HomeMy WebLinkAbout2010/05/25 Additional Information
MEMO
,A-.c'O'..\-C ""''- .J..-~
.::I"p.s /Co
~\f?
-@:!-
~'~
-~
--
--
CITY OF
(HULA VISTA
Department of Public Works
File: 0735-10-SW251
DATE:
May 25, 2010
VIA:
The Honorable Mayor and City Council
Jim Sandoval, City Manage~ r.--
Scott Tulloch, Assistant Cit~anager?)
~.\
R. A. Hopk' .' I' ctor ofPubhc Works
I ..
Road Closures Associated with the "G" Street sewer CIP Project, SW -251 involving
"G" Street from Fourth A venue to Second A venue for the Purpose of Constructing
Sewer Improvements
TO:
FROM:
SUBJECT:
On April 12,2010, Cass Construction Inc., a contractor hired by the City for the "G" Street Sewer
Project, submitted traffic control and detour plans requesting the closure of "G" Street, between Fourth
Avenue and Second Avenue for the purpose of constructing new sewer lines and modifying existing
sewer lines. The street closures would occur in phases and will never at one time close the entire
distance of "G" Street between Fourth A venue and Second A venue but will close an entire block fi'om
F01ll1h Avenue to Third Avenue and then from Third Avenue to Second Avenue (see attached detour
plats). The work should progress from west to east except the first phase of the project where work will
start at the intersection of Third Avenue and "G" Street. Night work will be allowed at the intersections
of Fourth Avenue and Third Avenue in order to cause the least disruption to vehicular traffic.
The exact timing of the street closures is not know at this time, but will likely begin late in the week of
May 24th The project duration is 60 consecutive working days, which extends the project into the
middle of August. Staff considers these as necessary closures to allow for the construction of the 12"
sewer main that is as deep as 17 feet. At 40 feet wide, "G" Street is a relatively narrow street, which
does not leave enough room for the contractor to dig the trench, place the trench spoils on the street and
allow room for both construction equipment and two-way traffic.
Signs will be erected notifying the public of the upcoming closures a minimum of two days in advance
of closing each of the streets. Residents of the affected street will be given 72 hours notice prior to any
closure of a street and of night work. Local traffic for residents along "G" Street as well as trash,
deliveries and emergency vehicles will all be given access through the closed road segments at all times.
Chula Vista Transit will not be affected by these street closures. There are no transit routes on this
segment of "G" Street. All emergency services will be adequately accommodated during the closure
periods.
The Traffic Engineering Section has reviewed and conceptually approved the attached closure and
detour plan.
Honorable Mayor and Council
May 25, 2010
Page 2
The purpose of this memorandum is to advise the City Council of said closures in accordance with
Council Policy No. 576-15, whIch requires that Council be notified in advance of a request to close a
street for major construction work.
If Council has no objections to the proposed street closures, staff will proceed with the closures
described shown above.
Attachments
cc: Diane Ho\vell, Offic~ of Corrununications
Raul Bejarano, Chief of Police
David Hanneman, Fire Chief
Andy Trujillo, Transit Manager
Police and Fire Dispatch
Amy Partos3n, Engineering Admin Analyst II
Lindsey Walters, Public Works Specialist
Matt Little, Assistant Director ofPlIblic Works
J:\Engineer\AGENDA\lnformatioll Itell1s\Road CloslIres\G St sewer 51 c10LlSlIre 5-24-10.doc
.-.----.---.----.- .~~-_._.._~--- -- ~......,.....,..~._~-~-~--~-~ -- --~-~-~-~-----~ ~~ -~,..----------.._--~--~~-~~
Ot'O~
'fs~~
\~)
Y4-10(U1
\M4-10(Rt)
\
\\\
s
'2.
'"
J\
)
NO SCALE
SSSI.
C{'i'\<-'C
y ~cC,S'
:r- f>..-OOS
'2.
"'\
\
LEGEND
~""'"''''''
C'J",,,,,o>~
IZB "--"'''''$
D:J ""'"
EI ""'---'CrI:J/IOFrlWU
iEl rm.o..~'""nH';;1IT
Q[] SNr"'--"""m"<I""~rr
C!J_
'O'O~
,;>;S~"
This Traffic Control 'Nark Zone
Plan is in accordance with the
City ofChula Visty 'tandar<t~.
Approved by: '/.J. ?;
Date: 5"
7:00 A.M. to 4:00 P.M.
SHEET 31
POS1EDSPEtwLiIAIT'SotJ:
4tl1AvehU&
"G'SlIa"(
Parll"'ay
~l'dA\~nue
G:lrf"tlAvanu"
2ndA,enua
IhI.P.H
"
,,"
"
"
1::5
"
PHASE 'G,H,I,J'
DETOUR
~
~"""'=
CASS CONSTRUCTION
""""'WADE BLACKWELL 619
e>_
985-4482
-",,,,,,,,.,
~~ -
(619)590-0929
AAROr~ ZELT
4" -10
GASS COIISTRUClION INC.
i,iL
~
,
I
I
(
I
I
J.c...
~l:;'-_-..__..>'~_. ~.
lEGE/ill
~"""'''--
0""",_
LTISI ~"'~'I""",,",
CD"""
EJ """"'''''''''WIlf.l..
[BJ =O'I!~l'rm<u"rr
00 =""""..""""""',
rn "''''''''
1'-5\'
CE.\'l"\'i::
~
~
POSTED SPEED LIMIT'S ON: M.P.H
4lhA;anua 35
'G'S!reel :30
Parl<Way 25
'JrdAvenue 25
GarrallAvaoue 25
'f-,Vll>-i
"i''''
S$i.
