Loading...
HomeMy WebLinkAboutPlanning Comm min 1982/03/10 MINUTES OF A REGULAR BUSINESS MEETING OF THE CITY PLANNING COMMISSION OF CHULA VISTA, CALIFORNIA March 10, 1982 A regular business meeting of the City Planning Commission of Chula Vista, California was held on the above date beginning at 7:00 p.m. in the Council Chambers, Public Services Building, 276 Fourth Avenue. Commissioners Present Pressutti, R. Johnson, Green, G. Johnson, O'Neill Stevenson and Williams Staff Present: Director of Planning Peterson, Principal Planner Lee, City Engineer Lippitt, Environmental Review Coordinator Reid, Transit Coordinator Gustafson, Assistant City Attorney Harron and Secretary Mapes The pledge of allegiance to the flag was led by Chairman Pressutti, and was followed by a moment of silent prayer. APPROVAL OF MINUTES MSUC (O'Neill-R. Johnson) The minutes of the meeting of February 10, 1982 be approved as written. ORAL COMMUNICATIONS Chairman Pressutti asked for oral communications and none were presented. 1. PUBLIC HEARING: Consideration of General Plan Amendment to redesi~nate 6 acres between North Fourth Avenue and North Glover, immediately north of the Department of Motor Vehicles~ from "Retail Commercial" to "Research and Limited Industrial" Director of Planning Peterson noted the location of approximately 6 acres north of the Department of Motor Vehicles with frontage on North Glover Avenue and a small amount of frontage on North Fourth Avenue. Brisbane Street, shown on the plat, has not been constructed. The property has been designated for commercial use for many years, although it does not have good exposure to Fourth Avenue. Inquiries concerning the property have indicated an interest in industrial development rather than commercial. At the present time Big Bear Markets is interested in the site as a possible location for a distribution center. It would be their intent to request a rezoning of the property and apply for a conditional use permit for that use. Brisbane Street will be constructed by Cal Trans when the construction of Route 54 freeway results in the closing of Trousdale to make room for ramps onto the freeway. This proposal would leave an area about 170'x170' at the inter- section of Fourth and Brisbane in the commercial category and redesignate the 2- ~ March 10, 1982 adjacent six acres to ~ight industrial. The staff believes a light industrial use would generate less traffic than a small shopping center which could be developed under the present zoning. It is recommended that the General Plan be amended to change the designation from Retail Commercial to Research and Limited Industrial. In response to a question from Commissioner Williams, Mr. Peterson affirmed that the property is in the flood plain of Sweetwater River. If construction occurs before construction of the flood control channel and free~ay, the applicant could either have construction of a type that is flood-proof or bring in fill material to raise the area above the flood plain elevation. This being the time and place as advertised, the public hearing was opened. Eugene Coleman, of Gotham Street, Chula Vista, showed three slides of the area taken during flooding conditions some time ago. He requested that the Commission respect the area as a flood plain and not rezone it to heavier use. He questioned whether the State would construct the proposed flood channel due to escalating costs. William Cowdry, 438 Camino Del Rio South, representing Big Bear Markets, asserted that they have had engineering work performed to develop a project that is safe and meets all requirements of the flood plain. He reminded the Commission that the land could be developed now for commercial uses, but he felt the proposed industrial use would be preferable for the area. As no one else wished to speak, the public hearing was closed. MSUC (Stevenson-R. Johnson) The Commission finds that in accordance with the Negative Declaration on IS-82-22 and the findings stated therein, the proposed General Plan Amendment will not have a significant impact upon the environment and adopts the Negative Declaration. MSUC (Stevenson-R. Johnson) The Commission recommends that the City Council amend the General Plan to change the designation of approximately 6 acres between North Fourth Avenue and North Glover Avenue from "Retail Commercial" to "Research and Limited Industrial" Director of Planning Peterson pointed out that the remaining three items on the agenda all pertain to the proposed EastLake Planned Community development. The first item pertains to the certification of the final EIR on which public hearings were held in November and December, 1981. The second item covers a General Plan Amendment for approximately 4.8 square miles, and the last agenda item is divided into three parts, the first of which deals with prezoning the property to P-C and approval of a general development plan. The second part is a consideration of Candidate CEQA Findings, and the third part is a Statement of Overriding Considerations, which must be continued to March 24 as preparation of the statement has not been completed. Mr. Peterson suggested that agenda items 3 and 4.a be considered before item 2 and that the final EIR be considered with the CEQA Findings under agenda item 4.b. Mr. Peterson recommended that following testimony, all items pertaining to EastLake be continued to March 24. He also suggested that the Commission may wish to set a time for closing tonight's meeting. -3- March 10, 1982 MSUC (R. Johnson-Williams) That the Commission attempt to adjourn the meeting around 11:00 p.m., with adjustments to be made when they see how far along they are at that time. 2. Consideration of Final EIR-80-3 on EastLake Planned Community 3. PUBLIC HEARING: Consideration of General Plan Amendment to chanqe the desi§nation of approximately 4.8 square miles from "Agriculture and Reserve," "Residential 1-3 DU/acre" and "Residential 4-12 DU/acre" to a series of urban densities as well as commercial, industrial, parks, schools and public open space in the area between Southwestern College Estates and Otay Reservoirs - EastLake/Cadillac Fairview Homes West 4. PUBLIC HEARING: a. Consideration of request to prezone approximately 4.8 square miles to P-C (Planned Community) and approve General Development Plan - Cadillac Fairview Homes West b. Consideration of Candidate CEQA Findinqs on the proposed EastLake Planned Community c. Consideration of Statement of Overridin~ Considerations on the proposed EastLake Planned Community With the use of slides, Director of Planning Peterson described the proposed General Plan Amendment which would accommodate a system of urban designations totalling 11,800 dwelling units, a 210 acre industrial park, about 28 acres of community commercial facilities located at two different sites, 30 acres of office uses, two manmade lakes and a system of parks and pedestrian ways that connect those facilities, along with five elementary schools, one high school and one junior high school. The total development would be divided into three phases extending over a period of approximately 20 years. The first phase would start at the northwest corner of the property and would include a portion of the industrial park and would also extend to the south side of Otay Lakes Road for a large part of the residential development. Phase 2 is discontinuous with a portion being an extension of the industrial development and the other portion being largely residential with some commercial and schools. Mr. Peterson pointed out the location of Phase 3 is also discontinuous. The EastLake proposal has been evaluated against the recently adopted Growth Management Policy and it was found that some statements of policy seem to support the approval of EastLake and some statements argue against the approval of EastLake at this time. Mr. Peterson advised there are two basic reasons for his recommendation for den~al of the General Plan Amendment. The first reason is that the City itself has not studied this easterly area and that is reflected by the existing General Plan designation which, for the most part, designates the area Agriculture and Reserve. The City recently hired a Contract Planner who has been given two tasks, the main one being that of studying this area and coming up with a system of urban designations and perhaps some conservations measures. Until that study has been completed and alternatives presented to the Planning -4- March 10, 1982 Commission and City Council indicating means of developing or conserving these lands, it is felt to be premature to approve a development proposal on any one portion of those lands, especially when the development proposal is as oddly configured as the Janal Ranch and in such a remote location from the developed portion of the city. The second reason for denial is that the City of Chula Vista can accommodate its own projected population growth over the next 23 years without allowing development to occur within those agricultural hinterlands. That is based on population projections for the area made by SANDAG together with the rates of growth the city has experienced between 1970 and 1980. Mr. Peterson expressed the belief there is intrinsic value in preserving those agricultural hinterlands as long as possible, and on the basis of past growth those areas could be preserved for a good many years. Mr. Peterson displayed a U.S.G.S. map which indicates that if EastLake is approved and a similar density is applied to the United Enterprises property, and if E1 Rancho del Rey develops in accordance with their adopted plan and other areas develop in accordance with approved plans, and assigning low density to the Bonita Miguel area due to the rough topography, the Chula Vista Planning Area would wind up with about 300,000 people. Four slides of views taken from a helicopter were presented showing the present condition of the property proposed for development as EastLake. Mr. Peterson advised that telephone calls were received in the office today from three people requesting that their opposition to EastLake be expressed to the Commission and made a part of the record; they included Bob Walton, Liz Walton, and Dr. and Mrs. Alvin May. Also, just before 5:00 p.m. today a letter was delivered from United Enterprises expressing their concern about whether the approval of EastLake would reflect on their ability to gain future approval for development, and about the use of sewer capacity by the EastLake development which would otherwise be available to their property. Copies of that letter will be supplied to the Planning Commission with the report for March 24. Commissioner Green questioned what may happen in that area if the proposed development plan is not approved. He wondered what the County would do and what influence the City of Chula Vista might have on the County's action. I~r. Peterson advised that the County planning staff had indicated that the kind of development proposed is not appropriate in the County and that the area should be annexed to the City of Chula Vista. Commissioner Green noted that this development would extend over 20 years and he felt the City could expect to see something develop out there within 20 years. Commissioner Williams asked when the Commission could expect to see the work of the Contract Planner. Mr. Peterson advised that a Council Conference is scheduled for late in April for the purpose of reviewing the Contract Planner's work; the Planning Commission will be included in that conference. -5- March 10, 1982 Commissioner Stevenson commented on discussion about the prematurity of the £astLake proposal, but the City of San Diego is talking about a large develop- ment under the Otay Mesa Community Plan for 44,000 residents. He asked if that has been finalized. Mr. Peterson advised that the Otay Mesa plan has been approved by the San Diego City Council although much of the land is within the County. He noted that the major constraint on development there is the lack of sewer and