ITEM TITLE:
RESOLUTION OF THE CITY COUNCIL OF THE ClTY OF
CHULA VISTA ACCEPTING. BIDS AND AWARDING THE
CONTRACT FOR THE "TRAFFIC SIGNAL MODIFICATION AT
THE INTERSECTIONS OF E STREET/BAY BOULEVARD AND
H STREET/BA Y BOULEVARD (Cll) NO. TF369)" PROJECT TO
HMS CONSTRUCTION, INe. IN TH AMOUNT OF $59,900
SUBMITTED BY:
DIRECTOR OF PUBLIC WORKS
ASSIST ANT D [RECTOR OF ENG
CITY MANAGER ~ ,.-
ASSISTANT C[TY~AGER 0]
REVIEWED BY:
4/5THS VOTE: YES D NO C2J
S UMlVlA R Y
On October 13,2010, the Director of Public Works received five (5) sealed bids for the "Traffic
Signal Modification at the Intersections of E StreetlBay Boulevard and H Street/Bay Boulevard in
the City of Chula Vista, California (CIP No. TF369)" project. This project is part of the Bicycle
Transportation Account (BTA) grant, Three Part Bicycle Facilities Improvement, to replace
inductive loop systems with new video detection cameras at the intersections of E Street/Bay
Boulevard and H StreetlBay Boulevard.
ENVIRONMENTAL REVIEW
The Environmental Review Coordinator has reviewed the proposed project for compliance with
the California Environmental Quality Act (CEQA) and has determined that the project qualifies
for a Class I categorical exemption pursuant to Section 153301 (c) (Existing Facilities) of the
State CEQA Guidelines because the improvements will be installed on streets. Thus, no further
environmental review is necessary.
RECOMMENDATION
Council adopts the resolution.:
BOARDS/COMMISSION RECOMMENDATION
Not applicable.
9-1
11/09/10, Iteml
Page 2 of 3
DISCUSSION
On November 25, 2008 by ResolutlOn Number 2008-262, the City Council approved the Local
Agency-State Agreement for Bicycle Transportation Account Project (Local Agency-State
Agreement) to provide bicycle amenities for commuters. The BT A grant project is a Three Part
Bicycle Facilities Improvement, to provide for bicycle amenities such as replacement of bus-
mounted bike racks, roadway signage for bicycle facilities and traffic signal video detection
units, in order to encourage alternative modes of transportation. The proposed action would
allow the City to enter into a contract for the replacement of existing inductive detection loops
with video detection cameras at two intersections. All other objectives of the Three Part project
have been completed.
City staff advertised the prevailing wage project on September 24, 20 I 0 and received five (5)
bids on October 13, 2010. The following table summarizes the bids received:
CONTRACTOR BID
1 HMS Construction, Inc. - Vista, CA $ 59,900
2 Lekos Electric, Inc. - El Cajon, CA $ 79,810
3 DBX Inc. - Temecula, CA $ 84,710
4 Republic, ITS - El Cajon, CA $149,375
Palm Engineering Construction - Riverside, CA
5 (The bid amount had a math error of $63,000. The correct total should $151,910
have been $88,910)
The low bid submitted by HMS Corporation, Inc. is above the Engineer's estimate of$54,000 by
$5,900, or approximately 10%. This difference is attributable to the fact that staff
underestimated the cost for the Video Imaging Detection System bid item; staffs estimate was
based upon an average unit cost for this item from previous bid submittals for similar projects.
The Contractor has satisfactorily completed similar traffic signal modification work with the City
within the last two years. Staff has reviewed HMS Construction, Inc.'s bid submittal and has
determined it to be responsive. Therefore, staff recommends awarding the TF369 project
contract to HMS Constmction, Inc.
Wage Statement
The work to be done under this contract is State funded. Contractors are obligated to pay not
less than the state prevailing wages to persons employed by them for work under this contract.
General prevailing wage rates (California Labor Code SlnO-1815) are predetermined by the
Department ofIndustrial Relations and are effective at the date of the contract award.
Disclosure Statement
Attachment I is a copy of the Contractor's Disclosure Statement.
9-2
11109110, Itern~
Page 3 of 3
DECISION MAKER CONFLICT
Staff has reviewed the property holdings of the City Council and has found no property holdings
within 500 feet of the boundaries of the property, which is the subject of this action.
CURRENT YEAR FISCAL IMPACT
On November 25, 200S by Resolution Number 2110S-263, the City Council accepted and
appropriated the Bicycle Transportation Account (BT A) funds for fiscal year 200S/2009 in the
amount of $135,630, estabhsheu the Three Part Bicycle FacilitIes Project, authorized the transfer
of li.mds in the amount of $15,070 ($11,000 from the Traffic Signal Fee Fund, $2,750 from the
Transportation Development Act (TDA) Fund, and $1,320 from TransNet funds), and amenued
the FY200S/20W CIP program.
A breakdown ofthe project costs is as follows:
FUNDS REQUIRED FOR CONSTRUCTION
A. Contract Amount $59,900
B. Contingencies (15%) $ S,9S5
C. Staff Cost (Construction Inspection, Survey, Design) $ 5,115
TOTAL FUNDS REQUIRED FOR CONSTRUCTION $74,000
PROJECT BUDGET
A. Transit Cap Project (remaining fund available) $ 1,000
B. BTA Grant (Local match reimbursement of 10%) $73,000
TOTAL PROJECT BUDGET $74,000
Sufficient funds are available in the TF369 project account to complete the contract work.
