HomeMy WebLinkAboutPlanning Comm Reports/1989/02/08 AGENDA
City Planning Commission
Chula Vista, California
Wednesday, February 8, 1989 - 7:00 p.m. City Council Chambers
PLEDGE OF ALLEGIANCE
INTRODUCTORY RERMARK
APPROVAL OF MINUTES - Meeting of January 11, 1989
ORAL COMMUNICATIONS
Opportunity for members of the public to speak to the Planning Commission
on any subject matter within the Commission's jurisdiction but not an item
on today's agenda. Each speaker's presentation may not exceed five minutes.
1. PUBLIC HEARING: Conditional Use Permit PCC-89-27: Request to
construct a 75-unit low-income housing project
for seniors at 628/638 Third Avenue - Salvation
Army
2. PUBLIC HEARING: PCZ-89-E: Consideration to rezone 7.72 acres
bounded by Broadway, Flower Street, Jefferson
Avenue, and 'E' Street, from C-T to C-C-P
Appel Development Company/City of Chula Vista
3. PUBLIC HEARING: Conditional Use Permit PCC-89-29: Request to
construction a Youth/Community Center on the
north side of 'L' Street, east of Fifth Avenue,
on the grounds of Chula Vista High School -
Community Development Department
OTHER BUSINESS
DIRECTOR'S REPORT
COMMISSION COMMENTS
ADJOURNMENT AT p.m. to the Study Session Meeting of February 25, 1989
at 5:00 p.m. in Conference Rooms 2 & 3
City Planning Commission
Agenda Items for Meeting of February 8, 1989 Page 1
1, PUBLIC HEARING: Conditional Use Permit PCC-89-27; request to construct
a 75-unit low-lncome housing project for seniors at
628/638 Third Avenue - Salvation Army
A. BACKGROUND
The request is to construct a ?5-unit, low-income housing project for
seniors on 1.1 acres located at 628/638 Third Avenue in the C-O Commercial
Office zone. The Code provides that housing developments for low and
moderate income seniors are allowed in the C-O zone upon the approval of a
conditional use permit.
The Environmental Review Coordinator conducted an Initial Study, IS-88-J7
of potential environmental impacts associated with the implementation of
the project. Based on the attached Initial Study and comments thereon, if
any, the Coordinator has concluded that there would be no significant
environmental impacts, and recommends adoption of the Negative Declaration
issued on IS-88-77.
B. RECOMMENDATION
1. Based on the Initial Study and comments on the Initial Study and
Negative Declaration, find that this project will have no significant
environmental impacts and adopt the Negative Declaration issued on
IS-88-;7.
2. Based on the findings contained in Section "E" of this report, adopt
a motion recommending that the City Council approve PCC-89-27 subject
to the following conditions:
a. The project shall comply with the plan approved or conditionally
approved by the Design Review Committee.
b. The project shall provide 39 off-street parking spaces,
C. DISCUSSION
Adjacent zoning and land use
North C-O Commercial Office
South C-0 Commercial Office
East C-O Commercial Office
West R-1 Single family residential
ExistinK site characteristics
The project site measures 165 ft. wide by 290 ft. deep (1.1 acres) and is
located on the west side of Third Avenue between "I" and "J" Streets. The
property presently contains two single-family dwellings, one of which has
been converted to office use. The site is abutting commercial office uses
to the north and south, and single family dwellings to the west.
Commercial offices are also located to the east, on the opposite side of
Third Avenue.
City Planning Commission
Agenda Items for Meeting of February 8, 1989 Page 2
Proposed use
The Salvation Army was selected by the Department of Housing and Urban
Development to receive funding to construct 75 units of Section 8 rental
housing for very low income seniors (those with incomes which do not
exceed 50% of the regional median income). The project would serve this
resident group for the full 40-year term of the HUD mortgage. The Section
8 program provides subsidies so that residents pay no more than 30~ of
their income for rent.
The project consists of 75 units within a single, L-shaped, four-story
structure. There are 18 studio and 56 one-bedroom senior rental units,
and one two-bedroom manager's unit. The building also contains a 1,500
sq. ft. recreation room which opens onto a 3,000 sq. ft. landscape/patio
area on the south side of the structure. Parking for 31 cars is provided
to the south and west of the building with a single access drive from
Third Avenue along the southerly property line.
Interior corridors will provide access to the units, which contain 415 sq.
ft. for studios and 520 sq. ft. for one-bedrooms; the sole two-bedroom
unit contains 1,040 sq. ft. Each unit also has a private balcony~-~75 sq.
ft. for studios and 95 sq. ft. for one-bedrooms. The total combined
private and common open space is estimated to be 16,000 sq. ft., or 213
sq. ft. per unit.
The Municipal Code allows for exceptions from the standard zoning
regulations based on projects limited to for low and moderate income
seniors. This proposal involves the following exceptions from the
applicable R-3 standards: an increase in density from 36 to 75 units;
decrease in off-street parking from 113 to 31 spaces; a decrease in open
space from 30,000 to approximately 16,000 sq. ft., with 5 ft. wide rather
than 6 ft. wide balconies; and an increase in maximum number of stories
from 3.5 to 4.0 (although the proposed building height of 44 ft. is under
the 45 ft maximum allowed by Code).
The project is subject to review and approval by the Design Review
Committee.
D. ANALYSIS
The ability to grant exceptions from the normal R-3 zoning standards for
senior housing developments is in recognition that the residents of such
projects often have dwelling characteristics which differ from other
groups, such as the need for less living space and parking accommodations,
and the generation of less traffic, noise and urban activity. The city
has an adopted senior housing policy which requires such projects to be
maintained for the exclusive use of low and moderate income seniors (60
years of age or older) for at least 25 years. In this case, the units
will be reserved for very low income seniors for at least 40 years.
City Planning Commission
Agenda Items for Meeting of February 8, 1989 Page 3
At present the senior housing policy provides no development guidelines or
locational criteria for senior projects. Each application has generally
been considered on its own merits as perceived at that point in time, and
without a great deal of experience from which to draw. Consequently,
there has been inconsistency in the exceptions granted and the greatest
exception has a tendency to become the rule for the next request.
Based on such concerns, and also because of a perceived over-concentration
of senior projects in the downtown-Civic Center area, the City Council at
one point placed a 180 day moratorium on accepting applications for
density bonus projects until the issues could be studied with input from
the Commission on Aging and with staff work jointly shared by the
Departments of Planning and Community Development. The moratorium has
since expired and the staff work has yet to be completed because of
overriding priorities. In the meantime, staff has generally discouraged
density bonus applications.
The City has recently employed a new Housing Coordinator, and it now
appears that a study can be completed and a more comprehensive density
bonus policy can be prepared for Commission and Council consideration
within the next several months. The following analysis is based on the
local experience gained to date with senior density bonus projects, plus
the regional experience of the new Housing Coordinator, and several
factors which we believe are unique to this project and site.
The issue of increased density involves questions of structural mass and
bulk, traffic and parking, and the general levels of noise and urban
activity generated by an increased concentration of people. Senior
projects generally consist of smaller units with fewer persons per
household, and seniors generally own fewer vehicles, generate less
traffic, and create less noise and activity than younger households of
equal size. Ideally, a senior density bonus project would create no more
visual or activity impacts than a standard density project.
Under the basic R-3 standards, the property could accommodate 36 units,
whereas the request is for 75 units -- an increase of 39 units or plus
108%. In recent years, five projects have been approved by the City with
density bonuses ranging from 28% to 93%. Generally, staff has favored the
projects that exceed the underlying density by no more than 50%. The
reason for this is that the typical senior unit contains one-bedroom and
approximately 550 sq. ft. of floor area, while the standard rental unit
contains two-bedrooms and approximately 800 sq. ft. of floor area -- a
difference in floor area of approximately 50%. The result being that the
structural mass for a 50% density bonus project will approximate that for
a standard pro3ect.
In the present case, the structural bulk is approximately twice as great
as would be expected with a typical R-3 development on this size lot--36
units at a typical 800 sq. ft. per unit would total 28,800 sq. ft. whereas
the structure in question totals 55,084 sq. ft. This particular site,
City Planning Commission
Agenda Items for Meeting of February 8, 1989 Page 4
however, is within a commercial office rather than R-3 zone. A commercial
development concept with two commercial floors above surface parking would
conform with the C-O zone and would allow this site to accommodate a
building of approximately 40,000 sq. ft., with a footprint of 20,000 sq.
it. and an overall height up to 45 ft. This would present a greater mass
and bulk than the subject project, which has a footprint of 14,000 sq. ft.
and an overall height of 44 ft.
An additional consideration is that the building has been configured and
placed on the lot so that the greatest mass is oriented to the north and
south, whereas the narrowest portion of the building and the only surface
without window openings is oriented to the most sensitive interface
area--the single family homes to the rear. The setback at this location
has also been established at 58 feet in order to further ameliorate the
visual impact on adjoining residents.