the construction of a large sewer line which would have to extend from the Otay Mesa to the Bay Front area and on to the 32nd Street Naval Station, which would be a major expense. There being no further questions, Chairman Pressutti called for the applicant's presentation. Bob Santos, with Cadillac Fairview Homes West expressed his pleasure in presenting a project he is very proud of. He pointed out this is a comprehensive long term plan spanning a 20 year period. He presented a 30 minute slide presentation to illustrate his views on the desirability of such a planned community. He discussed the changes which have occurred during the past 20 years in family size, housing needs and amenities, energy costs, the provision of public facilities, and the shift in industrial activity from traditional manufacturing types of employment to service related industries. Mr. Santos reported that in 1970 roughly half of California families could afford the median price of single family new homes but today that number has been reduced to around 15%; condominiums and townhouses which gained wide acceptance in the 70's will become an increasingly important segment of the marketplace in the years ahead. He predicted that people's choices about where they want to live, the kind of home they prefer, their shopping patterns, demands for public services and many other aspects of community life in the 80's and 90's will be different than they were in the 60's and 70's. His firm, with the use of consultants, has done considerable research to assist in charting the course for EastLake and finding solutions that will be responsive to the future. Noting the sharp rise in energy rates in San Diego County--over 60% in a one year period--Mr. Santos reported they have formulated a comprehensive energy conservation and full energy use program in which savings of over 50% can be anticipated. Also embodied in the EastLake development program is a water conservation element with a goal of cutting water consumption by a minimum of 25% as compared to more typical land development within the city. This includes a water reclamation program entailing a dual water system to be constructed throughout the community to allow the use of reclaimed water for all major open spaces, parks, recreation areas, green belts, and condominium common areas for landscape irrigation. Mr. Santos asserted that the EastLake Planned Community is structured to support a balanced transportation system which includes private vehicles, public transit and non-vehicular modes of travel. A system of bicycle and pedestrian trails will link the schools, parks, recreation facilities, commercial and employment areas. He advocated the use of the school-neighborhood park concept, suggesting that on a 10 acre site, an 8 acre park would be combined with a 2 acre elementary -6- March 10, 1982 school facility with the total unit designed to insure dual use and benefits. The outdoor recreation needs of the school would be provided within the park area with maintenance provided by the home owners association. The 2 acre school site would accommodate the footprint of the school physical plant and would be designed with a permanent core facility surrounded by a series of modular classroom pods on permanent foundations. The size of the school could be increased or decreased as determined by need. Mr. Santos affirmed their intent to produce a minimum of 10% of the units for low and moderate income buyers. The ability of potential home buyers to purchase a house will be greatly facilitated by the reduced costs resulting from energy conservation and water conservation efforts. Mr. Santos reported that a major element of EastLake is the rich variety of recreational and educational opportunities that will be offered. The project will include two manmade lakes designed and constructed with recreation use in mind. The larger lake will be adapted for active uses, such as fishing and sailing, whereas, the smaller lake would be more appropriate for passive recreational uses. Special recreation facilities to be constructed as the project develops include the EastLake Beach and Boat Club, EastLake Racquet Club and/or Tennis Court, EastLake Equestrian Center, nature Study Center, and a Lower Otay Recreation Area. The commercial complexes would also address leisure time opportunities, such as theaters, restaurants with entertainment and outdoor eating areas, outdoor exhibit spaces, a bandstand or small amphitheater, and possibly a storefront library. In a discussion of the fiscal planning and analysis, Mr. Santos asserted that a net fiscal benefit available to the City for citywide programs and services would be $210,000 a year at the end of phase I, and would swell to over $600,000 a year at the project buildout. He contended that Chula Vista is destined to become a major economic, social and political center within San Diego County and that the planning for EastLake acknowledges this destiny and promotes such goals. The EastLake plan reflects a commitment to aesthetics and preservation of the natural environment as evidenced by the allocation of 31% of the total area to parks and open space. The planned employment center and adjacent village shopping center would be designed to insure the harmonious relationship important to both elements. It is estimated that six to seven thousand new jobs will be created on site with an additional ten to 30 thousand secondary jobs created elsewhere in the local community. Mr. Santos reported that EastLake is planned to encourage interaction of different social, economic, age, and racial groups. Five density and land use components have been treated as variables in achieving this social interaction. He described the various types of future home buyers that EastLake would appeal to, beginning with single adults and young couples entering the ranks of home owners for the first time, with an income range of $25,000 to $35,000; approxi- mately 24% of the total EastLake dwellings would be