ITEM TITLE: a) Resolution Accepting contract work, construction of 5 Mg steel reservoir and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract I), approving Change Order No. 2 to the contract, and authorizing the City Engineer to execute the change order on behalf of the City b ) Resolution ~~,-~~~(,~ Accepting contract work, construction of 20 inch off-site water pipeline, telemetry conduit system and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract IIIB) c) Resolution Accepting contract work, construction of Otay Lakes Road, sewer and water lines, and all appurtenances in the City of Chula Vista (Eastlake Assessment District No. 85-2, Contract IIIA) d) Resolution Approving Change Order No. 9 for construction of 980 zone pump stations and appurtenances (Eastlake Assessment District 85-2, Contract II), authorizing the City Engineer to execute the change• order on behalf of the • City and extending the contract time for this project SUBMITTED BY: Director of Public Works/City Engineer REVIEWED BY: City Manager~~ (4/5ths Vote: Yes No X RECOMMENDATION: That Council adopt the resolution. DISCUSSION: In late 1986 and early 1987, the City Council awarded four contracts for the construction of the water improvement infrastructure needed to serve the Eastlake Planned Development. The contracts are: 1. Phase 1, 5 Mg Steel Reservoir, Trusco Co., Contractor, awarded December 17, 1986 by Resolution No. 12292. 2. Phase 2, 980 Zone Pump Station, Olson Construction Co., Contractor, awarded April 18, 1986 by Resolution No. 12442. 3. Phase 3A, Construction of Otay Lakes Road, sewer and water lines and all appurtenances, Olson Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • 4. Phase 36, 20-inch off-site water pipeline, Thibodo Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • Page 2, Item ~ Meeting Date-$T~~J$7 Contracts 1, 3 & 4 above are now completed to the satisfaction of both the Otay Water District and the City Engineer. Contract 1 required extra work amounting to $13,121.29 to make it acceptable to the Otay Water District. The work was completed at the direction of the District on July 8, 1987. The extra work increased the contract cost to $916,328.29. Contract 2, the 980 Zone pump station, has minor work to be accomplished before it can be accepted by the Otay Water District, the ultimate owner and operator of the facility. The Otay Water District has requested the contractor for the pump station project to install/modify several items that were not shown or correctly detailed on the plans or specifications. These items amount to $21,900 and will require about 2-3 weeks to complete. There are sufficient funds in the project's fund balance to cover this increase. It is, therefore, recommended that Council approve the change order (No. 9) authorizing the extra work and extending the contract to October 6, 1987. FINANCIAL STATEMENT • Authorized Expenditures a) 5 Mg Reservoir Contract ($905,845 original contract & contingencies) b) 20-inch off-site water pipeline ($688,518.10 original contract & contingencies c) Otay Lakes Road, sewer and waterline contract ($2,532,556 original contract & contingencies Sub-Total Final Expenditures a) 5 Mg Reservoir contract b) 20-inch off-site water pipeline c) Otay Lakes Rd., sewer and waterline Sub-Total Balance of Authorized Expenditures a) 5 Mg Reservoir contract b) 20-inch off-site water pipeline c) Otay Lakes Rd., sewer and waterline Sub-Total Staff time from point of inception to July 16, 1987 $28,866.09 X 2.238 (full cost recovery factor) FISCAL IMPACT: In addition to the construction in which the City is reimbursed b the sewer and surface improvements • Road. RS/mag WPC 3117E y the developer, provided by the $ 996,000.00 757,000.00 2,786,000.00 $ 916,328.29 689,91b.10 2,623,942.47 ~~:~6 $ 79, 671.71 67,081.90 162,057.53 $ 64,602.31 costs summarized above the City will maintain developer on Otay Lakes <; ~, COUNCIL AGENDA STATEMENT • Item ~ Meeting Date 8/25/87 ITEM TITLE: a) Resolution Accepting contract work, construction of 5 Mg steel reservoir and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract I), approving Change Order No. 2 to the contract, and authorizing the City Engineer to execute the change order on behalf of the City b) Resolution Accepting contract work, construction of 20 inch off-site water pipeline, telemetry conduit system and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract IIIB) c) Resolution /~?~-/~ Accepting contract work, construction of Otay Lakes Road, sewer and water lines, and all appurtenances in the City of Chula Vista (Eastlake Assessment District No. 85-2, Contract IIIA) d) Resolution Approving Change Order No. 9 for construction of 980 zone pump stations and appurtenances (Eastlake Assessment District 85-2, Contract II), authorizing • the City Engineer to execute the change• order on behalf of the City and extending the contract time for this project SUBMITTED BY: Director of Public Works/City E gineer REVIEWED BY: City Manager~~ (4/5ths Vote: Yes No X RECOMMENDATION: That Council adopt the resolution. DISCUSSION: In late 1986 and early 1987, the City Council awarded four contracts for the construction of the water improvement infrastructure needed to serve the Eastlake Planned Development. The contracts are: 1. Phase 1, 5 Mg Steel Reservoir, Trusco Co., Contractor, awarded December 17, 1986 by Resolution No. 12292. 2. Phase 2, 980 Zone Pump Station, Olson Construction Co., Contractor, awarded April 18, 1986 by Resolution No. 12442. 