ON-GOING FISCAL INfPACT
Completion of the project will have no fiscal impact to the City. The improvements will be
owned and maintained by Ca!trans.
ATTACHMENTS
1. Contractor's Disclosure Statement
Prepared by, Boushra Salem, Senwr Civil Eng{neer, Department of Public Works/Engineering
J'\Engil1<::el'\AOENDA\CAS2010\11-09-10\TF369-Contmct Award Agenda.doc
9-3
ATTACHMENT (
City of Chula Vista Disclosure Statement
Pursuant to Council Policy 101-01, prior to any action upon matters that will require discretionary action
by the Council, Planning Commission and all other official bodies of the City, a statement of disclosure of
certain ownership or fmancial interests, payments, or campaign contributions for a City of Chula Vista
election must be filed. The following information must be disclosed:
1. List the names of all persons having a financial interest in the property that is the subject of the
application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier.
I
illft
I
2. If any person * identified pursuant to (1) above is a corporation or partnership, list the names of all ..
individuals with a $2000 investment in the business (corporation/partnership) entity.
II In
I
3. If any person * identified pursuant to (1) above is a non-profit organization or trust, list the names
of any person serving as director of the non-profit organization or a.s trustee or beneficiary or
trustor of the trust.
I
tV/it
4. Please identify every person, including any agents, employees, consultants, or independent
contractors you have assigned to represent YOll before the City in this matter.
Ii/II
5. Has any person* associated wit.lJ. this contract had any financial dealings with an official** of the
City ofChula Vista as it relates to this contract within the past 12 months? Yes_ No~
;'
f(1t+-
If Yes, briefly describe the nature of e financial interest the official** may have in this contract.
Pr
16
Q:\Engineering\.AJI Projec1S\TF\TF369\TF369specs\TF369 PREY WAGE .doc
9-4
6. Have you made a contribution of more than $25~ithin the past twelve (12) months to a current
member of the Chula V' ta City Council? No i/'Ycs If yes, which Council member?
tr - -
7. Have you provided ore than $340 (or an item of equivalent value) to an official" of the City
of Chub Vista L~ the past twelve (12) months? (Thi0ncludes being a source of income, money to
retire a legal debt, gift, loan, etc.) Yes _ No ~
If Yes, which official" and what was the nature of item provided?
I/Ir
Date:! 0 -~- (0
*
P~rson is defined as: any individual, firm~ co-partnership, joint venture, association, social club,
fraternal organization, corporation, estate, trust, receiver, syndicate, any other county, city,
municipality, district, or other political subdivision, -or any other group or combination acting as
'8- unit.
**
Official includes, but is not limited to: Mayor, Council member, Planning Commissioner,
Member of a board, commission, Or committee of the City, employee, or staffmembets.
17
Q:\EnglnceringIAll Projects\TF\TF369\TF369spccs\TF369 PREY WAGE .doc
9-5
RESOLUTION NO. 2010-_
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA ACCEPTING BIDS AND AWARDING THE
CONTRACT FOR THE "TRAFFIC SIGNAL
MODIFICATION AT THE INTERSECTIONS OF E
STREET/BA Y BOULEV ARD AND H STREET/BAY
BOULEV ARD (CIP NO. TF369)" PROJECT TO HMS
CONSTRUCTION, INe. IN THE AMOUNT OF $59,900
WHEREAS, City staff prepared prevailing wage contract specifications and advertised
the project on September 24, 2010; and
WHEREAS, on November 25, 2008 by Resolution number 2008-262, the City Council
approved the Local Agency-State Agreement for Bicycle Transportation Account (BTA) project,
a Three Part Bicycle Facilities Improvement; and
WHEREAS, as part of the Three Part Bicycle Facilities Improvement, this project will
replace existing inductive loops with video detection camera at two intersections while the other
parts were complete; and
WHEREAS, on October 13, 2010, the Director of Public Works received five (5) sealed
bids for the project as follows:
CONTRACTOR BID
I HMS Construction, Inc. - Vista, CA $ 59,900
2 Lekos Electric, Inc. - EI Cajon, CA $ 79,810
3 DBX Inc. - Temecula, CA $ 84,710
4 Republic, ITS - EI Cajon, CA $149,375
Palm Engineering Construction - Riverside, CA
5 (The bid amount had a math error of $63,000. The correct total should $151,910
have been $88,910)
WHEREAS, the low bid by HMS Construction, Inc. is above the Engineer's estimate of
$54,000 by $5,900, or approximately 10% due to a lower estimated unit cost by the Engineer for
the "Furnish and Install Video Imaging Detection System;" and
WHEREAS, HMS Construction Inc. has installed traffic signal projects in the City with
satisfactory performance; and
WHEREAS, there are'sut1icient funds in TF369 project for Construction expenditure,
funded from the Transit Cap Project and BT A grant fund (appropriated by City Council
Resolution 2008-263).
9-6
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula
Vista does hereby accept bids and award the contract for the "Traffic Signal Modification at Two
Intersections at E StreetlBay Boulevard and H Street/Bay Boulevard" TF369 Project to HMS
Construction, Inc. in the amount of $59,900.
Presented by
Richard A. Hopkins
Director of Public Works
9-7