HomeMy WebLinkAboutAgenda Statement 1979/10/23 Item 12 CITY OF CHULA VISTA COUNCIL AGENDA STATEMENT Item No. 12 For meeti ng of 10/23/79 . - ~--:.= ITEM TITLE Resol ut ion 9fJ~ Approv ing Chang e Order Number One and Authorizing Expenditure of Additional Funds for East Naples Street Drainage Channel City Engineer ~ SUBMITTED BY ITEM EXPLANATION (4/5TH'S VOTE REQUIRED YES NO~) Meza-Hab Construction Company is the contractor for the construction of an improved drainage channel south of East Naples Street between Monserate Avenue and Helix Avenue. The contract dated July 19, 1979, was awarded by City Council Resolution No. 9653 on June 29, 1979. ... BACKGROUND: This project was budgeted in the amount of $74,400 in the 1977-78 Capital Improvement Program. The purpose of the project was to eliminate a recurring flooding problem during peak flows and to eliminate objectionable odors and mosquito breeding ponds during dry weather. Engineering originally designed a channel to carry the design 50 year flood consisting of a concrete bottom and 2-2 1/2 foot high masonry block walls. This project was advertised twice and the City twice rejected the low bids of $251,000 and $151,000. The City Council upon rejecting the bids the second time upon staff recommendation directed staff to redesign and readvertise a drainage project in reduced scope which would eliminate the odors and mosquito problem. DMH:nr/AN-005 (continued on supplemental page) Agreement_ Other EXHIBITS Resolution~ Ordinance Pl at~ Notification List___ ENVIRONMENTAL DOCUMENT: Attached___ Submitted on FINANCIAL IMPACT Cost of project is being financed with revenue sharing funds. City will assume maintenance of the improvements upon completion of the project. Approval of the Change Order for covering the natural channel banks with air blown concrete will reduce the amount of maintenance by City forces. Maintenance should be no higher than for any other improved channel. STAFF RECOMMENDATION Approve Change Order No. One in the amount of $11,318 increasing the contract cost to $70,018.00 and approving 26 working day extension of time to contract making contract completion date December 6, 1979. Authorize the additional expenditure of $6,644.42. BOARD/COMMISSION RECOMMENDATION '1l\ C\~ ,? City C:J!1'1cij of ChuiJ \!;-,,~J, C-!irc.irI:la COUNCIL ACTION DJt-::I 11).."'1)...7' ---~---~ Agenda Item No. 12 For Meeting of 10/23/79' Supplemental Page Two Engineering staff redesigned the project consisting of a concrete paved channel invert 10 feet wide. This design will carry a 1 year storm or 30 percent of the design flow and eliminate the odor and mosquito problem. A contract was awarded to Meza-Hab Construction Company in the amount ~f $58,700 to construct the project. THE ISSUE: Once construction of the channel had begun, engineering staff began receiving complaints from adjacent property owners. The adjacent property owners are concerned about erosion of the channel banks during moderate to peak flows and the resulting damage to their property. They have asked staff if anything can be done to prevent this erosion. Over the past 20 years this channel has eroded from an 18 inch ditch to a channel G feet in depth. The existing soil type is a lightly cemented sandstone. The contractor has shown that in place this soil is hard to cut but once it is exposed to water it crumbles easily. The concrete paved channel invert which Meza-Hab is constructing will increase the velocity of flow in the channel over what it was originally. For storms over 1 year frequency, the water will flow outside of the concrete paved channel invert and will start to erode the natural channel banks. The increased velocity would increase the rate at which erosion originally occurred. The channel as it is being constructed prevents the channel from cutting deeper but does not prevent the erosion of the channel banks during peak to moderate flows. SOLUTION: Engineering staff has investigated the complaints and concerns of the property owners and find that they are valid. There is a potential for continued erosion to the channel banks during moderate to peak storms. The erosion can be prevented by cutting the existing banks to a 1:1 slope for a height of 1.3 feet and covering them with 4 inches of wire mesh reinforced air blown concrete. This will result in a modified concrete trapezoidal channel capable of carrying the 50 year design flow without erosion to the channel banks. C(~ t~ Agenda Item No. 12 For Meeting of 10/23/79 Supplemental Page Three This solution will also satisfy the concerns of the property owners and will for all intents and purposes satisfy the concept of the original design with masonry walls. The original plans and specifications call for the placement of approximately 4200 square feet of 2-inch thick air blown mortar on graded channel slopes created by the construction of the concrete paved channel invert. Engineering staff is recommending that the item for ~-inch thick air blown mortar be deleted from the contract and that 9,116 square feet of 4-inch thick wire mesh reinforced air blown concrete be substituted by contract change order. The contractor, Meza-Hab Construction Company, has submitted a written proposal to construct the 9,116 quare feet of wire reinforced 4-inch air placed concrete on the channel bank for a total increase in the cost of the contract in the amount of $11,318. The cost of installing the 4-inch air placed wire reinforced concrete including additional grading is S~5,03h. The change order would also include deletions from the original contract of $13,718 consisting of 2-inch air placed concrete ~,40~), 8-inch air placed concrete berm ($320) and trench s'horing ($4,996). The contractor is also requesting that the contract time be increased ~6 additional working days to perform the extra work. Engineering staff believes that this request is reasonable. This project is financed by revenue sharing funds. The amount of funds available for construction is $71,331.93. Approval of the change order will increase the contract to S70,018, for an increase in contract cost of $11,318. $12,514.42 in unencumbered funds are available in the project account. Approval of the change order will require an additional authorized expenditure of $6,644.42 above that previously authorized by the City Council in the amount of $64,570 on June 2h, 1979. The City Engineer recommends approval of the change order and a time extension to the contract of 26 working days to perform the additional work. If approved, the contract completion date will be changed to December 6, 1979. A transparency of channel section is available for Council viewing. I>t'i U~ ~~1;~ FINANCIAL STATEMENT: Project budgeted amount original Contract Materials Unencumbered Balance Contract Change Order Cont ing enc ies Revised Contract Amount Contingencies Requested Authorized Expenditure Previous Authorized Expenditure Agenda Item No. 12 For Meeting of 10/23/79 Supplemental Page Four 571,331.93 58,700.00 117.51 12,514.42 11,318.00 1,190.42 70,018.00 1,191.).42 71,214.42 ,4,570.00 Additional Authorized Expenditure ~S44.42 Form No. F-229 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose set forth in the attached resolution is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated. Amount $ Fund Purpose Bidder Director of Finance The City of Chula Vista Date By Certification of Unencumbered Balance I HEREBY CERTIFY that the indebtedness and obligation to be incurred by the contract or agreement authorized by the attached resolution can be incurred without the violation of any of the provisions of the Charter of the City of Chu1a Vista, or the Constitution or the laws of the State of California, that sufficient monies have been appropriated for the purpose of said contract, that sufficient monies to meet the obligations of the contract are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn, and that said monies now actually in the Treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered. Amount Not to Exceed $ 6,644.42 600-6000-RS05 Director of Finance The City of Chula Vista Date 10/18/79 By Fund CIP Dept./Activity CIP Purpose Change Order 1 - E. Naples Drainage Channel Bidder Meza-Hab Construction Company il{ - 'l f ;; tj' Certificate No. 34