Loading...
HomeMy WebLinkAboutAgenda Statement 1979/10/09 Item 13CITY OF CHULA VISTA COUNCIL AGENDA STATEMEiVT Item No. 13 For meeting of 10/9/79 ITEM TITLE Resolution q7g~ Accepting Bids and Awarding Contract for Street Overlay Program 1979--80 - Various Streets Within City of Chula Vista, California and Ap roving Change Order No. 1 SUBMITTED BY City Engineer ITEM EXPLANATION (4/5TH'S VOTE REQUIRED YES NO x ) At 2:00 p.m, on September 19, 1979, in Conference Room 3 in the Public Services Building, the City Engineer received sealed bids for "Street Overlay Program 1979-80 - Various Streets Within City of Chula Vista, California." The scope of the project involved the placement of asphalt concrete overlay on Casselman, McIntosh, Landis, Flower Streets and East Park Lane. Bids were received from two contractors as follows: Daley Corporation, San Diego Asphalt, Inc., E1 Cajon $ 70,285.70 79,815.20 The low bid submitted by Daley Corporation is above the Engineer's estimate of $53,808 by $16,478.70 or 30.6. Bids were received in November of last year for a similar type overlay project. The unit cost then was $20.50 a ton for the placement of AC overlay. Our bid for this project is $31.35 a ton or an increase of 52.9 over November of last year. Staff in preparing their estimate used a unit cost of $24.00 a ton or a 17% increase over last year. However, recent dramatic increases in fuel prices and energ y has caused the cost of AC paving to increase rapidly. SLH:nr/AO-014 (continued on supplemental page) - tXH1~115 - Agreement Resolution x Ordinance Plat x Notification List Other ENVIRONMENTAL DOCUMENT: Attached Submitted on FINANCIAL IMPACT Upon completion of the project, City will assume routine maintenance of the facilities. \~ .~ STAFF RECOMMENDATION See Supplemental Page Three BOARD/COMMISSION RECOMMENDATION a COUNCIL ACTION Ciu~ti., ``i_,. ..:.iii: „l?:? ~,, - ~ _~oT_ ~ _7 ~ ,. ~- _ _. .~; Agenda Item No. 13 Supplemental Page Two For Meeting of 10/9/79 A review of the bid prices shown in the Daley Construction Service Publication indicates that the prices paid for asphalt concrete for jobs of similar size varies from $23,00 to $25.50 a ton, The City, however, does include a liquid latex rubber additive in the asphalt concrete which provides a longer life and thinner overlay as compared to regular AC but adds approximately $3.?.0 a ton to the price of the product. Based on staff's review, the low bid price is within an acceptable amount. Should we readvertise the job, we do not anticipate that we would receive a lower bid price. In fact, with the rapid increasing costs in petroleum products, we very likely would receive a bid at a higher amount. Based on the above information, we find the low bid to be acceptable. Attached is a plat showing the streets which were included in the bid for this overlay project, The streets included: 1. Casselman Street -- Fifth Avenue to Broadway 2. McIntosh Street - Fifth Avenue to Broadway 3. Landis Avenue - "E" Street to Davidson Street 4. Flower Street - Broadway to Fourth Avenue 5. East Park Lane - "E" Street to "F" Street The Federal Department of. Housing and Urban Development has rev iewed and approved the low bidder's eligibility to participate in a federally financed block grant project. Because the low bid and contingency were in excess of what was budgeted for the project in the amount of 513,~i00, we met with the Community Developm ent staff to see what measures could be taken so the project could still be awarded. They recommended that a portion of the "Local Option Fund" in the Block Grant program be used to finance this project. However , they d id not want to use a total amount of 513,500 from those funds. A significant portion of these funds are expected to be used for the construction of a storm drain system in Park Way and "G" Street west of Fifth Avenue. The Street Department was contacted to see which of the of the five streets proposed to be overlaid could be delayed until future funding was available. Tt was their recommendation that Landis Avenue from "E" Street to Davidson Street be postponed. Staff proposes that the Council award the contract in the ~~~~ Agenda Item No. 13' ,~ For Meeting of 10/9/79 Supplemental Page~.Tnree full amount plus