Loading...
HomeMy WebLinkAbout2010/06/22 Item 6CITY COUNCIL AGENDA STATEMENT ~~ ~ ~ ~~~ CITY OF ---~ CHULA VISTA 6/22/10, Item~_ ITEM TITLE: A. RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING $2,051,600 IN LOAN FUNDS FROM THE CALIFORNIA ENERGY COMMISSION TO INSTALL ENERGY EFFICIENT INDUCTION STREETLIGHTS B. RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING A DESIGN BUILD AGREEMENT FOR THE "CITYWIDE STREET LIGHTING RETROFIT" PROJECT (GG214) TO SOUTHERN CONTRACTING, INC. WHICH WILL BE FUNDED THROUGH FISCAL YEAR 2010/2011 CAPITAL IMPROVEMENT PROJECT GG214, REIMBURSED THROUGH THE CALIFORNIA ENERGY COMMISSION LOAN PROGRAM AND AUTHORIZING USE OF ALL AVAILABLE CONTINGENCIES SUBMITTED BY: DIRECTOR OF PUBLIC WORKS DIRECTOR OF CONSERVATION & ENVIRONMENTAL SERVICES REVIEWED BY: CITY MANAGER ASSISTANT CITY ANAGER ~~ 4/STHS VOTE: YES ^ NO SUMMARY The Public Works Department has been conducting an energy efficient streetlight assessment project in hopes of saving energy, reducing the size of our carbon footprint, and helping contribute to a safe public environment. There are two solutions defined due to the fact that different technologies perform better at certain mounting heights and upfront cost is also a factor. Both solutions offer reduced energy and maintenance costs of up to 50 percent while improving light quality. Solution one is to use LED luminaires for all new construction and improvement projects that include roadway lighting. The second solution is to use 55-watt induction luminaires to replace existing 100-watt high pressure sodium (HPS) luminaires on residential streets throughout the city. By retrofitting 4,600 streetlights with induction lighting technologies the City will reduce its energy consumption by 862,000 kwh per year, a cost savings of approximately $199,300 annually. The project will be funded through the California Energy Commission's (CEC) 1%-interest loan program and San Diego Gas & Electric's (SDG&E) energy efficiency rebates. 6-1 6/22/10, Item Page 2 of 4 Qualified firms with design build experience were solicited to present proposals for review. Based upon the submitted information, the most responsive proposal from a qualified candidate was chosen. ENVIRONMENTAL REVIEW The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the project qualifies for a Class 8 categorical exemption pursuant to Section 15308 [Actions by Regulatory Agencies for Protection of the Environment] of the State CEQA Guidelines because the energy savings resulting from the energy efficiency project will contribute to reducing Chula Vista's greenhouse gas or "carbon"' emissions thus improving air quality. Therefore, no further CEQA environmental review is necessary. RECOMMENDATION Council adopt the resolutions. BOARDS/COMMISSION RECOMMENDATION The project was presented to the Resource Conservation Commission (RCC) at their April 27, 2009 meeting as part of the City's Energy Efficiency & Conservation Block Grant Strategy. Although the RCC did not take formal action, the Commission expressed general support for the Strategy and the identified projects. DISCUSSION All Citywide facilities were identified as potential sites for an energy upgrade and retrofit as part of the City of Chula Vista's Local Government Partnership with San Diego Gas & Electric (SDG&E). SDG&E Engineers and City of Chula Vista staff have researched all possible efficient and cost saving methods to bring all City of Chula Vista facilities up to our cun'ent energy saving guidelines and standards. As part of that effort, on December 15, 2009, the Department of Public Works issued a Public Request for Proposals (RFP) for the "Municipal Street Lighting Retrofit Project", pursuant to § 2.57 of the City's Municipal Code, to design and construct lighting fixtures for the citywide street lighting retrofit installation ("Project") to qualified Design-Build firms. The following companies were sent requests for proposals: Patterson Brothers Lighting, Lekos Electric, Select Electric, T&M Perry Electric, Southern Contracting Company, and American Power Solutions. The ranking of firms through the bid process qualified four (4) respondents for interviews: Patterson Brothers Lighting, Lekos Electric, Southern Contracting Company, and American Power Solutions. Following the interviews, Southern Contracting Company was selected as the respondent who best met the design, monetary, and time criteria of the project with whom City could negotiate an agreement. As part of D/B's proposal, D/B submitted a "Not to exceed Gross Maximum Price" of the Project in the amount of one million nine hundred sixty seven thousand five hundred seventy one 6-2 6/22/10, Item~o Page 3 of 4 dollars ($1,967,571.00) ("Estimated Cost"/"EC") including an eighty four thousand and twenty- nine dollar ($84,029.00) City held contingency to initiate design of the proposed project. Following City's approval of 90% Construction Documents ("CD") and with the approval for funding through a California Energy Commission (CEC) loan, D/B shall submit a Guaranteed Maximum Price ("GMP"), at which time staff may return to Council if the GMP exceeds $2,082,571. This facilities improvement project is part of the City's broader efforts to promote energy efficiency at municipal sites and to lower citywide greenhouse gas or "carbon" emissions. The SDG&E/Califomia Public Utilities Commission Local Government Partnership Program has provided financial support for City staff to evaluate, identify, and coordinate the installation of these energy retrofit projects. Because Partnership funds are not able to be used for capital costs associated with the improvements, staff was authorized by City Council to pursue up to $9.1 million of low-interest financing from the CEC and SDG&E to fund the installation of energy efficiency and renewable energy technologies at municipal facilities (as amended under Resolution #2010-064). Under the resolution, the City Manager was also authorized to negotiate and execute all documents associated with the low-interest financing. As a result, the City of Chula Vista was recently awarded a $2,051,600 loan from the CEC for the induction streetlight retrofit project. The 1%-interest financing, which is partially subsidized by the American Recovery & Reinvestment Act of 2009 and is repaid through the annual energy cost savings estimated at $199,300, will be combined with up to $115,000 of SDG&E rebates (paid directly to the contractor) further lowering the net project costs. The $2,051,600 loan will be appropriated through the Fiscal Year 2010/2011 budget process. DECISION MAKER CONFLICT Although some Councilmembers own property within a 500 foot radius of the properties involved in the decision making, pursuant to California Code of Regulations Section 18705.2(a)(1), no conflicts exist as the decision will have no financial effect on the Councilmembers' properties; therefore, the Councilmembers are not disqualified from participating in the decision making. CURRENT YEAR FISCAL IMPACT There is no net impact to the General Fund. The contract amount and costs for implementing the energy efficiency improvement project will be funded through the CEC Loan Program which provides 1%-interest to fund facility energy efficiency improvements. The resulting energy cost savings (approximately $199,300 annually) will be used to repay the financing over the 10-year payback period. Total net project costs will also be reduced through energy efficiency rebates estimated at $115,000 from SDG&E (paid directly to the contractor), while City staff time will be supported through the SDG&E Local Government Partnership which is funded by California utility ratepayers under the auspices of the California Public Utilities Commission. The new capital improvement project (GG214 Induction Lighting -Residential Street Lights) was approved by Council on June 8, 2010 as part of the Feaz Year 2010/11 CIP Program. At this 6-3 6/22/10, Item ~O Page 4 of 4 time, staff recommends approving a Design Build Agreement with an effective start date of July 1.2010. FUNDS REQUIRED FOR PROJECT A. Contract Amount (Southern Contracting Inc) B. Contingencies (City Held) $1,967,571.00 84,029.00 TOTAL FUNDS REQUIRED FOR CONSTRUCTION $2,051,600 ONGOING FISCAL IMPACT The $2,051,600 CEC Loan's debt service would be fully offset by $199,300 in estimated annual energy savings (simple payback 10 years). After the financing is repaid, the City's General Fund would realize the full energy cost savings annually. In addition, the City will realize more immediate energy cost savings as utility rates increase every few years and as routine streetlight replacement costs are avoided. The final debt service amount will be determined upon completion of the project based on the actual expenditures. The debt service will be repaid through a reduction in utilities expenses in the General Fund. Staff will include this change as part of the FY 2012 budget process. ATTACHMENTS Attachment 1. CEC Loan Agreement Exhibit A. Design Build Agreement Prepared by: Gordon Day, Building Project Manager, Public Work-Engineering Brendan Reed, Environmental Resource Manager, Conservation & Environmental Services ]:\Engineer\AGFNDA\CAS2010\OG-O8-l OW l 13 Induction Streetlight Council Agenda_FINAL.doc 6-4 RESOLUTION NO. 2010 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING $2,051,600 IN LOAN FUNDS FROM THE CALIFORNIA ENERGY COMMISSION TO INSTALL ENERGY EFFICIENT INDUCTION STREETLIGHTS WHEREAS, the Public Works Department has been conducting an energy efficient streetlight assessment project in hopes of saving energy, reducing the size of our carbon footprint, and help contribute to a safe public environment; and WHEREAS, by retrofitting 4,600 streetlights with induction lighting technologies the City will reduce its energy consumption by 862,000 kwh per year, a cost savings of approximately $199,300 annually; and WHEREAS, the project will be funded through the California Energy Commission's (CEC) 1%-interest loan program and San Diego Gas & Electric's (SDG&E) energy efficiency rebates; and WHEREAS, the City of Chula Vista was recently awarded a $2,051,600 loan from the CEC for the induction streetlight retrofit project. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept $2,051,600 in loan funds from the California Energy Commission to install energy efficient induction streetlights. Presented by Richard A. Hopkins Director of Public Works 6-5 RESOLUTION N0. 2010 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING A DESIGN BUILD AGREEMENT FOR THE "CITYWIDE STREET LIGHTING RETROFIT" PROJECT (GG214) TO SOUTHERN CONTRACTING, INC. WHICH WILL BE FUNDED THROUGH FISCAL YEAR 2010/2011 CAPITAL IMPROVEMENT PROJECT GG214, REIMBURSED THROUGH THE CALIFORNIA ENERGY COMMISSION LOAN PROGRAM AND AUTHORIZING USE OF ALL AVAILABLE CONTINGENCIES WHEREAS, all Citywide facilities were identified as potential sites for an energy upgrade and retrofit as part of the City of Chula Vista's Local Government Partnership with San Diego Gas & Electric (SDG&E); and WHEREAS, SDG&E Engineers and City of Chula Vista staff have researched all possible efficient and cost saving methods to bring all City of Chula Vista facilities up to our current energy saving guidelines and standazds; and WHEREAS, as part of that effort, on December 15, 2009, the Department of Public Works issued a Public Request for Proposals (RFP) for the "Municipal Street Lighting Retrofit Project", pursuant to § 2.57 of the City's Municipal Code, to design and construct lighting fixtures for the citywide street lighting retrofit installation to qualified Design-Build firms. WHEREAS, the following companies were sent requests for proposals: Patterson Brothers Lighting, Lekos Electric, Select Electric, T&M Perry Electric, Southern Contracting Company, and American Power Solutions; and WHEREAS, the ranking of firms through the bid process qualified four (4) respondents for interviews: Patterson Brothers Lighting, Lekos Electric, Southern Contracting Company, and American Power Solutions. WHEREAS, following the interviews, Southern Contracting Company was selected as the respondent who best met the design, monetary, and time criteria of the project with whom City could negotiate an agreement; and WHEREAS, as part of the proposal, Southern Contracting Company submitted a "Not to exceed Gross Maximum Price" of the Project in the amount of two million fifty one thousand six hundred dollars ($2,051,600) ("Estimated Cost"/"EC") including a twelve thousand one hundred forty seven dollaz ($12,147) contingency to initiate design of the proposed project; and WHEREAS, Following City's approval of 90% Construction Documents and with the approval for funding through a California Energy Commission (CEC) loan, Southern Contracting Company shall submit a Guaranteed Maximum Price (GMP), at which time staff may return to Council if the GMP exceeds $2,082,571. 6-6 NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Chula Vista does hereby approve a Design Build Agreement for the "Citywide Street Lighting Retrofit" Project (GG214) to Southern Contracting, Inc. which will be funded through Fiscal Yeaz 2010/2011 Capital Improvement Project GG214, reimbursed through the California Energy Commission loan program and authorize use of all available contingencies. n Presented by to Richard A. Hopkins Director of Public Works Attorney 6-7 ATTACHMENT / ENERGY CONSERVATION ASSISTANCE ACCOUNT LOAN AGREEMENT LOAN NUMBER: PRINCIPAL AMOUNT: PROJECT TERM: 006-09-ECE-ARRA $2,051.600.00 12/2/2009-12/2/2011 This Loan Agreement (the "Agreement") is entered into as of the date it is executed by both parties hereto, between the California Energy Resources Conservation and Development Commission (the "Commission") and City of Chula Vista, a city (the "Borrower") located in San Diego County, Califomia. 1. STATUTORY AUTHORITY AND LOAN A. Pursuant to the purposes authorized by section 25410, et se of the California Public Resources Code (the "Energy Conservation Assistance Act"), the Commission has approved the Borrower's loan application dated October 14, 2009, which is not attached but is expressly incorporated by reference herein. B. Subject. to the terms, covenants, wnditions, and including Special Conditions contained herein, and the Budget Detail attached as Exhibit A hereto (the "Budget Detail") to the extent it modifies the Borrower's loan application, the Commission shall make a loan to the Borrower (the "Loan") in the amount of two million, fifty-one thousand and six hundred dollars ($2,051,600.00), evidenced by a Promissory Note (the "Promissory Note") for loan number 006- 09-ECE-ARRA attached hereto as Exhibit B. 2. PURPOSE The Borrower agrees to expend all funds disbursed pursuant to this Agreement only for the purposes and in the amounts set forth in the attached Budget Detail (the "Project"). Any other use of funds disbursed hereunder shall require prior written approval by the Commission. 3. LOAN DISBURSEMENT SCHEDULE A. The Commission agrees to disburse funds to the Borrower upon the Borrower's execution of the attached Promissory Note and any appropriate security instruments and required supplemental documents, including invoices as required in Section 3.B below. B. Loan funds shall be disbursed on a reimbursement basis based on invoices submitted by Borrower in a form approved by the Commission. Backup documentation for actual expenditures, including such items as timecards, vendor invoices, and proof of payment must be provided to substantiate the ECAA Pub Entity Loan Agreement ARRA SEP - 1 - Rev. 10/29/09 6-$ request. Commission staff will approve invoices only after verifying requested amounts against backup billings and determining that expenses are appropriate and used for the authorized purposes of this Loan. For executed Agreements, invoices fox expenses incurred during the Project Term are eligible for reimbursement. C. All invoices must be submitted within thirty (30) days after Project completion. D. Ten percent (10%) of the Loan amount will be withheld as retention until the final report is received from the Borrower and the Commission's Project Manager determines the Project has been satisfactorily completed. 4. LOAN REPAYMENT AND INTEREST All funds disbursed hereunder, together with all interest payable thereon, shall be repaid to the Commission in accordance with the terms of the Promissory Note. The Loan shall bear simple interest at the annual rate set forth in the attached Promissory Note on the principal balance of Loan funds disbursed to the Borrower. Payment of said interest shall be due at the time of semiannual scheduled Loan .repayment installments to the Commission, and interest shall accrue from the time of disbursal of funds to the Borrower until receipt of full Loan repayment to the Commission. 5. TERM A. The effecfive date of this Agreement shall be the date on which it has been executed by both parties hereto. B. The Borrower agrees to complete performance of its obligations under this Agreement within the applicable periods stated in this Agreement. 6. PREPAYMENT The Borrower shall have the right to prepay all or any part of the amount of this Loan at any time without penalty. PROMISSORY NOTE In order to evidence its debt to the Commission hereunder, the Borrower agrees to, contemporaneously with the execution of this Agreement, execute and deliver to the Commission the Promissory Note (attached as Exhibit B hereto). 8. ACCOUNTS, AUDITS, AND RECORDS A. The Boaower agrees to establish on its books a sepazate account for this Loan. This account shall be maintained as long as the Loan obligation remains unsatisfied. ECAA Pub Entity Loan Agreement-ARRA SEP - 2 - Rev. 1029/09 6-9 B. The Borrower further agrees to maintain records that accurately and fully show the date, amount, purpose, and payee of all expenditures drawn on said account for three (3) years after this Loan is repaid in full or three years after the federal grant term, whichever is later, unless the Commission requests a longer retention period. C. The Borrower further- agrees to utilize a voucher system by which all expenditures from said account will be authorized and authenflcated. D. The Borrower further agrees to allow the Commission or any other agency of the State of California (the "State") or the Federal Government, or their designated representatives, on written request, to have reasonable access to, and the right of inspection of, all records that pertain to said account or the Project. The Borrower also agrees to submit to an independent audit, if requested by the Commission, at the expense of the Borrower. Borrower agrees to maintain all such records for a minimum of three years after this Loan is repaid in full or three years after the federal grant term, whichever is later, unless the Commission notifies the Borrower, prior to the expiration of such three-year period, that a longer period of record retention is necessary. 9. SOURCE OF REPAYMENT; OPERATION OF PROJECT A. Semiannual payments due to the Commission under this Agreement shall be made from savings in energy costs or other legally available funds as the Borrower chooses. If the Borrower is a county, city, town, township, board of education, or school district, the Borrower agrees that the amount of the semiannual Loan repayment shall not be raised by the levy of additional taxes and shall not be an obligation against tax revenues, but shall be obtained either from savings in energy costs resulting from the subject energy conservation projects or other legally available funds as the Borrower chooses. B. Energy cost savings as detemuned by the Commission are based on energy usage and serving utility rate schedules at the time of the issuance of this Loan, except as specified in Special Conditions, if any, as detailed in this Agreement, and the information and data contained in the Borrower's loan application and technical study. The following-will not affect the Commission's initial finding of energy cost savings, and aze not a basis for claiming a lack of energy savings: a) changes in energy use and/or rate schedules which occur after issuance of the Loan, except as specified in Special Conditions, if any, as detailed in this Agreement, b) deviations in the project work scope from what was approved by the Energy Commission, c) changes in the Borrower's facility and/or equipment which occur after the issuance of the loan, including, but not limited to maintenance, operations, schedules, employees and facility alterations and expansions, d) deviations, omissions or errors found in the loan application and technical study after the loan award. The Borrower is responsible for ensuring the accuracy of the information contained in its loan ECAA Pub Entity Loan Agreement ARRA SEP - 3 - Rev. 1029/09 6-~0 application and technical study. In the event annual energy cost sauings resulting from the Project, as determined by the Commission, fail to equal or exceed the amount due under this Agreement, this Agreement may be renegotiated to assure that the repayment amount does not exceed the actual energy savings or avoided costs resulting from the Project, and the Promissory Note will be revised accordingly. In no event, however, will the number of semiannual installments payable hereunder and under the Promissory Note exceed thirty. C. The Borrower shall obtain and maintain in its records any and all permits and licenses required to install or operate the Project and shall comply with all local, state, and federal laws, rules and codes concerning the Project. The Borrower shaIl maintain the Project in good working order for the duration of the Loan and shall insure that staff members aze provided appropriate training on the operation and maintenance of the Project. The Borrower shall maintain insurance on the Project and, in the event of any casualty loss covered by such insurance policy, apply the proceeds to the repair of the Project or, with the approval of the Commission, may use the insurance proceeds to install alternate projects to generate alternative energy cost savings to repay the Loan. D. The Borrower agrees to provide the Commission with information necessary for administration of the Program for three yeazs following completion of the Project or three years after the federal grant term, whichever is later, unless the Commission requests a longer retention period. The needed information' includes the following, at a minimum, (1} the annual computation, required by Section 25414 of the Energy Conservation Assistance Act, of energy cost savings for the most recent fiscal year, calculated in the manner and provided in the format prescribed by the Commission and (2) any information or change in assumptions or operations which might affect. the Commission's initial determination of energy savings. E. The Borrower authorizes any official or agent of the Commission, the State, or the Federal Government to conduct physical inspections of the Project before the commencement; during construction, installation and implementation of the Project; and at any time prior to the complete repayment of the Loan. In each contract entered into with suppliers of goods and services to install, conduct, or operate the Project, including management services, the Borrower shall include terms which allow any officer or agent of the Commission, the State, or the Federal Government access to the Project site and to any books, documents, or records directly relevant to the Project. F. If, prior to final repayment of the Loan, the Borrower sells the equipment or material installed with the proceeds of the Loan or sells the building, facility or system in which the Project has been implemented, then the Borrower shall apply the sale proceeds to repay any remaining balance due under this ECAA Pub Entity Loan Agreement ARRA SEP - 4 - Rev. ] 0/29/09 6-11 Agreement in full at the time of such sale. The Borrower shall notify the Commission within five business days of the date on which the Borrower enters into an agreement to effect such transaction. The Borrower shall repay the Commission within 30 calendar days of receiving an invoice from the Commission for the balance due. G. Borrower shall not place any liens or encumbrances on the Project until the Loan is fully repaid. H. In accordance with Section 25415 of the Energy Conservation Assistance Act, the Borrower covenants to take such action as may be necessary to include all payments due hereunder in its annual budget and to make the necessary annual appropriations for all such payments. The obligation of the Borrower to make such payments shall be limited to the savings realized by the Borrower as a result of implementing the Project funded by the Loan. 10. DEFAULT A. The Borrower's failure to comply with any of the terms of this Agreement shall constitute a breach of this Agreement and an Event of Default. In such case, the Commission may declare this Agreement to have been breached and be released from any further performance hereunder. B. In the event of any default or breach of this Agreement by the Borrower, the Commission, without limiting any of its other legal rights or remedies, may to the extent permitted by law, declare the Promissory Note evidencing this Loan to be immediately due and payable. 11. TERMINATION This Agreement may be terminated for any reason set forth below. A. With Cause In the event of any breach by the Borrower of the conditions set forth in this Agreement, the Energy Commission may, without prejudice to any of its legal remedies, terminate this Agreement for cause upon five (5) days written notice to the Borrower. "Cause" includes without limitation: 1) Failure to perform or breach of any of the terms or covenants at the time and in the manner provided in this Agreement; or 2) Significant change in Energy Commission or federal policy such that the work or product being funded would not be supported by the Energy Commission or Federal Government; or ECAA Pub Entity Loan Ageement ARRA SEP - 5 - Rev. 10/29/09 6-12 3) Reorganization to a business entity unsatisfactory to the Energy Commission. B. Without Cause The Energy Commission may, at its option, terminate this Agreement without cause in whole or in part, upon giving thirty (30) days advance notice in writing to the Borrower. 12. REPORTING A. B. C. D. E. F. Progress reports aze due until Project completion. See Exhibit D for progress report due dates and content. A final report is due no later than 60 days after Project completion. The Commission will not process an invoice unless the Borrower's report submittals are up to date. If requested by the Commission, Borrower shall submit, within ten (10) days after the Commission's written request, a status report on its activities to date, pursuant to this Agreement. Reports shall be in a format as determined by the Commission. The Borrower shall submit reports regarding energy savings as described in Section 9.D above. 13. GENERAL TERMS A. Indemnification by the Borrower. The Borrower agrees to indemnify, defend, and save harmless the Commission, the State, the Federal Government, and then officers, agents, and employees from any and all claims, losses, or costs (including reasonable attorney fees) arising out of, resulting from, or in any way connected with the Loan or this Agreement, or the financing or the operation of the facilities financed with the Loan. B. Ownership of Equipment and Material. All equipment and material acquired under this Agreement shall become the property of the Borrower at time of purchase. The Borrower shall obtain and maintain in its records a written waiver of all claims, other than those previously made in writing and still unsettled, from each contractor who supplies goods -and services, including management services, in connection with the Project. All equipment purchased with Loan funds shall be subject to the equipment provisions of 10 Code of Federal Regulations (CFR) Part 600, which is incorporated by reference in Exhibit D. ECAA Pub Enriry Loma Agreement ARRA SEP - 6 - Rev. 10/29/09 6-13 C. Inde,~endent Canacity. The Borrower, and the agents and employees of the Borrower, in the performance of this Agreement, shall act in an independent capacity and not as officers or employees or agents of the Commission, the State of California, ox the Federal Government. D. Assignment. Without the written consent of the Commission, this Agreement is not assignable or transferable by the Borrower either in whole or in part. The Commission may assign its rights under this Agreement for security purposes, and in such event the assignee of this Loan Agreement, including the bond trustee of any bonds which may be secured by repayment of this Loan, shall be entitled to enforce the provisions hereof and shall be a third party beneficiary of this Agreement. E. Time of the Essence. Time is of the essence in this Agreement Borrower is required to take timely actions which, taken collectively, move to completion of the purpose for which this Loan was awazded. The Commission Project Manager will periodically evaluate the progress toward completion. If the Commission Project Manager determines that the Borrower is not progressing toward completion within one (1) yeaz after the effective date of this Agreement, the Commission Project Manager may, without penalty or prejudice to any of the Commission's other remedies, temunate this Agreement. F. Amendment. No amendment or variation of the terms of this Agreement shall be valid unless made in writing and signed by the parties hereto, and no oral understanding or agreement not incorporated herein shall be binding on any of the parties hereto. G. Severability. In the event that any provision of this Agreement is unenforceable or held to be unenforceable, then the parties agree that all other provisions of this Agreement have force and effect and shall not be affected thereby. H. Governine Law and Venue. This Agreement is governed by and shall be interpreted in accordance with the laws of the State of California. Venue shall be in Sacramento County. Non-discrimination. During the performance of this Agreement, the Borrower and its contractors and subcontractors shall not unlawfully discriminate, harass, or allow hazassment against any employee or applicant for employment because of seat, race, color, ancestry, religious creed, national origin, physical disability (including HIV and AIDS), mental disability, medical condition (cancer), age (over 40), marital status, and family caze leave. The Borrower and its contractors and subcontractors shall insure that the evaluation and treatment of their employees and applicants for employment aze free from such discrimination and harassment. The Borrower and its contractors and ECAA Pub Entity Loan Ageement ARRA SEP - 7 - Rev. 10/29/09 6-14 subcontractors shall comply with the provisions of the Fair Employment and Housing Act (Government Code Section 12990 (a-f) et seq.) and the applicable regulations promulgated thereunder (California Code of Regulations, Title 2, Section 7285 et seq.). The applicable regulations of the Fau Employment and Housing Commission implementing Government Code Section 12990 (a-f), set forth in Chapter 5 of Division 4 of Title 2 of the California Code of Regulations, are incorporated into this agreement by reference and made a part hereof as if set forth in full. The Borrower and its contractors and its subcontractors shall give written nofice of their obligations under this clause to labor organizations with which they have a collective bazgaining or other agreement. The Borrower and its contractors shall include the nondiscrimination and compliance provisions of this clause in all subcontracts to perform work under this Agreement. Incomoration of Ener¢y Conservation Assistance Act. The Energy Conservation Assistance Act, together with any applicable rules, regulations or procedures authorized by such statute, is incorporated by reference in this Agreement. Borrower Authorization. The Borrower certifies that it has full power and authority to enter into this Agreement, and this Agreement has been duly authorized, executed and delivered by the Borrower. The Borrower acknowledges that The resolufion of its governing body or other official action authorizing it to enter into this Agreement also authorizes such further acts as are necessary, including execution of the Promissory Note, to implement and further the intent of this Agreement. K. Prevailine Wade. The Borrower shall comply with Chapter 1 (commencing with Secfion 1720) of Part 7 of 1ivision 2 of the Labor Code relating to the payment of prevailing wage for work performed on the Project financed in whole or in part with the proceeds of the Loan. 14. NOTICE Any notice required to be given to the Commission hereunder shall be sent to the Commission at 1516 Ninth Street, MS-1, Sacramento, California 95814, attention Grants and Loans Office Manager, or at such other address as the Commission may designate in writing to the Borrower. Any notice required to be given to the Borrower hereunder shall be sent to the address shown below the Borrower's execution of this Agreement, or at such other address as the Boaower shall designate in writing to the Commission. Notice to either party may be given using the following delivery methods: U.S. mail, overnight mail, or personal delivery, providing evidence of receipt,. to the respective parties identified in this Agreement. Delivery by fax or e- mail is not considered notice for the purposes of this Agreement. Notice shall be effective when received, unless a legal holiday for the State commences on the date of ECAA Pub Entity Loan Agreement-ARRA SEP - 8 - Rev. 10/29/09 6-15 the attempted delivery in which case the effective date shall be postponed 24 hours, or whenever the next business day occurs. 15. FEDERAL PROVISIONS INCORPORATED BY REFERENCE, SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, AND GENERAL FEDERAL PROVISIONS This Loan is funded by the American Recovery and Reinvestment Act of 2009. See Exhibit D for additional terms for federal American Recovery and Reinvestment Act of 2009 requirements. ECAA Pub Entity Loan Agreement-ARRA SEP - 9 - Rev. 10/29/09 6-16 IN WITNESS WHEREOF, this Loan Agreement has been executed by the parties hereto. STATE OF CALIFORNIA -CALIFORNIA ENERGY COMMISSION Sherry Mediati PAINTED NAME OF AUTHORI7_,ED SIGNATURE ~`~ n AUTHORIZED $I NA BORROWER (If other than an individual, state whether a corporation, partnership, etc.) City of Chula Vista NAME OF BORROWER PRINTED NAME OF AUTHORIZED SIGNATURE MANAGER, GRANTS AND LOANS OFFICE ~ j~..~1 ~e ~2~Ia DATE DADA E MAIL ADDRESS: City of Chula Vista 276 Fourth Street Chula Vista, CA 91910 AMOUNT FISCAL ~ FUND -B/A IT. 3360-001-0890 (2) I LOAN NO. ENCUMBERED ~ YEAR Energy Resources Conservation $2,051,600.00 12009/2010 FED- 0890-3360-001-20 CH 1 Statute of ~ 006-09-ECE-ARRA I 2009 APPROPRIATION ORG. j j Program - ARRA SEP LINE ITEM ALLOTMENT 901.003D I I 6500-626.05-30007 APPROPRIATION AUG j ~ i LINE ITEM j ~ iALLOTMENT i I I HEREBY CERTIFY UPON MY OWN PERSONAL KNOWLEDGE THAT BUDGETED FUNDS ARE AVAIL F R THE PERIOD AND PURPOSE OF THE EXPENDITCTRE STATED ABOVE. SIGNA OF ACCO OFFICER I DATE ~ ~ a- ~O ECAA Pub Entity Loan Agreement ARRA SEP - 10 - Rev. 10/29/09 6-~~ C.~-~, J ~ ~,..~.~t .c--, TTTLE EXHIBIT A BUDGET DETAILS This loan is made to the City Chula Vista ("Borrower") for an Energy Savings Project. The project consists of the installation of induction street lighting to replace existing High Pressure Sodium street lamps. The Table below summarizes the estimated project cost(s), saving(s) and simple payback(s} for the project. TABLE 1: Estimated Energy Efficiency Project Savings: Estimated Estimated Annual Total Energy Energy Project Commission Cost Payback* Energy Efficiency Projects Cost Loan Savings -(Years) Install Induction Street Lights in City of Chula li Vista $2,051,600 1s $2051;604 ^' $200,000 10.3 '' ` - ~ ;~ I' . `, .' ~ ,_ ~ v I, , ; t AF ~ i" 1 L ~ ~ H ~ ~ ~ F ( ~ V - ~1R ~~ , , f l t~ ~ 9:a i (i :,• ~+? ~ : L f '4' 4 ~. S `_ f2 ~ y :~. t. GRAND TOTAL ALL MEASURES $2,051,600 $2,051,600 $200,000 10.3 " Payback based on the total protect cost. The payback based on the loan amount is 10.3 years based on Loan Amount of $2,051,600. The Borrower shall implement all projects in Table 1. Failure to implement all projects may reduce the approved loan amount. If necessary, the reduced loan amount wit! be determined by multiplying the annual energy cost savings by 13 or the total project cost, whichever is less. If the Borrower has received disbursements that exceed the amount of the reduced loan, the Borrower shall refund the difference to the Energy Commission. A-1 6-18 EXHIBTT B PROMISSORY NOTE LOAN NUMBER: 006-09-ECE-ARRA PRINCIPAL AMOUNT: ~ 2.051.600.00 INTEREST RATE: 1% For value received, the undersigned, (hereinafter referred to as the "Borrower"), promises to pay to the order of the State of California, Energy Resources Conservation and Development Commission (hereinafter referred to as the "Commission"), at its principal place of business at 1516 Ninth Street, Sacramento, California 95814, or at such other place as the Commission may designate the principal sum of two million, fifty-one thousand and six hundred dollars ($2,051,600.00) or such Iesser amount as shall equal the aggregate amount disbursed to the Borrower by the Commission pursuant to the above- referenced Energy Conservation Assistance Account Loan Agreement (the "Lcan Agreement") between the Borrower and the Commission, together with interest thereon at the rate of one percent per annum on the unpaid principal, computed from the date of each disbursement to the Borrower. Principal, together with interest thereon, is due and payable in semiannual installments as specified in the Estimated Amortization Schedule, attached hereto as Exhibit C, and as amended in the Final Amortization Schedule, beginning on or before December 22 of the fiscal year following the year in which the Project is completed and continuing thereafter on each June 22 and December 22 until said principal and interest shall be paid in fall. The Final Amortization Schedule, and any amended Final Amortization Schedule(s) are not attached but aze expressly incorporated by reference herein. 2. Payment of any scheduled installment received within thirty (30) days after its due date shall be considered to have been received on its due date and shall be first applied to accrued interest from the date of disbursal to the Borrower and the balance, if any, to principal. Payment of any scheduled installment received more than thirty (30) days after its due date but before the next billing shall be considered late, and interest on the unpaid principal shall accrue from date of disbursal to the Borrower through the actual payment date. However, payment of any scheduled installment received after a subsequent billing shall be considered overdue, and interest shall accrue on the unpaid principal from date of disbursal to the Borrower through the subsequent billing due date or actual payment date, whichever is later. 3. The Borrower may prepay this Promissory Note in full or in part, without penalty. 4. In accordance with Section 25415 of the Energy Conservation Assistance Act, the Borrower covenants to take such action as may be necessary to include all payments due hereunder in its annual budget and to make the necessary annual appropriations for atl such payments. The obligation of the Borrower to make such payments shall be limited to the savings realized by the Borrower as a result of implementing the Project funded by the Loan. ECAA Pub Enfity Promissory Note-ARRA SEP B-1 Rev. 10/29/09 6-19 5. if any installment is not paid within thirty (30) days after its due date, the Commission, at its option, may require the Borrower to pay a late change equal to five percent (5%) of the amount of the installment or Five Dollars ($5.00), whichever is greater. 6. On the occurrence of any event of default, the Commission, at its sole election and without limiting any of its other legal rights or remedies, may, to the extent permitted by law, declare all or any portion of the principal and accrued interest on this Promissory Note to be immediately due and payable and may proceed at once without further notice to enforce this Promissory Note according to law. 7. Each of the following occurrences shall constitute an event of default: A. Failure of the Borrower to repay any principal or interest when due under the terms of this Promissory Note; - B. Termination of the Loan Agreement pursuant to the terms thereof or breach by the Borrower of any terms of said Loan Agreement; C. Failure of the Borrower to undertake in a timely way the express and implied activities for which said Loan Agreement has been executed; D. Failure of the Borrower to obtain prior written Commission approval before undertaking a change in the scope of the activities for which said Loan Agreement has been executed; or E. Occurrence of (1) the Borrower becoming insolvent or bankrupt or being unable or admitting in writing its inability to pay its debts as they mature or malting a general assignment for the benefit of or entering into any composition or arrangement with creditors; (2) proceedings for the appointment of a receiver, trustee, or liquidator of the assets of the Borrower or a substantial part thereof, being authorized or instituted by or against the Borrower; or (3) proceedings under any bankruptcy, reorganization, readjustment of debt, insolvency, dissolution, liquidation or other similaz law, or any jurisdiction being authorized or instituted against the Borrower. No delay or failure of the Commission in the exercise of any right or remedy hereunder or under any other agreement which secures or is related hereto shall affect any such right or remedy, and no single or partial exercise of any such right or remedy shall preclude any further exercise thereof, and no action taken or omitted by the Commission shall be deemed a waiver of any such right or remedy. 9. Any notice to the Borrower provided for in this Promissory Note shall be given by mailing such nofice by certified mail, return receipt requested, addressed to the Borrower at the address stated in the Loan Agreement, or to such other address as the Borrower may designate by notice to the Commission. Any notice to the Commission shall be given by mailing such notice by certified mail, return receipt requested, to the ECAA Pub Emity Promissory Note-ARRA SEP B-2 Rev. 10!29/09 6-20 Commission at the address stated in the Loan Agreement, or at such other address as may have been designated by notice to the Borrower. 10. If suit is brought to collect any part of this Promissory Note, the Commission shall be entitled to collect all reasonable costs and expenses of said suit and any appeal therefrom, including reasonable attorney's fees. 11. This Promissory Note shall be binding upon the Borrower and its permitted successors and assigns and upon the Commission and its permitted successors and assigns. Without the written consent of the Commission, this Promissory Note is not assignable or transferable by the Borrower either in whole or in part. The Commission may assign its rights under this Promissory Note for security purposes, and in such event the assignee of this Promissory Note, including the bond trustee of any bonds which may be secured by repayments of this Promissory Note, shall be entitled to enforce the provisions hereof and shall be a third party beneficiary of this Promissory Note. 12. This Promissory Note shall be construed and enforced in accordance with the laws of the State of California. City of Chula Vista BORROWER PRINTED NAME OF AUTHORIZED REP NTATIVE / /Oy^ ED SIGNATURE TIT E~ -/~A~ 2~?2~2~~ DAB ECAA Pub Entity Promissory Note-ARRA SEP B-3 Rev. l0/L9/09 6-2~ EXFIIBTT C ES"I'IMATED AMORTIZATION SCHEDULE C-1 6-22 ~ ~- s+, State of California ,~ ,'i ~xi Energy Resources Conservation and Development Commission ~.,y:, ~>.~' 1516 Ninth Street "v'~ Sacramento, California 95814-5512 Estimated Loan Amortization Table Loan Number: 006-09-ECE-ARRA Number of Payments: 23 Recipient: City of Chula Vista Estimated Disbursement Date: 12/2/2010 Loan Amount: X2,051,600.00 Estimated Project Completion Date: 12/2/2011 Interest Rate: 1.00 % Annual Energy Savings: $200,000.00 T2ns# -Payment Date Accrued Interest - PaymentAmount `dnterest Paymerit Prindpal'Payment -'PdritipallBalance Dl' 12/2/20f0 $0.00 ($2,051,800.000 $0:00!':; ($2,051;600.00) '- $2,051,600:00 PS 12/22/2012 $42,212.37 $96,118.77 $42,212.37 $53,906.40 $1,997,693.60 P2 6/22/2013 $9,961.10 $96,118.77 $9,961.30 ¢86,157.67 $1,911,535.93 P3 12/22/2013 $9,583.87 $96,118.77 $9,583.87 $66,534.90 $1,625,001.03 P4 ~ 6/22/2014 $9,100.01 - $96,118.77 $9,100.01 $87,018.76 $1,737,982.27 PS 12/22/2014 $8,713.72 $96,118.77 $8,713.72 - $67,405.05 $1,650,577.21 P6 6/22/2015 $8,230.26 $96,118.77 $8,230.28 #87,888.49 $1,562,688.72 P7 12/22/2015 $7,834.85 $96,116.77 $7,834.85 $88,283.92 $1,474,404.80 P8 6/22/2016 $7,392.22 $96,118.77 $7,392.22 $68,726.55 $1,385,678.25 P9 12/22/2016 $6,947.37 $96,116.77 $6,947.37 $69,171.40 $1,296,506.65 P10 6/22/2017 $6,464.77 $96,118.77 $6,464.77 $89,654.00 $1,206,85286 P11 12/22/2017 $6,050.60 $96,118.77 $6,050.80 $90,067.97 $1,116,784.89 P12 6/22/2018 $5,568.63 $96,118.77 $5,566.63 $90,550.14 $1,026,234.74 P13 12/22/2018 $5,145.23 $96,118.77 $5,145.23 ~ $90,973.54 $935,261.20 P14 6/22/2019 $4,663.49 $96,118.77 .$4,663.49 $91,455.28 $843,805.93 P15 12/22/2019 ¢4,230.59 $96,118.77 $4,230.59 $91,688.18 $751,917.75 P16 6/22/2020 ¢3,769.89 $96,118.77 $3,769.89 $92,348.68 $659,568.86 P17 12/22/2020 $3,306.88 $96,118.77 $3,306.88 $92,611.69 $566,756.97 P18 6(22/2021 $2,826.02 $96,118.77 $2,826.02 $93,292.75 $473,464.23 P19 12/22/2021 ¢2,373.81 $96,118.77 $2,373.81 $93,744.96 $379,719.26 P20 6/22/2022 $1,893.39 $96,118.77 $1,893.39 $94,225.38 $285,493.89. P21 12(22/2022 $1,431.38 ¢96,118.77 $1,431.36 $94,687.39 $190,606.50 P22 6/22/2023 $951.42 $96,118.77 $951.42 $95,167.35 ~ $95,639.15 P23 12/22/2023 $479.51 $96,118.65 $479.51 $95,639.14 $0.00 Created try: ENERGY~Skawilli on 1/19/2010 3:42:47 PM C-2 6-23 006-09-ECE-ARRA EXHIBBT D FEDERAL PROVISIONS INCORPORATED BY REFERENCE, SPECIAL PROVISIONS RELATING TO WORIG FUNDED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, AND GENERAL FEDERAL PROVISIONS -STATE ENERGY PROGRAM (SEP) For purposes of this Exhibit D, the term "subawardee" refers to any entity other than a vendor that receives funding from the Borrower to carry out or support any portion of this Agreement. The term "vendor" refers to those entities defined as such by OMB Circular A-133 (see Subpart B, Sections .105 and .210). 'The Borrower must include all of the provisions below in its agreements with subawardees. It must include in its agreements with vendors only the provisions below that reference vendors. FEDERAL REGULATIONSIGUIDELINES/OMB CIRCULARS INCOPORATED BY REFERENCE The Office of Management and Budget {OMB) Circulars, federal regulations, and guidelines checked below are incorporated as part of this Agreement. These Terms and Conditions and any Special Conditions take precedence over the circulars, regulations, and guidelines checked below. OMB Circulars may be accessed on the OMB web site at www.whitehouse.oov/omb/circulars/index.html or by calling the Office of Administration, Publications Office, at (202) 395-7332. Federal regulations may be accessed at htto://ecfr.gpoaccess.gov. The Borrower must include in its awards the provisions below that apply to the particular organization concerned. ® Title 10 Code of Federal Regulations (CFR) Part 600: Department of Energy (DOE) Financial Assistance Regulations ® Title 1D Code of Federal Regulations (CFR) Part 420: State Energy Program ^ Title 48 Code of Federal Regulations (CFR), Ch. 1, Subpart 31.2: Contracts with Commercial Organizations (Supplemented by 48 CFR, Ch, 9, Subpart 931.2 for Department of Energy grants) (commercial firms and certain non-profit organizations) ® State Energy Program Funding Opportunity Announcement DE-FOA- 0000052, CDFA Number 81.041, State Energy Program (https://www. fed connect. net/Fed Connects ECAA ARRA T&Cs Page 1 of 20 10!29/09 6-24 Exo 006-09-ECE-ARRA ® OMB Circular A-102: Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments ^ OMB Circular A-110: Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations (also applicable to private entities) ® OMB Circular A-87: Cost Principles for State, Local and Tribal Governments ^ OMB Circular A-21: Cost Principles for Educational Institutions ^ OMB Circular A-122: Cost Principles Applicable to Grants, Contracts, and Other Agreements with Non-Profit Organizations (non-profit organizations and individuals, except for those specifically exempted) ® OMB Circular A-133: Audits of States, Local Govemments, and Non- profit Organizations ^ Other: ^ None 2. SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 A. ARRA-FUNDED PROJECT Funding for this award is from the American Recovery and Reinvestment Act (ARRA) of 2009, Pub. L. 111-5. Funding for this award is authorized by Public Resources Code, Section 25422, and the State Energy Program, Federal Grant Number DE-EE0000221, CFDA Number 81.041. The federal grant term expires on April 30, 2012. The Borrower and all subawardees/vendors are subject to audit by appropriate federal or State of California (State) entities. The State has the right to cancel, terminate, or suspend this Agreement if the Borrower or its subawardee fails to comply with the reporting and operational requirements contained herein. B. ENFORCEABILITY The Borrower agrees that if it or one of its subawardees/vendors fails to comply with all applicable federal and State requirements governing the use of ARRA funds, the State may withhold or suspend, in whole or in part, funds awarded under the program, or recover misspent funds following an ECAA ARRA T&CS O- Z 5Pa9Ex Df 20 1029109 006-09-ECE-RRRA audit. This provision is in addition to all other remedies available to the State under all applicable State and federal laws. C. REGISTRATION REQUIREMENTS Prior to beginning work, the Borrower must obtain a Dun and Bradstreet Data Universal Numbering System (DUNS) number and register with the Central Contract Registration (CCR). Websites are as follows: DUNS website: http://www.dnb.com/US/duns update CCR website: http://www.ccr.gov The Borrower must maintain current registrations in the CCR at all times during which it has an active award funded with ARRA funds. A DUNS Number is one of the requirements for registration in the CCR. D. SEGREGATION OF COSTS AND RECORDS The Borrower and its subawardees/vendors must segregate the obligations and expenditures related to funding under ARRA. Financial and accounting systems should be revised as necessary to segregate, track, and maintain these funds apart and separate from other revenue streams. No part of the funds from ARRA shall be commingled with any other funds or used for a purpose other than that of making payments for costs allowable for ARRA projects. Pursuant to 10 C.F.R. section 600.242 (incorporated by reference herein), records must be maintained for three (3) years after the loan is repaid in full or 3 years after the federal grant term, whichever is later, unless the Commission or Federal Government requests a longer retention period. The Borrower and its subawardees/vendors must keep separate records for ARRA funds to ensure those records comply with the requirements of ARRA. If this loan is split-funded with non-ARRA funds, the Borrower must track and report the ARRA funds separately to meet the reporting requirements of ARRA and related guidance. E. PROHIBITION ON USE OF ARRA FUNDS The Borrower agrees that, in accordance with ARRA, Section 1604, none of the funds provided under this agreement derived from ARRA may be used for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool. ECAA ARRA T&Cs 6-~p9ExD 20 10/29!09 006-09-ECE-ARRA F. ACCESS TO RECORDS In accordance with ARRA Sections 902, 1514, and 1515, the Borrower agrees that it shall permit the State of California, the United States Comptroller General or his representative, or the appropriate Inspector General appointed under Section 3 or 8G of the United States Inspector General Act of 1978 or his representative to: (1) examine any records of the Borrower or any of its subawardees/vendors that directly pertain to, and involve transactions relating to, this Agreement; and (2) interview any officer or employee of the Borrower or any of its subawardees/vendors regarding the activities funded with funds appropriated or othervvise made available by ARRA. The Borrower shall include this provision in all of its agreements with its subawardeeslvendors from whom it acquires goods or services in its execution of the ARRA-funded work. G. PUBLICATION Information about this agreement will be published on the Internet and linked to the website www.recovery.clov, maintained by the Accountability and Transparency Board. The Board may exclude posting contractual or other information on the website on a case-by-case basis when necessary to protect national security or to protect information that is not subject to disclosure under sections 552 and 552a of title 5, United States Code. H. PROTECTING STATE AND LOCAL GOVERNMENT AND CONTRACTOR WHISTLEBLOWERS The Harrower agrees that both it and its s;.~bawardeesPlendors shall comply with Section 1553 of ARRA, which prohibits all non-federal contractors, including the State, and all contractors of the State, from discharging, demoting or otherwise discriminating against an employee for disclosures by the employee that the emplcyee reasonably believes are evidence of: (1) gross mismanagement of a contract relating to ARRA funds; (2} a gross waste of ARRA funds; (3) a substantial and specific danger to public health or safety related to the implementation or use of ARRA funds; (4) an abuse of authority related to implementation or use of ARRA funds; or (5) a violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contract) awarded or issued relating to ARRA funds. The Borrower agrees that it and its subawardees shall post notice of the rights and remedies available to employees under Section 1553 of Title XV of Division A of the ARRA. The requirements of Section 1553 of the ARRA are summarized below. They include, but are not limited to: ECAA ARRA T&Cs Page 4 of 20 10/29/09 I)-2~ ExD 006-09-EC E-ARRA Prohibition on Reprisals: . An employee of any non-federal employer receiving covered funds under ARRA may not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing, including a disclosure made in the ordinary course of an employee's duties, to the Accountability and Transparency Board, an inspector general, the Comptroller General, a member of Congress, a State or federal regulatory or law enforcement agency, a person with supervisory authority over the employee (or other person working for the employer who has the authority to investigate, discover or terminate misconduct), a court or grand jury, the head of a federal agency, or their representatives, information that the employee believes is evidence of: • Gross management of an agency contract or grant relating to covered funds; • A gross waste of covered funds; A substantial and specific danger to public health or safety related to the implementation or use of covered funds; • An abuse of authority related to the implementation or use of covered funds; or • A violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contract) or grant, awarded or issued relating to covered funds. Agency Action: Not later than 30 days after receiving an inspector general report of an alleged reprisal, the head of the agency shat! determine whether there is sufficient basis to conclude that the non-federal employer has subjected the employee to a prohibited reprisal. The agency shall either issue an order denying relief in whole or in part or shall take one or more of the following actions: • Order the employer to take affirmative action to abate the reprisal. • Order the employer to reinstate the person to the position that the person held before the reprisal, together with compensation including back pay, compensatory damages, employment benefits, and other terms and conditions of employment that would apply to the person in that position if the reprisal had not been taken. • Order the employer to pay the employee an amount equal to the aggregate amount of all costs and expenses (including attorneys' fees and expert witnesses' fees) that were reasonably incurred by the employee for or in connection with, bringing the complaint regarding the reprisal, as determined by the head of a court of competent jurisdiction. Non-enforceability of Certain Provisions Waiving Rights and Remedies or Requiring Arbitration: Except as provided in a collective bargaining agreement, the rights and remedies provided to aggrieved employees by ECAA ARRA T&Cs O _ 2 ~9Ex Df 20 1029/09 006-09-ECE-ARRA this section may not be waived by any agreement, policy, form, or condition of employment, including any predispute arbitration agreement. No predispute arbitration agreement shall be valid or enforceable if it requires arbitration of a dispute arising out of this section. Requirement to Post Notice of Rights and Remedies: Any employer receiving covered funds under ARRA shall post notice of the rights and remedies as required therein. (Refer to Section 1553 of ARRA located at www.recoveN.gov, for specific requirements of this section and prescribed language for the notices.) INFORMATION IN SUPPORT OF ARRA REPORTING The Bonower will be required to submit backup documentation for expenditures of funds under ARRA including such items as timecards and invoices. See Loan Agreement, Section 3, Loan Disbursement Schedule, for more details oh backup documentation required for invoicing. In addition to the invoicing requirements, the Borrower shall provide copies of backup documentation at the request of the U.S. Department of Energy's (DOE's) Contracting Officer or designee, or the Commission's Contract Manager or designee. J. FALSE CLAIMS ACT The Borrower agrees that it shall promptly notify the State and shall refer to an appropriate federal inspector general any credible evidence that a principal, employee, agent, subawardee/vendor or other person has committed a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict of interest, bribery, gratuity, or similar misconduct involving ARRA funds. K. AVAILABILITY OF FUNDS Funds appropriated under ARRA and obligated to this award are available for reimbursement of costs until the end of the loan term or March 31, 2012, whichever comes first. L. REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF ARRA 1) This award requires the Borrower to complete projects or activities which are funded under ARRA and to report on use of ARRA funds provided through this award. Information from these reports will be made available to the public. 2) The reports are due in accordance with Section 11 of this Loan Agreement in addition to this section. ECAA ARRA T&Cs Page 6 of 20 10/29/09 6-29 Ex0 006-09-ECE-ARRA 3) Progress reports are due monthly by the third of the following month. For example, the January progress report is due by February 3. 4) The Borrower must maintain current registration in the CCR (http://www.ccr.gov) at all times during which it has an active federal award funded with ARRA funds. A DUNS Number (http://www.dnb.com) is one of the requirements for registration in the CCR. 5) The Borrower shall report the information described in Section 1512(c) of ARRA and other information reasonably requested by the State or required by the federal government or by the State to meet their obligation to provide accurate, complete, and timely information to the public; to meet the federal program reporting requirements; and/or to comply with State or federal law or regulation. Standard data elements and federal instructions for use in complying with reporting requirements under Section 1512 of ARRA are pending review by the federal government, were published in the Federal Register on April 1, 2009 (74 FR 14828), and are to be provided online at www.FederalReporting.gov. 6) The Borrower shall submit reports to the Commission's Project Manager in a format determined by the Commission. The Borrower must NOT register at FederalReporting.gov. 7) The Borrower must provide information including, but not limited to, the following: a) ARRA Section 1512 Report • Direct jobs created (i.e., new positions created and filled or unfilled positions that are filled) and jobs retained (i.e., previously existing filled positions that are retained as a result of ARRA fiunds). Only include jobs that are directly funded by ARRA funds. The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full- time schedule. • Description of jobs created. Provide a brief description of impact on the Borrower's workforce and include the types of jobs created and retained. Include time base (full-time or part-time) and duration (1 year, 1-2 years, 2-5 years, or more than 5 years). • Dun and Bradstreet (D&B) Data Universal Numbering System (DUNS) number. • Central Contractor Registration (CCR) number. ECAA ARRA T&Cs 6-~U Ex D 20 10Y29/09 006-09-ECE-ARRA • Award number. • Name (legal name as registered in CCR or D&B). • The Doing-Business-As (DBA) name as registered in CCR or D&B. • Address (physical location as listed in the CCR). • Congressional district (based on physical location address). • Type of entity (this is the °Business Type" in the CCR). • Amount awarded (total amount of the Commission agreement). • Amount received agreement funds Date of award (total cumulative amount of Commission received as of the reporting period). (date the Commission agreement was signed). • Award period (term of the Commission agreement). • Place of performance (the physical location of primary place of performance, including street address, city, state, zip code+4, country, congressional district, state senate district, and state assembly district). • Area of benefit (e.g., state, county, city, special district). Names and total compensation of five most highly compensated officers for the calendar year in which the agreement is awarded if, • In the Borrower's preceding fiscal year, the Borrower received - - 80 percent or more of its annual gross revenues from federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and - $25,000,000 or more in annual gross revenues from federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements • The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d) or section 6104 of the Internal Revenue Code of 1986. • Vendor Data Elements (purchases $25,000 or above) DUNS or name. • Zip code of Headquarters. • Description of the product and/or service provided by the vendor. • The amount invoiced from the vendor (aggregated) that will be paid with ARRA funds. ECAA ARRA T&Cs Page 8 of 20 10!29109 6-31 Exo 006-09-ECE-ARRA b) U.S. Department of Energy SEP Progress li2eport • A comparison of the actual accomplishments with the goals and objectives established for the period and reasons why the established goals were not met. • A discussion of what was accomplished under these goals during this reporting period, including major activities, significant results, major findings or conclusions, key outcomes or other achievements. This section should not contain any proprietary data or other information not subject to public release. If such information is important to reporting progress, do not include the information, but include a note in the report advising the reader to contact the Principal Investigator or the Project Director for further information. • Cost Status. Show approved budget by budget period. and actual costs incurred. Separate costs by project activities, administration, and evaluation. • Schedule Status. List milestones, anticipated completion dates, and actual completion dates. • Any changes in approach or aims, and reasons for change. • Actual or anticipated problems or delays, and actions taken or planned to resolve them. • Any absence or changes of key personnel or changes in consortium/teaming arrangement. • A description of any product produced or technology transfer activities accomplished during this reporting period, such as: • Publications {list journal name, volume, issue); conference papers; or other public releases of results. • Web 'site or other Internet sites that reflect the results of this project. • Networks or collaborations fostered. • Technologiesltechniques. • Inventions/patent applications. ^ Other products, such as data or databases, physical collections, audio or video, software or netware, models, educational aid or curricula, instruments or equipment. • Perrormance Metrics • Energy saved (kWh, therms, gallons, Btu, etc.). • Renewable energy installed capacity and generated. • GHG emissions reduced (tons) (CO2 equivalents) (methane, carbon, sulfur dioxide, nitrogen oxide, carbon monoxide). • Energy cost savings. • Funds leveraged. ECAA ARRA T&Cs Page 9 of 20 1029/09 6-320 006-09-ECE-ARRA Project type metrics. The key metrics to be reported will vary by project type. See Exhibit D, Attachment 6, Project Type Metrics. M. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS] - SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 The Borrower agrees that in accordance with ARRA, Section 1605, neither it nor its subawardees/vendors will use ARRA funds for a project for the construction, alteration, maintenance, or repair of a public building or public work unless all of the iron, steel and manufactured goods used in the project. are produced in the United States in a manner consistent with United States obligations under international agreements. The Borrower understands that this requirement may only be waived by the applicable federal agency in limited situations as set out in ARRA, Section 1605. 1) Definitions. As used in this award term and condition- a) Manufactured good means a good brought to the construction site for incorporation into the building or work that has been- Processed into a specific form and shape; or Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. b) Public building and public work means a public building of, and a public work of, a governmental entity (the United States; the District of Columbia; commonwealths, territories, and minor outlying islands of the United States; State and local governments; and multi-State, regional, or interstate entities which have governmental functions). These buildings and works may include, without limitation, bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance; or repair of such buildings and works. c) Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements. ECAA ARRA T&Cs - Page 10 of 20 10129!09 6-33 Ex t) 006-09-ECE-ARRA 2) Domestic preference. a) This award term and condition implements Section 1605 of the ARRA by requiring that alt iron, steel, and manufactured goods used in the project are produced in the United States except as provided in paragraph 2b and 2c of this section and condition. b) This requirement does not apply to the material listed by the Federal Government as follows: -None c) The award official may add other iron, steel, and/or manufactured goods to the list in paragraph 2b of this section and condition if the Federal Government determines that- • The cost of the domestic iron, steel, and/or manufactured goods would be unreasonable. The cost of domestic iron, steel, or manufactured goods used in the project is unreasonable when the cumulative cost of such material will increase the cost of the overall-project by more than 25 percent; • The iron, steel, and/or manufactured good is not produced, or manufactured in the United States in sufficient and reasonably available.quantities and of a satisfactory quality; or • The application of the restriction of Section 1605 of the ARRA would be inconsistent with the public interest. 3) Request for determination of inapplicability of Section 1605 of the ARRA. a) (i) Any recipient request to use foreign iron, steel, and/or manufactured goods in accordance with paragraph 2c of this section shall include adequate information for Federal Government evaluation of the request, including- • A description of the foreign and domestic iron; steel, and/or manufactured goods; • Unit of measure; • Quantity; • Cost; • Time of delivery or availability; • Location of the project; • Name and address of the proposed supplier; and • A detailed justification of the reason for use of foreign iron, steel, and/or manufactured goods cited in accordance with paragraph 2c of this section. ECAA ARRA T&Cs 6_p~p ~t~of 20 10/29/09 006-09-ECE-ARRA (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph 4 of this section. (iii) The cost of iron, steel, and/or manufactured goods material shall include all delivery costs to the construction site and any applicable duty. (iv) Any recipient request for a determination submitted after ARRA funds have been obligated far a project for construction, alteration, maintenance, or repair shall explain why the recipient could not reasonably foresee the need for such determination and could not have requested the determination before the funds were obligated. If the recipient does not submit a satisfactory explanation, the award official need not make a determination. b) If the Federal Government determines after funds have been obligated for a project for construction, alteration, maintenance, or repair that an exception to Section 1605 of the ARRA applies, the award official will amend the award to allow use of the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is nonavailability or public interest, the amended award shall reflect adjustment of the award amount, redistribution of budgeted funds, and/or other actions taken to cover costs associated with acquiring or using the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is the unreasonable cost of the domestic iron, steel,, or manufactured goods, the award official shall adjust the award amount or redistribute budgeted funds by at least the differential established in 2 CFR 176.110(a). c) Unless the Federal Government determines that an exception to Section 1605 of the ARRA applies, use of foreign iron, steel, and/or manufactured goods is noncompliant with Section 1605 of ARRA. 4) Data. To permit evaluation of requests under paragraph 2 of this section based on unreasonable cost, the Recipient shall include the following informaticn and any app{icable supporting data based on the survey of suppliers: ECAA ARRA T&Cs 6-3 5 zg Ex D f 20 70/29(09 006-09-ECE-ARRA Foreign and Domestic Items Cost Comparison Description Unit of Measure Quantity Cost s Item 1: Foreign steel, iron, or manufactured good Domestic steel, iron, or manufactured good Item 2: Foreign steel, iron, or manufactured good Domestic steel, iron, or manufactured good [List name, address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] ['include all delivery costs to the construction site.] N. WAGE RATE REQUIREMENTS UNDER SECTION 1606 OF THE ARRA In accordance with ARRA, Section 1606, the Borrower assures that it and its subawardees/vendors shall fully comply with said Section and notwithstanding any other provision of law and in a manner consistent with other provisions of ARRA, all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to ARRA shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the United States Secretary of Labor in accordance with Subchapter IV of Chapter 31 of Title 40, United States Code (Davis-Bacon Act). It is understood that the Secretary of Labor has the authority and functions set forth in Reorganization Plan Numbered 14 or 1950 (64 Stat. 1267; 5 U.S.C. App.) and Section 3145 of Title 40, United States Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C, 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis-Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis- Bacon contract clauses set forth in that section. The Borrower will complete and certify by signature on Attachment 7 of this Agreement its commitment to comply with 29 CFR 5.5, and return it to the Commission Grants and Loans Officer. ECAA ARRA T&Cs I)-~ 0 Ex D f 20 10/29/09 006-09-ECE-ARRA O. ARRA TRANSACTIONS LISTED IN SCHEDULE OF EXPENDITURES OF FEDERAL AWARDS 1) To maximize the transparency and accountability of funds authorized under ARRA as required by Congress and in accordance with 2 CFR 215.21 "Uniform Administrative Requirements for Grants and ~~ Agreements and OMB Circular A-102 Common Rules provisions, the Borrower agrees to maintain records that identify adequately the source and application of ARRA funds. OMB Circular A-102 is available at http'//www Whitehouse qov/omb/circulars/a102/a102.html. 2) If the Borrower is covered by the Single Audit Act Amendments of 1996 and OMB Circular A-133, "Audits of States, Local Governments, and Non-Profit Organizations, the Borrower agrees to separately identify the expenditures for federal awards under the ARRA on the Schedule of Expenditures of Federal Awards (SEFA} and the Data Collection Form (SF-SAC) required by OMB Circular A-133. OMB Circular A-133 is available at http'!lwww Whitehouse qov/omb/circulars/a133/a133.html. This shall be accomplished by identifying expenditures for federal awards made under ARRA separately on the SEFA, and as separate rows under Item 9 of Part III on the SF-SAC by CFDA number, and inclusion of the prefix "ARRA-" in identifying the name of the federal program on the SEFA and as the first characters in Item 9d of Part III on the 5F-SAC. 3) The Borrower agrees to separately identify to each subawardee, and document at the time of subaward and at the time of disbursement of funds, the federal award number, CFDA number, and amount of ARRA funds. When the Borrower awards ARR,4 funds for an existing program, the information furnished to subawardee shall distinguish the subawards of incremental ARRA funds from regular subawards under the existing program. 4) The Borrower agrees to require its subawardees to include on their SEFA information to specifically identify ARRA funding similar to the requirements for the recipient SEFA described above. This information is needed to allow the recipient to properly monitor subrecipient expenditure of ARRA funds as well as oversight by the federal awarding agencies, Offices of Inspector General, and the Government Accountability Office. ECAA ARRA T&Cs Page 14 of 20 10/29!09 6-37 ~o 006-09-ECE-ARRA P. DATA IN SUPPORT OF ENERGY SAVINGS AND EMISSION REDUCTIONS 1) The Commission may request utility bill data from ARRA SEP program participants to track program energy saving and greenhouse gas emission reduction impacts. Upon request, ARRA SEP program participants must be prepared to provide utility billing data for at least the 12 months preceding and the 12 months following the project's implementation of a building retrofit project. To ease the burden of this data provision by the participant, the Commission will work with the participant's utility company to facilitate the electronic exchange of the required billing data. The Borrower authorizes the Commission to exchange this. data with the Borrower's energy utility company and agrees to complete an authorization form if requested by the Commission. 2) Upon written request from the Commission, the Borrower and its subawardees shall allow the Commission or its agent access to facilities and records and allow the Commission or its agent to collect data needed to measure and verify electricity and fuel reductions (this may include but is not limited to utility bills, metering data, facility equipment surveys, information on operational practices, and site occupancy levels). Further, if requested, the Borrower and subawardee must provide the Commission or its agent associated data from a period prior to the start of the project as necessary to establish baseline energy and/or fuel use. The Borrower shall include this provision in its subaward agreements. Q. STATE ARRA GUIDELINES FOR STATE ENERGY PROGRAM The Commission's Guidelines for the State Energy Program, dated September 30, 2009, (publication number CEC-150-2009-004-F) are hereby incorporated by reference and made a part of this Agreement. The Borrower warrants that it has read and understands the Guidelines and acknowledges that requirements specified therein apply to the Borrower and the funding provided under this Agreement. The Borrower acknowledges that the Guidelines are subject to change pursuant to Public Resources Code Section 25462 and that any changes made to the Guidelines shall apply to the Borrower and the funding provided under this Agreement. 3. SITE VISITS The Commission, the federal awarding agency, and/or their designees have the right to make site visits at reasonable times to review project accomplishments and management. control systems and to provide technical assistance, if required. The Borrower must provide and must require subawardees to provide reasonable ECAA ARRA T&CS I]-3P,39 Ex D f 20 10/29/09 006-09-ECE-ARRA facilities and assistance for the safety and convenience of the government representatives in the performance of their duties. All site visits and evaluations must.be performed in a manner that does not unduly interfere with or delay the work. 4. NON-DISCRIMINATION CLAUSE This award is subject to the provisions of 10 CFR 1040.1 et seq., Nondiscrimination in Federally Assisted Programs. The Borrower will complete and certify by signature on the DOE Form 1600.5, U.S. DOE "Assurance of Compliance," (Exhibit D, Attachment 1 of this Agreement) its commitment to comply with this law and return it to the Commission Grants and Loans Officer. 5. CERTIFICATIONS REGARDING LOBBYING; DEBARMENT, SUSPENSION AND OTHER RESPONSIBILITY MATTERS; AND DRUG FREE WORKPLACE REQUIREMENTS This award is subject to the provisions of 10 CFR Part 601, 10 CFR Part 606, and 10 CFR Part 607. The Borrower will complete and certify by signature on the Form "Certifications Regarding Lobbying; Debarment, Suspension and Other Responsibility Matters; and Drug Free Workplace Requirements" (Exhibit D, Attachment 2 of this Agreement) its commitment to comply with these requirements and return it to the Commission's Grants and Loans Officer. 5. LOBBYING ACTIVITIES The Borrower agrees that none of the funds obligated under this agreement shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation. If applicable, the Borrower will disclose any lobbying activities by completing and signing the Standard Form LLL (Exhibit D, Attachment 3 of this Agreement) and retum it to the Commission's Grants and Loans Officer. 7. NATIONAL POLICY ASSURANCES The Borrower agrees to adhere to and include in any subawards the requirements set forth in the attached "National Policy Assurances" (Exhibit D, Attachment 4 of this Agreement). ECAA ARRA T&Cs Page 16 of 20 1029/09 6-39 Exo 006-09-EC E-ARRA 8. PUBLICATIONS A. The Borrower is encouraged to publish or otherwise make publicly available the results of the work conducted under this Agreement. B. An acknowledgment of Commission and federal support and a disclaimer must appear in the publication of any material, whether copyrighted or not, based on or developed under this project, as follows: Acknowledgment. "This material is based upon work supported by the California Energy Commission and the U.S. Department of Energy under Award Number(s) DE-0000221." Disclaimer. "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the California Energy Commission, the United States Government, nor any agency thereof, nor any employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the California Energy Commission, the United States Government, or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the California Energy Commission, the United States Government, or any agency thereof." 9. INTELLECTUAL PROPERTY PROVISIONS A. The intellectual property provisions applicable to this award are provided as Exhibit D, Attachment 5, to this award. B. Questions regarding intellectual property matters should be referred to the DOE Award Administrator and the Patent Counsel designated as the service provider for the DOE office that issued fhe award. The IP Service Providers List is found at http'//www gc doe qov/documents/Intellectual Property (IP) Service Provide rs for Acguisition.pdf. 10.FEDERAL, STATE, AND MUNICIPAL REQUIREMENTS The Borrower must obtain any required permits and comply with all applicable federal, state, and municipal laws, codes, and regulations for work performed under this award. ECAA ARRA T&Cs Page 17 of 20 10/29109 6-40 ~ c 006-09-ECE-ARRA 11.PRESERVATION OF OPEN COMPETITION AND GOVERNMENT NEUTRALITY TOWARDS CONTRACTORS' LABOR RELATIONS ON FEDERALLY FUNDED CONSTRUCTION PROJECTS A. Unless in conflict with State or local laws, the Borrower must ensure that bid specifications, project agreement, or other controlling documents in construction contracts awarded pursuant to this Agreement, or pursuant to a subaward to this Agreement, do not: 1) Require or prohibit bidders, offerors, contractors, or subcontractors to enter into or adhere to agreements with one or more labor organizations, on the same or other related construction project(s); or 2) Otherwise discriminate against bidders, offerors, contractors, or subcontractors for becoming or refusing to become or remain signatories or otherwise to adhere to agreements with one or more labor organizations, on the same or other related construction project(s). B. The term "construction contract" as used in this provision means any contract for the construction, rehabilitation, alteration, conversion, extension, or repair of buildings, highways, or other improvements to real property. C. Nothing in this provision prohibits bidders, offerors, contractors, or subcontractors from voluntarily entering into agreements with labor organizations. 12.DECONTAMINATION ANDlOR DECOMMISSIONING (D 8D) COSTS Notevi±hstanding any other provisions of this Agreement, the Government shall not be responsible for or have any obligation to the Borrower or its subawardees for (i) Decontamination and/or Decommissioning (D&D) of any of the Borrower's or its subawardees' facilities, or (ii) any costs which may be incurred by the Borrower or its subawardees in connection with the D&D of any of its facilities due to the performance of the work under this Agreement, whether said work was performed prior to or subsequent to the effective date of this Agreement. 13. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE The Borrower is restricted from taking any action using federal funds for projects under this award that would have an adverse effect on the environment or limit. the choice of reasonable alternatives prior to DOE providing a final NEPA determination regarding these projects. If the Borrower moves forward with activities that are not authorized for federal funding by the DOE Contracting Officer in advance of the final NEPA determination, the Borrower is doing so at risk of not receiving federal funding, ECAA ARRA T&Cs Page 18 of 20 10/29!09 6-41 ~ o 006-09-ECE-ARRA and such costs may not be recognized as allowable cost share. 14.NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCTS -SENSE OF CONGRESS It is the sense of the Congress that, to the greatest extent practicable, all equipment and products purchased with funds made available under this award should be American-made. 15. HISTORIC PRESERVATION Prior to the expenditure of federal funds to alter any structure or site, the Borrower is required to comply with the requirements of Section 106 of the National Historic Preservation Act (NHPA), consistent with DOE's 2009 letter of delegation of authority regarding the NHPA. Section 106 applies to historic properties that are listed in or eligible for listing in the National Register of Historic Places. In order to fulfill the requirements of Section 106, the Borrower must contact the State Historic Preservation Officer (SHPO), and, if applicable, the Tribal Historic Preservation Officer (THPO), to coordinate the Section 106 review outlined in 36 CFR Part 800. SHPO contact information is available at the following link: http://www.ncshpo.org/find/index.htm. THPO contact information is available at the following link: http:!/www.nathpo.org/map.html. Section 110(k) of the NHPA applies to DOE funded activities. Borrowers shall avoid taking any action that results in an adverse effect to historic properties pending compliance with Section 106. Borrowers should be aware that the DOE Contracting Officer will consider the Borrower in compliance with Section 106 of the NHPA only after the Borrower has submitted adequate background documentation and the SHPOIfHPO has provided written concurrence that it does not object to its Section 106 finding or determination. The Borrower shall provide a copy of this concurrence to the Commission and the Contracting Officer. If the Borrower's project involves alteration of any structure or site, the Commission Grants and Loans Office will provide further guidance on the Section 106 process. 16. AVAILABILITY OF FEDERAL FUNDS It is mutually agreed that partial or whole funding for this Agreement is dependent upon a federal agreement (DE-EE0000221) that has a scheduled budget period end date of April 30, 2012, and is subject to the following provisions: (1) This Agreement is subject to any additional restrictions, limitations, or conditions enacted by Congress or any statute enacted by Congress that may affect the provisions, terms, or funding of this Agreement; (2) Funding for this Agreement is subject to the approval of the U.S. Department of Energy (DOE) and to any additional ECAA ARRA T&Cs Page 19 of 20 10/29!09 6-42~ o 006-09-ECE-ARRA restrictions; limitations, or conditions imposed by DOE, federal law, federal court judgments, and/or federal agency orders which may affect the provisions or terms of this Agreement; (3) If Congress does not appropriate sufficient funds for the program, this Agreement shall be amended to reflect any reduction in funds; and (4) The Commission has the option to invalidate the Agreement under the 30- day cancellation clause or to amend the Agreement to reflect any reduction in funds. 17. RESOLUTION OF CONFLICTING CONDITIONS Any apparent inconsistency between Federal statutes and regulations and the terms and conditions contained in this award must be referred to the DOE Award Administrator for guidance. 18. STATEMENT OF FEDERAL STEWARDSHIP DOE will exercise normal federal stewardship in overseeing the project activities performed under this award. Stewardship activities include, but are not limited to, conducting site visits; reviewing performance and financial reports; providing technical assistance and/or temporary intervention in unusual circumstances to correct deficiencies which develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion to ensure that the award objectives have been accomplished. 19. UTILITY REEATES ARRA State Energy Program funding must be used to create new programs or expand existing programs, including ratepayer-funded programs, and not to supplant or replace existing state, ratepayer, or other funding. Therefore, if after the project is completed, the Borrower receives a rebate from its utility or other source for all or a portion of fhe project costs that have been funded by this loan, the Borrower must submit principal repayment to the Commission in the amount of that rebate within 10 working days of receipt of the rebate. This repayment will be considered an unscheduled principal repayment. ECAA ARRA T&Cs Page 20 of 20 10Y29/09 6-43 Exo THE ATTACHED AGREEMENT HAS BEEN REVIEWED AND APPROVED AS TO FORM BY THE CITY ATTORNEY'S OFFICE AND WILL BE FORMALLY SIGNED UPON APPRO/VA~L BY THE CITY COUNC ~ / C. Miesfeld y Attorney Dated: L ~ ~ DESIGN BUILD AGREEMENT FOR MUNICIPAL STREET LIGHTING RETROFIT PROJECT BETWEEN THE CITY OF CHULA VISTA AND SOUTHERN CONTRACTING COMPANY 6-44 DESIGN BUILD AGREEMENT FOR MUNICIPAL STREET LIGHTING RETROFIT PROJECT THIS Agreement shall be for the design calculatiotts and constmction installation of citywide Municipal Street Lighting and the payment of permitted costs therefore ("AgreemenP'). This Agreement is made and entered into this by and between THE CITY OF CHULA V[STA, a municipal corporation ("City"), and ,Southern Contracting Company ("Design Builder or DB"). City and D/B, when referenced herein, may be referred to individually as "Party" and collectively as "Parties." This Agreement is entered into with reference to the following facts: , RECITALS 1. The Public Works Department has been conducting an energy efficient streetlight assessment project with the intent to save energy, reduce the size of its carbon footprint and help contribute to a safe public environment. 2. Two solutions have been presented because different technologies perform better at certain mounting heights and the cost of the initial retrofit detemrines the duration of the loan payback. Both solutions offered reduce energy and maintenance costs of up to 50 percent while improving light quality. 3. Solution number one would be to identify LED luminaires as a revised City Standard for all new constmction and improvement projects that include roadway lighting. Solution number rivo is to replace 4600 existing 100- watt high-pressure sodium (HPS) luminaires on residential streets throughout the city with 55-watt induction luminaires. 4. As part of that effort, on December 15th, 2009, the Depatnent of Public Works Engineering Division issued a Public Request for Proposals (RFP) for the "Municipal Street Lighting Retrofit Project", pursuant to § 2.57 of the City's Municipal Code, to design and construct lighting fixtures for the citywide street lighting retrofit installation ("Project") to qualified Design-Build fuzes. 5. The following companies were sent requests for proposals; Patterson Brothers Lighting, Lekos Electric, Select Electric, T&M Petty Electric, Southern Contracting Company, and American Power Solutions. 6. The ranking of Earns through the bid process qualified four (4) respondents for interviews. Following the interviews of the four respondents, Southern Contracting Company was selected as the respondent who best met [he design, monetary, and time criteria of the project with whom City could negotiate an agreement. 7. As part of D/B's proposal, DB submitted a "Not to exceed Gross Maximum Price" of the Project in the amount of One Million Nine Hundred Sixty Seven Thousand Five Hundred Seventy One Dollars ($ 1,967,571.00) ("Estimated Cost"/"EC'7 Following City's approval of 90% Construction Documents ("CD") and with the approval for funding through a California Energy Commission (CEC) loan, D!B shall submit a Guaranteed Maximum Price ("GMP"), at which time staff may return to Council if the GMP exceeds $ 1,967,571.00. The City as a consideration of this agreement will allow the DB to apply for an incentive from SDG%E estimated at $115,000.00, which has been calculated into the GMP price of $ 1,967,571.00. The City agrees not to apply for said rebate and the DB assumes all responsibility for recovery of the incentive. 9. DB shall complete the Project, as a public improvement, according specifications provided by the City, and - adhere to the Special Terris & Coadifions of California Energy Commission (CEC) loan progmrn, including (bvt not limited [o) procurement, labor, and reporting requirements (Exhibit A) for an amount not to exceed the GMP. NOW THEREFORE, in consideration of the recitals, mutual obligations of the Parties, the covenants and conditions herein, and for other good and valuable, the sufficiency of which is hereby acknowledge, the Parties agree as follows: 6-45 ARTICLE I. DEFINITIONS ADA: The Americans with Disabilities Act of 1990 and any amendments thereto. Acceptance: Final approval by the City Inspection Team following the Final Inspection that Project Improvements are complete and work required on the Punch List has been finished. As-Builts: Project Record Documents that are the Contract plans modified from the original concept of the design to reflect the actual product built. CEQA: California Environmental Quality Act. Calendar Day(s): All days of the week, holidays and weekends included. Change Order: A written order, approved by City, authorizing a change in the work to be performed. City: The City of Chula Vista. Unless specifically provided otherwise, whenever this Agreement requires an action or approval by City, that action or approval shall be performed by the City representative designated by the Agreement. City Council: The City Council of the City of Chula Vista City's Project Administration Costs: Charges that City incurs to: (i) administer the acquisition of the Property, (ii) review and approve the plans and specifications for the project improvements, and (iii) inspect the project improvements during construction, until completion and Acceptance of [he Project. Contract Documents: Including, but not limited to: Conract Addenda, Notice Inviting Bids, Instructions to Bidders, Bid (including documentation accompanying Bid and any post-bid documentation submitted prior to Notice of Award), the Bonds, [he general conditions, [he Special Provisions, the Plans, Standard Plans, Standard Specifications, Reference Specifications, and all modifications issued after the execution of this Agreement. Contract Time: The number of Calendar Days permitted under this Agreement for D/B to achieve Substantial Completion. Defective Work: All work, material, or equipment that is unsatisfactory, faulty, incomplete, or does not conform to the Contract documents is defective. Design Build Team (D/BT): Those individuals designated as being a part of the Design Build Team. See Exhibit C. Estimated Cost: The total cost of the Project as estimated in preliminary cos[ estimates as shown in Exhibit A. Extra Work: Any City additions, modifications, or deletions to work or D/B obligations under this Agreement not within the original Scope of Work contemplated by this Agreement. Final Completion: The point at which the last of the following has occurred: (1) recordation of a Notice of Completion for the Project; (2) acceptance of [he Project by the City; (3) submission of all documents required to be supplied by D/B to City under this Agreement, including but not limited to warranties, and operating manuals; and (4) and delivery to City of a Certificate of Completion duly verified by D/B. Greenbook: The most recent edition of the Standard Specifications for Public Works Consvuction (including any City of Chula Vista standard special provisions). Guaranteed Maximum Price ("GMP"): The maximum compensation to which DB may be entitled for the performance of all Services, Work, and obligations and the satisfaction of all conditions under this Agreement, which amount shall include all authorized costs for labor, equipment, and material to design and build a fully functional Project in accordance with all applicable rules, regulations, and laws. Hard Construction Costs: Direct construction costs incurred in performing [he work, including taxes, delivery and installation. Hard Construction costs shall not include DB markup, handling fees, overhead, or other charges, except as otherwise set forth in this Agreement. 6-46 Hazardous Materials: Hazardous waste or hazardous substance as defined in any federal, state, or Local statute, ordinance, rule, or regulation applicable to the Property, including, without limitation the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended (Title 42 United States Code sections 9601-9675), the Resource Conservation and Recovery Act (Title 42 United States Code sections 6901- 6992k), the Carpenter Presley-Tanner Hazardous Substance Account Act (Health and Safety Code sections 25300- 25395.15), and the Hazardous Waste Control Law (Health and Safety Code sections 25100-25250.25). "Hazadous Materials" shall also include asbestos or asbestos containing materials, radon gas, and petroleum or petroleum fractions, whether or not defined as hazardous waste or hazardous substance in any such statute, ordinance, rule, or regulation. Holiday: The Cityobserved holidays. Law: All Federal, State, or local laws, regulations, ordinances, and/or policies. Milestones: Dates shown on the Project Schedule by which D/B shall complete major tasks either during design or construction of the Project. NEPA: National Environmental Policy Act. Notice to Proceed: City's written notice authorizing D/B to commence Work and/or Services on the Project. Notice of Termination: A written notice from City [o D/B terminating the Agreement in accordance with Article XXVII. Project Site: Multiple street sites throughout the City of Chula and further described in Exhibit "A", attached. Reimbursable Costs: All direct costs, including tabor, materials, permit fees, insurance and bonds, general conditions, overhead and profit. Services: Professional services, including design and construction management of the Project that are required to design and construct the Project in accordance with the Contract Documents. Services does not include Work. Substantial Completion: That stage in [he progress of the construction when all Work on [he Project is sufficiently complete in accordance with the Construction Documents, so that City can fully utilize entire Project; Substantial Completion shall further mean that all goods, services and systems to be provided under the terms and conditions of the Construction Documents are in place, have been initially tested, and are operationally functional, subject only to final testing, balancing and adjustments and normal Final Completion punch list work. Title 24: Califomia Building Standards Code, Califomia Code of Regulations, Title 24. Work: Alt labor, materials, supplies, and equipment that are necessary to construct the Project in accordance with the Contract Documents. Working Day(s): Monday through Friday, excluding City holidays. 6-47 ARTICLE II. SCOPE OF THE AGREEMENT 2.1 General. Except as expressly provided in [his Agreement, DB shall design and construct the Project in accordance with all the terms and conditions of this Agreement, Specifications, and the timeframes established by the Project Schedule ,which will be verified at 90% construction documents, attached as Exhibit "A", delivering a complete and functional Project within the Contract Time for an amount not to exceed the GMP. ARTICLE IIL TERM 3.1 Term of Agreement. This Agreement shall be effective on the date it is executed by [he last Party to sign the Agreement following City Council approval by Resolution. The term of this Agreement wilt extend from the date of execution until satisfaction of all terms and conditions herein, unless this Agreement is earlier terminated. ARTICLE IV. GENERAL PROJECT PERFORMANCE OBLIGATIONS 4.1 Standard of Care. Throughout the performance this Agreement, performed under this Agreement, D/B agrees that all Services and Work provided as part of this Agreement shall be performed in accordance with the standards customarily adhered to by experienced and competent engineering, and construction firms using the degree of care and skill ordinazily exercised by reputable professionals practicing in the same field of service in the State of California. 4.2 Compliance with all Laws. In the performance of this Agreement, DB shall comply with all laws, including but not limited to: 4.2.1 All City, County, State, and Federal laws, codes and regulations, ordinances, and policies, including, but not limited to, the following: 4.2.1.1 Environmental Regulations (i.e. CEQA/ NEPA). 4.2.1.2 The Americans with Disabilities Act ("ADA") and Title 24 of [he California Building Code. It is the sole responsibility of D/B [o comply with alt ADA and Title 24 regulations. 4.2.1.3 The Califomia Fair Employment and Housing Act and all other State, Federal and local laws including, but not limited to, [hose prohibiting discrimination on account of race, color, national origin, religion, age, sex or handicap. 4.1.2.4 The Clean Air Act of 1970, the Clean Water Act (33 USC 1368)-Executive Order ] 1738, and the Stormwater Management and Discharge Control-Ordinance No. 0-17988. 4.1.2.5 DB shall comply with the Essential Services Building Seismic Safety Act, SB 239 & 132. 4.1.2.6 DB shall comply immediately with all directives issued by City or its authorized representatives under authority of any laws, statutes, ordinances, rules, or regulations. 4.1.2.7 DB shall obtain and comply with all permits necessary to complete the Project, including, but not limited to Development Services Department permits and hazardous material permits. 4.1.2.8 Zoning, environmental, building, fire and safety codes and coverage, density and density ratios and lien laws. 4.2.2 /mp!ledKnowledge ofLaw.r. DB shall be responsible For all amendments or updates to standards and of all amendments or updates to standards, whether local, state, or federal, and such knowledge will be imputed to D/B to the extent allowed by law. 4.3 Design and Construction Standards. In the performance of the Services and Work covered by this Agreement, D/B shall comply the most current versions of design and construction specifications, all of which shall be incorporated herein by this reference. 4.3.1 SlandardSpecifiev~lons. 4.3.1.1 Greenbook. The 2000 Edition of the Standard Specifications for Public Works Construction. 6-48 4.3.1.2 California Department of Transportation Manual of Traffic Controls for Construction and Maintenance Work Zones. 4.3.2 City Specifications. 4.3.2.1 The 2000 Edition of the Chula Vista Standard Special Provisions. 4.3.2.2 The 2000 Edition of the Regional Standards. 4.3.2.3 The 2002 Edition of the Chula Vista Construction Standards. 4.3.2.4 The City's facility program, performance and design criteria, concept drawings, and reports. 4.3.3 Energy Conservation Standards. 4.3.4 Materials Standaidr. D/B shall use industrial grade, equipment and accessories for all facets of design and construction. 4.4 Obtain City Approval. For any and all actions under this Agreement that require City approval, including, but not limited to, changes or additions to Agreement, D/B shall obtain approval in writing from the designated City Representative, or when required by Law, from the City Council. DB acknowledges [hat approval from any individual other than the designated City Representative or City Council, where required, shall not be valid. 4.4.1 Failure to Obtain flpprova! Any costs or delays resulting from or associated with additions or modifications implemented without the written authorization of the City Representative shall be borne exclusively by DB and not be grounds for an increase in GMP or Contract Time. 4.4.1.1 Emergency. In the event of an emergency, DB shall take all reasonable actions necessary to protect public health, safety or property. Such action shall not require advance City approval; however, DB shall notify the City immediately of the emergency and as soon as reasonably possible provide a written statement to [he City explaining the emergency and the reasonable actions taken. Provided the emergency was not caused by or its creation contributed to by the DB, its employees, agents, or subcontractors, DB may be entitled to reasonable compensation for such actions. 4.4.2 No ketease From Obligations. City approval shall be a genera( approval only, and such approval shall in no way release or relieve D/B of responsibility for complying with all applicable laws, codes, and good consulting, design, or construction practices. 4.5 Decision Malone. D/B shall make decisions with reasonable promptness to avoid delay in the orderly progress of D/B's obligations under this Agreement and pursuant to the Project Schedule, which will be verified at 90% construction documents, attached as Exhibit "A". 4.6 Perform Services and Work in Phases. The Services and Work under this Agreement shall be performed in the manner and order described herein. ARTICLE V. PHASE I-DESIGN DEVELOPMENT 5.1 Desien Team. City has awarded this Agreement based on the speci5c qualifications of D/B to perform the design services required under this Agreement. All such services shall be provided by D/B unless the City has approved of the use of Subconsultants in the manner identified in Article VIII. 5.2 Services. In Phase I, D/B shall perform Services including, but not limited [o, the following: 5.2.1 ProjectDevetopment Develop and refine Project requirements. 5.2.2 ODD Prepaze complete DDDs, such that the DDDs include, without limitation, the fallowing: 5.2.2.1 Site Plans. Site plan with pertinent notes and dimensions indicating property line; existing public streets, sidewalks, curb cuts, other public improvements; required setbacks; service, trash, fire lane and truck access, adjacent buildings, building outline; basketball courts, multi- elements. As applicable [o [he project. 6-49 5.2.2.2 Floor Plans. Floor plans including graphically demonstrating interior and exterior walls and fenestration with notes, dimensions and gridlines; room names, structural bay spacing with grids, critical dimensions and area calculations. N/A. 5.2.2.3 Roof Plans. Roof plans including detailed notes, dimensions, mechanical equipment locations, define material for mechanical screens, skylights and roof access, roof materials, roof drainage and establish window-washing concept. As applicable to the project. N/A 5.2.2.4 Building Sections. Building sections, which shalt include vertical dimensions, floor assembly thickness showing known structural elements and notes. N/A. 5.2.2.5 Elevations. Exterior elevations, including material references and extent; visible roof [op elements; existing and new line of grade; indicate of floors with leader lines; and vertical dimensions; notes, dimensions and grid lines. N/A. 5.2.2.6 Wall Sections. Wall sections including all wall sections, dimensions, horizontal element offsets, and guide to exterior face of wall; dimensions, vertical floor to floor, floor to window head and sill and floor to ceiling; structural elements and assemblies; interior and exterior wall finishes; and wall and roof assembly. N/A 5.2.2.7 Outline specifications, written description of the project and components including site work. 5.2.2.8 Traffic circulation and landscaping should also be indicated at this stage if applicable. 5.2.3 Code Compliance. Verify all code compliance, including building construction type, occupancy sprinkler requirements, existing, zoning and other agency conformance and ADA. N/A. 5.2.4 Su6mirraLc. Prior to proceeding with Phase II, D/B shall prepare and submit the following to the City for review and written approval. 5.2.4.1 DDDs. Completed DDD.( Streetlight fixture, lamp and photocell catalog cuts) 5.2.4.1.1 Conditional Approval. In the event that City grants conditional approval, D/B shall address all City comments or issues and make associated revisions in the next set of drawings developed and submitted. 5.2.4.1.2 Delay/Costs. Any delay or additional costs resulting from the re-submittal shall be borne exclusively by DB and not be grounds for an increase in the GMP or Contract Time. 5.2.4.2 Other Deliverables. 3D rendered images, color and material boards, reflected ceiling plans, and special system or equipment plans. N/A. ARTICLE VI. PHASE II 6.1 Phase II Services. In Phase II of [he Project, D/B's shall perform Services including, but are not limited to, the following: 6.1.1 ProjecrDevelopmen! D/B shall diligently prosecute the development and refinement of Project requirements and review such requirements with City; 6.1.2 DigilalOocumenm!lon. D/B shall prepare CD's which shall include, without limitation, the following: 6.1.2.1 Architectural plans and details as applicable and necessary for the project., including: 6.1.2.1.1 Site plan indicating general location and nature of on-site and the necessary off-site improvements. 6.1.2.1.2 Floor plans, including roof, showing space assignments, sizes, and location of installed or fixed and movable equipment that affects the design of [he spaces. 6.1.2.1.3 Building elevations indicating exterior design elements and features, including fenestration arrangements, materials, mechanical and electrical features appearing on the walls, roofs, and adjacent azeas. 6-50 6.1.2.1.4 Interior elevations [o establish functional requirements, equipment, and all systems locations. N/A. 6.1.2.1.5 Typical building sections showing primary structural members, dimensions, and accommodation of functional systems. N/A. 6.1.2.1.6 Typical wall sections sufficient to indicate materials, openings, and major features. 6.1.2.2 Structural drawings including plans and sections of sufficient clarity and detail to show the extent and type of structural system and dimensions, final structural design criteria, foundation design criteria, preliminary sizing of major structural components, critical coordination clearances and applicable material lists. 6.1.2.3 Mechanical plans and details. N/A. 6.1.2.4 Landscape and Irrigation plan and details. N/A. 6.1.2.5 Electrical plans, calculations anddetails. 6. L2.6 Plumbing ptans and details. N/A 6.1.2.7 Plans showing installation of major systems, equipment, fixed furnishings and graphics. N/A 6.].2.8 Technical specifications. 6.1.2.9 All other technical drawings, schedules, diagrams and specifications, [o set forth in detail [he requirements for construction of the Project which, at a minimum, include: 6.1.2.9.1 Information customarily necessary for the use of those in [he building trades. 6.1.2.9.2 Documents customarily necessary to obtain regulatory agency approvals. 6.1.2.9.3 Color board and architectural rendering for required presentations. N/A. 6.1.2.10 Mechanical design documentation consisting of continued development and expansion of schematic mechanical design consisting of: 6.1.2.10.1 Single line layouts and the approximate sizing of all equipment and capacities, preliminary equipment layouts. 6.1.2.10.2 Required space requirements for [he equipment, required chases and clearances, acoustical and vibrations control, visual impacts and energy conservation measures. N/A 6.1.2.11 Electrical design documentation consisting of continued expansion of the schematic electrical design consisting of 6.1.2.11.1 Criteria for lighting, electrical, communications audio visual, close circuit T.V., lighting controls and other electrical systems typical to civic facilities, the approximate sizes and capacities of major components transformers-panels-switch gears; N/A. 6.1.2.11.2 Preliminary equipment layouts, required space for equipment, required chases and clearances. N/A 6.1.2.12 Sections through critical azeas showing coordination of architectural, structural, mechanical and electrical elements. 6.1.2.13 Final specifications, including but not limited to, the following: As applicable to the project: 6.1.2.13.1 Architectural. General description of the construction, including interior finishes, types and locations of acoustical treatment, typical and special floor coverings and final exterior and interior material selection. N/A. 6.1.2.13.2 Mechanical. Description of air conditioning, heating and ventilation systems and controls, ducts, and piping system. N/A 6-51 6.1.2.13.3 Electrical. Description of electrical services, including voltage; type and number of feeders; lighting systems, including lighting levels and audiovisual; security-fire alarms; and cable antenna television systems. 6.1.2.13.4 Landscape. General description of the construction, including plan materials, plant locations, maintenance period, and irrigation systems. N/A. 6.1.2.13.5 Play Areas. Description of play equipment, including installation procedures, type, color, finishes, and locations. N/A. 6.1.2.13.6 Site Work. General description of the construction, including finishes, types of materials and locations. 6.1.2.13.7 Other. Such other documents to fix and describe the size, quality and character of the entire Project, its materials, and such other elements as shall be appropriate. 6.1.2.14 Plumbing drawings, including location and quantity of fixtures, equipment sizes, room sizes for plumbing equipment, and final specifications as appropriate. N/A 6.1.3 PiojeclSequeaclag D/B shall determine and establish the sequence of construction, and if appropriate, identify separate bid packages to accomplish phased construction of the Project. 6.1.4 Cri/icolPalh. D/B shall prepare a detailed Critical Path Method schedule for all consvuction components of the Project ("Detailed Construction Schedule") utilizing Microsoft Project software, showing all major milestones, commencement of construction, sequence of construction, and completion of the Municipal Street Lighting Project, all of which shall conform with the dates of Substantial Completion and Final Completion of Project. 6.1.5 GovernmerrlalRevlew. DB shall review, as needed, the CD's with the governmental authorities having jurisdiction over the Project. 6.1.6 Accorrn~ingSyr/em. D/B shall provide a master accounting system and maVix on Microsoft Excel that will be updated, expanded, and provided to [he City monthly as the Project develops. 6.1.7 ProjecrManogemeal P/aa DB shall develop and implement a Project Management Plan and Procedures including: 6.1.7.1 Project status reports. 6. L7.2 Coordination/interface with the City and its other consultants/contractors 6. L7.3 Initial Design kickoff meeting to be held no later than five (5) working days from the Effective Date of Agreement. 6.1.7.4 Biweekly Design and Construction meetings 6.1.7.5 Interface and communications with other agencies 6.1.7.6 Vendors and subcontractors management 6.1.7.7 Document control 6.1.7.8 Schedule and budget control 6.1.7.9 Quality assurance and quality control. D/B shall establish and maintain a quality control program with appropriate reviews and independent testing procedures to ensure compliance with the Construction Documents during the construction phase. 6.6.10 Scheduling and cost convol reports, which shall be provided monthly throughout the design phase. 6.1.8 Conrlruc!lon Orawings andSpeclrea/rorcc D/B shall prepare construction drawings• and specifications suitable for obtaining City-approved permits and to allow constmction. 6.1.9 CltyApprovaL D/B shall submit Construction Documents and obtain City approval in writing of [he Construction Documents a[ seventy percent (70%), and ninety percent (90%) completion. 6-52 6:1.9.1 Condition Precedent. City approval of the Construction Documents is a condition precedent to authorization to proceed with subsequent work on the Project. 6.1.9.2 Notification, Modification, and Resubmittal. At 70%and 90% Completion, City will notify D/B in writing within the timeframes established in the Project Schedule following receipt of Construction Drawings of CiTy approval, or of request for modifications. If modifications are requested, DFB shall modify and resubmit Construction Drawings for City approval. 6.1.9.3 D/B Support. D/B shall provide support to a City Constructability Review Team for the review of [he Construction Documents at all stages of required submission. 6.1.10 MoleriaLr andFqulpmenlSpecfcaflorir. D/B shalt prepaze technical materials and equipment specifications for pre-purchase. 6.1.11 SurveyingandTertlrsg. D/B shall coordinate, perform, and complete all surveying, materials testing, and special testing for the Project at the Project site as required by this Agreement, the State Building Code, or any other law or regulation, in accordance with and considering the following: 6. L 1 I.1 DBT is responsible for identification and coordination to the City's GIS System concerning the location of each fixture replaced. Reports shall be made weekly to SDG&E so that the City can take advantage of [he Consumer Rate change immediately. 6.1.11.2 Existing Conditions. D/B shall obtain all necessary soils investigation and conduct agronomic testing required for design of the Project. The Soils Consultant shall prepare a statement that will be included in [he Bidding Documents as to the nature of soils, ground water conditions and any other information concerning the existing conditions of the site. N/A. 6. L 11.3 Utilities. D/B shall provide all required information for the construction or relocation of Public or private utility facilities that must be constructed or relocated as a result of this Project. D/B shall file all of the required documents for the approval of authorities having jurisdiction over the Project and in obtaining the services of all utilities required by the Project. N/A. 6.1. l ] ~4 Geotechnical Information. DB shall obtain all necessary geotechnical information required for the design and construction of the Project. The Project Engineering Geologist and/or Project Soils Engineer (qualified R.C.E. or R.G.E.) shall prepare a statement that will be included in the Bidding Documents, to address existing geotechnical conditions of the site that might affect construction. N/A. 6.1.11.5 Additional Surveys. D/B shall provide additional site surveys and geotechnical investigations to [he extent that DB determines they are necessary forfinal design. N/A. 6. L 11.6 No Reliance. DB shall not rely on City survey information as it is intended to be preliminary in nature and may not have sufficient accuracy or scope to support final design. 6.1.12 SlYPPP. DB shall prepare and incorporate into the Construction Documents a Stormwater Pollution Prevention Plan ("SWPPP") to be implemented by the DB during Project construction. Where applicable, the SWPPP shall comply with both the California Regional Water Quality Control Board Statewide General Construction Storm Water permit and National Pollution Discharge Elimination System permit requirements and any municipal regulations adopted pursuant to the permits. N/A. 6.1. l3 f/Uernarlves. D/B shall evaluate alternative structural and construction approaches to ensure economical designs, which optimize constructability, ye[ meet all codes, architectural concepts, schematic designs, and standard specifications of the Project. 6.1.14 Permi/.r. D/B shall obtain general building permit and all ancillary permits and licenses, including but no[ limited to, demolition permits, improvement permits and grading permits. City shall be responsible for all permit fees. 6.1.15 UpdoledCarls. DB shall provide updated construction cost estimates in conjunction with the submittals required in Section 6.1.9 to support Value Engineering ("VE") and constructabiliry reviews. 6-53 6.1.16 Final Review andApprovolojPlansandSpecificadons. DB shall deliver to City complete Construction Documents, including Construction Drawings, Plans and Specifications for the design and construction of the Project. City agrees to review the Construction Documents and provide City's written comments to D/B within five (5) Business Days of the date such Construction Documents are delivered to City in accordance with the notice provisions in Article XXIX. Approval shall not be unreasonably withheld. If requested by City, DB shall make changes [o the Construction Documents. ARTICLE VII. PHASE III. -CONSTRUCTION PHASE WORK AND SERVICES 7.1 Phase III. Work and Services. The D/B shall construct the Project in accordance with City specifications prepared by the D/B to meet or exceed all requirements of the City provided program, schematic design and the performance criteria. The D/B shall: 7.1.1 Blddirsg DB shall prepare and submit to the City for review separate bid packages, such bid packages shall be organized in the manner that D/B determines is appropriate to ensure the efficient and cost effective construction of the Project. 7.1.1.1 Competitive Bidding. D/B shall competitively bid the respective bid packages for the construction of the Project. 7.1.1.2 Pre-Bid Conferences. D/B shalt schedule and conduct pre-bid conferences to answer questions posed by bidders. Said answers and any other information required to provide clarification to the Construction Documents during the bidding process shall be issued as written addenda and provided to all prospective bidders. 7.1.1.3 Scheduling. D/B shall coordinate scheduling of bid packages, submittals. 7.1.1.4 Bid Results. D/B shall submit to [he City a summary of bid results for each bid package. 7.1.1.5 Bid Protests. DB shall hear and decide bid protests and shall develop and maintain bid protest procedures for that purpose. City shall be timely informed of all bid protests (prior to resolution) and the outcome of said protests. 7.1.1.6 Equal Opportunity Contracting/Nondiscrimination. DB shall not discriminate on the basis of race, gender, religion, national origin, ethnicity, sexual orientation, age, or disability in the solicitation, selection, hiring or treatment of subcontractors, vendors, or suppliers. D/B shall provide equal opporunity for subcontractors to participate in subcontracting opportunities. DB understands and agrees that violation of this Subsection shall be considered a material breach of this Agreement and may result in contract termination, debarment, or other sanctions. The language of this Subsection shall be inserted in contracts between D/B and any subcontractors, vendors, or suppliers. 7.1.1.7 Executing Contracts. D/B shall be responsible far entering into subcontracts, in DB's own name, with the bidder who in DB's discretion and professional opinion best meets [he monetary, time, and performance requirement of the Project. D/B shall be responsible for ensuring that these contracts fully comply with all applicable local, state and federal laws, some but not all of which are listed below. 7.1. L8 Additive Alternatives. D/B shall require additive alternates for extended warranties in bid packages for roofing and HVAC systems. N/A. 7.1.2 Meetings. DB shall conduct meetings identified below: 7.1.2.1 Preconstmction Meeting. DB shall conduct a preconstruction meeting with its officers, agents and employees and City. The purpose of this meeting is to discuss: (i) the Agreement conditions, (ii) Scope of Work clarifications, and (iii) City policies, inspection requirements, and procedures. 7.1.2.1.1 Attendance. D/B shall ensure that the preconstruction meeting is attended by D/B's project manager, all D/B's major subcontractors, the City's designated Representative, and all other persons necessary as determined by D/B or City. 10 6-54 7.1.2.2 Progress Meetings. D/B shalt conduct weekly progress meetings with the City and appropriate design and construction members. 7.1.2.3 Contractor Meetings. D/B shall conduct contractor meetings, as necessary, to provide technical input 7.1.2.3.1 D/B shall provide interpretation of technical specifications and drawings. 7.1.2.4 Rescheduling. Progress Meetings may be rescheduled if rescheduled meeting times are convenient for all necessary parties, and D/B has given no less than five (5) Calendar Days prior written notice of the rescheduled meeting. 7.1.2.5 Minutes. DB shall take corresponding meeting minutes and distribute copies to all attendees. 7.1.2.6 Reporting. D/B shall monitor and report to the City on actual performance compared to the Project Schedule, provide updated G[S, and verify that the latest changes to the Project, if any, have been made. 7.1.3 Conslruclion Managemenz During construction of the Project, D/B shall perform and be responsible for construction management, supervision, and administration services, including, but not limited to, tracking and reporting all expenses and atl aspects of the construction and coordinating all constmc[ion means, methods, techniques, sequences and procedures to ensure the efficient and orderly sequence of the construction of the Project. 7.1.3.1 Resident Management. DB shall provide resident management and contract administration, including specialists necessary for the functional, safe, on-budget and on-schedule completion of the Project, starting with [he issuance of a Notice to Proceed, upon receipt of final construction drawings, from the City and extending through issuance of Notice of Completion and Acceptance. City staff will perform inspections [o verify compliance with the plans, specifications and contract documents. The D/B resident staff shall ensure construction compliance with applicable local, state, and federal codes, building and environmental permit requirements, construction mitigation documents and enforcement of the Contract Documents. 7.1.3.2 Records Management. DB shall implement and maintain an internal records management and document control system as required to support project operations. The DB shall provide records management and document control information in a manner consistent with the City's reporting system. 7.1.3.3 Cash Flow. DB shall develop aproject-specific Plan for defining, tracking and reporting cash flow activity requirements and submit such plan to the City for review and approval prior to implementation. 7.1.3.4 Reporting. DB shall keep Ciry informed of the progress and quality of the design and construction ofthe Project. 7.1.3.5 Documents On-Site. D/B shall maintain a complete and up-to-date set of Construction Documents in the Projects Feld office a[ all times during construction that reflect all changes and modifications. 7.1.4 Side Safety, Security, and Compliance. DB shall be responsible for site safety, security, and compliance with all related laws and regulations. 7.1.4.1 Persons. D/B shall be fully responsible for the safety and security of its officers, agents, and employees, City's officers, agents, and employees, and third parties authorized by D/B to access the Project site. 7.1.4.2 Environmental. DB shall administer and enforce the Environmental Mitigation Monitoring and Reporting Plan for the Project, if any. In addition, D/B shall report environmental issues to the City in a manner consistent with the City's reporting system. D/B shall be responsible for [he environmental consequences of the Project construction and shall comply with all related laws and regulations, including the Clean Air Act of 1970, the Clean Water Act, Executive Order number ! 1738, and the Stormwater Management and Discharge Control Ordinance No. 11 6-55 0-17988 and any and all Best Management Practice guidelines and pollution elimination requirements as maybe established by the Enforcement Official. 7. L4.3 Risk of Loss. DB is responsible for the Project, project site, materials, equipment, and all other incidentals until the Project has been Accepted by the City and shall bear any costs or expenses associated with the loss thereof or damage thereto, including by theft, £re, or other casualties. 7.1.5 Public RighFOfGYay All work, including, materials testing, special testing, and surveying to be conducted in the Public right-0f--way shall be coordinated with the City. 7.1.5.1 Materials Testing. D/B shall pay for and coordinate with City to have all material tests within the Public right-of-way and any asphalt paving completed by City's Material Testing Laboratory. 7.1.5.2 Surveying. D/B shall pay for and coordinate with City's designated Representative all surveying required within the Public right-of-way. 7.1.5.3 Follow all Laws, Rules, and Regulations. D/B agrees to follow all City standards and regulations while working in the Public right of way, including but not limited to, utilizing proper traffic control and obtaining necessary permits. 7.1.6 Traffic CorslroL D/B shall address all traffic control requirements for the Project including, if necessary, separate traffic control plans and/or notes. 7.1.7 Abalemenl. D/B shall develop a mutually agreed upon program to abate and minimize noise, dust, and disruption to access for parking and services at all times for adjacent business entities and residences. 7.1.8 /nspee~ions. DB shall coordinate any and all required inspections, including special inspections, in such a manner that the progress of construction is not affected or impacted. The DB shall provide surveying, and other contracted services as required to complete project construction inspection and testing tasks. The City will provide inspection, special inspection, reinspection services, and periodic building inspections. 7.1.9 Permils. The Parties acknowledge that the construction work to be performed on the Project by DB in compliance with this Agreement is subject to the prior issuance of building, land development, and/or public improvement permits paid for and obtained by D/B. In the event that City, or any other governmental agency, unreasonably refuses to issue the permit(s) necessary to authorize the work to be performed or if the permit(s) are unreasonably canceled or suspended, then D/B is relieved from its obligation to construct those improvements covered by the denial of said permit(s). City shall, under such circumstances, pay DB the reasonable costs, not to exceed the amounts identified in this Agreement, for all work completed up to the date of denial of said permit(s). All plans, specifications and improvements completed to the date of the denial, suspension or cancellation of said permit(s) shall become [he property of City upon D/B's receipt of payment in full as described above. 7.1.10 Marntenance. D/B shall ensure Project is maintained in a clean, neat, sanitary and safe condition free from accumulation of waste materials or rubbish. Until Acceptance of the Project, DB shall be responsible for on-going site maintenance. Prior [o Final Completion, DB shall cause to be removed from and about the Project all tools, construction equipment, machinery, surplus materials, waste materials and rubbish and deliver the site to the City in a clean, neat, sanitary and safe condition. 7. L 10.1 Waste Removal Please be advised that Chula Vista Municipal Code 8.24.070 provides for an exclusive franchise for the removal and conveyance of all solid waste for hire (including recyclables) within City limits. The exclusive franchise agreement covers any hauling activity that requires the generator or their agent to pay a Fee for any service connected with removing or conveying waste. The City's franchise hauler is Allied (formerly Pacific) Waste Services and may be reached at (619) 421-9400. 7. L 11 Regueslfor/rsformo~ion /'%lF//. Parties acknowledge that [he RFI process is solely for correspondence between DB and the City. DB shall submit copies of each RFI [o City at the within twenty-four (24) hours of receipt. DB shall issue responses to RFIs. Unless D/B specifically requests a City response, City will not respond to RFIs. 12 6-56 7.1.12 /review andApprouvL DB shall provide timely review and approve shop drawings, samples of construction materials, product data, schedule submittals, and other submittals for compliance with the Construction Documents. D/B shall keep the City advised of all such matters being reviewed and approved by D/B and forward copies of such documents to City far review. 7.1.13 Royalties and OtherFeer. DB shall pay royalties and license fees, if applicable. D/B shall defend suits or claims for infringement of patent rights and shall defend and hold City and City's agents harmless from loss on account [hereof. 7.1.14 Provide City with a Detailed Construction Schedule (DSC) on a CD within fifteen (15) working days after receiving Notice to Proceed with Phase IV, provide updated versions of DCS on a monthly basis, and provide immediate notice of any impact on critical path items. ARTICLE VIH. SUBCONTRACTING 8.l Subcon[ractinti. 8.1.1 Derlgn Services. D/B shall perform or obtain the prior written consent of the City to subcontract all design services for the Project utilizing qualified, licensed and sufficiently experienced architects, engineers and other professionals (hereinjointly "Design Consultants") as identified in Exhibit "C". DB shall not be permitted to substitute any Design Consultant unless authorized by City. 8.1.2 L'onstruction Services. DB shall perform all construction on the Project utilizing subcontractors appropriately licensed by the California Contractors State License Board or other required agency. ARTICLE IX. PROJECT SCHEDULE 9.1 Project Schedule. D/B shall perform and complete the Services and Work under this Agreement according to the timeframes set forth in the Project Schedule, attached hereto as Exhibit "A", or a subsequently revised Project Schedule in such a manner that the GMP or Contract Time of the Project shall not be exceeded and that is consistent with the Standard of Care identified in Section 4.1. 9.1.1 Project Schedule. DB has submitted, as part of its proposal, a Project Schedule based on its estimate of the time necessary to complete the Project. 9.1.2 D/B:r Obligation. Subsequent to the effective date of this Agreement, D/B shall provide, coordinate, revise, and maintain the Project Schedule for all phases of the Project. 9.1.2.1 During the Project initiation and design phases, the D/B shall submit an updated Project Schedule to City monthly for approval. 9.1.2.2 During Construction, D/B shall submit an updated Project Schedule monthly to the City and shall include: 9.1.2.2.1 Forecast Data with the intended plan for the remainder of the contract duration. 9.!.2.2.2 Actual Data with indications of when and how much Work and/or Services was performed(%comple[e). 9.1.2.2.3 Logic changes or other changes required to maintain the Project Schedule. 9.1.3 Detail and Formal The Project Schedule shall be substantially similaz in detail and form to Exhibit "A", or it shall be in the form subsequently agreed to by the Parties. 9.1.4 Su6mittaL Project Schedule shall be submitted to City on a computer disk in a version of Microsoft Project 9.2 Proiect Completion. D/B acknowledges that all work on the Project under this Agreement will be complete and ready for its intended use by the Project Completion Date stated in the Project Schedule 9.3 Chanties in Proiect Schedule. Changes in Project Schedule, whether to logic, definition, or relationship must be approved by the City in writing as a Change Order pursuant to the manner identified in Article XIII. 13 6-57 ARTICLE X. DELAY IN PERFORMANCE 10.1 Time of Essence. Time is of the essence for this Agreement and each provision of this Agreement, including the Project Schedule, Start Date, and Project Completion Date contained herein, unless otherwise specified in this Agreement. D/B shall perform all Services and Work as expeditiously as is consistent with standard of care identified in Section 4.1. 10.2 Notification of Delav. If the DB anticipates or has reason to believe that the performance of Services and/or Work under this Agreement will be delayed, the DB shall immediately notify the City. A written notice of the delay must be delivered to the City within five (5) Calendaz Days of the initial notification, unless [he City allows an additional period of time to ascertain more accurate data in support of the request. The written notice shall include an explanation of the cause of the delay, a reasonable estimate of the length of [he delay, and all supporting data. The D/B shall include a written statement that the time adjustment requested is the entire time adjustment ro which D/B has reason to believe it is entitled as a result of the cause of the delay. An increase in time for completion does not necessarily mean that DB is entitled to an increase in GMP. If in [he opinion of [he City, the delay affects a material part of the Project, the City may exercise its rights under Article XXVII of [his Agreement or any other remedy available in law or equity. 10.3 De1ay If delays in the performance of Services or Work required under this Agreement are caused by unforeseen events beyond the control of the Parties, such delay may entitle the D/B to a reasonable extension of time or to additional compensation. Any such extension of time must be approved in writing by [he City. The following conditions may justify such a delay: war; changes in law or government regulation; labor disputes; strikes; fires, floods, adverse weather or other similar condition of [he elements necessitating cessation of [he D/B's work; inability to obtain materials, equipment, or labor; required additional Professional Services; or other specific reasons agreed to between the City and the D/B; provided, however, that (i) this provision shall not apply to, and the DB shall not be entitled to an extension of time, additional costs, or expenses for, a delay caused by the acts or omissions of the D/B, its consultants, contractors, employees, or other agents; and (ii) a delay caused by the inability [o obtain materials, equipment, or labor shall not entitle the D/B to an extension of time unless the D/B furnishes the City, in a timely manner, documentary proof satisfactory to City of the D/B's inabiliTy to obtain materials, equipment, or labor. 10.3.1 Caured6y City If D/B reasonably believes that any action, inaction, decision or direction by City or agent for the City will likely result in the GMP or ConVact Time being exceeded or [he Project being completed late, D/B will notify City at Project Team meeting and in writing within five (5) calendar days of discovering such action, inaction, decision, or direction. Included in such notice will be an estimate of the cost and time impact resulting from such action, inaction, decision or direction. D/B shall provide complete and accurate pricing within [en (10) calendar days of said discovery. 10.4 Costs of Delav/Liouidated Damages. City and D/B recognize that time is of the essence in this Agreement and that City will suffer financial loss if the Project is not completed by the Substantial Completion Date identified in the Project Schedule or any extensions subsequently approved. As the exact amount of financial loss cannot be accurately forecasted, the Parties have used their best efforts to establish an estimate of such loss. In doing so, the Parties have examined all of the circumstances and factors associated with a delay and have determined an amount that is fair and reasonable as liquidated damages. City and D/B agree that DB shall pay as liquidated damages (but not as a penalty) for each calendar day of delay beyond the time specified for Substantial Completion of the Project, the following amounts which D/B expressly agrees are "no[ unreasonable under [he circumstances" as defined in California Civil Code § 1671(6): $100 for each calendar day. Liquidated Damages shall not be assessed after the date on which Substantial Completion is achieved. In lieu of paying damages to the City, the Parties agree [hat City may choose to reduce the GMP by the amount of the liquidated damages. ARTICLE XI. PROJECT COSTS 1 L I Estimated Cost. The Estimated Cost of Project, according to the RFP is One Million Nine Hundred Sixty Severn Thousand Five Hundred Seventy One Dollars ($1,967,571.00). The City's obligation under this Agreement shall not exceed the Estimated Cost; however, once a GMP is determined and approved, the GMP shall become the not [o exceed amount of [he City's obligation. GMP is subject to change pursuant to methods established in this Agreement. 14 6-58 11.1.1 Cost Sc%edule. The EMP has been allocated among each activity or portion of the Project ("Itemized Cost(s)"). The Itemized Costs are included in Exhibit "A", attached. The cost incurred by the DB for a specific activity or portion of the Project shall not exceed the associated Itetized Cast. 11.2 GMP. At 90% complete construction documents, DB shall establish a GNIP and submit such GMP to the City for approval. 11.2.1 Nor to Exceed Amapa. The GMP shall not exceed $ 1,967,571.00. Any costs incurred by DB in excess of said GMP shall be the sole responsibility of the DB, unless a Change Order is approved by the City pursuant [o Article 7CIII of this Agreement. 11.2.1.1 Included Costs. In calculating the GMP, D/B shall include costs of the following: 11.2.1.1.1 All Design Consultants, including but not limited to electrical, lighting, and consultants. 11.2.1.1.2 Estimating, value engineering and construction management. 11.2.1.1.3 Construction supervision and project management personnel, including but not limited to superintendents, Project managers, Project secretaries, Project engineers, Project accountants, and all other DB personnel wherever located. 11.2.1.1.4 All on-site and off-site equipment, supplies and facilities, including but no[ limited to, computers, etmatng, dictating, communication and accounting equipment, office space, trailers, field equipment and storage Facilities. 11.2.1.1.4.1 Option to Purchase. In no case shall the cumulative monthly rental charges to the Project for equipment and Small Tools used by the DB exceed 90% of the fair market value of any one piece of equipment or Small Tools. At City's option, the full price for equipment or Small Tools may be paid, and City may take possession upon completion of the Work. 11.2.1.1.5 All Hard Consruction Costs. See Exhibit A 11.2.1.1.6 Contingency Fund, which shall be held by the Ciry. 11.2.1.1.7 Reimbursable Costs. See Exhibit A. 11.2.1.1.8 DB Fixed Fee for the complete design and construcdon of the entire Project as specified in the 90% CD's. 11.2.1.1.9 No more than $ 97,924.30 far Design Services and General Conditions 11.2.1.1.1 OAII home-office and field overhead casts of any type including document control and retention; 11.2.I.1.11A11 business license costs; 11.2.1.1.12A11 profit DB intends to earn under [his Agreement. 11.2.1.1.13A11 direct and incidental costs incurred by D/B, except for those specifically identified in the General Conditions section. 1 L2.1.1.14 OTHER. The City agrees to hold only 5% retention for the duration of the project. 11.2.1.2 Full Compensation. Unless otherwise expressly provided in this Agreement, GMP shall be the maximum amount of compensation to due to DB for all permitted costs of any type incurred by D/B in performing all services and obligations under [his Agreement. 11.2.2 Jtenricatiou. DB shall provide City with an itemization of the GMP that reconciles the GMP with the itemized costs. The itemization shall include [he following: 11.2.1.1 DB Fixed Fees. The fees charged by the contractor for staff, equipment, office space and overhead during the term of the project are included in the installation costs, 15 6-59 11.2.1.2 Hazd Construction Costs. Hard Construction Costs broken down into categories for each of the major trades for the Project, which will include labor, material expenses, equipment costs, and a reasonable D/B Contingency Fund. 11.2.1.3 Bonds, Permits and Insurance. 11.2.3 A!lerna~e 9!d!lemr. DB shall prepare, with the cooperation of the City, alternate bid items to assure that [he cost of the Project will not exceed the GMP. 11.2.4 ,Aduslmenls/o GtilPBasedondpprovedClronge Orders. GMP may be changed, increased or decreased, based on Change Orders approved pursuant to Article XIII. 11.2.5 Ad'urlmenls daredon Other CorUncreares GMP may be increased due to: (i) acts of God, acts of any governmental authority, the elements, war, litigation, shortages of material, labor strikes, inflation, later commonly accepted or adopted higher standards and specifications of construction, concealed or unknown conditions encountered in the completion of the Project, or other cause beyond D/B's control, (ii) actual bids received being greater than estimated, or (iii) other factors not the result of unreasonable conduct by DB. The GMP may be increased by the amount of such increases; however, if GMP as proposed to be increased shall exceed the Estimated Costs, such change to GMP shall be subject [o approval by City Council. 11.3 Duty to Advance Costs. DB shall advance all costs for Project subject to Reimbursement in the manner described in Article XVI. N/A. 11.4 Use of Protect Contingency. Project Contingency shall not be used without prior, written City approval and shall not be used for: (i) work required due to D/B's, its officers', agents' or employees' failure [o perform Work or Services according to [he terms of this Agreement, in compliance with the Construction Documents, and/or Law; or (ii) uninsured losses resulting from the negligence of DB, its officers, agents, or employees. I I.5 Notification of Increased Costs. If, at any time, the D/B anticipates [hat the amount expended on the Project will exceed the Estimated Cost or the GMP, when established, the D/B shall immediately, not mare than ten (10) Working Days from becoming awaze of the potential increase, notify the City in writing. This written notification shall include an itemized cost estimate and a list of recommended revisions that the D/B believes will bring the Project cost to within the Estimated Cost or GMP. Following the delivery of the Notice, D/B shall assist the City in reviewing [he itemized cos[ breakdown and adjusting the Scope of Work and establishing a revised Project, the cost of which will not exceed the Estimated Cost or GMP, once establish. 11.5.1 CiryActlon. Following consultation with the DB, the City may choose to: (i) approve an increase in the amount authorized for the Project; (ii) delineate a project, which may be constructed for the budget amount; (iii) any combination of (i) and (ii); or terminate the Project subject to the termination provisions in Article XXVII. ARTICLE XII. PRODUCTS 12.1 Submittals. Prior to the bidding process, D/B shall submit for City approval a list of products intended For use in the Project. Upon D/B's completion of plans and specifications, City will review and approve products specified therein. DB shall provide City a copy of each submittal for Ci[y approval throughout the duration of construction within twenty (20) Calendar Days of D/B's receipt of submittal. Approval is general approval only and in no way relieves D/B of its sole responsibilities under this Agreement or any and all laws, codes, permits or regulations. 12.2 Substitutions. DB shall submit all requests for product substitutions to City in writing within thirty (30) Calendar Days after the date of award of the construction contract. After expiration of the thirty (30) Calendar Days, City will allow substitution only when a product becomes unavailable due to no fault of D/B's contractor. City shall review substitution requests within thirty (30) Calendar Days of submission of such requests. D/B agrees that City requires Consultant's input and as such D/B shall coordinate a five (5) Working Day review by its Consultant. 12.2.1 Subslanliose /tequert D/B shall include with each substitution request complete data substantiating that the proposed substitution conforms to requirements of the Contract Documents. 16 6-60 12.2.2 O/B/Zeprererzta/ioizr. By submitting a substitution request, D/B is representing to City all of the following: (i) DB has investigated proposed product and determined that in all respect the proposed product meets or exceeds the specified product; (ii) D/B is providing the same warranty for the proposed product as was available for the specified product; (iii) DB shall coordinate installation and make any other necessary modifications which may be required for work to be complete in all respects; and (iv) D/B shall waive any claims for additional costs related to the substituted product, unless the specified product is not commercially available. 12.2.3 Separate Writlerz /lequest City will not consider either substitutions that are implied in the product data submittal without a separate written request or substitutions that will require substantial revision of construction contract documents. 12.3 Samoles. 12.3.1 Postage. Samples shall be sent to DB's office, cartiage prepaid. N/A. 12.3.2 ltevreiv. D/B shall furnish to City for review, prior to purchasing, fabricating, applying or instahing, (2) two samples (other than field samples) of each required material with the required finish. N/A. 12.3.2.1 Where applicable, all samples shall be 8" x 10" in size and shall be limited in thickness to a minimum consistent with sample analysis. In lieu thereof, [he actual full-size item shall be submitted. N/A. 12.3.2.2 D/B shall assign a submittal number. D/B shall include with each submission a list of all samples sent, a statement as to the usage of each sample and its location in the Project, the name of the manufacturer, trade name, style, model, and any other necessary identifying information. N/A. 12.3.2.3 All materials, finishes, and workmanship in the complete building shall be equal in every respect [o that of [he reviewed sample .N/A. 12.3.2.4 City will return one submitted sample upon completion of City review. N/A. 12.3.2.5 D/B's, or DB's agent's, field samples shall be prepared at the site. Affected finish work shall not commence until D/B or its agents have been given a written review of the field samples. N/A. 12.3.3 Nora Release ofLiabi!<ty. Ciry's review of samples in no way relieves DB of DB's responsibility for construction of Project in full compliance with all Contract Documents. 12.4 Observe Testing. When appropriate, D/B shall witness testing and review materials and equipment testing results and provide comments regarding conformance with specification requirements. ARTICLE XIII. CHANGE ORDERS 13.1 When Required. Change Orders shall be required in the following instances: 13.1.1 GMR Any adjustment in GMP. 13.1.2 Corztracl Time. Any adjustment in Contract Time of Completion Date. 13.1.3 Use ojCan/ingencyFund At any time D/B seeks to use the Contingency Fund, irrespective of impact on the GMP or Contract Time. 13.1.4 City Requests. The City directs DB to perform Additional Services. 13.1.5 Other. Any other instance for which this Agreement expresses that a Change Order shall be used. 13.2 Process for Aooroval of Chance Orders. Within five (5) Calendar Days of any event that gives rise to the need for a Change Order, the DB shall provide the City with written notice of the need for the same. The Change Order must indicate whether the change wilt affect, in any way, by increasing or decreasing, [he GMP, Project Schedule, or project quality established during the design and submittal review process. In addition, it shall be accompanied by a detailed and complete estimate of cost impact associated with the Change Order, including all appropriate direct and indirect costs and credits. All such costs and credits shall be accurately 17 6-61 categorized into DB Fixed Fee, Reimbursable Costs or Hard Construction Costs. D/B shall also provide City with a realistic estimate of the impact, if any, the Change Order will have on the Contract Time. 13.2.1 ProjeclN/anager9ppiouvL If the Change Order request does not result in an increase in the Estimated Cost, the City Representative shall either approve or reject the Change Order in writing within ten (l0) Working Days of receiving D/B's written notice, provided DB has submitted complete documentation substantiating the need for such Change Order. If City fails to respond to DB's written notice within the ten (10) Working Days, the Change Order request shall be deemed denied. 13.2.2 City CouncilApprouv! For Change Orders not subject to section 13.2.1, City Council approval is required. The City Council may either approve, reject, or approve in part such Change Orders. Council Approval shall no[ be subject to the [en (10) Working Day response time provided for in section 13.2.1. 13.3 Written Aaoroval of Chance Orders. D/B shall not proceed on work requested under a Change Order, absent written approval from the appropriate authority. Any Services or Work, which require t he approval of a Change Order, perform by D/B prior to approval shall not be reimbursed. 13.4Failure to Aeree on Cost of Chance Order or Time. In the event there is any disagreement or dispute between the Parties as to whether the D/B is entitled to a Change Order, the amount of the Change Order or any increase in Contract Time requested through the Change Order, the dispute shall be resolved by the Director of Public Works 13.5. If the determination of the Director of Public Works is challenged, such challenge shall be addressed in the manner identified in Section 30.11. D/B shall not have the right to stop or delay in the prosecution of any services or work, including services or work that is the subject of the Change Order (if directed by [he City), pending the determination of the Director of Public Works or, if applicable, final resolution. Instead, D/B shall continue diligently prosecuting all such services and work. 13.5 Full Compensation. Payment to D!B for Change Orders shall provide full compensation for all equipment, materials, labor, field and home office overhead, mark-ups, and profit necessary to complete the work. By executing a Change Order, the D/B or D/B's representative acknowledges that no additional compensation or claims for items of work listed in the Change Order will be al towed. 13.6 Errors and Omissions. DB shall not be reimbursed for any costs or expenses of a Change Order resulting from a design error or omission, D/B's negligence, or the negligence of any of D/B's agents or subagents. D/B shall be reimbursed for any costs or expenses of a Change Order resulting from a design error or omission that is the direct result of a City request for such design or omission. The City reserves the right to seek reimbursements for any funds used due to errors or omissions of the Design Consultants, D/B's negligence, or the negligence of any of DB's agents, or subcontractors. 13.7 City Refusal to Aoorove Chance Order. DB shall not have the right to terminate this Agreement for the City's refusal to approve a Change Order pursuant to Sections 13.2.1 and/or 13.2.2 ARTICLE XIV. EXTRA WORK 14.1 City Authority to Order Extra Work. City may at any time prior to Project Completion order Extra Work on the Project. The sum of all Extra Work ordered shall not exceed five percent (5%) of [he Estimated Cost at the time of the Bid Award, without invalidating this Agreement and without notice to any surety. 14.1.1 Requests in !Yr«ing All requests for Extra Work shall be in writing, shall be treated as, and are subject to the same requirements as Change Orders. DB shall not be responsible for failure to perform Extra Work, which was requested in a manner inconsistent with this section. 14.2 Bonds Required for Extra Work. D/B's and its agents' bonds, required under Article XXIV, shall cover any Extra Work provided that [he Extra Work is paid for by the Project Budget 14.3 Reimbursement for Extra Work. Work performed by D/B as Extra Work is reimbursable in [he same manner described in Article XIV. The Project contingency as described in Article XI, will be used first to cover the costs of Extra Work. 18 6-62 14.4 Marko D/B will be paid a reasonable allowance for overhead and profit for Extra Work. The allowance shall not exceed five percent (~%) of the approved costs for the Extra Work. ARTICLE XV. CHANGED CONDITIONS 15.1 Chaneed Conditions. Changed Conditions shall be addressed under the Greenbook section 3-4; however, Parties acknowledge that even if Changed Conditions are found to be present, the Project shall not exceed the GMP without express City Council approval of an increase to the Project Budget. Absent such express approval of additional funds, DB shalt provide City with value engineering and Parties will return Project to within the total Project cost. ARTICLE XVI. PAYMENT TERMS 16.1 Payment 16.1.1 FundrforPaymen! DB shall only be entitled to payment for Services and Work performed under this Agreement from the funds appropriated for the Project. 16.1.2 Maximum Payment DB shal l be entitled to payment in an amount not to exceed the GMP or subsequently approved increase in GMP. DB is not entitled to payment For unapproved expenses, unapproved increases in costs, or other increases caused by D/B negligence, omissions, or failure to seek approval for additional or increased costs. 16. L3 App/icv~<onjorPaymenG DB shall submit to City a certificate and application for payment on or before the 5'" day of each calendar month ("Payment Application"). The Payment Application shall be based upon the percentage of completion of the Schedule of Values plus any Reimburseable Costs, less any payments previously made by the City, incurred or advanced for [he Project for which DB has not previously received payment. The Payment Application must include all relevant documents in accordance with Section 16.1 If the City determines that all relevant documents have not been submitted, City shall request that DB provide additional documentation. DB shall provide additional documentation within ten (10) Working Days of request. City is not obligated to make payment to DB until City has received all relevant documentation to support Reimbursement Request. After all appropriate cos[ documentation has been received and City approves the Payment Application, City shall make payment to DB of all uncontested chazges within sixty (60) Calendar Days of receipt of a complete Payment Application. 16.1.3.1 Withholding. From each payment, ten percent (10%) will be deducted and retained by the City, and the remainder will be paid in accordance with the terms and conditions of [his Agreement. No payment made to D/B or its sureties will constitute a waiver of any rights the City has under [his Agreement. This section is not intended [o limit any rights the City may have under the Performance or Payment Bond. In lieu of withholding retention under this Agreement, at the election of D/B, City will deposit retention amounts into escrow and/or the substitution of securities for money as provided in California Public Contract Code Section 22300. 16.1.3.2 Payment of Withholding. The City will pay the DB for the amounts withheld forty-five (45) Calendar Days from recordation of the Notice of Completion, providing that no Stop Notices or Mechanic's Liens have been filed since the recordation of the Notice of Completion. 16.1.3.2.1 Where a Stop Notice or Mechanic's Lien has been filed following the recordation of the Notice of Completion, the amount in controversy shall continue to be withheld until a fully executed release of Stop Notice or Mechanic's Lien has been filed and a conformed copy delivered to the City. 16.1.4 Con~esledCharges. [n the event City contests any chazges contained in the Payment Application, the dispute shall be resolved in the manner identified in Section 27.11. 16.1.5 Cu~ofJforSubmirsion ojReimbursemenlRequer~s. D/B shall submit all Reimbursement Requests within six (6) months of the date on which Final Completion occurs and City accepts the Project. Any Reimbursement Request submitted after the Cutoff Date shall not be reviewed or included in Reimbursable Cost. 19 6-63 16.1.6. GeriJieation ojReim6ursemen~RequesG DB shall supply documentation to support the Reimbursement Request including, but not limited to, proof that all mechanic liens have been released, copies of invoices received and copies of cancelled checks, substitute checks, or image replacement documents showing that payment has been made in connection with the Reimbursement Request in the following manner: 16.1.6.1 DB shall submit two (2) copies of a Reimbursement Request (cover letter, invoice, and documentation) to the City. 16.1.6.2 After review and approval, the City shall prepare a memorandum to the Financing Department that the invoice is appropriate to pay. The memorandum shall indicate any costs to be disallowed and the reason for the disallowance. 16.1.6.3 Prior to the approval of the Reimbursement Request, City has the right to verify whether or not the materials and work for which reimbursement is being requested have been installed and performed as represented in the Reimbursement Request. 16.1.7 Non-reimbursable Casts. Except to the extent that City expressly assumes the risk of loss under this Agreement, City shall exclude from the amounts payable to D/B the fair value, as determined by City, of property that is destroyed, lost, stolen, or damaged rendering it undeliverable or unusable for City. In addition, D/B is not entitled to reimbursement for any cos[ or expenditure that has not been approved by the City in the manner required by this Agreement or the City Charter and roles, regulations, or laws promulgated [here-under. ARTICLE XVIL INSPECTION 17.1 Inspection Team. The Project shall be inspected by a team composed of, at a minimum, the following: i.) representatives of the City, ii.) representative from D/B's Design Team, iii.) the Construction Manager, and iv.Representative, (iii) D/B's Consultant(s), and (e) [he DB's construction superintendent [Inspection Team] 17.2 Inspection Stages. The Project shall be inspected by the Inspection Team at minimum during the following stages: (i) when required by code, (ii.) as directed by the "Special Inspections" provision, (iii) bi-weekly. 17.3 Access. City, its consultants, subcontractors, independent testing laboratories as well as other governmental agencies withjurisdictional interests will have access at reasonable times with the project manager's approval for this observation, inspecting and testing. DB shall provide them proper and safe conditions for such access and advise them of D/B's safety procedures and programs so that they may comply. 17.4 Additional Inspections. City will make, or have made, such inspections and tests, as the City deems necessary to see that the Work is being accomplished in accordance with the requirements of the Construction. 17.5 Notice. DB shall give City timely notice of readiness of the Work for all required on and off-site inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. D/B shall give a[ least 24 hours notice for on-site inspection and five (5) days notice for off-site inspection. 17.6 Costs of Inspection. Unless otherwise specified, the cost of inspection and testing will be borne by the City. Any expenses associated with re-inspection shall be borne by D/B. 17.7 Concealing Work. Prior to concealing work, D/B shall obtain approval of work from the City and as required by all Slate Building Codes. City has the right to stop or suspend Work activities which will conceal or cover up D/B Work product which is to be inspected or tested, or which will interfere with the inspection or testing activities, for a reasonable time and D/B will have no right to additional cost or time i[ may incur as a result of the Work stoppage. 17.8 Defective Work. In the event such inspections or tests reveal non-compliance with the requirements of the Construction Documents or defective work, the provisions and process of Article XXII shall apply. 17.9Not a Waiver of Obligations. Neither observations by the City nor inspections, tests, or approvals by City or others shall relieve D/B from D/B's obligations to perform [he Work in accordance with the Construction Documents. This approval is genera] approval only and in no way relieves DB of its sole responsibilities under this Agreement or any and all laws, codes, permits or regulations. 20 6-64 ARTICLE XVIII. PROJECT COMPLETION 18.1 Notice to City. When D/B determines that the Project is complete, D/B shall notify the City in writing of the Projects status within seven (7) Calendar Days of the D/B's determination. The notice shall certify to City that the Project has been completed in accordance with the Construction Documents, all applicable building codes and regulations, all permits, licenses, and certificates of inspection, use and occupancy, and ordinances relating [o the Project. 18.2 Walk-Throueh Inspection. A preliminary Walk-Through Inspection shall be conducted by City within ten (IO) Working Days following D/B's notice to City of completion ("Walk-Through Inspection"). The Walk- Through Inspection will be conducted by the Inspection Team identified in Article XVII, Section 17.1. 18.2.1 Pursch Lis[ A Punch List, if necessary, shall be prepared by City during the Walk-Through Inspection. The Punch List shall be presented to DB by the RE within three (3) Working Days of the Walk- Through Inspection. DB shall correct the items listed on the Punch Lis[ within thirty (30) Calendar Days of receipt of the punch list and prior to the Final Inspection. 18.2.2 Failure to /deaf//ems. As to any items not included on the Punch List or later discovered, nothing in this section is intended to limit D/B's obligations under this Agreement and City wilt maintain all remedies available under this Agreement and the law. 18.3 Equipment Demonstration. Prior to final inspection, D/B shall demonstrate to City the operation of each system in the Project, and instruct City personnel in operation, adjustment and maintenance of equipment and systems, using the operation and maintenance data. 18.3.1 Startup. The DB shall supervise, manage, and coordinate all project startup and testing activities for mechanical systems within the provisions of the project Contract Documents. 18.3.2 Reporting. The D/B shall report progress of project startup and testing to the City in a manner consistent with the City's reporting system. 18.4 Final Inspection. Provided D/B has corrected the Punch List items and notified the City of the correction ("Notice of Correction"), the Final Inspection for the Project shall be scheduled and conducted within ninety (90) Calendar Days of the Notice of Correction. ARTICLE XIX. PROJECT ACCEPTANCE AND FINAL COMPLETION 19.I Acceptance. Upon approval by the Inspection Team during the Final Inspection that Project improvements are complete and that work required on the Punch List has been finished, Ci[y shall accept the Project ("Acceptance"). Upon Acceptance, DB shall do all of the following: 19.1.1 Notice ofComple~ioa. D/B shall execute and file a Notice of Completion with the County Recorder of San Diego County and shall provide the RE with a conformed copy of the recorded Notice of Completion. 19.1.2 Lien aadA~laleria!/releases D/B shall cause all contractors and subcontractors to provide lien and material releases as to the Project and provide copies of such lien and material releases to the Ci[y or, upon approval of City which shall not be unreasonably withheld, provide bonds in lieu of lien and material releases in a form reasonably acceptable to City for all such work. 19.2 Final Completion. Final Completion of the Project shall be deemed [o occur on the last dace of the following events: (i) recordation of the Notice of Completion with a conformed copy to City; (ii) submission of all documents required to be supplied by D/B to City pursuant to this Agreement, including GIS infgtma[ioq warranties, and operating and maintenance manuals; or issuance of a final certificate of occupancy. 19.2.1 9s-Bui!lr. City will evaluate the submitted As-Builts for accuracy and completeness and may return comments. D/B shall meet with City until all issues are resolved. Upon issue resolution, in accordance with disputed work procedures in Section 22.6, D/B shall submit a mylar set and three (3) final blueline sets of As-Builts stamped by the architect/engineer of record as required by law. N/A 21 6-65 19.3 No Waiver. D/B's obligation to perform and complete the work in accordance with the Contract Documents shall be absolute. Neither recommendation of any progress payment or acceptance of work, nor any payment by City to D/B under the Contract Documents, nor any use or occupancy of [he Project or any part thereof by City, nor any act of acceptance by City, nor any failure to do act, nor any review of a shop drawing or sample submittal, will constitute an acceptance of work, which is not in accordance with the Contract Documents. ARTICLE XX. PROJECT DELIVERABLES 20.1 Protect Deliverables. Prior to Acceptance, D/B shall deliver all of the following to the City in the format required: 20.1.1 As-BuilLr. D/B shall provide As-Builts in l set of electronic format (pdt). and GIS data filed . 20.1.1.1 As-Builts shall show by dimension accurate to within one (1) inch, the centerline of each run of conduits and circuits, piping, ducts, and other similar items as determined by City, both concealed and visible. D/B shall clearly identify the item by accurate note such as "cast iron drain," galvanized water, etc. DB shall clearly show, by symbol or note, the vertical location of the item ("under slab", "in ceiling", "exposed", etc.), and make all identification sufficiently descriptive that it may be related reliably to the specification. D/B shall thoroughly coordinate all changes on the As-Builts making adequate and proper entries on each page of specifications and each sheet of drawings and other documents where entry is required to properly show the change. 20.1.1.2 D/B shall include all of the following on the As-Builts: 20.1.1.2.1 Depth of foundation in relation to finished first floor. 20.1.1.2.2 Horizontal and vertical locations of underground utilities and appurtenances, with referencesto permanent surface improvements. N/A. 20. (.1.2.3 Locations of internal utilities and appurtenances, with references to visible and accessible features of the structure. N/A. 20.1.1.2.4 Field changes of dimensions and details. N/A. 20.1.1.2.5 Changes authorized by approved proposal requests, construction Change Orders, discussion with City that resulted in any change/deviation from City's program, specifications, approved plans, equipment or materials. N/A. 20.1.1.2.6Details no[ issued with original Construction Drawings, design/build plans deferred approvals, etc. N/A. 20.1.1.2.7Upon completion of work, obtain signature of licensed surveyor or civil engineer on the Project record set verifying layout information. N/A. 20.1.1.2.SShow locations of all utilities on-site with size, and type of pipe, if different than specified, and invert elevations of pipe at major grade and alignment changes. N/A. 20.I.1.2.9The title "PROTECT RECORD" in 3/8" letters. 20.1.1.3 D/B shall maintain a set of As-Builts at the Project site for reference. DB shall ensure that changes to the As-Builts are made within twenty-four (24) hours after obtaining information. Changes shall be made with erasable colored pencil (not ink or indelible pencil), shall clearly describe the change by note (note in ink, colored pencil or rubber stamp) and by graphic line, shall indicate the date of entry, shall circle the area or areas affected and, in the event of overlapping changes, use different colors for each change. N/A 20.1.2 Operation andMainlenaneeA/onuaG. D/B shall submit all Operation and Maintenance manuals prepared in the following manner. 20.!.2.1 In triplicate, bound in 8'/: x 1 I inch (216 x 279 mm) three-ring size binders with durable plastic covers prior to City's Final Inspection. 22 6-66 20.1.2.2 A separate volume for each system as it applies to the project, including but not limited to, mechanical, electrical, plumbing, roofing, irrigation, and any other system as determined by City, with a table of contents and index tabs in each volume as follows: 20.1.2.2.IPart 1: Directory, listing names, addresses, and telephone numbers of DB's agents, suppliers, manufacturers, and installers. 20.1.2.2.2Part 2: Operation and Maintenance Instructions, arranged by specification division or system. For each specification division or system, provide names, addresses and telephone numbers of DB's agents, suppliers, manufacturers, and installers. In addition, list the following: (i) appropriate design criteria; (ii) list of equipment; (iii) parts list; (iv) operating instmctions,(v) maintenance instructions, equipment; (vi) maintenance instructions, finishes; (vii) shop drawings and product data; and (viii) warranties. 20.2 Ownership of Protect Deliverables. Upon Final Completion or Termination, Project Deliverables shall become the property of the City. DB and City mutually agree that the Contract documents for the Project shall not be used on any other work without the consent of each Party. Assemble and deliver to City upon Final Completion all records, documents, warranties, bonds, guarantees, maintenance/ service contracts, and maintenance and operating manuals ARTICLE XXI. WARRANTIES 21.1 Warranties Required. D/B shall provide and require its agents to provide the warranties listed below. This warranty requirement is not intended to exclude, and shall not exclude, other implicit or explicit warranties or guarantees required or implied bylaw. 21.1.1 Ma~erra/s andWonFinanshrp. DB shall guarantee, and shall require its agents to guarantee, all fixtures, photocells and lamps for the Project against defective workmanship and materials furnished by D/B for a period ten (10) years from the date of Project's Final Completion. D/B shall replace or repair any such defective work in a manner satisfactory to City, after notice to do so from City, and within the time specified in the notice. Ten-year warranty applies to defective fixtures, lamps and photocells, but does no[ include labor or equipment for in service (field) replacement. 21.1.2 NewMateriols andFquipmenG DB shall wazrant and guarantee, and shalt require its agents to warrant and guarantee, to City that all materials and equipment incorporated into the Project are new unless otherwise specified. 21.1.3 Design, Conslrrrc~ion, and0/her Defectr. D/B shall warrant and guarantee, and shall require its agents to warrant and guarantee to City that all work is in accordance with [he Plans and SpeciScations and is not defective in any way in design, construction or otherwise. 21.2 Form and Content. Except manufacturer's standard printed warranties, all warranties shall be on D/B's and DB's agent's, material supplier's, installer's or manufacturer's own letterhead, addressed to City. All - warranties shall be submitted in the forma[ specified in this section, modified as approved by City to suit the conditions pertaining to the warranty. 21.2.1 Owable Binder Obtain warranties, executed in triplicate by DB and manufacturers. Provide Table of Contents and assemble in binder with durable plastic cover. 21.2.2 Table ojContenlr All warranties shall be listed and typewritten in the sequence of the Table of Contents of the Project manual, with each item identified with the number and title of the specification section in which specified, and the name of product or work item. 21.2.3 /nder Tabs. Separate each warranty with index tab sheets keyed [o the Table of Contents listing. 21.2.4 Delai! Provide full information, using separate typewritten sheets, as necessary. List D/B's agents, installer, and manufacturer, with name, address and telephone number of responsible principal. 21.2.5 WarrantyS/art Da/e Except for items put into use with D/B's permission with date mutually agreed upon in writing, leave date of beginning of time of warranty open until the date of Final Completion. 23 6-6~ 2 L2.6 Signature and Notarization. All warranties shall be signed and notarized. Signatures shall be required from DB. 21.3 Term of Warranties. Unless otherwise specified or provided bylaw, lamp & fixture warranties shall extend for a term often (]0) yeaz(s) from the date of Final Completion. 21.3.1 P/anus, Trees, andSfvubc Not withstanding above, all shrubs and ground cover shall have a ninety (90) Calendar Day warranty period and trees shall have a one (1) year warranty period. All plant warranties shall commence from the date of Final Completion. N/A. 21.4 MeetinES. During the ten (10) year warranty period described in Section 21.3, D/B shall meet, and shall require its design Consultant, construction contractor, and key subcontractors [o meet, with the City representatives, on a monthly basis, if requested by City. This meeting shall be held to discuss and resolve any problems that City discovers in design, construction, or famishing, fixtures, and equipment of the Project during [he ten (10) year warranty period. N/A. 2L5 Warranty Inspection. At 180 and 360 days following Final Completion, during the one-year general building warranty period, D/B shall inspect each component of the Project, identify items requiring repair, and oversee and complete such repairs. Findings of such inspections shall be reported to the City. N/A. ARTICLE XXII. DEFECTIVE WORK 22.1 Correction, Removal, or Replacement. If within [he designated warranty period, or such additional period as may be required by law or regulation, the Project is discovered to contain Defective Work, the D/B shall promptly and in accordance with the City's written instructions and within the reasonable time limits stated therein, either correct the Defective Work, or if it has been rejected by City, remove it from the site and replace it with non-defective and conforming work. 22.2 Citv's Ri¢ht to Correct If circumstances warrant, including but not limited to an emergency or DB's failure to adhere to section 22.1, City may correct, remove, or replace the Defective Work. In such circumstances, D/B shall not recover costs associated with the Defective Work and shall reimburse the City for all City's costs, whether direct or indirect, associated with the correction or removal and replacement. 22.3 Non-Reimbursable Costs. All costs incurred by D/B or DB's agents [o remedy defects are nun-reimbursable costs. [f the City has already reimbursed the DB for the defective work, CiTy is entitled [o an appropriate decrease in Reimbursable Costs, to withhold a setoff against the amount, or to make a claim against D/B's bond if DB has been paid in full. 22.4 Extension of Warranri. When Defective Work, or damage therefrom, has been corrected, removed, or replaced during the warranty period, the ----year, or relevant warranty period, will be extended for an additional -------years from the date of the satisfactory completion of the correction, removal, or replacement. N/A 22.5 No Limitation on other Remedies. Exercise of the remedies for defects pursuant to this Article shall no[ limit the remedies City may pursue under this Agreement or law. 22.6 Disputes. If D/B and City are unable to reach agreement on disputed work, DB shall not have the right to stop or delay in the prosecution or any Services of Work, pending the determination of the Director of Public Works or, if applicable, final resolution. Instead DB shall continue to diligently prosecute all Work and Services. During the time of the dispute, the City shall withhold the amount of the charge in question and compensate DB for undisputed amounts. Payment of disputed amounts shall be as later determined by the Director of Public Works. If this decision is contested, the claims procedure in 27.11 shall be followed. D/B shall maintain and keep all records relating to disputed work for a period of three (3) years in accordance with Article XXVII. ARTICLE XXIII. MAINTENANCE OF LANDSCAPING & IRRIGATION WORK 23.1 Maintenance Period. If DB is required to install or maintain landscaping and/or irrigation, D/B shalt provide a maintenance period which shalt begin on the first day after all landscape and irrigation work on the Project is complete, checked, approved by City, and City has given written approval to begin the maintenance period, 24 6-68 and shall continue thereafter for ninety (90) Calendar Days or until Project Acceptance, whichever is longer. N/A. 23.2 Maintenance Area. DB or D/B's Contractor shall maintain all involved azeas of the Project. N/A. 23.3 Maintenance Required. DB or DB's Contractor shall conduct regulaz planting maintenance operations immediately after each plant is planted. Plants shall be kept in a healthy, growing condition and in a visually pleasing appearance by watering, pruning, mowing, rolling, trimming, edging, fertilizing, restaking, pest and disease controlling, spraying, weeding, cleaning up and any other necessary operation of maintenance. Landscape areas shall be kept free of weeds, noxious grass and all other undesired vegetative growth and debris. D/B or D/B's Contractor shall replace ali plants found to be dead or in an impaired condition within fourteen (14) days. Maintenance shall also include the following: (i) Filling and replanting of any low areas which may cause standing water; (ii) Adjusting of sprinkler head height and watering pattern; (iii) Filling and recompaction of eroded areas; (iv) Weekly removal of trash, litter, clippings and foreign debris; (v) Inspecting plants at least twice per week; (vi) Protecting all planting areas against traffic or other potential causes of damage. N/A. 23.4 Landscape and Irrisation Inspection. At the conclusion of the maintenance period, City shall inspect the landscaping and irrigation to determine the acceptability of the work, including maintenance. This inspection shall be scheduled with two (2) weeks notice, a minimum of ninety (90) Calendar Days after [he plant maintenance period commencement, or when the D/B or D/B's contractor notifies the City that they are ready for the final inspection, whichever comes last. The City will notify DB of all deficiencies revealed by the inspection before acceptance. N/A. 23.5 Extension of Maintenance Period. DB shall extend completion of [he maintenance period when, in City's opinion, improper maintenance and/or possible poor or unhealthy condition of planted material is evident at the termination of the scheduled maintenance period. D/B shall be responsible for additional maintenance of the work until all of the work is completed and acceptable. Additional costs for failure to maintain landscaping during the Maintenance Period are not Reimbursable Costs. N/A. 23.6 Replacement. Plants found to be dead or not in a vigorous condition, or if root balls have been damaged, within the installation, maintenance and guarantee periods, shall be replaced within fourteen (14) Working Days of notification by City. DB shall include, at DB's or DB's Contractor's expense, a timely written diagnosis of plant health by a certified Arborist, should a dispute arise. Arborist's report shall indicate reason for lack of vigor, potential remedies, if any, and estimate of time required to regain vigor and specified size. N/A. 23.6.1 Sairze KindandSize. Plants used for replacement shall be same kind and size as specified and shall be furnished, planted and fertilized as originally specified. Cost of all repair work to existing improvements damaged during replacements shall be borne by D/B and shall not be Reimbursable Costs. N/A. ARTICLE XXIV. BONDS 24.1 Pavment Bond. D/B shall provide or require its Construction Contractor to provide City with a Payment (material and labor) Bond in favor of City for one hundred percent (100%) of the Hard Construction Costs. 24.2 Performance Bond. D/B shall provide or require its Construction Contractor to provide City with a Faithful Performance Bond in favor of [he City for one hundred percent (100%) of the GMP. 24.3 Term. The Payment Bond shall remain in full force and effect at least until the Project is accepted by the City and all claims for materials and labor are paid, for a minimum of forty-five (45) Calendar Days after the filing of the Notice of Completion, except as otherwise provided by law or regulation. The Performance Bond shall remain in full force for thirty (30) Calendar Days following [he filing date of the Notice of Completion. 24.4 Certificate of AEency. All bonds signed by an agent must be accompanied by a certified copy of such agent's authority to act. 24.5 Licensine and Ratine. The bonds shall be duly executed by responsible surety companies admitted to do business in the State of California, licensed or authorized in the jurisdiction in which [he project is located [o issue bonds for the limits required by [his agreement, listed as approved by the United States Department of 25 6-69 Treasury Circular 570, and whose underwriting limitation is sufficient [o issue bonds in the amount required by this agreement and which also satisfy the requirements stated in Section 995.660 of the Code of Civil Procedure, except as provided otherwise bylaws or regulazions, secured through an authorized agent with an office in California, and have a minimum AM Best rating of"A-". 24.6 Form. All bonds shall be in the form prescribed by CiTy Attorney. 24.6 Insolvency or Bankruotcv. If the surety on any bond furnished by the Construction Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in any state where any part of the Project is located, D/B shall within seven (7) Calendar Days thereafter substitute or require the substitution of another bond and surety, acceptable to the City. ARTICLE XXV. INDEMNITY & DUTY TO DEFEND 25.1 Indemnity Defense and Hold Harmless -General Reuuirement. Except for liability for Professional Services covered under Section 25.2, D/B shall defend, indemnify, protect and hold harmless the City, its elected and appointed officers and employees, from and against any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of or incident to any alleged acts, omissions, negligence, or willful misconduct of D/B, its officials, officers, employees, agents, and contractors, arising out of or in connection with the performance of the Defined Services or [his Agreement. This indemnity provision does not include any claims, damages, liability, costs and expenses (including without limitations, attorneys fees) arising from the sole negligence or sole willful misconduct of the City, its officers, employees. Also covered is liability arising from, connected with, caused by or claimed [o be caused by the active or passive negligent acts or omissions of [he City, its agents, officers, or employees which may be in combination with the active or passive negligent acts or omissions of [he D/B, its employees, agents or officers, or any third party. 25.2 Professional Services. For [hose professionals who are required to be licensed by the state (e.g. architects, landscape architects, surveyors and engineers) ("Design Professionals"), Design Professionals shall defend, indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner arising out of, pertaining [o, or relating to any negligence, errors or omissions, recklessness, or willful misconduct of Design Professional, its officials, officers, employees, agents, D/Bs, and contractors arising out of or in connection with the performance of the Design Professional's Services. Also covered is liability arising from, connected with, caused by, or claimed to be caused by the active or passive negligent acts or omissions of the City, its agents, officers, or employees which may be in combination with [he active or passive negligent acts or omissions of the Design Professional, its employees, agents or officers, or any third party. The Design Professional's duty to indemnify, protect and hold harmless shall not include any claims or liabilities arising from the sole negligence or sole willful misconduct of the City, its agents, officers or employees. This section in no way alters, affects or modifies the Design Professional's obligation and duties under this Agreement. 25.3 Indemnification for Liens and Stoo Notices. The D/B shall keep the Project and Property free of any mechanic's Liens and immediately secure the release of any stop notices. The D/B shall defend, indemnify, protect, and hold harmless, the City, its agents, officers and employees from and against any and all liability, claims, costs, and damages, including but not limited [o, attorney fees, arising from or attributable to a failure to pay claimants. D/B shad be responsible for payment of all persons entitled to assert liens and stop notices. 25.4 Indemnification for Hazardous Materials. D/B agrees to defend, indemnify, and hold harmless, the City, its agents, officers and employees from and against any and all costs, damages, claims; and liabilities, including reasonable attorney fees, foreseeable or unforeseeable, directly or indirectly, arising from or telated to the Hazardous Materials identified in the Phase I or Phase Il Reports, if any, conducted pursuant to Article V. D/B's indemnity shall survive the close of escrow. Seller expressly preserves its rights against other parties and does not release, or waive its rights to contribution against, any other party. 25.5 Costs of Defense and Award. Included in the obligations in Sections 25.1 through 25.4, above, is the D/B's obligation to defend, at D/B's own cost, expense and risk, any and all aforesaid suits, actions or other legal proceedings of every kind that may be brought or instituted against [he City, its directors, officials, officers, employees, agents and/or volunteers. D/B shall pay and satisfy any judgment, award or decree that may be 26 6-70 rendered against City or its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expense and cost incurred by each of them in connection therewith. 25.6 Insurance Proceeds. D/B's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials, officers, employees, agents, and/or volunteers. 25.7 Enforcement Costs. DB agrees [o pay any and all costs City incurs enforcing the indemnity and defense provisions set forth in this Article XXV. 25.8 Survival. Consultant's obligations under this Article XXV shall survive the termination of this Agreement. ARTICLE XXVI. INSURANCE 26.1 General. DB shall not begin work under this Agreement until it has: (i) obtained, and upon the City's request provided to the City, insurance certificates reflecting evidence of all insurance required in section 26.2; (ii) obtained City approval of each company or companies; and (iii) confirmed that all policies contain the specific provisions required by section 26.4. 26.2 Tvnes of Insurance. At all times during the term of this Agreement, D/B shall maintain insurance coverage as follows: 26.2.1 Commercia/Genera/Liability. Contractor shall provide at its expense a policy or policies of Commercial General Liability [CGL] Insurance written on an ISO Occurrence form CG 00 01 07 98 or an equivalent forth providing coverage at least as broad and which shall cover liability arising from premises and operations, XCU (explosions, underground, and collapse) independent contractors, products/completed opemtions, personal injury and advertising injury, bodily injury, property damage, and liability assumed under an insured's contract (including the tort liability of another assumed in a business contract). There shall be no endorsement or modification of the CGL Insurance limiting the scope of coverage for either "insured vs. insured" claims or contractual liability. Contractor shall maintain the same or equivalent CGL Insurance as described herein for at least ten (10) years following substantial completion of [he work. All costs of defense shall be outride the policy limits. The Policy shall provide for coverage in amounts not less than one million dollars ($1,000,000) per occurrence for Bodily Injury, Personal Injury, or Property Damage. If Commercial General Liability Insurance or other form with a general aggregate limit shall apply separately to this projecUlocation, the general aggregate limit shall be twice the required occurrence limit. Can be reducedlo /MilLFDB prov<der ~rcesrLia6ilityminimum limi!! MZ JJG /11709 26.2.2 CommeicialAu~omobi/e Liab<liry. For all of D/B's automobiles used in conjunction with the Project including owned, hired and non-owned automobiles, D/B shall keep in full force and effect, a policy or policies of Commercial Automobile Liability Insurance written on an ISO form CA 00 Ol 12 90 or a later version of this form or equivalent form providing coverage at least as broad in the amount of one million dollars ($1,000,000) combined single limit per occursence, covering bodily injury and property damage for owned, non-owned and hired automobiles ["Any Auto"]. All costs of defense shall be outside the policy. 26.2.3 Archi~ecls andFngineers ProjessionalLiability. For all of DB's employees who are subject [o this Agreement, DB shall keep in full force and effect, or D/B shall require that its architect/engineer(s) of record keep in full force and effect errors and omissions insurance providing coverage for professional liability with a combined single limit of one million dollars ($1,000,000) per claim and two million dollars ($2,000,000) annual aggregate. DB shall ensure both that (i) this policy retroactive date is on or before the date of commencement of the Project; and (ii) this policy has a reporting period of three (3) years after [he date of completion or termination of this Agreement. D/B agrees that for the time period defined above, there will be no changes or endorsements to the policy that increases the City's exposure to loss. N/A 26.2.4 Excesr L<obi!<ty. DB shall provide Excess Liability Insurance affording two million dollars ($2,000,000) in excess of General Liability and Employer's Liability limits afforded on primary policies. The coverage will be subject to the same terms, conditions, and exclusions found in the primary policies. 26.2.4 Can be eliminated/FCGL Limit irprovideda/Z~L ./J'Gl1 /709 27 6-71 26.2.5 Contraclorr Po!luUon Liability. If the D/B or its Contractors' Work includes cleanup, removal, storage, or otherwise handling of hazardous or toxic chemicals, materials, substances, or any other pollutants, Contractor shall provide at their expense Contractors Pollution Liability Insurance appropriate to cover such activities in an amount not less than $3,000,000 Combined Single Limit per occurrence/aggregate for bodily injury, property damage and remediation. OKto accept /Mi! Jl'G 121709 26.2.5.1 Claims made policies will include a five (5) year Extended Claims Discovery Period applicable to this Agreement, if reasonably available. N/A 26.2.5.2 The policy for this insurance shall include Contractual Liability coverage. Such policy shall be endorsed [o specifically provide for Work performed under the Agreement. N/A 26.2.5.3 The D/B or its Contractors of any tier shall fumish to the City a policy or Certificate of Contractors Pollution Liability Insurance in which the City, its elected and appointed officers, employees, and agents, and the DB are named as additional insureds. The policy or Certificate must plainly designate the name of [he Project, name of the Disposal -Site, and the permits secured for its disposal. This Certificate must be furnished to the City, evidencing compliance with the outlined requirements, prior to [he D/B or Contractor beginning their Work on the Project. Any failure ro furnish this policy or Certificate of Insurance shall not relieve the D/B or Contractor from their obligations under this Section. N/A. 26.2.6 Hazardous Transporters Pol@dionLiobility. If the D/B's or its contractors' Work includes transportation of hazardous or toxic chemicals, materials, substances or any other pollutants [he DB or its Contractor of any tier shall provide, at their expense, Transporters Pollution Liability Insurance in an amount not less than $3,000,000 Combined Single Limit per occurrence/Aggregate for bodily injury, property damage and remediation. N/A 26.2.6.1 Claims Made policies will include a five (5) year Extended Claims Discovery Period applicable to this Agreement, if reasonably available. N/A 26.2.6.2 Such policy shall be endorsed to specifically provide coverage for Work performed under [his Agreement. The D/B or its contractors of any tier shall furnish the City with a policy or Certificate of Hazardous Transporters Pollution Liability Insurance in which [he City, its elected and appointed officers and employees, and agents, the D/B, and any upper tiered contractor are named additional insureds. N/A 26.2.6.3 The policy or Certificate must plainly designate the name of the Project, name of the Disposal Site, and the permits secured for its disposal This Certificate must be furnished to the City, evidencing compliance with the outlined requirements, prior to the D/B or Contractor beginning their Work on the Project. Any failure to fumish this policy or Certificate of Insurance shall not relieve the DB or Contractor from their obligations under this Section. N/A 26.2.7 <Yorker:r Compensatiors. For all of D/B's employees who are subject to this Agreement and to the extent required by the State of California, DB shall keep in full force and effect, a Workers' Compensation Insurance and Employers' Liability Insurance to protect DB against all claims under applicable state workers' compensation laws. The City, its elected officials, and employees will not be responsible for any claims in law or equity occasioned by the failure of the DB to comply with the requirements of [his section. That policy shall provide at least the statutory minimums of one million ($1,000,000) for Bodily Injury by Accident for each accident, one million dollars ($1,000,000) for Bodily Injury by Disease each employee, and a one million dollars ($1,000,000) for Bodily Injury by Disease policy limit 26.2.7. I Prior to the execution of the Agreement by the City, the DB shall file the following signed certification: "I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for worker's compensation or to undertake self- 28 6-72 insurance, in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of the Contract." 26.2.8 Builders Risk To the extent commercially available the Citv shall provide a policy of"all risk" Builders Risk Insurance. Coverage will be provided for the Replacement Cost of Materials, Equipment and Fixtures destined to become a permanent part of [he structure, and coverage will include Property in Transit and Property in Offsite Storage. The limit for [his policy shall be a minimum of $ (,967,571.00 (GMP dollar amount to reflect project soft and hard costs} It shall be DB's responsibility to bear the expense of any deductible ($ 10,000.00). The Builders Risk coverage shall expire at the time such insured property is occupied by City, or a Notice of Completion is filed, whichever occurs first. Contractor and its Subcontractors will be solely responsible for any loss or damage to their personal propeRy, including contractor's tools and equipment owned, used, leased or rented by the Contractor or Subcontractor. 26.3 Ratine Requirements. Except for State Compensation Insurance Fund, all insurance required by express provision of this Agreement shall be carried only by responsible insurance companies that have been given at least an "A" or "A--" and "V" rating by AM BEST, that are authorized by the California Insurance Commissioner to do business in the State of California, and that have been approved by the City. 26.3.1 Non AdmlrledCarders. The City will accept insurance provided by non-admitted, "surplus lines" carriers only if [he carrier is authorized to do business in the State of California and is included on the List of Eligible Surplus Lines Insurers [LESLI list] with a current AM BEST rating of no less than A:X. 26.4 Endorsements Required. Each policy required under Article XXVI, section 26.2 of this Agreement shall expressly provide, and an endorsement shall be submitted to the City, that: 26.4.1 Addilionallnruiedr. Except as to Architects and/or Engineers professional liability insurance and Workers Compensation, the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives shall be named as additional insureds. 26.4.1.1 Commercial General Liability. The policy or policies must be endorsed to include as an Additional Insured the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives. Liability Additional Insured Endorsement must be provided on ISO forth CG 2010 (11/85) or equivalent, specifically, coverage afforded City must be Primary and must not exclude Completed Operations. The coverage for Projects for which the Engineer's Estimate is one million dollars ($1,000,000) or more shall include liability arising out of: (i) Ongoing operations performed DB or on DB's behalf, (ii) D/B's products, (iii) D/B's work, including but not limited to completed operations performed by D/B or on D/B's behalf, or (iv) premises owned, leased, controlled, or used by D/B; the coverage for Projects for which the Engineer's Estimate is less than one million dollars ($1,000,000) shall include liability arising out of (i) Ongoing operations performed by D/B or on D/B's behalf, (ii) DB's products, work, including but not limited to completed operations performed by D/B or on D/B's behalf, or (iii) premises owned, leased, controlled, or used by you; Except that in connection with, collateral to, or affecting any construction contract to which the provisions of subdivision (b) of Section 2782 of the California Civil Code apply, these endorsements shall not provide any duty of indemniTy coverage for [he active negligence of the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives in any case where an agreement to indemnify the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives would be invalid undersubdivision (b) of Section 2782 of the California Civil Code. In any case where a claim or loss encompasses the negligence of [he Insured and the active negligence of the City of City of Chula V ista and its respective elected officials, officers, employees, agents, and representatives that is not covered because of California Insurance Code Section 11580.04, the insurer's obligation to [he City of San Chula Vista and its respective elected officials, officers, employees, agents, and representatives shall be limited to obligations permitted by Califomia Insurance Code Section 11580.04. 29 6-73 26.4.1.1 Commercial Automobile Liability Insurance. Unless the policy or policies of Commercial Auto Liability Insurance are written on an ]SO form CA 00 Ol 12 90 or a later version of this form or equivalent form providing coverage at least as broad, the policy or policies must be endorsed to include as an Additional Insured the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives, with respect [o liability arising out of automobiles owned, leased, hired or borrowed by or on behalf of the Contractor; Except that in connection with, collateral to, or affecting any constmction convact to which the provisions of subdivision (b) of Section 2782 of the California Civil Code apply, this endorsement shall not provide any duty of indemnity coverage for the active negligence of the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives in any case where an agreement to indemnify the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives would be invalid under subdivision (b) of Section 2782 of the Califomia Civil Code. In any case where a claim or loss encompasses the negligence of the Insured and the active negligence of the City of Chula Vista and its respective elected of£cials, officers, employees, agents, and representatives that is not covered because of California Insurance Code Section 11580.04, the insurer's obligation [o the City of Chula V ista and its respective elected officials, officers, employees, agents, and representatives shall be limited to obligations permitted by California Insurance Code Section 11580.04. 26.4.2 PrlmaryandNon-Contributory. The policies are primary and non-contributing to any insurance or self-insurance that may be carried by the City of Chula Vista, its elected officials, officers, employees, agents, and representatives with respect to operations, including the completed operations if appropriate, of the Named Insured. Any insurance maintained by the City of Chula V ista and its elected officials, officers, employees, agents, and representatives shall be in excess of DB's insurance and shall not contribute [o it. 26.4.3 lYalver ojSubroga!lon. Consultant's insurer will provide a Waiver of Subrogation in favor of the City for each required policy providing coverage for [he term required by this Agreement. 26.4.4 Project CenerolAggregale Limit The CGL policy or policies must be endorsed to provide a Designated Construction Project General Aggregate Limit that will apply only to the Work performed under this Agreement. Claims payments not arising from the Work shall not reduce the Designated Construction Project General Aggregate Limit. The Designated Construction Project General Aggregate Limit shall be in addition to the aggregate limit provided for the products-completed operations hazard. 26.4.5 Nrr!llenNo!!ee Except as provided for under Califomia law, the policies cannot be canceled, non- renewed or materially changed except after thirty (30) Calendar Days prior written notice by DB to the City by certified mail, as reflected in an endorsement which shall be submitted to the City, except for non-payment of premium, in which case ten (10) Calendar Days notice shall be provided. 26.4.5.1 The words "will endeavor" and "but failure to mail such notice shall impose no obligation or liability of any kind upon [he company, its agents, or representatives" shall be deleted from al! certificates. 26.4.6 Additionn//nsuionee. DB may obtain additional insurance not required by this Agreement. 26.4.7 Prior to Starling !York Before performing any work, D/B shall provide the City with all Certificates of Insurance accompanied by all endorsements. 26.5 Subcontractors. All coverages for subcontractors or subconsultants shall be subject to all of the requirements stated herein. Subcontractors and subconsultants shall be protected against risk of loss by maintaining insurance in [he categories and at the limits required herein. Subcontractors and subconsultants shall name City and DB as additional insureds under its policies. 26.6 Oblisation to Provide Documents. The D/B shall provide copies of documents including but not limited to certificates of insurance and endorsements, and shall furnish renewal documentation prior to expiration of insurance. Each required document shall be signed by the insurer or a person authorized by the insurer to bind 30 6-74 coverage on its behalf. The City reserves the right to require complete, certified copies of all insurance policies required herein. 26.6.1 Cooperation. The D/B and its Contractors shall cooperate fully with and provide any information or records requested by the City or regarding all aspects of the insurance and project, including but not limited to claims, audit, payroll, insurance records and safety. Delays in reporting information to the City may result in delays in progress payments to the DB. 26.7 Deductibles/Self Insured Retentions. All deductibles and self-insurance retentions on any policy shall be the responsibility of DB~. Deductibles and self-insurance retentions shall be disclosed to and approved by the City at the time [he evidence of insurance is provided. At the option of [he City, either. [he insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the D/B shall provide a financial guarantee satisfactory to the City guaranteeing payment of losses and related investigations, claim administration and defense expenses. 26.8 Policy Chances. D/B shall not modify any policy or endorsement thereto which increases [he City's exposure to loss for the duration of this Agreement. 26.9 Reservation of Riehts. The City reserves the right, from time to time, to review the Contractor's insurance coverage, limits, deductible and self-insured retentions to determine if they are acceptable to the City. The City will reimburse [he Contractor for the cost of the additional premium for any coverage requested by the City in excess of that required by this Agreement without overhead, profit, or any other markup. 26.10 Not a Limitation of Other Obligations. Insurance provisions under this section shall not be construed to limit the DB's obligations under [his Agreement, including Indemnity. 26.1 l Material Breach. Failure to maintain, renew, or provide evidence of renewal during the term of this Agreement may be treated by the City as a material breach of convact. ARTICLE XXVII. TERMINATION/SUSPENSION OF WORK 27.1 Suspension of Work for Archaeological and/or Paleontological Discoveries. If a discovery is made of an archaeological or paleontological interest, D/B shall immediately cease operations in the area of the discovery and shall no[ continue until ordered by City. When resumed, operations within the area of the discovery sha(I be as directed by City. 27.1.1 Discoveries which may be encountered may include, but aze not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, fossils or any item with cultural significance. 27.1.2 D/B shall be entitled to an extension of time and compensation in accordance with the provisions of this Agreement. 27.2 Termination of Aereement by Ciri for Cause. If, through any cause, D/B shall fail [o fulfill in a timely and proper manner D/B's obligations under this Agreement, or if D/B shall violate any of the covenants, conditions, agreements or stipulations of this Agreement, City shall have the right to terminate [his Agreement by giving written notice to DB of such termination and specifying the effective date thereof a[ least five (5) Calendar Days before the effective date of such termination. 27.3 Termination or Suspension for Convenience by City. City may terminate or suspend this Agreement at any time and for any reasoq by giving specific written notice [o D/B of such termination or suspension and specifying the effective date thereof, at least seven (7) Calendar Days before the effective date of such suspension or termination. In the even[ of an emergency, advance notice shall not be required under this provision. 27.4 Termination of Aereement by DB. D/B may terminate [he Agreement upon ten (10) days written notice [o Ciry, whenever either of the following occur 27.4.1 Projec/Suspercrion. If the Project has been suspended under the provisions of Section 27.1 or 27.3, for more than ninety (90) consecutive days through no fault or negligence of D/B, and notice to resume Work or to terminate [he Agreement has not been received from City within this time period; or, 31 6-75 27.4.2 Failure to PayAmounls Due andNol in Dispute. If City fails to pay DB any monies due and not in dispute in accordance with the terms of this Agreement within ninety (90) Calendar Days, plus the ten (10) Calendar Days afforded the City to remedy the failure, afrer presentation to City by D/B of a request therefore. 27.5 DB Action Required. Upon receipt of the Notice of Termination, D/B shall take any and al] action that may be necessary, or that the City Manager may direct, for the protection and preservation of the property related to this Agreement that is in the possession of DB and in which City has or may acquire an interest. 27.6 Possession Ownership, and Control of Documents. [n the event that this Agreement is terminated in accordance with Sections 27.2 through 27.4, al] finished or unfinished documents, data, studies, drawings, maps, plans, specifications, reports and other materials prepared by D/B, or any of its agents, Design Consultants or Subcontractors, shall, at [he option of the City, become the sole and exclusive property of the City. 27.7 City Ris;ht to Complete Project. In the event that the Agreement is terminated pursuant to this Article XXVII, City may take possession of the Project and may complete the Project by whatever method or means City may select. 27.7.1 E.rcess Coss. In the.event that the costs to complete the Project exceed the balance of funds, which had the Project been completed in accordance with [his Agreement would have been due, the D/B shall be liable for and pay such excess costs to the City. 27.8 Payment to DB Due to Termination. Upon termination, D/B shall be entitled to receive just and equitable compensation for satisfactory Work completed. In no event shall such amount exceed the total dollar amount authorized by City, reduced by the amount of payments previously made and any deductions permitted herein. The fair and reasonable amount shall be determined in goad faith by Director of Public Works considering the following: 27.8.1 The price for completed services accepted, including any retention, by City not previously paid. 27.8.2 The costs incurred in the performance of the Project terminated, including initial costs and preparatory expense allocable thereto. These costs are only for Work completed and accepted by the City based on an audit of all Contractors' bills of materials and the timecards for Work actually performed. 27.8.3 A portion of the DB Fixed Fee (overhead and profit) based on the percentage of Work completed on the Project; however, if D/B would have sustained a loss on the entire Agreement had it been completed, City shall allow no profit under this section and shall reduce the amount payable to reflect the indicated rate of loss. 27.8.4 D/B and Design Subcontractor services through the date of termination based on actual time spent as documented on timecards. Expenses shall be paid based on invoice and receipts provided by D/B. 27.8.5 Any amounts for Work or Services agreed to by the City Manager and D/B, but without duplication of any amounts agreed to above. 27.8.6 Reasonable demobilization costs, to the effective date of such [ertnination. 27.8.7 If termination occurs during Phase I, II, or III, DB shall only be entitled to the Fees for Phases I, II, or III, associated [herewith, or the respective portion thereof. 27.9 Lost Profits. Under no circumstances will D!B be entitled to any consideration for lost profit or lost opportunity costs. 27.lODeductions. The amount due D/B shall be reduced by amounts including the following: 27.10.1 Any claim that City has against D/B under this Agreement. 27.10.2 The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by DB or sold under the provisions of this clause and not recovered by or credited to City. 27.10.3 Damages caused by D/B's breach, including Excess Costs pursuant to Section 27.7.1. 32 6-76 27.10.4 Property Destroyed, Lost, Stolen or Damaged. Except to the extent that City expressly assumed the risk of loss, the City Manager shall exclude from [he amounts payable [o D/B, the fair value, as determined by the City Manager, of property that is destroyed, lost, stolen, or damaged so as to become undeliverable to City. 27.I lDisputes. If DB does not agree with the determination of the Director of Public Works, D/B shall promptly, but in no event later than 30 calendar days after the event(s) giving rise to the Claim, receipt of notice of such determination, or payment therefore, whichever is earlier, shall deliver the Claim to the City. The dispute shall be resolved in the manner provide for below: 27.1 ].l Claim. DB shall submit a Claim to City if a dispute occurs that arises from or relates to the Contract. The Claim shall be in writing and identify all relief to which DB asserts it is entitled as a result of the event(s) giving rise to the dispute. D/B shall substantiate all Claims, and shall process all Claims in accordance with this Section 27.11. All Claims are subject to the City's right to audit pursuant to Section 28.2. DB shall continue to perform the Services and the Work and maintain the Project Schedule during any dispute proceedings and City shall continue to make payments for undisputed Services and Work. 27.11.2 Delerminalion ofCloim. Within 30 days of receipt of a Claim, City will deliver a Final Determination to D/B. City shall not consider and will return to DB any written demand that does not conform to the requirements of Seclion 27.11. 27.11.3 Adminisrra~ive Appeal If D/B disagrees with a Final Determination, the Parties shall proceed as follows: 27.11.3.1 D/B shall submit a written appeal to City within 30 days of receipt of the Final Determination, which shall include the justification for the appeal. 27.11.3.2 Within I S days of receipt of D/B's appeal, City will schedule a Settlement Meeting/Administrative Hearing. D/B will have an opportunity to present the Claim to the Dispute Resolution Board [DRB] consisting of senior management at City. If a settlement agreement cannot be reached, the DRB will make a written determination on the issues presented. 27.11.3.3 The DRB shall make a written determination within 30 days after the Settlement Meeting/Administrative hearing. The DRB's determination shall be final and binding on D/B unless D/B submits to City a written objection within 30 days after receipt of DRB's determination. D/B's failure to submit an objection within that 30 day period shall constitute a waiver of D/B's right to pursue the Claim. If D/B submits a timely objection, the Parties shall proceed in accordance with 27.11.4 Failure/o Prosecrrle Claim arzd fYaiver. DB's failure to process a Claim in accordance with this Section shall constitute a waiver any and all claims for damages, compensation, or relief arising under this Agreement for amy and all Work and Services associated with the dispute. With respect to an event of termination, failure of D/B to dispute amounts paid in the manner and within the timeframe provided in this Seclion 27.1 I shall act as a waiver of any and all claims For damages or compensation arising under this Agreement for any and all Work and Services performed under this Agreement up [o [he effective date of Notice of Termination. D/B hereby expressly acknowledges and agrees that all such claims under this Section shall be waived as herein provided. 27.12Ri¢hts of City Preserved. In the event that the Agreement has been terminated, the termination shall not affect any rights or remedies of City against DB then existing or which may thereafter accme. Any retention or payment of moneys due DB by City will not release D/B from liability. It is agreed that termination hereafter will not in any way release, waiver, or abridge any rights the City has against D/B's performance bond surety. ARTICLE XVIII. RECORDS AND AUDITS 28.1 Record Svstem - Reimburseable Costs. DB shall develop and maintain an accurate system for tracking all Reimbursable Costs. Utilizing this system, DB shall include with each month payment application an 33 6-77 itemization of all such Reimbursable Costs actually incurred by D/B, during the previous month. If requested by the City, D/B shall provide all backup documentation supporting such Reimbursable Costs. 28.2 Record Svstem -Hard Construction Costs. DB shall develop and maintain an accurate system for tracking all Hard Construction Costs it incurs on the Project. Utilizing [his system, D/B shall include with each monthly application for payment an itemization of all Hard Construction Costs actually incurred by DB during the previous month. 28.3 Retention of Records. D/B, contractors, and subcontractors shall maintain data and records related to this Agreement for a period of not less than three (3) years following receipt of final payment under this Agreement or three (3) years following final settlement associated with the termination ofthis Agreement pursuant to Article XXVII, above. 28.4 Audit of Records. At any time during normal business hours, during the term of the contract plus and record retention period and as often as the City deems necessazg D/B and any or all Contractors or subcontractors shall make available to the CiTy For examination at reasonable locations within the City/County of San Diego all of the data and records with respect to all matters covered by this Agreement. DB and all contractors or subcontractors will permit the City to make audio of all invoices, materials, payrolls, records of personnel, and other data and media relating to all matters covered by this Agreement. If records are not made available within the City/County of San Diego, [hen D/B shall pay all [he CiTy's travel related costs [o audit the records associated with this Agreement at the location where the records aze maintained. Such costs will not be Reimbursable Costs. 28.2.1 Casts D/B and DB's agents shall allow City to audit and examine books, records, documents, and any and all evidence and accounting procedures and practices that City determines are necessary to discover and verify all costs of whatever nature, which aze claimed to have been incurred, anticipated to be incurred, or for which a claim for additional compensation or for Extra Work have been submitted under this Agreement. ARTICLE XXIX. NOTICES 29.1 W ruin .Any demand upon or notice required or permitted to be given by one Party to the other Party shall be in writing. 29.2 Effective Date. Except in relation to Change Orders as provided for in Article 13 or as otherwise provided by law, any demand upon or notice required or permitted [o be given by one Party to the other Party shall be effective: (i) on personal delivery, (ii) on the second business day after mailing by certified or registered U.S. Mail, re[um receipt requested, (iii) on the succeeding business day after mailing by Express Mail or after deposit with a private delivery service of general use (e.g., Federal Express) postage or fee prepaid as appropriate, or (iv) upon successful transmission of facsimile. 29.3 Recipients. Except in relation to Change Orders, all demands or notices required or permitted to be given shall be sent to all of the following: 29.3. ( Jim Filano, Southem Contracting Company 29.32 City of Chula Vista-Gordon Day, Project Manager 29.3.3 (Reserved) 29.4 Recipients of Chanee Orders. 29.4.1 Jim Filanc, Southem Contracting Company 29.4.2 29.4.3 29.5 Chanee of Address(esl. Notice of change of address shall be given in the manner set forth in this Article. 34 6-78 ARTICLE XXX. MISCELLANEOUS PROVISIONS 30.1 Headings. All article headings are for convenience only and shall no[ affect the interpretation of this Agreement. 30.2 Gender & Number. Whenever the context requires, the use herein of (i) the neuter gender includes the masculine and the feminine genders and (ii) the singular number includes [he plural number. 30.3 Reference to Paragraphs. Each reference in this Agreement to a section refers, unless otherwise stated, to a section in this Agreement. 30.4 Incorporation of Recitals. All recitals herein are incorporated into this Agreement and are made a part hereof. 30.5 Covenants and Conditions. All provisions of this Agreement expressed as either covenants or conditions on the part of the City or the Consultant, shall be deemed to be both covenants and conditions. 30.6 Integration. This Agreement and the Exhibits and references incorporated into this Agreement fully express all understandings of the Parties concerning the matters covered in [his Agreement. No change, alteration, or modification of the terms or conditions of this Agreement, and no verbal understanding of the Parties, their officers, agents, or employees shall be valid unless made in the form of a written change agreed to in writing by both Parties or an amendment to this Agreement agreed to by both Parties. All prior negotiations and agreements are merged into this Agreement. 30.7 Severability. The unenforceability, invalidity, or illegality of any provision of this Agreement shall not render any a other provision of this Agreement unenforceable, invalid, or illegal. 30.8 Drafting Ambiguities. The Parties agree that they are aware [ha[ they have the right to be advised by counsel with respect to the negotiations, terms and conditions of this Agreement, and the decision of whether or not to seek advice of counsel with respect [o this Agreement is a decision, which is [he sole responsibility of each Party. This Agreement shall not be construed in favor of or against either Party by reason of the extent to which each Party participated in the drafting of the Agreement. 30.9 Conflicts Between Terms. If an apparent conflict or inconsistency exists between the main body of this Agreement and the Exhibits, the main body of this Agreement shall control. If a conflict exists between an applicable federal, state, or local law, rule, regulation, order, or code and this Agreement, the law, rule, regulation, order, or code shall control. Varying degrees of stringency among the main body of [his Agreement, the Exhibits, and laws, rules, regulations, orders, or codes are not deemed conflicts, and the most stringent requirement shall control. Each Party shall notify the other immediately upon the identification of any apparent conflict or inconsistency concerning this Agreement. 30.10 Prompt Performance. Time is of the essence of each covenant and condition set forth in this Agreement. 30.I 1 Good Faith Performance. The parties shall cooperate with each other in good faith, and assist each other in the performance of the provisions of [his Agreement. 30.12 Further Assurances. City and D/B each agree to execute and deliver such additional documents as may be required to effectuate the purposes of this Agreement. 30.13 Exhibits. Each of the following Exhibits is attached hereto and incorporated herein by this reference: Exhibit A - List of sites and proposed schedule of values Exhibit B - Contract Terms and Requirements as specified in the RFP. All Federal Stimulus Plan Requirements (EECBG Special Terms and Conditions). Exhibit C - Southern Contracting Company RFP 30.14 Compliance with Controlling Law. The Consultant shall comply with all laws, ordinances, regulations, and policies of the federal, state, and local governments applicable to this Agreement, including California Labor Code section 1720 as amended in 2000 relating to the payment of prevailing wages during the design and preconstruction phases of a project, including inspection and land surveying work. In addition, the Consultant 35 6-79 shall comply immediately with all directives issued by the City or its authorized representatives under authority of any laws, statutes, ordinances, rules, or regulations. The laws of the State of Califomia shall govern and control [he terms and conditions of this Agreement. 30. U Jurisdiction. Venue, and Attorney Fees. The venue for any suit or proceeding concerning [his Agreement, the interpretation or application of any of its terms, or any related disputes shall be in the County of San Diego, State of California. The prevailing Party in any such suit or proceeding shall be entitled to a reasonable awazd of attorney fees in addition to any other award made in such suit or proceeding. 30.16 Municipal Powers. Nothing contained in this Agreement shall be construed as a limitation upon the powers of the City es a chartered city of the State of Califomia 30.17 Administrative Claims Requirements and Procedures. No suit or arbitration shall be brought arising out of this agreement, against the City unless a claim has first been presented in writing and Fled with the City and acted upon by the City in accordance with the procedures set forth in Chapter 1.34 of the Chula V ista Municipal Code, as same may from time to time be amended, the provisions of which are incorporated by this reference as if fully se[ forth herein, and such policies and procedures used by the City in the implementation of same. Upon request by City, Consultant shall meet and confer in good Faith with City for the purpose of resolving any dispute over the terms of this Agreement. 30.18 Third Party Relationships. Nothing in this Agreement shall create a contractual relationship between City and any third party; however, the Parties understand and agree that City, to the extent pepnitted by law, is an intended third party beneficiary of all D/B's contracts, purchase orders and other contracts between D/B and third party services. D/B shall incorporate this provision into its contracts, supply agreements and purchase orders. 30.19 Non-Assienment. The DB shall not assign the obligations under this Agreement, whether by express assignment or by sale of the company, nor any monies due or to become due, without the City's prior written approval. Any assignment in violation of this paragraph shall constitute a Default and is grounds for immediate termination of this Agreement, at the sole discretion of the City. In no event shall any putative assignment create a contractual relationship between the City and any putative assignee. 30.20 Successors in Interest. This Agreement and all rights and obligations created by this Agreement shall be in force and effect whether or not any Parties to the Agreement have been succeeded by another entity, and all rights and obligations created by this Agreement shall be vested and binding on any Party's successor in interest. 30.21 Independent Contractors. The D/B, any consultants, contractors, subcontractors, and any other individuals employed by [he D/B shall be independent contractors and not agents of the City. Any provisions of this Agreement that may appear to give the Ci[y any right to direct the D/B concerning the details of performing the Services under this Agreement, or to exercise any control over such performance, shall mean only that the DB shall follow the direction of the City concerning the end results of the performance. 3022 Approval. Where the consent or approval of a party is required or necessary under this Agreement, the consent or approval shall not be unreasonably withheld. 30.23 No Waiver. No failure of either the City or the Consultant to insist upon the strict performance by the other of any covenant, term or condition of this Agreement, nor any failure to exercise any right or remedy consequent upon a breach of any covenant, term, or condition of this Agreement, shall constitute a waiver of any such breach of such covenant, term or condition. No waiver of any breach shall affect or alter this Agreement, and each and every covenant, condition, and term hereof shall continue in full force and effect to any existing or subsequent breach. 30.24 Sienina Authority. The representative for each Party signing on behalf of a corporation, pazthership, joint venture or governmental entity hereby declares [hat authority has been obtained to sign on behalf of the corporation, partnership, joint venture, or entity and agrees to hold the other Party or Parties hereto harmless if it is later determined that such authority does not exist. 36 6-80 EV WITNESS WHEREOF, this Agreement the City of Chula Vista and Southern Contracting Company have executed this Agreement thereby indicating that they have read and understood same, and indicate their full and complete consent to its terms. This Agreement is dated , 2010 and [his date shall constitute the effective date of this Agreement. CITY OF CHULA VISTA, A Municipal Corporation Southern Contracting Company By: B ' CHERYL COX, Mayor TIMOTH CBRIDE, Owner Attest: DONNA NORRIS, City Clerk Approved as to form and legality: ey: BART MIESFELDS, City Attorney 37 6-81 EXHIBIT A 38 s-a2 AIA Type Document Applicafion and Certification for Payment Page 1 of 2 TO (OWNER): CITY OF CHULA VISTA 276 FOURTH AVE CHULA VISTA CA 91910 FROM (CONTRACTOR): Southern Contractlng Company 559 N. Twin Oaks Valley RD. San Marcos, CA 920fi9 CONTRACT FOR: PROJECT: STREET LIGHT DB RETROFIT VIA (ARCHITECT): APPLICATION NO: 1 PERIOD 70:525/2010 ARCHITECTS PROJECT NO: 87252 CONTRACT DATE: DISTRIBUTION TO: OWNER _ ARCHITECT CONTRACTOR 01 W CONTRACTOR'S APPLICATION FOR PAYMENT Applicafion is matle for Payment, as shown below, in con nection with the Contract Contnuafion Sheet, AIA Type Document is attached. 1. ORIGINAL CONTRACT SUM ................... . $ 1,967,571.00 2. Net Change by Change Orders ............... . $ 0.00 3. CONTRACT SUM TO DATE (Line 1 + 2). , ........ . $ 1,9fi7,571.00 4. TOTAL COMPLETED AND STORED TO DATE ..... . $ 0.00 5. RETAINAGE: a. 0.00 % of Completed Work $ 0.00 b. 0.00 % of Stored Material $ 0.00 Total relainage (Line Sa + 5b) ................... . $ 0.00 6. TOTAL EARNED LESS RETFJNAGE ............. . $ 0.00 (line 41ess Line 5 Total) 7. LESS PREVIOUS CERTIFICATES FOR PAYMENT (Line 6 from prior Certificate) ................... .. $ 0.00 B. CURRENT PAYMENT DUE ..... .............. .. $ 0.00 9. BALANCE TO FINISH, INCLUDING RETAINAGE (Line 31ess Line 6) $ 1,967,571.00 CHANGE ORDER SUMMARY ADDITIONS DEDUCTIONS Total changes approved in previous months by Owner 0.00 0.00 Total approved this Month 0.00 0.00 TOTALS 0.00 0.00 NET CHANGES by Change Order 0.00 The Undersigned Contractor certifies that to the best of the Contractor's knowledge, information and belief the work covered by this application for Payment has been completed in accordance with the Contract Documents, that all amounts have been paid by the Contractor for Work for which previous Cerfificales for Payment were issued and payments received from the owner, and that current payment shown herein is now due. CONTRACTOR: Southern Contractlng Company 559 N. Twin.Oaks Valley RD. San Marcos, CA 92069 By Timothy R. McBride /President State of. County of. Subscribed and Sworn to before me this Notary Public: My Commission Expires Day of 20 ARCHITECT'S CERTIFICATE FOR PAYMENT In Accordance with the Contract Documents, based on on-site observations and the data com- prising the above application, the Architect certifies to owner that to the best of the Architects knowledge, information and belief the Work has progressed as indicated,lhe quality of the work is in accordance with the Contract Documents, and the Contractor is entitled to payment of the AMOUNT CERTIFIED. AMOUNT CERTIFIED .. ............................. $ (Attach explanation if amount certified differs from the amount applied. Initial all ligures on this Application and on the Continuation Sheet that are changed to conform to the amount certified.) ARCHITECT: gy Date: This Certficate is not negofiable. The AMOUNT CERTIFIED is payable only to the Contractor named herein. Issuance, Payment and acceptance of payment are without preNdice to any rights of the Owner or Contractor under this Contract. Date: 07 TO (OWNER): CITY OF CHULA VISTA 276 FOURTH AVE CHULA VISTA CA 91910 FROM (CONTRACTOR): Southern Contracting Company 559 N. Tenn Oaks Valley RD. San Marcos, CA 92069 CONTRACT FOR: AIA Type Document Appticafion and Cerfificadon for Payment PROJECT: STREET LIGHT DiB RETROFIT VIA (ARCHITECT): /1PPLICATION NO: 1 PERIOD TO: 5/25/2010 ARCHITECTS PROJECT NO: 87252 CONTRACT DATE: Page 2 of 2 DISTRIBUTION TO: OWNER _ ARCHITECT CONTRACTOR ITEM DESCRIPTION Designl Engin eering 10 Design Costs 20 Bond 30 Insurance 40 DB Fized Fee Constructlon 50 Light Fixtures 60 Mobilization 70 Installation 80 GIS Data Collection 90 Traffic Control 100 General Conditlons 110 DB Fixed Fee 120 SDG&E Rebale REPORT TOTALS SCHEDULE PREVIOUS COMPLETED STORED COMPLETED VALUE APPLICATIONS THIS PERIOD MATERIAL STORED ova BALANCE RETAINAGE 41,652.42 0.00 0.00 0.00 0.00 0.00 41,652.42 0. 19,200.00 0.00 0.00 0.00 0.00 0.00 19,200.00 0. 22,258.22 0.00 0.00 0.00 0.00 0.00 22,258.22 0. 4,323.53 0.00 0.00 0.00 0.00 0.00 4,323.53 0. Totals: 87,434.17 0.00 0.00 0.00 0.00 0.00 87,434.17 0. 1,428,300.00 0.00 0.00 0.00 0.00 0.00 1,428,300.00 0 25,500.00 0.00 0.00 0.00 0.00 0.00 25,500.00 0 291,353.00 0.00 0.00 0.00 0.00 0.00 291,353.00 0 11,sso.oo o.DD 0.00 0.00 0.00 0.00 11sso.oa o 33,ifi0.00 0.00 0.00 0.00 0.00 0.00 33,160.00 0 56,271.88 .0.00 0.00 0.00 0.00 0.00 56,271.88 0 148,591.95 0.00 0.00 0.00 0.00 0.00 148,591.95 0 Totals: 1,995,136.83 0.00 0.00 0.00 0.00 0.00 1,995,136.83 0 -115,000.00 0.00 0.00 0.00 0.00 0.00 -115,000.00 0 00 00 00 00 00 00 00 00 Do 00 oD 00 00 00 $1,967,571.00 $0.00 $0.00 $0.00 $0.00 0.00 $1,967,571.00 $0.00 EXHIBIT B 39 6-85 -ECE-ARRA EXHIBIT D FEDERAL PROVISIONS INCORPORATED BY REFERENCE, SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009, AND GENERAL FEDERAL PROVISIONS -STATE ENERGY PROGRAM (SEP) For purposes of this Exhibit D, the term "subawardee" refers to any entity other than a vendor that receives funding from the Borrower to carry out or support any portion of this Agreement. The term "vendor" refers to those entities defined as such by OMB Circular A-133 (see Subpart B, Sections .105 and .210). The Borrower must include all of the provisions below in its agreements with subawardees. Vendors are subject only to the terms in Attachment 8 of this Exhibit (Vendor Flow-Down Provisions). 1. FEDERAL REGULATIONS/GUIDELINES/OMB CIRCULARS INCORPORATED BY REFERENCE The Office of Management and Budget (OMB) Circulars, federal regulations, and guidelines checked below are incorporated as part of this Agreement. OMB Circulars may be accessed on the OMB web site at www.whitehouse.gov/omb/circulars/index.html or by calling the Office of Administration, Publications Office, at (202) 395-7332. Federal regulations may be accessed at htto://ecfr.gpoaccess.gov. The Borrower must include in its subawards and vendor agreements the provisions below that apply to the particular organization concerned. ® Title 10 Code of Federal Regulations (CFR) Part 600: Department of Energy (DOE) Financial Assistance Regulations ® Title 10 Code of Federal Regulations (CFR) Part 420: State Energy Program ® State Energy Program Funding Opportunity Announcement DE-FOA- 0000052, CDFA Number 81.041, State Energy Program (https://www.fedconnect. net/FedConnectn ® OMB Circular A-102: Common Rule for Uniform Administrative Requirements for Grants and Cooperative Agreements to State and Local Governments ® OMB Circular A-110: Uniform Administrative Requirements for Grants and Agreements with Institutions of Higher Education, Hospitals, and Other Non-Profit Organizations (also applicable to private entities) ECAA ARRA T&Cs Page i of 22 5/11/10 Ex D 6-86 -ECE-ARRA ® OMB Circular A-87: Cost Principles for State, Local and Tribal Governments ® OMB Circular A-21: Cost Principles for Educational Institutions ® OMB Circular A-122: Cost Principles Applicable to Grants, Contracts, and Other Agreements with Non-Profit Organizations (non-profit organizations and individuals, except for those specifically exempted) ® OMB Circular A-133: Audits of States, Local Governments, and Non- profit Organizations ^ Other: ^ None 2. SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 A. ARRA-FUNDED PROJECT Funding for this award is from the American Recovery and Reinvestment Act (ARRA) of 2009, Pub. L. 111-5. Funding for this award is authorized by Public Resources Code, Section 25422, and the State Energy Program, Federal Grant Number DE-EE0000221, CFDA Number 81.041. The federal grant term expires on April 30, 2012. The Borrower and all subawardees/vendors are subject to audit by appropriate federal or State of California (State) entities. The State has the right to cancel, terminate, or suspend this Agreement if the Borrower or its subawardee fails to comply with the reporting and operational requirements contained herein. B. ENFORCEABILITY The Borrower agrees that if it or one of its subawardees/vendors fails to comply with all applicable federal and State requirements governing the use of ARRA funds, the State may withhold or suspend, in whole or in part, funds awarded under the program, or recover misspent funds following an audit. This provision is in addition to all other remedies available to the State under all applicable State and federal laws. ECAA ARRA T&Cs Page 2 of 22 5/11/10 Ex D s-a~ -ECE-ARRA C. REGISTRATION REQUIREMENTS Prior to beginning work, the Borrower must obtain a Dun and Bradstreet Data Universal Numbering System (DUNS) number and register with the Central Contract Registration (CCR). Websites are as follows: DUNS website: http://www.dnb.com/US/duns update CCR website: http://www.ccr.gov The Borrower must maintain current registrations in the CCR at all times during which it has an active award funded with ARRA funds. A DUNS Number is one of the requirements for registration in the CCR. D. SEGREGATION OF COSTS AND RECORDS The Borrower and its subawardees/vendors must segregate the obligations and expenditures related to funding under ARRA. Financial and accounting systems should be revised as necessary to segregate, track, and maintain these funds apart and separate from other revenue streams. No part of the funds from ARRA shall be commingled with any other funds or used for a purpose other than that of making payments for costs allowable for ARRA projects. Pursuant to 10 C.F.R. section 800.242 (incorporated by reference herein), records must be maintained for three (3) years after the loan is repaid in full or 3 years after the federal grant term, whichever is later, unless the Commission or Federal Government requests a longer retention period. The Borrower and its subawardees/vendors must keep separate records for ARRA funds to ensure those records comply with the requirements of ARRA. If this loan is split-funded with non-ARRA funds, the Borrower must track and report the ARRA funds separately to meet the reporting requirements of ARRA and related guidance. The Borrower's accounting records must be supported by such source documentation as cancelled checks, paid bills, payrolls, time and attendance records, and contract and subaward/vendor documents. The Borrower recognizes that Title 10 of the Code of Federal Regulations (CFR) section 420.18 places limitations on the use of funds available under this Agreement. The parties recognize and acknowledge that the funds available under this Agreement may be used for the purchase and installation of equipment and materials for energy efficient measures and renewable energy measures, including reasonable design costs, in accordance with 10 CFR 420.18, subdivision (e). The parties further recognize and acknowledge that the 50 percent funding limitations of 10 CFR 420.18, subdivision (e), paragraph (2), do not apply to the use of ARRA funds under this Agreement. (Refer to Section 9.7 of Exhibit 1 of the ECAA ARRA T&Cs Page 3 of 22 5/1 V W Ex D 6-88 -ECE-ARRA U.S. Department of Energy Funding Opportunity Announcement DE-FOA- 0000052.) E. PROHIBITION ON USE OF ARRA FUNDS The Borrower agrees that, in accordance with ARRA, Section 1604, none of the funds provided under this agreement derived from ARRA may be used for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool. ACCESS TO RECORDS In accordance with ARRA Sections 902, 1514, and 1515, the Borrower agrees that it shall permit the State of California, the United States Comptroller General or his representative, or the appropriate Inspector General appointed under Section 3 or 8G of the United States Inspector General Act of 1978 or his representative to: (1) examine any records of the Borrower or any of its subawardeesNendors that directly pertain to, and involve transactions relating to, this Agreement; and (2) interview any officer or employee of the Borrower or any of its subawardees/vendors regarding the activities funded with funds appropriated or otherwise made available by ARRA. The Borrower shall include this provision in all of its agreements with its subawardees/vendors from whom it acquires goods or services in its execution of the ARRA-funded work. G. PUBLICATION Information about this agreement will be published on the Internet and linked to the website www.recovery.aov, maintained. by the Accountability and Transparency Board. The Board may exclude posting contractual or other information on the website on a case-by-case basis when necessary to protect national security or to protect information that is not subject to disclosure under sections 552 and 552a of title 5, United States Code. H. PROTECTING STATE AND LOCAL GOVERNMENT AND CONTRACTOR WHISTLEBLOWERS The Borrower agrees that both it and its subawardees/vendors shall comply with Section 1553 of ARRA, which prohibits all non-federal contractors, including the State, and all contractors of the State, from discharging, demoting or otherwise discriminating against an employee for disclosures by the employee that the employee reasonably believes are evidence of: (1) gross mismanagement of a contract relating to ARRA funds; (2) a gross waste of ARRA funds; (3) a substantial and specific danger to public health ECAA ARRA T&Cs Page 4 of 22 5/11110 Ex D 6-89 -ECE-ARRA or safety related to the implementation or use of ARRA funds; (4) an abuse of authority related to implementation or use of ARRA funds; or (5) a violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contract) awarded or issued relating to ARRA funds. The Borrower agrees that it and its subawardees shall post notice of the rights and remedies available to employees under Section 1553 of Title XV of Division A of the ARRA. The requirements of Section 1553 of the ARRA are summarized below. They include, but are not limited to: Prohibition on Reprisals: An employee of any non-federal employer receiving covered funds under ARRA may not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing, including a disclosure made in the ordinary course of an employee's duties, to the Accountability .and Transparency Board, an inspector general, the Comptroller General, a member of Congress, a State or federal regulatory or law enforcement agency, a person with supervisory authority over the employee (or other person working for the employer who has the authority to investigate, discover or terminate misconduct), a court or grand jury, the head of a federal agency, or their representatives, information that the employee believes is evidence of: • Gross management of an agency contract or grant relating to covered funds; • A gross waste of covered funds; • A substantial and specific danger to public health or safety related to the implementation or use of covered funds; • An abuse of authority related to the implementation or use of covered funds; or • A violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contract) or grant, awarded or issued relating to covered funds. Agency Action: Not later than 30 days after receiving an inspector general report of an alleged reprisal, the head of the agency shall determine whether there is sufficient basis to conclude that the non-federal employer has subjected the employee to a prohibited reprisal. The agency shall either issue an order denying relief in whole or in part or shall take one or more of the following actions: • Order the employer to take affirmative action to abate the reprisal. • Order the employer to reinstate the person to the position that the person held before the reprisal, together with compensation including back pay, compensatory damages, employment benefits, and other ECAA ARRA T&Cs Page 5 of 22 5/11/10 Ex D 6-90 -ECE-ARRA terms and conditions of employment that would apply to the person in that position if the reprisal had not been taken. Order the employer to pay the employee an amount equal to the aggregate amount of all costs and expenses (including attorneys' fees and expert witnesses' fees) that were reasonably incurred by the employee for or in connection with, bringing the complaint regarding the reprisal, as determined by the head of a court of competent jurisdiction. Non-enforceability of Certain Provisions Waiving Rights and Remedies or Requiring Arbitration: Except as provided in a collective bargaining agreement, the rights and remedies provided to aggrieved employees by this section may not be waived by any agreement, policy, form, or condition of employment, including any predispute arbitration agreement. No predispute arbitration agreement shall be valid or enforceable if it requires arbitration of a dispute arising out of this section. Requirement to Post Notice of Rights and Remedies: Any employer receiving covered funds under ARRA shall post notice of the rights and remedies as required therein. (Refer to Section 1553 of ARRA located at www.recoverv.aov, for specific requirements of this section and prescribed language for the notices.) I. INFORMATION IN SUPPORT OF ARRA REPORTING The Borrower will be required to submit backup documentation for expenditures of funds under ARRA including such items as timecards and invoices. See Loan Agreement, Section 3, Loan Disbursement Schedule, for more details on backup documentation required for invoicing. In addition to the invoicing requirements, the Borrower shall provide copies of backup documentation at the request of the U.S. Department of Energy's (DOE's) Contracting Officer or designee, or the Commission's Contract Manager or designee. J. FALSE CLAIMS ACT The Borrower agrees that it shall promptly notify the State and shall refer to an appropriate federal inspector general any credible evidence that a principal, employee, agent, subawardee/vendor or other person has committed a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict of interest, bribery, gratuity, or similar misconduct involving ARRA funds. ECAA ARRA TBCs Page 6 of 22 5/11110 Ex D 6-91 -ECE-ARRA K. AVAILABILITY OF FUNDS Funds appropriated under ARRA and obligated to this award are available for reimbursement of costs until the end of the loan term or April 30, 2012, whichever comes first. L. REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF ARRA 1) This award requires the Borrower to complete projects or activities which are funded under ARRA and to report on use of ARRA funds provided through this award. Information from these reports will be made available to the public. 2) The reports are due in accordance with Section 12 of this Loan Agreement in addition to this section. 3) Progress reports are due monthly by the third of the following month. For example, the January progress report is due by February 3. 4) The Borrower must maintain current registration in the CCR (htto://www.ccr.oov) at-all times during which it has an active federal award funded with ARRA funds. A DUNS Number (htto://www.dnb.com) is one of the requirements for registration in the CCR. 5) The Borrower shall report the information described in Section 1512(c) of ARRA and other information reasonably requested by the State or required by the federal government or by the State to meet their obligation to provide accurate, complete, and timely information to the public; to meet the federal program reporting requirements; and/or to comply with State or federal law or regulation. Standard data elements and federal instructions for use in complying with reporting requirements under Section 1512 of ARRA are provided online at www.FederalReporting.gov. 6) The Borrower shall submit reports to the Commission's Project Manager in a format determined by the Commission. The Borrower must NOT register at FederalReporting.gov. 7) The Borrower must provide information including, but not limited to, the following: ECAA ARRA T&Cs Page 7 of 22 5/11/10 Ex D 6-92 -ECE-ARRA ECAA ARRA T&Cs a) ARRA Section 1512 Report • Direct jobs created (i.e., new positions created and filled or unfilled positions that are filled) and jobs retained (i.e., previously existing filled positions that are retained as a result of ARRA funds). Only include jobs that are directly funded by ARRA funds. The number shall be expressed as "full-time equivalent" (FTE), calculated cumulatively as all hours worked divided by the total number of hours in a full- time schedule. • Description of jobs created. Provide a brief description of impact on the Borrower's workforce and include the types of jobs created and retained. Include time base (full-time or part-time) and duration (1 year, 1-2 years, 2-5 years, or more than 5 years). • Furthermore, Borrowers will be required to calculate direct jobs created and retained by each subcontractor, including all subrecioients and manv vendors. Job calculations will be captured on the FTE Calculator tab of the Subrecipient 1512 reporting spreadsheet. Per the Single Audit Act Amendments of 1996, Borrowers should be able to substantiate vendor/subcontractor job hours reported by retaining payroll and project records for a minimum of three (3) years after the final payment has been received. The requirement to calculate vendor jobs does not apply to subcontracts with material suppliers or central service ~oviders (so-called "indirect" jobs). • Dun and Bradstreet (D&B) Data. Universal Numbering System (DUNS) number. • Central Contractor Registration (CCR) number. • Award number. • Name (legal name as registered in CCR or D&B). The Doing-Business-As (DBA) name as registered in CCR or D&B. • Address (physical location as listed in the CCR). • Congressional district (based on physical location address). • Type of entity (this is the "Business Type" in the CCR). • Amount awarded (total amount of the Commission agreement). • Amount received (total cumulative amount of Commission agreement funds received as of the reporting period). • Date of award (date the Commission agreement was signed). • Award period (term of the Commission agreement). Page 8 of 22 5/11/10 Ex D 6-93 ECE-ARRA ECAA ARRA T&C5 • Place of performance (the physical location of primary place of performance, including street address, city, state, zip code+4, country, congressional district, state senate district, and state assembly district). • Area of benefit (e.g., state, county, city, special district). • Names and total compensation of five most highly compensated officers for the calendar year in which the. agreement is awarded if, • In the Borrower's preceding fiscal year, the Borrower received - - 80 percent or more of its annual gross revenues from federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and - $25,000,000 or more in annual gross revenues from federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements • The public does not have access to information about the compensation of the senior executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d) or section 6104 of the Internal Revenue Code of 1986. • Vendor Data Elements (purchases $25,000 or above) • DUNS or name. Zip code of Headquarters. Description of the product and/or service provided by the vendor. • The amount invoiced from the vendor (aggregated) that will be paid with ARRA funds. b) U.S. Department of Energy SEP Progress Report • A comparison of the actual accomplishments with the goals and objectives established for the period and reasons why the established goals were not met. • A discussion of what was accomplished under these goals during this reporting period, including major activities, significant results, major findings or conclusions, key outcomes or other achievements. This section should not contain any proprietary data or other information not subject to public release. If such information is important to reporting progress, do not include the information, but include a note in the report advising the reader to contact the Principal Investigator or the Project Director for further information. Page 9 of 22 5/11/10 Ex D 6-94 -ECE-ARRA • Cost Status. Show approved budget by budget period and actual costs incurred. Separate costs by project activities, administration, and evaluation. • Schedule Status. List milestones, anticipated completion dates, and actual completion dates. • Any changes in approach or aims, and reasons for change. Actual or anticipated problems or delays, and actions taken or planned to resolve them. • Any absence or changes of key personnel or changes in consortium/teaming arrangement. • A description of any product produced or technology transfer activities accomplished during this reporting period, such as: • Publications (list journal name, volume, issue); conference papers; or other public releases of results. • Web site or other Internet sites that reflect the results of this project. • Networks or collaborations fostered. • Technologies/techniques. • Inventions/patent applications. • Other products, such as data or databases, physical collections, audio or video, software or netware, models, educational aid or curricula, instruments or equipment. • Performance Metrics • Energy saved (kWh, therms, gallons, Btu, etc.). • Renewable energy installed capacity and generated. • GHG emissions reduced (tons) (C02 equivalents) (methane, carbon, sulfur dioxide, nitrogen oxide, carbon monoxide). • Energy cost savings. • Funds leveraged. • Project type metrics. The key metrics to be reported will vary by project type. See Exhibit D, Attachment 6, Project Type Metrics. M. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS) - SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 The Borrower agrees that in accordance with ARRA, Section 1605, neither it nor its subawardees/vendors will use ARRA funds for a project for the construction, alteration, maintenance, or repair of a public building or public ECAA ARRA T&Cs Page 10 of 22 5/11/10 Ex D 6-95 -ECE-ARRA work unless all of the iron, steel and manufactured goods used in the project are produced in the United States in a manner consistent with United States obligations under international agreements. The Borrower understands that this requirement may only be waived by the applicable federal agency in limited situations as set out in ARRA, Section 1605. 1) Definitions. As used in this award term and condition- a) Manufactured good means a good brought to the construction site for incorporation into the building or work that has been- • Processed into a specific form and shape; or • Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. b) Public building and public work means a public building of, and a public work of, a governmental entity (the United States; the District of Columbia; commonwealths, territories, and minor outlying islands of the United States; State and local governments; and multi-State, regional, or interstate entities which have governmental functions). These buildings and works may include, without limitation, bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. c) Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent carbon, and may include other elements. 2) Domestic preference. a) This award term and condition implements Section 1605 of the ARRA by requiring that all iron, steel, and manufactured goods used in the project are produced in the United States except as provided in paragraph 2b and 2c of this section and condition. b) This requirement does not apply to the material listed by the Federal Government as follows: -None ECAA ARRA 7&Cs Page 11 of 22 5!11/10 Ex D 6-96 -ECE-ARRA c) The award official may add other iron, steel, and/or manufactured goods to the list in paragraph 2b of this section and condition if the Federal Government determines that- The cost of the domestic iron, steel, and/or manufactured goods would be unreasonable. The cost of domestic iron, steel, or manufactured goods used in the project is unreasonable when the cumulative cost of such material will increase the cost of the overall project by more than 25 percent; The iron, steel, and/or manufactured good is not produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or The application of the restriction of Section 1605 of the ARRA would be inconsistent with the public interest. 3) Request for determination of inapplicability of Section 1605 of the ARRA. a) (i) Any recipient request to use foreign iron, steel, and/or manufactured goods in accordance with paragraph 2c of this section shall include adequate information for Federal Government evaluation of the request, including- A description of the foreign and domestic iron, steel, and/or manufactured goods; Unit of measure; Quantity; • Cost; Time of delivery or availability; Location of the project; Name and address of the proposed supplier; and A detailed justification of the reason for use of foreign iron, steel, and/or manufactured goods cited in accordance with paragraph 2c of this section. (ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed cost comparison table in the format in paragraph 4 of this section. (iii) The cost of iron, steel, and/or manufactured goods material shall include all delivery costs to the construction site and any applicable duty. (iv) Any recipient request for a determination submitted after ARRA funds have been obligated for a project for construction, alteration, maintenance, or repair shall explain why the recipient could not reasonably foresee the need for such determination ECAA ARRA T&Cs Page 12 of 22 5~11~1~ Ex D 6-97 -ECE-ARRA and could not have requested the determination before the funds were obligated. If the recipient does not submit a satisfactory explanation, the award official need not make a determination. b) If the Federal Government determines. after funds have been obligated for a project for construction, alteration, maintenance, or repair that an exception to Section 1605 of the ARRA applies, the award official will amend the award to allow use of the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is nonavailability or public interest, the amended award shall reflect adjustment of the award amount, redistribution of budgeted funds, and/or other actions taken to cover costs associated with acquiring or using the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is the unreasonable cost of the domestic iron, steel, or manufactured goods, the award official shall adjust the award amount or redistribute budgeted funds by at least the differential established in 2 CFR 176.110(a). c) Unless the Federal Government determines that an exception to Section 1605 of the ARRA applies, use of foreign iron, steel, and/or manufactured goods is noncompliant with Section 1605 of ARRA. 4) Data. To permit evaluation of requests under paragraph 2 of this section based on unreasonable cost, the Recipient shall include the following information and any applicable supporting data based on the survey of suppliers: Foreign and Domestic Items Cost Comparison Description Unit of Measure Quantity Cost $s Item 1: Foreign steel, iron, or manufactured good Domestic steel, iron, or manufactured good Item 2: Foreign steel, iron, or manufactured good Domestic steel, iron, or manufactured good [List name, address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.] [Include other applicable supporting information.] ['Include all delivery costs to the construction site.] ECAA ARRA TBCs Page 13 of 22 5/11/10 Ex D I)-98 -ECE-ARRA N. WAGE RATE REQUIREMENTS UNDER SECTION 1606 OF THE ARRA In accordance with ARRA, Section 1606, the Borrower assures that it and its subawardees/vendors shall fully comply with said Section and notwithstanding any other provision of law and in a manner consistent with other provisions of ARRA, all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to ARRA shall be paid wages at rates not less than those prevailing on projects of a character similar in the locality as determined by the United States Secretary of Labor in accordance with Subchapter IV of Chapter 31 of Title 40, United States Code (Davis-Bacon Act). It is understood that the Secretary of Labor has the authority and functions set forth in Reorganization Plan Numbered 14 or 1950 (64 Stat. 1267; 5 U.S.C. App.) and Section 3145 of Title 40, United States Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis-Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis- Bacon contract clauses set forth in that section. The Borrower will complete and certify by signature on Attachment 7 of this Agreement its commitment to comply with 29 CFR 5.5, and return it to the Commission Grants and Loans Officer. When advertising for a public contract opportunity, Borrowers must attach the applicable wage determinations to the solicitation, assistance agreement, and resulting contract or grant. O. ARRA TRANSACTIONS LISTED IN SCHEDULE OF EXPENDITURES OF FEDERAL AWARDS 1) To maximize the transparency and accountability of funds authorized under ARRA as required by Congress and in accordance with 2 CFR 215.21 "Uniform Administrative Requirements for Grants and Agreements" and OMB Circular A-102 Common Rules provisions, the Borrower agrees to maintain records that identify adequately the source and application of ARRA funds. OMB Circular A-102 is available at http•//www Whitehouse oov/omb/circulars/a102/a102 html. 2) If the Borrower is covered by the Single Audit Act Amendments of 1996 and OMB Circular A-133, "Audits of States, Local Governments, and Non-Profit Organizations," the Borrower agrees to separately identify the expenditures for federal awards under the ARRA on the Schedule of ECAA ARRA T&Cs Page 14 of 22 5111/10 Ex D 6-99 -ECE-ARRA Expenditures of Federal Awards (SEFA) and the Data Collection Form (SF-SAC) required by OMB Circular A-133. OMB Circular A-133 is available at htto~//www Whitehouse gov/omb/circulars/a133/a133 html. This shall be accomplished by identifying expenditures for federal awards made under ARRA separately on the SEFA, and as separate rows under Item 9 of Part III on the SF-SAC by CFDA number, and inclusion of the prefix "ARRA=' in identifying the name of the federal program on the SEFA and as the first characters in Item 9d of Part III on the SF-SAC. 3) The Borrower agrees to separately identify to each subawardee, and document at the time of subaward and at the time of disbursement of funds, the federal award number, CFDA number, and amount of ARRA funds. When the Borrower awards ARRA funds for an existing program, the information furnished to subawardee shall distinguish the subawards of incremental ARRA funds from regular subawards under the existing program. 4) The Borrower agrees to require its subawardees to include on their SEFA information to specifically identify ARRA funding similar to the requirements for the recipient SEFA described above. This information is needed to allow the recipient to properly monitor subrecipient expenditure of ARRA funds as well as oversight by the federal awarding agencies, Offices of Inspector General, and the Government Accountability Office. P. DATA IN SUPPORT OF ENERGY SAVINGS AND EMISSION REDUCTIONS 1) The Commission may request utility bill data from ARRA SEP program participants to track program energy saving and greenhouse gas emission reduction impacts. Upon request, ARRA SEP program participants must be prepared to provide utility billing data for at least the 12 months preceding and the 12 months following the project's implementation of a building retrofit project. To ease the burden of this data provision by the participant, the Commission will work with the participant's utility company to facilitate the electronic exchange of the required billing data. The Borrower authorizes the Commission to exchange this data with the Borrower's energy utility company and agrees to complete an authorization form if requested by the Commission. 2) Upon written request from the Commission, the Borrower and its subawardees shall allow the Commission or its agent access to facilities and records and allow the Commission or its agent to collect data needed to measure and verify electricity and fuel reductions (this may ECAA ARRA T&Cs Page 15 of 22 5/1 t/10 Ex D 6-100 -ECE-ARRA include but is not limited to utility bills, metering data, facility equipment surveys, information on operational practices, and site occupancy levels). Further, if requested, the Borrower and subawardee must provide the Commission or its agent associated data from a period prior to the start of the project as necessary to establish baseline energy and/or fuel use. The Borrower shall include this provision in its subaward agreements. O. STATE ARRA GUIDELINES FOR STATE ENERGY PROGRAM The Commission's Guidelines for the State Energy Program, dated September 30, 2009, (publication number CEC-150-2009-004-F) are hereby incorporated by reference and made a part of this Agreement. The Borrower warrants that it has read and understands the Guidelines and acknowledges that requirements specified therein apply to the Borrower and the funding provided under this Agreement. The Borrower acknowledges that the Guidelines are subject to change pursuant to Public Resources Code Section 25462 and that any changes made to the Guidelines shall apply to the Borrower and the funding provided under this Agreement. 