3. Phase 3A, Construction of Otay Lakes Road, sewer and water lines and all appurtenances, Olson Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • 4. Phase 36, 20-inch off-site water pipeline, Thibodo Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • Page 2, Item ~ Meeting Date-$7~I$T Contracts 1, 3 & 4 above are now completed to the satisfaction of both the Otay Water District and the City Engineer. Contract 1 required extra work amounting to $13,121.29 to make it acceptable to the Otay Water District. The work was completed at the direction of the District on July 8, 1987. The extra work increased the contract cost to $916,328.29. Contract 2, the 980 Zone pump station, has minor work to be accomplished before it can be accepted by the Otay Water District, the ultimate owner and operator of the facility. The Otay Water District has requested the contractor for the pump station project to install/modify several items that were not shown or correctly detailed on the plans or specifications. These items amount to $21,900 and will require about 2-3 weeks to complete. There are sufficient funds in the project's fund balance to cover this increase. It is, therefore, recommended that Council approve the change order (No. 9) authorizing the extra work and extending the contract to October 6, 1987. FINANCIAL STATEMENT Authorized Expenditures a) 5 Mg Reservoir Contract b) ($905,845 original contract & contingencies) 20 i $ 996,000.00 - nch off-site water pipeline ($688,518.10 original contract & contingencies 757 000 00 • c) Otay Lakes Road, sewer and waterline contract , . ($2,532,556 original contract & contingencies 2,786,000.00 Sub-Total Final Expenditures a) b) 5 Mg Reservoir contract 20-inch off-site water pipeline $ 916,328.29 c) Otay Lakes Rd., sewer and waterline 689,91b.10 2,623,942.47 Sub-Total Balance of Authorized Expenditures a) b) 5 Mg Reservoir contract 20 i h $ 79,671.71 - nc off-site water pipeline 67 081 90 c) Otay Lakes Rd., sewer and waterline , . 162,057.53 Sub-Total Staff time from point of inception to July 16, 1987 $28,866.09 X 2.238 (full cost recovery factor) $ 64 602.31 FISCAL IMPACT: In addition to the construction costs summarized above in which the City is reimbursed by the developer, the City will maintain the sewer and surface improvements provided by the developer on Otay Lakes • Road. RS/mag WPC 3117E ,_ 1 ~,,.... • • COUNCIL AGENDA STATEMENT Item 7 Meeting Date 8/25/87 ITEM TITLE: a) Resolution Accepting contract work, construction of 5 Mg steel reservoir and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract I), approving Change Order No. 2 to the contract, and authorizing the City Engineer to execute the change order on behalf of the City b) Resolution Accepting contract work, construction of 20 inch off-site water pipeline, telemetry conduit system and appurtenances in the County of San Diego (Eastlake Assessment District 85-2, Contract IIIB) c) Resolution Accepting contract work, construction of Otay Lakes Road, sewer and water lines, and all appurtenances in the City of Chula Vista (Eastlake Assessment District No. 85-2, Contract IIIA) d) Resolution ~,~~/,~ Approving Change Order No. 9 for construction of 980 zone pump stations and appurtenances (Eastlake Assessment District 85-2, Contract II), authorizing the City Engineer to execute the change• order on behalf of the City and extending the contract time for this project SUBMITTED BY: Director of Public Works/City Engineer REVIEWED BY: City Manager~~ (4/5ths Yote: Yes No X RECOMMENDATION: That Council adopt the resolution. DISCUSSION: In late 1986 and early 1987, the City Council awarded four contracts for the construction of the water improvement infrastructure needed to serve the Eastlake Planned Development. The contracts are: 1. Phase 1, 5 Mg Steel Reservoir, Trusco Co., Contractor, awarded December 1 7, 1986 by Resolution No. 12292. 2. Phase 2, 980 Zone Pump Station, Olson Construction Co., Contractor, awarded April 18, 1986 by Resolution No. 12442. 3. Phase 3A, Construction of Otay Lakes Road, sewer and water lines and all appurtenances, Olson Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • 4. Phase 36, 20-inch off-site water pipeline, Thibodo Construction Co., Contractor, awarded May 13, 1986 by Resolution No. 12471. • Page 2, Item ~ Meeting Date-$7~'S7'$7 Contracts 1, 3 & 4 above are now completed to the satisfaction of both the Otay Water District and the City Engineer. Contract 1 required extra work amounting to $13,121.29 to make it acceptable to the Otay Water District. The work was completed at the direction of the District on July 8, 1987. The extra work increased the contract cost to $916,328.29. Contract 2, the 980 Zone pump station, has minor work to be accomplished before it can be accepted by the Otay Water District, the ultimate owner and operator of the facility. The Otay Water District has requested the contractor for the pump station project to install/modify several items that were not shown or correctly detailed on the plans or specifications. These items amount to $21,900 and will require about 2-3 weeks to complete. There are sufficient funds in the project's fund balance to cover this increase. It is, therefore, recommended that Council approve the change order (No. 9) authorizing the extra work and extending the contract to October 6, 1987. FINANCIAL STATEMENT • Authorized Expenditures a) 5 Mg Reservoir Contract ($905,845 original contract & contingencies) b) 20-inch off-site water pipeline ($688,518.10 original contract & contingencies c) Otay Lakes Road, sewer and waterline contract ($2,532,556 original contract ~ contingencies Sub-Total Final Expenditures a) 5 Mg Reservoir contract b) 20-inch off-site water pipeline c) Otay Lakes Rd., sewer and waterline Sub-Total Balance of Authorized Expenditures a) 5 Mg Reservoir contract b) 20-inch off-site water pipeline c) Otay Lakes Rd., sewer and waterline Sub-Total Staff time from point of inception to July 16, 1987 $28,866.09 X 2.238 (full cost recovery factor) FISCAL IMPACT: In addition to the construction in which the City is reimbursed by the developer, the sewer and surface improvements provided by the Road. RS/mag WPC 3117E $ 996,000.00 757,000.00 2,786,000.00 $ 916,328.29 689,91b.10 2,623,942.47 $ 79,671.71 67,081.90 162,057.53 $ 64,602.31 costs summarized above the City will maintain developer on Otay Lakes 1 C_ 'y