Loading...
HomeMy WebLinkAboutAgenda Statement 1987/08/04 Item 8COUNCIL AGENDA STATEMENT • Item 8 Meeting Date 8/4/87 ITEM TITLE: Resolution ~~~~ Approving an agreement between the City of San Di a ~an the City of Chul a Vista for the acquisition, installation and maintenance of metering devices to measure sewage flow at the "J" and "G" Street meterin stations SUBMITTED BY: Director of Public Works/Ci y Engineer REVIEWED BY: City Manager!~4 ~ ~ (4/5ths Vote: Yes No X ) As a member agency to the Metropolitan Sewerage System (Metro System), the City of Chula Vista (City) is required by agreement to compensate the City of San Diego (Metro) for administration, maintenance and operation (M&0) expenses for wastewater treatment. These charges are based proportionally on the amount of sewage the City discharges into the Metro System to the total flow of the system. The amount discharged by the City is determined from sewage flow data collected by monitoring, or metering, stations, installed at points of connection to the Metro sewer. Two of these stations are located on the "J" and "G" Street sewer mains. The meters existing at these stations are in need of replacement. The Agreement before Council will authorize Metro to .acquire and install monitors manufactured by ADS Services Incorporated (ADS). RECOMMENDATION: It is recommended approving the agreement between the installation and maintenance of the ADS metering stations. DISCUSSION: that Council adopt the resolution City and San Diego for acquisition, flow meters for the "J" and "G" Street Sewerage meters at "G" Street and "J" Street were initially installed in 1963 and extensively rebuilt in 1975. Since that time, replacement parts have been inc reasingly difficult to find. Flow monitors manufactured by ADS will be used to replace the existing meters. The ADS meters are more accurate and dependable and have the capability of being remotely accessed to download the flow data. It is for these reasons San Diego has recommended replacing existing meters with ADS meters. The attached agreement authorizes San Diego to acquire, install and maintain the ADS flow monitors for the "J" and "G" Street metering stations. Under thi s agreement the City agrees to reimburse San Diego for 1) the purchase and installation of the flow meters at approximately $18,000 per meter and 2) maintenance of the meters at approximately $2,570 per meter per year after the expiration of a 90-day warranty period. Funds for the costs associated with • Page 2, Item 8 • Meeting Date-$~7$'T the acquisition and installation of the meters in the amount of $40,000 have been appropri ated through the CIP process. The project i s to be funded using Sewer Income Funds. The City recently purchased the software necessary to download the flow data from the meters. After the flow meters are installed at the "J" and "G" Street stations, these meters may be accessed using the same ADS software. The procedure necessary to add these two stations to the software system is not difficult. FISCAL IMPACT: The initial cost for two ADS meters, including installation, is $36,000. Subsequent to a 90-day warranty period, yearly maintenance for both meters will be approximately $5,140 per year. The funds have been allocated from the Sewer Income Fund. EAF:nr/AR012 WPC 2886E y the City Coancil of Chula Viet , C 'forma Date~1 ~_ _~ ~: