PUBLIC HEARLL'lG TO CONSIDER WAIVING MATHEMATICAL
[RREGULARITIES IN THE BID RECEfVED FOR THE
"ROBINHOOD RANCH UNIT [I, SEWER PUMP STAT[ON
llvlPROVEMENTS - PHASE II (SW256A)," PER CITY CHARTER
SECTION [009
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA
VISTA WAIVING MATHEMATICAL IRREGULARITIES,
ACCEPTING BIDS AND AWARDING THE CONTRACT FOR THE
"ROBINHOOD RANCH UNIT II, SEWER PUMP ST A T[ON
IMPROVEMENTS - PHASE II (SW256A)" TO TED ENTERPRISES,
INC., IN THE AMOUNT OF $85,235; AUTHORIZING AN INTER-
PROJECT TRANSFER IN THE fuvIOUNT OF $[00,000 FROM
EXISTING PROJECT DR180 TO SW256A; APPROPRlA TING
$15,000 FROM THE SEWER REPLACEMENT FACILITIES
A V AILABLE FUND BALANCE TO SW256A; AND,
AUTHORIZING THE EXPENDi:T . OF ALL AVAILABLE
FUNDS IN THE PROJECT
DIRECTOR OF PUBLIC WORKS 7"'~.
ASSISTANT DlR~OF ENG.INE~
CITY MANAGER
ASS[STANT CITY. ANAGER ~
4/5THS VOTE: YES
~
NO
o
SUMMARY
On September 29, 2010, the Director of Public Works received sealed bids for the "Robinhood
Ranch Unit II, Sewer Pump Station Improvements - Phase II (SW256A)" Project. The work to be
done consists of the removal and disposal of existing improvements, installation of storm drain
pipes and structures, sidewalk, driveway, concrete slab, and retaining walls. The proposed action
would: (1) waive a minor clerical error that resulted in a lower total bid, (2) award the contract to
TED Enterprises, Inc, and (3) authorize the expenditure of available funds, as needed, to
complete the work in accordapce with City standards.
ENVIRONMENTAL REVIEW
The Enviromnental Review Coordinator has reviewed the proposed project for compliance with
the Califomia Enviromnental Quality Act (CEQA) and has determined that the project qualifies
for a Class 1 categorical exemption pursuant to Section 15301 [Existing Factlities] of the State
12-1
11/09/10, Item-LL
Page 2 of 4
CEQA Guidelines because the project consists of removal and replacement of existing facilities
with negligible expansion. Thus, no further environmental review is necessary.
RECOMMENDATION
Council adopt the resolution.
BOARDS/COMMISSION RECOMMENDATION
Not applicable.
DISCUSSION
The general scope of the Robinhood Ranch Unit II, Sewer Pump Station Improvements- Phase II
project is to complete site improvements for the sewer pump station and replace the existmg
crushed storm drain system, construction of a headwall, rip-rap energy dissipater, clean-out,
concrete slab, and driveway all within the same parcel. The work also includes all labor,
materials, equipment, transportation and protection of existing improvements and other work
necessary to complete the project.
On September 29, 2010, the Director of Public Works received twelve (12) bids for the
"Robinhood Ranch Unit II, Sewer Pump Station Improvements- Phase II (SW256A)" Project.
The following bids were received:
CONTRACTOR BID AMOUNT
I. TED Enterprise, Inc.- San Clemente, CA $85,235.00
2. MJC Construction, Inc. - Bonita, CA $87,525.00
3. Atom, Inc. - Hemet, CA $91,428.00
4. Clear Solutions Environeering, Inc. - Yuma, AZ $94,326.00
5. American Industrial Services- Escondido, CA $94,787.77
6. Obrero Corporation - San Diego, CA $97,415.00
7. HT A Engineering & Construction, Inc. - Poway, CA $98,350.00
8. New Century Construction - Lakeside, CA $101,700.00
9. Ahrens Corporation - San Diego, CA $102,252.00
10. Scheidel Contracting and Engineering, Inc.- La Mesa, CA $112,285.00
II. Zondiros Corp. - San Marcos, CA $113,900.00
12. Falcon Construction - San Diego, CA $129,640.00
Staff reviewed the apparent low bid proposal in the amount of $85,235 submitted by TED
Enterprise, Inc. During review of TED Enterprise's bid proposal, staff found that the contractor
had a minor mathematical error in a specific bid item subtotal; however, the grand total was
correct and the unit bid pri"Ce remained the same. TED Enterprise, Inc. submitted a letter
acknowledging said clerical error and stands by the corrected bid item subtotal (Attachment 1).