3. SITE VISITS The Commission, the federal awarding agency, and/or their designees have the right to make site visits at reasonable times to review project accomplishments and management control systems and to provide technical assistance, if required. The Borrower must provide and must require subawardees to provide reasonable facilities and assistance for the safety and convenience of the government representatives in the performance of their duties. All site visits and evaluations must be performed in a manner that does not unduly interfere with or delay the work. 4. NON-DISCRIMINATION CLAUSE This award is subject to the provisions of 10 CFR 1040.1 et seq., Nondiscrimination in Federally Assisted Programs. The Borrower will complete and certify by signature on the DOE Form 1600.5, U.S. DOE "Assurance of Compliance," (Exhibit D, Attachment 1 of this Agreement) its commitment to comply with this law and return it to the Commission Grants and Loans Officer. 5. CERTIFICATIONS REGARDING LOBBYING AND DEBARMENT, SUSPENSION AND OTHER RESPONSIBILITY MATTERS ECAA ARRA T&CS Page 16 of 22 5/11/10 Ex D 6-~~~ -ECE-ARRA This award is subject to the provisions of 10 CFR Part 601, 2 CFR Part 180, and 2 CFR Part 901. The Borrower will complete and certify by signature on the Form "Certifications Regarding Lobbying and Debarment, Suspension and Other Responsibility Matters' (Exhibit D, Attachment 2 of this Agreement) its commitment to comply with these requirements and return it to the Commission's Grants and Loans Officer. 6. LOBBYING RESTRICTIONS The Borrower agrees that none of the funds obligated under this agreement shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation. The Borrower will disclose any lobbying activities by completing and signing the Standard Form LtL (Exhibit D, Attachment 3 of this Agreement) and return it to the Commission's Grants and Loans Officer. 7. NATIONAL POLICY ASSURANCES The Borrower agrees to adhere to and include in any subawards the requirements set forth in the attached "National Policy Assurances" (Exhibit D, Attachment 4 of this Agreement). 8. PUBLICATIONS A. The Borrower is encouraged to publish or otherwise make publicly available the results of the work conducted under this Agreement. B. An acknowledgment of Commission and federal support and a disclaimer must appear in the publication of any material, whether copyrighted or not, based on or developed under this project, as follows: Acknowledgment. "This material is based upon work supported by the California Energy Commission and the U.S. Department of Energy under Award Number(s) DE-0000221." Disclaimer. "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the California Energy Commission, the United States Government, nor any agency thereof, nor any employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any ECAA ARRA T&Cs PEgeD17 of 22 5/t t/10 6-102 -ECE-ARRA information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the California Energy Commission, the United States Government, or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the California Energy Commission, the United States Government, or any agency thereof." 9. INTELLECTUAL PROPERTY PROVISIONS A. The intellectual property provisions applicable to this award are provided as Exhibit D, Attachment 5, to this award. A list of all intellectual property provisions may be found at http~//www gc energy qov/financial assistance awards htm. B. Questions regarding intellectual property matters should be referred to the DOE Award Administrator and the Patent Counsel designated as the service provider for the DOE office that issued the award. The IP Service Providers' List is found at htto~//www ac doe qov/documents/Intellectual Prooertv (IP) Service Provide rs for Acguisition.odf. 10. FEDERAL, STATE, AND MUNICIPAL REQUIREMENTS The Borrower must obtain any required permits and comply with all applicable federal, state, and municipal laws, codes, and regulations for work performed under this award. 11. [RESERVED] 12.DECONTAMINATION AND/OR DECOMMISSIONING (D&D) COSTS Notwithstanding any other provisions of this Agreement, the Government shall not be responsible for or have any obligation to the Borrower or its subawardees for (i) Decontamination and/or Decommissioning (D&D) of any of the Borrower's or its subawardees' facilities, or (ii) any costs which may be incurred by the Borrower or its subawardees in connection with the D&D of any of its facilities due to the performance of the work under this Agreement, whether said work was performed prior to or subsequent to the effective date of this Agreement. ECAA ARRA T&Cs Page 18 of 22 5!11/10 Ex D 6-103 -ECE-ARRA 13. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) COMPLIANCE The Borrower is restricted from taking any action using federal funds for projects under this award that would have an adverse effect on the environment or limit the choice of reasonable alternatives prior to DOE providing a final NEPA determination regarding these projects. If the Borrower moves forward with activities that are not authorized for federal funding by the DOE Contracting Officer in advance of the final NEPA determination, the Borrower is doing so at risk of not receiving federal funding, and such costs may not be recognized as allowable cost share. 14.NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCTS -SENSE OF CONGRESS It is the sense of the Congress that, to the greatest extent practicable, all equipment and products purchased with funds made available under this award should be American-made. 15. HISTORIC PRESERVATION Prior to the expenditure of federal funds to alter any structure or site, the Borrower is required to comply with the requirements of Section 106 of the National Historic Preservation Act (NHPA) outlined in 36 CFR Part 800, consistent with DOE's 2009 letter of delegation of authority regarding the NHPA. Section 106 applies to historic properties that are listed in or eligible for listing in the National Register of Historic Places. In order to fulfill the requirements of Section 106, the Energy Commission and the Borrower must contact the State Historic Preservation Officer (SHPO), and, if applicable, the Tribal Historic Preservation Officer (THPO), to coordinate the Section 106 review outlined in 36 CFR Part 800. SHPO contact information is available at the following link: http~//www ncshpo.oro/find/index.htm. THPO contact information is available at the following link: http~//www nathpo org/map html. Section 110(k) of the NHPA applies to DOE funded activities. Borrowers shall avoid taking any action that results in an adverse effect to historic properties pending compliance with Section 106. The Energy Commission executed a Programmatic Agreement (Programmatic Agreement) with the SHPO, as amended, to streamline the Section 106 consultation process and to categorically exclude some projects from the SHPO's direct review and consultation. Because of their nature, these categorically excluded projects cannot impact historic resources. The categorically excluded projects are identified in the Programmatic Agreement and include: (1) undertakings for planning, training and educational purposes; (2) undertakings to replace equipment on existing buildings or structures that result in no building or structure changes or ground disturbances; and (3) undertakings ECAA ARRA T&Cs Page 19 of 22 5/11/10 Ez D 6-104 -ECE-ARRA on buildings or structures less than 45 years of age that will result in no ground disturbances. Projects that are categorically excluded from the SHPO's direct review and consultation will be deemed to have satisfied Section 106 of NHPA without further review or involvement by the SHPO. The Energy Commission will evaluate projects to determine whether such projects are categorically excluded from the SHPO's direct review and consultation under the Programmatic Agreement. If projects are categorically excluded, the Energy Commission will issue the Borrower a clearance letter on the SHPO's behalf. In order for the Energy Commission to determine whether a given project is categorically excluded from the SHPO's direct review and consultation, the Borrower must prepare a Consultation Package, as provided in the Programmatic Agreement, for each building or structure upon. which the project will be undertaken. 16. AVAILABILITY OF FEDERAL FUNDS It is mutually agreed that partial or whole funding for this Agreement is dependent upon a federal agreement (DE-EE0000221) that has a scheduled budget period end date of April 30, 2012, and is subject to the following provisions: (1) This Agreement is subject to any additional restrictions, limitations, or conditions enacted by Congress or any statute enacted by Congress that may affect the provisions, terms, or funding of this Agreement; (2) Funding for this Agreement is subject to the approval of the U.S. Department of Energy (DOE) and to any additional restrictions, limitations, or conditions imposed by DOE, federal law, federal court judgments, and/or federal agency orders which may affect the provisions or terms of this Agreement; (3) If Congress does not appropriate sufficient funds for the program, this Agreement shall be amended to reflect any reduction in funds; and (4) The Commission has the option to invalidate the Agreement under the 30- day cancellation clause or to amend the Agreement to reflect any reduction in funds. 17. RESOLUTION OF CONFLICTING CONDITIONS Any apparent inconsistency between Federal statutes and regulations and the terms and conditions contained in this Exhibit D must be referred to the Commission's Project Manager for guidance. Any apparent inconsistency between Federal statutes and regulations and the terms and conditions contained in the Loan Agreement, and Exhibits A through C must be referred to the Commission's Project Manager for guidance. ECAA ARRA T&CS Page 20 of 22 5/11/10 Ex D 6-105 -EC E-ARRA 18.STATEMENT OF FEDERAL STEWARDSHIP DOE will exercise normal federal stewardship in overseeing the project activities performed under this award. Stewardship activities include, but are not limited to, conducting site visits; reviewing performance and financial reports; providing technical assistance and/or temporary intervention in unusual circumstances to correct deficiencies which develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion to ensure that the award objectives have been accomplished. 19. UTILITY REBATES ARRA State Energy Program funding must be used to create new programs or expand existing programs, including ratepayer-funded programs, and not to supplant or replace existing state, ratepayer, or other funding. Therefore, if after the project is completed, the Borrower receives a rebate from its utility or other source for all or a portion of the project costs that have been funded by this loan, the Borrower must submit principal repayment to the Commission in the amount of that rebate within 10 working days of receipt of the rebate. This repayment will be considered an unscheduled principal repayment. 20. CASH MANAGEMENT IMPROVEMENT ACT In accordance with 31 United States Code (U.S.C.) sections 3335, 6501, and 6503 (the Cash Management Improvement Act, or CMIA) and implementing regulations at 31 CFR Part 205, the Borrower shall minimize the time elapsing between the drawdown of funds from the Energy Commission and the disbursement of funds. The Borrower shall request reimbursement to occur as close as possible to the disbursement. The Borrower agrees that it has reviewed the applicable CMIA rules and regulations, and will follow their requirements in handling funds received pursuant to this Agreement. The Borrower also agrees that it will provide written notification to each of its subawardees, if any, of the CMIA and the need for each subawardee to comply with all applicable CMIA provisions and regulations 21. SPECIFIC REQUIREMENT TO SUBMIT WASTE MANAGEMENT PLAN Prior to the proposed project activities generating any waste, the Borrower is required to submit a copy of the Borrower's Waste Management Plan to the Commission Project Manager. This Waste Management Plan will describe the Borrower's plan to dispose of any sanitary or hazardous waste generated by the proposed project activities. Sanitary and hazardous waste includes, but is not ECAA ARRA T&Cs Page 21 of 22 5/11/10 Ex D 6-106 -ECE-ARRA limited to, construction and demolition debris, old light bulbs, lead ballasts, piping, roofing material, discarded equipment, debris, and asbestos. The Borrower's Waste Management Plan must comply with all federal, state, and local laws and regulations governing waste disposal. 22. SUBCONTRACTS Borrower shall submit to the Energy Commission copies of all executed subcontracts. Borrower shall also submit all applicable prevailing wage determinations for any and all labor and mechanic work to be performed, for Energy Commission approval. Borrower shall include this requirement in all subcontracts. ECAA ARRA T&Cs Page 22 of 22 5/11!10 Ex D 6-~07 AWARD# EXHIBIT D ATTACHMENT1 ASSURANCE OF COMPLIANCE DOE F 1600.5 U.S. Department of Energy OMB Control No. (06-94) Assurance of Compliance 1910-0400 All Other Editions are Obsolete Nondiscrimination in Federally Assisted Programs OMB Burden Disclosure Statement Public reporting burden for this collection of information is estimated to average 15 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Offce of Information Resources Management Policy, Plans, and Oversight, Records Management Division, HRA22 - GTN, Paperwork Reduction Project (1900-0400), U.S. Department of Energy, 1000 Independence Avenue, S. W., Washington, DC 20585; and to the Offce of Management and Budget (OMB), Paperwork Reduction Project (1900-0400), Washington, DC 20503. (Hereinafter called the "Applicant") HEREBY AGREES to comply with Title VI of Ne Civil Rights Act of 1964 (Pub. L.88-352), Section 16 of the Federal Energy Administration Act of 1974 (Pub.L.93-275), Section 401 of the Energy Reorganization Ad of 1974 (Pub.L.93~38), Ttle IX of the Education Amendments of 1972, as amended (PUb.L.92-318, Pub.L.93-568, antl Pub.L.94-482), Section 504 of the Rehabilitation Ad of 1973 (Pub.L.93-112), the Age Discrimination Act of 1975 (Pub.L.94-135), Title VIII of the Civil Rights Act of 1968 (Pub.L.90-284), the Department of Energy Organization Act of 1977 (PUb.L.95-91), and the Energy Conservation antl Production Ad of 1976, as amendetl (Pub.L.94385) and Title 10, Code of Federal Regulations, Pan 1040. In accordance with the above laws and regulations issued pursuant thereto, the Applicant agrees to assure that no person in the United States shall, on the ground of race, color, national origin, sex, age, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity in which the Applicant receives Federal assistance from the Department of Energy. Applicability and Period of Obligation In the case of any service, financial aid, covered employment, equipment, property, or sWcture provided, leased, or improved with Federal assistance extended fo the Applicant by the Department of Energy, this assurance obligates the Applicant for the period during which Federal assistance is extended. In the case of any transfer of such service, financial aid, equipment, property, or structure, this assurance obligates the transferee for the period during which Federal assistance is exended. If any personal property is so provided, this assurance obligates the Applicant for the period during which it retains ownership or possession of the property. In all other cases, Nis assurance obligates the Applicant for the period during which the Federal assistance is extended to the Applicant by the Department of Energy. Employment Practices Where a primary objective of the Fetleral assistance is to provide employment or where the Applicant's employment practices affect the delivery of services in programs or activities resulting from Federal assistance extended by the Depanment, the Applicant agrees not to discriminate on the ground of race, color, national origin, sex, age, or disability, in its employment practices. Such employment practices may include, but are not limited to, recruitment advertising, hiring, layoff or termination, promotion, demotion, transfer, rates of pay, training and participation in upward mobility programs; or other forms of compensation and use of facilities. Subrecipient Assurance The Applicant sball require any individual, organization, or other entitywith whom it subcontracts, subgrants, or subleases for the purpose of providing any service, financial aid, equipment, property, or structure to comply with laws cited above. To this end, the Subrecipient shall be required to sign a written assurance form, however, the obligation or both redpient and Subrecipient to ensure crompliance is not relieved by the collection or submission of written assurance forms. Data Collection and Access to Records The Applicant agrees to compile and maintain information pertaining to programs or activities developed as a result of the Applicant's receipt of Federal assistance from the Department of Energy. Such information shall include, but is not limited to, the following: (1) the manner in which services are or will be provided and related data necessary for determining whether any persons are or will be denied such services on the basis of prohibited discrimination; (2) the population eligible to be served by race, wlor, national origin, sex, age, and disability; (3) data regarding covered employment including use or planned use of bilingual public contact employees serving beneficiaries of the program where necessary to permit effective partidpaton by beneficiaries unable to speak or understand English; (4) the location of existing or proposed facilities connected with the program and related information adequate for determining whether the location has or will have the effect of unnecessarily tlenying access to any person on the basis of prohibited discrimination; (5) the present or proposed membership by race, color, national origin, sex, age, and disability, in arty planning or advisory body which is an integral part of the program; and (6) any additional written data determined by the Department of Energy to be relevant to its obligation to assure compliance by recipients with laws cited in the first paragraph of this assurance. ECAA ARRA T&Cs Page 1 of 2 5/11/10 Ex. D Att. 1 6-108 AWARD # DOE F 1600.5 (06-94) All Other Editions are Obsolete OMB Control No. 1 s1 aoaoo The Applicant agrees to submit requested data to the Department of Energy regarding programs and aUNities developed by the Applicant from the use of Federal assistance funds extended by the Department of Energy, Facilities of the Applicant (including the physical plants, building, or other structures) antl all records, books, accounts, and other sources of information pertinent to the Applicant's compliance with the civil rights laws shall be made available for inspection during normal business hours on request of an officer or employee of the Department of Energy specifically authorized to make such inspections. Instructions in this regard will be provided by the Director, Office of Civil Rights, U.S. Department of Energy. This assurance is given in consideration of and for the purpose of obtaining any antl all Federal grants, loans, contracts (ezGUding procurement contracts), property, discounts or other Federal assistance extended after the date hereto, to the Applicants by the Department of Energy, inUUding installment payments on account after such data of application for Federal assistance which are approved before such date. The Applicant recognizes and agrees that such Federal assistance vrill be extended in reliance upon the representation and agreements made in this assurance and that the United States shall have the right to seek judicial enforcement of this assurance. This assurance is binding on the Applicant, the successors, transferees, and assignees, as well as the person(s) whose signature appears below and who are authorized to sign this assurance on behalf of the Applicant. Applicant Certification The Applicant certifes that it has complied, or that, vriihin 90 days of the date of the grant, it vrili comply with all applicable requirements of 10 C.F.R. § 1040.5 (a copy will be furnished to the Applicant upon written request to DOE). Designated Responsible Employee ( ) Name antl Ttle (Printed to Typed) Telephone Number Applicant's Name Date Number ECAA ARRA T&Cs Page 2 of 2 5/11/10 Ex. D Att. 1 6-109 AWARD# EXHIBIT D ATTACHMENT2 CERTIFICATIONS REGARDING LOBBYING AND DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS Applicants should refer to the regulations cited below to determine the certification to which they are required to attest. Applicants should also review the instructions for certification included in the regulations before completing this form. Signature of this form provides for compliance with certification requirements under 10 CFR Part 601 "New Restrictions on Lobbying," 2 CFR Part 180 "OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement) and 2 CFR Part 907 "Nonprocurement Debarment and Suspension' The certifications shall be treated as a material representation of fact upon which reliance will be placed when the Department of Energy determines to award the covered transaction, grant, or cooperative agreement. LOBBYING The undersigned certifes, to the best of his or her knowledge and belief, that: (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the undersigned, to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form- LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all subawards at all tiers (including subcontracts, subgrants, and contrails under grants, loans, and cooperative agreements) and that all subrecipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transacion was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by section 1352, title 31, U.S. Code. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. 2. ADDITIONAL LOBBYING REPRESENTATION Applicant organizations which are described in section 501(c)(4) of the Internal Revenue Code of 1986 and engage in lobbying activities after December 31, 1995, are not eligible for the receipt of Federal funds constituting an award, grant, or loan. As set forth in seilion 3 of the Lobbying Disclosure Act of 1995 as amended, (2 U.S.C. 1602), lobbying activities are defined broadly to include, among other things, contacts on behalf of an organization with specified employees of the Executive Branch and Congress with regard to Federal legislative, regulatory, and program administrative matters. Check the appropriate block: The applicant is an organization described in section 501(c)(4) of the Internal Revenue Code of 1986? ^Yes ^No If you checked "Yes" above, check the appropriate block: The applicant represents that after December 31, 1995 it ^ has ^ has not engaged in any lobbying activities as defined in the Lobbying Disclosure Act of 1995, as amended. ECAA ARRA T&CS PE~agepl of 2 5/11/10 b~l~~ AWARD # 3. DEBARMENT, SUSPENSION, AND OTHER RESPONSIBILITY MATTERS (1) The prospective primary participant certifies to the best of its knowledge and belief, that it and its principals: (a) Are not presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from covered transactions by any Federal department or agency; (b) Have not within athree-year period preceding this proposal been convicted of or had a civil judgment rendered against them for commission of fraud or a criminal offense in connection with obtaining, attempting to obtain, or performing a public (Federal, State or local) transaction or contract under a public transaction; violation of Federal or State antitrust statutes or commission of embezzlement, theft, forgery, bribery; falsifcation or destruction of records, making false statements, or receiving stolemproperty; (c) Are not presently indicted for or otherwise criminally or civilly charged by a governmental entity (Federal, State or local) with commission of any of the offenses enumerated in paragraph (1)(b) of this certification; and (d) Have not within athree-year period preceding this application/proposal had one or more public transactions (Federal, State or local) terminated for cause or default. (2) Where the prospective primary participant is unable to certify to any of the statements in this certification, such prospective participant shall attach an explanation to this proposal. SIGNATURE As the duly authorized representative of the applicant, I hereby certify that the applicant will comply with the above certifications. Name of Applicant: Printed Name and Title of Authorized Representative: SIGNATURE ECAA ARRA T&Cs Page 2 of 2 5/i 1/10 ~=1"1'1 AWARD# EXHIBIT D ATTACHMENT3 STANDARD FORM LLL DISCLOSURE OF LOBBYING ACTIVITIES Approved by OMB 0348-0046 Complete this form to disclose lobbying activities pursuant to 31 U.S.C. 1352 (See reverse for oublic burden disclosure) 1. Type of Federal Action: _ 2. Status of Federal Action: 3. Report Type: a. contract a. bid/offer/application a. initial filing b. grant b. initial award b. material change c. cooperative agreement c. post-award d. loan For material change only: e. loan guarantee Year quarter f. loan insurance Date of last report 4. Name and Address of Reporting Entity: 5. If Reporting Entity in No. 4 is Subawardee, Enter Prime _Subawardee Name and Address of Prime: _ Tier , if Known: Congressional District, if known: Con ressional District, if known: 6. Federal DepartmenUAgency: 7. Federal Program Name/Description: CFDA Number, if applicable: 7. Federal Action Number, if known: 9. Award Amount, if known: $ 10. a. Name and Address of Lobbying Registrant b. Individuals Performing Services (including address (if individual, last name, first name, MI): if different from No. 10a) (last name, first name, MI): 11. Information requested through this form is authorized by title 31 U.S.C. section 1352. This Signature: disclosure of lobbying activities is a material representation of fact upon which reliance was placed Print Name: by the tier above when this transaction was made or entered into. This disclosure is required pursuant to 31 Title: U.S.C. 1352. This information will be reported to the Congress semi-annually and will be available for public Telephone No.: Date: inspection. Any person who fails to file the required disclosure shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. Federal Use Only ' Authorized for Local Reproduction Standard Form -LLL (Rev. 7-97) ECAA ARRA T&Cs Page t of 2 5/17/'10 Ex. D Att. 3 6-112 AWARD # INSTRUCTIONS FOR COMPLETION OF SF-LLL, DISCLOSURE OF LOBBYING ACTIVITIES This disclosure form shall be completed by the reporting entity, whether subawardee or prime Federal recipient, at the initiation or receipt of a covered Federal action, or a material change to a previous filing, pursuant to title 31 U.S.C. section 1352. The filing of a form is required for each payment or agreement to make payment to any lobbying entity for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with a covered Federal action. Complete all items that apply for both the initial filing and material change report. Refer to the implementing guidance published by the Office of Management and Budget for additional information. 1. Identify the type of covered Federal action for which lobbying activity is and/or has been secured to influence the outcome of a covered Federal action. 2. Identify the status of the covered Federal action. 3. Identify the appropriate classification of this report. If this is a follow-up report caused by a material change to the information previously reported, enter the year and quarter in which the change occurred. Enter the date of the last previously submitted report by this reporting entity for this covered Federal action. 4. Enter the full name, address, city, State and zip code of the reporting entity.. Include Congressional District, if known. Check the appropriate classification of the reporting entity that designates if it is, or expects to be, a prime or subaward recipient. Identify the tier of the subawardee, e.g., the first subawardee of the prime is the 1st tier. Subawards include but are not limited to subcontracts, subgrants and contract awards under grants. 5. If the organization filing the report in item 4 checks "subawardee," then enter the full name, address, city, State and zip code of the prime Federal recipient. Include Congressional District, if known. 6. Enter the name of the federal agency making the award or loan commitment. Include at least one organizational level below agency name, if known. For example, Department of Transportation, United States Coast Guard. 7. Enter the Federal program name or description for the covered Federal action (item 1). If known, enter the full Catalog of Federal Domestic Assistance (CFDA) number for grants, cooperative agreements, loans, and loan commitments. 8. Enter the most appropriate Federal identifying number available for the Federal action identified in item 1 (e.g., Request for Proposal (RFP) number; Invitations for Bid (IFB) number; grant announcement number; the contract, grant, or loan award number; the application/proposal control number assigned by the Federal agency). Included prefixes, e.g., "RFP-DE-90-001." 9. For a covered Federal action where there has been an award or loan commitment by the Federal agency, enter the Federal amount of the award/loan commitment for the prime entity ident~ed in item 4 or 5. 10. (a) Enter the full name, address, city, State and zip code of the lobbying registrant under the Lobbying Disclosure Act of 1995 engaged by the reporting entity identified in dem 4 to influence the covered Federal action. (b) Enter the full names of the individual(s) performing services, and include full address if different from 10(a). Enter Last Name, First Name, and Middle Initial (MI). 11. The certifying official shall sign and date the form, print his/her name, title, and telephone number According to the Paperwork Reduction Act, as amended, no persons are required to respond to a collection of information unless it displays a valid OMB control Number. The valid OMB control number for this information collection is OMB No. 0348-0046. Public reporting burden for this collection of information is estimated to average 10 minutes per response, including time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding the burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Office of Management and Budget, Paperwork Reduction Project (0348-0046), Washington, DC 20503 ECAA ARRA T&Cs Page 2 of 2 5/11/10 Ez. D Att. 3 6-113 AWARD # EXHIBIT D ATTACHMENT 4 By signing this agreement or accepting funds under this agreement, the Recipient assures that it will comply with applicable provisions of the following National Policy Assurances NATIONAL POLICY ASSURANCES (August 2008) To the extent that a term does not apply to a particular type of activity or awazd, it is self-deleting. I. Nondiscrimination Policies You must comply with applicable provisions of the following national policies prohibiting discrimination: 1 On the basis of race, color, or national origin, in Title VI of the Civil Rights Act of 1964 (42 U.S.C. 2000d et seq.), as implemented by DOE regulations at 10 CFR part 1040; 2 On the basis of sex or blindness, in Title IX of the Education Amendments of 1972 (20 U.S.C. 1681 et seq.), as implemented by DOE regulations at 10 CFR parts 1041 and 1042; 3 On the basis of age, in the Age Discrimination Act of 1975 (42 U.S.C.6101 et seq.), as implemented by Department of Health and Human Services regulations at 45 CFR part 90 and DOE regulations at 10 CFR part 1040; 4 On the basis of disability, in Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. 794), as implemented by Department of Justice regulations at 28 CFR part 41 and DOE regulations at 10 CFR part 1041; 5 On the basis of race, color, national origin, religion, disability, familial status, and sex under Title VIII of the Civil Rights Act (42 U.S.C. 3601 et seq.) as implemented by the Deparument of Housing and Urban Development at 24 CFR part 100; and 6 On the basis of disability in the Architectural Barriers Act of 1968(42 U.S.C. 4151 et seq.) for the design, construction, and alteration of buildings and facilities fmanced with Federal funds. II. Environmental Policies You must: 1 Comply with applicable provisions of the Clean Air Act (42 U.S.C.7401, et. seq.) and Clean Water Act (33 U.S.C. 1251, et. seq.), as implemented by Executive Order 11738 [3 CFR, 1971-1975 Comp., p. 799] and Environmental Protection Agency rules at 40 CFR part 32, Subpart J. 2 Immediately identify to us, as the awarding agency, any potential impact that you fmd this award may have on: ECAA ARRA T&Cs Page 1 of 7 5!71/10 6-~x14An. a AWARD # a. The quality of the human environment, including wetlands, and provide any help we may need to comply with the National Environmental Policy Act (NEPA, at 42 U.S.C. 4321 et. seq.) and assist us to prepare Environmental Impact Statements or other environmental documentation. In such cases, you may take no action that will have an adverse environmental impact (e.g., physical disturbance of a site such as breaking of ground) or limit the choice of reasonable alternatives until we provide written notification of Federal compliance with NEPA, as implemented by DOE at 10 CFR part 1021. b. Flood-prone areas, and provide any help we may need to comply with the National Flood Insurance Act of 1968 and Flood Disaster Protection Act of 1973 (42 U.S.C. 4001 et. seq.), which require flood insurance, when available, for Federally assisted construction or acquisition in flood- prone aeeas, as implemented by DOE at 10 CFR part 1022. c. Use of land and water resources of coastal zones, and provide any help we may need to comply with the Coastal Zone Management Act of 1972(16 U.S.C. 1451, et. seq.). d. Coastal bamers along the Atlantic and Gulf coasts and Great Lakes' shores, and provide help we may need to comply with the Coastal Barriers Resource Act (16 U.S.C. 3501 et. seq.), concerning preservation of bamer resources. e. Any existing or proposed component of the National Wild and Scenic Rivers system, and provide any help we may need to comply with the Wild and Scenic Rivers Act of 1968 (16 U.S.C. 1271 et seq.). £ Underground sources of drinking water in aeeas that have an aquifer that is the sole or principal drinking water source, and provide any help we may need to comply with the Safe Drinking Water Act(42 U.S.C. 300h-3). 3 Comply with applicable provisions of the Lead-Based Paint Poisoning Prevention Act (42 U.S.C. 4821-4846), as implemented by the Department of Housing and Urban Development at 24 CFR part 35. The requirements concern lead-based paint in housing owned by the Federal Government or receiving Federal assistance. 4 Comply with section 6002 of the Resource Conservation and Recovery Act of 1976, as amended (42 U.S.C. 6962), and implementing regulations of the Environmental Protection Agency, 40 CFR Part 247, which require the purchase of recycled products by States or political subdivision of States. IIi. Live Organisms 1 Human research subjects. You must protect the rights and welfaze of individuals that participate as human subjects in reseazch under this awazd in accordance with the Common Federal Policy for the Protection of Human Subjects (45 CFR part 46), as implemented by DOE at 10 CFR part 745. 2 Animals and plants. a. You must comply with applicable provisions of Department of Agriculture rules at 9 CFR parts 1- 4 that implement the Laboratory Animal Welfaze Act of 1966 (7 U.S.C. 2131-2156) and provide for humane transportation, handling, caze, and treatment of animals used in research, experimentation, or testing under this award. ECAA ARRA T&Cs Page 2 of 7 5/11110 Ex. D Att. 4 6-115 AWARD # b. You must follow the guidelines in the National Academy of Sciences(NAS) Publication "Guide for the Care and Use of Laboratory Animals"(1996, which may be found currently at http://www.nap.edu/readingroom/books/labratsn and comply with the Public Health Service Policy and Government principles Regarding the Care and use of animals (included as Appendix D to the NAS Guide). c. You must immediately identify to us, as the awazding agency, any potential impact that you find this award may have on endangered species, as defined by the Endangered Species Act of 1973, as amended ("the Act," 16 U.S.C. 1531-1543), and implementing regulations of the Departments of the Interior (50 CFR parts 10-24) and Commerce (50 CFR parts 217-227). You also must provide any help we may need to comply with 16 U.S.C. 1536(a)(2). This is not in lieu of responsibilities you have to comply with provisions of the Act that apply directly to you as a U.S. entity, independent of receiving this awazd. IV. Other National Policies 1 Debarment and suspension. You must comply with requirements regazding debarment and suspension in Subpart C of 2 CFR parts 180 and 901. 2 Drug-free workplace. You must comply with drug-free workplace requirements in Subpart B of 10 CFR part 607, which implements sec. 5151-5160 of the Drug-Free Workplace Act of 1988 (Pub. L. 100-690, Title V, Subtitle D; 41 U.S.C. 701, et seq.). 3 Lobbying. a. You must comply with the restrictions on lobbying in 31 U.S.C.1352, as implemented by DOE at 10 CFR part 601, and submit all disclosures required by that statute and regulation. b. If you aze a nonprofit organization described in section 501(c)(4)of title 26, United States Code (the Internal Revenue Code of 1968),you may not engage in lobbying activities as defined in the Lobbying Disclosure Act of 1995 (2 U.S.C., Chapter 26). If we determine that you have engaged in lobbying activities, we will cease all payments to you under this and other awazds and terminate the awards unilaterally for material failure to comply with the award terms and conditions. By submitting an application and accepting funds under this agreement, you assure that you aze not an organization described in section 501(c)(4) that has engaged in any lobbying activities described in the Lobbying Disclosure Act of 1995 (2 U.S.C. 1611). c. You must comply with the prohibition in 18 U.S.C. 1913 on the use of Federal funds, absent express Congressional authorization, to pay duectly or indirectly for any service, advertisement or other written matter, telephone communication, or other device intended to influence at any time a Member of Congress or official of any government concerning any legislation, law, policy, appropriation, or ratification. 4 Officials not to benefit. You must comply with the requirement that no member of Congress shall be admitted to any share or part of this agreement, or to any benefit arising from it, in accordance with 41U.S.C. 22. ECAA ARRA T&Cs Page 3 of 7 5111110 Ez. D Att. 4 s-~~6 AWARD # 5 Hatch Act. If applicable, you must comply with the provisions of the Hatch Act (5 U.S.C. 1501- 1508 and 7324-7326), as implemented by the Office of Personnel Management at 5 CFR part 151, which limits political activity of employees or officers of State or local governments whose employment is connected to an activity financed in whole or part with Federal funds. 6 Native American graves protection and repatriation. If you control or possess Native American remains and associated funerary objects, you must comply with the requirements of 43 CFR part 10, the Department of the Interior implementation of the Native American Graves Protection and Repatriation Act of 1990 (25 U.S.C., chapter 32). 7 Fly America Act. You must comply with the International Air Transportation Fair Competitive Practices Act of 1974 (49 U.S.C. 40118), commonly referred to as the "Fly America Act," and implementing regulations at 41 CFR 301-10.131 through 301-10.143. The law and regulations require air transport of people or properly to, from, between or within a country other than the United States, the cost of which is supported under this awazd, to be performed by or under acost-sharing arrangement with a U.S. flag carrier, if service is available. 8 Use of United States-flag vessels. a. Pursuant to Pub. L. 664 (43 U.S.C. 1241(b)), at least 50 percent of any equipment, materials or commodities procured, contracted for or otherwise obtained with funds under this award, and which may be transported by ocean vessel, must be transported on privately owned United States-flag commercial vessels, if available. b. Within 20 days following the date of loading for shipments originating within the United States or within 30 working days following the date of loading for shipments originating outside the United States, a legible copy of a rated, "on-boazd" commercial ocean bill-of-lading in English for each shipment of cargo described in paragraph 9.a of this section shall be furnished to both our award administrator (through you in the case of your contractor's bill-of-lading) and to the Division of National Cargo, Office of Market Development, Maritime Administration, Washington, DC 20590. 9 Research misconduct. You must comply with the government-wide policy on reseazch misconduct issued by the Office of Science and Technology Policy (available in the Federal Register at 65 FR 76260, December 6,2000, or on the Internet at www.ostp.gov), as implemented by DOE at 10 CFR part 733 and 10 CFR 600.31. 10 Requirements for an Institution of Higher Education Concerning Military recruiters and Reserve Officers Training Corps (ROTC). a. As a condition for receiving funds under an awazd by the National Nuclear Security Administration of the Department of Energy, you agree that you are not an institution of higher education that has a policy or practice placing any of the restrictions specified in 10 U.S.C. 983. as implemented by 32 CFR part 216, on: i. Maintenance, establishment, or operation of Senior ROTC units, or student participation in those units; or ii. Military recruiters' access to campuses, students on campuses, or information about students. ECAA ARRA T&Cs Page 4 of 7 5~11~10 Ex. D Att. 4 6-~~7 AWARD # b. If you are determined, using the procedures in 32 CFR part 216, to be such an institution of higher education during the period of performance of this award, we: i. Will cease all payments to you of funds under this awazd and all other awazds subject to the requirements in 32 CFR part 216; and ii. May suspend or terminate those awards unilaterally for material failure to comply with the awazd terms and conditions. 11. Historic preservation. You must identify to us any a. Any property listed or eligible for listing on the National Register of Historic Places that will be affected by this awazd, and provide any help we may need, with respect to this award, to comply with Section 106 of the National Historic Preservation Act of 1966 (16 U.S.C. 470f), as implemented by the Advisory Council on Historic Preservation regulations at 36 CFR part 800 and Executive Order 11593, "Identification and Protection of Historic Properties," [3 CFR, 1971-1975 Comp., p. 559]. b. Potential under this award for irreparable loss or destruction of significant scientific, prehistorical, historical, or archeological data, and provide any help we may need, with respect to this awazd, to comply with the Archaeological and Historic Preservation Act of 1974 (16 U.S.C.469a-1, et seq.). 12 Relocation and real property acquisition. You must comply with applicable provisions of 49 CFR part 24, which implements the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970(42 U.S.C. 4601, et seq.) and provides for fair and equitable treatment of persons displaced by federally assisted programs orpersons whose properly is acquired as a result of such programs. 13 Confidentiality of patient records. You must keep confidential any records that you maintain of the identity, diagnosis, prognosis, or treatment of any patient in connection with any program or activity relating to substance abuse education, prevention, training, treatment, or rehabilitation that is assisted directly or indirectly under this awazd, in accordance with 42 U.S.C. 290dd-2. 14 Consfitution Day. You must comply with Public Law 108-447, Div. J; Title I, Sec. 111 (36 U.S.C. 106 note), which requires each educational institution receiving Federal funds in a Federal fiscal yeaz to hold an educational program on the United States Constitution on September 17thduring that year for the students served by the educational institution. 15 Trafficking in Persons a. Provisions applicable to a recipient that is a private entity. 1. You as the recipient, your employees, subrecipients under this award, and subrecipients' employees may not- i. Engage in severe forms of trafficking in persons during the period of time that the award is in effect; ii. Procure a commercial sex act during the period of time that the award is in effect; or ECAA ARRA T&Cs Page 5 of 7 5/11/10 6-~1Xl~n. a AWARD# iii. Use forced labor in the performance of the awazd or subawazds under the award. 2. We, as the awarding agency, may unilaterally terminate this award, without penalty, if you or a subrecipient that is a private entity - i. Is determined to have violated a prohibition in pazagraph a.l of this award term; or ii. Has an employee who is determined by the agency official authorized to terminate the award to have violated a prohibition in pazagraph a.l of this award term through conduct that is either- A. Associated with performance under this award; or B. Imputed to you or the subrecipient using the standards and due process for imputing the conduct of an individual to an organization that aze provided in 2 CFR part 180, "OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement)," as implemented by our agency at 2 CFR part 901. b. Provision applicable to a recipient other than a private entity. We, as the awarding agency, may unilaterally terminate this award, without penalty, if a subrecipient that is a private entity- 1. Is determined to have violated an applicable prohibition in paragraph a.l of this award term; or 2. Has an employee who is determined by the agency official authorized to terminate the award to have violated an applicable prohibition in paragraph a.l of this award term through conduct that is either- i. Associated with performance under this award; or ii. Imputed to the subrecipient using the standards and due process for imputing the conduct of an individual to an organization that are provided in 2 CFR part 180, "OMB Guidelines to Agencies on Governmentwide Debarment and Suspension (Nonprocurement)," as implemented by our agency at 2 CFR part 901. c. Provisions applicable to any recipient. 1. You must inform us immediately of any information you receive from any source alleging a violation of a prohibition in paragraph a.l of this award term. 2. Our right to terminate unilaterally that is described in pazagraph a.2 or b. of this section: i. Implements section 106(g) of the Trafficking Victims Protection Act of 2000 (TVPA), as amended (22 U.S.C. 7104(g)), and ii. Is in addition to all other remedies for noncompliance that aze available to us under this award. ECAA ARRA T&Cs Page 6 of 7 5/11/10 D K.4 6-~~ AWARD# 3. You must include the requirements of paragraph a.l of this awazd term in any subaward you make to a private entity. d. Definitions. For purposes of this award term: 1. "Employee" means either: i. An individual employed by you or a subrecipient who is engaged in the performance of the project or program under this award; or ii. Another person engaged in the performance of the project or program under this award and not compensated by you including, but not limited to, a volunteer or individual whose services aze contributed by a third party as an in-kind contribution toward cost sharing or matching requirements. 2. "Forced labor" means labor obtained by any of the following methods: the recruitment, hazboring, transportation, provision, or obtaining of a person for labor or services, through the use of force, fraud, or coercion for the purpose of subjection to involuntary servitude, peonage, debt bondage, or slavery. 3. "Private entity": i. Means any entity other than a State, local government, Indian tribe, or foreign public entiTy, as those terms are defined in 2 CFR 175.25. ii. Includes: A. A nonprofit organization, including any nonprofit institution of higher education, hospital, or tribal organization other than one included in the defmition of Indian tribe at 2 CFR 175.25(b). B. Afor-profit organization. 4. "Severe forms of trafficking in persons," "commercial sex act," and "coercion" have the meanings given at section 103 of the TVPA, as amended (22 U.S.C. 7102). V. National Policy Requirements for Subawards. Recipient responsibility. You must include in any subaward you make under this award the requirements of the national policy requirements in Sections I through N of this document that apply, based on the type of subawazdee organization and situation ECAA ARRA T&Cs Page 7 of 7 5111/10 Ex. D Att. 4 6-120 AWARD # EXHIBIT D ATTACHMENTS FEDERAL INTELLECTUAL PROPERTY PROVISIONS Intellectual Property Provisions (NRD-1003) Nonresearch and Development Under this Agreement, the following intellectual property provisions apply to the rights of the Energy Commission and the U.S. Department of Energy (DOE). Nonprofit organizations are subject to the intellectual property requirements at 10 CFR 600.136(a), (c) and (d). All other organizations are subject to the intellectual property requirements at 10 CFR 600.136(a) and (c). 10 CFR 600 136 Intanoible orooertv. (a) The Energy Commission may copyright any work that is subject to copyright and was developed, or for which ownership was purchased, under an award. DOE reserves aroyalty- free, nonexclusive and irrevocable right to reproduce, publish or otherwise use the work for Federal purposes, and to authorize others to do so. (c) DOE has the right to: (1) Obtain, reproduce, publish dr otherwise use the data first produced under an award; and (2) Authorize others to receive, reproduce, publish, or otherwise use such data for Federal purposes. (d) (1) In addition, in response to a Freedom of Information act (FOIA) request for research data relating to published research findings produced under an award that were used by the Federal Government in developing an agency action that has the force and effect of law, the DOE shall request, and the Energy Commission shall provide, within a reasonable time, the research data so that they can be made available to the public through the procedures established under the FOIA. If the DOE obtains the research data solely in response to a FOIA request, the agency may charge the requester a reasonable fee equaling the full incremental cost of obtaining the research data. This fee should reflect the costs incurred by the agency, the Energy Commission, and applicable subrecipients. This fee is in addition to any fees the agency may assess under the FOIA (5 U.S.C. 552(a)(4)(A)). ECAA ARRA T&Cs Page 7 of 1 5/11/10 Ez. D rjtt_ 1 21 AWARD # EXHIBIT D ATTACHMENT6 PROJECT TYPE METRICS Metrics Activity: The key metrics to be reported will vary by project type. The minimum information to be reported, by project activity type, is listed below. The project type metrics to be reported for this award are checked below. ^Building Codes and Standards ^ Name of new code adopted ^ Name of old code replaced ^ Number and percentage of new and existing buildings covered by new code ^ Other: ^Building Retrofits ^ Number of buildings retrofitted, by sector ^ Square footage of buildings retrofitted, by sector ^ Other: ^Clean Energy Policy ^ Number of alternative energy plans developed or improved ^ Number of renewable portfolio standards established or improved ^ Number of interconnection standards established or improved ^ Number of energy efficiency portfolio standards established or improved ^ Number of other policies developed or improved ^ Other: ^Building Energy Audits ^ Number of audits performed, by sector ^ Floor space audited, by sector ^ Auditor's projection of energy savings, by sector ^ Other: ^Energy Efficiency Rating and Labeling ^ Types of energyconsuming devices for which energy-efficiency rating and labeling systems were endorsed by the State government, schools, or institutional procurement ^ Other: ^Government, School, Institutional Procurement ^ Number of units purchased, by type (e.g., vehicles, ofFce equipment, HVAC equipment, streetlights, exit signs) ^ Other. ^Industrial Process Efficiency (kwh equivalents) ^ Reduction in natural gas consumption (mmcf) ^ Reduction in fuel oil consumption (gallons) ^ Reduction in electricity consumption (MWh) ^ Other: ECAA ARRA TBCs Page 1 of 2 5/11/10 Ex. D Att. 6 6-122 AWARD # ^Industrial Retrofit Support ^ Number of buildings retrofitted, by industry type ^ Square footage of buildings retrofitted, by industry type ^ Other: ^Loans and Grants ^ Number and monetary value of loans given ^ Number and monetary value of grants given ^ Other: ^Renewable Energy Market Development ^ Number and size of solar energy systems installed ^ Number and size of wind energy systems installed ^ Number and size of other renewable energy systems installed ^ Other: ^Tax Credits ^ Monetary value of tax credits given, by sector ^ Other: ^Financial Incentives for Energy Efficiency and Other Covered Investments ^ Number and monetary value of financial incentive provided, by sector ^ Total value of investments incentivized, by sector ^ Other: ^Technical Assistance ^ Number of information transactions contacts (for example, webinar, site visit, media, fact sheet) in which energy efFciency or renewable energy measure were recommended, by sector ^ Other: ^Transportation ^ Number of alternative fuel vehicles purchased ^ Number of conventional vehicles converted to alternative fuel use ^ Number of new alternative refueling stations emplaced ^ Number of new carpools and vanpools formed ^ Number ofenergy-efficient traffic signals installed ^ Number of street lane-miles for which synchronized traffic signals were installed ^ Other. ^Workshops, Training, and Education ^ Number of workshops, training, and education sessions held, by sector ^ Type of workshops, training, and education sessions held ^ Number of people attending workshops, training, and education sessions, by sector ^ Other: ^Other Activities Not Previously Defined ^ Pertinent metric information for any activity not defined above should be captured and included as needed ^ Other: ^ Other: ^ Other: ECAA ARRA T&Cs Page 2 of 2 5!'11/10 Ex. D Att. 6 6-123 AWARD # EXHIBIT D ATTACHMENT7 DAMS-BACON AND CONTRACT WORK HOURS AND SAFETY STANDARDS ACT (1) Definitions. For purposes of this exhibit, Davis Bacon Act and Contract Work Hours and Safety Standards Act, the following definitions are applicable: a) Award means any grant, cooperative agreement or technology investment agreement made with Recovery Act funds by the Department of Energy (DOE) to a Recipient. Such Award must require compliance with the labor standards clauses and wage rate requirements of the Davis-Bacon Act (DBA) for work performed by all laborers and mechanics employed by Recipients (other than a unit of State or local government whose own employees perform the construction) Subrecipients, Contractors and subcontractors. b) Contractor means an entity that enters into a Contract. For purposes of these clauses, Contractor shall include (as applicable) prime contractors, Recipients, Subrecipients, and Recipients' or Subrecipients' contractors, subcontractors, and lower-tier subcontractors. "Contractor" does not mean a unit of State or local government where construction is performed by its own employees. c) Contract means a contract executed by a Recipient, Subrecipient, prime contractor or any tier subcontractor for construction, alteration, or repair. It may also mean (as applicable) (i) financial assistance instruments such as grants, cooperative agreements, technology investment agreements, and loans; and, (ii) Sub awards, contracts and subcontracts issued under financial assistance agreements. "Contract" does not mean a financial assistance instrument with a unit of State or local government where construction is performed by its own employees. d) Contracting Officer means the DOE official authorized. to execute an Award on behalf of DOE and who is responsible for the business management and non- program aspects of the financial assistance process e) Recioient means any entity other than an individual that receives an Award of Federal funds in the form of a grant, cooperative agreement or technology investment agreement directly from the Federal Government and is financially accountable for the use of any DOE funds or property, and is legally responsible for carrying out the terms and conditions of the program and Award. Sutiaward means an award of financial assistance in the form of money, or property in lieu of money, made under an award by a Recipient to an eligible Subrecipient or by a Subrecipient to a lower- tier subrecipient. The term includes financial assistance when provided by any legal agreement, even if the agreement is called a contract, but does not include the Recipient's procurement of goods and services to carry out the program nor does it include any form of assistance which is excluded from the definition of "Award" above. ECAA ARRA T&Cs Page 7 of 11 5/11/10 Ex. D Att. 7 6-124 AWARD# g) Subrecioient means anon-Federal entity that expends Federal funds received from a Recipient to carry out a Federal program, but does not include an individual that is a beneficiary of such a program. (2) Davis Bacon Act a) Minimum wages (i) All laborers and mechanics employed or working upon the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR part 3) ), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. The most current wage determinations of the Secretary of Labor applicable to this Agreement are posted at www.wdol.gov, and are hereby incorporated by reference into this Agreement. The Secretary of Labor periodically updates wage rates to reflect the prevailing wages in a particular locality. The Recipient, Subrecipient, the Recipient's and Subrecipient's contractors and subcontractors are responsible for checking the wage determinations published at www.wdol.gov to ensure that the most recent wage determination is incorporated into any contract or subcontract. Note: The Recipient, Subrecipients, the Recipient's and Subrecipient's contractors and subcontractors under this Agreement may not use the residential weatherization worker wage determination published for the Weatherization Assistance Program. Once a wage determination is applied to any contract or subcontract, the wages set forth in that wage determination shall remain effective for the entire term of that contract even if the Secretary of Labor updates its wage determinations during the term of the contract. The Recipient, Subrecipients, the Recipient's and Subrecipient's contractors and subcontractors are encouraged to contact the U.S. Department of Labor (DOL) Wage and Hour Division at 1-866-487-9243, or their local DOL Wage and Hour office, with questions concerning choosing the correct wage rates to be paid to a contractor or subcontractor. ECAA ARRA T&Cs Page 2 of 11 Ex. D Att. 7 5/11/10 6-125 AWARD# Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to 29 CFR Section 5.5 (a)(1)(iv) also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR Section 5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, That the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under 29 CFR Section 5.5 (a)(1)(ii)) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. (ii) (a) The Contracting Officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the Contract shall be classified in conformance with the wage determination. The Contracting Officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: i. The work to be performed by the classification requested is not performed by a classification in the wage determination; and ii. The classification is utilized in the area by the construction industry; and iii. The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (b) If the Contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the Contracting Officer agree on the classification and wage rate (including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the Contracting Officer to the Administrator of the Wage and Hour Division, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary. ECAA ARRA T&Cs Page 3 of 11 5/11/10 Ex. D Att. 7 6-126 AWARD# (c) In the event the Contractor, the laborers or mechanics to be employed in the classification or their representatives, and the Contracting Officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the Contracting Officer shall refer the questions, including the views of all interested parties and the recommendation of the Contracting Officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary. (d) The wage rate (including fringe benefits where appropriate) determined pursuant to 29 CFR Section 5.5(a)(1)(ii)(B) or (C), shall be paid to all workers performing work in the classification under this Contract from the first day on which work is performed in the classification. (iii) Whenever the minimum wage rate prescribed in the Contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the Contractor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. b) Withholding. The Department of Energy or the Recipient or Subrecipient shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the Contractor under this Contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the Contract. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work (or under the United States Housing Act of 1937 or under the Housing Act of 1949 in the construction or development of the project), all or part of the wages required by the Contract, the Department of Energy, Recipient or Subrecipient may, after written notice to the Contractor, sponsor, applicant, or owner, take such action as may be necessary ECAA ARRA T&Cs Page 4 of 11 5/11110 Ex. D Att. 7 6-~27 AWARD # to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. c) Payrolls and basic records. (i) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work (or under the United States Housing Act of 1937, or under the Housing Act of 1949, in the construction or development of the project). Such records shall contain the name, address, and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis- Bacon Act), daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR Section 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (ii) (a) The Contractor shall submit weekly for each week in which any Contract work is performed a copy of all payrolls to the Department of Energy if the agency is a parry to the Contract, but if the agency is not such a party, the Contractor will submit the payrolls to the Recipient or Subrecipient (as applicable) applicant, sponsor, or owner, as the case may be, for transmission to the Department of Energy. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR Section 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH- 347 is available for this purpose from the Wage and Hour Division Web site at http://www.dol.gov/whd/forms/wh347instr.htm or its successor site. The prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker, and shall provide them upon request to the Department of Energy if the agency is a party to the Contract, but if the agency is not such a party, the Contractor will submit them to the Recipient or ECAA ARRA T&Cs Page 5 of 11 SI11I10 Ex. D Att. 7 6-128 AWARD# Subrecipient (as applicable) applicant, sponsor, or owner, as the case may be, for transmission to the Department of Energy, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the sponsoring government agency (or the Recipient or Subrecipient (as applicable) applicant, sponsor, or owner). (b) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the Contract and shall certify the following: That the payroll for the payroll period contains the information required to be provided under Secticn 5.5 (a)(3)(ii) of Regulations, 29 CFR part 5, the appropriate information is being maintained under Section 5.5 (a)(3)(i) of Regulations, 29 CFR part 5, and that such information is correct and complete; ii. That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the Contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations, 29 CFR part 3; That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the Contract. (c) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by 29 CFR Section 5.5 (a)(3)(ii)(B). (d) The falsification of any of the above certifications may subject the Contractor or subcontractor to civil or criminal prosecution under section 1001 of title 18 and section 3729 of title 31 of the United States Code. (iii) The Contractor or subcontractor shall make the records required under 29 CFR Section 5,5(a)(3)(i) available for inspection, copying, or transcription by authorized representatives of the .Department of Energy or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit the required records or to make them available, the Federal agency may, after written notice to the Contractor, sponsor, applicant, or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of ECAA ARRA T&Cs Page 6 of 11 5111/10 Ex. D Att. 7 6-129 AWARD# funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR Section 5.12. d) Apprentices and trainees- (i) Apprentices. Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the Contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a Contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the Contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR Section 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually ECAA ARRA T&Cs Page 7 of 11 Ex. D Att. 7 5111!10 6-130 AWARD # registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at not less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who. is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (iii) Equal employment opportunity. The utilization of apprentices, trainees and journeymen under this part shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR part 30. e) Compliance with Copeland Act requirements. The Contractor shall comply with the requirements of 29 CFR part 3, which are incorporated by reference in this Contract. Contracts and Subcontracts. The Recipient, Subrecipient, the Recipient's and Subrecipient's contractors and subcontractor shall insert in any Contracts the clauses contained in 29 CFR Sections 5.5(a)(1) through (10) and such other clauses as the Department of Energy may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The Recipient shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all of the paragraphs in this clause. g) Contract termination: debarment. A breach of the Contract clauses in 29 CFR Section 5.5 may be grounds for termination of the Contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR Section 5.12. ECAA ARRA TBCs Page 8 of 11 Ex. D Att. 7 sn v1 a 6-131 AWARD # h) Compliance with Davis-Bacon and Related Act requirements. All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR parts 1, 3, and 5 are herein incorporated by reference in this Contract. i) Disputes concerning labor standards. Disputes arising out of the labor standards provisions of this Contract shall not be subject to the general disputes clause of this Contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR parts 5, 6, and 7. Disputes within the meaning of this clause include disputes between the Recipient, Subrecipient, the Contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. j) Certification of eligibility. (i) By entering into this Contract, the Contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the Contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR Section 5.12(a)(1). (ii) No part of this Contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR Section 5.12(a)(1). (iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. Section 1001. k) Requirement to submit copies of certified payrolls Borrower is responsible to submit to the Energy Commission on a weekly basis from the beginning of the project, a copy of all certified payrolls prepared in accordance with this Exhibit for all lower tier contractors. Requirement to notify the Energy Commission of any non-compliance Borrower is responsible to notify the Energy Commission of any non-compliance with Davis-Bacon Act prevailing wage requirements by any lower tier contractors. 3) Contract Work Hours and Safety Standards Act. As used in this paragraph, the terms laborers and mechanics include watchmen and guards. a) Overtime requirements. No Contractor or subcontractor contracting for any part of the Contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek ECAA ARRA TBCs Page 9 of N 5111/10 Ex. D Att. 7 6-132 AWARD # b) Violation; liability for unpaid wages; liquidated damages. In the event of any violation of the clause set forth in 29 CFR Section 5.5(b)(1) the Contractor and any subcontractor responsible therefore shall be liable for the unpaid wages. In addition, such Contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set. forth in 29 CFR Section 5.5(b)(1), in the sum of $10 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in 29 CFR Section 5.5(b)(1). c) Withholding for unpaid wages and liquidated damages. The Department of Energy or the Recipient or Subrecipient shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the Contractor or subcontractor under any such contract or any other Federal contract with the same prime Contractor, or any other federally-assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime Contractor, such sums as may be determined to be necessary to satisfy any liabilities of such Contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in 29 CFR Section 5.5 (b)(2)~ d) Contracts and Subcontracts. The Recipient, Subrecipient and Recipient's and Subrecipient's contractor or subcontractor shall insert in any Contracts the clauses set forth in 29 CFR Sections 5.5 (b)(1) through (4) and also a clause requiring the subcontractors to include these clauses in any .lower tier subcontracts. The Recipient shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in 29 CFR Sections 5.5 (b)(1) through (4) . d) The Contractor or subcontractor shall maintain payrolls and basic payroll records during the course of the work and shall preserve them for a period of three years from the completion of the Contract for all laborers and mechanics, including guards and watchmen, working on the Contract. Such records shall contain the name and address of each such employee, social security number, correct classifications, hourly rates of wages paid, daily and weekly number of hours worked, deductions made, and actual wages paid. The records to be maintained under this paragraph shall be made available by the Contractor or subcontractor for inspection, copying, or transcription by authorized representatives of the Department of Energy and the Department of Labor, and the Contractor or subcontractor will permit such representatives to interview employees during working hours on the job. ECAA ARRA T&Cs Page 10 of 11 5/11/10 Ex. D Att. 7 6-133 AWARD # SIGNATURE As the duly authorized representative of the applicant, I hereby certify that the applicant will comply with the requirements of 29 C.F.R. § 5.5. Name of Applicant: Printed Name and Title of Authorized Representative: IGNATURE DATE ECAA ARRA T&Cs Page 11 of 11 Ex. D Att. 7 sn v10 6-134 AWARD# EXHIBIT D ATTACHMENT8 VENDOR FLOW-DOWN PROVISIONS The provisions below must be included in all contracts with vendors that receive ARRA funding. The terms "vendor" and "subrecipient" as used below refer to those entities defined as such by Office of Management and Budget (OMB) Circular A-133, Subpart A, Section .105 and Subpart B, Section .210. NOTE: Section numbers in parentheses refer to Section Number of this Agreement A. Federal RegulationslGuidelineslOMBCirculars Incorporated by Reference Title 10 CFR Part 600 (Section 1) 2. Additional provisions that apply to the vendor (Section 1) B. Special Provisions Relating to Work Funded under the American Recovery and Reinvestment Act of 2009 3. ARRA-Funded Project (Section 2A) 4. Segregation of Costs and Records (Section 2D) 5. Prohibition on Use of ARRA Funds (Section 2E) 6. Access to Records (Section 2F) 7. Protecting State and Local Government and Contractor Whistleblowers (Section 2H) 8. Information in Support of ARRA Reporting (Section 21) 9. False Claims Act (Section 2J) 10. Reporting and Registration Requirements under Section 1512 of ARRA (Applicable only if payment to the vendor is $25,000 or more. Please use the following language in vendor subcontracts, rather than the language in the "Reporting and Registration Requirements" paragraph in this exhibit) (Section 2L) As this award requires [name of vendor] to complete projects or activities funded under ARRA, [name of vendor] must provide the following "Vendor Data Elements" to [name of subrecipient, or name of other entity that entered into contract with vendor]. This information must be provided to [name of subrecipient], so that it may fulfill its ARRA reporting obligations: Dun and Bradstreet Data Universal Numbering System (DUNS) Number (htto:/iwww.dnb.com) or name and zip code of headquarters 11. Required Use of American Iron, Steel, and Manufactured Goods (Covered Under International Agreements) - Section1605 of ARRA (Section 2M) 12. Wage Rate Requirements Under Section 1606 of ARRA (Section 2N) 13. ARRA Transactions Listed in Schedule of Expenditures of Federal Awards (Section 20) ECAA ARRA T&Cs Page 1 of 2 5/'11/10 Ex. D Att. 8 6-135 AWARD# C. Additional Federal Provisions 14. Site Visits (Section 3) 15. Non-Discrimination Clause (Section 4) 16. Certifications Regarding Lobbying and Debarment, Suspension and Other Responsibility Matters (Section 5) 17. Lobbying Restrictions (Section 6) 18. National Policy Assurances (Section 7) 19. Intellectual Property Provisions (Section 9) 20. Federal, State, and Municipal Requirements (Section 10) 21. Decontamination and/or Decommissioning (D&D) Costs (Section 12) 22. Notice Regarding the Purchase of American-Made Equipment and Products-Sense of Congress (Section 14) 23. Resolution of Conflicting Conditions (Please use the following language in vendor subcontracts, rather than the language in the "Resolution of Conflicting Conditions" paragraph in this exhibit) (Section 17) Any apparent inconsistency between federal statutes and regulations and the terms and conditions contained in this award must be referred to [name of subrecipient, or name of other entity that entered into contract with vendor]. [Name of subrecipient] will refer the matter to the Energy Commission's Chief Counsel's Office for guidance. 24. Cash Management Improvement Act (Section 20) 25. Specific Requirement to Submit Waste Management Plan (Section 21) 26. Subcontracts (Section 22) D. Exhibit D Attachments 27. Attachment 2 - Certifications Regarding Lobbying and Debarment, Suspension, and Other Responsibility Matters 28. Attachment 3 -Standard Form LLL, Disclosure of Lobbying Activities 29. Attachment 4 -National Policy Assurances (Applicable provisions) 30. Attachment 5 -Federal Intellectual Property Provisions 31. Attachment 7 -Davis-Bacon Act and Contract Work Hours and Safety Standards Act ECAA ARRA T&Cs Page 2 of 2 5/11/10 Ez. D Att. 8 6-136 ~vli .-.~.~ ~~ CHUlA V1SfA REQUEST FOR PROPOSAL (RFP) TO PROVIDE DESIGN BUILD SERVICES FOR THE DESIGN AND CONSTRUCTION OF THE MUNICIPAL STREET LIGHTING RETROFIT PROJECT IN THE CITY OF CHULA VISTA, CA RFP ISSUED: December 16th, 2009 SUBMITTALS ARE DUE BY: January 19th, 2010 City of Chula Vista Engineering Department 276 Fourth Avenue Building 200 Chula Vista, CA 91910 THIS IS A PREVAILING WAGE PROJECT 6-137 TABLE OF CONTENTS I. INTRODUCTION ................................................................................................................1 II SCOPE OF SERVICES ......................................................................................................2 A. Project Control (All Phases) ..........................................................................................2 B. Design Phase Services ...................................................................................................2 C. Construction Phase Services ....................................................................4 D. Operations and Startup Phase Services ........................................................5 III DESIGN BUILDER SELECTION PROCESS ....................................................6 N REQUEST FOR PROPOSALS SCHEDULE .....................................................7 V PUBLIC DISCLOSURE ..............................................................................7 VI SUBMITTAL REQUIREMENTS ...................................................................7 VII CONTRACT TERMS AND CONDITIONS ......................................................9 ATTACHMENT A -SPECIFICATIONS ................................................................12 ATTACHMENT B -SAMPLE DESIGN BUILD AGREEMENT ...................................13 ATTACHMENT C -ENERGY EFFICIENCY & CONSERVATION BLOCK GRANT (EECBG) SPECIAL TERMS AND CONDITIONS ...........:...14 6-138 I. INTRODUCTION The City of Chula Vista is circulating this RFP to firms qualified to provide design build services to the City with: community out-reach if required, value engineering, conceptual design, design /load calculation services, construction installation and construction management for the design and installation of induction powered street light fixtures in the City of Chula Vista. All DBT members shall be licensed and registered with the State of California as a C-10 contractor, or as General Contractor (B) with a listed C-10 subcontractor. This RFP document describes the typical elements of a project, the required scope of services, the selection process, and the minimum information that must be included in the proposal submittal. This RFP is intended to allow for the following scenarios: • DBT will combine work efforts with the City's current management team that has previously prepared the planning and/or conceptual documents. See Schedule A • DBT, created by the DB, uses previously prepazed planning and/or conceptual documents. All scenarios will result in continuing with design development, community out-reaches, construction document prepazation and construction of the project. This RFP does not commit the City to award a contract, to pay any costs incurred in the preparation of submittals to this request, or to procure or contract for services or supplies. The City reserves the right to accept or reject any or all submittals received as a result of this request, to negotiate with any qualified source, or to cancel in part or entirely the 1ZFP. The City reserves the right to reject any or all proposals in the City's sole discretion at any time prior to an awazd. II SCOPE OF WORK The City of Chula Vista (City), the 2"d lazgest municipality in San Diego County, has been a regional and national leader in climate protection policies and programs focused on reducing greenhouse gas emissions from municipal operations and the broader community. A cornerstone of the City's climate protection efforts have been energy efficiency retrofit projects at existing municipal facilities as well as the design and construction of new City buildings which exceed California energy efficiency standards (Title-24) by at least 20%. To complement these efficiency accomplishments, the City proposes to install induction street lighting throughout the City on residential side streets. This Request for Proposal (RFP) is specific to the turnkey design, engineering, purchase, delivery of materials, installation and commissioning of induction powered street lighting in the City of Chula Vista. All DBT members shall be licensed/registered with the State of California and shall demonstrate 5 years experience with induction lighting retrofits. All RFP responses should include DBT resumes, references and examples ofprevious installations. This RFP describes all the elements of the project, the required scope of services, the design build consultant selection process and the minimum information that must be included in the proposal. Failure to submit information in accordance with the RFP's requirements and procedures may be a cause for disqualification. Companies submitting proposals utilizing local suppliers and businesses may receive additional consideration during the review process. Proposal Selection Awazd will be based on the best-qualified proposal for the proposed design fees, general conditions, installation fees, warranty length and, direct savings and length of payback period. The length of payback period will be primary factors, but not the sole considerations for award. A contract(s) will be awarded in accordance with the Chula Vista Municipal Code and the Design/Build Ordinance as outlined in Section 2.57 of the Chula Vista Municipal Code. Proposal Guidelines The DBT should include and state in their proposed scope all; permits and approvals from governing agencies, all labor, taxes, incentives from local utilities and programs, services and equipment to produce fully functional and operational solaz induction lighting systems. System Commissioning The DBT shall be responsible for commissioning the systems once installed to ensure maximum performance. Commissioning will include, testing each light for proper function, the passing of final inspections to comply with permit and/or code requirements, meet applicable incentive program performance requirements and to create a GIS layer for induction streetlight luminaries using current technology and assistance from City staff. The DBT shall guarantee the performance of the installed lighting system package for at least ten (10) years. A. Project Control (All Phases) The DBT shall develop and implement the following Project Management Plan and Procedures: 1. Monthly project status reports (including schedule and budget updates). 2. Coordination interface with the City and its other consultants/contractors 6 X140 concerning right of way issues. 3. Progress meetings. 4. Interface and communicate with other agencies, as directed by the City. 5. Vendors and subcontractors management 6. Document control 7. Schedule and budget control 8. Quality assurance and quality control B. Design Phase Services Utilizing the City's required standazd specifications, facility program requirements, Federal, State and local laws, and City performance and design criteria, approved planning documents (if available), and reports that will be identified in the DesignBuild contract, for a typical project, if required the DBT will: Prepaze, submit and receive City approval for any site-specific planning/environmental documents. 2. Prepaze design development and construction drawings and specifications suitable for obtaining City approval and issuance of permits to allow for construction. 3. Complete the design for all elements of the projects, including but not limited to: structural engineering, electrical design and any specialty consulting azea. 4. Incorporate the requirements of permitting agencies as may become appazent in the course of design. The DBT shall apply for and secure all permits and provide all necessary reports, studies and support required to obtain all required permits. In addition, the DBT shall reseazch Air Pollution Control District and noise abatement requirements, along with any hazazdous materials management requirements of NFPA, Cal-OSHA and the City Fire Deparhnent. The DBT shall submit and obtain approval of Traffic Control plan to the City of Chula Vista Engineering Department before work commences. If required, the DBT shall incorporate appropriate lighting facilities in the design. 5. Conduct site surveys investigations to the extent necessary for fmal design 6. Prepaze cost estimates throughout all phase of project development. Perform value-engineering reviews to reduce cost/and or add value, utilizing all team members and City resources. Include recommendations tomaximize energy efficient and build a "green" orlow-pollution project. Prepare a Value Engineering Report of all considerations, recommendations and decisions. The goal is to maximize the quality of construction at a cost equal to or below the Project Budget. 6 3141 8. Perform Quality Control (QC) Review of the Drawings and Specifications throughout all phases in order to correct errors and omissions and reduce the quantity of Change Orders during the course of construction. Include a detailed review of drawings and designs relative to Code Compliance Laws. Organize and publish detailed QC Reports based on all findings. 9. Establish a Critical Path Method (CPM) Construction Schedule. Monitor and update to keep the project on schedule. 10. Establish a bidding strategy. Identify, contract, and procure long lead items. Create eazly bid packages where applicable. 11. Provide construction cost control estimates during the design to support value engineering and constructability reviews. 12. Identify all permit requirements and prepare applications and support documents necessary for obtaining all permits. Permit fees aze not a part of the cost of construction of the project. 13. The DBT shall be required to provide a cost estimate that will be used to establish a Guaranteed Maximum Price (GMP). Any savings at the end of the project will be deducted from the GMP and returned to the owner. 14. During the bidding of the Project, the DBT shall perform if appronriate: a. Create appropriate subdivisions ofwork into Bid Packages that reflect the major items ofwork. A detailed scope ofwork will be included with all bid packages. b. Secure a minimum of three complete and competitive bids for each package. c. Receive and resolve all RFI's and bid questions. d. Schedule meetings with the City to open and review bids for each subdivision of work. Review bids in detail. Clarify Scopes of Work, exclusions, etc. Ensure bids match DBT Scope of Work. e. Provide cost spreadsheets which compaze actual bids to cost estimates. 15. Prepaze draft Operations Manual Index to serve as the basis for preparing the final operations Manual during the construction phase. C. Construction Phase Services The DBT shall construct the facility in accordance with the approved construction drawings, specifications and associated permits. The DBT shall also: 6 414 2 Conduct weekly team meetings with the City and appropriate design team members during the course of construction to review the status ofthe project. Ensure the workmanship and materials provided are in accordance with the Project Specifications and the Architects meet or exceed quality construction industry standazds for this type of work. Provide list of required shop drawing submittals. Review shop-drawing submittals for technical and code compliance. Provide copy to the City for review and comment. Provide resident engineering, contract administration, and inspection staff, including specialists necessary for the functional, safe, on budget and on- schedule completion of the Project, starting with the issuance of a Notice to Proceed from the City and extending through issuance of Notice of Completion and Acceptance. City staff will also perform inspection to verify compliance with the plans and specifications, permits and contract documents. Ensure construction compliance with applicable local, state, and federal codes, building and environmental permit requirements, and construction mitigation documents and enforcement of the Contract Documents. Purchase and install all necessary equipment and witness all factory and field component, equipment and system testing as required by the project Contract Documents. 7. Submit the proposed QA/QC Plan to the City for review. The Plan shall not be implemented without written approval of the City. 8. Provide surveying, and other contracted services as required completing projects construction. Coordinate City contracted testing and inspection services during the course of construction. 9. Develop, implement and manage a construction phase Quality Assurance/Quality Control (QA/QC). The Plan shall include but not be limited to; 1) a statement and definition of QA/QC goals; 2) an identification of QA/QC criteria and elements; 3) development of the project QA/QC implementation plan; 4) development of the QA/QC materials, components, equipment and system testing plans; and, 5) enforcement of the plans and specifications. 10. Be responsible for preparing the Critical Path Method (CPM) schedule utilized during the project construction and startup activities. Use Microsoft Project scheduling software consistent with the City reporting system. 11. Develop aproject-specific Plan for defming, tracking and reporting cash flow activity requirements and submit such plan to the City for review and approval prior to implementation. 6 514 3 12. Develop aproject-specific Change Order Administration Plan for review and approval by the City. Upon written approval of the Plan, the DBT shall initiate implementation. The Plan shall define the required Change Order procedures, including requirements for requesting, developing, approving, and filing. 13. Implement and maintain an internal records management and document control system as required to support project operations. The DBT shall provide records management and document control information in a manner consistent with the citywide Prolog Management reporting/filing system. 14. The DBT shall develop an on-site Project Safety Plan for. review and approval by the City. The DBT shall administer and enforce the City approved on-site Project Safety Plan for the Project. The DBT shall monitor and enforce construction responsibility for safety and health issues relating to all workers at the Project Site. This shall include workers in duect employment to the Contractor and workers involved in a subcontracting, equipment supply, or any other project-related oral or written arrangement with the DBT. 15. Report accidents, claims, and other on-going safety related issues to the City in a manner consistent with Citywide reporting. systems. D. Operations and Startup Phase Services The DBT shall prepare, submit for City review and written approval a Project Startup and Testing Plan for the Project. The DBT shall fully implement the plan. 2. The DBT shall conduct Operator Training Sessions for personnel. 3. The DBT shall supervise, manage, and coordinate all project startup and testing activities for all systems. 4. Provide operation and maintenance manuals for equipment purchase and installed by DBT. 5. The DBT shall report progress of project startup and testing to the City in a manner consistent with the City's reporting system. 6. The DBT shall coordinate and expedite record drawings and specifications. 7. The DBT shall prepaze final accounting and close out reports. 8. The DBT shall prepaee GIS/plan/ location of installed fixtures. 9. Post Construction: DBT shall coordinate an 11-month walk through of the Project to review guarantee/warranty items. DBT shall coordinate all corrective work with the responsible parties and the City. The DBT shall report to the City all guarantee/warranty disputes. The DBT shall proceed to 6 6-144 resolve such disputes after having submitted to the City for review and approval the DBTs approach for obtaining resolution of the dispute. III IV V DESIGN BUILDER SELECTION PROCESS Candidates will compete fast on the basis of experience, design talent, past performance, resources, construction and management skills. Contracts will be awazded in accordance with the Chula Vista Municipal code and the Design/Build ordinance as outlined in Section .257 of the Chula Vista Municipal Code. REQUEST FOR PROPOSALS SCHEDULE The following schedule applies to the solicitation, receipt and evaluation of the Proposals, Statement of Qualifications (SOQ) and the selection ofthe DB. This RFP schedule is subject to modification in the City's sole discretion: Advertise and Issue RFP December 16, 2009 Proposals & SOQ Due January 19, 2010 City conducts Interviews with Qualified Candidates January 25`h-28~', 2010 City Council Certifies DB February 2010 PUBLIC DISCLOSURE Under the California Public Records Act Under the California Public Records Act (California Government Code Section 6250 et seq.) records in the custody of a public entity generally have to be disclosed unless the information being sought falls into one or more of the exemptions to disclosure set out in Government Code Sections 6254 through 6255. The cover letter of the submittal should contain a pazagraph that states whether or not DBT believes that its submittal does or does not contain information that falls into one of the exemptions of Government Code Sections 6254 through 6255 and whether or not DBT considers such information to be confidential. In the absence of a declaration, City may be obligated to disclose proposal to any party that requests it. Regazdless of assertions of confidentiality, proposal contents may still be disclosed if City, or a court with jurisdiction, determines that such proposal is a public record requiring disclosure. 6 X145 VI SUBMITTAL REQUIREMENTS The submittal deadline is December 10th 2009, no later than 4:00 P.M. (PST) at the City of Chula Vista, Public Services Building -Engineering Department, 276 Fourth Avenue Bldg. 200 Chula Vista, CA 91910. 2. Five (5) single-spaced copies, no more than 30 pages in length excluding exhibits and appendices, aze required for submittal. Submittals should be as brief as possible, while adequately describing how the DBT will approach the design build work program. Statement of Qualifications (SOQ) shall include: A letter of interest Understanding the project development process Summary of Qualifications Organizational Chart for project Team Design Build fee structure Resume (of key DB members) Design Build experience Client References Schedule of Rates Insurance Certification The submittal should focus on previous experience developing public projects as well as knowledge of issues germane to lazge scale lighting projects, a demonstrated ability to implement creative solutions to complex planning issues and a demonstrated ability to complete complex tasks within the pazameters of afast-paced performance schedule and within the terms of the contract. 4. The submittal shall also provide the name, title, address, and telephone number of individual(s) with authority to negotiate for the candidate and also who may be contacted during the period of submittal evaluation. Statement of the DBT's ability, if selected, to enter into a City contract with the City of Chula Vista, and ability to avoid conflicts of interest on this or any other public or private projects. 6. Other Information 6-146 a. Description of insurance coverage for prime respondent and co- venture partner(s) (types of coverage and policy limits, deductible, exclusions, and outstanding claims). b. Description of in-house resources for prime respondent and co- venturepartner(s) (i.e., computer capabilities, software applications, model protocol, and modeling programs, etc.) c. Respondents should provide, on a strictly confident basis, the following information: 1) Tax documents submitted to the IRS for the last three yeazs (information to be kept confidential) 2) List of prof ects completed in the last 5 yeazs 3) List of prof ects currently under development, or construction with status, development schedule and financial commitment 4) List of prof ects currently involved in litigation or unresolved claims for the contract 7. Incomplete submittals, incorrect information, or late submittals may be cause for immediate disqualifications. VII CONTRACT TERMS AND CONDITIONS City retains the right to reject any or all submittals. All respondents should note that the execution of any contract pursuant to this RFP is dependent upon the approval of the Chula Vista City Council in its sole discretion. Selection is also dependent upon the negotiation of a mutually acceptable contract with the successful respondent. The contract shall be prepared on a form acceptable to the City. The form of compensation shall be negotiated. The City reserves the right to propose a variety of compensation structures, including: 1) time and materials not to exceed, 2) guaranteed lump sum, and 3) percentage of project costs. City reserves the right on a project specific basis to request insurance including but not limited to increased limits of Liability coverage, CA admitted carvers A.M. Best rated no less than A V, Additional Insured Endorsement which does not exclude Completed Operations, Excess Liability, Pollution Liability, E&0 /Professional Liability Extended Reporting Period excess of 2 yeazs, Completed Operations Coverage of up to ten yeazs, Contractor Controlled or "Wrap Up" Insurance Program, Bonds. Each submittal shall be valid for not less than one hundred and twenty (120) days from the date of receipt. The firm(s) selected to perform the work described in this RFP will be required to provide minimum evidence of insurance as follows: 6 9147 1. Commercial General Liability insurance, ISO CG 0001 Occurrence form, with limits of not less than $2,000,000 per occurrence per project. Policy to include endorsement naming City of Chula Vista, its officers, officials, employees and volunteers as Additional Insured against all liability of the DB, its subcontractors, and its authorized representatives, arising out of, or in connection with, the performance of work under the contract with the City. Policy is to be endorsed to state it is Primary to any other insurance available to the City of Chula Vista and that insurer will provide THIRTY (30) days written notice to the City Clerk of the City of Chula Vista of cancellation or material change. 2. Commercial Automobile Liability Insurance, ISO CA 0001 form, Any Auto code, with a combined single limit of not less than $2,000,000,_covering bodily injury and property damage for owned, non-owned and hired automobiles, and name the City, its officers, officials, employees and volunteers as additional insureds. 3. Workers' Compensation and Employer's Liability insurance, for all employees who are normally engaged in Work at the Project Site, with Statutory Limits for Workers' Compensation and not less than Employer's Liability limit for Bodily injury by Accident $2,000,000, each accident Bodily Injury by Disease $1,000,000, Bodily Injury by Disease $1,000,000. A Waiver of Subrogation shall be endorsed to the policy naming the City of Chula Vista. 4. Professional Liability insurance shall be required of said fum for professional liability or en•ors and omissions insurance with a per claim limit of not less than $2,000,000 for services performed by the Design contractors and any subcontractors performing design services. The policy shall contain an extended reporting period of not less than 2 yeazs. As required. 5. Builder's Risk Property Insurance will be provided by the City. The limit is to reflect full replacement cost of hazd cost construction values. Perils aze to be all risk excluding Earthquake and Flood. Perils aze to include any transportation risk but is to exclude any equipment, machinery, tools, or property of similaz nature, owned, rented or used by DB or contractors. 6. Other Provisions. Prior to beginning Work under the Agreement, each and every contractor of any tier shall furnish Certificates of Insurance satisfactory to the City. All such certificates will contain at least the following provisions: a. Thirty (30) days written notice to the City prior to any cancellation, non-renewal or materials reduction in coverage. 10 6-148 b. The words "will endeavor" and "but failure to mail such notice shall impose no such obligation or liability of any kind upon the company, its agents or representatives" will be deleted from the certificate. Throughout the life of the Agreement, each and every contractor of any tier shall pay for and maintain in full force and effect, with an insurer authorized by the California Insurance Commissioner to do business in the State of Califomia, the policies evidenced herein. The City reserves the right to modify the insurance requirements or to substitute project insurance during contract negotiations. Bonds may be required for individual projects as required by City Policy. End of Request for Proposals 6-~49 ATTACHMENT A SPECIFICATIONS STREETLIGHT RETROFIT PROJECT: The city will convert approximately 4,600 street light luminaires from high-pressure sodium (HPS) to induction. This change will save the city more than $200,000 annually, with a simple payback of 10.3 years based on a loan amount of $2,051,600. SCOPE: • Select luminaires to be retrofit. • Develop purchase specification for induction luminaire. • Procure induction luminaires. • Remove and replace 100-watt HPS luminaires with new induction luminaires. • Create GIS layer for induction streetlight luminaires. SPECIFICATION: General Description: Luminaire shall be a GE M-250 roadway luminaire or City Staff- approved equal. The luminaire shall contain a completely pre-wired integral induction system and an optical assembly that shall provide full cut-off optics and an IES distribution of type 2. The City reserves the right to disqualify any fixture submitted after the review process is complete and justification for disqualification may or may not be provided. Mechanical: The luminaire shall include die-cast aluminum upper and lower housing with gray powder coat paint. Lower housing shall be hinged and removable and shall hold the flat glass lens in place. The intemal slip fitter shall contain two-bolts that do not pass through the housing but tighten from below with the lower housing in dropped position. Internal casting shall provide leveling step adjustments for fixture leveling. A one-piece pipe clamp shall be capable of adapting to 1-1/4" to 2" pipe without rearrangement of clamp or bolts. There shall be a prewired no-tool adjustable photoelectric control (PEC) receptacle. There shall be a polymer bird guard installed. The hinged door assembly shall feature tool-less entry by quick-release stainless steel bail latch or lever and shall provide audible and visual locking confirmation. The removable doorframe shall provide easy access to all serviceable parts. Induction System: Shall be the Philips QL induction system or city-approved equal. Operating voltages shall be 120-volt or 240-volt, correlated color temperature (CCT) _ 4000K, CRI = 80, providing either 50 or 55-watts. Warranty: 10 yeaz full system warranty. Recommended Consultants: Nate Mullen Visual Concepts, Kenny Perez/Principal 7343 Ronson Road,Ste.I San Diego, CA 92111 Business: (858) 278-4503 Fax: (858) 278-4573 12 6-150 ATTACHMENT B SAMPLE DESIGN BUILD AGREEMENT 13 6-151 DESIGN BUILD AGREEMENT FOR [INSERT PROJECT NAME] PROJECT This Agreement shall be for the design and construction of [INSERT NAME Of PROJEC°C] and the payment of permitted costs therefore ("Agreement"). This Agreement is made and entered into this , by and between THE CITY OF CHIJLA VISTA, a municipal corporation ("City"), and [INSERT N.4NIE OF D,~B], a [ENTER TYPL- OF CORPORATE ENTITY AAA PLACE OF 1NCORPOR,4TTON] ("Design Builder or DB"). City and DB, when referenced herein, may be referred to individually as "Party" and collectively as "Parties." This Agreement is entered into with reference to the following facts: RECITALS 1. (fNSF.RT]. 2. (INSERT]. 3. [INSERT]. 4. [INSERT]. 5. [INSERT].As part of that effort, on [INSERT DATE], the Department of Public Works, Engineering Division, issued a Request for Proposal (RFP), pursuant to § 2.57 of the City's Municipal Code, to design and construct replacement structures ("Project") to qualified Design-Build firms off the Priority List. 6. [INSERT]. 7. Following interviews of all [1NSEKTm] respondents, DB was selected as the respondent who best met the design, monetary, and time criteria of the project with whom City could negotiate an agreement. 8. As part of DB's proposal, DB submitted a "Not to exceed Gross Maximum Price" of the Project in the amount of [lNSER`C WRITTL-N DOL1..4R AMOUNT] ($[INSERT NUNfER1C AMOUNT]) ("Estimated Cost"/"EC"). 9. Following City's approval of 90% Construction Documents ("CD"), DB shall submit a guaranteed maximum price ("GMP"), not to exceed the Gross Maximum Price, for which the Project shall be designed and constructed. 10. DB shall complete the Project, as a public improvement, according to plans and specifications approved by CiTy, for an amount not to exceed the GMP. NOW, THEREFORE, in consideration of the recitals, mutual obligations of the Parties, the covenants and conditions herein, and for other good and valuable, the sufficiency of which is hereby acknowledge, the Parties agree as follows: 6-152 ARTICLE I. DEFINITIONS ADA: The Americans with Disabilities Act of 1990 and any amendments thereto. Acceptance: Final approval by the City Inspection Team following the Final Inspection that Project Improvements are complete and work required on the Punch List has been fmished. As-Builts: Project Record Documents that are the Contract plans modified from the original concept of the design to reflect the actual product built. CEQA: California Environmental Quality Act. Calendar Day(s): All days of the week, holidays and weekends included. Change Order: A written order, approved by City, authorizing a change in the work to be performed. City: The City of Chula Vista. Unless specifically provided otherwise, whenever this Agreement requires an action or approval by City, that action or approval shall be performed by the City representative designated by the Agreement. City Council: The City Council of the City of Chula Vista. City's Project Administration Costs: Chazges that City incurs to: (i) administer the acquisition of the Property, (ii) review and approve the plans and specifications for the project improvements, and (iii) inspect the project improvements during construction, until completion and Acceptance of the Project. Contract Documents: Including, but not limited to: Contract Addenda, Notice Inviting Bids, Instructions to Bidders, Bid (including documentation accompanying Bid and any post-bid documentation submitted prior to Notice of Awazd), the Bonds, the general conditions, permits from other agencies, the Special Provisions, the Plans, Standard Plans, Standazd Specifications, Reference Specifications, and all modifications issued after the execution of this Agreement. Contract Time: The number of Calendaz Days permitted under this Agreement for DB to achieve Substantial Completion. Defective Work: All work, material, or equipment that is unsatisfactory, faulty, incomplete, or does not conform to the Contract documents is defective. Design Build Team (DBT): Those individuals designated as being a part of the Design Build Team. Estimated Cost: The total cost of the Project as estimated in preliminary cost estimates as shown in Exhibit (INSERT]. Extra Work: Any City additions, modifications, or deletions to work or DB obligations under this Agreement not within the original Scope of Work contemplated by this Agreement. Final Completion: The point at which the last of the following has occurred: (1) recordation of a Notice of Completion for the Project; (2) acceptance of the Project by the City; (3) submission of all documents required to be supplied by DB to City under this Agreement, including but not limited to As-Built Drawings, warranties, and operating manuals; and (4) and delivery to City of a Certificate of Completion duly verified by DB. Greenbook: The most recent edition of the Standazd Specifications for Public Works Construction (including any City of Chula Vista standard special provisions). Guaranteed Maximum Price ("GMP"): The maximum compensation to which DB may be entitled for the performance of all Services, Work, and obligations and the satisfaction of all conditions under this Agreement, which amount shall include all authorized costs for labor, equipment, and material to design and build a fully functional Project in accordance with all applicable rules, regulations, and laws. Hard Construction Costs: Direct construction costs incurred in performing the work, including taxes, delivery and installation. Hard Construction costs shall not include DB mazkup, handling fees, overhead, or other charges, except as otherwise set forth in this Agreement. 6-153 Hazardous Materials: Hazardous waste or hazazdous substance as defined in any federal, state, or local statute, ordinance, rule, or regulation applicable to the Property, including, without limitation the Comprehensive Envsonmental Response, Compensation, and Liability Act of 1980, as amended (Title 42 United States Code sections 9601-9675), the Resource Conservation and Recovery Act (Title 42 United States Code sections 6901- 6992k), the Carpenter Presley-Tanner Hazadous Substance Account Act (Health and Safety Code sections 25300- 25395.15), and the Hazardous Waste Control Law (Health and Safety Code sections 25100-25250.25). "Hazazdous Materials" shall also include asbestos or asbestos containing materials, radon gas, and petroleum or petroleum fractions, whether or not defined as hazazdous waste or hazazdous substance in any such statute, ordinance, rule, or regulation. Holiday: The City-observed holidays. Law: All Federal, State, or local laws, regulations, ordinances, and/or policies. Milestones: Dates shown on the Project Schedule by which DB shall complete major tasks either during design or construction of the Project. NEPA: National Environmental Policy Act. Notice to Proceed: City's written notice authorizing DB to commence Work and/or Services on the Project. Notice of Termination: A written notice from City to DB terminating the Agreement in accordance with Article XXVII. Project Site: The property located at [INSERT] and further described in Exhibit "[INSERT]", attached. Reimbursable Costs: [PLEASE INSERT] Services: Professional services, including design and construction management of the Project that are required to design and construct the Project in accordance with the Contract Documents. Services does not include Work. Substantial Completion: That stage in the progress of the construction when all Work on the Project is sufficiently complete in accordance with the Construction Documents, so that City can fully utilize entire Project; Substantial Completion shall further mean that all goods, services and systems to be provided under the terms and conditions of the Construction Documents aze in place, have been initially tested, and aze operationally functional, subject only to final testing, balancing and adjustments and normal Final Completion punch list work. Title 24: California Building Standards Code, California Code of Regulations, Title 24. Work: All labor, materials, supplies, and equipment that are necessary to construct the Project in accordance with the Contract Documents. Work does not include Services. Working Day(s): Monday through Friday, excluding City holidays ARTICLE II. SCOPE OF THE AGREEMENT 2.1 General. Except as expressly provided in this Agreement, DB shall design and construct the Project in accordance with all the terms and conditions of this Agreement, approved Plans and Specifications, and the timeframes established by the Project Schedule, attached as Exhibit "[1NSER'f]", delivering a complete and functional Project within the Contract Time for an amount not to exceed the GMP. ARTICLE III. TERM 3.1 Term of Agreement. This Ageement shall be effective on the date it is executed by the last Party to sign the Agreement following City Council approval by Resolution. The term of this Agreement will extend from the date of execution until satisfaction of all terms and conditions herein, unless this Agreement is earlier terminated. 6-154 ARTICLE 1v. GENERAL PROJECT PERFORMANCE OBLIGATIONS 4.1 Standard of Care. Throughout the performance this Agreement, performed under this Agreement, DB agrees that all Services and Work provided as part of this A~eement shall be performed in accordance with the standazds customarily adhered to by experienced and competent professional azchitectural, engineering, landscape architecture, and construction funs using the degree of caze and skill ordinarily exercised by reputable professionals practicing in the same field of service in the State of California. 4.2 Comnliance with all Laws. In the performance of this Agreement, DB shall comply with all laws, including but not limited to: 4.2.1 All City, County, State, and Federal laws, codes and regulations, ordinances, and policies, including, but not limited to, the following: 4.2.1.1 Environmental Regulations (i. e. CEQA/ NEPA). 4.2.1.2 The Americans with Disabilities Act ("ADA") and Title 24 of the California Building Code. It is the sole responsibility of D/B to comply with all ADA and Title 24 regulations. 4.2.1.3 The Califomia Fair Employment and Housing Act and all other State, Federal and local laws including, but not limited to, those prohibiting discrimination on account of race, color, national origin, religion, age, sex or handicap. 4.2.1.4 The Clean Air Act of 1970, the Clean Water Act (33 USC 1368)-Executive Order 11738, and the Stormwater Management and Dischazge Control-Ordinance No. 0-17988. 4.2.1.5 DB shall comply with the Essential Services Building Seismic Safety Act, SB 239 & 132. 4.2.1.6 DB shall comply immediately with all directives issued by City or its authorized representatives under authority of any laws, statutes, ordinances, rules, or regulations. 4.2.1.7 DB shall obtain and comply with all permits necessary top complete the Project, including, but not limited to Development Services Departrnent permits and hazardous material permits. 4.2.1.8 Zoning environmental, building, fire and safety codes and coverage, density and density ratios and lien laws. 4.2.2 Implied Knowledge of Laws. DB shall be responsible for all amendments or updates to standazds and of all amendments or updates to standazds, whether local, state, or federal, and such knowledge will be imputed to DB to the extent allowed by law. 4.3 Design and Construction Standards. Inthe performance of the Services and Work covered by this Agreement, DB shall comply the most current versions of design and construction specifications, all of which shall be incorporated herein by this reference. 4.3.1 Standard Specifications. 4.3.1.1 Greenbook. The 2000 Edition of the Standazd Specifications for Public Works Construction. 4.3.1.2 California Department of Transportation Manual of Traffic Controls for Construction and Maintenance Work Zones. 4.3.2 City Specifications. 4.3.2.1 The 2000 Edition of the Chula Vista Standazd Special Provisions. 4.3.2.2 The 2000 Edition of the Regional Standazds. 4.3.2.3 The 2002 Edition of the Chula Vista Construction Standazds. 43.2.4 The City's facility program, performance and design criteria, concept drawings, and reports. 4.3.3 Energy Conservation Standards. 4 6-155 4.3.4 Materials Standards. DB shall use industrial grade, not residential grade, equipment and accessories for all facets of design and construction. 4.4 Obtain Citv Aovroval. For any and all actions under this Agreement that require City approval, including, but not limited to, changes or additions to Agreement, DB shall obtain approval in writing from the designated City Representative, or when required by Law, from the City Council. DB acknowledges that approval from any individual other than the designated City Representative or City Council, where required, shall not be valid. 4.4.1 Failure to Obtain Approval. Any costs or delays resulting from or associated with additions or modifications implemented without the written authorization of the City Representative shall be borne exclusively by DB and not be grounds for an increase in GMP or Contract Time. 4.4.1.1 Emergency. In the event of an emergency, DB shall take all reasonable actions necessary to protect public health, safety or property. Such action shall not require advance City approval; however, DB shall notify the City immediately of the emergency and as soon as reasonably possible provide a written statement to the City explaining the emergency and the reasonable actions taken. Provided the emergency was not caused by or its creation contributed to by the DB, its employees, agents, or subcontractors, D/B maybe entitled to reasonable compensation for such actions. 4.4.2 No Release From Obligations. City approval shall be a general approval only, and such approval shall in no way release or relieve DB of responsibility for complying with all applicable laws, codes, and good consulting, design, or construction practices. 4.5 Decision Makine. DB shall make decisions with reasonable promptness to avoid delay in the orderly progress of DB's obligations under this Agreement and pursuant to the Project Schedule, attached as Exhibit "[INSERT]". 4.6 Perform Services and Work in Phases. The Services and Work under this Agreement shall be performed three (3) "Phases" in the manner and order described herein. ARTICLE V. PHASE I -DESIGN DEVELOPMENT 5.1 Design Team. City has awarded this Ageement based on the specific qualifications of DB to perform the design services required under this Agreement. All such services shall be provided by D/B unless the City has approved of the use of Subconsultants in the manner identified in Article VIII. 5.2 Services. In Phase I, DB shall perform Services including, but not limited to, the following: 5.2.1 Project Development. Develop and refine Project requirements. 5.2.2 DDD. Prepare complete DDDs, such that the DDDs include, without limitation, the following: 5.2.2.1 Site Plans. Site plan with pertinent notes and dimensions indicating property line; existing public streets, sidewalks, curb cuts, other public improvements; required setbacks; service, trash, Fse lane and truck access, adjacent buildings, building outline; basketball courts, multi- use sports Field, softball field, informal skate area, play azeas, shelters, landscape and site elements. 5.2.2.2 Floor Plans. Floor plans including graphically demonstrating interior and exterior walls and fenestration with notes, dimensions and gridlines; room names, stmctural bay spacing with grids, critical dimensions and azea calculations. 5.2.2.3 Roof Plans. Roof plans including detailed notes, dimensions, mechanical equipment locations, define material for mechanical screens, skylights and roof access, roof materials, roof drainage and establish window-washing concept. 5.2.2.4 Building Sections. Building sections, which shall include vertical dimensions, floor assembly thickness showing known structural elements, notes and dimensions. 6-156 5.2.2.5 Elevations. Exterior elevations, including material references and extent; visible roof top elements; existing and new line of grade; indicate of floors with leader lines; and vertical dimensions; notes, dimensions and grid lines. 5.2.2.6 Wall Sections. Wall sections including all wall sections, dimensions, horizontal element offsets, and guide to exterior face of wall; dimensions, vertical floor to floor, floor to window head and sill and floor to ceiling; structural elements and assemblies; interior and exterior wall finishes; and wall and roof assembly; 5.2.2.7 Outline specifications, written description of [INSERT] and components including site work. 5.2.2.8 Traffic circulation and landscaping should also be indicated at this stage if applicable. 5.2.3 Code Compliance. Verify all code compliance, including building construction type, occupancy sprinkler requirements, existing, zoning and other agency conformance and ADA. 5.2.4 Submittals. Prior to proceeding with Phase R, D/B shall prepaze and submit the following to the City for review and written approval. 5.2.4.1 DDDs. Completed DDD. 5.2.4.1.1 Conditional Approval. Tn the event that City grants conditional approval, DB shall address al] City comments or issues and make associated revisions in the next set of drawings developed and submitted. 5.2.4.1.2 Delay/Costs. Any delay or additional costs resulting from the re-submittal shall be borne exclusively by DB and not be grounds for an increase in the GMP or Contract Time. 5.2.4.2 Other Deliverables. 3D rendered images, color and material boards, reflected ceiling plans, and special system or equipment plans. ARTICLE VI. PHASE II 6.1 Phase II Services. In Phase II of the Project, DB's shall perform Services including, but aze not limited to, the following: 6.1.1 Project Development. DB shall diligently prosecute the development and refinement of Project requirements and review such requirements with City; 6.1.2 Digital Documentation. D/B shall prepaze CD's which shall include, without limitation, the following: 6.1.2.1 Architectural plans and details, including: 6.1.2.1.1 Site plan indicating general location and nature of on-site and the necessary off-site improvements. 6.1.2.1.2 Floor plans, including roof, showing space assignments, sizes, and location of installed or fixed and movable equipment that affects the design of the spaces. 6.1.2.1.3 Building elevations indicating exterior design elements and features, including fenestration arrangements, materials, mechanical and electrical features appearing on the walls, roofs, and adjacent azeas. 6.1.2.1.4 Interior elevations to establish functional requirements, equipment, and all systems locations. 6.1.2.1.5 Typical building sections showing primary structural members, dimensions, and accommodation of functional systems. 6.1.2.1.6 Typical wall sections sufficient to indicate materials, openings, and major features. 6.1.2.2 Structural drawings including plans and sections of sufficient clarity and detail to show the extent and type of structural system and dimensions, final structural design criteria, foundation 6-157 design criteria, preliminary sizing of major structural components, critical coordination cleazances and applicable material lists. 6.1.2.3 Mechanical plans and details. 6.1.2.4 Landscape and Irrigation plan and detaIls. 6.1.2.5 Electrical plans and details. 6.1.2.6 Plumbing plans and details. 6.1.2.7 Plans showing installation of major systems, equipment, fixed furnishings and graphics. 6.12.8 Technical specifications 6.1.2.9 All other technical drawings, schedules, diagrams and specifications, to set forth in detail the requirements for construction of the Project which, at a minimum, include: 6.1.2.9.1 Information customarily necessary for the use of those in the building trades. 6.1.2.9.2 Documents customarily necessary to obtain regulatory agency approvals. 6.1.2.9.3 Color board and azchitectural rendering for required presentations. 6.1.2.10 Mechanical desi~ documentation consisting of continued development and expansion of schematic mechanical design consisting of: 6.1.2.10.1 Single line layouts and the approximate sizing of all equipment and capacities, preliminary equipment layouts. 6.1.2.10.2 Required space requirements For the equipment, required chases and cleazances, acoustical and vibrations control, visual impacts and energy conservation measures. 6.1.2.11 Electrical design documentation consisting of continued expansion of the schematic electrical design consisting of: 6.1.2.11.1 Criteria for lighting, electrical, communications audio visual, close circuit T.V., lighting controls and other electrical systems typical to civic facilities, the approximate sizes and capacities of major components transformers-panels-switch geazs; 6.1.2.11.2 Preliminary equipment layouts, required space for equipment, required chases and cleazances. 6.1.2.12 Sections through critical azeas showing coordination of azchitectural, structural, mechanical and electrical elements. 6.1.2.13 Final specifications, including but not limited to, the following: 6.1.2.13.1 Architectural. General description of the construction, including interior fmishes, types and locations of acoustical treatment, typical and special floor coverings and final exterior and interior material selection. 6.1.2.13.2 Mechanical. Description of air conditioning, heating and ventilation systems and controls, ducts, and piping system. 6.1.2.13.3 Electrical. Description of electrical services, including voltage; type and number of feeders; lighting systems, including lighting levels and audiovisual; security-fire alarms; and cable antenna television systems. 6.1.2.13.4 Landscape. General description of the construction, including plan materials, plant locations, maintenance period, and irrigation systems. 6.1.2.13.5 Play Areas. Description of play equipment, including installation procedures, type, color, fmishes, and locations. 6-158 6.1.2.13.6 Site Work. General description of the construction, including finishes, types of materials and locations. 6.1.2.13.7 Other. Such other documents to fix and describe the size, quality and chazacter of the entire Project, its materials, and such other elements as shall be appropriate. 6.1.2.14 Plumbing drawings, including location and quantity of fixtures, equipment sizes, room sizes for plumbing equipment, and fmal specifications as appropriate. 6.1.3 Project Sequencing. DB shall determine and establish the sequence of construction, and if appropriate, identify separate bid packages to accomplish phased construction of the Project. 6.1.4 Critical Path. DB shall prepaze a detailed Critical Path Method schedule for all construction components of the Project ("Detailed Construction Schedule") utilizing Microsoft Project softwaze, showing all major milestones, bid dates for the major bid packages, commencement of construction, sequence of construction, completion of structural elements, and completion of the Rohr Pazk Shade Structures, all of which shall conform with the dates of Substantial Completion and Final Completion of Project. 6.1.5 Governmental Review. DB shall review, as needed, the CD's with the governmental authorities having jurisdiction over the Project. 6.1.6 Accounting System. DB shall provide a master accounting system and matrix on MicrosoR Excel that will be updated, expanded, and provided to the City monthly as the Project develops. 6.1.7 Project Management Plan. DB shall develop and implement a Project Management Plan and Procedures including: 6.1.7.1 Project status reports. 6.1.7.2 Coordination/interface with the City and its other consultants/contractors 6.1.7.3 Initial Design kickoff meeting to be held no later than five (5) working days from the Effective Date of Agreement. 6.1.7.4 Biweekly Design and Constuction meetings 6.1.7.5 Interface and communications with other agencies 6.1.7.6 Vendors and subcontractors management 6.1.7.7 Document control 6.1.7.8 Schedule and budget control 6.1.7.9 Quality assurance and quality control. DB shall establish and maintain a quality control program with appropriate reviews and independent testing procedures to ensure compliance with the Construction Documents during the construction phase. 6.6.10 Scheduling and cost control reports, which shall be provided monthly throughout the design phase. 6.1.8 Construction Drawings and Spec fcations. DB shall prepare construction drawings and specifications suitable for obtaining City-approved permits and to allow construction. 6.1.9 City Approval. DB shall submit Construction Documents and obtain City approval in writing of the Construction Documents at fifty percent (50%), seventy percent (70%), and ninety percent (90%) completion. 6.1.9.1 Condition Precedent. City approval of the Construction Documents is a condition precedent to authorization to proceed with subsequent work on the Project. 6.1.9.2 Notification, Modification, and Resubmittal. At 50%, 70% and 90% Completion, City will notify DB in writing within the timeframes established in the Project Schedule following receipt of Construction Drawings of City approval, or of request for modifications. If 6-159 modifications are requested, DB shall modify and resubmit Construction Drawings for City approval. 6.1.9.3 DB Support. DB shall provide support to a City Constructability Review Team for the review of the Construction Documents at all stages of required submission. 6.1.10 Materials and Equipment Specifications. DB shall prepare technical materials and equipment specifications for pre-purchase. 6.1.11 Surveying and Testing. DB shall coordinate, perform, and complete all surveying, materials testing and special testing for the Project at the Project site as required by this Agreement, the State Building Code, or any other law or regulation, in accordance with and considering the following: 6.1.11.1 Greenbook 2003 Section 2-9 titled "Surveying" and City of Chula Vista's Horizontal and Vertical Control found on the Survey Control Network Map located on the City's Internet via the following link: http //www.chulavistaca. ov/City Services/Development Services/Eneineerina index.asp 6.1.11.2 Existing Conditions. DB shall obtain all necessary soils investigation and conduct agronomic testing required for design of the Project. The SoIls Consultant shall prepaze a statement that will be included in the Bidding Documents as to the nature of soils, ground water conditions and any other information concerning the existing conditions of the site. 6.1.11.3 Utilities. DB shall provide all required information for the construction or relocation of Public or private utility facilities that must be constructed or relocated as a result of this Project. DB shall file all of the required documents for the approval of authorities having jurisdiction over the Project and in obtaining the services of all utilities required by the Project. 6.1.11.4 Geotechnical Information. DB shall obtain all necessary geotechnical information required for the design and construction of the Project. The Project Engineering Geologist and/or Project Soils Engineer (qualified R.C.E. or R.G.E.) shall prepaze a statement that will be included in the Bidding Documents, to address existing geotechnical conditions of the site that might affect construction. 6.1.11.5 Additional Surveys. DB shall provide additional site surveys and geotechnical investigations to the extent that D/B determines they are necessary for final design. 6.1.11.6 No Reliance. D/B shall not rely on City survey information as it is intended to be preliminary in nature and may not have sufficient accuracy or scope to support final design. 6.1.12 SWPPP. DB shall prepaze and incorporate into the Construction Documents a Stormwater Pollution Prevention Plan ("SWPPP") to be implemented by the DB during Project construction. Where applicable, the S WPPP shall comply with both the California Regional Water Quality Control Boazd Statewide General Construction Storm Water permit and National Pollution Dischazge Elimination System permit requirements and any municipal regulations adopted pursuant to the permits. 6.1.13 Alternatives. DB shall evaluate alternative structural and construction approaches to ensure economical designs, which optimize constructability, yet meet all codes, azchitectural concepts, schematic designs, and standazd specifications of the Project. 6.1.14 Permits. DB shall obtain general building permit and all ancillary permits and licenses, including but not limited to, demolition permits, improvement permits and grading permits [WHEN???]. 6.1.15 Updated Costs. DB shall provide updated construction cost estimates in conjunction with the submittals required in Section 6.1.9 to support Value Engineering ("VE") and consttuctability reviews. 6.1.16 Final Review and Approval of Plans and Specifications. DB shall deliver to City complete Construction Documents, including Construction Drawings, Plans and Specifications for the design and construction of the Project. City agrees to review the Construction Documents and provide City's written comments to DB within [INSERT TIMEFRAME] Business Days of the date such Construction Documents aze delivered to City in accordance with the notice provisions in Article 9 6-160 XXIX. Approval shall not be unreasonably withheld. If requested by City, DB shall make changes to the Construction Documents. ARTICLE VIL PHASE III. -CONSTRUCTION PHASE WORK AND SERVICES 7.1 Phase III. Work and Services. The DB shall construct the Project in accordance with City-approved plans and specifications prepazed by the DB to meet or exceed all requirements of the City provided progam, schematic design and the performance criteria. The DB shall: 7.1.1 Bidding. DB shall prepaze and submit to the City for review separate bid packages, such bid packages shall be organized in the manner that DB determines is appropriate ensure the efficient and cost effective construction of the Project. 7.1.1.1 Competitive Bidding. DB shall competitively bid the respective bid packages for the construction of the Project. 7.1.1.2 Pre-Bid Conferences. DB shall schedule and conduct pre-bid conferences to answer questions posed by bidders. Said answers and any other information required to provide clazification to the Construction Documents during the bidding process shall be issued as written addenda and provided to all prospective bidders. 7.1.1.3 Scheduling. DB shall coordinate scheduling of bid packages, submittals. 7.1.1.4 Bid Results. DB shall submit to the City a summary of bid results for each bid package. 7.1.1.5 Bid Protests. DB shall heaz and decide bid protests and shall develop and maintain bid protest procedures for that purpose. City shall be timely informed of all bid protests (prior to resolution) and the outcome of said protests. 7.1.1.6 Equal Opportunity Contracting/Nondiscrimination. DB shall not discriminate on the basis of race, gender, religion, national origin, ethnicity, sexual orientation, age, or disability in the solicitation, selection, hiring or treatment of subcontractors, vendors, or suppliers. DB shall provide equal opportunity for subcontractors to participate in subcontracting opportunities. DB understands and agees that violation of this Subsection shall be considered a material breach of this Ageement and may result in contract termination, debarment, or other sanctions. The language of this Subsection shall be inserted in contracts between DB and any subcontractors, vendors, or suppliers. 7.1.1.7 Executing Contracts. DB shall be responsible for entering into subcontracts, in DB's own name, with the bidder who in DB's discretion and professional opinion best meets the monetary, time, and performance requirement of the Project. DB shall be responsible for ensuring that these contracts fully comply with all applicable local, state and federal laws, some but not all of which aze listed below. 7.1.1.8 Additive Alternatives. DB shall require additive alternates for extended warranties in bid packages for roofing and HVAC systems. 7.1.2 Meetings. DB shall conduct meetings identified below: 7.1.2.1 Preconstruction Meeting. DB shall conduct a preconstrnction meeting with its officers, agents and employees and City. The purpose of this meeting is to discuss: (i) the Agreement conditions, (ii) Scope of Work clarifications, and (iii) City policies, inspection requirements, and procedures. 7.1.2.1.1 Attendance. DB shall ensure that the preconstrnction meeting is attended by DB's construction contractor, project manager, all DB's major subcontractors, the City's [INSERT], and all other persons necessary as determined by DB or City. 7.1.2.2 Progress Meetings. DB shall conduct weekly progress meetings with the City and appropriate design and construction members. 10 6-161 7.1.2.3 Contractor Meetings. DB shall conduct contractor meetings, as necessary, to provide technical input. 7.1.2.3.1 DB shall provide interpretation of technical specifications and drawings. 7.1.2.4 Rescheduling. Progress Meetings may be rescheduled if rescheduled meeting times aze convenient for all necessary parties, and DB has given no less than five (5) Calendaz Days prior written notice of the rescheduled meeting. 7.1.25 Minutes. DB shall take corresponding meeting minutes and distribute copies to all attendees. 7.1.2.6 Reporting. DB shall monitor and report to the City on actual performance compazed to the Project Schedule, provide updated As-Builts, and verify that the latest changes to the Project, if any, have been made. 7.1.3 Construction Management. During construction of the Project, DB shall perform and be responsible for construction management, supervision, and administration services, including, but not limited to, tracking and reporting all expenses and all aspects of the construction and coordinating all construction means, methods, techniques, sequences and procedures to ensure the efficient and orderly sequence of the construction of the Project 7.1.3.1 Resident Management. DB shall provide resident management and contract administration, including specialists necessary for the functional, safe, on-budget and on-schedule completion of the Project, starting with the issuance of a Notice to Proceed, upon receipt of final construction drawings, from the City and extending through issuance of Notice of Completion and Acceptance. City staff will. perform inspections to verify compliance with the plans, specifications and contract documents. The DB resident staff shall ensure construction compliance with applicable local, state, and federal codes, building and environmental permit requirements, construction mitigation documents and enforcement of the Contract Documents. 7.1.3.2 Records Management. DB shall implement and maintain an internal records management and document control system as required to support project operations. The DB shall provide records management and document control information in a manner consistent with the City's reporting system. 7.133 Cash Flow. DB shall develop aproject-specific Plan for defining, tracking and reporting cash flow activity requirements and submit such plan to the City for review and approval prior to implementation. 7.1.3.4 Reporting. DB shall keep City informed of the progress and quality of the design and construction of the Project. 7.1.3.5 Documents On-Site. DB shall maintain a complete and up-to-date set of Construction Documents in the Projects field office at all times during construction that reflect all changes and modifications. 7.1.4 Site Safety, Securtry, and Compliance. DB shall be responsible for site safety, security, and compliance with all related laws and regulations. 7.1.4.1 Persons. DB shall be fully responsible for the safety and security of its officers, agents, and employees, City's officers, agents, and employees, and third parties authorized by DB to access the Project site. 7.1.4.2 Environmental. DB shall administer and enforce the Environmental Mitigation Monitoring and Reporting Plan for the Project, if any. In addition, DB shall report environmental issues to the City in a manner consistent with the City's reporting system. DB shall be responsible for the environmental consequences of the Project construction and shall comply with all related laws and regu]ations, including the Clean Air Act of 1970, the Clean Water Act, Executive Order number 11738, and the Stormwater Management and Dischazge Control Ordinance No. 0-17988 and any and all Best Management Practice guidelines and pollution elimination requirements as may be established by the Enforcement Official. 11 6-162 7.1.4.3 Risk of Loss. DB is responsible for the Project, project site, materials, equipment, and all other incidentals until the Project has been Accepted by the City and shall beaz any costs or expenses associated with the loss thereof or damage thereto, including by thefr, fire, or other casualties. 7.1.5 Public Right-of--Way. All work, including, materials testing special testing, and surveying to be conducted in the Public right-of--way shall be coordinated with the City. 7.1.5.1 Materials Testing. DB shall pay for and coordinate with City to have all material tests within the Public right-of--way and any asphalt paving completed by City's Material Testing Laboratory. 7.1.5.2 Surveying. DB shall pay for and coordinate with City's [INSER`f DFf?aR`IMEN"I'] all surveying required within the Public right-of--way. 7.1.5.3 Follow all Laws, Rules, and Regulations. DB agrees to follow all City standazds and regulations while working in the Public right of way, including but not limited to, utilizing proper traffic control and obtaining necessary permits. 7.1.6 Traffic Control. DB shall address all traffic control requirements for the Project including, if necessary, sepazate traffic control plans and/or notes. 7.1.7 Abatement. DB shall develop a mutually agreed upon program to abate and minimize noise, dust, and disruption to access for pazking and services at all times for adjacent business entities and residences. 7.1.8 Inspections. DB shall coordinate any and all required inspections, including special inspections, in such a manner that the progress of construction is not affected or impacted. The DB shall provide surveying, and other contracted services as required to complete project construction inspection and testing tasks. The City will provide inspection, special inspection, re-inspection services, and periodic building inspections. 7.1.9 Permits. The Parties acknowledge that the construction work to be performed on the Project by DB in compliance with this Agreement is subject to the prior issuance of building, land development, and/or public improvement permits paid for and obtained by DB. In the event that City, or any other governmental agency, umeasonably refuses to issue the permit(s) necessary to authorize the work to be performed or if the permit(s) are unreasonably canceled or suspended, then DB is relieved from its obligation to construct those improvements covered by the denial of said permit(s). City shall, under such circumstances, pay DB the reasonable costs, not to exceed the amounts identified in this Agreement, for all work completed up to the date of denial of said permit(s). Al] plans, specifications and, improvements completed to the date of the denial, suspension or cancellation of said permit(s) shall become the property of City upon D/B's receipt of payment in full as described above. 7.1.10 Maintenance. DB shall ensure Project is maintained in a clean, neat, sanitary and safe condition free from accumulation of waste materials or rubbish. Until Acceptance of the Project, DB shall be responsible for on-going site maintenance, including any erosion prevention measures. Prior to Final Completion, DB shall cause to be removed from and about the Project all tools, construction equipment, machinery, surplus materials, waste materials and rubbish and deliver the site to the City in a clean, neat, sanitary and safe condition. 7.1.10.1 Waste Removal. Please be advised that Chula Vista Municipal Code 8.24.070 provides for an exclusive franchise for the removal and conveyance of all solid waste for hire (including recyclables) within City limits. The exclusive franchise agreement covers any hauling activity that requires the generator or their agent to pay a fee for any service connected with removing or conveying waste. The City's franchise hauler is Allied (formerly Pacific) Waste Services and may be reached at (619) 421-9400. 7.1.11 Request for Information ("RFI ). Parties acknowledge that the RFI process is solely for correspondence between DB and its agents; however, DB shall submit copies of each RFI to City at the within twenty-four (24) hours of receipt. DB shall issue responses to RFIs. Unless DB specifically requests a City response, City will not respond to RFIs. 12 6-163 7.1. l2 Review and Approval. DB shall provide timely review and approve shop drawings, samples of constmction materials, product data, schedule submittals, and other submittals for compliance with the Construction Documents. D/B shall keep the City advised of all such matters being reviewed and approved by D/B and forwazd copies of such documents to City for review. 7.1.13 Royalties and Other Fees. DB shall pay royalties and license fees, if applicable. DB shall defend suits or claims for infringement of patent rights and shall defend and hold City and City's agents harmless from loss on account thereof 7.1.14 Provide City with a Detailed Construction Schedule (DCS) on an disc (CD) within fourteen (14) working days after receiving Notice to Proceed with Phase IV, provide updated versions of DCS on a monthly basis, and provide immediate notice of any impact on critical path items. ARTICLE VIII. SUBCONTRACTING 8.1 Subcontracting. 8.1.1 Design Services. DB shall perform or obtain the prior written consent of the City to subcontract all design services for the Project utilizing qualified, licensed and sufficiently experienced architects, engineers and other professionals (herein jointly "Design Consultants") as identified in Exhibit [INSERT]. DB shall not be permitted to substitute any Design Consultant unless authorized by City. 8.1.2 Construction Services. DB shall perform all construction on the Project utilizing subcontractors appropriately licensed by the California Contractors State License Board or other required agency. ARTICLE LK. PROJECT SCHEDULE 9.1 Project Schedule. DB shall perform and complete the Services and Work under this Agreement according to the timeframes set forth in the Project Schedule, attached hereto as Exhibit "[INSERT]", or a subsequently revised Project Schedule in such a manner that the GMP or Contract Time of the Project shall not be exceeded and that is consistent with the Standard of Care identified in Section 4.1. 9.1.1 Project Schedule. DB has submitted, as part of its proposal, a Project Schedule based on its estimate of the time necessary to complete the Project. 9.1.2 D/B's Obligation. Subsequent to the effective date of this Agreement, DB shall provide, coordinate, revise, and maintain the Project Schedule for all phases of the Project. 9.1.2.1 During the Project initiation and design phases, the DB shall submit an updated Project - Schedule monthly to the City for approval. 9.1.2.2 During Construction, DB shall submit an updated Project Schedule monthly to the City and shall include: 9.1.2.2.1 Forecast Data with the intended plan for the remainder of the contract duration. 9.1.2.2.2 Actual Data with indications of when and how much Work and/or Services was performed (% complete). 9.1.2.2.3 Logic changes or other changes required to maintain the Project Schedule. 9.1.3 Detail and Format The Project Schedule shall be substantially similaz in detail and form to Exhibit [INSERT], or it shall be in the form subsequently agreed to by the Parties. 9.1.4 Submittal. Project Schedule shall be submitted to City on a computer disk in a version of Microsoft Project. 9.2 Project Completion. DB acknowledges that all work on the Project under this Agreement will be complete and ready for its intended use by the Project Completion Date, [INSERT]. 13 6-164 9.3 Chances in Proiect Schedule. Changes in Project Schedule, whether to logic, definition, or relationship must be approved by the City in writing as a Change Order pursuant to the manner identified in Article XIII. ARTICLE X. DELAY IN PERFORMANCE 10.1 Time of Essence. Time is of the essence for this Agreement and each provision of this Agreement, including the Project Schedule, Start Date, and Project Completion Date contained herein, unless otherwise specified in this Agreement. DB shall perform all Services and Work as expeditiously as is consistent with standard of caze identified in Section 4.1. 10.2 Notification of Delav. If the DB anticipates or has reason to believe that the performance of Services and/or Work under this Agreement will be delayed, the DB shall immediately notify the City. A written notice of the delay must be delivered to the City within five (5) Calendaz Days of the initial notification, unless the City allows an additional period of tune to ascertain more accurate data in support of the request. The written notice shall include an explanation of the cause of the delay, a reasonable estimate of the length of the delay, and all supporting data. The DB shall include a written statement that the time adjustment requested is the entire time adjustment to which DB has reason to believe it is entitled as a result of the cause of the delay. An increase in time for completion does not necessarily mean that DB is entitled to an increase in GMP. If in the opinion of the City, the delay affects a material part of the Project, the City may exercise its rights under Article XXVII of this Agreement or any other remedy available in law or equity. 103 De1av If delays in the performance of Services or Work required under this Agreement aze caused by unforeseen events beyond the control of the Parties, such delay may entitle the DB to a reasonable extension of time or to additional compensaflon. Any such extension of time must be approved in writing by the City. The following conditions may justify such a delay: war; changes in law or government regulation; labor disputes; strikes; foes, floods, adverse weather or other similaz condition of the elements necessitating cessation of the DB's work; inability to obtain materials, equipment, or labor; required additional Professional Services; or other specific reasons agreed to between the City and the DB; provided, however, that: (i) [his provision shall not apply to, and the DB shall not be entitled to an extension of time, additional costs, or expenses for, a delay caused by the acts or omissions of the DB, its consultants, contractors, employees, or other agents; and (ii) a delay caused by the inability to obtain materials, equipment, or labor shall not entitle the DB to an extension of time unless the DB furnishes the City, in a timely manner, documentary proof satisfactory to City of the DB's inability to obtain materials, equipment, or labor. 10.3.1 Caused by Ciry. If DB reasonably believes that any action, inaction, decision or direction by City or agent for the City will likely result in the GMP or Contract Time being exceeded or the Project being completed late, DB will notify City at Project Team meeting and in writing within five (5) calendaz days of discovering such action, inaction, decision, or direction. Included in such notice will be an estimate of the cost and time impact resulting from such action, inaction, decision or direction. DB shall provide complete and accurate pricing within ten (10) calendar days of said discovery. 10.4 Costs of Delav/Liuuidated Damages. Ciry and DB recognize that time is of the essence in this Agreement and that City will suffer financial loss if the Project is not completed by the Substantial Completion Date identified in the Project Schedule or any extensions subsequently approved. As the exact amount of financial loss cannot be accurately forecasted, the Parties have used their best efforts to establish an estimate of such loss. In doing so, the Parties have examined all of the circumstances and factors associated with a delay and have determined an amount that is fair and reasonable as liquidated damages. City and D/B agree that DB shall pay as liquidated damages (but not as a penalty) for each calendar day of delay beyond the time specified for Substantial Completion of the Project, the following amounts which DB expressly agrees aze "not unreasonable under the circumstances" as defined in California Civil Code §1671(b): $100 for each calendar day. Liquidated Damages shall not be assessed after the date on which Substantial Completion is achieved. In lieu of paying damages to the City, the Parties agree that City may choose to reduce the GMP by the amount of the liquidated damages. ARTICLE XI. PROJECT COSTS 11.1 Estimated Cost. The Estimated Cost of Project, according to the RFP is [INSERT' WRITTEN DOLL,4R. AMOUNT (INSERT NUbIERIC DOLLAR AMOUNT)]. The City's obligation under this Agreement shall not 14 6-165 exceed the Estimated Cost; however, once a GMP is determined and approved, the GMP shall become the not to exceed amount of the City's obligation. GMP is subject to change pursuant to methods established in this Agreement. - I L 1.1 Cost Schedule. The EMP has been allocated among each activity or portion of the Project ("itemized Cost(s)"). The Itemized Costs aze included in Exhibit "[INSERT]", attached. The cost incurred by the DB for a specific activity or portion of the Project shall not exceed the associated Itemized Cost. 11.2 GMP. At 90% complete construction documents, DB shall establish a GMP and submit such GMP to the City far approval. 11.2.1 Not to Exceed Amount. The GMP shall not exceed $[1NSERT NL1MF.,RIC DOLLAR Alv(OUNT]. Any costs incurred by DB in excess of said GMP shall be the sole responsibility of the DB, unless a Change Order is approved by the City pursuant to Article XIII of this Agreement. 11.2.1.1 Included Costs. In calculating theGMP, DB shall include costs of the following: 11.2.1.1.1 All Design Consultants, including but not limited to azchitectural, structural, civil, mechanical, electrical, communications, graphics and art consultants, landscape azchitects, and acoustical, audio visual, lighting, and security consultants. 11.2.1.1.2 Estimating, value engineering and construction management. 11.2.1.1.3 Construction supervision and project management personnel, including but not limited to superintendents, Project managers, Project secretaries, Project engineers, Project accountants, and all other DB personnel wherever located. 11.2.1.1.4 All on-site and off-site equipment, supplies and facilities, including but not limited to, computers, estimating, dictating, communication and accounting equipment, office space, trailers, field equipment and storage facilities. 11.2.1.1.4.1 Option to Purchase. In no case shall the cumulative monthly rental charges to the Project for equipment and Small Tools used by the DB exceed 90% of the fair mazket value of any one piece of equipment or Small Tools. At City's option, the full price for equipment or Small Tools may be paid, and City may take possession upon completion of the Work. 11.2.1.1.5 All Hard Construction Costs. 11.2.1.1.6 DB Contingency Fund, which shall not exceed 5% of Hazd Construction Costs. 11.2.1.1.7 Reimbursable Costs. Example: Utility fees. 11.2.1.1.8 DB Fixed Fee for the complete design and construction of the entire Project as specified in the 90% CD's. 11.2.1.1.9 No more than $[INSERT NUMERIC DOLLAR AMOUNT]. for Design Services and General Conditions. 11.2.1.1.10 All home-office and field overhead costs of any type including document control and retention; 11.2.1.1.1 I All business Hcense costs; 11.2.1.1.12 All profit DB intends to eam under this Agreement. 11.2.1.1.13 All direct and incidental costs incurred by DB, except for those specifically identified under the General Conditions section. [WHERE DO WE DEFINE DIRECT OR INCIDENTAL COSTS`?]. 11.2.1.1.14 [INSERT OTHER'??^]. 15 6-166 11.2.1.2 Full Compensation. Unless otherwise expressly provided frt this Agreement, GMP shall be the maximum amount of compensation to due [o DB for all permitted costs of any type incurred by D/B in performing all services and obligations under this Agreement. 11.2.2 Itemization. DB shall provide City with an itemization of the GMP that reconciles the GMP with the itemized costs. The itemization shall include the following: 11.2.1.1 DB Fixed Fees. The fees chazged by the contractor for staff, equipment, office space and overhead during the term of the project. 11.2.1.2 Hard Construction Costs. Hazd Construction Costs broken down into categories for each of the major trades for the Project, which will include labor, material expenses, equipment costs, and a reasonable DB Contingency Fund. 11.2.1.3 [What else???]. 11.2.3 Alternate Bid Items. DB shall prepare, with the cooperation of the City, alternate bid items [o assure that the cost of the Project will not exceed the GMP. 11.2.4 Adjustments to GMP Based on Approved Change Orders. GMP may be changed, increased or decreased, based on Change Orders approved pursuant to Article XIII. 11.2.5 Adjustments Based on Other Cost Increases. GMP may be increased due to: (i) acts of God, acts of any governmental authority, the elements, waz, litigation, shortages of material, labor strikes, inflation, later commonly accepted or adopted higher standazds and specifications of construction, concealed or unknown conditions encountered in the completion of the Project, or other cause beyond DB's control, (ii) actual bids received being greater than estimated, or (iii) other factors not the result of unreasonable conduct by DB. The GMP may be increased by the amount of such increases; however, if GMP as proposed to be increased shall exceed the Estimated Costs, such change to GMP shall be subject to approval by City Council. 11.3 Duty to Advance Costs. DB shall advance all costs for Project subject to Reimbursement in the manner described in Article XVI. 11.4 Use of Proiect Contingencv. Project Contingency shall not be used without prior, written City approval and shall not be used for: (i) work required due to DB's, its officers', agents' or employees' failure to perform Work or Services according to the terms of this Agreement, in compliance with the Construction Documents, and/or Law; or (ii) uninsured losses resulting from the negligence of DB, its officers, agents, or employees. 11.5 Notification of Increased Costs. If, at any time, the DB anticipates that the amount expended on the Project will exceed the Estimated Cost or the GMP, when established, the DB shall immediately, not more than ten (10) Working Days from becoming aware of the potential increase, notify the City in writing. This written notification shall include an itemized cost estimate and a list of recommended revisions that the DB believes ` will bring the Project cost to within the Estimated Cost or GMP. Following the delivery of the Notice, DB shall assist the City in reviewing the itemized cost breakdown and adjusting the Scope of Work and establishing a revised Project, the cost of which will not exceed the Estimated Cost or GMP, once establish. 11.5.1 City Action. Following consultation with the DB, the City may choose to: (i) approve an increase in the amount authorized for the Project; (ii) delineate a project, which maybe constructed for the budget amount; (iii) any combination of (i) and (ii); or terminate the Project subject to the termination provisions in Article XXVII. ARTICLE XII. PRODUCTS 12. 1 Submittals. Prior to the bidding process, DB shall submit for City approval a list of products intended for use in the Project. Upon DB's completion of plans and specifications, City will review and approve products specified therein. D/B shall provide City a copy of each submittal for City approval throughout the duration of construction within twenty (20) Calendaz Days of DB's receipt of submittal. Approval is general approval only and in no way relieves DB of its sole responsibilities under this Agreement or any and all laws, codes, permits or regulations. 16 6-167 12. 2 Substitutions. DB shall submit all requests for product substitutions to City in writing within thirty (30) Calendar Days after the date of awazd of the construction contract. After expiration of the thirty (30) Calendar Days, City will allow substitution only when a product becomes unavailable due to no fault of DB's contractor. City shall review substimtion requests within thirty (30) Calendaz Days of submission of such requests. DB ae ees that City requires Consultant's input and as such D/B shall coordinate a five (5) Working Day review by its Consultant. 12.2.1 Substantiate Request. DB shall include with each substitution request complete data substantiating that the proposed substitution conforms to requirements of the Contract Documents. 12.2.2 D/B Representations. By submitting a substitution request, DB is representing to City all of the following: (i) DB has investigated proposed product and determined that in atl respect the proposed product meets or exceeds the specified product; (ii) DB is providing the same warranty for the proposed product as was available for the specified product; (iii) DB shall coordinate installation and make any other necessary modifications which may be required for work to be complete in all respects; and (iv) DB shall waive any claims for additional costs related to the substituted product, unless the specified product is not commercially available. 12.2.3 Separate Written Request. City will not consider either substitutions that aze implied in the product data submittal without a separate written request or substimtions that will require substantial revision of construction contract documents. 12.3 Samples. 123.1 Postage. Samples shall be sent to DB's office, carnage prepaid. 12.3.2 Review. DB shall furnish to City for review, prior to purchasing, fabricating, applying or installing, (2) two samples (other than field samples) of each required material with the required finish. 12.3.2.1 Where applicable, all samples shall be 8" x 10" in size and shall be limited in thickness to a minimum consistent with sample analysis. In lieu thereof, the actual full-size item shall be submitted. 12.3.2.2 DB shall assign a submittal number. DB shall include with each submission a list of all samples sent, a statement as to the usage of each sample and its location in the Project, the name of the manufacturer, trade name, style, model, and any other necessary identifying information. 12.3.23 All materials, fmishes, and workmanship in the complete building shall be equal in every respect to that of the reviewed sample. 12.3.2.4 City will return one submitted sample upon completion of City review. 12.3.2.5 D/B's, or DB's agent's, field samples shall be prepazed at the site. Affected finish work shall not commence until DB or its agents have been given a written review of the field samples. 12.3.3 Not a Release of Liability. City's review of samples in no way relieves DB of DB's responsibility for construction of Project in full compliance with all Contract Documents. 12.4 Observe Testing. When appropriate, DB shall witness testing and review materials and equipment testing results and provide comments regazding conformance with specification requirements. ARTICLE XIII. CHANGE ORDERS 13.1 When Required. Change Orders shall be required in the following instances: 13.1.1 GMP. Any adjustment in GMP. 13.12 Contract Time. Any adjushnent in Contract Time of Completion Date. 13.13 Use ojContingency Fund. At any time DB seeks to use the Contingency Fund, irrespective of impact on the GMP or Contract Time. 13.1.4 City Requests. The City directs DB to perform Additional Services. 1~ s-isa 13.1.5 Other Any other instance for which this Agreement expresses that a Change Order shall be used. 13.2 Process for Approval of Chance Orders. Within five (5) Calendaz Days of any event that gives rise to the need for a Change Order, the DB shall provide the City with written notice of the need for the same. The Change Order must indicate whether the change will affect, in any way, by increasing or decreasing, the GMP, Project Schedule, or project quality established during the design and submittal review process. In addition, it shall be accompanied by a detailed and complete estimate of cost impact associated with the Change Order, including all appropriate direct and indirect costs and credits. All such costs and credits shall be accurately categorized into DB Fixed Fee, Reimbursable Costs or Hazd Construction Costs. DB shall also provide City with a realistic estimate of the impact, if any, the Change Order will have on the Contract Time. 13.2.1 Project Manager Approval. If the Change Order request does not result in an increase in the Estimated Cost, the [INSERT WHO] shall either approve or reject the Change Order in writing within ten (10) Working Days of receiving DB's written notice, provided DB has submitted complete documentation substantiating the need for such Change Order. If City fails to respond to DB's written notice within the ten (10) Working Days, the Change Order request shall be deemed denied. li.2. 2 City Council Approval. For Change Orders not subject to section 13.2.1, City Council approval is required. The City Council may either approve, reject, or approve in part such Change Orders. Council Approval shall not be subject to the ten (10) Working Day response time provided for in section li9.1. 13.3 Written Approval of Chance Orders. DB shall not proceed on work requested under a Change Order, absent written approval from the appropriate authority. Any Services or Work, which require t he approval of a Change Order, perform by DB prior to approval shall not be reimbursed. 13.4 Failure to Agree on Cost of Chance Order or Time. In the event there is any disagreement or dispute between the Parties as to whether the DB is entitled to a Change Order, the amount of the Change Order or any increase in Contract Time requested through the Change Order, the dispute shall be resolved by the Director of Public Services. If the determinafion of the Director of Public Works is challenged, such challenge shall be address in the manner identified in Section 30.17. DB shall not have the right to stop or delay in the prosecution of any services or work, including services or work that is the subject of the Change Order (if directed by the City), pending the determination of the Director of Public Services or, if applicable, fmal resolution. Instead, DB shall continue diligently prosecuting all such services and work. 13.4 Full Compensation. Payment to DB for Change Orders shall provide full compensation for all equipment, materials, labor, field and home office overhead, mark-ups, and profit necessary to complete the work. By executing a Change Order, the DB or DB's representative acknowledges that no additional compensation or claims for items of work listed in the Change Order will be allowed. 13.5 Errors and Omissions. DB shall not be reimbursed for any costs or expenses of a Change Order resulting from a design error or omission, DB's negligence, or the negligence of any of DB's agents or subagents. DB shall be reimbursed for any costs or expenses of a Change Order resulting from a design error or omission that is the drect result of a City request for such design or omission. The City reserves the right to seek reimbursements for any funds used due to errors or omissions of the Design Consultants, DB's negligence, or the negligence of any of DB's agents, or subcontractors. 13.6 City Refusal to Approve Chance Order. DB shall not have the right to terminate this Agreement for the City's refusal to approve a Change Order pursuant to Sections li.2.lor and 13.2.3 . ARTICLE XIV. EXTRA WORK 14.1 City Authority to Order Extra Work. City may at any time prior to Project Completion order Exfra Work on the Project. The sum of all Extra Work ordered shall not exceed five percent (5%) of the Estimated Cost at the time of the Bid Awazd, without invalidating this Agreement and without notice to any surety. 14.1.1 Requests in GVriting. All requests for Extra Work shall be in writing, shall be treated as, and aze subject to the same requirements as Change Orders. DB shall not be responsible for failure to perform Extra Work, which was requested in a manner inconsistent with this section. 18 6-169 142 Bonds Repaired for Extra Work. DB's and its agents' bonds, required under Article XXIV, shall cover any Extra Work provided that the Extra Work is paid for by the Project Budget 14.3 Reimbursement for Extra Work. Work performed by DB as Extra Work is reimbursable in the same manner described in Article XVI. The Project contingency as described in Article Xl, will be used fast to cover the costs of Extra Work. 14.4 Markup. DB will be paid a reasonable allowance for overhead and profit for Extra Work. The allowance shall not exceed five percent (5%) of the approved costs for the Extra Work. ARTICLE XV. CHANGED CONDITIONS 15. 1 Chaneed Conditions. Changed Conditions shall be addressed under the Greenbook section 3-4; however, Parties acknowledge that even if Changed Conditions are found to be present, the Project shall not exceed the GMP without express City Council approval of an increase to the Project Budget. Absent such express approval of additional funds, DB shall provide City with value engineering and Parties will return Project to within the total Project cost. ARTICLE XVI. PAYMENT TERMS 16.1 Pavment 16.1.1 Funds for Payment. DB shall only be entitled to payment for Services and Work performed under this Agreement from the funds appropriated for the Project. 16.1.2 Maximum Payment. DB shall be entitled to payment in an amount not to exceed the GMP or subsequently approved increase in GMP. DB is not entitled to payment for unapproved expenses, unapproved increases in costs, or other increases caused by DB negligence, omissions, or failure to seek approval for additional or increased costs. 16.1.3 Application for Payment . DB shall submit to City a certificate and application for payment on or before the 5`" day of each calendaz month ("Payment Application"). The Payment Application shall be based upon the percentage of completion of the Schedule of Values plus any Reimburseable Costs, less any payments previously made by the City, incurred or advanced for the Project for which DB was has not previously received payment. The Payment Application must include all relevant documents in accordance with Section 15.1.6. If the City determines that all relevant documents have not been submitted, City shall request that DB provide additional documentation. DB shall provide additional documentation within ten (10) Working Days of request. City is not obligated to make payment to DB until City has received all relevant documentation to support Reimbursement Request. After all appropriate cost documentation has been received and City approves the Payment Application, City shall make payment to DB of all uncontested chazges within sixty (60) Calendar Days of receipt of a complete Payment Application. 16.1.3. 1 Withholding. From each payment, ten percent (10%) will be deducted and retained by the City, and the remainder will be paid in accordance with the terms and conditions of this Agreement. No payment made to DB or its sureties will constitute a waiver of any rights the City has under this Agreement. This section is not intended to limit any rights the City may have under the Performance or Payment Bond. In lieu of withholding retention under this Agreement, at the election of DB, City will deposit retention amounts into escrow and/or the substitution of securities for money as provided in California Public Contract Code Section 22300. 16.1.3.2Payment of Withholding. The City will pay the DB for the amounts withheld forty-five (45) Calendar Days from recordation of the Notice of Completion, providing that no Stop Notices or Mechanic's Liens have been filed since the recordation of the Notice of Completion. 16.1.3.2.1 Where a Stop Notice or Mechanic's Lien has been filed following the recordation of the Notice of Completion, the amount in controversy shall continue to be withheld until a fully executed release of Stop Notice or Mechanic's Lien has been filed and a conformed copy delivered to the City. 19 6-170 16.1.3. 3 Contested Chazges. In the event City contests any chazges contained in the Payment Application, the dispute shall be resolved in the manner identified in Section 21.6. DB shall not have the right to stop or decay in the prosecution or any Services of Work, pending the determination of the Director of Public Services or, if applicable, final resolution. Instead DB shall continue to diligently prosecute all Work and Services. During the time of the dispute, the City shall withhold the amount of the chazge in question. 16.1.3. 4 Cutoff for Submission of Reimbursement Requests. DB shall submit all Reimbursement Requests within six (6) months of the date on which Final Completion occurs and City accepts the Project. Any Reimbursement Request submitted afrer the Cutoff Date shall not be reviewed or included in Reimbursable Cost. 16.1.4 verification of Reimbursement Request. DB shall supply documentation to support the Reimbursement Request including, but not limited to, proof that all mechanic liens have been released, copies of invoices received and copies of cancelled checks, substitute checks, or image replacement documents showing that payment has been made in connection with the Reimbursement Request in the following manner: 16.1.4. 1 DB shall submit two (2) copies of a Reimbursement Request (cover letter, invoice, and documentation) to the City. 16.1.4. 2After review and approval, the City shall prepaze a memorandum to the Financing Department that the invoice is appropriate to pay. The memorandum shall indicate any costs to be disallowed and the reason for the disallowance. 16.1.4. 3 Prior to the approval of the Reimbursement Request, City has the right to verify whether or not the materials and work for which reimbursement is being requested have been installed and performed as represented in the Reimbursement Request. 16.1.5 Non-reimbursable Costs. Except to the extent that City expressly assumes the risk of loss under this Agreement, City shall exclude from the amounts payable to DB the fair value, as determined by City, of property that is destroyed, lost, stolen, or damaged rendering it undeliverable or unusable for City. In addition, DB is not entitled to reimbursement for any cost or expenditure that has not been approved by the City in the manner required by this Agreement or the City Charter and rules, regulations, or laws promulgated there-under. ARTICLE XVII. INSPECTION 17.1 Inspection Team. The Project shall be inspected by a team composed of, at a minimum, the following: i.) representatives of the City, ii.) representative from DB's Design Team, iii.) the Construction Manager, and iv.Representative, (iii) DB's Consultant(s), and (e) the DB's constmction superintendent [Inspection Team] 17.2 Inspection Sta¢es. The Project shall be inspected by the Inspection Team at minimum during the following stages: (i) when required by code, (iiJ as directed by the "Special Inspections" provision, (iii) bi-weekly. 173 Access. City, its consultants, subcontractors, independent testing laboratories as well as other governmental agencies with jurisdictional interests will have access at reasonable times with the project manager's approval for this observation, inspecting and testing. DB shall provide them proper and safe conditions for such access and advise them of DB's safety procedures and programs so that they may comply. 17.4 Additional Inspections. City will make, or have made, such inspections and tests, as the City deems necessary to see that the Work is being accomplished in accordance with the requirements of the Construction. 17.5 Notice. DB shall give City timely notice of readiness of the Work for all required on and off-site inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. DB shall give at least 24 hours notice for on-site inspection and five (5) days notice for off-site inspection. 17.6 Costs of Inspection. Unless otherwise specified, the cost of inspection and testing will be borne by the City. Any expenses associated with re-inspection shall be borne by DB. 20 6-171 17.7 Concealing Work. Prior to concealing work, DB shall obtain approval of work from the City and as required by all State Building Codes. City has the right to stop or suspend Work activities which will conceal or cover up DB Work product which is to be inspected or tested, or which will interfere with the inspection or testing activities, for a reasonable time and DB will have no right to additional cost or time it may incur as a result of the Work stoppage. 17.8 Defective Work. In the event such inspections or tests reveal non-compliance with the requirements of the Construction Documents or defective work, the provisions and process of Article XXlt shall apply. 17.9 Not a Waiver of Oblisations. Neither observations by the City nor inspecfions, tests, or approvals by City or others shall relieve DB from DB's obligations [o perform the Work in accordance with the Construction Documents. This approval is general approval only and in no way relieves DB of its sole responsibilities under this Agreement or any and all laws, codes, permits or regulations. ARTICLE XVIII. PROJECT COMPLETION 18.1 Notice to City. When DB determines that the Project is complete, DB shall notify the City in writing of the Projects stains within seven (7) Calendaz Days of the D/B's determination. The notice shall certify to City that the Project has been completed in accordance with the Construction Documents, al] applicable building codes and regulations, all permits, licenses, and certificates of inspection, use and occupancy, and ordinances relating to the Project. 18.2 Walk-Through Inspection. A preliminary Wallc-Through Inspection shall be conducted by City within ten (10) Working Days following DB's notice to City of completion ("Walk-Through Inspection"). The Walk- Through Inspection will be conducted by the Inspection Teazn identified in Article XVII, Section 17.1. 18.2.1 Punch List. A Punch List, if necessary, shall be prepared by City during the Wallc-Through Inspection. The Punch List shall be presented to DB by the RE within three (3) Working Days of the Wallc- Through Inspection. DB shall correct the items listed on the Punch List within thirty (30) Calendar Days of receipt of the punch list and prior to the Final Inspection. 18.2.2 Failure to Ident fy Items. As to any items not included on the Punch List or later discovered, nothing in this section is intended to limit DB's obligations under this Agreement and City will maintain all remedies available under this Agreement and the law. 18.3 Equipment Demonstration. Prior to final inspection, DB shall demonstrate to City the operation of each system in the Project, and instruct City personnel in operation, adjustment and maintenance of equipment and systems, using the operation and maintenance data. 18.3.1 Startup. The DB shall supervise, manage, and coordinate all project startup and testing activities for mechanical systems within the provisions of the project Contract Documents. 18.3.2 Reporting. The DB shall report progress of project startup and testing to the City in a manner consistent with the City's reporting system. 18.4 Final Inspection. Provided DB has corrected the Punch List items and notified the City of the correction ("Notice of Correction"), the Final Inspection for the Project shall be scheduled and conducted within ninety (90) Calendaz Days of the Notice of Correction. ARTICLE XIX. PROJECT ACCEPTANCE AND FINAL COMPLETION 19.1 Acceptance. Upon approval by the Inspection Team during the Final Inspection that Project improvements aze complete and that work required on the Punch List has been finished, City shall accept the Project ("Acceptance"). Upon Acceptance, DB shall do all of the following: 19.1.1 Notice of Completion. DB shall execute and file a Notice of Completion with the County Recorder of San Diego County and shall provide the RE with a conformed copy of the recorded Notice of Completion. 19.1.2 Lien and Material Releases. DB shall cause all contractors and subcontractors to provide lien and material releases as to the Project and provide copies of such lien and material releases to the City or, 21 6-172 upon approval of City which shall not be unreasonably withheld, provide bonds in lieu of lien and material releases in a form reasonably acceptable to City for all such work. 19.2 Final Completion. Final Completion of the Project shall be deemed to occur on the last date of the following events: (i) recordation of the Notice of Completion with a conformed copy to City; (ii) submission of all documents requred to be supplied by DB to City pursuant to this Agreement, including As-Built Drawings, warranties, and operating and maintenance manuals; or issuance of a final certificate of occupancy. 19.2.1 As-Builts. City will evaluate the submitted As-Builts for accuracy and completeness and may return comments. DB shall meet with City until all issues aze resolved. Upon issue resolution, in accordance with disputed work procedures in Section 22.6, DB shall submit a mylaz set and three (3) final blueline sets of As-Builts stamped by the azchitect/engineer of record as required by law. 19.2 No Waiver. DB's obligation to perform and complete the work in accordance with the Contract Documents shall be absolute. Neither recommendation of any progress payment or acceptance of work, nor any payment by City to DB under the Contract Documents, nor any use or occupancy of the Project or any part thereof by City, nor any act of acceptance by City, nor any failure to do act, nor any review of a shop drawing or sample submittal, will constitute an acceptance of work, which is not in accordance with the Contract Documents. ARTICLE XX. PROJECT DELIVERABLES 20.1 Proiect Deliverables. Prior to Acceptance, DB shall deliver all of the following to the City in the format required: 20.1.1 As-Builts. DB shall provide As-Builts in 3 sets of paper and electronic format (pdf) or CAD files on CD disks. 20. L1.1 As-Builts shall show by dimension accurate to within one (1) inch, the centerline of each run of conduits and circuits, piping, ducts, and other similaz items as determined by City, both concealed and visible. DB shall cleazly identify the item by accurate note such as "cast iron drain," galvanized water, etc. DB shall cleazly show, by symbol or note, the vertical location of the item ("under slab", "in ceiling", "exposed", etc.), and make all identification sufficiently descriptive that it may be related reliably to the specification. DB shall thoroughly coordinate all changes on the As-Builts making adequate and proper entries on each page of specifications and each sheet of drawings and other documents where entry is required to properly show the change. 20. 1.1.2 DB shall include all of the following on the As-Builts: 20.1.1.2.1 Depth of foundation in relation to finished fast floor. 20. 1.1.2.2 Horizontal and vertical locations of underground utilities and appurtenances, with references to permanent surface improvements. 20. 1.1.2.3 Locations of internal utilities and appurtenances, with references to visible and accessible features of the structure. 20. 1.1.2.4 Field changes of dimensions and details. 20. 1.1.2.5. Changes authorized by approved proposal requests, construction Change Orders, discussion with City that resulted in any change/deviation from City's program, specifications, approved plans, equipment or materials. 20. 1.1.2.6 Details not issued with original Construction Drawings, design build plans deferred approvals, etc. 20. 1.1.2.7 Upon completion of work, obtain signature of licensed surveyor or civil engineer on the Project record set verifying layout information. 20. 1.1.2.8 Show locations of all utilities on-site with size, and type of pipe, if different than specified, and invert elevations of pipe at major grade and aligntnent changes. 20. 1.1.2.9 The title "PROJECT RECORD" in 3/8" letters. 22 6-173 20. 1.1.3 DB shall maintain a set of As-Builts at the Project site for reference. DB shall ensure that changes to the As-Builts are made within twenty-four (24) hours after obtaining information. Changes shall be made with erasable colored pencil (not ink or indelible pencil), shall cleazly describe the change by note (note in ink, colored pencil or rubber stamp) and by graphic line, shall indicate the date of entry, shall circle the azea or azeas affected and, in the event of overlapping changes, use different colors for each change. 20.1.2 Operation and Maintenance Manuals. DB shall submit all Operation and Maintenance manuals prepared in the following manner: 20.1.2.1 In triplicate, bound in 8% x 11 inch (216 x 279 mm) three-ring size binders with durable plastic covers prior to City's Final Inspection. 20.1.2.2 A sepazate volume for each system, including but not limited to, mechanical, electrical, plumbing, roofing, irrigation, and any other system as determined by City, with a table of contents and index tabs in each volume as follows: 20. 1.2. 2.1Part 1: Directory, listing names, addresses, and telephone numbers of DB's subcontractors, agents, suppliers, manufacturers, and installers. 20. 1.2. 2.2Part 2: Operation and Maintenance Instructions, arranged by specification division or system. For each specification division or system, provide names, addresses and telephone numbers of DB's agents, suppliers, manufacturers, and installers. In addition, list the following: (i) appropriate design criteria; (ii) list of equipment; (iii) parts list; (iv) operating instructions;(v) maintenance instructions, equipment; (vi) maintenance instructions, fmishes; (vii) shop drawings and product data; and (viii) warranties. 20.2 Ownership of Project Deliverables. Upon Final Completion or Termination, Project Deliverables shall become the property of the City. DB and City mutually agree that the Contract documents for the Project shall not be used on any other work without the consent of each Parry. Assemble and deliver to City upon Final Completion all records, documents, warranties, bonds, guarantees, maintenance/ service contracts, and maintenance and operating manuals ARTICLE XXI. WARRANTIES 21.1 Warranties Required. DB shall provide and require its agents to provide the warranties listed below. This warranty requirement is not intended to exclude, and shall not exclude, other implicit or explicit warranties or guarantees required or implied by law. 21.1.1 Materials and Workmanship. DB shall guarantee, and shall requre its agents to guazantee, all work on the Project against defective workmanship and materials furnished by DB for a period of two (2) years from the date of Project's Final Completion. DB shall replace or repair any such defective work in a manner satisfactory to City, after notice to do so from City, and within the time specified in the notice. 21.1.2 New Materials and Equipment. DB shall warrant and guazantee, and shall require its agents to warrant and guazantee, to City that all materials and equipment incorporated into the Project aze new unless otherwise specified. 21.1.3 Design, Construction, and Other Defects. DB shall warrant and guarantee, and shall require its agents to warrant and guarantee to City that all work is in accordance with the Plans and Specifications and is not defective in any way in design, construction or otherwise. 21.2 Form and Content. Except manufacturer's standazd printed warranties, all warranties shall be on DB's and D/B's agent's, material supplier's, installer's or manufacturer's own letterhead, addressed to City. All warranties shall be submitted in the format specified in this section, modified as approved by City to suit the conditions pertaining to the warranty. 21.2.1 Durable Binder Obtain warranties, executed in triplicate by DB, DB's agents, installers, and manufacturers. Provide Table of Contents and assemble in binder with durable plastic cover. 23 6-174 21.2.2 Table of Contents. All warranties shall be listed and typewritten in the sequence of the Table of Contents of the Project manual, with each item identified with the number and title of the specification section in which specified, and the name of product or work item. 21.2.3 Index Tabs. Separate each warranty with index tab sheets keyed to the Table of Contents listing. 21.2.4 Detail. Provide full information, using separate typewritten sheets, as necessary. List DB's agents, installer, and manufacturer, with name, address and telephone number of responsible principal. 21.2.5 Warranty Start Date. Except for items put into use with DB's permission with date mutually agreed upon in writing, leave date of beginning of time of warranty open until the date of Final Completion. 21.2.6 Signature and Notarization. Al] warranties shall be signed and notarized. Signatures shall be required from DB's construction contractor and where appropriate, the responsible subcontractor. 21.3 Term of Warranties. Unless otherwise specified or provided by law, warranties shall extend for a term of two (2) yeaz(s) from the date of Final Completion. 21.3.1 Plants, Trees, and Shrubs. Not withstanding above, all shrubs and ground cover shall have a ninety (90) Calendaz Day warranty period and trees shall have a one (1) year warranty period. All plant warranties shall commence from the date of Final Completion. 21.4 Meetings. During the two (2) yeaz warranty period described in Section_ 1.3, DB shall meet, and shall require its design Consultant, construction contractor, and key subcontractors to meet, with the City representatives, on a monthly basis, if requested by City. This meeting shall be held to discuss and resolve any problems that City discovers in design, construction, or furnishing, fixtures, and equipment of the Project during the two (2) yeaz warranty period. 21.5 Warrantv Inspection. At 180 and 360 days following Final Completion, during the one-yeaz general building warranty period, DB shall inspect each component of the Project, identify items requiring repair, and oversee and complete such repairs. Findings of such inspections shall be reported to the City. ARTICLE XXII. DEFECTIVE WORK 22.1 Correction, Removal, or Replacement. If within the designated warranty period, or such additional period as maybe required by law or regulation, the Project is discovered to contain Defective Work, the DB shall promptly and in accordance with the City's written instructions and within the reasonable time limits stated therein, either correct the Defective Work, or if it has been rejected by City, remove it from the site and replace it with non-defective and conforming work. 22.2 Citv's Right to Correct If circumstances warrant, including but not limited to an emergency or DB's failure to adhere to section 21.1, City may correct, remove, or replace the Defective Work. In such circumstances, DB shall not recover costs associated with the Defective Work and shall reimburse the City for all City's costs, whether direct or indtrect; associated with the correction or removal and replacement. 22.3 Non-Reimbursable Costs. Al] costs incurred by DB or DB's agents to remedy defects are non-reimbursable costs. If the City has already reimbursed the DB for the defective work, City is entitled to an appropriate decrease in Reimbursable Costs, to withhold a setoff against the amount, or to make a claim against DB's bond if DB has been paid in full. 22.4 Extension of Warrantv. When Defective Work, or damage therefrom, has been corrected, removed, or replaced during the warranty period, the two (2) yeaz, or relevant warranty period, will be extended for an additional two (2) yeazs from the date of the satisfactory completion of the correction, removal, or replacement. 22.5 No Limitation on other Remedies. Exercise of the remedies for defects pursuant to this Article shall not limit the remedies City may pursue under this Agreement or law. 22.6 Disputes. If DB and City aze unable to reach agreement on disputed work, City may drect DB to proceed with the work and compensate DB for undisputed amounts. Payment of disputed amounts shall be as later determined by the Du ector of Public Services. If this decision is contested, the claims procedure in 29.17 shall be followed. DB shall maintain and keep all records relating to disputed work for a period of three (3) yeazs in accordance with Article XXVIII. 24 6-175 ARTICLE XXIII. MAINTENANCE OF LANDSCAPING & IRRIGATION WORK 23.1 Maintenance Period. If DB is required to install or maintain landscaping and/or irrigation, DB shall provide a maintenance period which shall begin on the first day after all landscape and irrigation work on the Project is complete, checked, approved by City, and City has given written approval to begin the maintenance period, and shall continue thereafter for ninety (90) Calendaz Days or until Project Acceptance, whichever is longer. 23.2 Maintenance Area. DB or DB's Contractor shall maintain all involved azeas of the Project. 23.3 Maintenance Required. DAB or DB's Contractor shall conduct regular planting maintenance operations immediately after each plant is planted. Plants shall be kept in a healthy, growing condition and in a visually pleasing appeazance by watering, pruning, mowing, rolling, trimming, edging fertilizing restaking pest and disease controlling, spraying, weeding cleaning up and any other necessary operation of maintenance. Landscape azeas shall be kept free of weeds, noxious grass and all other undesired vegetative growth and debris. DB or DB's Contractor shall replace all plants found to be dead or in an impaired condition within fourteen (14) days. Maintenance shall also include the following: (i) Filling and replanting of any low azeas which may cause standing water; (ii) Adjusting of sprinkler head height and watering pattern; (iii) FIlling and recompaction of eroded areas; (iv) Weekly removal of trash, litter, clippings and foreign debris; (v) Inspecting plants at least twice per week; (vi) Protecting all planting areas against traffic or other potential causes of damage. 23.4 Landscape and Irrisation Insnection. At the conclusion of the maintenance period, City shall inspect the landscaping and 'irrigation to determine the acceptability of the work, including maintenance. This inspection shall be scheduled with two (2) weeks notice, a minimum of ninety (90) Calendaz Days after the plant maintenance period commencement, or when the DB or DB's contractor notifies the CiTy that they aze ready for the final inspection, whichever comes last. The City will notify DB of all deficiencies revealed by the inspection before acceptance. 23.5 Extension of Maintenance Period. DB shall extend completion of the maintenance period when, in City's opinion, improper maintenance and/or possible poor or unhealthy condition of planted material is evident at the termination of the scheduled maintenance period. DB shall be responsible for additional maintenance of the work until al] of the work is completed and acceptable. Additional costs for failure to maintain landscaping during the Maintenance Period are not Reimbursable Costs. 23.6 Replacement. Plants found to be dead or not in a vigorous condition, or if root balls have been damaged, within the installation, maintenance and guazantee periods, shall be replaced within fourteen (14) Working Days of notification by City. DB shall include, at DB's or DB's Contractor's expense, a timely written diagnosis of plant health by a certified Arborist, should a dispute arise. Arborist's report shall indicate reason for lack of vigor, potential remedies, if any, and estimate of time Yequired to regain vigor and specified size. 23.6.1 Same Kind and Siae. Plants used for replacement shall be same kind and size as specified and shall be famished, planted and fertilized as originally specified. Cost of all iepair work to existing improvements damaged during replacements shall be borne by DB and shall not be Reimbursable Costs. ARTICLE XXIV. BONDS 24.1 Payment Bond. DB shall provide or require its Construction Contractor to provide City with a Payment (material and labor) Bond in favor of City for one hundred percent (100%) of the Hazd Construction Costs. 24.2 Performance Bond. DB shall provide or require its Construction Contractor to provide City with a Faithful Performance Bond in favor of the City for one hundred percent (100%) of the GMP. 24.3 Term. The Payment Bond shall remain in full force and effect at least until the Project is accepted by the City and all claims for materials and labor are paid, for a minimum of forty-five (45) Calendaz Days after the filing of the Notice of Completion, except as otherwise provided by law or regulation. The Performance Bond shall remain in full force for thirty (30) Calendaz Days following the filing date of the Notice of Completion and Acceptance, at which time it will convert to a ten percent (10%) warranty bond, which shall remain in place until the end of all warranty periods set forth in this Agreement. 25 6-176 24.4 Certificate of Agencv. All bonds sued by an agent must be accompanied by a certified copy of such agent's authority to act. 24.5 Licensing and Rating. The bonds shall be duly executed by responsible surety companies admitted to do business in the State of California, licensed or authorized in the jurisdiction in which the project is located to issue bonds for the limits required by this agreement, listed as approved by the United States Department of Treasury Circular 570, and whose underwriting limitation is sufficient to issue bonds in the amount required by this agreement and which also satisfy the requirements stated in Section 995.660 of the Code of Civil Procedure, except as provided otherwise by laws or regulations, secured through an authorized agent with an office in California, and have a minimum AM Best rating of "A--". 24.6 Form. All bonds shall be in the form prescribed by City Attorney. 24.7 Insolvency or Bankruotcv. If the surety on any bond furnished by the Construction Contractor is declazed bankrupt or becomes insolvent or its right to do business is terminated m any state where any part of the Project is located, DB shall within seven (7) Calendaz Days thereafter substitute or require the substitution of another bond and surety, acceptable to the City. ARTICLE XXV. INDEMNITY & DUTY TO DEFEND 25.1 Indemnity Defense and Hold Harmless -General Requirement. Except for liability for Professional Services covered under Section 25.2, DB shall defend, indemnify, protect and hold harmless the City, its elected and appointed officers and employees, from and against any and all claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner azising out of or incident to any alleged acts, omissions, negligence, or willful misconduct of DB, its officials, officers, employees, agents, and contractors, azising out of or in connection with the performance of the Defined Services or this Agreement. This indemnity provision does not include any claims, damages, liability, costs and expenses (including without limitations, attorneys fees) arising from the sole negligence or sole willful misconduct of the City, its officers, employees. Also covered is liability arising from, connected with, caused by or claimed to be caused by the active or passive negligent acts or omissions of the City, its agents, officers, or employees which may be in combination with the active or passive negligent acts or omissions of the DB, its employees, agents or officers, or any third party. 25.2 Professional Services. For those professionals who aze required to be licensed by the state (e.g. azchitects, landscape azchitects, surveyors and engineers) ("Design Professionals"), Design Professionals shall defend, indemnify and hold the City, its officials, officers, employees, volunteers, and agents free and harmless from any and al] claims, demands, causes of action, costs, expenses, liability, loss, damage or injury, in law or equity, to property or persons, including wrongful death, in any manner azising out of, pertaining to, or relating to any negligence, errors or omissions, recklessness, or willful misconduct of Design Professional, its officials, officers, employees, agents, DBs, and contractors arising out of or in connection with the performance of the Design Professional's Services. Also covered is liability azising from, connected with, caused by, or claimed to be caused by the active or passive negligent acts or omissions of the City, its agents, officers, or employees which may be in combination with the active or passive negligent acts or omissions of the Design Professional, its employees, agents or officers, or any third party. The Design Professional's duty to indemnify, protect and hold harmless shall not include any claims or liabilities arising from the sole negligence or sole willful misconduct of the City, its agents, officers or employees. This section in no way alters, affects or modifies the Design Professional's obligation and duties under this Agreement. 25.3 Indemnification for Liens and Stoo Notices. The DB shall keep the Project and Property free of any mechanic's liens and immediately secure the release of any stop notices. The D/B shall defend, indemnify, protect, and hold harmless, the City, its agents, officers and employees from and against any and all liability, claims, costs, and damages, including but not limited to, attorney fees, azising from or attributable to a failure to pay claimants. DB shall be responsible for payment of al] persons entitled to assert liens and stop notices. 25.4 Indemnification for Hazardous Materials. DB agrees to defend, indemnify, and hold harmless, the City, its agents, officers and employees from and against any and all costs, damages, claims, and liabilities, including reasonable attorney fees, foreseeable or unforeseeable, directly or indirectly, azising from or related to the Hazazdous Materials identified in the Phase I or Phase II Reports, if any, conducted pursuant to Article V. 26 6-177 DB's indemnity shall survive the close of escrow. Seller expressly preserves its rights against other parties and does not release, or waive its rights to contribution against, any other party. 25.5 Costs of Defense and Award. Included in the obligations in Sections 2~.1 through 2~.4, above, is the DB's obligation to defend, at DB's own cost, expense and risk, any and all aforesaid suits, actions or other legal proceedings of every kind that maybe brought or instituted against the City, its directors, officials, officers, employees, agents and/or volunteers. DB shall pay and satisfy anyjudgment, awazd or decree that maybe rendered against City or its directors, officials, officers, employees, agents and/or volunteers, for any and all legal expense and cost incurred by each of them in connection therewith. 25.6 Insurance Proceeds. DB's obligation to indemnify shall not be restricted to insurance proceeds, if any, received by the City, its directors, officials, officers, employees, agents, and/or volunteers. 25.7 Enforcement Costs. DB agrees to pay any and all costs City incurs enforcing the indemnity and defense provisions set forth in this Article XXV. 25.8 Survival. Consultant's obligations under this Article XXV shall survive the termination of this Agreement. 27 6-178 ARTICLE XXVI. INSURANCE 26.1 General. DB shall not begin work under this Agreement until it has: (i) obtained, and upon the City's request provided to the City, insurance certificates reflecting evidence of all htsurance required in section 263; (ii) obtained City approval of each company or companies; and (iii) confirmed that all policies contain the specific provisions required by section 26.4. 26.2 Tvoes of Insurance. At all times during the term of this Agreement, DB shall maintain insurance coverage as follows: 26.2.1 Commercial General Liability. Contractor shall provide at its expense a policy or policies of Commercial General Liability [CGL] Insurance written on an ISO Occurrence form CG 00 O1 07 98 or an equivalent form providing coverage at least as broad and which shall cover liability arising from premises and operations, XCU (explosions, underground, and collapse) independent contractors, products/completed operations, personal injury and advertising injury, bodily injury, property damage, and liability assumed under an insured's contract (including the tort liability of another assumed in a business contract). There shall be no endorsement or modification of the CGL Insurance limiting the scope of coverage for either "insured vs. insured" claims or contractual liability. Contractor shall maintain the same or equivalent CGL Insurance as described herein for at least ten (10) years following substantial completion of the work. All costs of defense shall be outside the policy limits. The Policy shall provide for coverage in amounts not less than two million dollars ($2,000,000) per occurrence for Bodily Injury, Personal Injury, or Property Damage. If Commercial General Liability Insurance or other form with a general aggregate limit shall apply separately to this project/location, the general aggregate limit shall be twice the required occurrence limit. 26.2.2 Commercial Automobile Liability. For all of DB's automobiles used in conjunction with the Project including owned, hired and non-owned automobiles, DB shall keep in full force and effect, a policy or policies of Commercial Automobile Liability Insurance written on an ISO form CA 00 OI 12 90 or a later version of this form or equivalent form providing coverage at least as broad in the amount of one million dollazs ($1,000,000) combined single limit per occurrence, covering bodily injury and property damage for owned, non-owned and hired automobiles ["Any Auto"]. All costs of defense shall be outside the policy. 26.2.3 Architects and Engineers Professional Liability. For all of DB's employees who are subject to this Agreement, DB shall keep in full force and effect, or DB shall require that its architecdengineer(s) of record keep in full force and effect errors and omissions insurance providing coverage for professional liability with a combined single limit of one million dollars ($1,000,000) per claim and two million dollazs ($2,000,000) annual aggregate. DB shall ensure both that (i) this policy retroactive date is on or before the date of commencement of the Project; and (ii) This policy has a reporting period of three (3) years after the date of completion or termination of this Agreement. DB agrees that for the time period defined above, there will be no changes or endorsements to the policy that increases the City's exposure to loss. 26.2.4 Excess Liability. DB shall provide Excess Liability Insurance affording three million dollazs ($3,000,000) [Generally Check with Risk) in excess of General Liability and Employer's Liability Limits afforded on primary policies. The coverage will be subject to [he same terms, conditions, and exclusions found in the primary policies. 26.2.5 Contractors Pollution Liability. If the DB or its Contractors' Work includes cleanup, removal, storage, or otherwise handling of hazardous or toxic chemicals, materials, substances, or any other pollutants, Contmctor shall provide at their expense Contractors Pollution Liability Insurance appropriate to cover such activities in an amount not less than $3,000,000 Combined Single Limit per occurrence/aggregate for bodily injury, property damage and remediation. 26.2.5.1 Claims made policies will include a five (5) year Extended Claims Discovery Period applicable to this Agreement, if reasonably available. 26.2.5.2 The policy for this insurance shall include Contractual Liability coverage. Such policy shall be endorsed to specifically provide for Work performed under the Agreement. 28 6-179 26.2.5.3 The DB or its Contractors of any tier shall furnish to the City a policy or Certificate of Contractors Pollution Liability Insurance in which the City, its elected and appointed officers, employees, and agents, and the DB aze named as additional insureds. The policy or Certificate must plainly designate the name of the Project, name of the Disposal -Site, and the permits secured for its disposal. This Certificate must be furnished to the City, evidencing compliance with the outlined requirements, prior to the DB or Contractor beginning their Work on [he Project. Any failure to furnish this policy or Certificate of Insurance shall not relieve the DB or Contractor from their obligations under this Section. 26.2.6 Hazardous Transporters Pollution Liabiliry. If the DB's or its contractors' Work includes transportation of hzadous or toxic chemicals, materials, substances or any other pollutants the DB or its Contractor of any tier shall provide, at their expense, Transporters Pollution Liability Insurance in an amount not less than $3,000,000 Combined Single Limit per occurrence/Aggregate for bodily injury, property damage and remediation. 26.2.6.1 Claims Made policies will include a five (5) yeaz Extended Claims Discovery Period applicable to this Agreement, if reasonably available. 26.2.6.2 Such policy shall be endorsed to specifically provide coverage for Work performed under this Agreement. The DB or its contractors of any tier shall famish the City with a policy or Certificate of Hazazdous Transporters Pollution Liability Insurance in which the City, its elected and appointed officers and employees, and agents, the DB, and any upper tiered contractor are named additional insureds. 26.2.6.3 The policy or Certificate must plainly designate the name of the Project, name of the Disposal Site, and the permits secured for its disposal. This Certificate must be famished to the City, evidencing compliance with the outlined requirements, prior to the DB or Contractor beginning their Work on the Project. Any failure to furnish this policy or Certificate of Insurance shall not relieve the DB or Contractor from thew obligations under this Section. 26.2.7 Worker's Compensation. For all of DB's employees who aze subject to this Agreement and to the extent required by the State of California, DB shall keep in full force and effect, a Workers' Compensation Insurance and Employers' Liability Insurance to protect DB against al] claims under applicable state workers' compensation laws. The City, its elected officials, and employees will not be responsible for any claims in law or equity occasioned by the failure of the D/B to comply with the requirements of this section. That policy shall provide at least the statutory minimums of one million ($1,000,000) for Bodily Injury by Accident for each accident, one million dollazs ($1,000,000) for Bodily Injury by Disease each employee, and a one million dollars ($1,000,000) for Bodily Injury by Disease policy limit. 26.2.7.1 Prior to the execution of the Agreement by the City, the DB shall file the following signed certification: "I am aware of the provisions of Section 3700 of the Labor Code which requires every employer to be insured against liability for worker's compensation or to undertake self- insurance, in accordance with the provisions of that code, and I will comply with such provisions before commencing the performance of the work of the Contract." 26.2.8 Builder's Risk. To the extent commercially available, the City shall provide a policy of "a11 risk" Builders Risk Insurance. DB shall add City and its respective elected officials, officers, employees, agents, and representatives to the policy as loss payees, to the extent such insurance is commercially available. Coverage will be provided for the Replacement Cost of Materials, Equipment and Fixtures destined to become a permanent part of the structure, and coverage will include Property in Transit and Property in Offsite Storage. DB shall also add its construction contractor, and the construction contractor's subcontractors to the policy as additional named insureds or loss payees, to the extent their interest may appear. The limit for this policy shall be a minimum of $ [fNSERT] (GMP dollar amount to reflect project soft and hard costs). It shall be DB's responsibility to beaz the expense of any deductible. The Builders Risk coverage shall expire at the time such insured property is occupied by City, or a Notice of Completion is filed, whichever occurs first. Contractor and its Subcontractors will 29 6-180 be solely responsible for any loss or damage to their personal property, including contractor's tools and equipment owned, used, leased or rented by the Contractor or Subcontractor. 26.3 Ratine Requirements. Except for State Compensation Insurance Fund, all insurance required by express provision of this Agreement shall be carded only by responsible insurance companies that have been given at least an "A" or "A--" and "V" rating by AM BEST, that aze authorized by the Califomia Insurance Commissioner to do business in the State of California, and that have been approved by the City. 26.3.1 Non-Admitted Carriers. T'he City will accept insurance provided by non-admitted, "surplus lines" carriers only if the carrier is authorized to do business in the State of California and is included on the List of Eligible Surplus Lines Insurers [LESLI list] with a current AM BEST rating of no less than A:X. 26.4 Endorsements Required. Each policy required under Article XXVI, section 26.2 of this Agreement shall expressly provide, and an endorsement shall be submitted to the City, that: 26.4.1 Additional Insureds. Except as to Architects and/or Engineers professional liability insurance and Workers Compensation, the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives shall be named as additional insureds. 26.4.1.1 Commercial Genera] Liability. The policy or policies must be endorsed to include as an Additional Insured [he City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives. Liability Additional Insured Endorsement must be provided on ISO form CG 2010 (11/85) or equivalent, specifically, coverage afforded City must be Primary and must not exclude Completed Operations. The coverage for Projects for which the Engineer's Estimate is one million dollars ($1,000,000) or more shall include liability arising out of: (i) Ongoing operations performed DB or on DB's behalf, (ii) DB's products, (iii) DB's work, including but not limited to completed operations performed by DB or on D/B's behalf, or (iv) premises owned, leased, controlled, or used by DB; the coverage for Projects for which the Engineer's Estimate is less than one million dollars ($1,000,000) shall include liability azising out of: (i) Ongoing operations performed by DB or on DB's behalf, (ii) DB's products, work, including but not limited to completed operations performed by DB or on DB's behalf, or (iii) premises owned, ]eased, controlled, or used by you; Except that th connection with, collateral to, or affecting any construction contract to which the provisions of subdivision (b) of Section 2782 of the California Civil Code apply, these endorsements shall not provide any duty of indemnity coverage for the active negligence of the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives in any case where an agreement to indemnify the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives would be invalid under subdivision (b) of Section 2782 of the California Civil Code. In any case where a claim or loss encompasses the negligence of the Insured and the active negligence of the City of City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives that is not covered because of Califomia Insurance Code Section 11580.04, the insurer's obligation to the City of San Chula Vista and its respective elected officials, officers, employees, agents, and representatives shall be limited to obligations permitted by California Insurance Code Section 11580.04. 26.4.1.1 Commercial Automobile Liability Insurance. Unless the policy or policies of Commercial Auto Liability Insurance aze written on an ISO form CA 00 Ol 12 90 or a later version of this form or equivalent form providing coverage at least as broad, the policy or policies must be endorsed to include as an Additional Insured the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives, with respect to liability azising out of automobiles owned, leased, hired or borzowed by or on behalf of the Contractor; Except that in connection with, collateral to, or affecting any construction contract to which the provisions of subdivision (b) of Section 2782 of the Califomia Civil Code apply, this endorsement shall not provide any duty of indemnity coverage for the active negligence of the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives in any case where an agreement to indemnify the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives would be invalid 30 6-181 under subdivision (b) of Section 2782 of the California Civil Code. In any case where a claim or loss encompasses the negligence of the Insured and the active negligence of the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives that is not covered because of California Insurance Code Section 11580.04, the insurer's obligation to the City of Chula Vista and its respective elected officials, officers, employees, agents, and representatives shall be Limited to obligations permitted by Califomia Insurance Code Section 11580.04. 26.42 Primary and Non-Contributory. The policies are primary and non-contributing to any insurance or self-insurance that maybe tamed by the City of Chula Vista, its elected officials, officers, employees, agents, and representatives with respect to operations, including the completed operations if appropriate, of the Named Insured. Any insurance maintained by the City of Chula Vista and its elected officials, officers, employees, agents, and representatives shall be in excess of DB's insurance and shall not contribute to it. 26.4.3 Waiver of Subrogation. Consultant's insurer will provide a Waiver of Subrogation in favor of the City for each required policy providing coverage for the term required by this Agreement. 26.4.4 Project General Aggregate Limit. The CGL policy or policies must be endorsed to provide a Designated Construction Project General Aggregate Limit that will apply only to the Work performed under this Agreement. Claims payments not arising from the Work shall not reduce the Designated Construction Project General Aggregate Limit. The Designated Construction Project General Aggregate Limit shall be in addition to the aggregate limit provided for the products-completed operations hazazd. 26.4.5 Written Notice. Except as provided for under Califomia law, the policies cannot be canceled, non- renewed or materially changed except after thirty (30) Calendaz Days prior written notice by DB to the City by certified mail, as reflected in an endorsement which shall be submitted to the City, except for non-payment of premium, in which case ten (10) Calendaz Days notice shall be provided. 26.4.3.1 The words "will endeavor" and "but failure to mail such notice shall impose no obligation or liability of any kind upon the company, its agents, or representatives" shall be deleted from all certificates. 26.4.6 Additional Insurance. DB may obtain additional insurance not required by this Agreement. 26.4.7 Prior to Starting Work Before performing any work, DB shall provide the City with all Certificates of Insurance accompanied by all endorsements. 26.5 Subcontractors. All coverages for subcontractors or subconsultants shall be subject to all of the requirements stated herein. Subcontractors and subconsultants shall be protected against risk of loss by maintaining insurance in the categories and at the limits required herein. Subcontractors and subconsultants shall name City and DB as additional insureds under its policies. 26.6 Obliaation to Provide Documents. The DB shall provide copies of documents including but not limited to certificates of insurance and endorsements, and shall furnish renewal documentation prior to expiration of insurance. Each required document shall be signed by the insurer or a person authorized by the insurer to bind coverage on its behalf. The City reserves the right to require complete, certified copies of all insurance policies required herein. 26.6.1 Cooperation. The DB and its Contractors shall cooperate fully with and provide any information or records requested by the City or regazding all aspects of the insurance and project, including but not limited to claims, audit, payroll, insurance records and safety. Delays in reporting information to the City may result in delays in progress payments to the DB. 26.7 Deductibles/Self Insured Retentions. All deductibles and self-insurance retentions on any policy shall be the responsibility of DB. Deductibles and self-insurance retentions shall be disclosed to and approved by the City at the time the evidence of insurance is provided. At the option of the City, either: the insurer shall reduce or eliminate such deductibles or self-insured retentions as respects the City, its officers, officials, employees and volunteers; or the DB shall provide a fmancial guarantee satisfactory to the City guazanteeing payment of losses and related investigations, claim administration and defense expenses. 31 6-182 26.8 Policv Chances. DB shall not modify any policy or endorsement thereto which increases the City's exposure to loss for the duration of this Agreement. 26.9 Reservation of Rights. The City reserves the right, from time to time, to review the Contractor's insurance coverage, limits, deductible and self-insured retentions to determine if they aze acceptable to the City. The City will reimburse the Contractor for the cost of the additional premium for any coverage requested by the City in excess of that required by this Agreement without overhead, profit, or any other mazkup. 26.10 Not a Limitation of Other Obligations. Insurance provisions under this section shall not be construed to limit the DB's obligations under this Agreement, including Indemnity. 26.11 Material Breach. Failure to maintain, renew, or provide evidence of renewal during the term of this Agreement may be treated by the City as a material breach of contract. ARTICLE XXVII. TERMINATION/SUSPENSION OF WORK 27.1 Suspension of Work for Archaeological and/or Paleontological Discoveries. If a discovery is made of an azchaeological or paleontological interest, DB shall immediately cease operations in the area of the discovery and shall not continue until ordered by City. When resumed, operations within the azea of the discovery shall be as directed by City. 27.1.1 Discoveries which may be encountered may include, but aze not be limited to, dwelling sites, stone implements or other artifacts, animal bones, human bones, fossils or any item with cultural significance. 27.1.2 DB shall be entitled to an extension of time and compensation in accordance with the provisions of this Agreement. 27.2 Termination of Agreement by City for Cause. If, through any cause, DB shall fail to fulfill in a timely and proper manner DB's obligations under this Agreement, or if DB shall violate any of the covenants, conditions, agreements or stipulations of this Agreement, City shall have the right to terminate this Agreement by giving written notice to DB of such termination and specifying the effective date thereof at least five (5) Calendaz Days before the effective date of such termination. 273 Termination or Suspension for Convenience by City. City may terminate or suspend this Agreement at any time and for any reason, by giving specific written notice to D/B of such termination or suspension and specifying the effective date thereof, at least seven (7) Calendar Days before the effective date of such suspension or termination. In the event of an emergency, advance notice shall not be required under this provision. 27.4 Termination of Agreement by DB. DB may terminate the Agreement upon ten (10) days written notice to City, whenever either of the following occur: 27.4.1 Project Suspension. If the Project has been suspended under the provisions of Section 27.1 or 27.=, for more than ninety (90) consecutive days through no fault or negligence of DB, and notice to resume Work or to terminate the Agreement has not been received from City within this time period; or, 27.42 Failure to Pay Amounts Due and Not in Dispute. If City fails to pay DB any monies due and not in dispute in accordance with the terms of this Agreement within ninety (90) Calendaz Days, plus the ten (10) Calendaz Days afforded the City to remedy the failure, after presentation to City by DB of a request therefore. 27.5 DB Action Required. Upon receipt of the Notice of Termination, DB shall take any and all action that may be necessary, or that the City Manager may direct, for the protection and preservation of the property related to this Agreement that is in the possession of DB and in which City has or may acquire an interest. 27.6 Possession. Ownership, and Control of Documents. In the event that this Agreement is terminated in accordance with Sections 27 2 through 2Z4, all fmished or unfmished documents, data, studies, drawings, maps, plans, specifications, reports and other materials prepazed by DB, or any of its agents, Design Consultants or Subcontractors, shall, at the option of the City, become the sole and exclusive property of the City. 32 6-183 27.7 Ciri Right to Complete Proiect. In the event that the Agreement is terminated pursuant to this Article VII, City may take possession of the Project and may complete the Project by whatever method or means City may select. 27.7.1 Excess Costs. In the event that the costs to complete the Project exceed the balance of funds, which had the Project been completed in accordance with this Agreement would have been due, the DB shall be liable for and pay such excess costs to the City. 27.8 Payment to DB Due to Termination. Upon termination, DB shall be entitled to receive just and equitable compensation for satisfactory Work completed. In no event shall such amount exceed the total dollaz amount authorized by City, reduced by the amount of payments previously made and any deductions permitted herein. The fair and reasonable amount shall be determined in good faith by City considering the following: 27.8.1 The price for completed services accepted, including any retention, by City not previously paid. 27.8.2 The costs incurred in the performance of the Project terminated, including initial costs and prepazatory expense allocable thereto. These costs aze only for Work completed and accepted by the City based on an audit of all Contractors' bills of materials and the timecazds for Work actually performed. 27.83 A portion of the DB Fixed Fee (overhead and profit) based on the percentage of Work completed on the Project; however, if DB would have sustained a loss on the entire Agreement had it been completed, City shall allow no profit under this section and shall reduce the amount payable to reflect the indicated rate of loss. 27.8.4 DB and Design Subcontractor services through the date of termination based on actual time spent as documented on timecazds. Expenses shall be paid based on invoice and receipts provided by DB. 27.8.5 Any amounts for Work or Services agreed to by the City Manager and DB, but without duplication of any amounts agreed to above. 27.8.6 Reasonable demobilization costs, to the effective date of such termination. 27.8.7 If termination occurs during Phase I, II, or III, DB shall only be entitled to the Fees for Phases I, II, or III, associated therewith, or the respective portion thereof. 27.9 Lost Profits. Under no circumstances will DB be entitled to any consideration for lost profit or lost opportunity costs. 27.IODeductions. The amount due DB shall be reduced by amounts including the following: 27.10.1 Any claim that City has against DB under this Agreement. 27.10.2 The agreed price for, or the proceeds of sale of, materials, supplies, or other things acquired by DB or sold under the provisions of this clause and not recovered by or credited to City. 27.10.3 Damages caused by DB's breach, including Excess Costs pursuant to Section 27.7.1. 27.10.4 Property Destroyed, Lost, Stolen or Damaged. Except to the extent that City expressly assumed the risk of loss, the City Manager shall exclude from the amounts payable to DB, the fair value, as determined by the City Manager, of property that is destroyed, lost, stolen, or damaged so as to become undeliverable to City. 27.11Disputes. If DB does not agree that the amount determined by the City Manager is fair and reasonable. DB shall within thirty (30) Calendaz Days of receipt of payment, shall gives notice of such disagreement to City. The dispute shall be resolved in the manner provide for in Section 22.6. 27.12 Waiver of Claims. In the event of termination under this Article XXVI, failure of DB to dispute amounts paid in the manner and within the timeframe provided in Section 27.I I shall act as a waiver of any and all claims for damages or compensation arising under this Agreement for any and all Work and Services performed under this Agreement up to the effective date of Notice of Termination. DB hereby expressly acknowledges and agrees that such claims shall be waived as herein provided. 27.13Rishts of City Preserved. In the event that the Agreement has been terminated, the termination shall not affect any rights or remedies of City against DB then existing or which may thereafter accrue. Any retention 33 6-184 or payment of moneys due D/B by City will not release DB from Liability. It is agreed that termination hereafter will not in any way release, waiver, or abridge any rights the City has against DB's performance bond surety. ARTICLE XXVIII. RECORDS AND AUDITS 28.1 Record Svstem - Reimburseable Costs. DB shall develop and maintain an accurate system for tracking all Reimbursable Costs. Utilizing this system, DB shall include with each month payment application an itemization of all such Reimbursable Costs actually incurred by DB, during the previous month. If requested by the City, DB shall provide all backup documentation supporting such Reimbursable Costs. 28.2 Record Svstem -Hard Construction Costs. DB shall develop and maintain an accurate system for tracking all Hard Construction Costs it incurs on the Project. Utilizing this system, DB shall include with each monthly application for payment an itemization of al] Hazd Construction Costs actually incurred by DB during the previous month. 28.3 Retention of Records. DB, contractors, and subcontractors shall maintain data and records related to this Agreement for a period of not less than three (3) yeazs following receipt of final payment under this Agreement or three (3) yeazs following fmal settlement associated with the termination of this Agreement pursuant to Article XXVII, above. 28.4 Audit of Records. At any tune during normal business hours, during the term of the contract plus and record retention period and as often as the City deems necessary, DB and any or all Contractors or subcontractors shall make available to the City for examination at reasonable locations within [he City/County of San Diego all of the data and records with respect to all matters covered by this Ageement. DB and all contractors or subcontractors will permit the City to make audits of all invoices, materials, payrolls, records of personnel, and other data and media relating to all matters covered by this Agreement. If records are not made available within the City/County of San Diego, then DB shall pay all the City's travel related costs to audit the records associated with this Agreement at the location where the records are maintained. Such costs will not be Reimbursable Costs. 28.4.1 Costs. DB and DB's agents shall allow City to audit and examine books, records, documents, and any and all evidence and accounting procedures and practices that City determines aze necessary to discover and verify all costs of whatever nature, which are claimed to have been incurred, anticipated to be incurred, or for which a claim for additional compensation or for Extra Work have been submitted under this Agreement. ARTICLE XXIX. NOTICES 29.1 Writine. Any demand upon or notice required or permitted to be given by one Party to the other Party shall be in writing. 29.2 Effective Date. Except in relation to Change Orders as provided for in section 29.4 or as otherwise provided by ]aw, any demand upon or notice required or permitted to be given by one Party to the other Party shall be effective: (i) on personal delivery, (ii) on the second business day after mailing by certified or registered U.S. Mail, return receipt requested, (iii) on the succeeding business day after mailutg by Express Mail or aRer deposit with a private delivery service of general use (e.g., Federal Express) postage or fee prepaid as appropriate, or (iv) upon successful transmission of facsimile. 29.3 Recipients. Except in relation to Change Orders, all demands or notices required or permitted to be given shall be sent to all of the following: 29.3.1 29.3.2 29.3.3 29.4 Recipients of Chance Orders. 29.4.1 34 6-185 29.4.2 29.4.3 29.5 Chance of Address(esl. Notice of change of address shall be given in the manner set forth in this Article. ARTICLE XXX. MISCELLANEOUS PROVISIONS 30.1 Headings. All article headings aze for convenience only and shall not affect the interpretation of this Agreement. 30.2 Gender & Number. Whenever the context requires, the use herein of (i) the neuter gender includes the masculine and the feminine genders and (ii) the singulaz number includes the plural number. 30.3 Reference to Paragraphs. Each reference in this Agreement to a section refers, unless otherwise stated, to a section in this Agreement. 30.4 Incorporation of Recitals. All recitals herein are incorporated into this Agreement and aze made a part hereof. 30.5 Covenants and Conditions. All provisions of this Agreement expressed as either covenants or conditions on the part of the City or the Consultant, shall be deemed to be both covenants and conditions. 30.6 Integration. This Agreement and the Exhibits and references incorporated into this Agreement fully express all understandings of the Parties concerning the matters covered in this Ageement. No change, alteration, or modification of the terms or conditions of this Agreement, and no verbal understanding of the Parties, their officers, agents, or employees shall be valid unless made in the form of a written change agreed to in writing by both Parties or an amendment to this Agreement agreed to by both Parties. All prior negotiations and agreements aze merged into this Agreement. 30.7 Severability. The unenforceability, invalidity, or illegality of any provision of this Agreement shall not render any any other provision of this Agreement unenforceable, invalid, or illegal. 30.8 Drafting Ambiguities. The Parties agree that they aze aware that they have the right to be advised by counsel with respect to the negotiations, terms and conditions of this Agreement, and the decision of whether or not to seek advice of counsel with respect to this Agreement is a decision which is the sole responsibility of each Party. This Ageement shall not be construed in favor of or against either Party by reason of the extent to which each Party participated in the drafting of the Agreement. 30.9 Conflicts Between Terms. If an apparent conflict or inconsistency exists between the main body of this Agreement and. the Exhibits, the main body of this Agreement shall control. If a conflict exists between an applicable federal, state, or local law, rule, regulation, order, or code and this Agreement, the law, rule, regulation, order, or code shall control. Varying degrees of stringency among the main body of this Agreement, the Exhibits, and laws, rules, regulations, orders, or codes are not deemed conflicts, and the most stringent requirement shall control Each Party shall notify the other immediately upon the identification of any appazent conflict or inconsistency concerning this Agreement. 30.10 Prompt Performance. Time is ofthe essence of each covenant and condition set forth in this Agreement. 30.11 Good Faith Performance. The parties shall cooperate with each other in good faith, and assist each other in the performance of the provisions of this Agreement. 30.12 Further Assurances. City and DB each agree to execute and deliver such additional documents as maybe required to effectuate the purposes of this Agreement. 30.13 Exhibits. Each of the following Exhibits is attached hereto and incorporated herein by this reference: Exhibit A - Exhibit B - 35 6-186 Exhibit C Exhibit D Exhibit E Exhibit F 30.14 Compliance with Controlline Law. The Consultant shall comply with all laws, ordinances, regulations, and policies of the federal, state, and local governments applicable to this Agreement, including Califomia Labor Code section 1720 as amended in 2000 relating to the payment of prevailing wages if stated in the RFP, during the design and preconstmction phases of a project, including inspection and land surveying work. In addition, the Consultant shall comply immediately with all drrectives issued by the City or its authorized representatives under authority of any laws, statutes, ordinances, rules, or regulations. The laws of the State of Califomia shall govern and control the terms and conditions of this Agreement. 30.15 Jurisdiction, Venue, and Attorney Fees. The venue for any suit or proceeding conceming this Agreement, the interpretation or application of any of its terms, or any related disputes shall be in the County of San Diego, State of Califomia. The prevailing Party in any such suit or proceeding shall be entitled to a reasonable awazd of attorney fees in addition to any other awazd made in such suit or proceeding. 30.16 Municipal Powers. Nothing contained in this Agreement shall be construed as a limitation upon the powers of the City as a chartered city of the State of Califomia. 30.17 Administrative Claims Requirements and Procedures. No suit or arbitration shall be brought arising out of this agreement, against the City unless a claim has fast been presented in writing and filed with the City and acted upon by the City in accordance with the procedures set forth in Chapter 1.34 of the Chula Vista Municipal Code, as same may from time to time be amended, the provisions of which aze incorporated by this reference as if fully set forth herein, and such policies and procedures used by the City in the implementation of same. Upon request by City, Consultant shall meet and confer in good faith with City for the purpose of resolving any dispute over the terms of this Agreement. 30.18 Third Party Relationships. Nothing in this Agreement shall create a contractual relationship between City and any third party; however, the Parties understand and agree that City, to the extent permitted by law, is an intended third party beneficiary of all DB's contracts, purchase orders and other contracts between DB and third party services. DB shall incorporate this provision into its contracts, supply agreements and purchase orders. 30.19 Non-Assignment. The DB shall not assign the obligations under this Agreement, whether by express assignment or by sale of the company, nor any monies due or to become due, without the City's prior written approval. Any assignment in violation of this pazagraph shall constitute a Default and is grounds for immediate termination of this Agreement, at the sole discretion of the City. In no event shall any putative assignment create a contractual relationship between the City and any putative assignee. 30.20 Successors in Interest. This Agreement and all rights and obligations created by this Agreement shall be in Force and effect whether or not any Parties to the Agreement have been succeeded by another entity, and all rights and obligations cleated by this Agreement shall be vested and binding on any Party's successor in interest. 30.21 Independent Contractors. The DB, any consultants, contractors, subcontractors, and any other individuals employed by the DB shall be independent contractors and not agents of the City. Any provisions of this Agreement that may appeaz to give the City any right to duect the DB concerning the details of performing the Services under this Agreement, or to exercise any control over such performance, shall mean only that the DB shall follow the direction of the City concerning the end results of the performance. 30.22 Approval. Where the consent or approval of a party is required or necessary under this Agreement, the consent or approval shall not be unreasonably withheld. 30.23 No Waiver. No failure of either the City or the Consultant to insist upon the strict performance by the other of any covenant, term or condition of this Agreement, nor any failure to exercise any right or remedy consequent upon a breach of any covenant, term, or condition of this Agreement, shall constitute a waiver of any such breach of such covenant, term or condition. No waiver of any breach shall affect or alter this 36 6-187 Agreement, and each and every covenant, condition, and term hereof shall continue in full force and effect to any existing or subsequent breach. 30.24 Si¢nino Authority. The representative for each Party suing on behalf of a corporation, partnership, joint venture or governmental entity hereby declares that authority has been obtained to sign on behalf of the corporation, partnership, joint venture, or entity and agrees to hold the other Party or Parties hereto harmless if it is later determined that such authority does not exist. IN WITNESS WHEREOF, this Agreement the City of Chula Vista and [INSERT] have executed this Agreement thereby indicating that they have read and understood same, and indicate their full and complete consent to its terms. This Agreement is dated , 2010 and this date shall constitute the effective date of this Agreement. CITY OF CHULA VISTA, A Municipal Corporation [INSERT COMPANY] By: CHERYL COX, Mayor Attest: DONNA NORRIS, City Clerk By: [NAME OF AUTHORIZED REPRESENTATIVE} Approved as to form and legality: BART MEISFELD, City Attorney Dated , 2010 37 6-188 ATTACHMENT C EECBG SPECIAL TERMS AND CONDITIONS 14 6-189 083109 SPECIAL TERMS AND CONDITIONS FOR THE ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT PROGRAM -FORMULA GRANTS Table of Contents 1. RESOLUTION OF CONFLICTING CONDITIONS ............................................................................... ...1 2. AWARD AGREEMENT TERMS AND CONDITIONS ......................................................................... ...1 3. AWARD PR07ECT PERIOD AND BUDGET PERIODS ...................................................................... ...1 4. STAGED DISBURSEMENT OF FUNDS ............................................................................................... ...1 5. PAYMENT PROCEDURES -ADVANCES THROUGH THE AUTOMATED STANDARD APPLICATION FOR PAYMENTS (ASAP) SYSTEM ........................................................................... ...2 6. INCREMENTAL FUNDING AND MAXIMUM OBLIGATION -COEXTENSIVE BUDGET PERIOD AND PROJECT PERIOD ......................................................................................................................... ...2 7. COST SHARING FFRDC'S NOT INVOLVED ....................................................................................... ...2 8. REBUDGETING AND RECOVERY OF INDIRECT COSTS ............................................................... ...3 9. CEII.ING ON ADMINISTRATIVE COSTS ........................._._.............................................................. ...4 10. LIMITATIONS ON USE OF FUNDS ...................................................................................................... ...4 11. PRE-AWARD COSTS .............................................................................................................................. ...4 12. USE OF PROGRAM INCOME -ADDITION ......................................................................................... ...4 13. STATEMENT OF FEDERAL STEWARDSHIP ..................................................................................... ...4 14. SITE VISITS ............................................................................................................................................. ...5 15. REPORTING REQUIREMENTS ............................................................................................................. ...5 16. PUBLICATIONS ...................................................................................................................................... ...5 17. FEDERAL,STATE, AND MUNICIPAL REQUIl2EMENTS ................................................................. ...6 18. INTELLECTUAL PROPERTY PROVISIONS AND CONTACT INFORMATION ............................. ._6 19. LOBBYING RESTRICTIONS ................................................................................................................. ...6 20. NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCT S - - SENSE OF CONGRESS ......................................................................................................................... ..6 21. INSOLVENCY, BANKRUPTCY OR RECEIVERSHIP ......................................................................... ...6 22. NATIONAL ENVD20NMENTAL POLKY ACT (NEPA) REQUIIEMENTS ...................................... ..6 23. DECONTAMINATION AND/OR DECOMMISSIONING (D&D) COSTS ............................................ ..7 24. SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAY 2009) ...................................................................................... ...7 25. REPORTING AND REGISTRATION REQUIItEMENTS UNDER SECTION 1512 OF THE RECOVERY ACT (MAY 2009) ............................................................................................................... 11 26. REQUIltED USE OF AMERICAN IIiON, STEEL, AND MANUFACTURED GOODS -- SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAY 2009) ......... 11 27. REQUIItED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS)--SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAY 2009) .............................................................................. 13 28. WAGE RATE REQUIlZEMENTS UNDER SECTION 1606 OF THE RECOVERY ACT (MAY 2009)16 29. RECOVERY ACT TRANSACTIONS LISTED IN SCHEDULE OF EXPENDITURES OF FEDERAL AWARDS AND RECIPIENT RESPONSIBILITIES FOR INFORMING SUBRECIPIENTS (MAY 2009) .......................................................................................................................................................... 17 30. DAMS BACON ACT REQUIREMENTS (MAY 2009) .......................................................................... 17 31. HISTORIC PRESERVATION .................................................................................................................. 25 ATTACHMENT' I -INTELLECTUAL PROPERTY PROVISIONS ..............._............................................... 26 Not Specified/Other 6-190 083109 SPECIAL TERMS AND CONDITIONS FOR THE ENERGY EFFICIENCY AND CONSERVATION BLOCK GRANT PROGRAM -FORMULA GRANTS I. RESOLUTION OF CONFLICTING CONDITIONS Any apparent inconsistency between Federal statutes and regulations and the terms and conditions contained in this awazd must be referred to the DOE Award Administrator for guidance. 2. AWARD AGREEMENT TERMS AND CONDITIONS This awazd/agreement consists of the Grant and Cooperative Agreement cover page, plus the following: a. Special terms and conditions. b. Attachments: Attachment No. Title 1 Intellectual Property Provisions 2 Project Activity Worksheet(s) aze attached. If the Worksheet is for the Strategy, the grant will be amended to include additional Worksheets as activities are approved. 3 Federal Assistance Reporting Checklist 4 Budget Pages are attached. For Strategy, the SF-424A is attached, if it was included in the application. The grant will be amended to include additional Budget Pages as activities are approved. 5 Davis-Bacon Act Wage Determination(s), if applicable. For Strategy awards, the Wage Determination will be included when activities aze approved. 6 Special Requirements, if applicable c. Applicable program regulations: Title V, Subtitle E of the Energy Independence Security Act (EISA) of 2007, Public Law 110-140. d. DOE Assistance Regulations, 10 CFR Part 600 at http://ecfr.gpoaccess.gov and if the award is for research and to a university or non-profit, the Research Terms & Conditions and the DOE Agency Specific Requirements at http://www.nsfgov/bfa/dias/policy/rtc/index.jsp. e. Application proposal as approved by DOE. f. National Policy Assurances to Be Incorporated as Awazd Terms in effect on date of awazd at http://manaoement.enersysov/business doe/1374 htm 3. AWARD PROJECT PERIOD AND BUDGET PERIODS The Project and Budget Periods for this award are concurrent fora 36-month period as indicated in Item No. 7 of the Assistance Agreement Face Page. 4. STAGED DISBURSEMENT OF FUNDS IXl IF MARKED. THIS TERM IS APPLICABLE The total funding allocation for this awazd is shown in Block 13 of the Assistance Agreement Cover Page. However, funds will be released according to a staged disbursement schedule. Al] funds must be expended within 36 months of the effective date of [he award. Not Specified/Other 6-191 083109 [ ]For Energy Efficiency Conservation Strategy (EEGs) Only awards, funds in the amount of $ [ ] is released to the Recipient to begin work on the EECS. The approved activities aze listed in Attachment 2, Project Activity Worksheets. The remaining funds will be released for disbursement upon DOE approval of the EECS and amendment of the awazd to include the authorized Project Activity Worksheets. [X] Funds in the amount of $1,100,000 is released to the Recipient to begin work on the activities listed in Attachment 2, Project Activity Worksheets. The remaining funds will be released for disbursement upon DOE approval of additional activities and amendment of the award to include the authorized Project ActiviTy Worksheets. (] Funds m the amount of $ [ ] is released to the Recipient to begin work on administrative duties pending resolution of problematic issues such as eligibility, technical issues, NEPA, historic preservation, budgetary items, or similaz issues. The remaining funds will be released upon successful resolution of these issues and amendment of the awazd. 5. PAYMENT PROCEDURES -ADVANCES THROUGH THE AUTOMATED STANDARD APPLICATION FOR PAYMENTS (ASAP) SYSTEM f 1 IF MARKED, THIS TERM DOES NOT APPLY- SEE ATTACHMENT 6 a. Method of Payment. Payment will be made by advances through the Department of Treasury's ASAP system. b. Requesting Advances. Requests for advances must be made through the ASAP system. You may submit requests as frequently as required to meet your needs to disburse funds for the Federal shaze of project costs. If feasible, you should time each request so that you receive payment on the same day that you disburse funds for direct project costs and the proportionate shaze of any allowable indirect costs. If same-day transfers are not feasible, advance payments must be as close as is administratively feasible to actual disbursements. c. Adjusting payment requests for available cash. You must disburse any funds that aze available from repayments to and interest earned on a revolving fund, program income, rebates, refunds, contract settlements, audit recoveries, credits, discounts, and interest earned on any of those funds before requesting additional cash payments from DOE/NNSA. d. Payments. All payments aze made by electronic funds transfer to the bank account identified on the ASAP Bank Information Form that you filed with the U.S. Department of Treasury. 6. INCREMENTAL FUNDING AND MAXIMUM OBLIGATION -COEXTENSIVE BUDGET PERIOD AND PROJECT PERIOD APPLICABLE ONLY TO INCREMENTALLY FUNDED AWARDS. This award is funded on an incremental basis. The maximum obligation of the DOE/NNSA is limited to the amount shown on the Agreement Face Page. You are not obligated to continue performance of the project beyond the total amount obligated and your pro rata shaze of the project costs, if cost sharing is required. Additional funding is contingent upon the availability of appropriated funds and substantial progress towazds meeting the objectives of the awazd. 7. COST SHARING FFRDC'S NOT INVOLVED APPLICABLE ONL YIF COST SHARING IS INCL UDED IN THE AWARD. a. Total Estimated Project Cost is the sum of the Government share and Recipient share of the estimated Not Specified/Other 6-192 083109 project costs. The Recipient's cost share must come from non-Federal sources unless otherwise allowed by law. By accepting federal funds under this award, you agree that you aze liable for your percentage share of total allowable project costs, on a budget period basis, even if the project is terminated eazly or is not funded to its completion. This cost is shazed as follows: Budget Budget Government Share Recipient Share Total Estimated Cost Period Period Star[ $/% $/% No. 1 09/21/2009 $1,974,300 / 59% $1,395,000 / 41% $3 369,300 Total Pro'ect b. If you discover that you maybe unable to provide cost sharing of at least the amount identified in paragraph a of this article, you should immediately provide written notification to the DOE Award Administrator indicating whether you will continue or phase out the project. If you plan to continue the project, the notification must describe how replacement cost sharing will be secured. c. You must maintain records of al] project costs that you claim as cost sharing, including in-kind costs, as well as records of costs to be paid by DOE/NNSA. Such records are subject to audit. d. Failure to provide the cost sharing required by this Article may result in the subsequent recovery by DOE/NNSA of some or all the funds provided under the awazd. 8. REBUDGETING AND RECOVERY OF INDIRECT COSTS THE APPLICABLE TERM IS MARKED BELOW. [ ] REBUDGETING AND RECOVERY OF INDIRECT COSTS - REIMBURSABLE INDIRECT COSTS AND FRINGE BENEFITS a. If actual allowable indirect costs and fringe benefits are less than those budgeted and funded under the award, you may use the difference to pay additional allowable direct costs during the project period. If at the completion of the award the Government's share of total allowable costs (i.e., direct, indirect, fringe benefits), is less than the total costs reimbursed, you must refund the difference. b. Recipients are expected to manage their indirect costs and fringe benefits. DOE will no[ amend an award solely to provide additional funds for changes in indirect costs and fringe benefits. DOE recognizes that the inability to obtain full reimbursement for indirect costs and fringe benefits means the recipient must absorb the underrecovery. Such underrecovery may be allocated as part of the organization's required cost sharing. [X] REBUDGETING AND RECOVERY OF INDIItECT COSTS -REIMBURSABLE INDIRECT COSTS a. If actual allowable indvect costs are less than those budgeted and funded under the award, you may use the difference to pay additional allowable direct costs during the project period. If at the completion of the award the Government's share of total allowable costs (i.e., direct and indirect), is less than the total costs reimbursed, you must refund the difference. b. Recipients are expected to manage their indirect costs. DOE will not amend an award solely to provide additional funds for changes in indirect cost rates. DOE recognizes that the inability to obtain full reimbursement for indirect costs means the recipient must absorb the underrecovery. Such underrecovery may be allocated as part of the organization's required cost sharing. c. The budget for this awazd includes indirect costs, but does not include fringe benefits. Therefore, fringe benefit costs shall not be charged to nor shall reimbursement be requested for Not Specified/Other 6-193 083109 this project nor shall the fringe benefit costs for this project be allocated to any other federally sponsored project. In addition, fringe benefit costs shall not be counted as cost shaze unless approved by the Contracting Officer. [ ] REBUDGETING AND RECOVERY OF INDIRECT COSTS - IlVDIItECT COSTS AND FRINGE BENEFITS ARE NOT REIMBURSABLE The budget for this awazd does not include indirect costs or fringe benefits. Therefore, these expenses shall not be chazged to nor reimbursement requested for this project nor shall the fringe and indirect costs from this project be allocated to any other federally sponsored project. In addition, indirect costs or fringe benefits shall not be counted as cost share unless approved by the Contracting Officer. 9. CEILING ON ADMINISTRATIVE COSTS a. Recipients may not use more than 10 percent of amounts provided under this program, or $75,000, whichever is greater (EISA Sec 545(b)(3)(A), for administrative expenses, excluding the costs of meeting the reporting requirements under Title V, Subtitle E of EISA. These costs should be captured and summarized for each activating under the Projected Costs Within Budget: Administration. b. Recipients are expected to manage their administrative costs. DOE will not amend an award solely to provide additional funds for changes in administrative costs. The Recipient shall not be reimbursed on this project for any fmal administrative costs that are in excess of the designated 10 percent administrative cost ceiling. In addition, the Recipient shall neither count costs in excess of the administrative cost ceiling as cost shaze, nor allocate such costs to other federally sponsored projects, unless approved by the Contracting Officer. 10. LIMITATIONS ON USE OF FUNDS a. Recipients may not use more than 20 percent or $250,000, whichevez is greater (EISA Sec 545(b)(3)(B), for the establishment of revolving loan funds. b. Recipients may not use more than 20 percent or $250,000, whichever is greater (EISA Sec 545(b)(3)(C), for subgrants to nongovernmental organizations for the purpose of assisting in the implementation of the energy efficiency and conservation strategy of the eligible unit of local government. 11. PRE-AWARD COSTS APPLICABLEONLYIFCOMPLETED BELOW. You are entitled to reimbursement for preawazd costs in the amount of $[ ]for [he period from [MonthDayYear] to [MonthDayYear] in accordance with your request dated [MonthDayYeaz] if such costs are allowable in accordance with the applicable Federal cost principles referenced in 10 CFR Part 600. 12. USE OF PROGRAM INCOME -ADDITION If you eam program income during the project period as a result of this awazd, you may add the program income to the funds committed to the awazd and use it to further eligible project objectives. 13. STATEMENT OF FEDERAL STEWARDSHIP DOE/NNSA will exercise normal Federal stewardship in overseeing the project activities performed under this award. Stewardship activities include, but are not limited to, conducting site visits; reviewing performance and financial reports; providing technical assistance and/or temporary intervention in unusual Not Specified/Other 6-194 083109 circumstances to correct deficiencies which develop during the project; assuring compliance with terms and conditions; and reviewing technical performance after project completion to ensure that the award objectives have been accomplished. 14. SITE VISITS DOE's authorized representatives have the right to make site visits at reasonable times to review project accomplishments and management control systems and to provide technical assistance, if required. You must provide, and must require your subawardees to provide, reasonable access to facilities, office space, resources, and assistance for the safety and convenience of the government representatives in the performance of their duties. All site visits and evaluations must be performed in a manner that does not unduly interfere with or delay the work. 15. REPORTING REQUIREMENTS a. Requirements. The reporting requirements for this award are identified on the Federal Assistance Reporting Checklist, DOE F 4600.2, attached to this award. Failure to comply with these reporting requirements is considered a material noncompliance with the terms of the award. Noncompliance may result in withholding of future payments, suspension, or termination of the current award, and withholding of future awazds. A willful failure to perform, a history of failure to perform, or unsatisfactory performance of this and/or other financial assistance awazds, may also result in a debarment action to preclude future awards by Federal agencies. b. Dissemination ofscientific/technical reports. Scientific/technical reports submitted under this award will be disseminated on the Internet via the DOE Information Bridge (www.osti.gov/bridge), unless the report contains patentable material, protected data, or SBIIt/STTR data. Citations for journal articles produced under the award will appear on the DOE Energy Citations Database (www.o sti. eov/energyc itations). c. Restrictions. Reports submitted to the DOE Information Bridge must not contain any Protected Persona] Identifiable Information (PR), limited rights data (proprietary data), classified information, information subject to export control classification, or other information not subject to release. 16. PUBLICATIONS a. You aze encouraged to publish or otherwise make publicly available the results of the work conducted under the award. b. An acknowledgment of Federal support and a disclaimer must appear m the publication of any material, whether copyrighted or not, based on or developed under this project, as follows: Acknowledgment: "This material is based upon work supported by the Department of Energy under Award Number DE-SC0002295." Disclaimer: "This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof" Not Specified/Other 6-195 083109 17. FEDERAL, STATE, AND MUNICIPAL REQUIREMENTS You must obtain any required permits and comply with applicable federal, state, and municipal laws, codes, and regulations for work performed under this award. 18. INTELLECTUAL PROPERTY PROVISIONS AND CONTACT INFORMATION a. The intellectual property provisions applicable to this awazd are provided as an attachment to this award or aze referenced on the Agreement Face Page. A list of all intellectual property provisions may be found at httpl/www.ec.doe.eov%financial assistance awards.htm. b. Questions regarding intellectual property matters should be referred to the DOE Award Administrator and the Patent Counsel designated as the service provider for the DOE office that issued the award. The IP Service Providers List is found at http://www.ec.doe.eov/documents intellectual Property (IPl Service Providers for Acquisition 19. LOBBYING RESTRICTIONS By accepting funds under this award, you agree that none of the funds obligated on the award shall be expended, directly or indirectly, to influence congressional action on any legislation or appropriation matters pending before Congress, other than to communicate to Members of Congress as described in 18 U.S.C. 1913. This restriction is in addition to those prescribed elsewhere in statute and regulation. 20. NOTICE REGARDING THE PURCHASE OF AMERICAN-MADE EQUIPMENT AND PRODUCTS -SENSE OF CONGRESS It is the sense of the Congress that, to the greatest extent practicable, all equipment and products purchased with funds made available under this award should be American-made. 21. INSOLVENCY, BANKRUPTCY OR RECEIVERSHIP a. You shall immediately notify the DOE of the occurrence of any of the following events: (i) you or your parent's filing of a voluntary case seeking liquidation or reorganization under the Bankruptcy Act; (ii) your consent to the institution of an involuntary case under the Batilauptcy Act against you or your parent; (iii) the filing of any similar proceeding for or against you or your parent, or its consent to, the dissolution, winding-up or readjustment of your debts, appointment of a receiver, conservator, trustee, or other officer with similar powers over you, under any other applicable state or federal law; or (iv) your insolvency due to your inability to pay your debts generally as they become due. b. Such notification shall be in writing and shall: (i) specifically set out the details of the occurzence of an event referenced in paragraph a; (ii) provide the facts surrounding that event; and (iii) provide the impact such event will have on the project being funded bythis award. c. Upon the occurrence of any of the four events described in the first paragraph, DOE reserves the right to conduct a review of your award to determine your compliance with the required elements of the award (including such items as cost share, progress towazds technical project objectives, and submission of required reports). If the DOE review determines that there are significant deficiencies or concerns with your performance under the award, DOE reserves the right to impose additional requirements, as needed, including (i) change your payment method; or (ii) institute payment controls. d. Failure of the Recipient to comply with this provision maybe considered a material noncompliance of this financial assistance award by the Contracting Officer. 22. NATIONAL ENVIRONMENTAL POLICY ACT (NEPA) REQUIREMENTS You aze restricted from taking any action using Federal funds, which would have an adverse effect on the Noi Specified/Other 6-196 083109 environment or limit the choice of reasonable alternatives prior to DOE/NNSA providing either a NEPA cleazance or a final NEPA decision regarding this project. PROHHiITED ACTIONS INCLUDE ANY ACTIVITIES RELATED TO THE MUNIPAL SOLAR INSTALLATION PROJECT EXCEPT THE ASSESSMENT. Other prohibited activities include any project activities that aze not included in Attachment 2 of this award. This restriction does not preclude you from approved project activities included in Attachment 2 of this award. HOWEVER, FURTHER ACTIVITIES RELATED TO THE MUNICII'AL SOLAR INSTALLATION PROJECT REQUIRE PRIOR APPROVAL BY THE DOE NEPA COMPLIANCE OFFICER AND UNILATERAL MODIFICATION OF THE AWARD AGREEMENT. EECBG FUNDING ($874,300.00) WILL BE WITHHELD FOR MUNICPAL SOLAR INSTALLATION UNTIL THIS CONDITION HAS BEEN SATISFIED. If you move forwazd with activities that are not authorized for federal funding by the DOE Contracting Officer in advance of the final NEPA decision, you are doing so at risk of not receiving federal funding and such costs may not be recognized as allowable cost share. If this awazd includes construction activities, you must submit an environmental evaluation report/evaluation notification form addressing NEPA issues prior to DOE/NNSA initiating the NEPA process. 