PUBLIC HEARING TO CONSIDER WAIVING MATHEMATICAL
IRREGULARITIES IN THE BIDS RECEIVED FOR THE "SEWER
REHABILITATION PROGRAM, FY 2008-2009 VARIOUS
LOCATIONS IN THE CITY OF CHULA VISTA, CA
(SW255B/SW235)" PROJECT PER CITY CHARTER SECTION
1009
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA WAIVING MATHEMATICAL IRREGULARITIES
iN THE BIDS, ACCEPTING BIDS AND AWARDING A
CONTRACT FOR THE "SEWER REHABILITATION PROGRAM,
FY 2008-2009 VARIOUS LOCATIONS IN THE CITY OF CHULA
VISTA, CA (SW255B/SW235)" PROJECT TO CHARLES KING
COMPANY, INC OF SiGNAL HILL, CA IN THE AMOUNT OF
$995,546.25, AND AUTHORIZING THE DIRECTOR OF PUBLIC
WORKS TO EXPEND A V AiLABLE FU
DLRECTOR OF PUBLIC WORKS
ASSiSTANT DIRECTOR OF ENGINEE
CITY MANAGER ~ ___
ASSISTANT CITY /t--;:;AGER -==;>)
4/STHS VOTE: YES D NO D
ITEM TITLE:
SUBMITTED BY:
SUMMARY
On September 15, 20iO, the Director of Public Works received three (3) sealed bids for the
"Sewer RehabilitatIOn Program, FY 2008-2009 various locations in the City of Chula Vista
(SW255B/SW235)" project. The project will replace existing broken sewer mains and laterals,
repair cracked sewer lines, and replace asphalt concrete pavement in various locations
throughout the City ofChula Vista.
ENVIRONMENTAL REVIEW
The Environmental Review Coordinator has reviewed the proposed project for compliance with
the California Environmental Quality Act and has deternlined that the project qualifies for a
Class 1 categorical exemption pursuant to Section 15301 of the State CEQA Guidelines. Thus,
no further environmental review is necessary.
7-1
10/12/10, Item 7
Page 2 of 5
RECOMMENDATION
Council conduct the public hearing and adopt resolution.
BOARDS/COMiVIfSSION RECOMMENDATION
Not applicable.
DISCUSSION
Based on the results of compiled data inspections, including those performed with a closed
circuit television camera. a number of access areas and sewer pathways have been identified by
the Public Works Department as requiring replacement and/or rehabilitation. Certain sections of
pipe are cracked and need to be replaced, repaired or relined to prevent groundwater infiltration
or leachll1g of raw sewage into the ground. The general scope of the project involves the
replacement of existing broken sewer mains and laterals, the installation of pipe lining to repair
cracked sewer lines, the replacement of sewer access holes, trenching, and asphalt concrete
pavement.
The locations and types of work to be done are detailed in Plats I through 23 (Attachment I).
The method used for the rehabilitation of the City's sewer mains and laterals employs an industry
standard practice known as cure in place pipe (CIPP). This mode of rehabilitation utilizes a
specialty liner designed to seal connectIOns by lining pipes that are less than 24 inches in
diameter. The specially designed liner is a fiberglass laminate completely impregnated with a
curing resin. This liner is installed by inHating and pushing the liner into the sewer main. Once
inside, a 2 to 3 inch brim is formed and adhered to the inside of the host sewer pipe providing a
watertight seal. This procedure restores the integrity of the sewer mains and prevents the
infiltration of ground water and/or ex-filtration ofraw sewage water from leaking outside of the
pipe. Onee the liner is cured, the sewer lateral openings leave an identifiable indention which are
cut open by remote robots. The rehabilitation of sewer mains will also prevent roots from
penetrating the sewer main. Root infiltration of sewer mains has a potential of causing more
damages to the pipe and causing stoppage of flow.
While the CIPP is known for being a trenchless method of rehabilitation, the City cannot avoid
digging into the pavement within certain areas of the City. It still becomes necessary for the
Contractor to open the streets and trench down to perfonn repairs to certain sewer main. Under
this contract, the Contractor will be allowed to perform work at night to reduce traffic
congestions within business areas of City during the day. Night work within residential
neighborhoods will not be allowed.
On September 15, 2010, Public Works staff advertised the annual "Sewer Rehabilitation
Program, FY 2008-2009 various locations in the City of Chula Vista (SW255B)" project. The
apparent low bidders were contingent upon a grand total base bid of all locations shown on plats
I to 23 (Attachment 1). The bids from the three contractors are as follows:
7-2
10/12/10, ltemL
Page 3 of 5
CONTRACTOR BASE BID TOTAL
Charles King Company, Inc. - Signal Hills, CA S 995,546.25
Palm Engineering and Construction, Ine. - San Diego, CA $1,222,172.00
Zondiros, Inc. - San Marcos, CA $1,237,297.00
However, after examining the three bidder's submittal package, it was found that all submitted
bids containeu mathematical irregularities. Despite the $10 mathematical irregularity by Charles
King Company, Inc., their mathematical irregularity does not change their low bid ranking. In
addition, by waiving all mathematical irregularities, none of the low bid rankings change as
shown in the above table. Thus, in the best interest of the City and during this time of buuget
crisis, statl recommends that a public hearing he held in accordance with the City Charter to
waive all mathematical irregularity in all bids and accept all bids.
The low bid by Charles King Company, Inc. of $995,546.25 is $340,456.75 (25%) below the
Engineer's estimate of $1,335,990. The Engineer's estimate was based on average prices for
similar types of work completeu during the last two years. This difference in competitive
bidding can be attributed to the current state of the economy. The high degree of competition
within the constmction market and the lack of work in other jurisdictions make it difficult to
predict Clr project market value cost without some adjustment to the contract cost.
While Charles King Company heauquarters are locateu in Orauge County, they have uone
previous work for the City of San Diego. Staff verifieu the references provided by the
contractor; their work record has been satisfactory. After reviewing the low bidder, staff
recommends awarding a $995,546.25 contract to Charles King Company, Inc. of Signal Hills,
CA.
The locations of the proposeu work are located in the cast side and west side of I-80S. Eighty
percent (80%) of the repairs are locateu within the west side of Chula Vista and approximately
ten percent (10%) are located In the east side of I-80S Freeway and the remaining location,
approximate ten (10%) percent can be found in the Montgomery area (Attachment 1).
Approval of this resolution will authorize an inter-project transfer and authorize City staff to
expend all available funds and increase the value of the contract as necessary due to unforeseen
cirCUl11st311Ces. Unforeseen circumst311ces may cause an increase in quantities beyond what was
anticipated dunng the preparation of the project speci fications. Due to the age of the City streets
in the western part of the City, "unforeseen circumstances" may occur during the removal of the
existing sewer mains anu excavation occurring within the street. Fielu conditions could also
differ from the proposed improvement plans and specifications. As a result, auditional material
may be required to rehabilitate the project site, which could lead to possible "Change Orders" to
the contract. This is a typical situation with all sewer rehabilitation projects built in this area.
According to City Council Policy No. 574-01, if a change order exceeds the cumulative contract
change oruer aggregate amount allowable to be approved by the Director of Public Works
Operations, City Council approval is required. Under said City Council Policy the amount
wuuld be $72,688.22. However, approval of tonight's resolution will increase the Director of
Public Works Operations' authority to approve change oruers as necessary up to the contingency
7-3
I
10/12/10, IteJ 7
page!4 of 5
amount of$190,000.00 or an additional 19% of the contract amount. Any funds that are not used
during constmctIon will be redistributed back to the appropriate original funding source.
'vVage Statement
The contractors who bid on this project were not required to pay prevailing wages to persons
employed by them for the work perfonned under this project. No special minority or W01l1en-
owned business requirements were necessary as part of the bid. However, a "Notice to
Contractors" was sent to various trade publications in order to encourage disadvantaged
businesses to bid on the project.
Disclosure Statement
Attached is ~ copy of the Contractor's Disclosure Statement (Attachment 2).
DECISION MAKER CONFLICT
Staff has reviewed the property holdings of the City Council and has found a conflict exists, in
that Councilmember, Pamela Bensoussan has property holdings within 500 feet of the
boundaries of the property which is the subject of this action.
CURRENT YEAR FISCAL IMPACT
Sufficient Sewer Facility Replacement funds were previously appropriated as part of the FY
2008-2009 Capital Improvement Program (Crp) budgets for sewer rehabilitation projects.
Furthermore, sufficlent Trunk Sewer funds are available and were previously appropriated for
SW235 during the FY 2006 2007 Capital Improvement Program. It is proposed that these funds
be utilized along with the "Sewer Rehabilitation Program FY 2008-09 Various Locations in the
City of Chula Vista (SW255B/SW235)" project funds to perform the required work. All work
for Main Street sewer diversion west of Third Avenue shall be charged to SW235. This project
was added to the Sewer Rehabilitation project due to the similar type of work involved and to
obtain better competitive value for all work. City staff have been instmcted to keep all
accounting work for SW235 project separated from the SW255B Sewer Rehabilitation work
since the funding is not alike.
FUNDS REQUIRED FOR CONSTRUCTION
A. Contract Amount 5995,546.25
B. Contingencies (approximately 19'1" of Contract Cost) $190,000.00
C. Staff Costs:
Design Staff (8% of the Project Cost) $120,795.00
Construction Inspection (9.50% of the Project Cost) $137,140.00
TOTAL $1,443,481.25
FUNDS A V A1LABLEFOR CONSTRUCTION
A. Sewer Facility Replacement funds FY 2008-2009 (SW255) $] ,365,23 7.25
B. Trunk Sewer funds FY 2006-2007 (SW235) $ 78,244.00
TOTAL $1,443,481,25
7-4
!
I
'-
10/12/1 0, Item 7
Page 5 of 5
ONGOING FISCAL IMPACT
Upon completion of the project, the improvements will require only routine City sewer
maintenance.
ATTACHMENTS
1. Plats of work locations to be done
2. Disclosure Statement from Charles King Company, Inc.
Prepared by: Poten G. San Pedro. Sr. Engineering Tech.. Jose Luis Gomez. L.s.. and Project Manager.
J-\Englllecr\AGENDAICAS201 0110-12-10\SW255b A113 Sewer Rehab Program FY 08 - 09 - mlKPA.doc
7-5
~L3 ~~~~ F "\q,," ~\Jl~~~~ \~~
~~~, \~ rfu '\~J)~ lr\(~~r~~~
~. I' ~,' ~:\~ fi' ~j~ilfl1-liJI~~l~~ ~~l;:~n=I!J(
r';~t 2 ~~{ ;\\~~ 1'((~.' ~."Jh ::' ~~rm.i;1~'
J, 7'iO'orl ~~~ ~~J1 ~p I~~~ ~1 C~~ ~
I"" (\\ I- "'~~~~ ~ "" .... _V ~ ->::7 6o'e,. '/jJ' V;j;1'~ ij
~,I G 51 (~14h~iJff\\4(22 iU ~ 1 ~ R , ~ ~ 'B: .. ~o; :}~':I. . ~ J
"'~, ~ 2{}/iii\~2J ,:;.aw II: ~\, 1\ \q;r--==, ~ . ~ "~ ~/':/Jtt.~ 'l~ b1 >I- u
'), ;J \ fF:~ ~~21~~Q~~\.\( 1J\\,\:: ;;;':,' ''',;J,f~r, dJ"~~'V ,'r ~r iJP, P/~ ~ ~
. I S' 10 L \\ IS:) , 'e '-' V"" ""- /,t -n ::::l\ V ;)\ ~ l\~'Q';,~z<,' 1"1 ~iii
~~\1J6~\\tr9A~~~" d ~~ca ~=-~~7)~~\# Pt&:j~)1J1 Or
I' 6 ~~~~~~wa~~~1 ~~ t1{;---::::~! i,'[GFAP'~~ ~~, 7'\\1'\uj,J
'" ~ ~0 ~~~, 71 ~m'\\\ \~ \\\\1 -ff ~'" ,\ ~ ; ~~
~~~\LJ L ~ uV, ~~ '"\, ~'~ l(,,'P" []\fDOO
~~O~~' r:.~' \r!' !J. PI""'; /.~ '\\
t ~,~fSJ.~ ,~"'PI' /(~, \ ~~
0" pA'O \~;;.J~ --oF .~ \rA~1 fHP[\:s
1 ~~ 11 ,~' A flhliR ~~ ~ (6~ ~ \\,~~~ ~:~;\~ ~'\LE ill :1
~\ ~ ~"^JN ~~~HI~}j fl;z~. ~ ~ - r; IJNO SCALE (0~i5,,~Yl ,~~\:,!
::Jd~~6)1 ,\ ~~~" '''''~) - ~ ",~~I
D~1JW~BIAN PEDRO TITLE CITY OF CHULA VISTA P~'ijAgE~!J'PEDRO --PROJECT LOCA TlON
DATE: SHEET 7 SEWER REHABILITATION PROGRAM APPROVED BY. # ORDER OF PRIORITY
07/20/2070 OF 1 SHTS FISCAL YEAR 2008 ) 2009 JOSE GOMEZ PROJECT FILE #SW255
1--
~
o
f
m
~
I~
.....
I
.....