C't?~S
\':c."',
'G 5'
4-10(Rt)
<,/-",1'0'
'051
~\..\S\.
'fI"OOS.;:-J
NO SCI;lE
\""
%
Ii'
,
\
",1'0'
,\-,:5''/-
This Traffic Control Work Zone
Plan is in accordance with the
City of Chuta Vi Standard
Approved by:. '2i
Date:
\
SHEET 22
""""CASS CONSTRUCTION
""""WADE BLAC1WVELL 61 9
NIGHT WORK ONLY
10:00 P,M. to 6:00 A.M.
PHASE 'F'
DETOUR
.~.
985.4482
CABS CONSTRUCTION INC.
". "'~~~pO-0929
"""""" AARON ZElT
4.1
~".
'"';:"
","
\
i
, ,
,
,
"
"1;
~'I.,;'.
:]>;.).~~-"",
,.",. .
,.:-'~'-'-_.c....__._
,
LEGEND
fill'l_~
D_"",~_
~"""":E<>WI
ITJ~
El_e=.or""'....
!:EIl'lI."'''''WltCA<EImllW<r
@]""~'.um>~"
CEJ_
'OS"
c.-{\,\t<C-S
:'i"';"'('
?-Oosffi:-'-
""i
,~Si?:
IJO SCALE
M.PJ;
"
'"
"
"
"
SHEET 16
,,"o"CASS CONSTRUCTION
WADE BLACKWELL 619
-
985-4482
POSTED $Pe:EDLl~,'JrS ON:
4\hAvenull
'G'Sb"Bot
p",~Way
~rdAven~
GOlfettAvenua
NIGHT WORK ONLY
10:00 P.M. to 6:00 A.M.
PHASE 'E'
DETOUR
CASS CONSTRUCTIOt.j INC.
I
.-
(619) 590.0929
AARON ZELT
"""'T.
0;',
4-2-10
I
I
,
I
V
x'
\:
.'l
!
r
\
\
I
\
,
i
I.
This Traffic Control Work Zone
Plan is in accordance with the
City of Chula ViSi" 'tandard
Approved by'
Date: ~?-~ :;)
LEGEND
~-~
8",-,~
!ill"""""tcAAO
ITJ_
8 ""'"","IIFTltO.<a.
lEJ11>I'CllEe.oJW:'''''I'IIIII'''''''
lIDOJGtlIU:EO~"
ClJilJ4c;!,ll
OS1ED SPEED LlMrrs ON;
~1hAvenu"
'GS~ool
parkWo
Cenli1l"SIree\
G:m-"~Av"~u"
VilllCll S~eel
RoosevellS\r2ol
M.P.H
"
"
25
'25
25
"
"
551,
C{'i'?-'E.S
"~"""
,:\51.
!C.\i"t:.\..
,?-OoS
M4-10(U)
CONTRACTOR'S NOTE:
TH~ l:ONTAACWR W:l&L NOTlFY TIlE CONSTRUCTION tt<5P!;cno~~
SEI;T10N.24f10URSI'FUORTolMPlEME.'l11rlGTIiisTRAFFlCt:ONTROL
PlAN BI'COI-ITAC11NG IIlSPECTlONSAT 1~19) 397..s12B
""i
.",sil'
NIGHT WORK ONLY
1 0:00 P.M. to 6:00 A.M.
PHASE 'A'
DETOUR
Coo.....'
'CASS CONSTRUCTION
~-
WADE BLACf<WELL 619
~L.I
~"""""(619) 590,0929
AARON ZELT
CASS CONSTRUCTION INC.
~
NO SCAlE
SHEET 6
e_
985-4482
-12-1
!
l'
i
i
'.
I'
i"
I
I
I
I
!
,
I
!
II
!I
1:1
I
'ii'
iil
'::
[".:
l:i
..'
ill
;,.,
!i
'~'i
::i
'1
,j
!;]
,
I
....;~
r
i
I...
I........ '
r
\
,
,
I
f
..
I'
I,
L
LEGEND
~'''''''''''''''^
Q.","",oat""'"
EEl"""",,,,,,,,,
CO"""
a~1i"'''''''''-
8:D "",,0Ir.-""~nm<UJJ<T
1Ji}"'>l<lllE:l~
CfJ "-"0=
cRS\'
\~~' "-"",,
.,1'
M4-10{U)
___M4-10(RI)
P"OSlED SPEED liMITS O~l M,P.H
4tl1A"cnuu 35
'G'Streel 30
parl<l"Ia 25
3rdAvellUe 25
Gamll1./wenu~ 25
55\'
c;-<t'~~S
'2-\.\'2;<;'
,?-OOSeJ
",,,,,
,~S''''
This Traffic Control Work Zone
Plan is in accordance with the
CityofChllla Vis" ,)tandards.
Approved by: '
Date: (;< (J)
M4-10{RI)
7;00 A.M. to 4:00 P.M.
PHASE 'B','C', & 'D'
DETOUR
~"-
. CASS CONSTRUCTION
WADE ~LACKWELl 619 985-.1482
ii.
CASS CONSTRUCTION INC.
(619) 590-0929
AARON ZEL T
I t
i<;
~
NO SCAlE
I
I
I
,
'I
I
SHEET 11
j
I
I,
l
;1
:i
j!
d
.,
"
'I"
ii'
'I,
III
i:1
-27-10
,
..'
:!.
',:1'
'Hi'
i~