targeted to serve this group. The second group is the young growing families, referred to as move-up buyers, with an income range of $25,000 to $45,000; 27% of the EastLake dwellings would serve this group. The third group is the mature family approaching the peak of their economic curve with incomes ranging in excess of $40,000; 32% of -7- March 10, 1982 the EastLake dwellings are targeted to serve this group. The last major group is the older adult home buyers, both in the work force and beyond it. This group would be seeking housing with good geographic location and lifestyle opportunity with an increased focus on the active life; 17% of the EastLake dwellings would be targeted to serve this group. Slides were shown of the various types of housing and amenities that would appeal to each of the groups. It is anticipated that the lower purchase price and low maintenance aspects of attached housing would be particularly attractive to the first time home owners, and that 25% to 55% of each of the other groups would also be interested in attached housing for a variety of reasons. Mr. Santos asserted that while density does not represent a level of quality, it does have a major importance in the community planning process. He cited that a townhouse with the same amount of space as a single family detached house uses 25% less fuel. He also pointed out that roads and park lands are not designed on a per unit basis or density basis, but that the cost per dwelling unit of such infrastructure is reduced with higher density. Speaking to the concern of prematurity, Mr. Santos pointed out that this is only the planning stage and that development would occur only in logical increments with preestablished private sector commitments for required facilities and services. He reviewed the various processes of plan approval that would follow if approval is given to this first phase of planning; such approval will insure Chula Vista's control over the development of the 3,073 acre property. Mr. Santos requested that no action be taken by the Commission at this meeting, and that they be given an opportunity to respond to the issues raised in the staff report at a future meeting. Principal Planner Lee, with the use of a number of slides, discussed the zoning and land use patterns proposed for the EastLake project. He pointed out that in urbanized areas, density tends to decrease as development extends from the core of the city, as in Bonita and E1 Rancho del Rey. An option to this is to create a "new town" which provides the necessary commercial and industrial base to result in a self-contained community; such new towns are separated from adjacent communities by meaningful open space to define community boundaries. EastLake will have many of the characteristics of a new town by providing an industrial base, service commercial, and areas of community focus, such as the schools and lakes. It is apparently the intent of the developer to avoid making EastLake so independent that the existing Chula Vista business areas would suffer, but rather to provide service commercial areas which would compliment the existing shopping centers in the city. However, looking at the proposed density and posture of EastLake it appears as a new town and therefore broad bands of open space should be incorporated in the plan to define its community boundaries. Mr. Lee pointed out that promoting the EastLake density through the uncommitted Chula Vista Planning Area would result in a population of nearly 300,000 people for the planning area. The committed development area of Chula Vista encompasses 30 square miles and represents about 55% of the total planning area. The EastLake plan represents about 5 square miles and approximately 9% of the area and proposes 30,000 residents. Approximately 4 square miles or approximately 7% of the area is in the Mt. Miguel development area which could accommodate approximately 10,000 residents. If density similar to EastLake were applied to the larger United Enterprises property, it would result in 100,000 people. -8- March 10, 1982 Traditionally, Chula Vista has absorbed about 1,000 dwelling units a year. If that figure were doubled and the city absorbed 2,000 units a year it would take nearly 40 years to develop the planning area to that projected population. EastLake projects a growth of approximately 750 dwelling units a year. Mr. Lee noted the importance of planning the remaining 45% of the planning area, including EastLake, United Enterprises, and the Miguel property. In doing so it is necessary to think beyond ownership lines to arrive at an acceptable plan. Mr. Lee compared the density proposed for EastLake with other developed or approved projects within the City to help the Committee understand the nature of the EastLake Plan. He noted that 63% of the residential area in EastLake will average 9 dwelling units per acre. He displayed an aerial photo of the Brandywine development constructed in Chula Vista several years ago which was built on 25 acres and has 8 dwelling units per acre. In EastLake there would be over 700 acres developed at a density higher than Brandywine. Mr. Lee pointed out on the EastLake plan the core areas in the eastern portion of the site which represent about 125 to 135 acres and are indicated for 1300 dwelling units or 10 units per acre. In comparison the graded area of the Watt project lying north of "H" Street and planned for residential construction is approximately 125 acres in size with 830 dwelling units planned for the area, with two-thirds of those units set as condominiums. Thus the EastLake core areas at the east end of the project are at densities 50% higher than those approved for the Watt project which is adjacent to 1-805 and "H" Street. At the southwest corner of the EastLake project, 135 acres of developable land which is surrounded by agricultural land is proposed at a density equal to the same Watt area. Mr. Lee pointed out that the General Plan establishes goals and land use patterns of a