The low bid submitted by TED Enterprise Incorporated is below the Engineer's estimate of
$92,900 by $7,665 (9% below the Engineer's estimate). Design staff has verified the references
12-2
11/09/10, Item /2-
Page 3 of 4
provided hy the contractor and has determined that the contractor has perfonned satisfactorily for
those references. The Contractor's License No. 949397A is current amI active.
Also for consideration is the authority of the Director of Public Works to approve change orders
over and above existing policy limits. Under City Council Policy No. 574-01, if an individual
change order causes the cumulative increase in change orders to exceed the Director's authority
("Maximum Aggregate Increase in Change Orders"), then City Council approval is required.
The base contract amount for the subject project is 585,235. The corresponding maximum
aggregate contract increase that may be approved by the Director of Public "vVorks under Policy
No. 574-01 is $8,523.50. Approval of tonight's resolution will increase the Director of Public
Works' authority to approve change orders as necessary up to the contingency amount of
$17,000, an increase of $8476.50 and will authorize the expenditure of all available
contingencies and to increase the valLIe of the contract, as necessary, resulting trom
unforeseeable conditions and unit quantity adjustments. Unforeseen conditions include such
items as utility conflicts, hazardous materials, unexpected underground conflicts, etc. If the
contingency funds are not used, then they will be returned to the project fund balance.
Disclosure Statement
Attached is a copy of the contractor's Disclosure Statement as Attachment 2.
Wage Statement
Contractors bidding on this project were not required to pay prevailing wages to persons
employed by them for work under this project, No special minority or women owned business
requirements were necessary as part of the bid documents. However, the "Notice to Contractors"
was sent to various trade publications in order to encourage disadvantaged businesses to bid on
the proj eet.
DECISION MAKER CONFLICT
Staff has reviewed the decision contemplated by this action and has determined that the decision
concerns repairs, replacement, or maintenance of existing streets or similar facilities and,
therefore, there is not a material financial effect of the decision on the property holdings of the
City Council Members pursuant to California Code of Regulations sections 18704.2(b)(2) and
18705 .2(b)( I).
CURRENT YEAR FISCAL IMPACT
There is no impact to the General Fund. At this time, statI is recommending an inter-project
transfer in the amount of $100,000 from existing capital improvement project (DRI80) to CIF
SW256A, and appropriating $15,000 from the Sewer Replacement Facilities Available Fund
balance to SW256A as necessary to complete the project. A breakdown of the project costs is as
follows:
12-3
11/09/10, Item /2-
Page 4 of 4
FUNDS REQUIRED FOR CONSTRUCTION
A. Contract Amount $ 85,235
B. Contingencies
C. Staff Time & Testing Costs $ 17,000
l. Design Staff Cost (Design, Survey, Environmental, Right-of- $ 25,000
Way, Public Works)
2. Staff Cost (Construction Inspection, Construction Staking & $ 30,000
Design Management) 5) 5,554
3. Material Testing/Geotechnical Engineering
TOT AL FUNDS REQUIRED FOR CONSTRUCTION $ 162,789
FUNDS A V AILABLE FOR PROJECT
A. Sewer Facility Replacement funds FY 2008-2009 (SW255) $ 47,789
B. Additional appropriation from the Sewer Replacement Fum1 $ 15,000
C. Inter- Project Transfer from DRI80 $ 100,000
. TOTAL FUNDS AVAILABLE $ 162,789
ON-GOING FISCAL IMPACT:
Upon completion of the project, the improvements will require only routine City maintenance.
