Loading...
HomeMy WebLinkAbout2010/08/17 Item 6 CITY COUNCIL AGENDA STATEMENT ;:?}:Vf:.. CITY OF ~~~ (HUlA VISTA 8/17/10, Item-0- SUBMITTED BY: RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA REJECTING ALL BIDS FOR THE "SEWER REPAIR PROJECT AT CALLE MESITA,;rHIRD AVENUE, AND LA MEDIA IN THE CITY OF CHU /A VISTA, CA (CIP NO. SW270)" DIRECTOR OF PUBLIC WORKS ASSISTANT DlR~CT R OF ENGINE CITY MANAGE /' ASSISTANT CITY ANAGER Cr I 4/5THS VOTE: YES D NO [g] ITEM TITLE: REVIEWED BY: SUMMARY On July 21, 2010, the Director of Public Works received three (3) sealed bids for the "Sewer Repair Project at Calle Mesita, Third Avenue, and La Media in the City ofChula Vista, CA (CIP No. SW270)" project. The project would rehabilitate existing broken sewer mains and laterals, repair cracked sewer lines and rehabilitate existing manholes in various locations throughout the City. The two lowest bids received were determined to be non-responsive and the third bid was 58% higher than the lowest bid. Therefore, staff recommends that all bids be rejected and re-bid with a larger sewer rehabilitation project. ENVIRONMENTAL REVIEW Not applicable. RECOMMENDATION Council adopt the resolution. BOARDS/COMMISSION RECOMMENDATION Not applicable. DISCUSSION The City's sewer rehabilitation program identifies problematic areas within the City's sewer network by perfoffi1ing l11spections using closed-circuit television and then determining which sewer mal11S require rehabilitation. Segments of pipe that are cracked are re-lined to prevent groundwater infiltration or leaching of raw sewage into the ground, as well as stmctural failure. Based on the results of these inspections, staff determined that the rehabilitation of existing 6-1 I I I. 8/17/10, Item~ Page 2 of 3 sewer lines within Calle Mesita, Third Avenue, and La Media Road should proceed as soon as possible. On July 2,2010, Public Works staff advertised the "Sewer Repair Project at Calle Mesita, Third Avenue, and La Media Road in the City of Chula Vista, CA (C]F No: SW270)" project. The followmg bids were received. I CONTRACTOR I COMMENT 18 PALM ENGINEERING, INC. - SAN DIEGO, CA (NON-RESPONSIVE - DID NOT $160,413 SIGN ADDENDUM) . SC V ALLEY ENGINERING, INC. - EL CAJON, CA (NON-RESPONSIVE - DID NOT 8 SIGN ADDENDUM) TC CONSTRUCTION COMPANY, INC.- 58% HIGHER COST THAN ~",;,; SANTEE, CA APPARENT LOW BIDDER The low bid submitted by Palm Engineering, Inc. [or $]60,413 is $43,902 below the Engineer's estimate of $204,315; thc Engineer's estimate was based on average prices for similar types of work completed during the last two years. However, Palm Engineering, Inc. and the second lowest bidder, SC Valley Engineering, ]nc., both failed to sign the addendum issued before the bid opening date of July 21, 2010. Due to the City's procedures stated in the bid package and the addendum, a bid would be considered non-responsive and incomplete without the signed addendum. Therefore, both Palm Engineering, Inc. and SC Valley Engineering, Inc. are considered non- responsive. The third lowest bidder, TC Constmction Company, ]nc., submitted a bid of $253,555, which is $49,240 (25%) higher than the Engineer's estimate of $204,315 and 58% higher than Palm Engineering's bid proposal. TC Construction's submitted bid is more than staff anticipated for the work to be constmcted. Due to the large cost differential between the apparent low bidder and the high bidder (58% cost). and in the interest of the City, staff proposes that all bids be rejected at this time. Upon rejection of all bids, staff will re-advertise these project locations with the SW255B Sewer Rehabilitation Project, which is similar in scope. Further, contractors will be required to complete these locations as their first order of work. SW255B will be advertised in late-August 2010. It is anticipated that the City will receive much more competitive bids for the work. DECISION MAKER CONFLICT StatT has reviewed the property holdings of the City Council and has found a conflict exists, in that Councllmember McCann has property holdings within 500 feet of the boundaries of the property which is the subject ofthis action. 6-2 I I 1- CURRENT YEAR FISCAL IMPACT None at this time. ONGOING FISCAL IMPACT Not applicable. ATTACHMENTS 1. Location Plats Prepared by Poten G San Pedro, S'r Engineering Technician, Public Works Dept. Jose Luis Gomez,-Land Surveyor/Project Manager, Public 1Vorks Dept. J:\Engincer\A GENDA ICAS201 OI08-17-1Ql.SW270A J J JRejecllOn.doc 6-3 8/17/10, Item~ Page 3 of 3 ATTACHMENT 1 Location Plats 6-4 /~ _/-\---~\ \ I~\ \ ~,~3 C! M / '''' , /________------~\ _--~-: ~ ' "" a ~ ~ N" N \ ~~ ~ ,I \ $ \ VI ~ ~ (' '",--.:;:;;;;;~~-~~" ,,-~- \.. ~".- es"' "_I'---'~~ \ \ ' ~ ~ . \-' ! ,," i ! \; ~r~- ! " ,____ '\\L:---- i ,\ ~})~; w / ' '\ ~ ~'/-:o /, - ---~--~ ~;::::-/ 0 ~/ ~ :2;;! - . ---- j .--------------- \ ~ -------- \ ...... ...---- 0-- 3 I C17 ~ CiJ \-- __ \ 0 ~JJl- ,IJ? \-'- ~ 0 @y __ ." ~ ,C :_< ~,,v (;(~, \ / .-- "', "s f@ (-~"" lEI ~ ~ ' W ')} ,"0 . - ~;~~'~"~-Fl",;- \ ~ , \ i ~""~~ \ ~t-l' -d""',-" \fn ~.J r~ " :3 . ~,rb~~rl)~iJ)<:~'-"" ~-> ,/---.----:/ "" :', i.;:J. ,...,..... ;;H/./\ ?'" ~ . ~R ,.fig- ~.\ OJ \ ~ ' N 'A8/"'::;' __ ;; - "J ..)~' '1:::-;] (if,. ~'~. ,.0 . '::; ~"11 t:g7 \ ,<7;13" .". /./ ~ -- -,' ~ ,ll />!\,,, ~ \~,/ ..// "i"'I' , " ".,./. '" ) ._ ^ \'/\/ * ~ t-l.,.. S ): ,~.,. '" ~ ~-,..-- '. - -------a '" ~ '" ~ '3 '" 6-5 - - ;" _.~ -,_.... :::-I \ ~,\,'\:..~ Lj 61~o G~)\NOe C)\wJIlO oS- C ~ "' o ~ ~ ....--- ~ 8 ---- ;::It ~ o ~ ~ ~ " - ~ " t :, ~ o ~ ~-- ~ ~ ;r, ~ ~ ~ ~ ~ \ -:-1 ~ l~-~\ ~ \ ~ N ~ ,/' \'~~ o ~ . ~ 0 , ' '- "--- "'- " o ~ ., ~ 8 N -~ .J" I -- ---- \ \ \ 1089 ~A ~ ~ I 11(96 CA;L[ M[5fT~~ \2 \ \ 1086 I \ ~ \\ ~ \ / \ f \0 ~, Iv/ \ J-------\0 ~ \/ '6 \i3~ "& // \1085 \ 1 095 \~-::r\ 225 (]) MH #230 TO MH #253 / 6' POINT REPAIR / @ 60' - 66' FROM MH #230 / 795 LF - 8" CIPP LINER ---- o o \ \ \ i \ ~ I i i I , \ \ \ \ 1095 \ ~ ,~~ (Sj CJI \ \ ~ ~l --4 \ \~ 6\ ~ \ . ~ \J:-. 1::]\ \ ~ '2: Ill, , j\:r-~ --4 \ :::r::3 a CD ~ CJ1 IN -->. a CD CJ1 --4 a CD CJ1 NO SCALE -->. MH #230 TO MH #229 / 205 LF - 8" CIPP LINER MH #230 TO MH #231 / 18 ' POINT REPAIR/ @ 46' - 52: @ 87' - 93', @ 152' - 158' FROM MH#230 /765 LF - 8" CIPP LINER ~ ORA WN 8Y: 77ILE: POTEN G. SAN PEDRO OA IE: I SHEET 1 06 70 ?070 OF 5 SHTS. CITY OF CHULA VISTA SEWER REPAIRS 6-6 PROJECT FILE #SW270 PREPARED 8Y: POltN G. SAN PEDRO APPRO'l[D 8Y: GREG TSCHERCH I f I ,r \ .I \1085 \ 1075 \ \ \ \ 1065 \ \ \ \ \ \ \ \ \\ SCARPADA ~f f ___ _____ C _--- . r- i I I - . - - \ ~\ \\--... \ " ~ \,.l-\\ ----- \\ \ ----I \ \ \ \ \\ '\ \\ 1089 \ ~ \\ \ 1081 FJ \ \ Noswe \ \ 1073 ~96 \ \ 1065 \ ~ \ 1086 \\ 1049 \\ 1 057 ~ V1Q95 \ E MESITA 4 v.\; ~ \ CALL MH #250 NEW MH 1078 \ 1060 \ 1068 \ 1072 \ ' 1054 \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ ' \ ~ \ 1047 1029 \039 \ \ \ \ 1057 \ \ \ \ o MH #7396 TO MH #250 / 100 ' POINT REPAIR / @ 92' - 727', @ 188' - 253' FROM MH #7396 / INSTALL 7 NEW MANHOLES / 400 LF - 8" CIPP UNER ~ \ .~ I I CALLE ORA WN S.('. TITLE: POTEN G. SAN PEDRO OA TE: I SHEET 2 06-10-2010 OF 5 SHTS. CIIY OF CHULA VISTA SEWER REPAIRS PROJECT FILE #SW270 PREPARED SY: PO TEN G. SAN PEDRO APPROVED SY: GREG TSCHERC/-! 6-7 - , _.--~ _. -- _.- \-- ',- -- \ \ '- - 'I. "-. ______~t \. ....., ..------ \ '\ . \ \ \ \ \ \ \ \ \ . \ i , . I I I I _ I I ~11009 11017 ;~I . \ 0 I MH #2621 1008 1012 --, I I I I . i l f I o 0) o 11026 I I I j I j 1 I , 209 / I 215 / / / / I _ 1054 \ \ i \ i \ , i \ \ \ \ 1039 \ 1029 \ \ \ \ \ \ \ ~ -" , -;-'-'- '" ---=-=:... -- \ \ \ \ \ NO SCALE \ \ \ \ \ \ \ \ \ \ \ \ \ , I \ i \ 1025 \ 1033 MH #261 \ 6 CALLE MESITA i \\ 1046 \ 1036 \ \ \ I \ . \ \ i \ \ I ' \ \ I , ^ / \ l \ / 1011 \ I \ i \ I \ I \ k \ 1021 MH #250 TO MH #267 / 400 LF - 8" CIPP LINER Mi-l #26/ TO MH #262 / 10' POiNT REPAIR / @ 40' - 50' / LINE MH #262 FROM MH ,#267/ 195 LF - 8" CiPP LINER --- MH #263 TO MH #262 / 13 ' POINT REPAiR/ @ 46' - 52: @ 87' - 93: @ 152' - 158' FROM IiIH ,#263/ 165 LF - 8" C/PP LiNER ORA WN BY: ilTLE: POEN G. SAN PEDFiO DAle: SHEeT j 06 10 ')010 OF 5 SHTS. CITY OF CHULA VISTA SEWER REPAIRS PROJECT FILE #5'11270 PREPARED BY: PO TEN G. SAN PEDRO . APPROVED BY: GREG TSC;-ImUI 6-8 I I I ,,.. ~ "- ;.:": y-v ~ NO SCALE \ \ '- /". \\/ , (,filA ~ \...:.Q - ~ ~\ ;:,~. ')"A--/~\ o NEW SEWER h(ANHOLE @ TELEGRAPH CANYON RD / OTA Y LAKES RD / LA MEDIA RD / NEW MH / 10' NEW PIPE /660 LF - a" CIPP LINER DRAWN 8Y' TITLE: POltN G. SAN PEDRO OA It: I SHEET 4 106-10-2010 OF 5 SHTS. CITY OF CHULA VISTA SEWER REPAIRS PROJEC T FILE ,#SW270 PREPARED BY' POltN G. SAN PEDRO APPROVE:D BY: GF?EG TSCHEF?CH 6-9 I '-_' I , \ '\ \ \ I ;/ )"-.. "--<~' .. /'-< - '~ -y~-'-' \---- ~ '--,-\-~, , , '\ ' i ,,/', '- i 51 \ \ ____\ 1t:.. \ ,. " ". 1 1.1 / /~"-.. '<i'rl\\I-\t:. ______\', ~ \ 1- " \ ; \ , V~( .....--.....-- _-? --n '.' _____I ~\ 0 '--..-'"I, \ \ \ \~' ~, \..-~\ \" ----\ \ ' ~ \J-J--' \ \ --' ( '. ,. \ \ \ \.....------ ~\ \ \VI \; \\\ \ ,'\\ \\ \ ~,\ \\ \ \ \~ \ \ ' \ \ \...-\ \ \~; -- '\ ~ ~\ ',..-\ y\ \ \ \ \ \ '" \ ---'. ~\ \ '~\ "\ \ \ \ . . \ \ \ ~ t:---\---\\ \ \ \ \ \ l~ ....___ \ \ \ \ \- \ \ 2: \ \ \ \...-~ \ 'M \ ...----\ \ \~ 590 \ ~ ~~ \ \ \ \<'\ ~\---- ~ ~~G) . \. \ \ \ ~\~ \ -----y -- \" \ \ \ \~ ~ \ \----- -- ---- ____~\ \505 \_j-\ \ ~ ---\ \ - \-- \ \ ~ ,---- Y--, '\!!!I!J --, ~' \ \ \/~\ \~ \" NO SCALE \ V~~ \!~\ \ 511 ____~~\ Y ____---\ ...--\~~\ ~ \" --------\~' \ ,. -:Q ------------- . \ ___ . 535\ \~ \ ....___----\ \ ---------= \ ...____--\ \ 531 ~\'" \\ \, -- ...---- / ~ 542 \ ~ ---- \ ~\ \------- \_---\ _________\ \ 547 \...