general and comprehensive nature. Zoning is more precise and occurs at a reasonable time in advance of development when specific facts are available to make precise decisions. Because of planning studies being conducted for the entire eastern planning area, the uncertainty over water availability, and the major funding required to construct the primary north-south road, which will eventually cross Bonita Valley, it is recommended that if the Planning Commission approve the item, that a zoning commitment be given only for Phase I, which is the northwest area of the project, which abuts existing development in Chula Vista, and would stop at Telegraph Canyon Road. This would allow develop- ment for a five to six year period. The remaining area would be classified "agriculture" as a holding zone. Mr. Lee discussed the planning boundaries since approval of EastLake would carry a land use commitment to adjacent areas. He pointed out the areas which would be particularly affected. It was noted that the EastLake plan proposes sites for 5 elementary schools, one junior high school and one high school. Based on school district projections there would be a need for 7 elementary schools, two or three junior high schools and 2 high schools. Mr. Lee presented information on capital costs associated with the major onsite and offsite improvements required to service the proposed development. This would include a fire station and equipment, a police vehicle, a lease for a library, transit subsidy and payroll costs for one year. The total cost for the various services and salaries would be just under two million dollars. -9- March 10, 1982 Mr. Lee discussed the staff's proposal for the EastLake area which would reduce the density from 11,800 units to 7,500 dwelling units, which would be an average of about 5 dwelling units per acre. It would also limit development to the area east of the San Diego pipeline and would eliminate 225 acres of proposed development. John Lippitt, City Engineer, discussed three areas of providing public works facilities: circulation, sewer and drainage. He indicated that his primary concern with serving development in this area is the circulation. Several traffic studies were performed on a computer analysis by the Jack Raub Company in Orange County, as well as an analysis by Stephen George under the Environmental Impact Report. Based upon that analysis and the proposed growth, traffic generation was projected for the year 2000. Two road networks to serve the area to the east of Chula Vista were considered. Network I represented a full service network including completion of the 125 corridor going north and south, Orange Avenue extending through United Enterprises property, and the extension or widening of Telegraph Canyon Road and East "H" Street. Network 2 is a constrained development proposal which eliminates Orange Avenue, provides for the construction of a portion of the 125 corridor but does not extend it to the south or north to the Route 54 freeway. Full traffic volumes for both networks were determined and the percentage that would be attributable to the EastLake project. On that basis a generalized statement is included in the conditions and some tentative improvements to be installed as each phase of EastLake is developed. He read condition No. 32 in the staff report, which he felt was most pertinent with regard to the provision of public works facilities. Mr. Lippitt advised that based on the project impacts and the amount of traffic projected for the year 2000, a table of EastLake's responsibility for providing streets to serve the area was prepared and included in the list of conditions. The major improvement would be the Route 125 transportation corridor north to Route 54, which would be a four lane divided highway. Telegraph Canyon Road would be widened to six lanes and East "H" Street widened to four lanes (the original two lanes will be installed by the City and the Gersten Company). Mr. Lippitt displayed diagrams showing the five basins for sewer improvements and for storm drain facilities. Bill Gustafson, Transit Coordinator, reported that the existing transit service to the eastern portion of Chula Vista is Route 704 and 705 which terminate in the vicinity of Southwestern College. Any service to the EastLake area would involve service beyond the present service area. He contended that transit service should be provided to a newly developing area concurrent with the development in order to establish ridership habits when the dwelling units are first occupied rather than later. The problem with establishing transit service initially is that in the initial period of population growth ridership may be low and the service unproductive compared to the rest of the system. Mr. Gustafson expressed his belief in the need for two types of transit service for EastLake: First, an extension of the line haul service to connect the EastLake area to downtown Chula Vista, probably through the extension of Route 705. The second system would be an internal system to serve the EastLake area itself. He suggested that the developer participate finacially in the establishment of the services by supporting the line haul service for a period -10- March 10, 1982 of up to four years at a decreasing rate. The internal or shuttle system within the project would probably not be required until the end of Phase I development, or during Phase 2. With regard to capital facilities, Mr. Gustafson suggested that the developer assist in purchasing two vehicles for the internal circulation system and provide two transportation centers within EastLake to serve as a focal point for the line haul system and the internal system. Also, that there be some design considerations in the street network that would incorporate bus bays at major intersections or major loading points and some minimal fixtures, such as benches, at major loading points. The estimated cost for these facilities would be in the range from $500,000 to $1,000,000. The cost of