,--
FINAL LOCATION FOR SEWER REHABILITATION (SW255)
(l) Landis Avenue
(4) Fourth Avenue
(7) Davidson Street
(10) 312 "I" Street
(13) Sewer Mauhole Adjustmeut
(16) ]220 Tobias Drive
(19) 702 Elm Avenue,
(22) 075 Whitney Street
(24) Line SWR MH Otay Lakes Rd
(26) Flower Street Freeway Crossing
(28) 215 Camiuo Del Cerro Grande
(30) 1105 Camino Del Cerro Grande
(33) 1025 Calle Mesita
(36) Third Avenue
+
+
+
+
+
+
+
+
+
+
+
+
+
+
(2) Landis Aveuue + (3) 435 Third Avenue +
(5) 974 Fourth Avenue + (6) 2387 Faiver St. +
(8) ] 05 Minot Avenue + (9) 173 Broadway +
(11) 442 East "J" Street + (12) 1318 Hilltop Drive +
(J4) 333 "H" Street + (15) 856 Nadon Avenue +
(17) 1256 Tobias Drive + (18) "J" Street +
(20) 544 Glover Avenue + (21) 646 Del Mar Avenue +
(23) "I" Street +
(25) Line SWR MH Icastlake Parkway +
(27) Main Street. Sewer Projeet (SW235) +
(29) 1094 Calle Mesita +
(31) 1078 Calle Mesita + (32) 1054 Calle i\lesita +
(34) 1005 Calle Mesita + (35) La Media +
(37) 230 Camino Elevado
~
~~
z
0) 8" VCP / 30' POINT REPAIR / @ 6' - 12: @ 16' - 22: @ 75' - 93' FROM MH #1929 /
95 LF - 8" CIPP LINER
CD 8" VCP / 12' POINT REPAIR / @ 60' - 66: @ 582' - 588' FROM MH # 1985 /
590 LF - 8" CIPP LINER
ORAWN BY: TITLE:
POTEN G. SAN PEDRO
DA TE: SHEET 1
08-01-'10 OF 22 SHTS.
PROJECT FILE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-8
~~\
z
CD 8" VCP / 6' POINT REPAIR / @ 134' -
DRA WN BY: TITLE:
POTEN G. SAN PEDRO
DATE: SHEET 2
08-07-'70 OF 22 SHTS.
140' FROM MH 5484/ 495 LF - 8" CIPP LINER
PROJECT FILE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPRO VED BY:
JOSE LUIS GOMEZ
7-9
~
~~
z
o 8" VCP / 40' POINT REPAIR / @ /58'-764: @ 356' - 362; @ 376' - 382: @ 423' - 433;
@ 525' - 537" FROM MH #3500 / 660 LF - 8" CIPP LINER
DRAWN BY: TITLE:
POTEN G. SAN PEDRO
DA TE: SHEET J
08-07-'/0 OF 22 SHTS.
PROJECT FILE #SW2558
PREPARED BY.'
POTEN G. SAN PEDRO
APPRO VED 8\:
JOSE LUIS GOMEZ
7-10
I
.L
~!~
z
\
\
--
o 8" VCP /64' POINT REPAIR / @ 0' - 21; @ 86' -97; @ 170' - 185: @ 263 - 272;
@ 290' - 300' FROM MH /4404 / 345 LF - 8" CIP? UNER
ORAWN BY: nTLE:
POTEN G. SAN PEDRO
OA rE: SHEET 4
08-01-'10 OF 22 SHTS.
PROJECT FILE /SW2558
PREPARED BY'
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-11
MAIN ST
I ~ I I
>- m~
'"
I)j
'" I I I
~I z: >-
'"
I OS
MANYA ST (3
I 2377 2365 2385 2445 - "l
- 2464
MH
MH 15156 2430
/5757 I~ l FAIVRE ST -
2387 CD\. ~ - -
MARIAN A ~ --1 24lJ0
I I I
CD 18" VCP / 6' POINT REPAIR / @ 63' - 69' FROM MH #5756 /660 LF - 18" CIPP LINER
w
m~
z:
CD 8" VCP/ 6' POINT REPAIR / @ 297 - 333' FROM MH #5270 / JJ5 LF - 8" CIPP LINER
DRA WN BY:
POTEN G.
OATE:
08-07- '70
TITLE:
PROJECT FILE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
SAN PEDRO
SHEET 5
OF 22 SHTS.
7-12
,
__1._
o
~
8" VCP / 142' POINT REPAIR / @ 0' -
/ NO LINER REOUIRED
~
w
m~
z
~
m~
z
\
o 8" VCP / 45' POINT REPAIR/ @ 3' - 18: @ 30'- 40: @ 130' - 137:
FROM MH 2116 / 325 LF - Bn CIPP LINER
DRAWN BY: TITLE:
POTEN G. SAN PEDRO
OA TE: SHEET 6
08-01-'10 OF 22 SHTS.
@ 150' - 163'
PROJECT FILE #SW255B
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY.'
JOSE LUIS GOMEZ
7-13
@ 8" VCP / 70' POINT REPAIR / @ 0'- 75: @ 700' - 715: @ 355' - 375: @ 415' - 435,
FROM MH #3432 / 465 LF - 8" CIPP LINER / LINE MANHOLE #3433
~
~ <I: Mil
W~ I #30220 @
z "'/ ", 4" 4" 45'
~
475
415
o
@ 8" VCP / 40' POINT REPAIR / @ 10' - 76: @ 40' - 50: @ 137' - 746', @ 197' - 206:
@ 250' - 256' FROM MH 3077/260 LF - 8" CIPP LINER
PROJECT FILE #SW2558
DRAWN BY: lITLE: PREPARED BY:
POTEN G. SAN PEDRO POTEN G. SAN PEDRO
DA TE: SHEET 7 APPROVED BY:
08-07- '70 OF 22 SHTS. JOSE LUIS GOMEZ
7-14
~
~~
z
""-.
@ 8" VCP / 705' POINT REPAIR / @ 20' - 702: @ 250' - 273' FROM MH ,#5746 /
275 LF - 8" CIPP LINER
DRAWN BY: TITLE:
POTEN G. SAN PEDRO
DA TE: SHEET B
08-07- '70 OF 22 SHTS.
PROJECT FILE ,#SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED 8Y:
JOSE LUIS GOMEZ
7-15
m
NO SCALE
~
NO SCALE
~
w
~!
z
ADJUST ALL SEWER
MANHOLES TO
GRADE
@ BROADWAY & nG" ST: SWR MH#'s 2978, 2980, 2981, 2984.
PROJECT FILE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-16
m
,,\S'
C"Il\.~ CUll\!.'
10\" U" SIl~\Il\!.
CUIl\l1'~
NO SCALE
@ 8" VCP / 25' POINT REPAIR / @ 0' - 6; @ 50' - 60; @ 250' - 259' FROM MH /5428 /
665 LF - 8" CIPP LINER FROM MH /5427 TO 5436 / UNCOVER 2 SI#? MH @ 200' & @ 350' /
FOR GLOVER AVE MH /5436 SEE SHEET /75, ITEM / 23
4:
'"
B11 B12 '"
w
;;; 8J5
B15 816 ""
N 283 ea7 91
"" 819
820 -l
B19 "-
CAMINO VISTA REAL
TELEGRAPH
CANYON RD
NO SCALE
@ 8" VCP / 66' POINT REPAIR / @ 720' -
/255 LF- 8" CIPP LINER
DRAWN BY: TITLE:
POTEN G. SAN PEDRO
DA TE: SHEET to
08-07- '70 OF 22 SHTS.
160;
@ 188' - 214' FROM MH /3552 /
PROJECT FILE /SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVEO BY:
JOSE LUIS GOMEZ
CITY OF CHULA VISTA
SEWER REHABILlT A llON
(SW255)
7-17
I '/.">
'/.0
@ 8" VCP / 65' POINT REPAIR / @ 33' - 39: @ 94' - 100: @ 147' - 156',
@ 190' - 196: @ 206' - 244' FROM MH #5733/ 405 LF - 8" CIPP LINER
@
8" VCP / 6' POINT REPAIR / @ 60' - 66' FROM MH #5680 / 455 LF - 8" elPp LINER
PROJECT FILE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPRO VEO BY:
JOSE LUIS GOMEZ
TITLE:
CITY OF CHULA VISTA
SEWER REHABILlT A nON
(SW255)
DRAWN BY:
POTEN G. SAN PEDRO
OA TE: SHEET 11
08-07- '10 OF 22 SHTS.
7-18
,.'
@ 8" VCP /21' POINT REPAIR / @ 604' - 625' FROM MH #3962 / 655 LF - 8" CIPP LINER
~
NO
SCALE
@ 8" VCP / 18' POINT REPAIR / @ 3' - 12', @ 73' - 82' FROM MH #3828 /
605 LF- 8" CIPP LINER
DRAWN BY: lITLE:
POTEN G. SAN PEDRO
DA TE: SHEET 12
08-01-'10 OF 22 SHTS.
CITY OF CHULA VISTA
SEWER REHABIUTATlON
(SW255)
PROJECT FILE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY.'