23. DECONTAMINATION AND/OR DECOMMISSIONING (D&D) COSTS Notwithstanding any other provisions of this Agreement, the Government shall not be responsible for or have any obligation to the recipient for (i) Decontamination and/or Decommissioning (D&D) of any of the recipient's facilities, or (ii) any costs which may be incurred by the recipient in connection with the D&D of any of its facilities due to the performance of the work under this Agreement, whether said work was performed prior to or subsequent to the effective date of this Agreement. 24. SPECIAL PROVISIONS RELATING TO WORK FUNDED UNDER AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAY 2009) Preamble The American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, (Recovery Act) was enacted to preserve and create jobs and promote economic recovery, assist those most impacted by the recession, provide investments needed to increase economic efficiency by spurring technological advances in science and health, invest in transportation, environmental protection, and other infrastructure that will provide long-term economic benefits, stabilize State and local government budgets, in order to minimize and avoid reductions in essential services and counterproductive State and local tax increases. Recipients shall use grant funds in a manner that maximizes job creation and economic benefit. The Recipient shall comply with all terms and conditions in the Recovery Act relating generally to governance, accountability, transparency, data collection and resources as specified in Act itself and as discussed below. Recipients should begin planning activities for their first tier subrecipients, including obtaining a DUNS number (or updating the existing DUNS record), and registering with the Central Contractor Registration (CCR). Be advised that Recovery Act funds can be used in conjunction with other funding as necessary to complete projects, but tracking and reporting must be separate to meet the reporting requirements of the Recovery Act and related guidance. For projects funded by sources other than the Recovery Act, Contractors must keep separate records for Recovery Act funds and to ensure those records comply with the requirements of the Act. The Government has not fully developed the implementing instructions of the Recovery Act, particularly concerning specific procedural requirements for the new reporting requirements. The Recipient will be provided these details as they become available. The Recipient must comply with al] requirements of the Not Specified/Other 6-197 083109 Act. If the recipient believes there is any inconsistency between ARRA requirements and current award terms and conditions, the issues will be referred to the Contracting Officer for reconciliation. Definitions For purposes of this clause, Covered Funds means funds expended or obligated from appropriations under the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5. Covered Funds will have special accounting codes and will be identified as Recovery Act funds in the grant, cooperative agreement or TIA and/or modification using Recovery Act funds. Covered Funds must be reimbursed by September 3Q, 2015. Non-Federal employer means any employer with respect to covered funds -the contractor, subcontractor, grantee, or recipient, as the case may be, if the contractor, subcontractor, grantee, or recipient is an employer; and any professional membership organization, certification of other professional body, any agent or licensee of the Federal government, or any person acting directly or indirectly in the interest of an employer receiving covered funds; or with respect to covered funds received by a State or local government, the State or local government receiving the funds and any contractor or subcontractor receiving the funds and any contractor or subcontractor of the State or local government; and does not mean any department, agency, or other entity of the federal govemment. Recipient means any entity that receives Recovery Act funds directly from the Federal government (including Recovery Act funds received through grant, loan, or contract) other than an individual and includes a Slate that receives Recovery Act Funds. Soecia] Provisions A. Flow Down Requirement Recipients must include these special terms and conditions in any subawazd. B. Seeresation of Costs Recipients must segregate the obligations and expenditures related to funding under the Recovery Act. Financial and accounting systems should be revised as necessary to segregate, track and maintain these funds apart and separate from other revenue streams. No part of the funds from [he Recovery Act shall be commingled with any other funds or used for a purpose other than that of making payments for costs allowable for Recovery Act projects. Prohibition on Use of Funds None of the funds provided under this agreement derived from the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, may be used by any Slate or local government, or any private entity, for any casino or other gambling establishment, aquarium, zoo, golf course, or swimming pool. C. Access to Records With respect to each financial assistance agreement awazded utilizing at least some of the funds appropriated or otherwise made available by the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, any representative of an appropriate inspector general appointed under section 3 or 8G of the Inspector General Act of 1988 (5 U.S.C. App.) or of the Comptroller General is authorized - (I) to examine any records of the contractor or grantee, any of its subcontractors or subgrantees, or any State or local agency administering such contract that pertain to, and involve transactions relation to, the subcontract, subcontract, grant, or subgrant; and Not Specified/Other 6-198 083109 (2) to interview any officer or employee of the contractor, grantee, subgrantee, or agency regazding such transactions. D. Publication An application may contain technical data and other data, including trade secrets and/or privileged or confidential information, which the applicant does not want disclosed to the public or used by the Govemment for any purpose other than the application. To protect such data, the applicant should specifically identify each page including each line or paragraph thereof containing the data to be protected and mark the cover sheet of the application with the following Notice as well as referring to the Notice on each page to which the Notice applies: Notice of Restriction on Disclosure and Use of Data The data contained in pages ---- of this application have been submitted in confidence and contain trade secrets or proprietary information, and such data shall be used or disclosed only for evaluation purposes, provided that if this applicant receives an award as a result of or in connection with the submission of this application, DOE shall have the right to use or disclose the data here to the extent provided in the awazd. This restriction does not limit the Government's right to use or disclose data obtained without restriction from any source, including the applicant. Information about this agreement will be published on the Internet and ]inked to the website www.recovery.gov ,maintained by the Accountability and Transparency Board. The Board may exclude posting contractual or other information on the website on a case-by-case basis when necessary to protect national security or to protect information that is not subject to disclosure under sections 552 and 552a of title 5, United States Code. E. Protectine State and Local Government and Contractor Whistleblowers The requirements of Section 1553 ofthe Act are summarized below. They include, but are not limited to: Prohibition on Reprisals: An employee of any non-Federal employer receiving covered funds under the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, may not be discharged, demoted, or otherwise discriminated against as a reprisal for disclosing, including a disclosure made in the ordinary course of an employee's duties, to the Accountability and Transparency Board, an inspector general, the Comptroller General, a member of Congers, a State or Federal regulatory or law enforcement agency, a person with supervisory authority over the employee (or other person working for the employer who has the authority to investigate, discover or terminate misconduct, a court or grantjury, the head of a Federal agency, or their representatives information that the employee believes is evidence of • gross management of an agency contrnct or grant relating to covered funds; • a gross waste of covered funds • a substantial and specific danger to public health or safety related to the implementation or use of covered funds; • an abuse of authority related to the implementation or use of covered funds; or • as violation of law, rule, or regulation related to an agency contract (including the competition for or negotiation of a contract) or grant, awarded or issued relating to covered funds. Agency Action: Not later than 30 days after receiving an inspector general report of an alleged reprisal, the head of the agency shall determine whether there is sufficient basis to conclude that the non-Federal employer has subjected the employee to a prohibited reprisai. The agency shall either issue an order denying relief in whole or in part or shall take one or more of the following actions: • Order the employer to take affirmative action to abate the reprisal. • Ordez the employer to reinstate the person to the position that the person held before the reprisal, together with compensation including back pay, compensatory damages, employment benefits, Not Specified/Other 6-99 083109 and other terms and conditions of employment that would apply to the person in that position if the reprisal had no[ been taken. • Order the employer to pay the employee an amount equal to the aggregate amount of all costs and expenses (including attorneys' fees and expert witnesses' fees) that were reasonably incurred by the employee for or in connection with, bringing the complaint regazding the reprisal, as determined by the head of a court of competentjurisdiction. Nonenforceablity of Certain Provisions Waiving Rights and remedies or Requiring Arbitration: Except as provided in a collective bazgaining agreement, the rights and remedies provided to aggrieved employees by this section may not be waived by any agreement, policy, form, or condition of employment, including any predispute arbitration agreement. No predispute arbitration agreement shall be valid or enforceable if it requires azbitration of a dispute azising out of this section. Requirement to Post Notice of Rights and Remedies: Any employer receiving covered funds under the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, shall post notice of the rights and remedies as required therein. (Refer to section 1553 of the American Recovery and Reinvestment Act of 2009, Pub. L. 111-5, www.Recovery.gov, for specific requirements of this section and prescribed language for the notices.). F. Request for Reimbursement Reserved G. False Claims Act Recipient and sub-recipients shall promptly refer to the DOE or other appropriate Inspector General any credible evidence that a principal, employee, agent, contractor, sub-grantee, subcontractor or other person has submitted a false claim under the False Claims Act or has committed a criminal or civil violation of laws pertaining to fraud, conflict or interest, bribery, gratuity or similar misconduct involving those funds. H. Information in supportive of Recovery Act Reoortine Recipient may be required to submit backup documentation for expenditures of funds under the Recovery Act including such items as timecards and invoices. Recipient shall provide copies of backup documentation at the request of the Contracting Officer or designee. I. Avai]ability of Funds Funds appropriated under the Recovery Act and obligated to this award aze available for reimbursement of costs until September 30, 2015. J. Additional Fundine Distribution and Assurance of Appropriate Use of Funds Applicable if awazd is to a State Government or an Aeencv Certification by Governor --Not later than April 3, 2009, for funds provided to any State or agency thereof by the American Reinvestment and Recovery Act of 2009, Pub. L. 111-5, the Governor of the State shall certify that: 1) the state will request and use funds provided by the Act; and 2) the funds will be used to create jobs and promote economic growth. Acceptance by State Legislature -- If funds provided to any State m any division of the Act are not accepted for use by the Governor, then acceptance by the State legislature, by means of the adoption of a concurrent resolution, shall be sufficient to provide funding to such State. Distribution -After adoption of a State legislature's concurrent resolution, funding to the State will be Not Specified/Other 10 6-200 083109 for distribution to local governments, councils of government, public entities, and public-private entities within the State either by formula or at the State's discretion. K. Certifications With respect to funds made available to State or local governments for infrastructure investments under the American Recovery and Reinvestment Ac[ of 2009, Pub. L. 1 I I-5, the Governor, mayor, or other chief executive, as appropriate, certified by acceptance of this awazd that the infrastructure investment has received the full review and vetting required by law and that the chief executive accepts responsibiliTy that the infrastructure investment is an appropriate use of taxpayer dollars. Recipient shall provide an additional certification that includes a description of the investment, the estimated total cost, and the amount of covered funds to be used for posting on the Internet. A State or local agency may not receive infrastructure investment funding from funds made available by the Ac[ unless this certification is made and posted. 25. REPORTING AND REGISTRATION REQUIREMENTS UNDER SECTION 1512 OF THE RECOVERY ACT (MAY 2009) a. This award requires the recipient to complete projects or activities which are funded under the American Recovery and Reinvestment Act of 2009 (Recovery Act) and to report on use of Recovery Act funds provided through this award. Information from these reports will be made available to the public. b. The reports are due no later than ten calendaz days after each calendar quarter in which the recipient receives [he assistance award funded in whole or in part by the Recovery Act. c. Recipients and their first-tier recipients must maintain current registrations in the Central Contractor Registration (http://www.cccgov) at all times during which they have active federal awazds funded with Recovery Act funds. A Dun and Bradstreet Data Universal Numbering System (DUNS) Number (http://www.dnb.com) is one of the requirements for registration in the Central Contractor Registration. d. The recipient shall report the information described in section 1512(c) of the Recovery Act using the reporting instructions and data elements that will be provided online at http://www.FederalReporting.gov and ensure that any information that is pre-filled is corrected or updated as needed. 26. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS -- SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAY 2009) THIS AWARD TERM IS APPLICABLE TO ANY RECOVERYACT FUNDS FOR CONSTRUCTION. ALTERATION, MAINTENANCE. OR REPAIR OFA PUBLIC B UILDING OR PUBLIC WOR%AND THE TOTAL PROJECT yAL UE IS ESTIMATED LESS THAN $7.443.000. THIS AWARD TERM ALSO APPLIES TO ALL SUBGRANTS AND CONTRACTS a. Definitions. As used in this awazd term and condition-- (1) Manufactured good means a good brought to the construction site for incorporation into the building or work that has been- (i) Processed into a specific form and shape; or (ii) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. (2) Public building and public work means a public building of, and a public work of, a governtnental entity (the United States; the District of Columbia; commonwealths, territories, and minor Not Specified/Other 11 6-201 083109 outlying islands of the United States; State and local governments; and multi-State, regional, or interstate entities which have governmental functions). These buildings and works may include, without limitation, bridges, dams, plants, highways, parkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. (3) Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent cazbon, and may include other elements. b. Domestic preference. (i) This award term and condition implements Section 1605 of the Amecican Recovery and Reinvestment Act of 2009 (Recovery Act) (Pub. L. 111--5), by requiring that all iron, steel, and manufactured goods used in the project aze produced in the United States except as provided in paragraph (b)(3) and (b)(4) of this section and condition. (2) This requirement does not apply to the material listed by the Federal Government as follows: None (3) The award official may add other iron, steel, and/or manufactured goods to the list in pazagraph (b)(2) of this section and condition if the Federal Government determines that-- (i) The cost of the domestic iron, steel, and/or manufactured goods would be umeasonable. The cost of domestic iron, steel, or manufactured goods used in the project is umeasonable when the cumulative cost of such material will increase the cost of the overall project by more than 25 percent; (ii) The iron, steel, and/or manufactured good is not produced, or manufactured in the United States in sufficient and reasonably available quantities and of a satisfactory quality; or (iii) The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest. c. Request for determination of inapplicability of Section 1605 of the Recovery Act . (1) (i) Any recipient request to use Foreign iron, steel, and/or manufactured goods in accordance with paragraph (b)(3) of this section shall include adequate information for Federal Government valuation of the request, including- (A) A description of the foreign and domestic iron, steel, and/or manufactured goods; (B) Unit of measure; (C) Quantity; (D) Cost; (E) Time of delivery or availability; (F) Location ofthe project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign iron, steel, and/or manufactured goods cited in accordance with paragraph (b)(3) of this section. (ii) A request based on unreasonable cost shall include a reasonable survey of the mazket and a completed cost compazison table in the format in paragraph (d) of this section. (iii) The cost of iron, steel, and/or manufactured goods material shall include all delivery costs to the construction site and any applicable duty. (iv) Any recipient request for a determination submitted after Recovery Act funds have been obligated for a project for construction, alteration, maintenance, or repair shall explain why [he recipient could not reasonably foresee the need for such determination and could not have requested the determination before the funds were obligated. If the recipient does not submit a satisfactory explanation, the awazd official need not make a determination. Not Specified/Other 12 6-202 083109 (2) If the Federal Government determines afrer funds have been obligated for a project for construction, alteration, maintenance, or repair that an exception to section 1605 of the Recovery Act applies, the awazd official will amend the awazd to allow use of the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is nonavailability or public interest, the amended awazd shall reflect adjustment of the award amount, redistribution of budgeted funds, and/or other actions taken to cover costs associated with acquiring or using the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is the unreasonable cost of the domestic iron, steel, or manufactured goods, [he award official shall adjust the award amount or redistribute budgeted funds by at ]east the differential established in 2 CFR 176.110(a). (3) Unless the Federal Government determines that an exception to section 1605 of the Recovery Act applies, use of foreign iron, steel, and/or manufactured goods is noncompliant with section 1605 of the American Recovery and Reinvestment Act. d. Data. To permit evaluation of requests under paragraph (b) of this section based on unreasonable cost, the Recipient shall include the following information and any applicable supporting data based on the survey of suppliers: Foreign and Domestic Items Cost Comparison Description Unit of Measure Quantity Cost dollars Item 7: Forei steel, iron, or manufactured ood Domestic steel, iron, or manufactured ood Item 2: Forei steel, iron , or manufactured ood Domestic steel, iron, or manufactured ood List name, address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information. *Include all delivery costs to the construction site. 27. REQUIRED USE OF AMERICAN IRON, STEEL, AND MANUFACTURED GOODS (COVERED UNDER INTERNATIONAL AGREEMENTS)--SECTION 1605 OF THE AMERICAN RECOVERY AND REINVESTMENT ACT OF 2009 (MAY 2009) THIS AWARD TERM IS APPLICABLE TO ANY RECOVERYACT FUNDS FOR CONSTRUCTION ALTERATION. MAINTENANCE. OR REPAIR OFA PUBLIC BUILDING OR PUBLIC WORX WITH A TOTAL PROJECT VALUE OVER 87.443.000 THAT INVOLVES IRON. STEEL. AND/OR MANUFACTURED GDODS MATERIALS COVERED UNDER INTERNATIONAL AGREEMENTS. THIS AWARD TERM ALSO APPLIES TO ALL SUBGRANTS AND CONTRACTS. a. Definitions. As used in this award term and condition-- Not Specified/Other 13 6-203 083109 Designated country - (1) A World Trade Organization Government Procurement Agreement country (Aruba, Austria, Belgium, Bulgaria, Canada,' Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hong Kong, Hungary, Iceland, Ireland, Israel, Italy, Japan, Korea (Republic of), Latvia, Liechtenstein, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Singapore, Slovak Republic, Slovenia, Spain, Sweden, Switzerland, and United Kingdom; (2) A Free Trade Agreement (FTA) country (Australia, Bahrain, Canada, Chile, Costa Rica, Dominican Republic, EI Salvador, Guatemala, Honduras, Israel, Mexico, Morocco, Nicazagua, Oman, Peru, or Singapore); or (3) A United States-European Communities Exchange of Letters (May I5, 1995) country: Austria, Belgium, Bulgaria, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Poland, Portugal, Romania, Slovak Republic, Slovenia, Spain, Sweden, and United Kingdom. Designated country iron, steel, and/or manufactured goods - (1) Is wholly the growth, product, or manufacture of a designated country; or (2) In the case of a manufactured good that consist in whole or in part of materials from another country, has been substantially transformed in a designated country into a new and different manufactured good distinct from the materials from which it was transformed. Domestic iron, steel, and/or manufactured good - (1) Is wholly the growth, product, or manufacture of the United States; or (2) In the case of a manufactured good that consists in whole or in part of materials from another country, has been substantially transformed in the United States into a new and different manufactured good distinct from the materials from which it was transformed. There is no requirement with regard to the origin of components or subcomponents in manufactured goods or products, as long as the manufacture of the goods occurs in the United States. Foreign iron, steel, and/or manufactured good means 'von, steel and/or manufactured good that is not domestic or designated country iron, steel, and/or manufactured good. Manufactured good means a good brought to the construction site for incorporation into the building or work that has been-- (1) Processed into a specific form and shape; or (2) Combined with other raw material to create a material that has different properties than the properties of the individual raw materials. Public building and public work means a public building of, and a public work of, a governmental entity (the United States; the District of Columbia; commonwealths, territories, and minor outlying islands of the United States; State and local governments; and multi-State, regional, or interstate entities which have governmental functions). These buildings and works may include, without limitation, bridges, dams, plants, highways, pazkways, streets, subways, tunnels, sewers, mains, power lines, pumping stations, heavy generators, railways, airports, terminals, docks, piers, wharves, ways, lighthouses, buoys, jetties, breakwaters, levees, and canals, and the construction, alteration, maintenance, or repair of such buildings and works. Not Specified/Other 14 6-204 081109 Steel means an alloy that includes at least 50 percent iron, between .02 and 2 percent cazbon, and may include other elements. b. Iron, steel, and manufactured goods. (1) The award term and condition described in this section implements-- (i) Section 1605(a) of the American Recovery and Reinvestment Act of 2009 (Pub. L. 111--5) (Recovery Act), by requiring that all iron, steel, and manufactured goods used in the project are produced in the United States; and (ii) Section 1605(d), which requires application of the Buy American requirement in a manner consistent with U.S. obligations under international agreements. The restrictions of section 1605 of the Recovery Act do not apply to designated country iron, steel, and/or manufactured goods. The Buy American requirement in section 1605 shall not be applied where the iron, steel or manufactured goods used in the project are from a Party to an international agreement that obligates the recipient to treat the goods and services of that Party the same as domestic goods and services. This obligation shall only apply to projects with an estimated value of $7,443,000 or more. (2) The recipient shall use only domestic or designated country iron, steel, and manufactured goods in performing the work funded in whole or part with this award, except as provided in paragraphs (b)(3) and (b)(4) of this section. (3) The requirement in paragraph (b)(2) of this section does not apply to the iron, steel, and manufactured goods listed by the Federal Government as follows: None (4) The award official may add other iron, steel, and manufactured goods to the list in paragraph (b)(3) of this section if the Federal Government determines that-- (i) The cost of domestic iron, sleet, and/or manufactured goods would be unreasonable. The cost of domestic iron, steel, and/or manufactured goods used in the project is unreasonable when the cumulative cost of such material will increase the overall cost of the project by more than 25 percent; (ii) The iron, steel, and/or manufactured good is not produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality; or (iii) The application of the restriction of section 1605 of the Recovery Act would be inconsistent with the public interest. c. Request for determination of inapplicability of section 1605 of the Recovery Act or the Buy American Act. (1) (i) Any recipient request to use foreign iron, steel, and/or manufactured goods in accordance with paragraph (b)(4) of this section shall include adequate information for Federal Government evaluation of the request, including-- (A) A description of the foreign and domestic iron, steel, and/or manufactured goods; (B) Unit of measure; (C) Quantity; (D) Cost; (E) Time of delivery or availability; (F) Location of the project; (G) Name and address of the proposed supplier; and (H) A detailed justification of the reason for use of foreign iron, steel, and/or manufactured goods cited in accordance with paragraph (b)(4) of this section. (ii) A request based on unreasonable cost shall include a reasonable survey of the mazket and a completed cost comparison table in the format in paragraph (d) of this section. (iii) The cost of aon, steel, or manufactured goods shall include al] delivery costs to the Not Specified/Other 15 6-205 083109 construction site and any applicable duty. (iv) Any recipient request for a determinavon submitted after Recovery Act funds have been obligated for a project for construction, alteration, maintenance, or repair shall explain why the recipient could not reasonably foresee the need for such determination and could not have requested the determination before the funds were obligated. If the recipient does not submit a satisfactory explanation, the award official need not make a determination. (2) If the Federal Government determines after funds have been obligated for a project for construction, alteration, maintenance, or repair that an exception to section 1605 of the Recovery Act applies, the awazd official will amend the award to allow use of the foreign iron, steel, and/or relevant manufactured goods. When the basis for the exception is nonavailability orpublic interest, the amended award shall reflect adjustment of the award amount, redistribution of budgeted funds, and/or other appropriate actions taken to cover costs associated with acquiring or using the foreign iron, steel, and/or relevant manufactured goods.. When the basis for the exception is the unreasonable cost of the domestic iron, steel, or manufactured goods, the awazd official shall adjust the awazd amount or redistribute budgeted funds, as appropriate, by at ]east the differential established in 2 CFR 176.110(a). (3) Unless the Federal Government determines that an. exception to section 1605 of the Recovery Act applies, use of foreign iron, steel, and/or manufactured goods other than designated country iron, steel, and/or manufactured goods is noncompliant with the applicable Act. d. Data. To permit evaluation of requests under paragraph (b) of this section based on umeasonable cost, the applicant shall include the following information and any applicable supporting data based on the survey of suppliers: Foreign and Domestic Items Cost Comparison Description Unit of Measure Quantity Cost dollars Item !: Forei steel, iron, or manufactured ood Domestic steel, iron, or manufactured mood Item 2: Forei steel, iron , or manufactured ood Domestic steel, iron, or manufactured ood List name, address, telephone number, email address, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary. Include other applicable supporting information. *Include al] delivery costs to the construction site. 28. WAGE RATE REQUIREMENTS UNDER SECTION 1606 OF THE RECOVERY ACT (MAY 2009) THIS AWARD TERM IS APPLICABLE TO RECOVERY ACT PROGRAMS OR ACTIVITIES THAT MAYItWOLVE CONSTRUCTION. ALTERATION. MAINTENANCE. OR REPAIR. THIS AWARD TERM ALSO APPLIES TO ALL SUBGRANTS AND CONTRACTS. Not Specified/Other 16 6-206 083109 a. Section 1606 of the Recovery Act requires that all laborers and mechanics employed by contractors and subcontractors on projects funded directly by or assisted in whole or in part by and through the Federal Government pursuant to the Recovery Act shall be paid wages at rates not less than those prevailing on projecu of a character similar in the locality as determined by the Secretary of Labor in accordance with subchapter IV of chapter 31 of title 40, United States Code. Pursuant to Reorganization Plan No. 14 and the Copeland Act, 40 U.S.C. 3145, the Department of Labor has issued regulations at 29 CFR parts 1, 3, and 5 to implement the Davis-Bacon and related Acts. Regulations in 29 CFR 5.5 instruct agencies concerning application of the standard Davis-Bacon contract clauses set forth in that section. Federal agencies providing grants, cooperative agreements, and loans under the Recovery Act shall ensure that the standazd Davis-Bacon contract clauses found in 29 CFR 6.5(a) are incorporated in any resultant covered contracts that are in excess of $2,000 for construction, alteration or repair (including painting and decorating). b. For additional guidance on the wage rate requirements of section 1606, contact your awarding agency. Recipients of grants, cooperative agreements and loans should dvect their initial inquiries concerning the application of Davis-Bacon requirements to a particular federally assisted project to the Federal agency funding the project. The Secretary of Labor retains final coverage authority under Reorganization Plan Number 14. 29. RECOVERY ACT TRANSACTIONS LISTED IN SCIiEDULE OF EXPENDITURES OF FEDERAL AWARDS AND RECIPIENT RESPONSIBILITIES FOR INFORMING SUBRECIPIENTS (MAY 2009) a. To maximize the transparency and accountability of funds authorized under the American Recovery and Reinvestment Act of 2009 (Pub. L. 111--5) (Recovery Act) as required by Congress and in accordance with 2 CFR 215.21 "Uniform Administrative Requirements for Grants and Agreements" and OMB Circular A--102 Common Rules provisions, recipients agree to maintain records that identify adequately the source and application of Recovery Act funds. OMB Circular A--102 is available at http://www.whitehouse.gov/omb/circulars/a102/a102.htm1 b. For recipients covered by the Single Audit Act Amendments of 1996 and OMB Circular A--] 33, "Audits of States, Local Govemments, and Non-Profit Organizations," recipients agree to separately identify the expenditures for Federal awards under the Recovery Acton the Schedule of Expenditures of Federal Awards (SEFA) and the Data Collection Form (SF--SAC) required by OMB Circular A-- 133.OMB Circular A--133 is available at http://www.whitehouse.gov/omb/circulars/ali3/a133.htm1. This shall be accomplished by identifying expenditures for Federal awards made under the Recovery Act sepazately on the SEFA, and as separate rows under Item 9 of Part III on the SF--SAC by CFDA number, and inclusion of the prefix "ARRA-" in identifying the name of the Federal program on the SEFA and as the fvst characters in Item 9d of Part III on the SF--SAC. c. Recipients agree to separately identify to each subrecipient, and document at the time of subawazd and at the time of disbursement of funds, the Federal award number, CFDA number, and amount of Recovery Act funds. When a recipient awards Recovery Act funds for an existing program, the information furnished to subrecipients shall distinguish the subawards of incremental Recovery Act funds from regular subawards under the existing program. d. Recipients agree to require their subrecipients to include on their SEFA information to specifically identify Recovery Act funding similar to the requirements for the recipient SEFA described above. This information is needed to allow the recipient to properly monitor subrecipient expenditure of ARRA funds as well as oversight by the Federal awarding agencies, Offices of Inspector Genera] and the Government Accountability Office. 30. DAVIS BACON ACT REQUIREMENTS (MAY 2009) THIS AWARD TERM IS APPLICABLE TO ARRA AWARDS WHEN WAGE RATE Not Specified/Other 17 6-207 083109 REQUIREMENTS UNDER SECTION 1606 OF THE RECOVERYACT TERM IS APPLICABLE. THIS AWARD TERM IS ALSO APPLICABLE TO SUBGRANTS AND CONTRACTS. Note: Where necessary to make the context ofthese articles applicable to this awazd, the term "Contractor" shall mean "Recipient" and the term "Subcontractor" shall mean "Subrecipient or Subcontractor" per the following definitions. Recipient means the organization, individual, or other entity that receives an award from DOE and is financially accountable for the use of any DOE funds or property provided for the performance of the project, and is legally responsible for carrying out the terms and conditions of the award. Subrecipient means the legal entity to which a subaward is made and which is accountable to the recipient for the use of the funds provided. The term may include foreign or international organizations (such as agencies of the United Nations). Davis-Bacon Act (a) Definikon.-"Site of the work"- (1) Means-- (i) The primary site of the work. The physical place or places where the construction called for in the awazd will remain when work on it is completed; and (ii) The secondary site of the work, if any. Any other site where a significant portion of the building or work is constructed, provided that such site is- (A) Located in the United States; and (B) Established specifically for the performance of the award or project; (2) Except as provided in paragraph (3) of this definition, includes any fabrication plants, mobile factories, batch plants, borrow pits, job headquarters, tool yards, etc., provided- (i) They aze dedicated exclusively, or nearly so, to performance of the award or project; and (ii) They are adjacent or virtually adjacent to the "primary site of the work" as defined in paragraph (a)(1)(i), or the "secondary site of the work" as defined in paragraph (a)(1)(ii) of this definition; (3) Does not include permanent home offices, branch plant establishments, fabrication plants, or tool yards of a Contractor or subcontractor whose locations and continuance in operation are determined wholly without regard to a particular Federal award or project. In addition, fabrication plants, batch plants, borrow pits, job headquarters, yards, etc., of a commercial or material supplier which are established by a supplier of materials for the project before opening of bids and not on the Project site, are not included in the "site of the work." Such permanent, previously established facilities are not a part of the "site of the work" even if the operations for a period of time may be dedicated exclusively or nearly so, to the performance of a award. (b) (I) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week, and without subsequent deduction or rebate on any account (except such payroll deductions as are permitted by regulations issued by the Secretary of Labor under the Copeland Act (29 CFR Part 3)), the full amount of wages and bona fide fringe benefits (or cash equivalents thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, or as may be incorporated for a secondary site of the work, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Any wage determination incorporated for a secondary site of the work shall be effective from the first day on which work under the award was performed at that site and shall be incorporated without any adjustment in award price or estimated cost. Laborers employed by the construction Contractor or construction subcontractor that are transporting portions of the building or work between the secondary site of the work and the primary site of the work shall be Not Specified/Other 18 6-208 083109 paid in accordance with the wage determination applicable to the primary site of the work. (2) Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2) of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (e) of this article; also, regulaz contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such period. (3) Such laborers and mechanics shall be paid not less than the appropriate wage rate and fringe benefits in the wage determination for the classification of work actually performed, without regard to skill, except as provided in the article entitled Apprentices and Trainees. Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein; provided, that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. (4} The wage determination (including any additional classifications and wage rates conformed under pazagmph (c) of this article) and the Davis-Bacon poster (WH-1321) shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can be easily seen by the workers. c. (I) The Contracting Officer shall require that any class of laborers or mechanics which is not listed in the wage determination and which is to be employed under the award shall be classified in conformance with the wage determination. The Contracting Officer shall approve an additional classification and wage rate and fringe benefits therefore only when all the following criteria have been met: (i) The work to be performed by the classification requested is not performed by a classification fr the wage determination. (ii) The classification is utilized in the area by the construction industry. (iii) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (2) If the Contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives and the Contracting Officer agree on the classification and wage rate (including the amount designated for fringe benefits, where appropriate), a report of the action taken shall be sent by the Contracting Officer to the Administrator of [he: Wage and Hour Division Employment Standards Administration U.S. Department of Labor Washington, DC 20210 The Administrator or an authorized representative will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional time is necessary. (3) In the event the Contractor, the laborers or mechanics to be employed in the classification, or their representatives, and the Contracting Officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the Contracting Officer shall refer the questions, including the views of all interested parties and the recommendation of the Contracting Officer, to the Administrator of the Wage and Hour Division for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the Contracting Officer or will notify the Contracting Officer within the 30-day period that additional Time is necessary. Not Specified/Other 19 6-209 083109 (4) The wage rate (including fringe benefits, where appropriate) determined pursuant to subpazagmphs (c)(2) and (c)(3) of this article shall be paid to all workers performing work in the classification under this award from the first day on which work is performed in the classification. (d) Whenever the minimum wage rate prescribed in the award for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the Contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (e) If the Contrnctor does not make payments to a trustee or other third person, the Contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program; provided, that the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the Contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. Rates of Wages The minimum wages to be paid laborers and mechanics under this awazd involved in performance of work at the project site, as determined by the Secretary of Labor to be prevailing for the corresponding classes of laborers and mechanics employed on projects of a character similaz to the contract work in the pertinent locality, are included as an attachment to this award. These wage rates are minimum rates and are not intended to represent the actual wage rotes that the Contractor may have [o pay. Payrolls and Basic Records (a) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of 3 years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address, and social security number of each such worker, his or hec correct classification, hourly rates of wages paid (including rntes of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in section 1(b)(2)(B) of the Davis-Bacon Act), daily and weekly number of hours worked, deductions made, and actual wages paid. Whenever the Secretary of Labor has found, under pazagraph (d) of the article entitled Davis-Bacon Act, that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the Contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual cost incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (b) (1) The Contractor shall submit weekly for each week in which any award work is performed a copy of all payrolls to the Contracting Officer. The payrolls submitted shall set out accurately and completely al] of the information required to be maintained under paragraph (a) of [his article. This information may be submitted in any form desired. Optional Forat WH-347 (Federal Stock Number 029-005-00014-1) is available for this purpose and may be purchased fromthe -- Superintendent ofDocuments U.S. Government Printing Office Washington, DC 20402 The Prime Contractor is responsible for the submission of copies of payrolls by all subcontractors. (2) Each payroll submitted shall be accompanied by a "Statement of Compliance," signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the awazd and shall certify -- (i) That the payroll for the payroll period contains the information required to be maintained under Not Specified/Other 20 6-2~~ 083109 paragraph (a) of this article and that such information is correct and complete; (ii) That each laborer or mechanic (including each helper, apprentice, and trainee) employed on the awazd during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in the Regulations, 29 CFR Part 3; and _(iii) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the award. (3) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by subparagraph (b)(2) of this article. (4) The falsification of any of the certifications in this article may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 3729 of Tide 31 of the United States Code. (c) The Contractor or subcontractor shall make the records required under pazagraph (a) of this article available for inspection, copying, or transcription by the Contracting Officer or authorized representatives of the Contracting Officer or the Department of Labor. The Contractor or subcontractor shall permit the Contracting Officer or representatives of the Contracting Officer or the Department of Labor to interview employees during working hours on the job. If the Contractor or subcontractor fails to submit required records or to make them available, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR 5.12. Withholding of Funds The Contracting Officer shall, upon his or her own action or upon written request of an authorized representative of the Department of Labor, withhold or cause to be withheld from the Contractor under this awazd or any other Federal awazd with the same Prime Contractor, or any other federally assisted awazd subject to Davis-Bacon prevailing wage requirements, which is held by the same Prime Contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the award. In the event of failure to pay any laborer or mechanic, including any apprentice, trainee, or helper, employed or working on the site of the work, al] or part of the wages required by the awazd, the Contracting Officer may, after written notice to the Contractor, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. Apprentices and Trainees (a) Apprentices. (1) An apprentice will be permitted to work at less than the predetermined rate for the work they performed when they aze employed- (i) Pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship and Training, Employer, and Labor Services (OATELS) or with a State Apprenticeship Agency recognized by the OATELS; or (ii) In the first 90 days of probationary employment as an apprentice in such an apprenticeship program, even though not individually registered in the program, if certified by the OATELS or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. Not Specified/Other 21 6-211 083109 (2) The allowable ratio of apprentices to journeymen on the job site in any craft classification shall not be greater than the ratio permitted to the Contractor as to the entire work force under the registered program. (3) Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated in pazagraph (a)(1) of this article, shall be paid not less than the applicable wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. (4) Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the Contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. (5) Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. Ifthe apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. (6) In the event OATELS, or a State Apprenticeship Agency recognized by OATELS, withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (b) Trainees. (1) Except as provided in 29 CFR 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they aze employed pursuant to and individually registered in a program which has received prior approval, evidenced by forma] certification by the U.S. Department of Labor, Employment and Training Administration, Office of Apprenticeship Training, Employer, and Labor Services (OATELS). The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by OATELS. (2) Every trainee must be paid at not less than the rate specified m the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed in the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate in the wage determination which provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate who is not registered and participating in a training plan approved by the OATELS shall be paid not less than the applicable wage rate in the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate in the wage determination for the work actually performed. (3) In the event OATELS withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed Not Specified/Other 22 6-212 083109 until an acceptable program is approved. (d) Equal employment opportunity. The utilization of apprentices, trainees, and journeymen under this article shall be in conformity with the equal employment opportunity requirements of Executive Order 11246, as amended, and 29 CFR Part 30. Compliance with Copeland Act Requirements The Contractor shall comply with the requirements of 29 CFR Part 3, which are hereby incorporated by reference in this awazd. Subcontracts (Labor Standards) (a) Definition. "Construction, alteration or repair," as used in this article means all Types of work done by laborers and mechanics employed by the construction Contractor or construction subcontractor on a particulaz building or work at the site thereof, including without limitation- (1) Altering, remodeling, installation (if appropriate) on the site of the work of items fabricated off- si[e; (2) Painting and decorating; (3) Manufacturing or furnishing of materials, articles, supplies, or equipment on the site of the building or work; (4) Transportation of materials and supplies between the site of the work within the meaning of pazagraphs (a)(1)(i) and (ii) of the "site of the work" as defined in the article entitled Davis Bacon Act of this awazd, and a facility which is dedicated to the construction of the building or work and is deemed part of the site of the work within the meaning of paragraph (2) of the "site of work" definition; and (5) Transportation of portions of the building or work between a secondary site where a significant portion of the building or work is constructed, which is part of the "site of the work" definition in paragraph (a)(1)(ii) of the Davis-Bacon Act article, and the physical place or places where the building or work will remain (pazagrnph (a)(1)(i) of the Davis Bacon Act article, in the "site of the work" definition). (b) The Contractor or subcontractor shall insert in any subcontracts for construction, alterations and repairs within the United States the articles entitled- (1) Davis-Bacon Act; (2) Contract Work Hours and Safety Standads Act --Overtime Compensation (if the article is included in this awazd); (3) Apprentices and Trainees; (4) Payrolls and Basic Records; (5) Compliance with Copeland Act Requirements; (6) Withholding of Funds; (7) Subcontracts (Labor Standazds); (8) Contract Termination -Debarment; Not Specified/Other 23 6-213 083109 (9) Disputes Concerning Labor Standazds; (10) Compliance with Davis-Bacon and Related Act Regulations; and (1 I) Certification of Eligibility. (c) The Prime Contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor performing construction within the United States with all the award articles cited in paragraph (b). (d) (1)Within 14 days after issuance of the award, the Contractor shall deliver to the Contracting Officer a completed Standard Form (SF) 1413, Statement and Acknowledgment, for each subcontract for construction within the United States, including the subcontractor's signed and dated acknowledgment that the articles set forth in paragraph (b) of this article have been included in the subcontract. Within 14 days after the award of any subsequently awarded subcontract the Contractor shall deliver to the Contracting Officer an updated completed SF 1413 for such additional subcontract. (e) The Contractor shall insert the substance of this article, including this paragraph (e) in all subcontracts for construction within the United States. Contract Termination --Debarment A breach of the award articles entitled Davis-Bacon Act, Contract Work Hours and Safety Standards Act -- Overtime Compensation, Apprentices and Trainees, Payrolls and Basic Records, Compliance with Copeland Act Requirements, Subcontracts (Labor Standards), Compliance with Davis-Bacon and Related Act Regulations, or Certification of Eligibility maybe grounds for termination of the whole award or in part for the Recovery Act covered work only, and for debarment as a Contractor and subcontractor as provided in 29 CFR 5.12. Compliance with Davis-Bacon and Related Act Regulations All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR Parts 1, 3, and 5 are hereby incorporated by reference in [his award. Disputes Concerning Labor Standards The United States Department of Labor has set forth in 29 CFR Parts 5, 6, and 7 procedures for resolving disputes concerning labor standards requirements. Such disputes shall be resolved in accordance with those procedures and not the Disputes and Appeals as defined in 10 CFR 600.22. Disputes within the meaning of this article include disputes between the Contractor (or any of its subcontractors) and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. Certification of Eligibility (a) By entering into this award, the Contractor certifies that neither it (nor he or she) nor any person or firm who has an interest in the Contractor's fum is a person or firm ineligible to be awarded Government awards by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). (b) No part of this award shat] be subcontracted to any person or firm ineligible for award of a Government award by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR 5.12(a)(1). (c) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18 U.S.C. 1001. Approval of Wage Rates Not Specified/Other 24 6-214 083109 All straight time wage rates, and overtime rates based thereon, for laborers and mechanics engaged in work under this awazd must be submitted for approval in writing by the head of the contracting activity or a representative expressly designated for this purpose, if the straight time wages exceed the rates for corresponding classifications contained in the applicable Davis-Bacon Act minimum wage determination included in the award. Any amount paid by the Contractor to any laborer or mechanic in excess of the agency approved wage rate shal] be at the expense of the Contractor and shall not be reimbursed by the Government. If the Government refuses to authorize the use of the overtime, the Contractor is not released from the obligation to pay employees at the required overtime rates for any overtime actually worked. 31. HISTORIC PRESERVATION Prior to the expenditure of Federal funds to alter any structure or site, the Recipient is required to comply with the requirements of Section 106 of the National Historic Preservation Act (NHPA), consistent with DOE's 2009 letter of delegation of authority regardingthe NHPA. Section 106 applies to historic properties that are listed in or eligible for listing in the National Register of Historic Places. In order to fulfill the requirements of Section 106, the Recipient must contact the Stale Historic Preservation Officer (SHPO), and, if applicable, the Tribal Historic Preservation Officer (THPO), to coordinate the Section 106 review outlined in 36 CFR Part 800. SHPO contact information is available at the following link: httn://www.ncshoo.orJfind/index.htm. THPO contact information is available at the following link: httn://www. nathpo.orJman.html. Section 110(k) of the NHPA applies to DOE funded activities. Recipients shall avoid taking any action that results in an adverse effect to historic properties pending compliance with Section 106. Recipients should be awaze that the DOE Contracting Officer will consider compliance with Section 106 of NHPA complete only after the Recipient has submitted adequate background documentation to the SHPO/THPO for its review, and the SHPO/THPO has provided written concurrence to the Recipient [hat it does not object to its Section 106 5nding or determination. Recipient shall provide a copy of this concurrence to the Contracting Officer. Not Specified/Other 25 6-215 083109 ATTACHMENT 1 -INTELLECTUAL PROPERTY PRO VISIONS Intellectual Property Provisions (NRD-1003) Nonresearch and Development Nonprofit organizations are subject to the intellectual property requirements at 10 CFR 600.136(a), (c) and (d). All other organizations are subject to the intellectual property requirements at 10 CFR 600.136(a) and (c). 600.136 Intangible property. (a) Recipients may copyright any work that is subject to copyright and was developed, or for which ownership was purchased, under an award. DOE reserves aroyalty-free, nonexclusive and irrevocable right to reproduce, publish or otherwise use the work for Federal purposes, and to authorize others to do so. (c) DOE has the right to: (1) Obtain, reproduce, publish or otherwise use the data first produced under an award; and (2) Authorize others to receive, reproduce, publish, or otherwise use such data for Federal purposes. (d) In addition, in response to a Freedom of Information act (FOIA) request for reseazch data relating to published research findings produced under an award that were used by the Federal Government in developing an agency action that has the force and effect of law, the DOE shall request, and the recipient shall provide, within a reasonable time, the research data so that they can be made available to the public through the procedures established under the FOIA. If the DOE obtains the research data solely in response to a FOIA request, the agency may charge the requester a reasonable fee equaling the full incremental cost of obtaining the research data. This fee should reflect the costs incurred by the agency, the recipient, and applicable subrecipients. This fee is in addition to any fees the agency may assess under the FOIA (5 U.S.C. 552(a)(4)(A)). Not Specified/Other 26 6-216 Pale i or 22 Genera_ Decisicr. Number: CA100001 C4/16/20i0 CA1 Superseded General Decision Number: CA20080001 State: California Construction Types: Building, Heavy (Heavy and Dredging), Highway and Residential Coun *_y: San Ciego Ccunty in California. BUILDING CONSTRUCTION PROJECTS; DREDGING PROJECTS (does not include hopper dredge work); HEAVY CONSTRUCTION PROJECTS (does not include water well drilling); HIGHWAY CONSTRUCTION PROJECTS; RESIDENTIAL CONSTRUCTION PROJECTS (consisting of single family homes and apartments up to and including 9 stories) Modification Number 0 1 2 3 Publication Date 03/12/2010 03/19/2010 04/02/2010 04/16/2010 ASBE0005-002 01/01/2010 Asbestos Workers/Irs ulator (Includes the application of all insulating materials, protective coverings, coatings, and finishes to all types of mechanical systems).....$ Fire Stop Technician (Application of Firestopping Materials for wa1'_ openings and penetrations in walls, floors, ceilings and curtain walls) ...........................$ ASBE0005-004 01/01/2010 Rates Fringes 32.93 15.32 24.21 13.76 Rates Fringes Asbestos Removal worker/hazardous material handler (Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials £rom mechanical systems, whether they contain asbestos or not)....$ 18.85 8.03 BOIL0092-003 10/G1/2009 Rates Fringes BOILERMAKER ......................$ 40.22 22.26 BRCA0009-008 11/01/2009 http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb6-21 ~ 06/16/2010 Page 2 of 22 Rates Fringes BRICKLAYER; MARBLE SETTER........$ 31.40 13.55 ---------------------------------------------------------------- BRCA0018-004 C6/Ol/2008 Rates Fringes MARBLE FINISAER ............... ...$ 25.52 9.08 TILE FINISHER ................. ...$ 21.07 7.88 TILE LAYER .................... _________________ ...$ ____ 32.05 ___________ 11.99 ___________________ _____________ BRCA0018-010 09/01/2009 Rates Fr'_nges TERRAZZO FINISHER ............. ...$ 26.59 9.62 TERRAZZO WORKER/SETTER........ ...$ 33.63 10.46 CARP0409-002 07/01/2008 Rates Fringes Diver (1) wet .................. ...5 663.68 9.82 (2) Standby .............. ...$ 331.84 9.82 (3) Tender ............... ...$ 323.84 9.82 (9) Assistant Tender..... ...$ 299.84 9.82 Amounts in "Rates' co'_umn are --------- per ---- day ----------- ------------------- --------------------- CARP0409-008 07/01/2008 Rates Fringes Modular Furniture Snstaller... ...5 19.00 7.41 CARP0547-001 07/01/2009 Rates Fringes CARPENTER (1) Bridge ............. ....$ 37.28 10.58 (2) Commercial Building ....S 32.30 10.58 (3) Heavy & Highway.... ....$ 37.15 10.58 (4) Residential Carpenter..$ 25.84 10.58 (5) Residen *_ia1 Insulation Installer.... ....$ 18.00 8.16 MILLWRIGHT ................... ....$ 37.65 10.58 PILE DRIVERMAN ................ ....$ 37.28 10.58 CARP0597-002 07/01/2009 Rates Fringes Drywall (1) Work on wood framed construction of single family residences, apartments or condominiums under four stories Drywall Insta_ler/Lather.. .$ 21. 00 8.58 Drywall Stocker/SCrapper.. .$ 11. 00 6.67 (2) All other work Drywall Installer/Lather.. .S 27. 35 9.58 Drywall Stocker/SCrapper.. .$ 11. 00 6.67 http://www.wdol.gov/wdol/scafiles/davisbacon/CA1.dvb6-218 06/16/2010 Page 3 of 22 ----------------------------------- ELEC0569-001 06/01/2009 Rates Electri ciars (Tunnel Work) Cable Splicer ........... ....$ 41. 98 Electrician ............. ....$ 91. 23 Electricians: (A11 Other work, Including-4 Stories Residential) Cable Splicer ........... ....$ 37. x.0 Electrician ............. ....$ 36. 65 ELEC0569-005 12/01/2009 Rates Fringes 3~+11.29 3~+11.29 3$+11.29 3~+11.29 Fringes Sound & Communications Sound Technician............$ 26.42 $10.47 Soundman ....................$ 21.14 $8.74 SOUND TECHNICIAN: Terminating, operating and performing final check-out SOUNDMAN: Wire-pulling, splicing, assembling and installing devices SCOPE OF WORK Assembly, installation, operation, service and maintenance of components or systems as used in closed circuit television, amplified master television distribution, CATV on private property, intercommunication, burglar alarm, fire alarm, life support and all security alarms, private and public telephone and related telephone interconnect, public address, paging, audio, language, electronic, background music system less than line voltage or any system acceptable for class two wiring for private, commercial, or industrial use furnished by leased wire, frequency modulation or other recording devices, electrical apparatus by means of which electricity is applied to the amplification, transmission, transference, recording or reproduction of voice, music, sound, impulses and video. Excluded from this Scope cf Work - transmission, service and maintenance of background music. A11 of the above shall include the installation and transmission over fiber optics. ELEC0569-006 10/01/2009 Work on street lighting; traffic signals; and underground systems and/or established easements outside of buildings Rates Fringes Traffic signal, street light and underground work Utility Technician #1.......$ 27.00 $7.53 Utility Technician #2.......$ 20.00 $7.32 STREET LIGHT & TRAFFIC SIGNAL WORK: UTILITY TECHNZCIAN #1: Installation of street lights and traffic signals, including electrical circuitry, programmable controller, pedestal-mounted electrical meter enclosures and laying of pre-assembled cable in ducts. The http://www.wdoLgov/wdol/scafiles/davisbacon/CA l .dvb 6- 21 9 06/16/2010 Page =: of 22 layout of electrical systems and communication installation including prover position of trench depths, and radius at duct banks, location for manholes, street lights and traffic signals. UTILITY TECHNICIAN #2: Distribution of material at jobsite, installation of underground ducts for electrical, telephone, cable TV land communication systems. The setting, leveling, grounding and racking of precast marh oles, handholes and transformer pads. ------------------------------------------------------------ ELEC0569-008 12/01/2005 Rates Fringes ELECTRICIAN (Residential, 1-3 Stories) .........................$ 21.00 3~+2.55 ------------------------------------------------------------- ELEC1245-001 06/01/2009 Rates Fringes LINE CONSTRUCTION (1) Lineman; Cable splicer. .$ 44.47 13.11 (2) Equipment specialist (operates crawler tractors, commercial motor vehicles, backhoes, trenchers, cranes (50 tons and below), overhead & underground distribution line equipment).......... .$ 35.52 12.07 (3) Groundman .............. .$ 27.17 11.82 (4) Powderman .............. .$ 39.71 12.23 HOLIDAYS: New Year's Day, M.L. King Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and day after Thanksgiving, Christmas Day ----------------------------------------------------------- ELEV0018-001 01/01/2010 Rates Fringes ELEVATOR MECHANIC ................$ 45.33 20.035 FOOTNOTE: PAID VACATION: Employer contributes 8$ of regular hourly rate as vacation pay credit for employees with more than 5 years of service, and 6o for 6 months to 5 years of service. PAID HOLIDAYS: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day. ENGI0012-003 07/01/2009 Rates Fringes OPERATOR: Power Equipment (All Other Work) GROUP 1 ................. ...$ 36. 83 17.22 GROUP 2 ................. ...$ 37. 61 17.22 GROUP 3 ................. ...$ 37. 90 17.22 GROUP 4 ................'. ...$ 39. 39 17.22 GROUP 5 ................. ...$ 40. 49 17.22 GROUP 6 ................. ...$ 39. 61 17.22 GROUP 7 ................. ...$ 90. 71 17.22 http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb 6-220 06/16/2010 Paee 5 of 22 GROUP 8 ................ ....$ 39.72 17.22 GROUP 9 ................ ....$ 40.82 17.22 GROUP 10 ................ ....$ 39.84 17.22 GROUP 11 ................ ....$ 40.94 17.22 GROUP 12 ................ ....$ 40.01 17.22 GROUP 13 ................ ....$ 40.11 17.22 GROUP 14 ................ ....$ 40.14 17.22 GROUP 15 ................ ....$ 40.22 17.22 GROUP 16 ................ ....$ 40.34 17.22 GROUP 17 ................ ....$ 40.51 17.22 GROUP 18 ................ ....$ 40.61 17.22 GROUP 19 ................ ....$ 40.72 17.22 GROUP 20 ................ ....$ 40.84 17.22 GROUP 21 ................ ....$ 41.01 17.22 GROUP 22 ................ ....$ 41.11 17.22 GROUP 23 ................ ....$ 41.22 17.22 GROUP 29 ................ ....$ 41.34 17.22 GROUP 25 ................ ....5 91.51 17.22 OPERATOR: Power Equipment (Cranes, Pi ledriving & Hoisting) GROUP 1 ................ ....$ 38.18 17.22 GROUP 2 ................ ....$ 38.96 17.22 GROUP 3 ................ ....$ 39.25 17.22 GROUP 4 ................ ....$ 39.39 17.22 GROUP 5 ................ ....$ 39.61 17.22 GROUP 6 ................ ....$ 39.72 17.22 GROUP 7 ................ ....$ 39.84 17.22 GROUP B ................ ....$ 40.01 17.22 GROUP 9 ................ ....5 40.18 17.22 GROUP 10 ................ ....$ 41.18 17.22 GROUP 11 ................ ....$ 92.18 17.22 GROUP 12 ................ ....$ 43.18 17.22 GROUP 13 ................ ....$ 49.18 17.22 OPERATOR: Power Equipment (Tunnel Work) GROUP 1 ................ ....$ 38.68 17.22 GROUP 2 ................ ....$ 39.46 17.22 GROUP 3 ................ ....5 39.75 17.22 GROUP 9 ................ ....$ 39.89 17.22 GROUP 5 ................ ....$ 40.11 17.22 GROUP 6 ................ ....$ 40.22 17.22 GROUP 7 ................ ....5 40.34 17.22 PREMIUM PAY: $3.75 per hour shall be paid on all Power Equipment Operator work on the £ollowng Military Bases: China Lake Naval Reserve, Vandenberg AFB, Point Arguello, Seely Naval Base, Fort Irwin, Nebo Annex Marine Base, Marine Corp Logistics Base Yermo, Edwards AFB, 29 Palms Marine Base and Camp Pendleton Workers required to suit up and work in a hazardous material environment: 52.00 per hour additional. Combination mixer and compressor operator on gunite work shall be classified as a concrete mobile mixer operator. SEE ZONE DEFINITIONS AFTER CLASSIFICATIONS POWER EQUIPMENT OPERATORS CLASSIFICATIONS GROUP 1: Bargeman; Brakeman; Compressor operator; Ditch Witch, with seat or similar type equipment; Elevator operator-inside; Engineer Oiler; Forklift operator (includes Toed, lull or similar types under 5 tons; Generator operator; Generator, pump or compressor plant http://www.wdol.gov/wdol/scafiles/davisbacon/CAI .dvb 6-2 2 ~ 06/16/2010 Pale 6 of 22 operator; Pump operator; Signalman; Switchman GRCIIP 2: Asphalt-rubber plant operator (nurse tank operator); Concrete mixer operator-skip type; Conveyor operator; Fireman; Forklift operator (includes loe d, lull or similar types over 5 tons; Hydrostatic pump operator; oiler crusher (asphalt or concrete plant); Petromat laydown machine; PJU side dum jack; Screening and conveyor machine operator (or similar types); Skiploader (wheel type up to 3/4 yd. without attachment); Tar pot Fireman; Temporary heating plant operator; Trenching machine oiler GROUP 3: Asphalt-rubber blend operator; Bobcat or similar type (Skid steer); Equipment greaser (rack); Ford Ferguson (with dragt ype attachments); Helicopter radioman (ground); Stationary pipe wrapping and cleaning machine operator GROUP 4: Asphalt plant fireman; Backhoe operator (mini-max or similar type); Boring machine operator; Boxman or mixerman (asphalt or concrete); Chip spreading machine operator; Concrete cleaning decontamination machine operator; Concrete Pump Operator (small portable); Drilling machine operator, smallauger types (Texoma super economatic or similar types - Hughes 100 or 200 or similar types - drilling depth of 30' maximum); Equipment greaser (grease truck); Guard rail post driver operator; Highline cableway signalman; Horizontal Directional Drilling Machine; Hydra-hammer-aero stomper; Micro Tunneling (above ground tunnel); Power concrete curing machine operator; Power concrete saw operator; Power-driven jumbo form setter operator; Power sweeper operator; Rock Wheel Saw/Trencher; Roller operator (compacting); Screed operator (asphalt or concrete); Trenching machine operator (up to 6 ft.); Vacuum or much truck GROUP 5: Equipment Greaser (Grease Truck/MUlti Shift). GROUP 6: Articulating material hauler; Asphalt plant engineer; Batch plant operator; Bit sharpener; Concrete joint machine operator (canal and similar type); Concrete planer operator; Dandy digger; Deck engine operator; Cerrickman (oilfield type); Drilling machine operator, bucket or auger types (Calweld 100 bucket or similar types - Watson 1000 auger or similar types - Texoma 330, 500 or 600 auger or similar types - drilling depth of 45' maximum); Drilling machine operator; Hydrographic seeder machine operator (straw, pulp or seed), Jackson track maintainer, or similar type; Kalamazoo Switch tamper, or similar type; Machine tool operator; Maginnis internal full slab vibrator, Mechanical berm, curb or gutter(concrete or asphalt); Mechari cal finisher operator (concrete, Clary-Johnson-Bidwell or similar); Micro tunnel system (below ground); Pavement breaker operator (truck mounted); Road oil mixing machine operator; Roller operator (asphalt or finish), rubber-tired earth moving equipment (single engine, up to and including 25 yds. struck); Self-propelled tar pipelining machine operator; Skiploader operator (crawler and wheel type, over 3/4 yd. and up to and including 1-1/2 yds.); Slip form pump operator (power driven hydraulic lifting device for concrete forms); Tractor operator-bulldozer, tamper-scraper (single engine, up to 100 h.p. flywheel and similar types, up to and including D-5 and similar types); Tugger hoist operator (1 drum); Ultra high pressure waterjet cutting tool system operator; Vacuu_n blasting machine operator 6-222 http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb 06/16/2010 Page 7 of 22 GROUP 7: Welder - General GROUP 8: Asphalt or concrete spreading operator (tamping or finishing); Asphal*_ paving machine opera*_or (Barber Greene or similar type); Asphalt-rubber distribution operator; Backhoe operator (up to and including 3/4 yd.), small ford, Case or similar; Cast-in-place pipe laying machine operator; Combination mixer and compressor operator (gunite work); Compactor operator (self-propelled); Concrete mixer operator (paving); Crushing plant operator; Dri11 Doctor; Drilling machine operator, Bucket or auger types (Calweld 150 bucket or similar types - Watson 1500, 2000 2500 auger or similar types - Texoma 700, 800 auger or similar types - drilling depth cf 60' maximum); Elevating grader operator; Grade checker; Gradall operator; Grouting machine operator; Heavy-duty repairman; Heavy equipment robotics operator; Kalamazoo balliste regulator or similar type; Kolman belt loader and similar type; Le Tourneau blob compactor or similar type; Loader operator (Athey, Euclid, Sierra and similar types); Mobark Chipper or similar; Ozzie padder or similar types; P.C. slot saw; Pneumatic concrete placing machine operator (Hackley-Presswell or similar type); Pumpcrete gun operator; Rock Drill or similar types; Rotary drill operator (excluding caisson type); Rubber-tired earth-moving equipment operator (single engine, caterpillar, Euclid, A*_hey Wagon and similar types with any and all attachments over 25 yds. up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator (multiple engine up to and including 25 yds. struck); Rubber-tired scraper operator (self-loading paddle wheel type-John Deere, 1040 and similar single unit); Self- propelled curb and gutter machine operator; Shuttle buggy; Skiploader operator (crawler and wheel type over 1-1/2 yds. up to and including 6-1/2 yds.); Soil remediation plant operator; Surface heaters and planer operator; Tractor compressor drill combination operator; Tractor operator (any type larger than D-5 - 100 flywheel h.p. and over, or similar-bulldozer, tamper, scraper and push tractor single engine); Tractor operator (boom attachments), Traveling pipe wrapping, cleaning and bendng machine operator; Trenching machine operator (over 6 ft. depth capacity, manufacturer's rating); trenching Machine with Road Miner attachment (over 6 ft depth capacity): Ultra high pressure water] et cutting tool system mechanic; Water pull (compacticn) operator GROUP 9: Heavy Duty Repairman GROUP 10: Drilling machine operator, Bucket or auger types (Calweld 200 B bucket or similar types-Watson 3000 or 5000 auger or similar types-Texoma 900 auger or similar types-drilling depth of 105' maximum); Dual drum mixer, dynamic compactor LDC350 (or similar types); Mcnorail locomotive operator (diesel, gas or electric); Motor patrol-blade operator (single engine); Multiple engine tractor operator (Euclid and similar type-except Quad 9 cat.); Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Pneumatic pipe ramming tool and similar types; Prestressed wrapping machine operator; Rubber-tired earth-moving equipment operator (single engine, over 50 yds. struck); Rubber tired earth moving equipment operator (multiple engine, Euclid, caterpillar and similar over 25 yds. and up to 50 yds. struck), Tower crane repairman; Tractor loader operator (crawler and wheel type over 6-1/2 yds.); Woods mixer operator (and similar Pugmill equipment) 6-223 http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb 06/16/2010 Page 3 of 22 GROUP 11: Heavy Duty Repairman - Welder Combination, Welder - Certified. GROUP 12: Auto grader operator; Automatic slip form operator; Drilling machine operator, bucket or auger types (Calwel d, auger 2C0 CA or similar types - Watson, auger 6000 or similar types - Hughes Super Duty, auger 200 or similar types - drilling depth of 175' maximum); F_oe ram or similar with compressor; Mass excavator operator less tha 750 cu. yards; Mechanical finishing machine operator; Mobile £orm traveler operator; Motor patrol operator (multi-engine); Pipe mobile machine operator; Rubber-tired earth- moving equipment operator (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck); Rubber-tired self- loading scraper operator (paddle-wheel-auger type self-loading - two (2) or more units) GROUP 13: Rubber-tired earth-moving equipment operator operating equipment with push-pull system (single engine, up to and including 25 yds. struck) GROUP 14: Canal liner operator; Canal trimmer operator; Remote- control earth-moving equipment operator (operating a second piece o£ equipment: $1.00 per hour additional); Wheel excavator operator (over 750 cu. yds.) GROUP 15: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine-up to and including 25 yds. struck) GROUP 16: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 17: Rubber-tired earth-moving equipment operator, operating equipment with push-pull system (multiple engine, Euclid, Caterpillar and similar, over 50 cu. yds. struck); Tandem tractor operator (operating crawler type tractors in tandem - Quad 9 and similar type) GROUP 18: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, up to and including 25 yds. struck) GROUP 19: Rotex concrete belt operator (or similar types); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - single engine, Caterpillar, Euclid, Athey Wagcn and similar types with any and all attachments over 25 yds.and up to and including 50 cu. yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, up to and including 25 yds. struck) GROUP 20: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb6- 2 24 06/16/2010 Page 9 of 22 types in any combination, excluding compactior. units - single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps, and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 21: Rubber-tired earth-moving equipment operator, operating in tandem (scrapers, belly dumps and similar types in any combination, excluding compaction units - multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) GROUP 22: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, up to and including 25 yds. struck) GROUP 23: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, Caterpillar, Euclid, Athey Wagon and similar types with any and all attachments over 25 yds. and up to and including 50 yds. struck); Rubber-tired earth-moving equipment operator, operating with the tandem push-pull system (multiple engine, up to and including 25 yds. struck) GROUP 24: Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (single engine, over 50 yds. struck); Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar, over 25 yds. and up to 50 yds. struck) GROUP 25: Concrete pump operator-truck mounted; Rubber-tired earth-moving equipment operator, operating equipment with the tandem push-pull system (multiple engine, Euclid, Caterpillar and similar type, over 50 cu. yds. struck) CRANES, PILEDRIVING AND HOISTING EQUIPMENT CLASSIFICATIONS GROUP 1: Engineer oiler; Fork lift operator (includes toed, lull or similar types) GROUP 2: Truck crane oiler GROUP 3: A-Frame or winch truck operator; Ross carrier operator (jobsite) GROUP 4: Bridge-type unloader and turntable operator; Helicopter hoist operator GROUP 5: Hydraulic boom truck; Stinger crane (Austin-Western or similar type); Tugger hoist operator (1 drum) GROUP 6: Bridge crane operator; Cretor crane operator; Hoist operator (Chicago boomand similar type); Lift mobile operator; .Lift slab machine operator (Vagtborg and similar types); Material hoist and/or manlift operator; Polar gantry crane operator; Self Climbing scaffold (or similar type); Shovel, backhoe, dragline, clamshell operator (over 3/4 yd. and up to 5 cu. yds. mrc); Tugger hoist operator GROUP 7: Pedestal crane operator; .Shovel, backhoe, dragline, clamshell operator (over 5 cu. yds. mrc); Tower crane 6-225 http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb 06/16/2010 Paee 10 of 23 repair; Tugger hoist operator (3 drum) GROUP 8: Crane operator (up to and including 25 ton capacity); Crawler transporter operator; Derrick barge operator (up to and including 25 ton capacity); Hoist operator, stiff legs, Guy derrick or similar type (up to and including 25 ton capacity); Shovel, backhoe, dragline, clamshell operator (over 7 cu. yds., M.R.C.) GROUP 9: Crane operator (over 25 tons and up to and including 50 tons mrc); Derrick barge operator (over 25 tons up to and including 50 tons mrc); Highline cableway operator; Hoist operator, stiff legs, Guy derrick or similar type (over 25 tons up to and including 50 tons mrc); K-crane operator; Polar crane operator; Self erecting tower crane operator maximum lifting capacity ten tons GROUP 10: Crane operator (over 50 tons and up to and including 100 tons mrc); Derrick barge operator (over 50 tons up to and including 100 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 50 tons up to and including 100 tons mrc), Mobile tower crane operator (over 50 tons, up to and including 100 tons M.R.C.); Tower crane operator and tower gantry GROUP 11: Crane operator (over 100 tons and up to and including 200 tons mrc); Derrick barge operator (over 100 tons up to and including 200 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 100 tons up to and including 200 tons mrc); Mobile tower crane operator (over 100 tons up to and including 200 tons mrc) GROUP 12: Crane operator (over 200 tons up to and including 300 tons mrc); Derrick barge operator (over 200 tons up to and including 300 tons mrc); Hoist operator, stiff legs, Guy derrick or similar type (over 200 tons, up to and including 300 tons mrc); Mobile tower crane operator (over 200 tons, up to and including 300 tons mrc) GROUP 13: Crane operator (over 300 tons); Derrick barge operator (over 300 tons); Helicopter pilot; Hoist operator, stiff legs, Guy derrick or similar type (over 300 tons); Mobile tower crane operator (over 300 tons) TUNNEL CLASSIFICATIONS GROUP 1: Skiploader (wheel type up to 3/4 yd. without attachment) GROUP 2: Power-driven jumbo form setter operator GROUP 3: Dinkey locomotive or motorperson (up to and including 10 tons) GROUP 9: Bit sharpener; Equipment greaser (grease truck); Slip form pump operator (power-driven hydraulic lifting device for concrete forms); Tugger hoist operator (1 drum); Tunnel locomotive operator (over 10 and up to and including 30 tons) GROUP 5: Backhoe operator (up to and including 3/4 yd.); Small Ford, Case or similar; Dri11 doctor; Grouting machine operator; Heading shield operator; Heavy-duty repairperson; Loader operator (Athey, Euclid, Sierra and similar types); Mucking machine operator (1/4 yd., rubber-tired, rail or track type); Pneumatic concrete placing machine operator 6-226 http://www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Page 11 0 (Hackley-Presswell or similar tyne); Pneumatic heading shield (tunnel); Pumpcrete gun operator; Tractor compressor drill combination operator; Tugger hoist operator (2 drum); Tunnel locomotive operator (over 30 tons) GROUP 6: Heavy Duty Repairman GROUP 7: Tunnel mole boring machine operator ENGINEERS ZONES $i.00 additional per hour for all of IMPERIAL County and the portions of KERN, RIVERSIDE & SAN BERNARDTNO Counties as defined below: That area within the following Boundary: Begin in San Bernardino County, approximately 3 miles NE of the intersection of I-15 and the California State line at that point which is the NW corner of Section 1, T17N,m R14E, San Bernardino Meridian. Continue W in a straight line to that point which is the SW corner of the NW ilh of Section 6, T27S, R42E, Mt. Diablo Meridian. Continue North to the intersection with the Inyo County Boundary at that point which is the NE corner of the W i~'2 of the N it's of Section 6, T25S, R42E, MDM. Continue W along the Inyo and San Bernardino County boundary until the intersection with Kern County, as that point which is the SE corner of Section 39, T29S, R40E, MDM. Continue W along the Inyo and Kern County boundary until the intersection with Tulare County, at that point which is the SW corner of the SE il'~ of Section.32, T29S, R37E, MDM. Continue W along the Kern and Tulare County boundary, until that point which is the NW corner of T25S, R32E, MDM. Continue S following R32E lines to the NW corner of T31S, R32E, MDM. Continue W to the NW corner of T31S, R31E, MDM. Continue S to the SW corner o£ T325, R3iE, MDM. Continue W to SW corner of SE il'~i of Section 34, T32 S, R30E, MDM. Continue S to SW corner of T11N, R17W, SBM. Continue E along south boundary of T11N, SBM to SW corner of T11N, R7 W, SBM. Continue S to SW corner of T9N, R7W, SBM. Continue E along south boundary of T9N, SBM to SW corner of T9N, R1E, SBM. Continue S along west boundary of R1E, SMB to Riverside County line at the SW corner of T1S, R1E, SBM. Continue E along south boundary of T1s, SBM (Riverside County Line) to SW corner of T15, R10E, SBM. Continue S along west boundary of R10E, SBM to Imperial County line at the SW corner of T8S, R10E, SBM. Continue W along Imperial and Riverside county line to NW corner of T9S, R9E, SBM. Continue S along the boundary between Imperial and San Diego Counties, along the west edge of R9E, SBM to the south boundary of Imperial County/California state line. Follow the California state line west to Arizona state line, then north to Nevada state line, then continuing NW back to start at the point which is the NW corner of Section 1, T17N, R14E, SBM $1.00 additional per hour for porti ors of SAN LUIS OBISPO, KERN, SANTA BARBARA & VENTURA as defined below: That area within the following Boundary: Begin approximately 5 miles north of the community of Cholame, on the Monterey County and San Luis Cbispo County boundary at the NW corner of T25S, R16E, Mt. Diablo Meridian. Cort inue south along the west side of R16E to the SW corner of T30S, R16E, MDM. Continue E to SW corner of T30S, R17E, MDM. Continue S to SW corner of T31S, R17 E, MDM. Continue E to SW corner of T31S, R18E, MDM. Continue S alor_g West side of R18E, MDM as it crosses into San Bernardino Meridian numbering area and becomes R30W. Follow the west side of R30W, SBM to the SW corner of T9N, R30W, SBM. http://www.wdol.gov/wdol/scafiles/davisbacon/C~1 a~b~ 06/16/2 ,~ 6-228 Page 12 of 22 Continue E alcng the south edge of T9N, SBM to the Sarta Barbara County and Ventura County boundary at that point whch is the SW corner of Section 34.T9N, R24W, SBM, continue S along the Ventura County line to that point which is the SW corner of the SE il'~ of Section 32, T7N, R24W, SBM. Continue E along the south edge of T7N, SBM to the SE corner to T7N, R21W, SBM. Continue N along East side of R21W, SBM to Ventura County and Kern County boundary at the NE corner of TBN, R21W. Continue W along the Ventura County and Kern County boundary to the SE corner of T9N, R21W. Continue North along the East edge of R21W, SBM to the NE corner of T12 N, R21W, SBM. Continue West along the north edge of T12N, SBM to the SE corner of T32 S, R21E, MDM. [T12N SBM is a think strip between T11N SBM and T32S MDM;. Continue North along the East side of R21E, MDM to the Kings County and Kern County border at the NE corner of T25S, R21E, MDM, continue West along the Kings County and Kern County Boundary until the intersection of San Luis Obispo County. Continue west along the Kings County and San Luis Obispo County boundary until the intersection with Monterey County. Continue West along the Monterey County and San Luis Obispo County boundary to the beginning point at the NW corner of T25S, R16E, MDM. $2.00 additional per hour for INYO and MONO Counties and the Northern portion of SAN BERNARDINO County as defined below: That area within the following Boundary: Begin at the intersection of the northern boundary of Mono County and the California state line at the point which is the center of Section 17, T10N, R22E, Mt. Diablo Meridian. Continue S then SE along the entire western boundary of Mono County, until it reaches Inyo County at the point which is the NE corner of the W il'~ of the NW ilk of Section 2, T85, R29E, MDM. Continue SSE along the entire western boundary of Inyo County, until the intersection with Kern County at the point which is the SW corner of the SE ilk o£ Section 32, T24S, R37E, MDM. Continue E along the Inyo and Kern County boundary until the intersection with San Bernardino County at that point which is the SE corner of section 34, T245, R40E, MDM. Continue E along the Inyo and San Bernardino County boundary until the point which is the NE corner of the W if'-z of the NW il'~ of Section 6, T25S, R42 E, MDM. Continue Sto that point which is the SW corner of the NW i~'a of Section 6, T27S, R92E, MDM. Continue E in a straight line to the California and Nevada state border at the point which is the NW corner of Section 1, T17N, R19E, San Bernardino Meridian. Then continue NW along the state line to the starting point, which is the center of Section 18, T10N, R22E, MDM. REMAINING AREA NOT DEFINED ABOVE RELIEVES BASE RATE __________________________________________ ENGI0012-004 08/01/2009 Rates Fringes OPERATOR: Power Equipment (DREDGING) (1) Leverman .............. ..$ 44.83 17 .22 (2) Dredge dozer.......... ..$ 40.36 17 .22 (3) Ceckmate .............. ..$ 40.25 17. 22 (4) Winch operator (stern winch on dredge).......... ..$ 39.70 17. 