The R-3 standards would require the 75 units to be served by 113
off-street parking spaces, based on a ratio of 1.5 spaces for each studio
or one-bedroom unit, and two spaces for the manager's unit. The proposal
is to provide 31 spaces, or 0.41 spaces per unit.
The parking issue has probably been the most difficult to resolve with
prior senior projects. The City has approved ratios varying from 0.45 per
unit to 0.83 per unit. At one time many jurisdictions believed that 1/2
space per unit was adequate. This was later increased to 3/4 space per
unit, and now many communities are using a 1:1 ratio for one-bedroom
senior units. Generally, we are now looking at ratios which would
approximate 0.75-1.0 spaces for each studio or one-bedroom unit, and 1.5
spaces for each two-bedroom unit, at least in the case of
privately-initiated projects which serve low and moderate income seniors.
This federally-subsidized proposal is distinctive from the typical
privately-initiated project in that all of the residents will be very low
income (50% or less of the regional median) rather than low (50%-80%) or
moderate (80%-120%) income residents. The very low income typically own
fewer vehicles, and a review of other federally-subsidized very low income
senior projects in the area, including the Town Centre Manor on "F" Street
across from the Civic Center, confirm that a ratio of one-half space per
unit is adequate to serve both residents and guests. Using this ratio,
the project would require a total of 39 rather than the 31 parking spaces
proposed--2 spaces for the manager's unit, plus 37 spaces for the senior
units--and a condition of approval has been recommended to this effect.
The proposal also includes a reduction in the total required open space
from 400 sq. ft. to approximately 210 sq. ft. per unit. In most previous
cases the City has approved a reduction in the overall ratio provided that
adequate private open space is available for each unit. In this instance,
each studio unit has a 75 sq. ft. balcony, and each one--bedroom unit has a
95 sq. ft. balcony. The narrow balconies were considered by the Design
Review Committee and considered acceptable based upon the overall increase
City Planning Commission
Agenda Items for Meeting of February 8, 1989 Page 5
in total square footage of balcony area and the number of residents using
each unit. These figures are consistent with the R-3 standards for
private open space. The project will also include a 1,500 sq. ft.
recreation room, and an adjacent patio and landscaped area totaling 3,000
additional sq. ft. (It should be noted that the Salvation Army is
contributing approximately $500,000 to provide extra features and
amenities, including balconies, which federal funding does not provide
for.)
The final requested exception is an increase in the maximum number of
stories from 3.5 to 4 stories. Since the allowable height limit is 45
ft., and the project is designed at a height of 44 ft., the increase in
number of stories becomes in this case an issue more related to usability
or density rather than mass and bulk. The issue of density has already
been discussed above.
With regard to the issue of the project location in relation to the
availability of public services and facilities, this site is almost
ideally situated. A full-service grocery store is located approximately
600 feet to the south at the northwest corner of Third and "J", and
medical facilities and services surround the site. Third Avenue is a
major bus route, and the Salvation Army building is only one lot removed
from the site to the south. Memorial Park and Morman Park are located
approximately three blocks to the north.
As a result of these factors, we are recommending approval of the request
subject to the conditions noted and based on the following findings.
E. FINDINGS
1. That the proposed use at the location is necessary or desirable to
provide a service or facility which will contribute to the general well being
of the neighborhood or the community.
The project will provide 75 units of affordable rental housing for
very low income seniors within the community, and at a location which
provides ready access to a wide range of public services and
facilities.
2. That such use will not under the circumstances of the particular
case, be detrimental to the health, safety or genecal welfare of persons
restdin$ or working in the vicinity or Injurious to prol)erty or l~voYmen~!
in the vicinity.
The bulk and mass of the structure are not inconsistent with what
could be developed on the site under the existing C-O zone. The
building has been placed on the lot in a manner which minimizes the
impact on the adjacent residential uses to the west. The project
will be required to provide 39 parking spaces which is believed to be
adequate to serve a very low income senior development,
City Planning Commission
Agenda Items for Meeting of February 8, 1989 Page 6
3. That the proposed use will comply with the regulations and
conditions specified in the code for such use.
The use will be required to comply with all applicable codes,
conditions, and requirements prior to the issuance of a building
permit.
4. That the granting of this conditional use peri. it will not adversely
affect the general plan of the City or the adopted plan of any govem~ment
agency.
The proposal complies with General Plan policy with regard to density
bonuses for senior citizen projects.
WPC 5921/2652P
negative declaration
PROJECT NAME: Salvation Amy
PROJECT LOCATION: 623/638 Third Avenue
PROJECT APPLICANT: The Salvation Amy 900 Nest Ninth Street
Los Angeles, CA 90015
CASE NO: IS-88-77 DATE: July 14, 1988
A. Pro,i ect SettlnR
The project site consists of two parcels with a combined area of 1.09
acres. The two conti§uous parcels are located on the west side of Third
Avenue between "I" and "J" Streets within the C-O (Office Commercial) zone
district. The proposed site presently contains two single family
dwellin§s (one on each parcel) and several accessory stz~uctures. The
subject site is limited to the north and south by professional office
buildinEs, to the west by single family residences and to the east by
professional offices across Third Avenue.
B. Pr_E~ ect Descri]?tion
The proposed development plan consists of the construction of a 4-story
structure containing 75 senior citizen apartment units and parking
facility for 29 vehicles.
C. Compatibility with Zoning and Plans
The subject site General Plan designation is professional offices which
promotes the establishment of an exclusive office commercial district.
The current zoning of this parcel reflects the General Plan desi§nation
(C-O, Commercial Offices) and allows residential land uses subject to a
conditional use permit. Development of residential project within
zone are regulated by the density and development requirements established
in the R-3 zone (multi-family residential).
The proposed density for this project is 69 dwelling units per acre which
is not compatible with the high density residential density designated by
the General Plan (13 to 26 dwellin§ units per acre). However, a provision
in the General Plan allows density bonuses for senior citizen projects.
The current density limitation of this parcel under a typical multi-family
residential development would allow a maximum of 28 units and the project
totalled 75 units. This translates to a 167% density bonus. A
conditional use permit for the senior citizen project and approval by City
Council for the density bonus will be required prior to issuance of
construction permits.
~.. city of chula vista planning department CI~ OF
environmental review section CHIJtA ViS'fA
-2-
D. Compliance With the Threshold Standard Policy
1. Fire/EMS
The estimated fire/EMS response time is 3 minutes which is within the
acceptable range of threshold standard.
2. Police
The Police Department is currently maintaining an acceptable level of
service based on the threshold standard.
3. Traffic
The Engineering Department has reviewed the proposed project and
determined that it will not adversely affect the existing levels of
service on roads and intersections in the vicinity.
4. Parks/Recreation
Threshold standards do not apply to pro~ects located west of
interstate freeway 805.
5. Drainage
The Engineering Department has concluded that existing drainage
facilities would accommodate storm water flows and volumes, and that
City standards would not be exceeded.
6. Sewer
Existing sewer lines have been judged to have adequate capacities for
sewage flows and volumes that would be generated by the proposed
project.
7. Water
The Sweetwater Authority was notified and has not identified any
constraints to providing an adequate water supply for the project.
E. Identification of Environmental Effects
In accordance with the Initial Study, the project would not result in any
significant environmental effects.
F. Identification of Potentially Environmental Effects
1. Schools
Mo adverse impact is anticipated to affect local schools once this
project is designed to accommodate senior citizens only.
city of chula vista planning department ¢1~0~
environmental review section CHULA VISTA
-3-
2. Noise
The project would be located adjacent to Third Avenue which is
designated in the Chula Vista General Plan as a "collector road."
Third Avenue is presently handling an average of 20,520 vehicle trips
per day (average 1987) resulting in potentially significant noise
levels.
An acoustical analysis which identifies potential interior and
exterior (patios and balconies) noise levels has been prepared for
this project. The analysis indicates that the State mandated maximum
interior noise levels will be met with the structural finish
materials as proposed. Proof of compliance will be required at the
building permit level. In regard to the project amenities exposed to
the exterior ambient noise, it is concluded from the report that all
patios and balconies facing east and the majority of the ones facing
north will not meet the 65 dBA exterior noise levels; therefore, the
following mitigation measures will be necessary.
1. Prior to issuance of construction permits, an acoustical
analysis shall be prepared by a qualified acoustician
delineating the 65dBA contours.
2. Applicant shall submit an adequate design for an acoustical
barrier to provide a line of site protection for balconies and
patios.
If adequate noise protection cannot be provided, the
Environmental Review Coordinator will conduct further public
review and this Negative Declaration may be found null and void.