----.- \ Y f \______ \ \ 51 \ \ \-----\ 548 \ 5:~1 _-----\ __ ________---5\ d \-----\ ------:> ~~~~ ~----\'?~ ~ \_---\_------ 578 \ ~ \------;\.-.~, <p~ \ \ \---/,\ \ \ 581 \ \ ~ \ \ , \ \ . "\ -, \' .--;::;?\ \ , .....--- \ ~\ _______ 7\ ~ \ ......-'\ \ \ \, --'{~ \----_-\ ~\~ 5~\: \~.---- "~\___--\ ~ ~---,\ ~ It--------\ \ \ '" \ ~8' \ _____ \. ____( \ \ \...-- . <.,} \ \ --..---lr\ \ \ ..-I J 51 i ____, \ '.. -..-- \ , \ ~ o MH #3582-TO MH #3348/8" VCP /81 LF POINT REPAIR / @ 319' - 328', @ 438' - 447', @ 467' - 476', @ 505' - 493', @ 675' - 657' FROM MH .f3582 / CONSTRUCT NEW MANHOLE AND REMOVE BRICK MH / 660 LF - 8" crpp LINER PROJECT FILE #SW270 DRAWN BY' TITLE: PR[PARED BY' POTE:N G. SAN PEDRO CITY OF CHULA VIS I A POTE:N G, SAN PED,c1O DAlE. \SH[ET5 S' H/ER REPAIDS APPRO'/E:DBY 06 -10- 2010 OF 5 SH TS. c: 11 \ \ 1\ GR[G TSCHCRCH 6-10 RESOLUTION NO. 2010- RESOLUTION OF THE CITY COUNCIL OF TI-IE CITY OF CHULA VISTA REJECTING ALL BIDS FOR THE "SEWER REPAIR PROJECT AT CAL,LE MESITA, THIRD AVENUE, AND LA MEDIA IN THE CITY OF CHULA VISTA, CA (CIP NO. SW270)" WHEREAS, on July 21, 2010, the Director of Public Works received three (3) sealed bids for the "Sewer Repair Project at Calle Mesita, Third A venue, and La Media in the City of Chula Vista, CA (CIP No. SW-270)" project as follows: I CONTRACTOR I COMMENT I~ PALM ENGINEERING, INC. - SAN (NON-RESPONSIVE - DID $160,413 DIEGO, CA NOT SIGN ADDENDUM) SC VALLEY ENGINERING, INC. - EL (NON-RESPONSIVE - DID $213,877 CAJON, CA NOT SIGN ADDENDUM) TC CONSTRUCTION COMPANY, INC.- 58% HIGHER COST THAN $253,555 SANTEE, CA APPARENT LOW BIDDER and; WHEREAS, the apparent low bid by Palm Engineering, Inc. of $160,413 is $43,902 (21.5%) below the Engineer's estimate of $204,315; and WHEREAS, Palm Engineering, Inc. and the apparent second lowest bidder, SC Valley Engineering, Inc., both failed to sign the only addendum dated July 13,2010 prior to the bid opening; and WHEREAS, failure to sign the addendum renders bids submitted by Palm Engineering, Inc. and SC Valley Engineering, Inc. non- responsive; and WHEREAS, the lowest responsive bid submitted by TC Construction, Inc. of$253,555 is $49,240.00 (25%) above the Engineer's estimate 01'$204,315; and WHEREAS, the engineer's estimate was based on average prices for similar types of work completed during the last two years; and 6-11 Resolution No. Page 2 WHEREAS, due to the large cost differential of 58% between Palm Engineering, Inc.'s bid and TC Construction, Inc.'s bid; and WHEREAS, in the best interests of the City, all bids shall be rejected at this time; and WHEREAS, staff shall re-advertise this project with SW255B Sewer Rehabilitation Project, which is similar in scope. NOW, THEREFORE, BE IT RESOLVED the City Council of the City of Chula Vista does hereby reject all submitted bids received for the construction of "Sewer Repair Project at Calle Mesita, Third Avenue, and La Media in the City of Chula Vista, CA (CIP No. SW270)" project. BE IT FURTHER RESOLVED that after rejecting all bids, staff shall re-advertise this project with the SW255B Sewer Rehabilitation Project, which is similar in scope. Presented by Richard A. Hopkins Director of Public Works 6-12