JOSE LUIS GOMEZ
7-19
'-1\':;'
C\\Il\..l>> COIl'"-'
,'lOt 1l?\O'"-
C\ .,,'1 $
COil"
@
8" VCP / 224' POINT REPAIR / @ 41' - 73; @ 703' - 712; @ 306' - 378', @ 320' - 326:
@ 417' - 442: @ 456' - 590' FROM MH /3228 / 665 LF - 8" CIPP LINER /
FOR "H" STREET MH /5436 SEE SHEET /12, ITEM /17
\ 5\
5,",,,5\ "
@ 8" VCP / 50' POINT REPAIR / @ 12' - 20: @ 75' - 90: @ 705' -
FROM MH /2925 / 345 LF - 8" CIPP LINER MH /2924 TO 2947
DRAWN Br. llTLE:
POTEN G. SAN PEDRO
DATE: SHEET 13
08-01-'10 OF 22 SHTS.
CITY OF CHULA VISTA
SEWER REHABILlTAllON
(SW255)
125: @ 257' - 266'
PROJECT FILE /SW255B
PREPARED sr.
POTCN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-20
I
'-
m
NO
SCALE
@ 8" VCP / 40' POINT REPAIR / @ 30' - 48; @ 60' - 82' FROM MH#320S /
650 LF - 8" CIPP LINER
@ 8" VCP / 72' POINT REPAIR / @ 3' - 63; @ 106' - 118' FROM MH #3287 /
640 LF - 8" CIPP LINER PROJECT FILE #SW2558
DRAWN BY: TITLE: PREPARED BY:
POTEN G. SAN PEDRO POTEN G. SAN PEDRO
DATE: SHEET 14 APPROVED BY:
08-07-'70 OF 22 SHTS. JOSE LUIS GOMEZ
7-21
m
NO
SCALE
LINE SWR MH WITH:
WARREN ENVIRONMENTAL SYSTEM
WWIY. WARRENENVIRO. COM
@ LINE SWR MH #7352 & SWR MH /2228 WITH WARREN ENVIRONMENTAL PRODUCT OR EQUAL
SfWi' MAIN IS 15-INCHES
COVE:
@,
~ MH
~ /13822
NO
SCALE
II
^
~
-<
@ LINE SWR MH /13822 WITH WARREN ENVIRONMENTAL PRODUCT OR EQUAL
SWR MAIN INTO MH ARE 12" & 8" MAIN
DRAWN BY: nTLE:
POTEN G. SAN PEDRO
DA TE: SHEET 15
08-01-'10 OF 22 SHTS.
CITY OF CHULA VISTA
SEWER REHABILlT A llON
(SW255)
PROJECT FILE /SW255B
PREPARED BY:
POTEN G. SAN PEDRO
APPRO VED BY:
JOSE LUIS GOMEZ
7-22
./'&'
Vs
t'R~~
4--41-
--
@ 8" VCP / 78' POINT REPAIR / @ 365' - 377; @383' - 389;
@ 504' - 570' FROM MH #931/510 LF - 8" CIPP LINER
DRAWN BY: nTLE:
POTEN G. SAN PEDRO
DATE: SHEET 16
08-07-'10 OF 22 SHTS.
PROJECT FILE /SW255B
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-23
>
<I:
o
Z
V>
W
0<:
w...
I II
--
l~rmTrH I I I
I II ~ eTIlI rrmmn
MONTGOMERY ST
~ 0TffilJ ~ ] =
H -mmn ~ LLDJJt ==
ZENITH ST W <I:
~i lTrTTITITO[
~llll 1- Ig=t
~I\\
MAIN ST
~
-
r-
"-..!.
'-----
1 FOURTH AV c==
~L
~
NO SCALE
DRAWN BY:
POTEN G. SAN PEDRO
DA TE' SHEET 17
08-01-'10 OF 22 SHTS.
SEE PLANS AND SPECIFICATION FOR:
SW235 MAIN 5T SEWER IMPROVEMENTS
TITLE:
CITY OF CHULA VISTA
SEWER REHABILITATION
(SW235)
PROJECT FILE iSW255B
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-24
1095
CJ
SdCJ
:::0)".
a~ ->. ~
<. a
->. ssa to
a 01
to )",10
01 ~p
NO SCALE
f'l
S:: ->.
:r: 30 a
->. to
a 1:3 01
1089 to
01 \."j
->.
CALLE MESITA
1086 ~ N
0 N 0
<..0 '-'" U\
~ 0
28
N N
~
~ U\
0
@ MH /230 TO MH /253 / 195 LF - 8" CIPP LINER
@ MH /230 TO MH /229 / 205 LF - 8" CI~P LINER
@ MH /230 TO MH /231 / 165 LF - 8" CIPP LINER
DRA WN BY: 77TLE:
paTEN G. SAN PEDRO
DATE: SHEET 78
08-01-'10 OF 22 SHTS.
