ITEM TITLE Public Hearing Considering Coastal Development Permit Application
No. 025 for construction of underground low-voltage conduit
SUBMITTED BY: Community Development Director ~~\..J
REVIEWED BY: City Manager~'~ ~_~' j/ (4/5th Vote Yes No )
Rohr Industries has submitted ~"" _
a coastaldevelopment permit application for the construc
tion of an underground low-voltage conduit within G Street right-of-way just west
of Bay Boulevard. The project is exempt from environmental review, however, a con-
struction permit will be required in addition to a coastal development permit.
RECOMMENDATION: That the City Council conduct a public hearing and consider and
adopt the attached resolution and findings therein:
1. Finding that the proposed project is consistent with the policies of the
certified LCP; and
2. Approving Coastal Development Permit No. 025 subject to conditions listed
on Exhibit A.
~S/COMMISSIONS RECOMMENDATION: Not applicable.
DISCUSSION:
The applicant proposed to install approximately 245 linear feet of underground con-
crete conduit to house (4) 4" utility conduits. The purpose of this project
is to connect low-voltage utility lines between two existing industrial buildings
separated by B Street right-of-way. The conduits will accommodate supervisory and
computer lines.
Construction will consist of trenching to a depth of 5 feet, conduit construction,
back fill, compaction, and repaving. The site is currently developed with industrial
buildings and roadway pavement and is void of any native vegetation. The site does
not support any wildlife. Wetlands are not on or adjacent to the work site.
Excavation activities will be limited to the months between April 1 and November 1
as are all grading activities to be conducted within the Bayfront Specific Plan
boundaries.
Conditions of Approval
1. Trenching is limited to the months from April 1 through October 30.
2. The applicant and proposal shall comply with all coastal zone requirements
• and standard conditions of approval listed in the Coastal Development Pro-
cedures Manual.
Item 18
Date: / /
F.I NDI NGS
~ on the following findings, the proposed project has been found to be consistent
wi~Fi the olicies of the certified Local Coastal Plan:
P
1. The project site is located on existing, developed industrial property and the
site does not have access to coastal waters or resources. Therefore, no restriction
or impact on coastal access or recreational facilities will result from this project.
2. Construction activities consist of trenching on currently developed land. There
are no natural plants or wildlife present or dependent upon the site; therefore,
no impact on wildlife will result.
3. Currently, access on G Street is limited due to its terminus on the east side
of Rohr's Industrial complex; therefore, through vehicle circulation will not be
effected during construction.