22 (5) Fireman-Oiler, Deckhand, Bargeman, 6-229 http://www.wdol.gov/wdoUscafiles/davisbacon/CA l . dvb 06/16/2010 Pale 13 of 22 Leveei!and ...................$ 39.16 17.22 (6) Barge Mate ..............$ 39.77 17.22 ---------------------------------------------------------- IRON0002-004 07/01/2009 Rates Fringes Ironworkers: Fence Erector ...............$ 26.58 15.24 Ornamental, Reinforcing and Structural ..............$ 33.C0 23.71 PREMIUM PAY: $6.00 additional per hour at the following locations: China Lake Naval Test Station, Chocolate Mountains Naval Reserve-Niland, Edwards AFB, Fort Irwin Military Station, Fort Irwin Training Center-Goldstone, San Clemente Island, San Nicholas Island, Sisanville Federal Prison, 29 Palms - Marine Corps, U.S. Marine Base - Barstow, U.S. Naval Air Facility - Sealey, Vandenberg AFB $4.00 additional per hour at Army Defense Language Instit Naval Post Graduate School - Logistics Center $2.00 additional per hour at Port Hueneme, Port Mugu, U.S the following locations: rte - Monterey, Fallon Air Base, Monterey, Yermo Marine Corps the following locations: . Coast Guard Station - Two Rock ___________________________________ LAB00089-001 07/01/2009 Rates Fringes LABORER (BUILDING and all other Residential Construction) Group 1 ................... ..$ 25.02 13 .50 Group 2 ................... ..$ 25.90 13 .50 Group 3 ................... ..$ 26.61 13 .50 Group 4 ................... ..$ 27.41 13 .50 Group 5 ................... ..$ 28.09 13 .50 LABORER (RESIDENTIAL CONSTRUCTION - See definition below) (1) Laborer ............... ..$ 22.87 10 .83 (2) Cleanup, Landscaping, Fencing (chain link or wood) ..................... ..$ 21.58 10 .63 RESIDENTIAL DEFINITION: wood or metal frame construction of single family residences, apartments and condominums - excluding (a) projects that exceed three stories over a garage level, (b) any utility work such as telephone, gas, water, sewer and other utilities and (c) any £ine grading work, utility work or paving work in the future street and public right-of-way; but including all rough grading work at the job site behind the existing right of way LABORER CLASSIFICATIONS GROUP 1: Cleaning and handling of panel forms; Concrete 6-230 http://www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Page i4 of 22 Screeding for Roucht Strike-off; Concrete, water curing; Demolition laborer; Flagman; Gas, oil and/or water pipeline laborer; General Laborer; General clean-up laborer; Landscape laborer; Jetting laborer; Temporary water and air lines laborer; Material hoseman (walls, slabs, floors and decks); Plugging, £illing of Shee-bolt holes; Dry packing of concrete; Railroad maintenance, Repair Trackman and road beds, Streetcar and railroad construction trac laborers; Slip form raisers; Slurry seal crews (mixer operator, applicator operator, squeegee man, Shuttle man, top man), £illing of cracks by any method on any surface; Tarman and mortar man; Tool crib or tool house laborer; Window cleaner; Wire Mesh puling-all concrete pouring operations GROUP 2: Asphalt Shoveler; Cement Dumper (on 1 yard or larger mixer and handling bulk cement); Cesspool digger and installer; Chucktender; Chute man, pouring concrete, the handling of the cute from ready mix trucks, such as walls, slabs, decks, floors, foundations, footings, curbs, gutters and sidewalks; Concrete curer-impervious membrane and £orm oiler; Cutting torch operator (demoliton); Guinea chaser; Headboard man-asphlt; Laborer, packing rod steel and pans; membrane vapor barrier installer; Power broom sweepers (small); Riiprap, stonepaver, placing stone or wet sacked concrete; Roto scraper and til ler; Tank sealer and cleaner; Tree climber, faller, chain saw operator, Pittsburgh Chipper and similar type brush shredders; Underground laborers, including caisson bellower GROUP 3: Buggymobile; Concrete cutting torch; Concrete cutting torch; Concrete pile cutter; Driller, jackhammer, 2 1/2 feet drill steel or longer; Dri Pak-it machine; High sealer (including drilling of same); Hydro seeder and similar type; Impact wrench, mult-plate; Kettlemen, potmen and mean applying asphalt, lay-kol d, creosote, line caustic and similar type materials (applying means applying, dipping, brushing or handling of such materials for pipe wrapping and waterproofing); Operators of pneumatic, gas, electric tools, vibratring machines, pavement breakers, air blasting, come-along, and similar mechanical tools not separately classified herein; Pipelayers back up man coating, grouting, making of joints, sealing, caulking, diapering and inclduing rubber gasket joints, pointing and any and all other services; Rotary Scarifier or multiple head concrete chipping scaarifier; Steel header board man and guideline setter; Tampers, Barko, Wacker and similar type; Trenching machine, handpropelled GROUP 9: Asphalt raker, luterman, ironer, apphalt dumpman and asphalt spreader boxes (all types); Concrete core cutter (walls, floors or ceilings), Grinder or sander; Concrete saw man; cutting walls or flat work, scoring old or new concrete; Cribber, shorer, lagging, sheeting and trench bracing, hand-guided lagging hammer; Laser beam in connection with laborer's work; Oversize concrete vibrator operator 70 pounds and over; Pipelayer performing all services in the laying, installation and all forms of connection of pipe from the point of receiving pipe in the ditch until completion of oepration, including any and all forms of tubular material, whether pipe, metallic or non-metallic, conduit, and any other stationary type of tubular device used for the conveying of any substance or element, whether water, sewage, solid, gas, air or other product whatsoever and without regard to the nature of material from which the tubular material is Fabricated; No 6-231 http://www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Page 15 of 22 joint pipe and stripping of same; Prefabricated manhole ins'_ailer; Sandblaster (nozzleman), Porta shot-blast, water blasting GROUP 5: Blasters Powderman-All work of loading holes, placing and blasting of all pwder and explosives of whatever type, regardless of method used for such loading and placing; Driller-all power drills, excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and any and all other types of mechanical drills without regard to the form of motive power. LABOOOB9-002 11/01/2008 Rates Fringes LABORER (MASON TENDER)...........$ 25.86 12.13 LAB00089-004 07/01/2009 HEAVY AND HIGHWAY CONSTRUCTION Rates Fringes Laborers: GROUP 1 ........ .............$ 26.14 13.50 GROUP 2 ........ .............$ 26.60 13.50 GROUP 3 ........ .............$ 27.01 13.50 GROUP 4 ........ .............$ 27.85 13.50 GROUP 5 ........ .............$ 30.72 13.50 LABORER CLASSIFICATIONS GROUP 1: Laborer: General or Construction Laborer, Landscape Laborer. Asphalt Rubber Material Loader. Boring Machine Tender (outside), Carpenter Laborer (cleaning, handling, oiling & blowing of panel forms and lumber), Concrete Laborer, Concrete Screeding for rough strike-off, Concrete water curing. Concrete Curb & Gutter laborer, Certified Confined Space Laborer, Demolition laborer & Cleaning o£ Brick and lumber,Expansion Joint Caulking; Environmental Remediation, Monitoring Well, Toxic waste and Geotechnical Drill tender, Fine Grader, Fire Watcher, Limbers, Brush Loader, Pilers and Debris Handlers. flagman. Gas Oil and Water Pipeline Laborer. Material Hoseman (slabs, walls, floors, decks).; Plugging, filling of shee bolt holes; Dry packing of concrete and patching; Post Holer Digger (manual); Railroad maintenance, repair trackman, road beds; Rigging & signaling; Scaler, Slip-Form Raisers, Filling cracks on any surface, tool Crib or Tool House Laborer, Traffic control (signs, barriers, barricades, delineator, cones etc.), Window Cleaner GROUP 2: Asphalt abatement; Buggymobile; Cement dumper (on 1 yd. or larger mixers and handling bulk cement); Concrete curer, impervious membrane and form oiler; Chute man, pouring concrete; Concrete cutting torch; Concrete pile cutter; driller/Jackhammer, with drill steel 2 1/'2 feet or longer; Dry pak-it machine; Fence erector; Pipeline wrapper, gas, oil, water, pot tender & £orm man; Grout man; Installation of all asphalt overlay fabric and materials used for reinforcing asphalt; Irrigation laborer; Kettleman-Potman hot mop, includes applying asphalt, lay-kl_old, creosote, lime caustic and similar tyhpes of materials (dipping, brushing, handling) and waterproofing; Membrane vapor barrier installer; Pipelayer backup man 6-232 http://www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Page 16 of 22 (coating, grouting, mating cf joints, sealing caulkiing, diapering including rubber basket joints, pointing); Rotary scarifier, multiple head. concrete chipper; Rock Slinger; Roto scraper & tiller; Sandblaster pot tender; Septic tank digger/installer; Tamper/wacker operator; Tank scaler & cleaner; Tar man & mortar man; Tree climber/f aller, chainb saw operator, Pittsburgh chipper & similar type brush shredders. GROUP 3: Asphalt, installation of all frabrics; Buggy Mobile Man, Bushing hammer; Compactor (all types), Concrete Curer - Impervious membrane, Form Oiler, Concrete Cutting Torch, Concrete Pile Cutter, Driller/Jackhammer with drill steel 2 1/2 ft or longer, Dry Pak-it machine, Fence erector including manual post hole digging, Gas oil or water Pipeline Wrapper - 6 ft pipe and over, Guradrail erector, Hydro seeder, Impact Wrench man (multi plate), kettleman-Potman Hot Mop includes applying Asphalt, Lay-Ko1d, Creosote, lime caustic and similar types of materials (dipping, brushing or handling) and waterproofing. Laser Beam in connection with Laborer work. High Scaler, Operators of Pneumatic Gas or Electric Tools, Vibrating Machines, Pavement Breakers, Air Blasting, Come-Alongs and similar mechanical tools, Remote-Controlled Robotic Tools in connection with Laborers work. Pipelayer Backup Man (Coating, groutin g,m makeing of joints, sealing, caulking, diapering including rubber gasket joints, pointing and other services). Power Post Hole Digger, Rotary Scarifier (multiple head concrete chipper scarifier), Rock Slinger, Shot Blast equipment (8 to 48 inches), Steel Headerboard Man and Guideline Setter, Tamper/blacker operator and similar types, Trenching Machine hand propelled. GROUP 9: Any worker exposed to raw sewage. Asphalt Raker, Luteman, Asphalt Dumpman, Asphalt Spreader Boxes, Concrete Core Cutter, Concrete Saw Man, Cribber, Shorer, Head Rock Slinger. Installation of subsurface instrumentation, monitoring wells or points, remediation system installer; Laborer, asphalt-rubber distributor bootman; Oversize concrete vibrator operators, 70 pounds or over. Pipelayer, Prfefabricated Manhole Installer, Sandblast Nozzleman (Water Baasting-Porta Shot Blast), Traffic Lane Closure. GROUP 5: Blasters Powderman-All work of loading holes, placing and blasting of all powder and explosives of whatever type, regardless of method used for such loading and placing; Horizontal directional driller, Boring system, Electronic traking, Driller: all power drills excluding jackhammer, whether core, diamond, wagon, track, multiple unit, and all other types of mechanical drills without regard to form of motive power. Environmental remediation, Monitoring well, Toxic waste and Geotechnical driller, Toxic waste removal. Welding in connection with Laborer's work. * LAB00300-008 08/05/2009 Rates Fringes LABORER PLASTER CLEAN-UP LABORER....$ 26.65 14.70 PLASTER TENDER ..............$ 29.20 14.70 Work at Military Bases - $3.00 additional per hour: Coronado Naval Amphibious Base, Fort Irwin, Marine Corps Air 6-233 http:,~/www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Pale 17 of 22 Station-29 Palms, Imperial Beach Naval Air Station, Marine Corps Logistics Supply Base, Marine Corps Pickle Meadows, Mountain Warfare Training Center, Naval Air Facility-Seeley, Nor*_h Island Naval Air Station, Vandenberg AFB. ______ ____ LAB00882-002 01/01/2010 Rates Asbestos Removal Laborer.........$ 26.15 14.25 SCOPE OF WORK: Includes site mobilization, initial site cleanup, site preparation, removal of asbestos-containing material and toxic waste, encapsulation, enclosure and disposal of asbestos- containing materials and toxic waste by hand or with equipment or machinery; scaf Folding, fabrication of temporary wooden barriers and assembly of decontamination stations. LAB01189-001 07/01/2009 Rates Fringes Laborers: (riORIZONTAL DIRECTIONAL DRILLING) (1) Drilling Crew Laborer.. .$ 27.05 10.40 (2) Vehicle Operator/Hauler .$ 27.22 10.40 (3) Horizontal Directional Drill Operator ............. .$ 29.07 10.40 (9) Electronic Tracking Locator .................... .$ .31.07 10.40 Laborers: (STRIPING/SLURRY SEAL) GROUP 1 .................... .$ 28.50 13.56 GROUP 2 .................... .$ 29.80 13.56 GROUP 3 .................... .5 31.81 13.56 GROUP 4 .................... .$ 33.55 13.56 LABORERS - STRIPING CLASSIFICATIONS GROUP 1: Protective coating, pavement sealing, including repair and filling of cracks by any method on any surface in parking lots, game courts and playgrounds; carstops; operation of all related machinery andequipment; equipment repair technician GROUP 2: Traffic surface abrasive blaster; pot tender - removal of all traffic lines and markings by any method (sandblasting, waterblasting, grinding, etc.) and preparation of surface for coatings. Traffic control person: controlling and directing traffic through both conventional and moving lane closures; operation of all related machinery and equipment GROUP 3: Traffic delineating device applicator: Layout and application of pavement markers, delineating signs, rumble and traffic bars, adhesives, gcide markers, other traffic delineating devices including traffic cort rol. This category includes all traffic related surface preparation (sandblasting, waterblasting, grinding) as part of the application process. Traffic protective delineating system installer: removes, reloca*_es, installs, permanently affixed roadside and parking delineation barricades, fencing, cable anchor, guard rail, reference signs, monument markers; operation of all related machinery and Fringes http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb6-234 06/16/2010 Pale 18 of 22 equipment; power broom sweeper GROUP 4: Striper: layout and application of traffic stripes and markings; hot thermo plastic; tape traffic stripes and markings, including traffic control; operation of all related machinery and equipment PAIN0036-001 01/01/2010 Rates Fringes Painters: (Including Lead Abatement) (1) Repaint .......:.........$ 26.05 9.41 (2) All Other Work..........$ 29.32 9.41 REPAINT of any previously painted structure. Exceptions: work involving the aerospace industry, breweries, - commercial recreational facilities, hotels which operate commercial establishments as part o` hotel service, and sports facilities. ----------- ------------- PAIN0036-010 01/02/2010 Rates Fringes DRYWALL FINISHER/TAPER (1) Building & Heavy Construction ................$ 29.19 12.19 (2) Residential Construction (Wood frame apartments, single family homes and multi-duplexes up to and including four stories) ....................$ 18.00 7.97 ------------- --------- PAIN0036-012 C1/01/2010 Rates Fringes GLAZIER ..........................$ 36.55 14.87 --------------------------------------------------------- PAIN0036-019 02/01/2009 Rates Fringes SOFT FLOOR LAYER .................$ 26.77 11.75 --------------------------------------------------------- PLA50200-005 08/05/2009 Rates Fringes PLASTERER ........................$ 35.41 9.88 NORTH ISLAND NAVAL AIR STATION, COLORADO NP.VAL AMPHIBIOUS BASE, IMPERIAL BEACH NAVAL AIR STATION: $3.00 additional per hour. - ------- ----------------------- PLASO500-001 06/26/2009 Rates Fringes CEMENT MASON/CONCRETE FINISHER GROUP 1 .................... .$ 26.92 8. 70 GROUP 2 .................... .$ 28.07 8. 70 GROUP 3 .................... .$ 30.75 B. 10 6-235 http://www.wdol. gov/wdol/scafiles/dav isbacon/CA l .dvb 0 611 6/2 0 1 0 Page 19 of 22 CEMENT MASONS - work inside the building line, meeting the following criteria: GROUP 1: Residential wood frame project of any size; work classified as Type III, IV or Type V construction; interior tenant improvement work regardless the size o£ the project; any wood frame project of four stories or less. GROUP 2: Work classified as type I and II construction GROUP 3: All other work ---------------------------- PLUM0016-006 07/01/2009 Rates Fringes PLUMBER, PIPEFITTER; STEAMFITTER (1) Work on strip malls, light commercial, tenant improvement and remodel work ....................... .$ 28.84 14.47 (2) Work on new additions and remodeling of commercial buildings, bars, restaurants, and stores not to exceed 5,000 sq. ft. of floor space..... .$ 35.97 15.86 (3) All other work......... .$ 37.10 16.84 (4) Camp Pendleton......... --------------------------- .$ 41.60 16.84 ----- PLUM0016-011 07/01/2009 -- ----------- --------------- Rates Fringes PLUMBER/PIPEFITTER Residential ................ ------- ----- .$ 29.97 12.91 ------- PLUM0395-001 07/01/2009 -- ----------- -- ------ Rates Fringes PLUMBER Landscape/Irrigation Fitter .$ 26.70 13.89 Sewer & Storm Drain Work... .$ 25.18 15.67 ROOF0045-001 08/01/2009 Rates Fringes ROO FF R ...........................$ 23.63 6.50 _________________________ ___________________ SFCA0669-001 01/01/2009 Rates Fringes SPRINKLER FITTER .................$ 33.50 15.30 ____________ _______ _ SHEE0206-001 01/01/2010 Rates Fringes SHEET METAL WORKER Camp Pendleton ..............$ 36.05 15.81 Except Camp Pendleton.......$ 34.05 15.81 6-236 http://www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Page 20 of 22 Sheet Metal Technician......$ 23.99 4,71 SHEET METAL TECHNICIAN - SCOPE: a. Existing residential buildings, both single and multi-family, where each unit is heated .and/or cooled by a separate system b. New single family residential buildings including tracts. c. New multi-family residential buildings, not exceeding five stories of living space in height, provided each unit is heated or cooled by a separate system. Hotels and motels are excluded. d. LIGHT COMMERCIAL WORK: Any sheet metal, heating and air conditioning work performed on a project where the total construction cost, excluding land, is under $1,000,000 e. TENANT IMPROVEMENT WORK: Any work necessary to finish interior spaces to conform to the occupants o£ commercial buildings, after completion of the building shell TEAM0036-001 07/01/2009 Rates Fringes Truck drivers: GROUP L ......... ............$ 19.90 18.30 GROUP 2 ......... ............$ 29.49 18.30 GROUP 3 ......... ............$ 24.69 18.30 GROUP 4 ......... ............$ 24.89 18.30 GROUP 5 ......... ............$ 25.09 18.30 GROUP 6 ......... ............$ 25.59 18.30 GROUP 7 ......... ............$ 27.09 18.30 FOOTNOTE: HAZMAT PAY: Work on a hazmat job, where hazmat certification is required, shall be paid, in addition to the classification working in, as follows: Levels A, B and C - +$1.00 per hour. Workers shall be paid hazmat pay in increments of four (9) and eight (8) hours. TRUCK DRIVER CLASSIFICATIONS GROUP 1: Fuel Man, Swamper GROUP 2: 2-axle Dump Truck, 2-axle Flat Bed,Concrete Pumping Truck, Industrial Lift Truck, Motorized Traffic Control, Pickup Truck on Jobsite GROUP 3: 2-axle Water Truck, 3-axle Dump Truck, 3-axle Flat Bed, Erosion Control Nozzleman, Dump Crete Truck under 6.5 yd, Forklift 15,000 lbs and over, Prell Truck, Pipeline work Truck Driver, Road Oil Spreader, Cement Distributor or Slurry Driver, Bootman, Ross Carrier GROUP 9: Off-road Dump Truck under 35 tons 9-axles but less than 7-axles, Low-Bed Truck & Trailer, Transit Mix Trucks under 8 yd, 3-axle Water Truck, Erosion Control Driver, Grout Mixer Truck, Dump Crete 6.Syd and over, Dumpster Trucks, DW 10, DW 20 and over, .Fuel Truck and Dynamite, Truck Greaser, Truck Mounted Mobile Sweeper 2-axle Winch Truck GROUP 5: O£f-road Dump Truck 35 tons and over, 7-axles or more, Transit Mix Trucks 6 yd and over, A-Frame Truck, Swedish Cranes GROUP 6: Of£-Road Special Equipment (including but not limited to Water Pu11 Tankers, Athey Wagons, DJB, B70 Wuclids or like Equipment) 6-237 http://www.wdol.gov/wdol/scafiles/davisbacon/CA l .dvb 06/16/2010 Page 21 of 22 GROUP 7: Repairman ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- --------------------------------------------------------------- Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29C FR 5.5 (a) (1) (ii)1. In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.6 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 6-238 http://www.wdol.gov/wdol/scafiles/davisbacon/CAl.dvb 06/16/2010 Pale 22 of 22 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Bcard (formerly the Wage Appeals Board). Write to: Administrative Review Board O.S. Department of Labor 200 Cons *_itution Avenue, N.W. Washington, DC X210 4.) All decisions by the Administrative Review Board are final . END OF GENERAL DECISION 6-239 http://www.wdol.gov/wdol/scafiles/davisbacon/CAI .dvb 06/16/2010 EXHIBIT C 40 6-240 PROPOSAL TO PROVIDE DESIGN BUILD SERVICES FOR THE DESIGN AND CONSTRUCTION OF MUNICIPAL STREET LIGHT RETROFIT PROJECT Prepared for: The City of Chula Vista ~~~~ ~~~~~ u~ici~~l Street Lighting fZetr®fit ~r®~ect Presented by: Southern Contracting Company `~F~~F£91~m r '9 1441 "~NICA~~ Date Prepared January 19, 2010 6-241 ~~,YGINFFPi C~ EST. C 9 lF 1963 ~" ~RILaI~ ~~~ eQ~'GY~WCiWr'~ co~iaotry LIC N0.222262 559 Twin Oaks Valley Road P.O. Box 445 San Marcos, CA 92079 Phone 760-744-0760 Fax 760-744-fi475 January 19, 2010 Mr. Gordon Day Building Project Manager City of Chula Vista Public Services Building 200 276 Fourth Avenue Chula Vista, California 91910 Public Works Department, Engineering Building Subject -Proposal to Provide Design Build Services for the Design and Construction of Induction Street Lights for the City of Chula Vista Dear. Mr. Day, Please find enclosed the attached proposal for your consideration for design- buildservices for the City of Chula Vista. We have taken great care to address every requirement in the request for proposal. Please note we have no outstanding claims or litigation on any current projects. This induction street lighting retrofit project creates several opportunities for Chula Vista including: 1. Utilizing local supplier to accrue sales tax benefits to Chula Vista, a $20,000 benefit not factored into our quotation but a real and tangible benefit to Chula Vista. This is discussed in greater detail in the attached Executive Summary, 2. Integrating the design-build project with our in-place solar Photovoltaic Design-Build Team resulting in a more efficient project with shorter lines of communication. This also affords Chula Vista to add this project as a Change Order to the in-place contract, reducing Chula Vista's direct contract negotiation and administrative costs. Please refer to Section 6, Commercial Proposal for mare details. We currently have five street light crews immediately available to start installation once the appropriate fixtures are selected and approved by Chula Vista. Based on our calculated installation rate, we estimate this project should take no more than 120-150 days to complete. Because we draw from IBEW Local 569, we are able to add addition, well-trained 2-man crews with 6-242 about one week notice, thus providing Chula Vista with the ability to accelerate this proposed schedule at no extra cost. Southern Contracting has the ability to enter into a contract with the City of Chula Vista and the ability to avoid conflicts of interest on any project, public or private. I look forward to hearing from Chula Vista and am prepared to negotiate the design-build contract on behalf of Southern Contracting. Please contact me at any time should you have any questions during the evaluation period. Sincerely, ~~:~~ Ti ~ Timothy McBride President, CEO Southern Contracting Company Ushering in the Post Carbon Era 6-243 PROPOSAL TO PROVIDE DESIGN BUILD SERVICES FOR THE DESIGN AND CONSTRUCTION OF MUNICIPAL STREET LIGHT RETROFIT PROJECT Prepared for: The City of Chula Vista Municipal Street Lighting Retrofit Project Presented by: Southern Contracting Company Eesix~E ,fE,tva3_ ~• Date Prepared January i9, 2010 6-244 `~ ~ ~ 1~l~~i~ipal Street Li~l~tin~ s ff~~~t~~. lQetr®f~t Pr~,yect ~i1~1~ O~ COlfi~elltS EXECUTIVE SUMMARY 1 Section 1 PROJECT DEVELOPMENT PROCESS 4 Section 2 SUMMARY OF QUALIFICATIONS Section 3 DESIGN BUILD ORGANIZATION Section 4 KEY PERSONNEL 5 7 8 Section 5 DETAILED DESIGN BUILD EXPERIENCE 10 Section 6 COMMERCIAL PROPOSAL 15 APPENDIX 16 ie~Page Table of Contents 6-245 l~~u~ici,~a/ Str~~t Lir~,~tirrdr~ `~`~;~,~~` Retrofit Pr®j~~#~ Request for Qualifications Requirerr~er~ts Checklist 1. Letter of Interest • Cover transmittal letter 2. Understanding the Project Development Process • Section 1, Project Development Process, Page 4 3. Organization Chart for Project Team • Section 3, Design Build Organization, Page 7 4. Design Build Fee Structure • Section 6, Commercial Proposal, Page 15 5. Resumes of Key Design Build Members • Section 4, Key Personnel, Page 8 • Appendix A 6. Detailed Design Build Experience • Section 2, Summary of Qualifications, Page 5 • Section 5, Detailed Design Build Experience, Page 10 7. Streetlight Experience • Section 5, Detailed Design-Build Experience, Page 14 8. Client References • Otay River Project, City of San Diego, Page 12 • Colorado River Authority, Metropolitan Water District, Page 12 • Ormond Beach, Reliant Energy, Page 13 9. Insurance Certification • Appendix C 10. Other Requirements • GIS Mapping Layer, Executive Summary, Page 3 • Surety Bondability Letter in lieu of Financial Statements, Appendix C iii ~ Page Table of Contents 6-246 ~~~~~ ~ ~ ~~~ l~a~r~icip~l ~tr~~t L.i~htinr~ lF. T967 '~' Rebr~~®~ ~r~~irLi ~ICAL~ ~X~CUt1VE' SiIY~Y~idT~7 Overvieo~ The City of Chula Vista ("Chula Vista") continues to expand its regional leadership role in reducing its carbon footprint and utility energy bills through the implementation of its municipal streetlight retrofit project. Though this project is straight forward and Chula Vista has developed a preliminary specification to replace approximately 4,600 street lights with induction street lights, there are still several challenges facing the city, including final selection of the best performing lighting kit(s) that, when energy savings are calculated, result in the lowest cost of ownership as measured by simple payback. Southern Contracting has been assisting municipal and private sector clients install street lighting systems for over 20 years. In fact, we currently provide street light replacement crews to SDG&E as part of our Master Services Agreement and have been providing these services far over 10 years. As a result, we have a highly productive installation crew ready to hit the ground running on this project. Execution Approach Design Phase Though this is a design-build project, Chula Vista has already identified that it will be replacing existing HPS fixtures with new, 100,000 hour life induction street lights and specified certain products, including GE M-250 Luminaires and Phillips QL Induction System, or equal. This preliminary bid specification has been established by Nate Mullen Visual Concepts (Mullen), the lighting consultant retained by Chula Vista. Southern proposes to work closely with Mullen during the design phase to identify and either confirm the use of the above components or recommend an equal substitute that may offer a better value. For the purposes of competitive pricing, Southern is quoting the replacement with the above GE and Phillips components. Procurement and Installation There are several factors, among others, that will materially impact the payback calculation, including: 1. Labor cast /productivity 2, SDG&E Product Rebates 3. Old Street Light Disposal 1~Page Executive Summary 6-247 . l'~~r~icip~l S#re~~ iig~tin~ -f~;~~ ~ R~~rafit Pr®j=~ct Labor Cost /Productivity -Next to the actual cost of the induction lighting fixtures, the greatest cost risk exposure to this project will be the installation labor. Southern addresses this risk in two ways: 1. Firm Fixed Labor Installation Price, regardless of the selected light system, Our quote is presented in Section 6, Commercial Proposal. This is based on the identified 4,600 light fixtures targeted for replacement. 2. Labor Productivity, and its impact on labor cost, is inherently included in our fixed labor quote. Should Chula Vista decide to increase or reduce the number of fixtures, we are prepared to adjust our labor quote to reflect a precise fixture count. The Unit Price Adjustment is also presented in Section 6. As mentioned above, we own our own equipment and have several highly experienced street light crews ready to start work once lighting fixtures are delivered. SDG&E Product Rebates will factor directly into the Simple Payback calculation that Chula Vista used to apply for the CEC 3% interest loan. This loan requires that the payback period be kept less than 11 years. We have confirmed the applicable rebate to apply to this project. This rebate is presented with our quote in Section 6. Old Street Light Disposal is another value-added service Southern may be able to offer Chula Vista. On past street light replacement projects for other municipalities, we have been able to sell any usable street light in Mexico through our NECA affiliate, ARS Proyectos. We have been able to obtain credits for past clients ranging from $10 to $30 per fxture. We will aggressively explore this opportunity on behalf of Chula Vista during the design phase and apply the net value this benefit to Chula Vista, recovering only nominal administrative, handling and shipping fees. In our base quotation, we have provided for packaging and disposal of the old light fixtures to an approved hazardous disposal facility. In the event we are able to sell these through our business partner in Mexico we will credit this disposal shipping and packaging fee back to Chula Vista. The commercial details of this credit are presented in Section 6, Commercial Proposal. GIS Mapping Layer Chula Vista has identified the need for the selected Contractor to provide a GIS Mapping Layer for the newly installed streetlights. We are familiar with the SanGIS system which provides a GIS layer for streetlights for the City and County of San Diego. In this system, the mapping system/database requires a brief coded description of the asset (streetlight) and its GIS coordinates. We will record this data as the fixtures are installed and provide this information to Chula Vista for input into its GIS database. In the event Chula Vista 2~Page Executive Summary 6-248 ENfi1NF ~,T~y° ~A~~ri~i~~l St~ee~ ~i~~ti~~ ```'~area~c~`" l4etrofit Praj~~t does not have such as system, the SanGIS system is available for other cities to join and utilize for similar purposes. The Southern Design-Build Team We propose to incorporate this street light replacement project within our existing design build team structure currently in place on the Solar Photovoltaic Design Build Project. Since the design process is rather limited and straight forward, we propose to integrate Mullen directly into our overall plan as we have significant street light experience. This will keep the overall cost down to Chula Vista and is reflected in our quote. We will only utilize the service of Engineering Partners, Inc. where and when appropriate. Technical Approach We are proposing to provide the specified GE luminaires and Phillips induction light fixtures in our firm, fixed quotation. The specification brochures are presented in Appendix D, Product Brochures. Of particular note, the design specification called for the light fixture to provide a photoelectric receptacle, not a photoelectric control. However, this particular model will only work with photoelectric sensor control. Anew photoelectric control device is included with our quotation. No bird spikes are included as they are not required per a written response received from Chula Vista clarifying this requirement. Local Procurement -Tax Benefit to Chula Vista We are proposing to supply the quoted light fixtures through California Electric Supply (CES) located at 1011 Bay Blvd, Chula Vista. We will work closely with CES to deliver and stage the light fixtures according to our installation plan, eliminating the need for special warehousing. and shipping. In addition this step will assure that all sales taxes will accrue to the benefit of Chula Vista. SUmmarjr Southern has swell-oiled team to execute this project. By combining our team approach with Chula Vista's consultant, Nate Mullen Visual Concepts, we have produced a highly competitive proposal presented here. Furthermore, by integrating this project with our in- place Solar Photovoltaic Design-Build Team, the overall project cost should be kept to a minimum, providing Chula Vista the opportunity to add this project as a change order to the in-place contract as general terms and conditions have already been negotiated. Also, lines of communication and overall coordination should be simplified for the benefit of Chula Vista. 3~Page Executive Summary 6-249 ~~~'NS~~''~m f~~~f~cf~af St~~~~ Ligf~t,~~g 'F~;~~~~' R~t~®~i~ Per®~~~~ Se~~i~~ 1 P~o~EC~' DE~1E~.®~1~El~i'I' PROCESS Overview This project poses a special challenge in that Chula Vista has already retained the services of Mullen to assist with preliminary performance specifications and product selection. We propose to work closely with Mullen to finalize product selection, providing Mullen the information they will need to confirm the Simple Payback method which forms the basis for the CEC loan. The x-factors here have been identified above and include a firm fixture count, applying the correct SDG&E rebate, and obtaining a credit for the used lighting fixtures for the benefit of Chula Vista. From a technical perspective, the typical 60%, 90%, 100% design review process should be able to be reduced to just a 90% review and final approval of the selected luminaires and lighting systems. This is more a procurement effort than a lighting design effort as Mullen as already assisted Chula Vista develop the proposal specifications that form basis of our quotation. iNarranty and Maintenance Support Southern's normal warranty includes manufacturer's equipment warranty, typically 30 days to one year, depending on the product, and our standard one year labor installation workmanship warranty. As part of the RFP specification we are prepared to follow up eleven months after system turnover to handle any warranty and/or product defect issues to protect Chula Vista's warranties and product guarantees. This step will assure Chula Vista that Southern's 1-year labor warranty may be utilized to keep costs to a bare minimum. The manufacturers' warranties will be passed directly along to Chula Vista and provide 10- year protection guaranteeing the 100,000 hour expected life. _. 4~Page Project Development Process 6-250 ~Eiti6iNi~gi y gr. yc ~~I~/C1~7c"3~ Str~e~~ L®gllt~rv~ s h $eCtl®Ti ~ SU1vI14/IARY OF (~iJAI.IFIG.~TIONS Overview Southern Energy Team has significant experience in all facets of design-build project execution. We specialize in the design-build project delivery system. Our team provides expert planning and implementation of cost-effective, intuitive designs to meet a variety of client needs such as: • Value Engineering o ROI vs. Life Cycle Cost o Constructability o Maintainability • Constr uction Management o Project Safety o Quality Assurance and Control o Subcontract Administration and Control o Quality Assurance and Control • Design o Auto CAD • Cost and Scheduling o Primavera Scheduling or Microsoft Project for CPM network schedules o Expedition for document control and change management o Estimating and Budgeting • Procurement o Major equipment, lighting systems o Field Materials Electrical Construction Capabilities Southern Contracting offers depth and experience in multiple capacities such as: variable frequency drives; motor control centers; high, medium and low voltage switch gear; process logic control panels; instrumentation; SCADA; fiber optics; communication and data; UPS systems; lighting; building automation; security systems, CCTV, Access controls, fire alarm; photovoltaic systems; low, medium, high voltage splicing and testing for the fallowing: • Street Lighting Systems • Solar Photovoltaic Installation • Distributed Generation / Co- Generation • Power Generation • Co-Generation Facilities Water Filtration Systems • Site Distribution Systems 5~Page Summary of Qualifications 6-251 ~Eas~orf~/y >~ Ip 1953~~ `~aicacv~ l~9iu~ici,~ai St~+~~t Lighting • Energy Management /Power quality • Transmission • Underground Distribution • Overhead Distribution • Pump Stations • Sewage Treatment Plants • Hydro-Electric • Micro-Turbine Facilities • Desalinization Facilities • Facility Power Lighting • Substations • Military Installations • Lighting Maintenance and Retrofits • Line Clearance /Tree Trimming • Communications /Data (External) • Street Lighting • Traffic Controls • 20 A and 20 B Overhead to Underground Conversions • Conduit and Substructure Construction • Directional Boring • Cable Replacement • Commercial and Residential Service Conversions • Above Grade and Below Grade Substation Site Preparation • Marine Ship to Shore Power Systems Substations From small jobs to large complex projects, Southern Contracting is capable of meeting our clients' specifications and performance goals. 6~Page __ Summary of Qualifications 6-252 .~p61Hg~ ~: ~~ ll'~Il~r~i~cip~l St~~~t Lig~a#~ir~~ 'f~1ea~~~ Re~t~-afit Pra,~iect Section ~ DESIGN-DUILD ORGANIZATION Overview As described above, we are proposing to integrate Mullen into our overall project approach to take advantage of their expertise and familiarity with the project. We also propose to integrate this project with our existing solar photovoltaic design-build team. The project organization is proposed as follows: Project 7~Page Key Personnel 6-253 Organization EN6+~F9i ~` ~ y~ l~a~~a~ci~al St~~~t L.i~~iti~a~ s p~ 9 9~}~ ~+¢ !F i9b7 a~~~l ~~I~ i~/ V~~YL /CAt SeC'~10~1 ~ I~EY PERSONNEL Overview Described below are the key personnel we propose for the Southern Energy Team. Detailed resumes are presented in Appendix C. • James Filanc, Program Manager • Steve Fisher, Project Manager, Chief Estimator • Pat Baker, Safety and Quality • Eric Mueller, Superintendent James Filanc Project (Program) Manager Southern Contracting will be led by Mr. James Filanc. Mr. Filanc has more than 30 year's industry experience as a project manager, cost and schedule engineer, and systems developer. He has designed and implemented complex technology solutions for major international companies, including CF Braun, Brown and Root and Jacobs Engineering. He has managed budgets in excess of $400 million and is well versed in all facets in all areas of professional project management. He is currently responsible as Project Manager on Chula Vista's Solar Design-Build Project. Steve Fisher Project Manager Mr. Filanc will be supported by Mr. Steve Fisher. With over 40 years of electrical and general construction experience, Mr. Fisher will oversee the design, procurement and installation of the induction lighting fixtures. He has been the Project Manager on numerous public works projects street lighting projects, including an on-going streetlight replacement program for SDG&E. Mr. Fisher is also responsible for all street lighting estimates and cost control for Southern and will ably assist with Chula Vista's street light retrofit project. 8~Page Key Personnel 6-254 ~ENfS[f~'y~+. ~r~~aec~~al St~-~et Li~l~tie~~ ~~rat~~ R~tT®fft d®~'a~~~t Pat Baker Safety and Quality Manager Southern will also be supported by Mr. Pat Baker, Southern's Safety Director. Mr. Baker has built a working relationship with the superintendents, foremen, and crews, instilling safe practices and awareness. Over the past 5 years our employees have developed a solid safety mind set, with the company's overall safety record improving every year. In 2007, Southern was recognized as one of the top five safest electrical contractors in the United States. The employees and Safety Director work to hand in hand to make sure that the employees have all the safety equipment and training needed to do the job correctly and safely. Eric Mueller Superintendent As General Superintendent, General Foreman, Journeyman Equipment Operator and Labor Mr. Mueller has over 31 years of direct relevant project experience in the construction of Joint Trench Utilities and street light installation projects. As a General Superintendent Mr. Mueller's responsibilities include: overall project safety compliance; quality control compliance; owner/designer/contractor relations; project coordination and progress meetings; labor and equipment resource planning and allocation; subcontractor scheduling; equipment installation and maintenance; technical and administrative oversight of subcontractors; Joint Trench Utility and Street Light projects. Mr. Mueller has substantial superintendent experience in the field of joint trench utilities construction and street lighting projects. Typical projects that Mr. Mueller has supervised include: Streetlight projects, Overhead to Underground Conversions projects for Utility Companies, Developer Dry Utility Installations for a majority of California Developers. Oversight of public and private streetlight systems, supervision of the installation of Gas Distribution Systems on military and utility properties. The resumes of Southern's team members are shown in Appendix A. 9~Page Key Personnel 6-255 ~E~fSttfq'ym l®~~aaec(op.}>~/'~~ Sg~tr~~+e#,~ Li~if~ti.~~ 'R'lEal SeCtl®11 rJ ~~$ DE'I'AILEI) DESIGN-BIJILD EXPEDIENCE ' 'm4~ Overview Southern has been executing design-build projects for more than 30 years. Starting with Project Housing on Camp Pendleton in 1977, Southern executed the work as a design-build project for power distribution around base housing, electrifying more than 200 housing units. Southern's most relevant design-build experience has been in partnership with Engineering Partners, Inc. (EPI). The following projects were pertormed as design-build, with the * ones performed with EPI. • Otay River Pump Station* • CRA Aqueduct Project* • Substation C • 29 Palms Media Transmission • Ormond Beach • Camp Pendleton LCAC Project • Olivenhain-Hodges Pump Station At the end of this section is a detailed listing of our streetlight experience. Our past performance for the last three years and current experience can be found in Appendix 8. Otay River Pump Station, City of San Diego For this design-build project, completed in July, 2003, Southern furnished labor, materials, equipment and supervision required for the electrical and instrumentation construction work complete for the Otay River Pump Station/South Metro Interceptor Sewage Lift Station CORPS) as described below: • Performed final electrical connections to J. R. Filanc Construction Company (JRF) furnished equipment; i.e. electric pumps/motors, electric operated valves, electric operated sluice gate, pump seal water systems, sump pump systems, hoists, odor control systems, ventilation fans, and air conditioners for the ORPS. • Performed all necessary and incidental electrical and instrumentation work for the ORPS including furnishing; SDG&E main service equipment, main switchboard, _ __ _. _ 10 ~ Page Detailed Design Build Experience 6-256 ~~~~~''~ ~f. 1963~t' /5~i.! iO ~iL ~O ~~~ir {. '~A/CAt automatic transfer switch, motor control center, variable frequency drives, engine- generator system, gas monitoring system, pump/motor vibration & temperature monitoring system, pressure switches, wet-well level instruments, ORPS control system panel, Westinghouse DCS Integration. • Performed the electrical and instrumentation work for the duplex pumping system provided as a Temporary Pump Station (2-25hp) constructed by JRF to bypass the ORPS structure. JRF will furnish; electric pumps/motors and a duplex pumping system controller. THE DIVERSION STRUCTURE • Furnished all labor, materials, equipment and supervision required for the electrical and instrumentation work complete for the Diversion Structure as described below: • Performed final electrical connections to ]RF furnished equipment; i.e. electric operated sluice gates. SCC will perform all necessary and incidental electrical and instrumentation work for the Diversion Structure including furnishing; SDG&E main service equipment, Diversion Structure control system panel, Fiber Optic System to ORPS, Westinghouse DCS Integration. FIBER OPTIC SYSTEM TO GROVE AVENUE PUMP STATION • Furnished all labor, materials, equipment and supervision required for the Fiber Optic System to the Grove Avenue Pump Station. • Coordinated installation of the Fiber Optic System conduit in the pipeline right-of- way during Erreca's pipeline work activity. Erreca's will provide all traffic control labor, equipment and materials for SCC's work activity. Furnish trench excavation, slurry backfill, pull boxes and fiber optic system materials. Erreca's will haul all excess trench excavation spoils made by SCC. 11 ~ Page Detailed Design Build Experience 6-257 ~.~Y6~7kfq FY s^r. ~r lp T963 ~Y ~%acas~" Reference: i'~I~>ni~ipal Str~~~ Ligh~ir~~ P~etr~~'it ~r®,~~~~ HDR Engineering, Inc. AI Binsfieid 9444 Farnham Street, Suite 300 San Diego, CA 92123-1300 Phone (858)712-8400 Fax (858)715-8333 abinsfie@hdrinc.com CRA Aqueduct This design-build project, in partnership with EPi, valued at $9.2 million for Southern, consisted of the following: Removal and disposal of existing nine 230kV and ten 69kV oil circuit breakers with associated power cables, control cables, and breaker appurtenances at ail five pumping plants; furnishing, installing and commissioning of new eight 230kV and four 69kV SF6 gas insulated circuit breakers including station power cables, line connections, equipment anchorage, and design drawings necessary to complete the installation of circuit breakers at all five pumping plants; replacing existing Peddler 34.SkV 1000kVA Substation with a complete new substation including structural steel supports and foundations at Gene Pumping Plant; replacing three hundred (300) instrument transformers for existing 6.9kV switches in pump switching house at all pumping plants; designing and installing of 15 VFDs for head gate motor controls at all five pumping plants; and complete head gate mechanical refurbishing work completed by a subcontractor at all pumping plants. Project also included disposal of total 148,000 gallons of PCB contaminated oil removed from 230kV and 69kV circuit breakers to be demolished. Work was completed in April, 2004. Reference: David Yanez, Metropolitan Water District (951) 992-8539 12(Page Detailed Design Build Experience 6-258 CB control cables, overhead ~``~~NESLf £~~m ~E/;.~T963 Vii' "h'ICAI~ Ormond Beach ,}~®®~rg~~~~i)~a/~~ Street Li~fat6r~r~ PS ~i t9 ®~/t r~®~~Ct Southern design-built this $560K project with design assistance by EPI, providing new 66kV transmission line while replacing old underground feeder in the generating plant. Project scope of work included designing of transmission line; concrete pile driving, concrete foundations, furnishing and installation of structural steel towers, installation of ACSR cable with disconnect switches, cable tray system, and installation of Kerite cables with terminations. Work was completed in March, 2007. Reference: Matt Haskell, Reliant Energy (Owner) (805)207-5985 Olivenhain Hodges Pump Station (Underway) This project, valued at $6.8 million to Southern, consists of a pump station, and 69kV switchyard. The switchyard, executed as a Design-Build Project by Southern Contracting, will tie into the exiting 69kV switchyard owned and operated by SDG&E. • Other key project components installed by Southern Contracting include: • 12kVa Switchgear • Bus Duct • Two (2) 25 mVa transformers • Fire Alarm • Security System • Area Lighting • Balance of plant electrical components Reference: 13 ~ Page Detailed Design Build Experience 6-259 l~l~rr~i~ipa! Street Li~latir~g '~';~~`~' Retrafit Pr+Dje~t Unique Challenge Met The key challenge with this project has been excavating a deep pit where the pump station will be housed below the bottom of the lake, allowing for pump station to efficiently draw water as required. A temporary coffer dam was built to allow construction and blasting to proceed, and allow for underground tunneling to be performed tying into the outfall structure erected in the middle of the lake. Streetlight Experience Below is a listing Southern's extensive streetlight experience: PROJECT REFERENCES: Southern Contracting Company LIGHTING 559 N. Twin Oaks Valley Rd San Marcos, CA 92069 (760) 744-0760 Phone (760) 744-6475 Contract: 6360011474 Project Title: Master Service Agreement Job I.D. # N/A Year Completed On-Going Location: San Diego, CA Contract Price: 2,054,003.00 Owner: San Diego Gas & Electric Point of Contact: Kim Taylor (858) 654-8619 8315 Century Park Ct. San Diego, CA 92123 Contract: N/A Project Title: Conduit Dry Utilities, St. Light Studio 15 Job I.D. # 95822 Year Completed: 2008 Location: San Diego, CA Contract Price: 124,735.00 Owner: Studio Housing Partners, LP Point of Contact: Allgire General Constructors, Inc. David Whitehead (760) 477-8455 3278 Grey Hawk Court Carlsbad, CA 92008 14~Page Detailed Design Build Experience 6-260 ~.~~~Fey ~~ ~ 1~. 79b3~'' ~R1CAl~ Contract: Project Title: Job I.D. # Year Completed: Location: Contract Price: Owner: Point of Contact: Contract: Project Title: Job I.D. # Year Completed: Location: Contract Price: Owner: Point of Contact: 1~9t~nicipal Stre~~ Li~3~tir~~ l°z~'Yrtlfl~ ~r®,~~L~' TOVR-13 Dry Utilities, Street Lights, So. Twin Oaks Valley Rd. 95192 2007 San Marcos, CA 772,278.00 San Elijo Hills Construction Company Leon Hayden (760)918-8200 1903 Wright Place, Ste. 220 Carlsbad, CA 92008 N/A Whispering Hills Tr. #15571, Dry Utilities, St. Lights 94962, 3 & 94692 2007 San Juan Capistrano, CA 1,296,000.00 Whispering Hills LLC (949) Dennis Gage 19700 Fairchild Road, Ste. 833-1100 120, Irvine CA 92612 Contract: 105041 Project Title: San Elijo Hills Phase 3 & 5, Dry Utilities, Street Lights Job I.D. # 94652, 3, 5 Year Completed: 2006 Location: San Marcos, CA Contrail Price: 2,182,861.00 Owner: San Elijo Hills Construction Company (760) 918-8200 Point of Contact: Leon Hayden 1903 Wright Place, Ste. 220, Carlsbad CA 92008 Contract: EHCC No. 2522 Projeil Title: Balifield Lighting and Power Upgrade Job I.D. # 94281 Year Completed: 2006 Location: San Diego Contract Price: $1,218,243.00 Owner: Grossmant Union High School District Point of Contact: Erickson Hali Construction Mindi Chent (619) 461-1322 Contract # N/A Project Title: Escala-Mission City North, Dry Utilities, Street Lights Job I.D. # 92722 Year Completed: 2005 Location: San Diego, CA Contrail Price: $584,329.25 Owner: Horton/Continental Residential, Inc., Tony Occhino (760) 931-1980 Point of Contact: J.T. Kruer, Chuck Knight (858) 756-7320 18754 Aliso Canyon Rd, Rancho Santa Fe, CA 92067 15 ~ Page Commercial Proposal 6-261 -EN6INEE,~~ ~' gr. t'f~t9fi3 i' !°'•YICAI~ Contract # Project Title: Job I.D. # Year Completed Location: Contract Price: owner: Point of Contact Contract # Project Title: Job I.D. # Year Completed: Location: Contract Price: Owner: Point of Contact: Contract: Project Title: Job I.D. # Location: Contract Price: Owner: Point of Contact: Contract # Project Title: Job I.D. # Location Contract Price: Owner: Point of Contact: Contract # Project Title: Job I.D. # Location: Contract Price: Owner: Point of Contact Contract # Project Title: Job I.D. # Location: Contract Price: Owner: 16~Page !/''~~~icdi~j.~/'9~ St~e~t d.~~/a~i~~ 50292831-OL Terracing, Spruce Canyon Outdoor Lighting 92503 2004 San Diego $50,000.00 Greystone Homes Matthew Howe (760) 804-7700 N/A Repair, Replace, Install New Street Lights 92443,92453 2003 Oceanside, Various Locations $11,106.00 City of Oceanside Steve Elliott (760) 435-5067 008081 Torrey Pines 9A, Vista Sorrento Parkway 90793 San Diego $8,600 Westbrook Torrey Hills, LP Erreca's, Attn: Max Frazier (619) 390-6400 N/A Repair Ball Field 90631 Oceanside $7,239.95 City of Oceanside Alan McNeil (760) Lights 435-4500 N/A San Diego Spectrum Outdoor Lights 90161 San Diego $275,000.00 LNR Kearny Mesa, Inc. J.T. Kruer & Assoc., Attn: Rod Chilcote 100023 San Elijo 89733 San Marcos $350,000.00 San Elijo Hills Town Center Lighting (858)756-7320 Hills Development Co. Commercial Proposal 6-262 `~~ Eqy~ ,. !p T96J ~~ /CaIV~ $~C$1flI1 6 ~I~~i~si~a/'.i~ S~~e2t Li~i3ti~~ ~i~~~~1 ~~ r~+~~~~t Design-Build Fee Structure Firm, Fixed Price Southern is proposing to perform and complete the installation of 4,600 street light fixtures project for a firm, fixed price of $$2,082,571.00. This includes all scope items defined in Chula Vista's Request For Proposal and is broken down as follows: Item Price to Chula Vista Base Firm Fixed Quotation $2,082,571.00 Less: SDG&E Product Incentive Rebate -$43,108.00 Adjusted Cost to Chula Vista $2,039,463.00 Should the number of street light fixtures deviate from this 4,600 fixtures, the above price will be adjusted up or down by $452.73 per fixture. Fixture Recycle Opportunity Southern has recycled lighting fixtures to Mexico, obtaining a credit offset for the benefit of our past clients. Below is an approximation of the value of this benefit Chula Vista may enjoy should we be able to obtain a similar credit. Dispose of Light Fixtures to Mexico Credit for Hazardous Disposal -$5,000.00 PRojected Credit For Re-Sale to Mexico -$46,000.00 Adjusted Net Cost to Chula Vista $1,988,463.00 This recycle credit is approximate and for comparison purposes only. We will pass along the net savings to Chula Vista once we Chula Vista approves of our proposed Mexico recycling plan and we have found a suitable buyer. Financial Strength and Insurability Please find in Appendix C a copy of a Surety Bondability Letter from Travelers. This is strong indication of the fnancial strength and health of Southern Contracting, Inc. A copy of the insurance binder with the specified amounts is also included in Appendix C. We will provide a full set of reviewed financial statements upon request. 17 ~ Page Commercial Proposal 6-263 E~6LYf ~~°~~ >~~~®~,~~~1 St~~~~ Li~9~ti>r~~ `f~Ta~ca~ ]~~~'PL~~It PI'IU,~~C$ L~pper~dices o App~~a~iX A -Resumes of Ivey Personnel o App~I1S~1X D -- Past Performance Last Three Years and On-Going L'Jork o AppentliX C -Financial Attachment -Financial Statements, Surety Bondabiiity Letter and Insurance Certificate o Appendix D -ProductBrochures 18 ~ Page Appendix 6-264 ~,N61NFew 6T: tic ._ ~. *"[ ~1~963' -i' !f'h'7Cil14~~~ !~~~y~ig~T/i~,/~J.~~i]gSt~°~~re¢t Li~~tir~~ ~~~f i.09 iZ ri ®~~~r` ~~lj3i'13L~~X ~ ~esu~es ®~ fey Pers®r~nel • lames Filanc, Project (Program) Manager • Steve Fisher, Project Manager, Chief Estimator • Pat Baker, Safety and Quality • John Wheeler, Superintendent 19~Page Appendix 6-265 EY611If ~`~~ '~° l~~~i~i,~a~! St~e~t Ligl~tir~g a %;~t~' Ret~~fit Pra,~~~t RESUME FOR KEY PERSONNEL E~t6lNr Name: JAMES FILANC ax ,`. f4W ~. Position: Project Manager ~2atvv~' Education & Training BS, Finance, San Diego State University Masters Studies, CSU, Long Beach Technical Writing, University of California Los Angeles LEED Course Preparation, AGC, San Diego Mr. Filanc has over 32 years of relevant in the energy, technology and healthcare industries. He has managed budgets in excess of $400 million, and been responsible for the development of complex, technical projects for Fluor Daniels, Brown & Root, and Jacobs Engineering. He is also Southern's Proiect Manager on the Chula Vista Solar Photovoltaic Design-Build Proiect For Southern Contracting, Mr. Filanc is responsible for the energy efficiency and renewable energy market project opportunities. He has overseen the development of energy efficiency retrofit projects, commercial solar photovoltaic projects and wind farm control cabling projects. Mr. Filanc currently holds the following positions: • State of California Workforce Education and Training Taskforce, Web portal Design, Chaired by the CPUC; • National Electrical Contractors Association Green Technology Task Force, national task force to promote best energy efficiency contracting practices across the United States; • Lawrence Berkeley National Laboratories Automated Demand Response Technical Advisory Group member. Assist LBNL implement demand response technology underwritten by California Energy Commission and USDOE for Waste Water and Food Processing industries; • CALCTP Steering Committee -oversight of workforce development training program to develop green collar jobs around lighting automation technology. Supported by UC Davis, SCE, SDG&E, CPUC, CEC, and PG&E.; 20~Page APPendix 6-266 aEpStYFpgi `~ ~ ~ Nit~~~~i~~~ St~-e~t Li~O~t~n~ 3: F~ltat • San Diego State University, Construction Management Advisory Committee to the school of JR Filanc School of Engineering and Construction Management. Providing green practices advice and curriculum development. Delegate, Washington International Renewable Energy Conference. Held every two years, this international event brings together the leading thinkers, polity makers and technologist from around the globe to promote and develop renewable energy policy and technology implementation. Past sessions held in Berlin, Germany, and Beijing, China His prior experience includes: • Project Controls Manager, Mina Abdullah Refinery Expansion, Brown & Root, Kuwait. 1985-1987. Responsible for the home office cost and schedule team, managing a $167 million home office budget supporting Middle East field construction activities. • Marketing Services Manager, Brown & Root, Western Region. 1987-1993. Responsible developing new business, organizing project teams, establishing project management plans, and setting up project controls systems for oil and gas projects in Saudi Arabia, Venezuela, Texas, and Alaska. • Marketing Services Manager, Jacobs Engineering, Western US. 1993-1997. Responsible for supporting business development activity in the energy, semiconductor, mining, petrochemical, and pharmaceutical industries. Organized project teams, developed project management plans and contracting strategies. • Vice President, Business Development, Brindersan. 1997-2000. Responsible for overall business development of refinery, oil and gas, and commercial fueling station work. Implemented project controls tools /systems company-wide. • President, Care Path Informatics, 2000-2007. Built a healthcare software company in partnership with physicians and nurses to automate the patient charting process in emergency rooms. • Director, Business Development and Government Affairs, Southern Contracting Company, (2006-present). Market leader for Green Technology implementation strategies. 21~Page APPendix 6-267 ~3'E~iiT.ffg,~6'. J~~~i~i~~1 Str~~t Li~lati~~ `~rcA~c~~' Retrofit P1'o,~~~t RESUME FOR KEY PERSONNEL ~Ex~F~q@ Name: Steve Fisher r 1943 ~ICAI Position: Project Manager, Director of Electrical Operations Education & Training US San Diego College of Extended Studies, Construction Management, Construction Supervision San Diego State University, Business Management, History Construction Claims Management National Electrical Contractors Association (NECA), Sales Methods and Project Management U.S. Marine Corps Reserve Mr. Fisher has over 30 years of direct relevant project experience in the design and construction of street lighting systems, electrical power distribution systems, data/communication systems and process control and instrumentation monitoring systems. As Director of Utility Operations Mr. Fisher's responsibilities include: Business operations management, project management, field crew supervision, estimating, sales, new business development, customer relations, contract administration, bid and change order negotiations, materials and equipment purchasing and allocation, scheduling and coordination. Mr. Fisher works directly with the utility companies, as well as developer far installation of joint trench backbone, industrial and residential systems to utility company specifications. He has significant experience with traffic signal, street and highway lighting systems. He is also experienced with Federal (U.S. Navy), state and local government contracts. His most relevant and recent project management experience includes: • Master Services Agreement, Streetlight Replacement and Maintenance Program. San Diego Gas and Electric. Various sites throughout San Diego County. Year completed: On-going. ConVact Value: $2,054,003.00 • Paradise Village PH-1, General Design and Construction for PVHR, LLC. National City, CA. $275,000. Completed 2008. • Streetlight Studio 15 and Conduit Dry Utilities, Studio Housing Partners, LP., San Diego, CA. $124,0000. Completed 2008. • San Elijo Trenching and Conduit Project, San Diego Gas and Electric. $726,000. Completed 2008. • Dry Utilities and Street Lighting Project. San Elijo Hills Construction Company. Phase I and II. $2.9 MM. Completed 2007. • Whispering Hills Dry Utilities. Whispering Hills LLC. $1,296,000. Completed 2007. • Chollas Substation UG Trench and Conduit for 69 kVa Substation. SDG&E. $644,000. Completed 2005. • Escala Mission City North Dry Utilities and Street Lights.. Horton Residential, Inc. $584,000. Completed 2004. 22 ~ Pa9e APPendix 6-268 . 1~9~#~~~!~$®pp.~/~~ Stye^~y.~ Li~~s#~,i~r,~ !F_1953~'~' ~~irVIr ~9L Tr®J~LI. "A/Gpl RESUME FOR KEY PERSONNEL ~s~x~a c~~4. 'ym Name: Pat Baker ' ~CAt~ Position: Safety and Quality Director Education & Training: OSHA 500 & 502, EM 385-1-1 Certification, NFP 70E, NUCA Excavation Safety & Competent person training, SWPP Basic training, SWPP Management Training, Hazardous Materials Management Certification. Forklift Train the Trainer Certification, Flagger Train The trainer Certification. First Aid & CPR, NFPE Electrical Safety in the Workplace Seminar, NFPE Developing an Electrical Safety Program Seminar, Fleet Safety (Fleet Management) Certification As Southern's Safety Director for southern contracting Pat has built a working relationship with the Superintendents, Foremen, Crews, the employees know what their responsibilities are as far as safety and they know what the ramifications are if they do not follow the safety program. Over the past 5 years our employees have developed a good solid safety mind set. The employees and Safety Director work to hand in hand to make sure that the employees have all the safety equipment and training they need to do the job correctly and safely. The Safety Director has overseen the safety of Southern's employees for Water Treatment Plants, Sewer Treatment Plants, Water Pumping Plants, Overhead to Underground Conversion Projects. Wildfire Restoration Projects, Private Development projects and more. Pat is also responsible for keeping Southern Contracting up to date on regulatory changes, new training programs, tools, and best practices, as well as Quality Control and Assurance. Southem Contracting Experience • 2009 - RP-1 Asset Management Items and Digester No. 6&7 Repair, Riverside, CA • 2008 -Temecula TVRWRF MCC-11A Replacement, Temecula, CA • 2008 -University of California Irvine Electrical Step 3 Main Campus, Irvine, CA • 2008 - JB Latham Treatment Plant Sodium Hypochlorfite Upgrade, Orange, CA • 2008 - RP-4 Regional Plant No. 4 Expansion to 14 MGD, San Bernardino, CA • 2008 -San Clemente Aeration Sys Replacement, San Clemente, CA 23 ~ Page /Appendix 6-269 ~~~~~Ci~ `~ ~:W~° l~ca~i~ipaa Str~~~ ~i~~tir~~ ~`~a;~at~~i Retrd~fif P,~®~ect • 2008 -Michelson WRP 2005 Phase 1 Upgrades, Orange, CA • 2008 -Perris VRWRF Tertiary Expansion 2005, Perris, CA • 2008 -Mid Valley Water Reclamation Plant Phase No. 4, Coachella, CA • 2008 -Paradise Village PH1, National City, CA • 2008 -San Elijo Hills Area "T" Phase 4, San Marcos, CA • 2008 -Conduit Dry Utilities, Street Light Studio 5, San Diego, CA • 2008 -San Elijo Ave 20A Trenching and Conduit Job, Encinitas, CA 24jPage Appendix 6-270 ~'~EH67.FE~'~¢~. iy~~9~~i~i~}mil Str~~t Li~ht9~~ ~~/C~LVAri~ I'i ~. t~~ ~~ i ~r~~'~. ~t RESUME FOR ERIC MUELLER s~xrF~ Name: Eric Mueller ,r9~19G3 G `'~PICAI~ Position: Superintendent Education & Training Journeyman Equipment Operator Local Union 12 -OSHA Confined Space Entry-Competent Person; OSHA Trench Excavation and Shoring-Competent Person; OSHA CPR and First-Aid Certification for Construction, Traffic Control Certification. His most relevant and recent project management experience includes: • Master Services Agreement, Streetlight Replacement and Maintenance Program. San Diego Gas and Electric. Various sites throughout San Diego County. Year completed: On-going. Contract Value: $2,054,003.00 • Paradise Village PH-1, General Design and Construction for PVHR, LLC. National City, CA. $275,000. Completed 2008. • Streetlight Studio 15 and Conduit Dry Utilities, Studio Housing Partners, LP., San Diego, CA. $124,0000. Completed 2008. • San Elijo Trenching and Conduit Project, San Diego Gas and Electric. $726,000. Completed 2008. • Dry Utilities and Street Lighting Project. San Elijo Hills Construction Company. Phase I and II. $2.9 MM. Completed 2007. Whispering Hills Dry Utilities. Whispering Hills LLC. $1,296,000. Completed 2007. • Chollas Substation UG Trench and Conduit for 69 kVa Substation. SDG&E. $644,000. Completed 2005. • Escala Mission City North Dry Utilities and Street Lights:. Horton Residential, Inc. $584,000. Completed 2004. 25jPage Appendix 6-271 c~"E~ESr.~fA''% . yg~}~~~c~~¢.a~ St~e}+a~S~ Le~~t~r~~ ~"~, 1963 '~' /°C ~i $~lr~~~L f~1~®~~ir {. App~d~(~IX B ~as~ Pe~°f®r~n~nc~ Last ~~re~ Years and On®~oin~ W®rk PROJECT REFERENCES: ~authem ~°antractiny E'arrrpanp 559 N. Twin Oaks Valley Rd, San Marcos, CA 92069 Ph(760)744-0760 Fax(760)744-6475 Major Projectr Completed in Last Three Years Project Title: Miramar Energy Facility MEF-II Job I.D. # 96661 Location: San Diego, CA Contract Price: $1,484,123 Year Completed:2009 Engineer: Wellhead Owner: San Diego Gas & Electric 6875 Consolidated Way San Diego, CA 92121 General Contractor: TTSC Construction Corporation Rudge Wynn (916) 240-8432 255 South Guild Avenue, Ste. C Lodi, CA 95240 Project Title: Chevy Chase 968 Reservoir Job I.D.# 95921 Location: Glendale, CA Contract Price: $526,1 23 Year Completed:2009 Engineer: Kennedy/Jerks Consultants Owner: City of Glendale / Glendale Water & Power Gary Roepke (805) 890-9500 141 North Glendale Ave. Glendale, CA 91206 General Contractor: SEMA Construction, Inc. Tim Sarre (949] 470-0500 6 Orchard, Ste 150 Lake Forest, CA 92630 26JPage Appendix 6-272 ~~'~Kr~r. f~'~o lF 19G3''v ~AICAC~~ 1~l~r~i~i~~~ Sf~~~~ Li~~~i~~ R~~r~~~~ Project Project Title: H.J. Mills WTP Ozone 3&4 Job I.D. # 95571 Location: Riverside, CA Contract Price: $1,451 ,182 Year Completed:2009 Engineer: Metropolitan Water District of Southern California Owner: Metropolitan Water District of Southern California Louis Francuz (951) 776-2715 700 North Alameda Street Los Angeles, CA 90012 Genera] Contractor: C.W. Roen Construction Company Jonathon HIiora (925) 837-5501 40 Oak Court Danville, CA 94526 Project Title: Mesquite Regional Landfill Water Distribution System Job I.D. # 95531 Location: Brawley, CA Contract Price: $608,0 66 Year Completed:2009 Engineer: County Sanitation District No. 2 of Los Angeles Owner: County Sanitation Dish'ict No. 2 of Los Angeles Stephen R Maguin 1955 Workman Mill Road Whittier, CA 90601 General Contractor: Mingus Construction, (928) 6349556 917 Main Street Clarkdale, AZ 86324 Project Title: IEUA - RP-1 ASSET Management Items and Digester Nos 6&7 Job I.D. # 95511 Location: Ontario, CA Contract Price: $752,348 Year Completed:2009 Engineer: MWH Americas, Inc. Owner: Inland Empire Utility Agency (909)993-1600 6075 Kimball Ave., Bidg B Chino, CA 91101 General Contractor: Denboer Engineering and Construction, Inc. Alex Gazibay (760) 327-1949 4575 East Camino Parocela Palm Springs, CA 92264 27jPage Appendix 6-273 ~,asisF~y ~' s:st ~m e~~T9W i.. "~/1CSt~~ l~®®~~ai~i)p~! S~r~/~~¢t Ligl~~i,n~ ~G~l~~~lL ~L~~~~i.iL Project Title: Phase 1 -Michelson Water Reclamation Plant 2005 Upgrades Job I.D.# 94951 Location: Irvine, CA Contract Price: $878,510 Year Completed:2009 Engineer: Owner: General Contrzctor: CH2MHILL Irvine Ranch Water District FofiCharnaw (949)453-0228 15600 San Canyon Ave. Irvine, CA 92618 Gateway Pacific Constructors Gary Bechtel 8055 Freeport Blvd. Sacramento, CA 95832 Project Title: JB Latham Treatment Plant Sodium Hypochlorite Upgrade Job I.D.# 95241 Location: Dana Point, CA Contract Price: $262,8 25.00 Year Completed:2008 Engineer: Lee & Ro, Inc Owner: South Orange County Wastewater Authority Brian Peck (949] 234-5421 34156 Del Obispo Street Dana Point, CA 92629 General Contractor: SS Mechanical Corporation Myra Porter (714) 847-1317 17631 Metzler Lane Huntington Beach, CA 92647 Project Title: Loma Alta Creek Job I.D. # 95611 Location: Oceanside, CA Contract Price: $395,5 16.00 Year Completed:2008 Engineer: Carollo Engineers Owner: City of Oceanside GussPennell(80S)505-1020 300 North Coast Highway Oceanside, CA 92054 General Contractor: Orion Construction Heidi Andrews (760) 597-9660 1232 Keystone Way Vista, CA 92801 28JPage Appendix 6-274 `~,'A61NifH ,- ~f i9aa ~~t~~ ~~,~i~ip~i S~~°~et Li~~tir~~ R~'tP'ta,i'i# P1'+~j~Ct Project Title: Encino Water Pollution Control Facility Phase V Expansion Job I.D. # 94981 Location: Carlsbad, CA Contract Price: $9,585 ,955.00 Year Completed:2008 Engineer: Black & Veatch Owner: EncinaWastewaterAuthority 6200 Avenida Encinas Cazisbad, CA General Contractor: JR Filanc Construction Company Arnold Wingler (760) 941-7130 740 North Andreasen Drive Escondido, CA 92029 Project Title: Mid Valley Water Reclamation Plant Phase No. 4 Job I.D. # 94361 Location: Thermal, CA Contract Price: $2,260 ,560.00 Year Completed:2008 Engineer: Lee and Ro, Inc. Owner: Coachella Valley Water District Royce Jones (760) 398-2651 Ext 2432 BS-995 Avenue 52 Coachella, CA 92236 General Contractor: CW Roen Construction Company Steven R Rosenblum (925) 837-5501 Ext 110 40 Oak Court Danville, CA 94526 Project Title: RP-4 Expansion tol4MGD Job [.D. # 94231 Location: Rancho Cucamonga, CA ContradPrice: $4,059,991.00 Year Completed:2008 Engineer: Black & Veatch Owner: Inland Empire Utilities Agency Mike McFarland (909) 993-1628 6075 Kimball Avenue, Bldg B China, CA 91710 General Contractor: Tasisei -T&K Joint Venture Edmond Sayegh 25500 Hawthorne Blvd., Ste. 1000 Torrance, CA 90505 29~Page Appendix 6-275 ~,xs~xefq - ~` esr. ~e~rc~ l~lu~ag~i;~~! Sheet L~~,~t~~g Project Title: 66Kv Cable Replacement at Ormond Beach Generating Station Job [.D, # 95001 Location: Ventura, CA Contract Price: $560,7 42.00 Year Completed:2007 Engineer: Engineering Partners, Inc. Owner: Reliant Energy Ormond Beach Matt Haskell (805) 207-5985 1000 Main Street Houston, TX 77002 Project Title: North Twin Oaks Pump Station Job I.D. # 94381 Location: San Mazcos, CA Contract Price: $251,0 00.00 Year Completed:2007 Engineer: MoraesPham&Associates Owner: Vallecitos Water District General Contractor: (760)744-0460 201 Vallecitos De Oro San Marcos, CA 92069 TC Construction Ca. Maria Pasaba (619)448-4560 10540 Prospect Ave Santee, CA 92071 Project Title: 450-1 Recycled Water Reservoir & 680-1 Recycled Water Pump Station Job I.D. # 94371 Location: Chula Vista, CA Contract Price: $1,000,000.00 Year Completed:2007 Engineer: MWH Owner: Otay Water District (619)670-2222 2554 Sweetwater Springs Road Spring Valley, CA 91978 General Contractor: TC Construction Co. Maria Pasaha (619)448-4560 10540 Prospect Ave Santee, CA 92071 30 ~ Page Appendix 6-276 ~ENSiNL~ -f ,~~ .: l~~r~icip~i St~~~t Li~1~~i~~ P~etrafit Pra~ie~t Project Title: Transmission Media Upgrade, 29 Palms MCAGCC Task Order #37 ]ob I.D. # 94561 Location: 29 Palms, CA Contract Price: $1,095 ,000.00 Year Completed:2006 Engineer: Engineering Parhters, Inc. Owner. Southwest Div. NVAFACENGCOM 29, Palms ROICC/OPD2 P.O. Box 6013 Bldg 1138T1 Twentynine Palms, CA 92278-6C13 General Contractor: West Coast Air David Dudley (619) 561-8000 12365 Mapleview Street Lakeside, CA 92040 Project Title: March Air Force Base Recycled Water Facility Upgrade Phase 1 Job I.D. # 93641 Location: Perris, CA Contract Price: 1,099,450 Year Completed:2006 Engineer: Kriegar & Stewart, Inc. Owner: Western Municipal Water District John Dahlke,(951]789-5000 450 Alessandro Blvd. Riverside, CA 92508 Genera] Contractor: Pascal & Ludwig Constructors Jeff Brooks Ph (909) 706-7686 2049 East Francis Street Ontario, CA 91761 Project Title: Temecula WRF Expansion Job I.D. # 93681 Location: Temecula, CA Contract Price: 1,830,000.00 Year Completed:2006 Engineer: Corolla Owner: Eastern Municipal Water District Bruce Mitzel, (951) 928-3777 2270 Trumble Road Perris, CA 92572 General Contractor: ARB, Inc Bob Zaiser Ph (949) 454-7120 26000 Commercentre Drive Lake Forest, CA 92630 Ph (949) 454-7120 31 ~ Page Appendix 6-277 r~~61NF ~'~`~ ~~r~i~f~a,~ St~~iet Lighti~ag ~ICAL On-Going Work Southern Contracting Company Current Work In Progress Contract Est Cost Cost Completion Value At Completion to Date Date Olivenhain-Hodges $ 6,896,240 $ 6,560,000 $ 3,409,575 June 2010 Palmdale WRP Stage V $ 16,200,000 $ 15,390,000 $ 915,187 August 2011 Lancaster Liquid $ 1,075,174 $ 1,010,000 $ 50,455 December 2009 Miramar Water Tx Plant $ 2,606,000 $ 2,475,000 $ 98,497 December 2010 Encina Waste Water $ 9,633,213 $ 9,633,213 $ 6,054,816 June 2009 UCI-OilSwitches $ 169,500 $ 160,000 $ 103,200 February 2009 HJ Mills WTP $ 1,301,639 $ 1,235,000 $ 836,881 October 2009 San Vicente Res $ 159,000 $ 130,000 $ 78,958 October 2009 Chevy Chase Reservoir $ 504,598 $ 480,000 $ 9,739 February2010 Rolando #2 $ 350,000 $ 275,000 $ 205,158 June 2009 La Jolla Blvd $ 376,319 $ 280,000 $ 261,677 June 2009 $ 39,271,683 $ 37,628,213 $ 12,024,144 ._.. 32 ~ Page Appendix s-2~a ~~~i~iP~/ 5~~~~t Li~~i~i~~ 'f~~AZ~S` Retro~'it P~®~~~t Appendix C Financial Attachments o Sa~rety ~®ndability Letter o Insa~rance Binder 33 ~ Page APPeodix 6-279 .~+vY6iNFr~.. ET-' Hm ~p T9bJ '~' ~~~icila~! Strut Lir~l~ti~g fRe~P~i'®t Pi't~~~~t Surety Bondability Letter (two pages) TRAVELERS January [4, .D10 Ciro dfChuYa Yista 2?b Fourth Avenue, Bld_t ?770 Chula V ot:t, CA 919 t D Travefers Casualtyand Surety Company of America 9325 Sky Fark Ct #220 San Diego, GA92t23 Fax: (866) 728-8987 RE: Surety Bvbdabihty LetR-r-Southern Cantrzeting C'o+npany To Nhom It btay foncem, 14"r undcrsmml that $outhem Conlracung Company is iit the prv+tt5s of Pic•gnatifyina far a construction pnijezt(:) fur theCity of Chula V Isla- As Part i)1 t tis pm+.ess you have requested that Somhrtn Cmitractin_sCompnny provide evidence at their hn:mcial i:.~pabil"th t7 obtain and maintain the necessary bonds to cover rts construction pro;was. Tmveters Casualty and Surz[v Company cf America has had the plrasureof hm[dhng 5anthem Coniracting Compam's bonding regniremeais since 1491. Tavelers Casualty and Surety Company of Amenca enjoys an "A+^ rating by .A.M. 6zst. and appmr> ail the Tmasury Ltst" as _..>_t _Ge.++....t,. rMrnt rinvennnent and then arc eonsidcicd :m `Admitted buret;"approved by We have Iwnelett several prajecu for Snuttierh Contracting C,nupany with the fargesi bingin excess of 520,000,000. 1Ve piivide South2tb witlr an ;p_Yrem,ale bvudin~ facihh aFS50;000,000. These projects have all been sgccessfully cothplated and lfd nut represent the ceilingthat was avsiWblu for This cumpnn}. buE rather the larcest ihatwv ltave>u far beeri requested to provide. Our investigatiob of dtis firm clearly iadicatcs a company [honmghiy versed in thz cnnstfvetivn industry with. a Meat depth of evpzriencrd pzvple vv4to fiuvz becmne kttown fur theif abiGnlo complete jvhs vq schedule anit within burLet. W'e assure you that bascvl upon our nvrmal:cunditions piing prevalent, a'e can Foresee no diFTiculty ip fulfilling requests by your organization ro caecutu faahfid pufimnanre and labor. mid material bands, us requ'ucd by the terms of any mntruct awarded to them in The prieermtge ou[hned ub4~c. You undcKStand, of couse;ahar any arruiuem=nt fnr tkie final barrct or ponds is a matter lxnveen [he Contractor and ourscCves and we assunee n> liability to third paniei or tv you if for any reason we dv nut eseoutc am required bonds. Thrs Izuer ~s nu[ an assumption of labildg oar is p a btd. petformance; or pm'mentlwnd. This letter is issued only asa banding reference requested from us' by vw client. Phase do nut heshate [o ednlad meat 761k733--'_610 n~ith any gnesti~ns or fur farther input Sincerek', Travelers Caswlry and Surety Campanv i?fAmrrica ~~~. 4latthzvv C. Gaynor Attomzv-irt-Fact X 6-280 c7ENE5CEf~'yG+ 1"~v~t~c~~al S~~eet Li~6~ti~~ `F~,~~~5~' it~trafi~' Project This Pnwx of 3rz LAIC -n am uvmlt•rami Fy e~ uurhvriry afftm RNiaaap raglunum tldvpva! tlg the &mJSCh OJeKRam aP F'arnugmun C.nualry CumFmnp, H411tq aixl (ivuamy Iralmamo CMnpm-~.; FJv-'ri. uad G+urnl. Immaae. tjoJaxalircn,hw'., it. Paul fire :wd ttarira 0~ runt CnmP 4r. Pvn C.imNem Wccm v Ci.mP:ur.. Se psul tlen:ury [rawan.e Canrywi. Tvvrlers Csualrv niNSme{y fompmy,'Fnvcfers Ci+wfp +M S rc:y L'nmpu+- -.:-drreris, arvl'UnuedScuc:• FiJeueF amFtiumm~t} Cmi4wrv;, wNah nsaWUimn:rrvn,a :n tug k!i:v aw.lfe.l rrwlim; as Y+Ifaa~. RF..Q)LY`El). {hht the Clnirnun..M1:. Pti.::Jaul. ar._; lLc C'hmmi.vt: any L ~m+ue Yirz P:nAltnr. xti Sc+i~u vwv Pre•t.1-w: un~i 4'wr Yre+l?tpm. vn3 S ivM:Y'icc Pna:r4Yx. ehe Teen`vrrn anY ,iwilinnl7mewerAg Cngx m 5euciury..x my ,Lry:ml 5ercyu ma+ agp~ivi uta m v tpeYn d Y:una pr d:;t kx 01d as NN...vdt of the Cnnymnv aruF m.n 1vx 5i~k appno:r. xuch audu d, x (ii.::;r tv .Ce:fnmc or vuilm tt aa. prcu'n!n k> acv a'iilt me C m Pmy a name amt +..J snh!he Cumprvrv'i><Ih:nlx,•ucny':;,rnc,annrzax~,af'inJCn yti~,.:m!anax+ardnc ~lF)u^nanv'io'de aatur`. r~l rt-wdY ,husaewt. trc:xvnmec nu.Smnimy. m'al Jn).. efuJAtrieus arc C+r yiwdof Oircin on-u..~nra re.rv~a<.n}ava~Jt app!m{r:aio-t ern lw:he pr:aar;ti:ra hnn xav:.m.la:,. fl'ATWFR R};5nl,l'F.D: {trot rt.• Cfumm~n-ihc Ptisialenr am \9.:e Chavm+n ::aY ~+a~uira vx'c PianideaL M) kvec Yir. Vraudem .V'mTV&' Pnskhnt ma; S!C~ Ie.JI m :m p n ef>a. ioi+vpe ap arJa nrv:n ni:e nr mrt: nrFcna Ix empke en n[ N{ (. n p: nr: pnnimw :hul uwa.:;w:h Jeh`~rum uln+aitnrr and na:Pp Ihen+f i+ti4+tin to rneu iiYrM tisxrs~. +ialito FllRTIIER RE1gLtlEU, tmu aae. F.iM-mrvr5nu': ec:rwm_xr.•i r+t a ,ha:thvWhl::nJFmJw-.uFnm JA'Ca•mplma vlaµfa'++gm~.lu. eha pi:i~h W. my4ryi;CTUnimm~ vm-Y-v+i[WiuvV N•.:Je)J. +nY ~n[M\tPavvm nor})`ic. P nkn[ ly' Sa I l c Fi<a3alea( fFa Tn1 ueC.9n { L nt Trca4lRt Iht C ap:ratt Sa tutu Ylt i ?I LMI luAltlrt toJJaIJ LIe+tM auJ 'rEd rc'I(h.:h¢ Cnmp .~.J A a G. n.wrv u ~\...nm Sccrelan', rx br dmv exauteJ V dee ,cal. if rryu ! F, ,n er ti:Jn •Nr lm arvi•xt and A;'eMPuniiam m uv prer pnvnhe.l m lim ,x W. mrtla•-:n: a m+ar cenilesles aF slnhrvuy ur bT me n mm:. Gimp m} u1Mxrv P!vwmf +n a un14T tlclmi;lhnn Al auJa nlq; u:ei Sr In Fl"RTF1kR RE5l)L\'4D..mW fiz: aynvmn rsaNi!+f lh mtbwiny vfl.~ Fn.L~.v-umF w uviu Rc i!n 'v tinHar Y•e rradem.:uiY. Ync PnsiJ.ml. Wlv ;1asWm Y';tn Pra 'wont: aay $CCrmwi, um A.axymm S, n nnJ F.e u:.l of :he C:!ml n; maa Fe aii'i .d h. lir.icu4 iv art. Power ut.MUme. ra u am urv. zratuaW mlatinq tlnerT aF'p`)imii:e R.vJmtt Y:cc Presakm_ Rvvair;m:C x. G s Sacrcrrzw~ x An rn yw n-YaZ Ye pupneavufy al ittueinpanJ an acng Mwd. m r ala. r Lir:y ml :M: wneiirES rlFl+naxr: in Ihv nmum dn:m!f, vnl m- ucA P.w.m vi N me m ccrnfn r Farm} fucA BAUm W 1 vaiurc x Ya.a uxf v:¢ imll h valiil .unl 2aJmy upon itK Company vN vm such purer r~ e%ci: led anJaxndmd W > ntl Lx.)m:h Nurv ms and I~mvm4 +ral ~AVII ha vubJ e:al F mien. on hoEUnlnP~mthe 6nnre mrh npµux+•ngq d{nd;iru 4rawWYmg mwh:~unuarhtJ. I.xni Yl.1.!'u?m~'~n.tha wukr+i)+w'd.~U•4,>frnr isnrWV,.d`Fannm4t:m.C:nanfwEt~vY.FvElhv amt ::riWy L. n+nmrr, lnc.SG Pn:l Fiic:mJ Yfuim:fawn-dmx C.+mlan`. Sr, Pv:r.Gvunlun (nwru~ui Cant •. 11 P:ud 5 rcta+'ampuny Trs Vlcexr,'av+rdR and SuRlYCm>ip.n .C~)menh, :1ni14'nasx $ta4a fiJ.l Fr.r w^ army G) r atroc anJ.nrrcet:npy u(eir•Pnwu Sr.SWimu.~e~aukd by :rul.Campumca. wkcM rsla (allN :andklli.Y. I~'fFf J)lt`IRe7P.1 10 I\TFS'FBR)~]'\YlIF.AE[)Fflsashcrc!WF+vrny:unJ.mJvllti\eJJ:~u+cals r~t.s:wCilm?aeiare Aq`/'~~/~~!J(aFL~+t::_....~___.._ -_...: v-~ Kno. bl lan~+ ~ ,t.+iaanr Sc.:emn +'Rb saaua.Y agmp ~.: ~ r~ ~ t~ - ~,vanai f -5 SfiiL " ~ r 1.n/ piM aw - Ti++erily rpe aWhrnnefry a/rhia. POVCi aF :44ttIwv.{111-~i!kl-.t±t-tNNinr>.Ympet us;u ww lnveA':+!+vody:ne.Plv;aeercler ie Ne Nkiuey~Ilryrl tromtAr:U. aNnscnnmM nvh. u;vu}ysW :Ixdmodr dhhe tiomkn }aS thu PnaYe Antraimd, 35 ~ Page Appendix 6-281 ~,yfilffifN b7 h~: ~F 1963 i' l~l~~i~~~fal ~~r~~t l.i~~ti>~~ Insurance Certificate (first page). Balance of certification available upon request. ACORD' ~EiL"~tA= '~i~-,E. E ~ : - w9asnoo9 P TM5 CERTIRCATf 6 L45UE0 A4AAMTTFR Oi INfORMAIRnI remm ONLYAro caxFExs rioEIGNrsDran Tne COtnFICAt[ MDIDFR. SulRvanCurasMonroeirlsuRLnce Services TIr DEmvcATE oan xm ~~~ ExtExoaR nLTU Tr ROEO svTIN wuuo aELOVr DavEAADE FP 900 Mwttedtobrtve; Sufe 705 . A a CA 92879 Caona „ ~~ Tra.+Iaa RVFEOY~Y ._ afAnNeeE 98tAe]JS00 Uoneaf0EB0ai0 E6REn T bT'F°M~Fn!Y NVenCUNEMavoemu S w v. l w r e n C fl C M lru En wu® NatlonalUnlPn FV De °f ompany rac ng o Southern P.C. 0oz 445 CA 92079 o saAw seneesnt Nmvatm c«rpeny s San Marc .mwu THE POLICES GE INSURANCE lSTED BELOW NAY ISSU ED f INSURED NAMED VEF THE FOWL! P WOICATED. NOTLMILS'fANDINGRNY REOWREMFM. TERM OR CONCinON O i ANY CONniACT OR OTE+flED000MENS WtPNRESP[R TO WIRCN TNIS LERi1FIGtiE MAY BE LSSUEOOR MAY PERTAIN;. TNE.INSURANCE AffOR0E0 BY 7Nf FOLIQES DESCRIBEONERFIN E::aUalEtt SO ALLINE TEPM`a.E%CWSiONS:AND CONOm10Na OF SUCH POLCIE3-AGGR EGATE UMITSSNOWN MAY NAVE-BEEN REDUCED BY PAID ClAeeS. pOUEY VE kiP rollEY [VIw TYH LTR TYFE Oi @SIIPAXfE POLICY MUbG ~ UINB p 6ENERAI UAEIUTY OTE000667CBMTIL09 10/ta00B. 10/1!1010 ~~e"x a«elgpµ RptrL1W XCl1iMIWN nNo.wac 6.WLAMOL QOCCUR nm GOI ee mw.La MVUwn s ' .ccmr+n s- eeoeuctscttwa.`" a cE ' eT a AurowoeREUAULnr DTataomrceFaicroa tataoos ionauio zoNEbmsnRlelan t.aaomo uN wre Y WIYM. TYxO1MR62 AewE I ''O~P~ roaxvwer ~~ M1sewU oiN.G[ P...maW' f GARl10E UABBIiV NrA arav. u.accvrt atNU u :wr uno on AInOOIar. O EXCESS[N®IfiY aE038L193L ttYIa004 O~I~.A'1 E t0/1a010 aCM ^WK./4aL m AR~ f Ruun t vntxnm+s WUFaEIS'COMPFNSATbna Bat~y58 t011a889 ~Lrrt tOEflAtO ~ D fMFLOYFf6' IiABARY u Meau.NLVILTiE S sSi.VRYYlI1R t«aW PUpoar onp ewGxVaravawwnea r.)edmllelawnea . CRy RECub'(Nb. RE alEwx elEeab, Fmplgxs an upmwnEEC ~lp~pr ICA:TENOL'€7ER$i=~' ~ _=?r'°£f;At~EL'^kAt~16 .•_ ~_. - "•:° -_~ I'F GERF . . ANY QiT11f MOVE OPS4TnEDPOUOIES (E CANCFLLLD BFFgSINE F« BW FMFRMS Onh Gl10Et GATE TNFAEOF:TXE IaaUNG CQ10AaY YIBI. MNL n warrtw ionttTD TN[ ETRtiIGTE NOLwexAnm toTNE CNYof Chufa Vista LEEr. PaiaL'CiPV9~Naa 278 FOUnh Avenus ~ •tnorprx...rq..warndw. ChWa Vise CA 91970 sta. ' 9atlb CEmao /r~~ .u- iaM0.~25:5R1..- ~}Js'Si'~ffi~si~ _: PS'rr~eFf°P"~Rp Ot&Zry9B8C~d as ...tue OSPY taa+ ama®. 4vlu itak ./vHew a. u.a. w xp i K.va 3fi ~ Page Appendix 6-282 ~EN61KEfy~ `~ ~~' yc l~lu~iri~al S#e~ee~ Li~l~#i>~~ f~,ea~ Re~~®fit Praj~ct App~r~dix D Product Pr®ch~re~ Procurement Note: The Phillips "QL" Lighting interior components of the proposed G.E. Luminaire require an operating voltage of 120V, or separately a range of 200V to 277V. G.E. does not offer a 120/240V or a 120/240/277V multitap ballast. It will be necessary for Chula Vista to identify which streetlight poles have either a 120V or a 240V source to ensure the appropriate catalog # Is selected. Luminaires M-25~R2i'_UM[NAiRE W1FM CUTOFF OPT1C5 APPt1WlOr14 rr s~rRt ~~ f«:ewdmed}ueeaattesmNS,Padu^9icmeiM otMrwNCOr erem 3 SPEOFlCAn011fFAiUR6 • 1]vJerSP~ Dw~D6't sEpfilNr • Ofr2aG:PlwxnWPlmusn9 ~[n Paler 9reY • Shee6ide Od)uuobi! E39 f niigi~k Doe scchet sloMard wnart bmP'aawlabk U ~oCcerksel Mecum • PlGLAS" fuo~hanreflec[« xore amum.r.mams 'Nn6PR.$IYA IR FYNCe 37 ~ Page cru~n~a~q~nm~P~oK. louse • NO-tOd PE rK2P1eC1! • Phg-in sptkar •-f~ue96'aka?-fro AgM aFaae 94'hnx5 PiB-ZOW f«MiwmR1 F~F#ahrndstuNess steeimk • P~DcPestw«ds[mdmd Wxreyuir ml Wr Sua peel Appendix s-gas FgLBiNe' ~y !"~t~~i~i}~~~ St~°~et Li~~tir~r~ e (F~ArcatC~~S~ f~~tf alit rPi~~E9Ct ROADWAY LIGHTING GU1DF FORM SPFCIFICATtONS M-250 fl~12RC1 INDUCTION LUMINAIRE ~'GE~(EliiCOESCRfP-~0~~,., £~~. ~~,~:~~ Fhe luminaire designated MZRC shall be a GE M 250 madumy luminaire, brdennq number M2RC54QGE1GSCZ. The MZRC is capable of providing either the SSW err the 85W Phillips QL induction system in'the same motlel. The luminaire shall contain a completely prewired m[egral induction system and an optical assembly that shall .provide an LES Distributfan Type SC2. ~MECW{S~IE(~E QDIi(~TRft TL~E~~` The fumirmire shall incude a precision die-cast aluminum upper and lower housirigwithpptyester Powder gray point Paint finish shall meet ASTM B717 Tar eartostpn resistande, Lower housing shall be hinged and separable and shall hold retractor in place. TTe internal slipfit[er shall rontain two bolts. which der not pass through the housing tivt tighten tram an aptiarwl' prewired no-toot receptoUe. There shall be a installed. The Ringed dbor d,. quick-release paddle type g the use of no tools and shall aonfirmatiar The removable :ess to the Feffector, refractor. Norge vessel The at shall be position ~"o~~`~cssF~t ~q., ~' The cut-alt opticdl assemtly shall include a predsian-formed aluminum reflettar and a heaUimpadt,resistdrtt tempered flat gloss: The re(lectar shall have a chemica3ly bondetl 1lghtweight hon-hreakatle siticafe coating provioing a non-porous surface that. taointpiri5 a hrght specular finish after 2500 hour exposure to sdtt tog tesbng following ASTM dans[ruation around the removing co gasket of air ion system-shall he [he Phillips OL Induction system of the discharge vessel. power coupler, dnd Ehe xF "REFER TO PRODUCT PAGE FOR BALLAST SELECTIONS,. F-0R providing long 1He of less thbn ten percent farlure MORE DEF3NITIVE INFORMATION, REFER TO BAilAST ?00 hours low lumen depreciation of less than thirty SPKIFKATIONS IN TECHNICAL DATA SECTION. 60p00 hdurs.80 CBI, with b dhoice of either 30001%1 color temperature of each Wattage IS51^"1 and 85W) ling voltage of 200 - 271. The pourer coupler cooling ded try a beat sink Luminoire Shall contain d three n Pevdle[E fmpfinerk arEPmmW neeu~e GmemH fiManv4 xf GlPnd nttv~¢ UvW% ~bN3YgY[I:O.UO!]('tiVpW v0(N Paget Guide Form Specifications-2009 38~Page 6-284 Appendix ~.cyl6tNf~ ~ ~-~ ~~ ~t~~i~~~~i rSt~~~~ Li~~i~ir~~ a ROAE)WkY L(GHTiNG GUIDE FORM SPfC1FICATIONS M-25fJ fM2RC)1NDUCTlON LUMINAIRE GEtJERt4LQESCR(PT(O(~C~~~ ~'~ Fhe luminafre designated M2RC sho31. he o GTE. M-250 roadway lumihaire. ordering number M2RCEgOGE1G5n2. The M2RC fs capable of providing either the SSW dr the 85W Pfiillips Ol induction system in-the same model The lumihaire shall contain a cdmpletely prewired integral induatjon system and an optical asszmbly !fiat shall provide an IES 0lsiribution Type SC2. The lumihaire shal} inctVde a precision the-cost aluminum upper and lowef housing with polyester powder gray paint. Paint finish shall meet ASTM 8317 tot cortasipn resismn<e.. Lower housing shall be Tinged and separable grid sFOll hold refractor in place: the inferno! slipfi[ter shall contain two. bolts. which do not pass through tPe housing but Yghten tram below with lower housing in dropped position. Intemafcosting prpvides leueiing~step adjustments for fixture leveling. The ahe-piece pipe. damp shal3 be tpppble of adopting to. t-ilq-inch through 2-inch 14Z tfirouah. 60 mml Dioe without a art ektemol,. quick-release peddle drreauinna the use of ^o tools and 6. Induction System The induction system-shill be the PhMips OL Induction system consisting of the discharge vessel. power coupler, and the HF generator providing Idng life of less than ten percent failure rate at 60;000 pours. IoW lumen depreciotian pf less than )hirty percent at 60.000 hours. 80 CRI, wkh a choice of either 30001R1 ar g0001q mlar temperature at each wattage 155W and 86V/1 and operating voltage of 200 - 277: The pawsrtoupler cooling Shalt be aided 6y a heat sink Laminaire shall caatdin a three position. terminal aoprd. ppiiaal assembly shall include a pre eflectar and aheatlimpad-resist The reftector shalt have o chem~ non-breakphle siNEate coating. surface that mpintoins p pdgnt s lour exposure to salt fag testing 6 The optical assemblyshall hove which acts as. a fgter by excfudii ion when the luminaires is closed i consist aF a charcoal fNter wiffi a. ! glass the charcppl filter allows p trrtdminates svpn as hydrocarbons * REFER TO PRODUCT PAGE FOR BAlL45i SELECTfONS. FOR MORE DEFINITIVE INFORMA74ON, REFER TO BALUST SPECIFICATIONS W TECHNICAL OA7A 4ECTION. ! ambreeN ir~emmkeF6(eerel eel¢ic CunevM ^'rrSmtae al Ge:vM Ekttre Campmy ~b5Y0f I[(N(I~geWMU1WM! Paget Guide form Specifications-2009 39~Page 6-285 Appendix