3. Fire Protection
The proposed development plan provides emergency vehicle access to
the site. In addition to the access, the Fire Marshal has indicated
that the structure shall be fully protected by an approved fire
sprinkler system augmented by an approved standpipe system (Class I
or III), fire alarm system, smoke detectors, and a knox key box for
Fire Department entry. These are standard development requirements.
4. Transportation
The project consists of the construction of 75 units, §enerat[ng an
estimated 450 ADT (averase daily vehicle trips). The City Traffic
Engineer has indicated that the estimated project traffic added to
the existing 20,520 APT on Third Avenue will not si§nificantly reduce
the service elves on the street or other area streets. The existin§
office commercial zone could allow a commercial building with a
potential traffic generation of over 1000 APTs. Therefore, the
proposed use will not add significant or potentially impacting or
local or regional levels.
city of chula vista planning depsrtment CI~OF
envirOnmental review lectlon CHULA VISTA
-4-
G. FindinKs of insiKnificant impac~
Based on the followin§ findings, it is detevmined that the project
described above will not have a significant environmental {mpact and no
environmental impact report needs to be prepared.
1. The project has the potential to substantially de,Fade the quality of
the environment, substantially reduce the habitat of a fish oF
wildlife species, cause a fish or wildlife population to drop below
self-sustaining levels, threaten to eliminate a plant or animal
conmunity, reduce the number or restrict the range of a rare or
endangered plant oF animal, or eliminate important examples of the
major periods of Califomlia history or prehistorlr.
The project size is within an urbanized area of the City and does not
contain rare or endangered plant or animal species and is not known
to be a historic or prehistoric site. Therefore, no adverse or
degrading effect in the environment will be created as a result of
this project.
2. The project has the potential to achieve short-term environmental
goals to the disadvantage of long-ter~ environmental goals.
The proposed project is in conformance with the Zoning Ordinance but
differs from the land use designation of the General Plan. However,
it is consistent with the General Plan text which encourages the
development of senior citizen projects to satisfy the elderly housing
needs.
3. The project has possible effects which afc individually limited but
cumulatively considerable. As used in the subsection, "cumulatively
considerable" means that the incremental effects of an individual
project are considerable when viewed in connection with the effects
of past projects, the effects of other current projects, and the
effects of probable future projects.
The project would be comparable in scale and design to the existing
commercial/office uses on the property and thus would not create
adverse cumulative effects on the environment.
4. The environmental effects of a project will cause substantial adverse
effects on human beings, either directly or indirectly.
No sobstantlal adverse effects on human beinEs, either directly or
~ndirect[y will occur as a ~esult of the project.
city of chula vista planning department C;P/OF
environmental review ,ecIIon. CHUIA VISTA
-5-
H. Consultation
1. Individuals and Or~anlzations
City of Chula Vista: J. Luis Hernandez, Assistant Planner
Roger Daoust, Senior Civil Engineer
Ken Larsen, Director of Bulldlng and Housin~
Carol Gore, Fire Marshal
Hal Rosenber~, Traffic Engineer
Applicant The Salvation A~m¥
900 W. Ninth Street
Los Angeles, CA 90015
2. Documents
The Chula Vista General Plan
The Chula Vista Municipal Code
This determination, that the project will not have any significant
environmental impact, is baaed on the attached Initial Study, any comments on
the Initial Study and any comments on thia Negative Declaration. Further
information regardin§ the environmental review of the project is available
from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA
EN 6 (Rev. 3/88)
WPC 5370P
city of chula vista planning department CI~' OF
environmental review lectlon. CHULA VIS'"I-A
FOR OFFICE USE
Case No ..
Fee 5/~'m ~;£; D,~ -~ /
INITIAL STUDY Receipt No.
Date Rec'd
City of Chula Vista Accepted by
Application Form Project
A. BACKGROUND
l. PROJECT TITLE The Salvation Army Chula Vista Silvercrest Residence
2. PROJECI LOCATION (Street address or description)
628/638 Third Avenue, Chula Vista
Assessors Book, Page & Parcel No. ~ ......... a~s 20=_, Lot ,
3. BRIEF PRNECT DESCRIPTION 5 stories Senior Citizen Housing
4. Name of Applicant The Salvation Army
Address 900 West Ninth Street Phone(213) 627-5571
City Los Angeles State California Zip 90015
5. Hame of Preparer/Agent Flewelling & Moody Architects
Address 766 Colorado Boulevard Phone (213) -256-4151
City Los Angeles State California Zip 90041
Relation to Applicant Architect
6. Indicate all permits or approvals and enc]0sures or documents
required by the Environmental Review Coordinator.
a. Permits or approvals required:
General Plan Revision x Design Review Committee __ Public Project
Rezoning/Prezoning -- Tentative Subd. Map __ Annexation
Precise Plan -- Grading Permit __ Design Review Board
Specific Plan -- Tentative Parcel Map __ Redevelopment Agency
Cond. Use Permit -- Site Plan & Arch. Review × Initial Study
Variance Other
b. Enclosures or documents (as required by the Environmental Review
Coordinator).
Location Map/Survey X Arch. Elevations __ Eng. Geology Report
Grading Plan -- Landscape Plans __ Hydrological Study
Site Plan -- Photos of Site & Biological Study
Parcel Map -- Setting -- Archaeological Survey
Precise Plan Tentative Subd. Map × Noise Assessment
Specific Plan -- Improvement Plans --Traffic Impact Report
Other Agency Permit or × Soils Report __ Dther
Approvals Required X Floor Plans
E~J 3 (Rev. 12/82)
- 2 -
PROPOSED PROJECT
1. Land Area: sq. footage 47,850 or acreage l.l
If land area to be dedicated, state acreage and purpose.
No
2. Complete this section if project is residential.
a. Type development: Single family Two family
Multi family x Townhouse Condominium
b. Number of structures and heights 1-Structure - 5 stories
ApProx. 54 feet
c. Number of Units: 1 bedroom 56 2 bedrooms l
3~cy 18 4 bedrooms ~ Total units 75
d. Gross density (DU/total acres)
e. Net density (DU/total acres minus any dedication)
f. Estimated project population 85
g. Estimated sale or rental price range HUD 30% of income/Sec.8 subsidy
h. Square footage of floor area(s) 11541.5 x 5 = 57,708' Sq. Ft.
i. Percent of lot coverage by buildings or structures Approx 40%
j. Number of on-site parking spaces to be provided 57
k. Percent of site in road and paved surface Approx 30%
3. Complete this section if project is commercial or industrial. N/A
a. Type(s) of land use
b. Floor area Height of structure(s)
c. Type of construction used in the structure
d. Describe major access points to the structures and the
orientation to adjoining properties and streets
e. Ilumber of on-site parking spaces provided
f. Estimated number of employees per shift , Number of
shifts Total
g. Estimated number of customers (per day) and basis of estimate
- 3 -
h. Estimated range of service area and basis of estimate
i. Type/extent of operations not in enclosed buildings
j. Hours of operation
k. Type of exterior lighting
4. If project is other than residential, commercial or industrial
complete this section. N/A
a. Type of project
b. Type of facilities provided
c. Square feet of enclosed structures
d. Height of structure(s) - maximum
e. Ultimate occupancy load of project
f. l~umber of on-site parking spaces to be provided
g. Square feet of road and paved surfaces
C. PROJECT CHARACTERISTICS
1. If the project could result in the direct emission of any air
pollutants, (hydrocarbons, sulfur, dust, etc.) identify them.
2. Is any type of grading or excavation of the property anticipated No
(If yes, complete the following:)
a. Excluding trenches to be backfilled, how many cubic yards of
earth will be excavated?
h. How many cubic yards of fill will be placed?
c. How much area (sq. ft. or acres) will be graded?
d. ~hat will be the - ~aximum depth of cut
Average depth of cut
Maximum depth of fill
Average depth of fill
- 4 -
3. Describe all energy consuming devices which are part of the proposed
project and the type of energy used (air conditioning, electrical
appliance, heating equipment, etc.) Heat Pumpsf Electric Cooking,
4. Indicate the amount of natural open space that is part of the Rroject
(sq. ft. or acres) 13,000 Sq.Ft.
5. If the project will result in any employment opportunities describe
the nature and type of these jobs. Apartment Manager, Assistant
Manaqer, Maintenance Person
6. Will highly flammable or potentially explosive materials or
substances be used or stored within the project
site? No
7. How many estimated automobile trips, per day, will be generated by
the project? 30
8. Describe (if any) off-site improvements necessary to implement the
project, and their points of access or connection to the project
site. Improvements include but not limited to the following:, new
streets; street widening; extension of gas, electric, and sewer
lines; cut and fill slopes; and pedestrian and bicycle facilities.
Extension of Utilities, Curbs and Gutters
D. DESCRIPTION OF ENVIRONMENTAL SETTING
1. Geology
Has a geology study been conducted on the property? Yes (see attached)
(If yes, please attach)
Has a Soils Report on the project site been made? Yes (See attached)
(If yes, please attach)
2. Hydrology
Are any of the following features present on or adjacent to the
site? N~ (If yes, please explain in detail.)
a. Is there any surface evidence of a shallow ground water
table? No
b. Are there any watercourses or drainage improvements on or
adjacent to the site? No
- 5 -
c. Does runoff from the project site drain directly into or toward
a domestic water supply, lake, reservoir or bay?
d. Could drainage from the site cause erosion or siltation to
adjacent areas? No
e. Describe all drainage facilities to be provided and their
location. Normal roof drainaqe and parkinq lot run off
3. Noise
a. Wi]] there be any noise generated from the proposed project site
or from points of access which may impact the surrounding or
adjacent land uses? No
4. Biology
a. Is the project site in a natural or partially natural state?
No
b. Indicate type, size and quantity of trees on the site and which
(if any) will be removed by the project. 94,, oeooer. Z&" fru±t tree
53" palm
5. Past Use of the kand
a. Are there any known historical resources located on or near the
project site? No
b. Have there been any hazardous materials disposed of or stored on
or near the project site? ~o
6. Current Land Use
a. Describe all structures and land uses currently existing on the
project site. 2 - type v residential homes
- 6 -
b. Describe all structures and land uses currently existing on
adjacent property.
North 1 - Story Residential
South 2 Stories Office Building
East 2 Stories Office Building
West 2 - Stories Residential
7. Social
a. Are there any residents on site? /If so, how many?) No
b. Are there any current employment opportunities on site? (If so,
how many and what type?)
Please provide any other information which could expedite the evaluation of
the proposed project.
See Attachement #l
- 7 -
E. CERTIFICATION
or
Owner/owner in escrow*
I, The Salvation Army Chula Vista Residences, Inc.
consultant cr ~
HEREBY AFFIRM, that to the best of my belief, the statements and information
herein contained are in all respects true and correct and that all known
information concerning the project and its setting have been included in
Parts B, C and D of this application for an Initial Study of possible
environmental impact and any enclosures for attachments thereto.
~If acting for a corporation, include capacity and company name.
PLEASE PROVIDE ANY OTHER INFORMATION WHICH COULD EXPEDITE THE
EVALUATION OF THE PROPOSED PROJECT:
The proposed project is a HUD Section 202 senior citizen
project. The funding was awarded to The Salvation Army for this
project on this specific site as the result of a competitive
process. The project was selected by HUD because of the strength
and stability of The Salvation Army, the demonstrated need for
more of this type of housing in Chula Vista, and the quality of
the site for this purpose.
The project will provide Chula Vista 75 units of new Section
8 senior housing (with 10% of the units for the handicapped).
Parking proposed for the project is 57 spaces, or parking
for 76% of the apartments. At this ratio, the project would have
a substantially higher parking space ratio than either
Congregational Tower or Town Centre Manor.
Cars Units Ratio
Congregational Tower 63 186 34%
Town Centre Manor 28 59 47%.
This proposal (spaces) 57 75 76%
In addition to the excellent community services available in
the neighborhood, it is anticipated that the seniors in the
housing facility would take full advantage of the many senior
services provided at The Salvation Army Corps and Community
Center two lots south of the subject property. These services
include:
1. Senior Nutrition Program which provides low cost
lunch daily for 150 seniors.
2. Meals-On-Wheels, which now serves about 40 seniors
per day in the community, would be available to
seniors in the new facility who were temporarily
unable to attend the luncheons.
~, ~old~n Agers Club currently has about 200 members.
'Phis social organization takes trips and enjoys
other social activities.
4. Ladies' Home League, which is comprised mostly of
older women, sews and has crafts projects for
community service.
Attachment 1
5. League of Mercy has about 50 members. They visit
15 different Chula Vista hospitals and nursing
homes per week.
6. Exercise program for seniors.
7. Church activities.
8. Library.
9. Recreational activities including bingo and
billiards.
10. Language classes.
11. Legal assistance.
12. Podiatrist visits the Center two times per week.
13. Medicare/MediCal assistance.
14. Periodic health screening (urine and blood pressure
checks) on a weekly basis.
15. AARP meetings are held at the Center.
Attachment 1
THE SALVATION ARMY
AND
THE SALVATION ARMY CHULA VISTA RESIDENCES, INC.
BOARD OF DIRECTORS*
ANDREW S. MILLER, PRESIDENT & DIRECTOR
799 Bloomfield Avenue
Verona, New Jersey 07044
WILLARD S. EVANS, VICE PRESIDENT & DIRECTOR
30840 Hawthorne Boulevard
Rancho Palos Verdes, California 90274
KENNETH HOOD, VICE PRESIDENT & DIRECTOR
30840 Hawthorne Boulevard
Rancho Palos Verdes, California 90274
EVELYN J. HUNTER, SECRETARY & DIRECTOR
30840 Hawthorne Boulevard
Rancho Palos Verdes, California 90274
LE ROY PEDERSEN, TREASURER & DIRECTOR
30840 Hawthorne Boulevard
Rancho Palos Verdes, California 90274
RONALD G. IRWIN, DIRECTOR
30840 Hawthorne Bouleuard
Rancho Palos Verdes, California 90274
FRED L. RUTH, DIRECTOR
30840 Hawthorne Boulevard
Rancho Palos Verdes, California 90274
*The Board of Directors of The Salvation Army, a California
non-profit corporation (Sponsor) and the Board of Directors
of The Salvation Army chula Vista Residences, Inc. (Borrower)
are the same persons.
They are selected to serve as directors until they are
removed or they resign, pursuant to the provisions of Article
II, Section 2 of The Salvation Army By-laws and Article II,
Sections 2.1, 2.2, and 2.3 of The Salvation Army Chula Vista
[~esidences, inc. By-laws.
Therefore, no specific length of term can be shown for the
officers and directors.
The above list includes all the duly qualified and sitting
officers and Board Members of both the Sponsor and Borrower
on the first day of June, 1987.
Attachment 2
- 8 -
Case No. ~_... ~ .4
CITY DATA
F. PLANNING DEPARTMENT
1. Current Zoning on site: ~ --~ 6~-~ ~Y4~y'ZE~F~--
North ~-~::) # //
South ~--~ ~ ~
East ~__.~ , ~ ~
West /~-~--/ C ~IH~L~ ~AHI~ /~/~.
Does the project, conform to the current zoning? y~ ~{~IN~
2. General Plan land use
designation on site: ~oV~a~ ~~
North d ~(
South ~ ~
East ~ ~
West ~U~ ~/~ /~/b~F/~
Is the project compatible with the General Plan Land Use Diagram? ~
Is the project area designated for conservation or open space or adjacent
to an area so designated? ~o
Is the project located adjacent to any scenic routes? t,~O
(If yes, describe the design techniques being used to protect or enhance
the scenic quality of Chula Vista.) ~.~//~, ~
How many acres of developed parkland are within the Park Service District
of this project as shown in the Parks and Recreation Element of the
General Plan? ~
What is the current park acreage requirements in the Park Service
District? ~f ~--.~.
How many acres of parkland are necessary to serve the proposed project?
(2AC/lO00 pop. ) ,/?g~,
Does the project site provide access to or have the potential to provide
access to any mineral resource? (If so, describe in detail.) ~
-9-
3. Schools , ~/~ :
If the proposed pr~o~6-~ is residential, please complete the following:
Current Current Students Generated
School Attendance Capacity From Project
Elementary ~
Jr. High '~
Sr. High '~
4. Aesthetics
Does the project contain features which could be construed to be at a
variance from nearby features due to bulk, form, texture or color? (If
so, please describe.)
5. Energy Consumption
Provide the estimated consumption by the proposed project of the following
sources:
Electricity (per year)
Natural Gas (per year)
Water (per day)
6. Remark s:
Director o( Planning or Representative Date
- 10 -
G. ENGINEERING DEPARTMFNT
1. Drainage
a. Is the project site within a flood plain?
b. Will the project be subject to any existing flooding hazards?
c. Nill the project create any flooding hazards? JGIO
d. I,lhat is the location and description of existinq on-site
drainage facilities? /L)o~)~,, m~/~,
e. Are they adequate to serve the project? ~)//~
f. Nhat is the location and description of existing off-site
drainage~e~/facil!tie~s? ~)~/~ ~..u'~-r ~'/~2~,.~ -~--,LA~ ~--~..,
g. Are they adequate to serve the project?
2. .Transportation
a. Nhat roads provide primary access to the project? ~/
b. What is the estimated number of one-way auto trips to be
generated by the project (per day)? .~0
c. What is the ADT and estimated level of service before and after
project completion?
Before After
A.D.T. ~ O,c~ ~ ~-) ~0
L.O.S. ~
d. ~re the t:,rimar,:, ,~,cces~, roads ~!efi'~ate to serve the project?
If not, explain briefly. ·
e. Will it be necessary that additional dedication, widening and/or
improvement be made to existing streets? /~}~
If so. specify the general nature of the necessary actions.
- ll
Case No.
3. Geoloqy.
a. Is the project site subject to:
Known or suspected fault hazards? /Jo h A~t"c¥/~_-& ~
Landslide or slippage? ~ffO __] ~,~//'~'m~
II
b. Is an engineering geolo~ report necessary to evaluate tke
project?
4. Soils
a. Are ther~ny anticipated adverse soil conditions on the project
site? ~ J
b. If yes, what are these adverse soil conditions?
c. Is a soils report necessary? ~ ~j ~/~ y~'~
5. Land Form
a. What is the average natural slope of the site? ] ~/~S ~/~,
b. What is the maximum natural slope of the site?~/~~~
6. Noise
Are there any traffic-related noise levels impacting the site that
are significant enough to justify, ~hat a noise analysis be required
of the applicant?
-12-
Case No.
7. Air Ouality
If there is any direct or indirect automobile usage associated with
this project, complete the following:
Total Vehicle
Trips Emission Grams of
/per day) Factor Pollution
co x ll8.a =
Hydrocarbons # X 18.3
NOx (NO2) u X 20.0 :
Particulates * X 1.5
Sul fur ~ X .78 : ~"~)
8. Waste Generation
How much solid and liquid (sewage) waste will be generated by the
proposed project per day?
I~hat is the location and size of existing sewer lines on or, adjacent
Are they adequate to serve the proposed project?
9. Public Facilities/Resources Impact
If the project could exceed the threshold of having any possible
significant impact on the environment, please identify the public
facilities/resources and/or hazards and describe the adverse impact.
(Include any potential to attain and/or exceed the capacity of any
public street, sewer, culvert, etc. serving the project area.)
Remarks/necessary mitigation measures
H. FIRE DEPART~IENT .
1. What is the distance to the nearest fire station and wh. at is the F, ire
Departm~,nt's es_timated reaction time? / //~-~ ~ ,22'~ c~x~ '
2. ~ill the Fire Department be able to provide an adequate level o'f fire
protection for the proposed facilit~ without an increase in equipment
or personnel? ~ ~,.~ ·
FTre Harsnal Dat
Project [iame Salvation \rmy-!;ilvercrest ~ate
Project Address 628-65S Third Avenue
To: Planning Department- Luis Hernandez
Environmental Review Coordinator
John liardesty, Engineering
Engineering, Subdivisions
Building and Housing
From: Fire Prevention Bureau
This department has reviewed the information or plans referred to us by you. Please
note the following comments:
1. Project requires the following:
A. One public fire hydrant (Required fire flow is 4000 GP~]
B, Fire sprinkler sysFem
C. Class ~ or III standpipe s~stem
D. Fire Alarm system
E, Corridor and trait smoke detectors,
F. Knox key box system for Fire Department entry.
CITY OF CHULA VISTA
DISCLOSURE STATEMENT
APPLICANT'S STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS
IWHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL, PLANNING
ICOMMISSION AND ALL OTHER OFFICIAL BODIES.
The following information must be disclosed:
1. List the names of all persons having a financial interest in the application.
The Salvation Army Chula Vista
Residence, Inc.
The Salvation Army - Department of Housing & Urban Development
List the names of all persons having any ownership interest in the property involved.
The Salvation Army Chula Vista
Residence, Inc.
2. If any person identified pursuant to {1) above is a corporation or partnership, list
the names of all individuals owning more than 10% of the shares in the corporation
or owning any partnership interest in the partnership.
The Salvation Army, A California
Non-profit Corporation
3. If any person identified pursuant to (1) above is a non-profit organization or a
trust, list the names of any person serving as director of. the non-profit
organization or as trustee or beneficiary or trustor of the trust.
See attachment #1
4. Have you had more than $250 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and Council within the past twelve months?
Yes No × If yes, please indicate person(s)
IPerson is defined as: "Any individual, firm, copartnership, joint venture, association, )
~ club, fraternal organization, corporation, estate, trust, receiver, syndicate,
this and any other county, city and county, city, municipality, district or other
political subdivision, or any other group or combination acting as a unit."
. . The Salvation Army, ~n~_~ vis~ ~l±vercr~s~ e~
(NOTE. Attach additional pages as necessary.).%<~ ~ ~
Signature of applicant/date
Major Ronald J. Bowles
WPC 0701P for/ THE SALVATION ARMY
A-llO ~'rint or type name of applicant
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 1
2. PUBLIC HEARING: PCZ-89-E - Consideration to rezone 7.72 acres Bounded
by Broadway, Flower Street, Jefferson Avenue, and "E"
Street, ~rom C-T to C-C-P - Appel Development Company/
City of Chula Vista
A. BACKGROUND
1. This proposal involves the rezoning of the block bounded by Broadway
on the east, Flower Street on the north, Jefferson Avenue on the
west, and "E" Street on the south, from C-T, Thoroughfare Commercial,
to C-C-P, Central Commercial with Precise Plan. Appel ~evelopment
Company initiated the request for the 4.03 acres representing the
northerly portion of the block, and City staff has expanded the
proposal to include the remaining 3.69 acres constituting the
southerly portion of the block.
2. The Environmental Review Coordinator conducted an Initial Study,
IS-89-41, of potential environmental impacts associated with the
implementation of the project. Based on the attached Initial Study
and comments thereon, if any, t~e Coordinator has concluded that
there would be no significant environmental impacts, and recommends
adoption of the Negative Declaration issued on IS-89-41.
B. RECOMMENDATION
1. Based on the Initial Study and comments on the Initial Study and
Negative Declaration, find that this project will have no significant
environmental impacts and adopt the Negative Declaration issued on
IS-89-41.
2. Adopt a motion recommending that the City Council enact an ordinance
to change the zone on 7.72 acres from C-T to C-C-P as shown on
Exhibit A.
C. DISCUSSION
Adjacent zoning and land use.
North C-T & R-3 Commercial and Residential
South C-T Commercial
East C-T Commercial
West C-V-P Elementary School
Existing site characteristics.
Ti~e northerly one-half of the ~lock--the subject of the Appel
application--consists of boat sales, auto rental ano storage, an~ five
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 2
apartment units. The southerly one-half of the block includes a trailer
park, multiple family residential, and commercial uses fronting on
Broadway and "E" Street. With the exception of the Cornell's Center at
the southwest corner of "E" Street and Jefferson Avenue, the block could
be characterized as containing a significant amount of underutilized
acreage, plus a mixture of older, non-planned and incompatible commercial
and residential uses, many of which are in a state of physical decline.
The entire block is one of several areas which were recently included
within the Town Centre II Redevelopment Area in order to establish she
legal and financial tools to assist, if necessary, with physical and
economic revitalization. The Town Centre II Plan does not include a land
use plan or set of development standards for the area, Put refers to the
City's General Plan and underlying zoning to determine land uses,
intensities, and building standards.
General Plan.
The present General Plan designates the property as Commercial
Thoroughfare. Both the existing C-T zone and the proposed C-C-P zone are
consistent wit~l this designation. The Draft General Plan Update will
propose the property as Retail Commercial, which generally excludes
thoroughfare commercial and automobile-oriented services unless they
constitute a small part of a planned commercial development. The C-C-P
zone is consistent with the proposed Retail Commercial designation, but
the existing C-T zone is not.
Related Application.
On January 11, 1989, the Planning Commission endorsed a proposal to amend
the zoning ordinance to allow mixed commercial-residential projects by
conditional use permit in the C-C-P zone. The amendment would provide an
appropriate zone to implement the mixed-use concept as called for in the
text of the Draft General Plan Update, and would also facilitate Appel's
plans for a mixed-use project on the northerly portion of the block in
question provided this rezoning is approved. The Council will consider
the amendment on February 7, an~ their action will be reported to the
Commission.
D. ANALYSIS
Rezoning.
There are several factors which support the rezoning to C-C-P:
1. The C-C zone and the P Precise Plan Modifying District are
appropriate in instances where compatibility and coordination of
uses, as well as quality of design, are of prime importance.
The block in question consists of several separate parcels under
different ownerships, but is one of the few large, contiguous
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 3
commercial areas along the Broadway commercial strip. It is also
located at one of the most prominent commercial corners in the City,
with nearly 600 ft. of frontage on "E" Street which is one of four
designated westerly gateways into the City. The C-C zone is a
general retail and service commercial zone which is designed to
accommodate shopping centers and other larger planned commercial
districts. The C-C zone excludes the "heavier" thoroughfare and
automotive-oriented uses which often present design problems, and
which are difficult to integrate with less intensive retail and
service commercial uses.
2. The C-C-P zone presents less potential for conflict with the abutting
residential area and elementary school.
Since the C-C zone excludes the "heavier" commercial uses allowed in
the C-T zone, it affords a better interface with the single and
multiple family dwellings to the north and the elementary school to
the west in terms of both activity and visual impacts. The precise
plan process further affords the City the authority to a~dress the
specifics of these interface areas beyond that provided by the basic
development standards of the zone.
3. The proposed rezoning is consistent with the Draft General Plan
Update and the Fown Centre II Redevelopment Plan.
The Draft General Plan Update designates the block for Retail
Commercial, and discusses the need to upgrade the Broadway frontage
and to introduce residential and mixed-use projects where appropriate
between Flower Street on the north and "I" Street on the south. The
C-C-P zone is consistent with the Retail commercial designation, and
will provide some relief from the auto-oriented uses which
proliferate along Broadway. If amended, it will also provide the
authority to consider mixed-use development on the property. The
Precise Plan Modifying District will also provide the planning
mechanism in conjunction ~¢ith the legal and financial tools provided
by the Town Centre II Redevelopment Plan if the City should choose to
assist with redevelopment on the southerly portion of the block.
4. The rezonin§ woulO create only one nonconforming use outside Appel's
holdings.
With the exception of the service station at the northwest corner of
Broadway an~ "E" Street, the other thoroughfare and auto~oriented
uses within the olock--including the boat sales, auto rental/storage
and a van conversion enterprise --would become nonconformin§ uses
under the C-C-P zone (the residential uses are presently
nonconforming and would remain so with the rezoning). The boat sales
and auto rental/storage operations, however, are located on Appel's
property; leaving the van conversion business at 186 Broadway as the
only use which could be considered to De adversely impacted by the
rezoning, at least in the short term.
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 4
Nonconforming use status means that the use cannot be enlarged,
extended, reconstructed, substituted or structurally altered, except
for minor repairs or maintenance, or in order to comply with health
and safety codes. A nonconforming use which is determined by the
Commission to be of the same or a more desirable nature may be
substituted for another nonconforming use. We believe the long-term
benefits to be gained by the public and the involved property owners
resulting from the rezonin~ far outweigh what may be the short-term
disadvantage of these restrictions to a single use.
Precise Plan
The precise plan submitted by Appel for the northerly portion of the
block shows 10,000 sq. ft. of commercial space along the Broadway
frontage, with 90 residential units located above and to rear of the
commercial frontage. Appel has also submitted a conceptual plan
which shows how the project could integrate with commercial
redevelopment of the southerly portion of the block.
Provided the C-C-P mixed-use amendment and this rezoning are
successful, the conditional use permit and precise plan will be
forwarded to the Redevelopment Agency (City Council) for review under
the authority of the Town Centre II Redevelopment Plan. The precise
plan is further subject to the review and approval of the Design
Review Committee. The conceptual plan for the southerly portion of
the block has been submitted in support of the Appel project, and
cannot be dictated to the involved property owners without their
cooperation, or without action by the Redevelopment Agency to
assemble the land and establish this or another alternative plan as
the precise plan for the area. In the absence of this action, the
coordination and integration of development on the southerly portion
of the block will have to be addressed, as best it can, through
individual precise plans.
The P Modifying District may be applied to areas within the city only
when one or more of the following circumstances is evident:
1. The subject property, or the neighborhood or area in which the
property is located, is unique by virtue of topography,
geological characteristics, access, configuration, traffic
circulation or some social or historic situation requiring
special handling of the development on a precise plan basis.
2. The property or area to which the P modifying district is
applied is an area adjacent and contiguous to a zone allowing
different land uses, and the development of a precise plan will
allow the area so designated to coexist between land usages
which might otherwise prove incompatible.
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page
3. The basic or underlying zone regulations do not allow the
property owner and/or the city appropriate control or
flexibility needed to achieve an efficient and proper
relationship among the uses allowed in the adjacent zones.
4. The area to which the P modifying district is applied consists
of two or more properties under separate ownership wherein
coordination regarding access, on-site circulation, site
planning, building design and identification is necessary to
enhance the public convenience, health, safety and general
welfare.
All of the circumstances are evident with the subject property. The
site is a City block consisting of several parcels under separate
ownerships, and is located on a scenic gateway adjacent to
residential uses as well as an elementary school--all of which
support the need for the control and flexibility provided by a
precise plan to promote the proper relationship among on- and
off-site uses and areas.
WPC 5912P
I [ ~ , i I I
"D" ~ ,~ I
STREET -., .!--_..-I
~ ,
I ,
'-\'
~,'
FEASTER ~I ~
ELEMENTARY
pROJECT AREA
ii '--" E"--------..,eSTREET
I
CITY s~ ~ ---~
~ i
I~i~ ~-- ~-- *_ ___
[AFP~L ~V~PH*NT ~.1' ~LOCATOR:~HI~IT Z '
~ZON~ ~ C-T
negative declaration
PROJECT NAME: Flower & Broadway, Mixed Use Project
PROJECT LOCATION: Southwest Corner of Flower Street and Broadway
PROJECT APPLICANT: Appel Development Co.
CASE NO: IS-89-41 DATE: January 23, 1989
A. Project Setting
The project site is located at the southwest corner of Flower Street and
Broadway. The 4.03.acre parcel extends westerly along the Flower Street
frontage to Jefferson Avenue. The parcel frontage on Broadway and
Jefferson is approximately 300 feet while its frontage on Flower Street is
approximately 580 feet. Currently, there are two small apartment
buildings with a total of 5 dwelling units, a car rental agency utilizing
the site a boat repair facility, and a vacant lot.
Land uses in the project's vicinity include commercial to the east and
north along Broadway, single-family and multi-family residential to the
north along Flower Street, Feaster Elementary School to the west, and a
mobile home park to the south.
The parcel is topographically flat and has no known adverse soil
conditions. A soils report will be required prior to issuance of a
building permit, however.
B. Project Description
The proposed mixed use project consists of 90 residential apartment units
and 10,000 square feet of commercial retail space. Prior to project
construction the existing apartments and small commercial structures will
be demolished and removed. The project's commercial component fronts on
Broadway with 14 residential units on the second floor above the retail
space. The remaining 76 units consist of four 2 story structures adjacent
and west of the commercial structure. The 90 units consists of forty
1-bedroom apartments and fifty 2-bedroom apartments. The apartment
complex surrounds a central recreation area with a spa, swimming pool,
recreation building and landscaped open areas.
The project provides a total of 210 parking spaces. Fifty spaces are for
retail use. One hundred and sixty spaces are for residential use. Of the
160 spaces 50 spaces are provided within enclosed garages, 32 spaces are
provided wlthin carports and the remaining 78 are open bay parking spaces.
~.. city of chula vista planning department CIIYOI:
environmental review section CHU[A VISTA
-2-
An estimated 36 elementary school, 16 junior high and 12 senior school
students could be generated by the proposed project. Feaster Elementary
School is currently busing 82 students to other schools, and Chula Vista
Junior and senior high schools are operating over capacity. Prior to the
issuance of a building permit, the applicant will be required to submit
school fees.
C. Compatibility with Zoning and Plans
The project site is currently zoned CT and is designated as high density
residential and Thoroughfare Commercial. The project applicant has
applied for a rezoning to the CC-P zone.
D. Compliance with the Threshold/Standards Policy
1. Fire/EMS
The estimated Fire/EMS response time is one to six minutes, which is
within the acceptable range of the Threshold Standard.
2. Police
The Police Department is currently maintaining an acceptable level of
service based on the Threshold Standard.
3. Traffic
The Engineering Department has reviewed the proposed project and
determined that it would not adversely affect the existing levels.of
service on roads and intersections in the vicinity. However, 5
8.8+ feet of right-of-way dedication is required on Broadway to
provide the necessary transition to the ultimate intersection width
of 61 feet from center .line to property line. Improvements are
required on Broadway to provide 53 feet from center line to curb line
and shall include AC paving, curb, gutter and sidewalk, and median.
A street light is required on Jefferson Street.
4. Park/Recreation
The Parks and Recreation Department has determined that the proposed
project would not exceed adopted Threshold Standards.
5. Drainage
The Engineering Department has concluded that existing drainage
facilities would accommodate storm water flows and volumes and that
City standards would not be exceeded.
6. Sewer
Existing sewer lines are adequate to serve the proposed project.
city of chula vista planning departmant Cl~O~
- envlronmenlal review sectlon. CHUL~,Vl~i'A
-3-
7. Water
Service to the site is currently provided. The addition of the
proposed project would not effect the Threshold Standard.
E. Identification of Environmental Effects
In accordance with the Initial Study, the Flower and Broadway, Mixed Use
Project would not result in any significant environmental effects.