CITY OF CHULA VISTA
SEWER REHABILITATION
(SW255)
PROJECT FILE /SW255B
PREPARED BY.
paTEN G. SAN PEDRO
APPROVEO BY:
JOSE LUIS GOMEZ
7-25
I
L
NO SCALE:
1081
OJ
CCl
o
~
'<C-
10S7 1065
1049
MH ~250 1072
1060 1068
1054
1075
1039
1047
1057
9
@ MH #7396 TO MH #250 / 400 LF - 8" CIPP L1NF:R
DRAWN BY; TIlLE:
POTEN G. SAN Pt:DRO
OATE: SHEET 19
08-01- '10 OF 22 SHTS.
CITY OF CHULA VlST A
SEWER REHABILITATION
(5\'1255)
PROJE:CT FILE: #SW2558
PREPARED BY;
POTEN C. SAN PEDRO
APPROVED BY..
JOSE: LUIS COMez
7-26
~
NO SCALE
f'....
If)
1049 a
~
If) 1033 MH #250
g 1009 1017 1025
-
MH LL[ M[SITA 1046 1054
1036
1028
1012 1020
209
215
1021
1029
1039
@ MH #250 TO MH #261 / 400 LF - 8" CIPP LINER
@ MH #261 TO MH #262 / 200 LF - 8" CI?? LINER
@ MH #263 TO MH #262 / 85 LF - 8" CIP? LINER
ORAWN BY: nTLE:
PO TEN G. SAN PEDRO
OA TE: SHEET 20
08-07-'10 OF 22 SHTS
CITY OF CHULA VISTA
SEWER REHABILITATION
(SW255)
PROJECT FILE #SW255B
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7-27
\
~\
~
~
NO SCALE
@
NEW SEWER MANHOLE @ TELEGRAPH CANYON RD / OTA Y LAKES RD / LA MEDIA RD
/ NEW MH WITH 70' NEW PIPE / 400 LF - 8" elPp LINER NEXT MANHOLE TO THE EAST
PROJECT FiLE #SW2558
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
JOSE LUIS GOMEZ
7lTLE:
CITY OF CHULA VISTA
SEWER REHABILITATION
(SW255)
DRAWN BY:
POTEN G. SAN PEDRO
DA TE: SHEET 21
08-01-'10 OF 22 SHTS.
7-28
\
~~ _ J5T
@ MH #3582 TO MH #3348 / 8" VCP / 81 LF POINT REPAIR / @ 319' - 328; @ 438' - 447:
@ 467' - 476; @ 505' - 493; @ 615' - 657' FROM MH #3582 / REHAB/LlTA TE MANHOLES
#3348 AND #3582 / 660 LF - 8" C/PP LINER PROJECT FILE #SW256B
DRAWN BY.- TITLE: TY 0 U PREPARED BY:
PO TEN G. SAN PEDRO Cl F CH LA VlST A POTEN G. SAN PEDRO
DATE.- SHEET 22 SEWER REHABILITATION APPRDVfDBY:
08-01- '10 OF 22 sHTs. (SW255) JOSE LUIS GOMEZ
7-29
1039
104
1029
\
@
MH #378 TO MH #343 / 30 LF POINT REPAIR / @ 10' - IS; @ 124' -130;
@ 194' - 200; @ 262' - 268: @ 297' - J03' FROM MH #378/ J05 LF -
8" CIPP LINER
DRA WN BY: TITLE:
POTEN G. SAN PEDRO
OA TE: SHEET 23
09-08-2010 OF 2J SHTS
CITY OF CHULA VISTA
SEWER REHABILITATION
PROJECT FILE #SW255
PREPARED BY:
POTEN G. SAN PEDRO
APPROVED BY:
GREG TSCHERCH
7-30
A TT ACH4\IIENT ~
CITY OF CHULA VISTA DISCLOSUPJi: STATElVlEl'i"T
PUlSUa.T1t to Council Policy 101-011 prior to any action upon matters that will require discretionary action
by the Council, Planning Commission and all other official bodies of the City, a statement of disclosure of
certain ownership or fmaneia) interests, payments, or campaign contributions for a City of Chula Vista
election must be filed, The following information must be disclosed:
1. List the names of all persons having a financial interest b the property that is the subject of the
application or the contract, e.g., owner, applicant, contractor, subcontractor, material supplier.
J1 O/lf '
2, If any person';' identified pursuant to (1) above is a corporation or partnership, list the names of all
indl\~duals with a S2000 investment in the business (corporation/partnership) entity,
AI Iii
3, If any person* identified pursullilt to (1) above is a non-profit organization or trust, list the names
of any person serving as director of the non-profit organization or as trustee or beneficlary or
trustor of the trust.