contingencies, then authorize staff to approve a change order with the contractor to reduce the contract amount by about 55,550. To accomplish this it will be necessary to transfer funds from the "Local Option Fund" in the Block Grant program to the pavement overlay project account. At the completion of the project any funds remaining in the pavement overlay account will be transferred back to the "Local Option Fund" in the block grant program. It is anticipated that a maximum of about $5,100 of the b).ock grant local option funds will be usQd for this overlay project. A transparency is available for Council viewing. FINANCIAL STATEMENT Adequate funds are not available for construction of this project as bid . A summary of the additional funding required is as follows: Contract Amount for the Overlay Project S 70,286.70 Contingencies 913.3(' TOTAL FUNDS REQUIRED TO CONSTRUCT PROJECT S 71,200.00 Funds Available in Pavement Overlay Block Grant Program $ 57,500,00 Additional Funds Required $ 13,600.OD STAFF RECOMMENDATION: 1. City Council authorize the transfer of $13,600 in budget account 663--1330-BG-82, Local Option Funds, to account 533-5330-BG-58C, Pavement Overlay Block Grant Program . 2. City Council authorize the expenditure of $71,200 from account no. 633-,330-BG-68C. 3. City Council accept bid and award contract to Daley Corporation in the amount of $70,285.70. 4. City Council authorize execution of Change Order No. 1 red ucing the contract in the amount of $5,550.00. ~~~ Form No. F-229 12/73 CERTIFICATE OF CITY/DIRECTOR OF FINANCE Certification of Unappropriated Balance I HEREBY CERTIFY that the money required for the appropriation of funds for the purpose set forth in the attached resolution is available in the Treasury, or is anticipated to come into the Treasury, and is otherwise unappropriated. Amount S Fund Purpose Bidder Director of Finance The City of Chula Vista Date By Certification of Unencumbered Balance I HEREBY CERTIFY that the indebtedness and obligation to be incurred by the contract or agreement authorized by the attached resolution can be incurred without the violation of any of the provisions of the Charter of the City of Chula Vista, or the Constitution or the laws of the State of California, that sufficient monies have been appropriated for the purpose of said contract, that sufficient monies to meet the obligations of the contract are actually in the Treasury, or are anticipated to come into the Treasury to the credit of the appropriation from which the same are to be drawn, and that said monies now actually in the Treasury, together with the monies anticipated to come into the Treasury, to the credit of said appropriation are otherwise unencumbered. Amount Not to Exceed $ 71,200.00 633 6330 BG 68C Director of Finance The City of Chula Vista Date 10/4/79 By Fund Com. Dev. Blk. Grant Dept./Activity Com. Dev. Block Grant Purpose Contract for Street Overla.v Program 1979-80 Bidder Daily Corporation Certificate No. 30 l~ '~ - ; ~ CHANGE IP1 CONTRACT """~j . t, ~ewc~ - ORDER NO. TWO Street Overlay Program, 1979-80 DATE November 30, 1979 Various Streets Within City _ of Chula Vista CONTRACT Daley Corporation CONTRACTOR JOB AO-014 The following change shall be made to increase the contract dated October 25, 1979, between the City of Chula Vista and Daley Corporation , Contractor. REMARKS AND DETAILS: Additional move in costs for paving of A.=venue between "E" Street and Davidson previousl~~ being deleted from contract No. 1. Asphaltic concrete tonnage was con tract work allowing Landis Avenue t tonnage quantity. 12 inch overlay on Landis Street. Landis Avenue work through Change Order 483 tons short of revised ~ be done within approved Prove-In Lump Sum Cost ORIGINAL, CONTRACT PRICE It is agreed by the undersigned that all extra work shall be performed and materials furnished in accordance with the original contract and in accordance with the statement, if any, attached hereto. Previous Change Order Nos. - $ 6,552.15 Revised Total. Contract Price $ 63,734.55 This Change Order No. 2 $ 665.00 TOTAL CONTRACT $ 64,399.55 -- ~~ n~~ $ 665.00 $ 70,286.70 APPROVED BY: ACCEPTED BY: ORDERED BY: John P. Lippitt Cit En ineer Daley por tion B : ~`~: Kenneth J. Go mp Seni i ~-- ~ . PW-E-44 l ~- y~~~