G. Findings of Insignificant Impact
Based on the following findings, it is determined that the project
described above will not have a significant environmental impact and no
environmental impact report needs to be prepared.
1. The project has the potential to substantially degrade the quality of
the environment, substantially reduce the habitat of a fish or
wildlife species, cause a fish or wildlife population to drop below
self-sustainin§ levels, threaten to eliminate a plant or animal
community, reduce the number or restrict the range of a rare or
endangered plant or animal, or eliminate important examples of the
major periods of California history or prehistory.
The property is within the City s Redevelopment Area and supports no
sensitive habitat or species. There are no known geologic hazards
on-site.
2. The project has the potential to achieve short-term environmental
goals to the disadvantage of long-term environmental goals.
The project conforms to the long-term goals of the City as identified
and therefore, will not achieve any short-term goals to the
disadvantage of long term'goals.
The Engineering Department has determined that future traffic
conditions will warrant improvements to the intersection of Broadway
and Street south of the project area. A continuous right hand turn
lane will require street widening on Broadway and this property is
within the transition area for the improvement. Provision for this
future modification will be a condition of the applicant's building
permit.
3. The project has possible effects which are individually limited but
cumulatively considerable. As used in the subsection, "cumulatively
considerable" means that the incremental effects of an individual
project are considerable when viewed in connection with the effects
of past projects, the effects of other current projects, and the
effects of probable future projects.
city of Chula vista planning department CllYOF
environmental revllw laCtlon. CHUba~Vl~TA
-4-
This project and others in the vicinity could impact educational
services. However, with increasing capacity in eastern Chula Vista,
attendance boundary adjustments, payment of school fees and the
formation of community facilities districts "cumulatively
considerable" impacts will be avoided.
4. The environmental effects of a project will cause substantial adverse
effects on human beings, either directly or indirectly.
The project would not substantially increase ambient noise levels,
nor would it result in the generation of any hazardous materials
which could significantly impact human beings.
H. Consultation
1. Individuals and Organizations
City of Chula Vista: Steve Griffin, Associate Planner
Roger Daoust, Senior Civil Engineer
Ken Larsen, Director of Building and Housing
Carol Gove, Fire Marshal
Shauna Stokes, Parks & Recreation
Applicant's Agent: Anthony G. Ambrose
HCH Partners
4877 Viewridge Avenue
San Diego, CA 92123
2. Documents
The Chula Vista General Plan
The Chula Vista Municipal Code
EIR-88-3 Town Centre II Expansion
IS-89-44 Sea Vale Apts.
This determination, that the project will not have any significant
environmental impact, is based on the attached Initial Study, any comments on
the Initial Study and any comments on this Negative Declaration. Further
information regarding the environmental review of the project is available
from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA
92010~ · ,
ENVIRON~AL REVIEW COORDINATOR
EN 6 (Rev. 3/88)
WPC 5898/0175P
- city o! chula vista planning department CI1YO~
'~ environmental review sectlon. CHULAVISTA
- FOR OFFICE
Case No.
Fee
INITIAL STUDY Receipt No.
Date Rec'd
City of Chula Vista Accepted
Application Form Project
A. BACKGROUND
1. PROJECT TITLE Flower and Broadway
2. PROJECT LOCATION (Street address or description
Southeast corner of Flower and Broadway
Assessors Book, Page & Parcel No. $6~ -~,~'~?~'%~nd 22
3. BRIEF PROJECT DESCRIPTION Proposes 90-unit residential
housing and 107000 SF Retail --
Mixed Use Development
4. Name of Applicant Appel Development
Address 2254 San Diego Avenue~ Suite 200 Phone 291-7647
City San Diego State CA Zip )2110
5. Name of Preparer/Agent Martinez/Won~ & Associates~ Inc.
Address 701 B Street, Suite 440 Phone 233-4857
City San Diego State CA Zip 92101
Relation to Applicant Architect
6. Indicate all permits or approvals and enclosures or documents
required by the Environmental Review Coordinator.
a. Permits or approvals required:
General Plan Revision x Design Review Committee Public Project
Rezoning/Prezoning Tentative Subd. Map Annexation
Precise Plan __Grading Permit Design Review Board
Specific Plan __ Tentative Parcel Map .'~ Redevelopment Agency
Cond. Use Permit Site Plan & Arch. Review '
Variance Other
b. Enclosures or documents (as required by the Environmental Review
Coordinator).
Location Map X Arch. Elevations Eng. Geology Report
Grading Plan x Landscape Plans Hydrological Study
Site Plan x Photos of Site & Biological Study
Parcel Map -- Setting Archaeological Survey
Precise Plan Tentative Subd. Map Noise Assessment
Specific Plan __ Improvement Plans Traffic Impact Report
Other Agency Permit or Soils Report Other
Approvals Required
~' ~ ( 12/82)
.... ~ Rev.
- 2 -
B. PROPOSED PROJECT
1. Land Area: sq. footage 175~419 SF or acreage 4.03 Acres
If land area to be dedicated, state acreage and purpose.
N/A
2. Complete this section if project is residential.
a. Type development: Single family Two family
Multi family X Townhouse Condominium
b. Number of structures and heights 2 Story Building
Maximum Height: 30~-0''
c. Number of Units: 1 bedroom 40 2 bedrooms 50
3 bedrooms 0 4 bedrooms O Total units 90
d. Gross density (DU/total acres) 22.5 / per Acre
e. Net density (DU/total acres minus any dedication) 22.5 / per Acre
f. Estimated project population 150 - 180 persons
g. Estimated sale or rental price range$5OO to $695
h. Square footage of floor area(s) Approx. 67,500 SF Total
i. Percent of lot coverage by buildings or structures
j. Number of on-site parking spaces to be provided 224
k. Percent of site in road and paved surface 36%
3. Complete this section if project is commercial or industrial.
a. Type(s) of land use Commerical / Residential
b. Floor area 10,o00 SF Height of structure/s) 30~-0'' Max.
c. Type of construction used in the structure Wood Frame
Type 5
d. Describe major access points to the structures and the
orientation to adjoining properties and streets
Facinq Broadway
e. Number of on-site parking spaces provided 50 spaces
f. Estimated number of employees per shift 20 , Number of
shifts One Total 20
g. Estimated number of customers (per day) and basis of estimate
50 - 1OO
- 3 -
h. Estimated range of service area and basis of estimate
General Retail Use / per Market Study
i. Type/extent of operations not in enclosed buildings
N/A
j. Hours of operation 8 to 12 hours
k. Type of exterior lighting Energy Saver Lightin9 per
Title 24 Energy Requirement
4. If project is other than residential, commercial or industrial
complete this section.
a. Type of project N/A
b. Type of facilities provided
c. Square feet of enclosed structures
d. Height of structure(s) - maximum
e. Ultimate occupancy load of project
f. Number of on-site parking spaces to be provided
g. Square feet of road and paved surfaces
C. PROJECT CHARACTERISTICS
1. If the project could result in the direct emission of any air
pollutants, (hydrocarbons, sulfur, dust, etc.) identify them.
N/A
2. Is any type of grading or excavation of the property anticipated N/A
/If yes, complete the following:) Genera} finish grading
The site is very level
a. Excluding trenches to be backfilled, how many cubic yards of
earth will be excavated?
h. How many cubic yards of fill will be placed?
c. How much area ~sq. ft. or acres) will be graded?
d. What will be the - Maximum depth of cut
Average depth of cut
Maximum depth of fill
Average depth of fill
- 4 -
3. Describe all energy consuming devices which are part of the proposed
project and the type of energy used lair conditioning, electrical
appliance, heating equipment, etc.)
Air~£onditi~ninq, Use Heat pump unit.
4. Indicate the amount of natural open space that is part of the project
/sq. ft. or acres) 56,000 Square Feet
5. If the project will result in any employment opportunities describe
the nature and type of these jobs.
General retail services and management services for residential bu~l,llng.
6. Will highly flammable or potentially explosive materials or
substances be used or stored within the project
site? N/A
7. Now many estimated automobile trips, per day, will be generated by
the project? Approximately 500 trips
8. Describe (if any) off-site improvements necessary to implement the
project, and their points of access or connection to the project
site. Improvements include but not limited to the following: new
streets; street widening; extension of gas, electric, and sewer
lines; cut and fill slopes; and pedestrian and bicycle facilities.
Street trees; street scape; hardscape parings and street lighting, etc.
D. DESCRIPTION OF ENVIRONMENTAL SETTING
1. Geology
Has a geology study been conducted on the property? NO
/If yes, please attach)
Has a Soils Report on the project site been made? NO
IIf yes, please attach)
2. Hydrology
Are any of the following features present on or adjacent to the
site? NO /If yes, please explain in detail.)
a. Is there an~osurface evidence of a shallow ground water
table?
b. Are there any watercourses or drainage improvements on or
adjacent to the site?