N Iii
4,
Please identify every person, includi.ng any agents, employees, consultants, or independent
contractors you have assigned to represent you before L1-te City in this matter.
N/A
I
5,
Has any person* associated with thi~ contract had any financial dealings vvith an official*'~ oj the
City ofChula Vista as it relates to this contract within the past 12 months? Y~s_ No~
53
Q"\Engin:-:ring,\All Proje.clS\S'V.;\SW270\RE BID SW270\sPECS\sW270 SE\\'ER REH..'\Bn..rrATION FL.NALdoc
7-31
I
~
j
r
:\
i
'~
\
I
b
If Yes, br:i~fly describe the nature ofllie financial interest the orucial"'* may have in this contract.
6.
Have you made a contribution of more than $250 within the past twelve (\2) months to a current
member of the Cllul. Vista City Council? No / Yes _ If yes, which COlmcil member?
7.
Have you provided more than $340 (or an item of equivalent value) to an official** of the City
orChula Vista in the past twelve (12) months? (Th,is includes being a source of income, money to
retire ,degal debt, gift, loan, etc.) Yes _ No ~ .
lfYes, which offic131** and what was the nature of it ern provided?
Date:
C}, 1'''{j''O
J~
Signature of Corltractor/ Applicant
l~h,,'~/CS it...,,'G} i:j.Tl/~?C:'I>'" 7(.
/'-..!.::'/:)fTl- F,:"lC; r~CJr'C(":!I1(-
Print or type name of Contractor/Applicant
"
Person is defmed as: any individual, firm, co-partnership, joint venture, association, social club,
fraternal organization, corporation, estate; trust, receiver, syndicate, any other county, city,
municipali~ district, or other political subdi\1.sion, -Of any other group or combination acting as
a unit.
;r-*
Official includes, but is not limited to: Mayor, Council member, Planning Commissioner,
Member ofa boanl, commission, or committee ofthe City, employee, or staff members.
54
Q:\E.ngineering\All P,oject;i\sW,\S\V170\RE-BID SW270\sPECS\sW270 SEVlER RE.:"-lABILlTA nON FmALdoc
7-32
RESOLUTION NO. 2010-
RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CHULA VISTA WAIVING MATHEMATICAL
IRREGULARlTlES IN THE BIDS, ACCEPTING BIDS AND
AWARDING A CONTRACT FOR THE "SEWER
REHABlLIT A TION PROGRAM, FY 2008-2009 VARIOUS
LOCATIONS IN THE CITY OF CHULA VISTA, CA
(SW255B/SW235)" PROJECT TO CHARLES KING
COMPANY, INC OF SIGNAL HILL, CA IN THE AMOUNT OF
$995,546.25, AND AUTHORIZING THE DIRECTOR OF
PUBLIC WORKS TO EXPEND AVAILABLE FUNDS
WHEREAS, on September 15, 2010, the Director of Public Works received three (3)
sealed bids for the "Sewer Rehabilitation Program, FY 2008-2009, various locations in the City
ofChula Vista, CA (CIP No. SW255B/SW235)" project as follows:
CONTRACTOR BASE BID TOTAL
Charles King Company, Inc. - Signal Hills, CA $ 995,546.25
Palm Engineering and Construction, Inc. - San Diego, CA $1,222,172.00
Zondiros, Inc. - San Marcos, CA $1,237,297.00
WHEREAS, the apparent low bid by Charles King Company, Inc. of $995,546.25 is
$340,451i.75 (25%) below the Engineer's estimate of$1,335,990; and
WHEREAS, Charles King Company, Inc.'s $10 mathematical irregularity does not
change the rankings of the bidders; and
WHEREAS, the headquarters of Charles King Company, Inc. IS located in Orange
County; and
WHEREAS, staff has veritied other the references provided by the contractor and their
work record has been satisfactory; and
WHEREAS, the engineer's estimate was based on average prices for similar types of
work completed during the last two years; and
WHEREAS, in the best interests of the City, all bids shall be accepted at this time.
7-33
Resolution No.
Page 2
NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Chula Vista
does hereby waive mathematical irregularities in the bids, accept bids and award a contract for
the "Sewer Rehabilitation Program, FY 2008-2009 Various Locations in the City of Chula Vista,
CA (SW255B/SW235)" Project to Charles King Company, Inc of Signal Hi!!, CA in the amount
of$995,546.25, and authorize the Director of Public Works to expend available funds.