participation in the operations in the fixed route service and the shuttle system and purchase of two buses would be around one half million dollars, which does not include the cost of any design element into the street network or the two transportation centers. The meeting recessed at 9:20 p.m. and was reconvened at 9:30 p.m. Environmental Review Coordinator Reid reported that following the hearings on the draft E.I.R., the final E.I.R. has been prepared in three volumes: the first volume contains the basic text; the second is comments received on the draft and response to those comments; and the third volume contains the appendices. Mr. Reid advised that one of the major revisions in the E.I.R. is the inclusion of an analysis of traffic impacts at the 1-805 interchanges, as well as conditions relating to future traffic studies and specific street improvements. Letters from the school districts requested some modifications in the E.I.R. and that has been accomplished. Mr. Reid pointed out this is a Master Environmental Impact Report and supplemental reports will be required for Sectional Area Plans and tentative subdivision maps. Since this is a large scale project that will be developed over a number of years, there will be a number of discretionary acts required during the development. The level of specificity available now is not adequate to make a final decision as to land form, alteration, biological impacts, etc. Some of the major impacts identified in the E.I.R. include the irreversible commitment to an urban intensity of land use, possible encroachment of urban uses into the viewshed of Otay Lakes, impacts on transportation and circulation systems, and a series of urban services, such as sewer, education, fire protection, library. There would also be an unavoidable effect on the air quality, and an increase in ambient noise level both in the project area and offsite where traffic volumes would be increased. Mr. Reid noted that the CEQA Findings identify which impacts are significant, which can be mitigated to a level of insignificance, the impacts which it is infeasible to mitigate, and the impacts which come under the authority of another agency to mitigate. If changes are made in the project during the development stage, it may require changes in the CEQA findings. Commissioner Williams felt the E.I.R. did not contain sufficient information on water availability or on the effect on the air quality. If the Arizona water is cut off and there is no other source of water developed, and if the population in the San Diego area continues as projected, what effect would this have on the present residents in terms of quality of life. -11- March 10, 1982 Commissioner Stevenson suggested contacting the City of San Diego since they have just approved the Otay Mesa development with an increase of 44,000 persons they must have looked into the water availability aspects. Commissioner G. Johnson noted in the report the requirement for library personnel being included in the cost to the developer and wondered if the same requirement would be needed by the schools. She also asked for a status report on the progress of East "H" Street, the Watt development, Bonita Haciendas, and Long Canyon Estates--where they lie in the general timetable. Also, if Long Canyon is not developed, what would be the effect of runoff water without the retention basins required in that project. Commissioner Stevenson expressed confusion over the fiscal analysis, since one portion of the report indicates a positive fiscal impact to the city, and the conditions require that the developer pay certain amounts for library, fire protection, police and public works services, yet the E.I.R. assumes that the City would be paying for these services. Mr. Reid advised that the suggested conditions of approval relative to those requirements are basic start-up costs for a brief period of time, whereas the fiscal analysis in the E.I.R. is for the 20 year life span of the project and beyond. Commissioner Williams questioned the feasibility of developing a 200 acre industrial park without access to railroad transportation or direct freeway access and asked staff to investigate whether or not similar industrial develop- ments have occurred so remote from a freeway. Chairman Pressutti declared the public hearing open for testimony on agenda items 2, 3 and 4. Gene Coleman, Gotham Street, Chula Vista, noted that reference was made to Route 125, although it was deleted from the State highway plans some years ago. He also commented on the controversy over SDG&E's exhorbitant rates and the reason they give is that they have to extend service into remote areas and here we go again. He reported that the Police Department has only one patrol in the Southwestern College Estates area and there have been recent incidents of auto theft and residential burglaries. Also, that the streets are deteriorating due to lack of maintenance and street trees have not been trimmed for two or three years. He noted that Chula Vista has employed a consultant to attract industry and business to the city to fill the available prezoned land, and this project would add more acreage to that vacant land. He pointed out that although Cadillac Fairview has a letter from the Otay Water District indicating they can serve the area, that District is exceeding its entitlement of water, which has not been a factor in the past but will become a factor if the supply is diminished as it surely will be. He urged the Planning Commission to deny the request for an amendment to the General Plan. Martha McDonald, 4425 Acacia Avenue, representing the Long Canyon Home Owners' Association, expressed support for denial of the General Plan Amendment and approval of an 18 month moratorium on amendments to the General Plan and other development proposals in the eastern territories for the following reasons: 1) Prematurity--adopted General Plan indicates the area should not be urbanized -12- March 10, 1982 until after 1990. There is presently sufficient vacant land within the city to take care of the projected population growth. General Plan amendments should not be adopted prior to completion of the study underway by the contract planner hired by the City. 2) EastLake represents leapfrog development and urban sprawl. This approval would oppose the recently adopted Growth Manage- ment Policy which calls for in-filling and compact settlement patterns. 