Loading...
HomeMy WebLinkAboutAgenda Statement 1979/10/23 Item 08 CITY OF CHULA VISTA COUNCIL AGENDA STATEMENT I~ ,.......--,-.= Item No. 8 For meeting of 10/23/79 ITEM TITLE Resolution 9!rJC Approving Agreement With Mitchell-Webb Associates, Inc. for the Preparation of plans and Specifications for the Construction of Solar Heating System at Lorna Verde Pool City Engineer ~ (4/5TH' S VOTE REQUIRED YES_ NO~) SUBMITTED BY ITEM EXPLANATION The City of Chula Vista has budgeted funds for the installation of a solar heating system at Lorna Verde Pool in 1978-79 Capital Improvement Program. This project is designated as CIP project PD-13. Included in the $94,000 funds budgeted for this project are funds sufficient to cover the cost of engineering consultant fees for the preparation of plans and specifications. ... A letter was sent out to a number of engineering consultant firms requesting that they submit letters of interest to the City Engineer if they wished to be considered by the City for providing engineering consultant services for the preparation of plans and specifications for the Lorna Verde Solar Heating System. A total of six firms responded and indicated they were interested in providing the consulting services. Engineering, Building, and Parks & Recreation Department staff interviewed the six consulting firms and selected Mitchell-Webb Associates, Inc. for the preparation of plans and specifications for this project. SLH:nr/JR-006 (continued on supplemental page) Agreement~ EXHIBITS Resolution~ Ordinance Plat_ Notification List___ Other ENVIRONMENTAL DOCUMENT: Attached___ Submitted on FINANCIAL IMPACT Expenditure of $9,000 from project PD-13 for engineering consultant services. The cost estimated for the entire project is $94,000. STAFF RECOMMENDATION 1. City approve agreement between Mitchell-Webb Associates, Inc. and the City of Chula Vista. 2. City Council authorize the expenditure of $9,000 from project PD-13, Account No. 600-6000-PD-13. BOARD/COMMISSION RECOMMENDATION COUNCIL ACTION C:'.y C:::unc:! of VistJ, CJ,lfornia qtZO D;~t2d /()-J.3'7? Agenda Item No. 8 For Meeting of 10/23/79 Supplemental Page Two Mitchell-Webb Associates, Inc. have executed an agreement for providing professional consulting engineering services for the preparation of plans and specifications for "Construction of Solar Heating System at Lorna Verde Pool." The agreement calls for the Engineer of Work to perform the following: A. Prepare preliminary designs and/or studies of alternate systems proposed for review by City staff. The cost effective analysis shall be made of the various designs proposed. B. Prepare final design plans and specifications. C. Provide bid quantities and prepare cost of estimate. D. Act as City's consultant during construction to ensure compliance with specifications. Engineer of Work shall provide originals of as-built plans upon completion of work and acceptance of work by City Council. E. Provide engineering to design additional roof supports if necessary to support weight of solar panels. This work shall not proceed unless authorization is first obtained from the City. In accordance with the terms of the agreement, the City will provide the following: A. All field survey work and monumentation of ground control as required. B. Supply copies of the building plans for the pool as required by the Engineer of Work. C. All pertinent record data available in the City files. D. All existing utility information as provided by the various companies. E. Linens with City title block on which the design is to be placed. F. City will print final plans and contract documents for bidding and construction purposes. Mitchell-Webb Associates, Inc. have agreed to provide engineering services on an hourly basis in accordance with the attached wage schedule (Exhibit A). The Engineer of q ~ 2(J ffG (J Agenda Item No. 8 For Meeting of 10/23/79 Supplemental Page Three Work agreed to perform all work designated to him as outlined above for a total compensation not to exceed the amount stated below for each of the sub-sections. Sub-Section A Sub-Section B & C Sub-Section D Sub-Section E $2500 $4500 $1500 * Total Compensation not to exceed $8500. *payment for work done for Sub-Section E shall be paid for on an hourly basis in accordance with the attached wage schedule (Exhibit A). The amount of work at this time for this item cannot be determined. Engineering staff recommends an additional expenditure of $500 be approved and set aside for this item. Form No. F-229 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose set forth in the attached resolution is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated. Amount $ Fund Purpose Bidder Director of Finance The City of Chula Vista Date By Certification of Unencumbered Balance I HEREBY CERTIFY that the indebtedness and obligation to be incurred by the contract or agreement authorized by the attached resolution can be incurred without the violation of any of the provisions of the Charter of the City of Chula Vista, or the Constitution or the laws of the State of California, that sufficient monies have been appropriated for the purpose of said contract, that sufficient monies to meet the obligations of the contract are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn, and that said monies now actually in the Treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered. Amount Not to Exceed $9,000.00 619 6190 PRBG2080 Director of Finance The City of Chula Vista Date 10/18/79 By Fund 1974 State Block GrntDept./Activity 1974 State Block Grant Purpose Construction of Solar Heating System-Lorna Verde Pool Bidder Mitchell-Webb Associates, Inc. Certificate No. 33 f~