ATTACHMENTS
I. TED Enterprise Letter
2. Contractor's Disclosure Statement
Prepared by: Boushra Salem, P.E.. Senior Civil Engineer, Public Works Department
.J:\Engineer\AGENDA \CAS201 0\11-09-1 O\S\V256A~Contract Award Agenda.doc
12-4
A TIACHMENT J
Ted Enterprises Inc
Lic # 949397
October 11, 2010
City of Chula Vista
Department of Pub tic Works- Engineeriog
Infrastructure Design Section
Attention: Luis Ladrada
RE: Robinhood Ranch Unit II Sewer Pump Station
lrnprovemenls - Phase 2
(CIP No. SW-256A)
D"ar Luis
Item # 3 re-establishing existing Landscape and Irrigation 600 sq. feel @3.50=$4,130.00wasa
mathematical error on our parl Item # 3 corrected amount should read 600 sq feet @ 3.50 =
$2100.00. We acknowledge the mathematical error and with corrected ammU1t stand by our grand
total bid of$85,235.00
We look forward to working with the City ofChuJa Vista. Please don't hesitate to contact us-with any
further questions, comments, concerns.
Thank you,
~(/0>y
(760) 802-3450 -Ceil
(949)361-3065
555 N El Camino Real San C1cmentc~ Ca. 92672
FAX (949)369-99JO
(;'d
o ,6669S6V6
II'no
"H:LO 0, L, PO
12-5
ATIACHMENl ....:!:-
CITY OF CmJLA VISTA DISCLOSURE STATEMENT
pursuant tn Cnuncil PnIicy 101-01, prior tD any action upon matters that will require discretinnary actinn
by the Council, Planning Commission and all nther officw bodies nf the City, a stal<:ment nf disclosure of
certain ownership or financial interests, payments, or campaign contributions for a City- of Cbu1a Vista
electinn must be filed. Tbe following information must be disclosed:
1. List the names of all persons baving a financial interest in the property that is the subject of the
application nr the contract, e.g., nwner, applicant, contractor, subcontractor, material supplier.
Ie ""..1 Uov -r
Jt;.e.. (/".,.,M'L-
~l~ ...f:- Co --':.ll.oU...::r""<'U', 1~
2. If any person' identified pursuant to (1) above is a corporation or partnership, list the names of all
individuals with a $2000 investment in the business (corporation/partnership) entity.
K...l.\..~'1 He\.--(
j,,-t. VAvt:,'f, 1--
3. If any person' identified pursuantto (1) abnve is a non-profit organization or trust, list the omnes
of any person serving as director of the nan-profit organization or as trustee or beneficiary or
trustor of the trust.
f'10";'.L
4. Please identify every person, including any .agents. employees, consultants; or independent
contractors you have assigned to represent ymi before the City ill this mB!ter.
j(-!L.~I j./,....-r
J o-t.. V.4vb~:J__
5.
Has any person' associated with this contract had aoy financial dealings with ao official.' of ):he
City of Cbula Vista as it relates to this contract within the past 12 months? Yes_ No L
18
Q:\Engine:ring\A11 Projec.ts\SWiSW255\SW256A\SW156A Spec Fma19-9.1O.bfS-""v.doc
12-6
If Yes, briefly describe the nature of the financial interest the official~::: may have in this contract..
6.
Have you made a contributi. 'on of more than $2~ within the past twelve (12) months to a current
member of the Chula Vista City Council? No L Yes _ If yes, which Council member?
Have you provided more tlum $340 (or an item of equivalent value) to an official" of the City
ofChu!a Vista in the past twelve (12) months? (I1lls includes being a source of income, money tn
retire a legal debt, gift, loan, etc.) Yes _ No L
7.