3) EastLake violates Chula Vista's west to east policy. 4) EastLake will be growth inducing, which is a significant adverse impact that is unmitigable. 4) The proposed density is too high. EastLake shows a higher density than any other Planned Community. 6) Major traffic impacts from EastLake will be outside of the project and outside of the City of Chula Vista. These impacts are substantial and would create the need for costly improvements to the involved subregions of the circulation system. Mrs. McDonald expressed belief that the General Plan Amendment should be denied because the EastLake project is not in conformance with the County regional land use map, the Chula Vista general land use map, the regional growth manage- ment plan for San Diego County, Chula Vista's west-to-east policy, the State of California Environmental Goals and Policy Report of 1978, the Board of Supervisors' agricultural policy, the Open Space Element and Conservation Element of Chula Vista, LAFCO's agricultural land preservation policy, the Series V population projections, the County of San Diego and City of Chula Vista circulation plans, or with the goals and objectives of the Sweetwater Community Plan. Nancy Palmer, member of the San Diego Chapter of Sierra Club, and a resident of Chula Vista, called attention to the position taken by the Sierra Club in opposing EastLake at this time because it will result in the irretrievable loss of valuable agricultural land, make air quality maintenance impossible and result in growth beyond the capacity of the City of Chula Vista to provide services. She asserted that the current agricultural value of the Janal Ranch should not be underrated; it lies within the coastal zone and its potential for commercial, vegetable and flower farming increases as transportation costs increase and water reclamation processes improve. Industrial and strategic farming are agricultural alternatives that require far less water. She called attention to a recent article on strategic agriculture and to a table listing industrial crops for arid lands. The current and continuing agricultural potential of the area under consideration should not be ignored. She stressed that the EastLake plan will make air quality maintenance impossible. Ms. Palmer called attention to a list of major residential developments which have been approved or have maps pending before the Planning Commission, which would result in the addition of 4,278 dwelling units within the city, and without EastLake Chula Vista's population will reach 100,000 by 1990. She also referred the table depicting impacts on air quality, energy, municipal finance and transporta- tion which can be expected from population growth even without EastLake. She urged that the General Plan Amendment be denied and give serious consideration to a moratorium on future developments until those developments already approved can progress to the point where their actual impact to the city can be accurately assessed. Gale Burkey, President of Sweetwater Valley Civic Association, expressed the opposition of that association to the General Plan Amendment and their support for the Growth Management Policy and the west to east developmental pattern. The Civic Association is especially concerned on regional traffic problems that will impact the valley floor if premature development is allowed to proceed. He asserted that the north/south traffic corridor has not been adequately planned to spare the Sweetwater Valley from traffic impacts. -13- March 10, 1982 Paul Whitten, 5960 San Miguel Road, Bonita, chairman of the Sweetwater Community Planning Group, stated it is their position that the final E.I.R. as presented at this time is not adequate and not complete. He also expressed their position in opposition to the General Plan Amendment and to the Planned Community zoning. He pointed out that under the E1 Rancho del Rey Plan, approved ten years ago, for approximately 3,000 acres, only about 33 per cent of the proposed development has taken place, and if there was a sociological need for that development it would have taken place by this time. In response to a question raised by Commissioner Green as to whether development could take place in the County, Mr. Whitten referred to a letter received from Supervisor Hamilton stating that the proposal is totally inconsistent with the County General Plan. Mr. Whitten expressed the opinion that the letter submitted by United Enterprises is very justified, based on a letter from SANDAG which states that if EastLake is approved inconsistencies with regional population forecasts will be so substantial that reasonable measures to mitigate the adverse impacts of premature growth do not seem likely, and mitigation would have to be accomplished by deferral of development in other portions of the South Bay. Mr. Whitten asserted that the lack of identification of impacts offsite and the mitigation of those impacts in a logical fashion is exhibited in the documents submitted. Road improvements and drainage improvements are required offsite, not within the City of Chula Vista, and the City does not have the authority to require assessment districts to pay for those improvements; it would require a joint powers agreement with the County. He contended the report is inaccurate in stating there will not be an adverse fiscal impact, since there will be financial costs that somebody has to bear. He commented that the school and park sites is very innovative, but felt that people could not be denied the use of the parks except at certain hours, but he did not