If Yes, which official" and what was the nature of item provided?
Date:
q, 1"1.1~
u
\n"-- \fAL--t:k:l- 1/7
Print or type naine of Contractorl Applicant
>;': person is defmed as: any individual, firm:, co~partnership, joint venture, association, social club,
fraternal organization, corporation, estate, trust receiver, syndicate, any other county, city,
municipality, district, or other political subdivision, -or:any other group or combination acting as
a unit
J!;* Official includes, but is not limited to: Mayor, Council member, Planning Commissioner,
Member of a board, commission, or committee of the City, employee, or staff members.
\9
Q:\E!1gin~Dg\Al1 Projects\SW\SW256\SW'-56A.I.SW256A sp~ FiUJl g..9_10.bfu_WJ.dcc
12-7
RESOLUTION NO. 2010-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA WAIVING MATHEMATICAL
IRREGULARITIES, ACCEPTING BIDS AND AWARDING
THE CONTRACT FOR THE "ROBINHOOD RANCH UNfT II,
SEWER PUMP STATION IMPROVEMENTS - PHASE ]]
(SW256A)" TO TED ENTERPRISES, INC., IN THE AMOUNT
OF $85.235; AUTHORIZING AN INTER-PROJECT
TRANSFER IN THE AMOUNT OF $100,000 FROM EXISTING
PROJECT DRI80 TO SW256A; APPROPRlATING $15,000
FROM THE SEWER REPLACEMENT FACILITIES
AVAILABLE FUND BALANCE TO SW256A; AND,
AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE
FUNDS
WHEREAS, on September 29, 2010, the Director of Public Works received twelve (12)
sealed bids for the" for the "Robinhood Ranch Unit II, Sewer Pump Station Improvements -
Phase 11 (SW256A)" Project" project as follows:
CONTRACTOR BID AMOUNT
1. TED Enterprise, Inc.- San Clemente, CA $85,235.00
2. MJC Construction, Inc. - Bonita, CA $87.525.00
3. Atom, Inc. - Hemet, CA $91,428.00
4. Clear Solutions Environeering, Inc. - Yuma, AZ $94,326.00
5. American Industrial Services- Escondido, CA $94,787.77
6. Obrero Corporation - San Diego, CA $97.415.00
7. HTA Engineering & Construction, lnc. Poway, CA $98,350.00
8. New Century Construction - Lakeside, CA $101,700.00
9. Ahrens Corporation - San Diego, CA $102,252.00
10. Scheidel Contracting and Engineering, Inc.- La Mesa, CA $112,285.00
II. Zondiros Corp. - San Marcos, CA $113,900.00
12. Falcon Construction - San Diego, CA $129,640.00
WHEREAS, the apparent low bid by TED Enterprise, Inc. of $85,235.00 is below the
Engineer's estimate of $92,900 by $7,665 (9% below the Engineer's estimate; and
WHEREAS, staff found that TED Enterprise, Inc. had a minor mathematical error in a
specilic bid item subtotal; however, the grand total was correct and the unit bid price remained
the same; and
WHEREAS, TED Enterprise, Inc. submitted a letter acknowledging said clerical error
and stands by the corrected bid item subtotal; and
12-8
Resolution No.
Page 2
WHEREAS, staff has verified the references provided by the contractor and their work
record has been satisfactory; and
WHEREAS, the engineer's estimate was based on average prices for similar types of
work completed during the last two years; and
NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Chula Vista
does hereby waive mathematical irregularities, accept bids and award the contract for the
"Robinhood Ranch Unit II, Sewer Pump Station Improvements - Phase II (SW256A)" to TED
Enterprises, Inc., in the amount of $85,235; authorize an inter-project transfer in the amount of
$100,000 from existing project DR180 to SW256A; appropriate $15,000 from the Sewer
Replacement Facilities available fund balance to SW256A; and authorize the expenditure of all
available funds.
Presented by
Richard A. Hopkins
Director of Public Works
12-9
-