believe school children and the general public can co-mingle successfully. He further expressed the belief that move-on modular buildings would not meet the earthquake standards of the State of California. Mr. Whitten questioned whether the City could force the developer to pay for all of the costs for services, or could expect a subsequent developer who might purchase the land to meet the obligations. He suggested that the Commission put aside the slide presentation presented tonight and plan for the future development of the Chula Vista Planning Area in a logical sensible way. John Rojas, Jr., 1169 Second Avenue, advised that his residence is now in San Diego County, but it may, in the future, be annexed to Chula Vista. He noted that although the area is developed with homes it has never had adequate public improvements. If the area annexes to Chula Vista, the city's population will be over 100,000. Land is available in that area for industrial use, near existing freeways, both I-5 and 1-805. Those residents are looking forward to the leader- ship and being a part of Chula Vista. -14- March 10, 1982 Gretchen Burkey, Environmental Chairman of the Sweetwater Women's Club, speaking for that group, reported that their concerns regarding traffic and circulation remain just as great as they were during the E.I.R. hearing. Those problems have not been alleviated. EastLake has addressed the mitigation of adverse impacts on its own project but completely ignored the horrendous consequences of that mitigation, which is dumping the northbound traffic on the Sweetwater valley floor and the impact it will have on residents of Bonita. She urged that the General Plan Amendment be denied and an 18 month moratorium on development be adopted. Susan Painter, 704 Gretchen Road, spoke in response to comments made by Mr. Santos about this project not affecting the redevelopment area of Chula Vista. He had indicated that the type of businesses proposed in EastLake would not compete or detract from the type of businesses in the redevelopment area. She felt this was an interesting comment since none of the businesses have been established, nor has their inventory or clientele, so it is not possible to determine competition. She suggested that the EastLake community would be more oriented toward the east and residents would use Route 125 or 1-805 rather than coming to the business district of Chula Vista. She also commented on his statement that there would be 7,000 to 9,000 jobs onsite, and unless such jobs were limited to EastLake residents, there would be a great increase in traffic with resultant air pollution. She urged that the EastLake project be turned down. Don Armstrong, 37 Palomar Drive, Chula Vista, advised that as a banker and construction loan officer he has witnessed a lot of sl~p-bang builders build up the hillsides in Bonita with undesirable results. He has lived in Irvine and worked with Cadillac Fairview in developing Woodbridge Village. He contended that company would not let down the City of Chula Vista. He suggested this area needs a be%ter environment, not the type of development the County is striving for, such as a federal prison and second border crossing. He contended that leapfrogging into a new area results in developments like Rancho Bernardo, Woodbridge Village, or Mission Viejo, which are not bad examples of development; they have not taken away from anything but have added to California. They concentrate on people, on better living and on better jobs. He advised that he does not see EastLake as a threat to Chula Vista, but rather a blessing of something better for this area. It would be a development that would bring attractive industry because it furnished a good living environment. Peter Watry, 81 Second Avenue, recalled the projects for Sports World and Plaza Del Rey, which were overturned by a referendum vote following approval by the City Council. He indicated he is not urging the Commission to vote this project down just to avoid that type of conflict, and if the Commission believes the project is good for Chula Vista, then they should support it. He pointed out that a decision of this size and impact comes only once or twice in a decade, and that such a decision effects the basic character of Chula Vista. He agreed that the internal part of the plan is beautiful, but the Commission must also consider its effect on the rest of Chula Vista. He contended it would change the whole center of 9ravity of the community of Chula Vista and have an impact on all of the city. Pete Schiff, representing Bonita Highlands Home Owners Association, advised that group is opposed to the project as presented. They are concerned with how it will impact their community and Corral Canyon which would become a racetrack, and the Sheriff's Department would not be able to police it. He felt it could not be adequately policed with the increased amount of traffic that would result from the EastLake project. He asked that the City consider the impact it will have on other communities outside of the city limits. He also objected to the -15- March 10, 1982 location of parks adjacent to small elementary schools and felt that the joint use of such parks by the public and by the school children is not acceptable. Chairman Pressutti noted that it was nearly 11:00 p.m.and the Commission had expressed their desire to adjourn at that hour. He suggested that action could be taken on the E.I.R. if it is the Commission's desire and the other agenda items continued to a subsequent meeting. MSUC (O'Neill-Williams) Agenda items 2, 3 and 4 on tonight's agenda be continued to the meeting of March 24, 1982. DIRECTOR'S REPORT Director of Planning Peterson reminded the Commission members that Statements of Economic interest must be filed with the City Clerk by April 1st to avoid payment of a penalty. No Commission comments were offered. ADJOURNMENT The meeting adjourned at 11:08 p.m. to the meeting of March 17, 1982. Respectfully submitted, Helen Mapes, Secretary