NO
- 5 -
c. Does runoff from the project site drain directly into or toward
a domestic water supply, lake, reservoir or bay?
NO
d. Could drainage from the site cause erosion or siltation to
adjacent areas? NO
e. Describe all drainage facilities to be provided and their
location. NO
3. Noise
a. Will there be any noise generated from the proposed project site
or from points of access which may impact the surrounding or
adjacent land uses?
NO
4. Biology
a. Is the project site in a natural or partially natural state?
NO
b. Indicate type, size and quantity of trees on the site and which
(if any) will be removed by the project. N/A
5. Past Use of the Land
a. Are there any known historical resources located on or near the
project site?
N/A
b. Have there been any hazardous materials disposed of or stored on
or near the project site?
N/A
6. Current Land Use
a. Describe all structures and land uses currently existing on the
project site. Commercial/
Residential
- 6 -
b. Describe all structures and land uses currently existing on
adjacent property.
North CommerJcal
South Uommercial
East Residential
West Residential
7. Social
a. Are there any residents on site? {If so, how many?) N/A
b. Are there any current employment opportunities on site? {If so,
how many and what type?) NO
Please provide any other information which could expedite the evaluation of
the proposed project.
- 7 -
E. CERTIFICATION
Martinez/Wonq & Associates~ Inc. or Consultant or Agent*
HEREBY AFFIRM, that to the best of my belief, the statements and information
herein contained are in all respects true and correct and that all known
information concerning the project and its setting have been included in
Parts B, C and D of this application for an Initial Study of possible
environmental impact and any enclosures for attachments thereto.
*If acting for a corporation, include capacity and company name.
-8-
Case No. ~'
CITY DATA
F. PLANNING DEPARTMENT
1. Current Zoning on site:
North ~ -.~ ~t ~ 7'-
South ¢~
East cT
West ~-%/-
Does the project ~onform to the current zoning? ~ ~
2. General Plan land u~e
designation on site: -~ ~ ~.,_~./
North ~, ~ ,, ~ ,~ /
South ~Z~.-~ l~ ~-~ .
East ~, d '~
West ~/C - ~ '
Is the project compatible with the General Plan Land Use Diagram?
Is the project area designated for conservation or open space or adjacent
to an area so designated?
Is the project located adjacent to any scenic routes?
.{If yes, describe the design techniques being used to protect or enhance
the scenic quality of Chula Vista.)
How many acres of developed parkland are within the Park Service District
of this project as shown in the Parks and Recreation Element of the
General Plan? .£~
What is the current park acreage requirements in the Park Service
District? -~.
How many acres of parkland are necessary to serve the proposed project?
(2AC/lO00 pop.) ~:'. ~
Does the project site provide access to or have the potential to provide
access to any mineral resource? (If so, describe in detail.)
-9-
3. Schools
If the proposed project is residential, please complete the following:
Current Current Students Generated
School Attendance Capacity From Project
E1 ementary .g_~ ~ I ~.v~
Jr. High .I '35
Sr. High ~' ~'~' I ~ ?¥ i ~ /~'
4. Aesthetics
Does the project contain features which could be construed to be at a
variance from nearby features due to bulk, form, texture or color? {If
so, please describe.) ~->x~
S. Energy Consumption
Provide the estimated consumption by the proposed project of the following
sources:
Electricity {per year)
Natural Gas (per year)
Water {per day)
6. Remarks:
-lO-
No.-'~
Case .~___~
G. ~NGINEERING DEPARTMENT
1. Drainage
a. Is the project site within a flood plain?
b. Will the proje, ct be subject-to any existing flooding hazards?
c. Will the project create any]flooding hazards?
d. What is the location and_~scrtp~on of existing on-site
drainage facilities? ~4~ ~ ~C
e. Are they adequate to serve the project? ~
f. What is the location and Uescripti~n of existing off-site.
drainage facilities? ~~d~ y- ~ ~-~
g. ~e ~hey adequate to serve ~ project?
2.
a. Hhat ~ds provfde p~ma~y access, ~o ~he
b. gha~ fs ~he estimated numbe~ of one-way au~Gips ~o be
generated by the projec~ (pe~ day)?
c. Hhat is the ADT and estimated ]eye] of servfce before and
Afte~
L.0.s.
d. Are the primary access roads adequate to serve the project?
If not, explain briefly.
e. Will it be necessary that additional dedic.aJ;ion, widening and/or
improvement be made to existing streets?
I.f so, specify the general nature of thJ In~j~'~sarv ac~nnc ~'~'~ --,
-ll -
Case No.
3. .Geology
a. Is the project site subject to:
Known or suspected fault hazards? ! 0~1~.~ ~mo
Liquefaction?~ ~ ~~,~ ~
Landslide or slippage? ~ y~ ?~
b. Is an engineering geolo~ report necessary to evaluate the
project?.~O~ ~ ~%~(~ ~X~/ ~ ~~
4. Soils ~'/~ ~t
a. Are there any ~nticipated adverse soil conditions on the project
b. If yes, what are these adverse soil conditions? . ~/~
·
c. Is a soils report necessary? y~ ~r ~ ~0, J~i~J
5. Land Form
........ b. What is the maximum natural slope of the site? ~~
6. Noise
Are there any t~affic-related no~se levels impacting the site that
8~e significant enough to justify that a noise analysis be ~equired
of the applicant? ~
-12-
Case No.
7. Air Quality
If there is any direct or indirect automobile usage associated with
this project, complete the following:
Total Vehicle
Trips Emission Grams of
(per day) Factor Pollution
Hydrocarbons /t X 18.3 =
NOx {NO2) " X 20.0 :
Particulates ~' ~ 1.5 : /
x .78
8. Waste Generation
How much solid and liquid {sewage) waste will be generated by the
proposed project per day?
~hat is the location and size of existing on or a
sewer lines djacent
Are they adequate to serve the proposed project?
9. Public Facilities/Resources Impact
If the project could exceed the threshold of having any possible
significant impact on the environment, please identify the public
facilities/resources and/or hazards and describe the adverse impact.
{Include any potential to attain and/or exceed the capacity of any
public street, sewer, culvert, etc. serving the project area.)
Remarks/necessary mitigation measures
- 13 -
Case No.
H. FIRE DEPARllqENT
1. What is the distance to the nearest fire station and what is the Fire
Department's estimated reaction time? ~ ~., ~ & ~,~
2. Will the Fire Department be able to provide an adequate level of fire
protection for the proposed facility without an increase in equipment
or personnel?
3. Remarks
Marshal
Date
Project Name Date 11-9-88
Project Address Broadway and Flower
To: Planning DePartment
Environmental Review Coordinator
John Hardesty, Engineering
Engineering, Subdivisions
Building and Housing
From: Fire Prevention Bureau
This department has reviewed the information or plans referred to us by you. Please
note the following comments:
1. Project will require the installation of private fire hydrants.
2. Project will require a fire alarm system.
3. "Removable fence" does not satisfy the requirement for fire department access.
4. Access to interior of complex is inadequate and will require the installation
of either sprinkler system or standpipe system to mitigate the problem.
-13(a)-
Case No. /s-- ~'- .~?'./
H-1. PARKS & RECREATION DEPARTMENT
1. Are existing neighborhood and community parks near the project
adequate to serve the population increase resulting from this
project?
Neighborhood ?w~o-w.~__~
Community parks ~x~c~.,~, ! .A~,~,r~ ~c~z<~-
2. If not, are parkland dedications or other mitigation proposed
as part of the project adequate to serve the population increase?
Neighborhood A2 / q
Community parks
3. Does this project exceed the Parks and Recreation Thresholds
established by City Council policies?
Parks and Recreation Director or Date
Representative
CITY OF CHULA VISTA
DISCLOSURE STATEMENT
APPLICANTIS STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP I~TERESTS ON ALL APPLICATIONS
WHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL, PLANNING
COMMISSION AND ALL OTHER OFFICIAL BODIES.
The following information must be disclosed:
I. List the names of all persons having a financial interest in the application.
Bert and Bob Investment Co.
Appel Development Company
List the names of all persons having any ownership interest in the property involved.'
Bert Epstein Steve Appel
Bob Epstein Dan Appel
2. If any person.identified pursuant to (1) above is a corporation or partnership, list
the names of all individuals owing more than 10% of the shares in the corporation
or owning any partnership interest in the partnership.
N/A
3. If any person identified pursuant to (1) above is a non-profit organization or a
trust, list the names of any person serving as director of the non-profit
organization or as trustee or beneficiary or trustor of the trust.
4. Have you had more than $250 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and Council within the past twelve months?
Yes__ NoXx If yes, please indicate person{s)
IPerson i~ defined as: "Any individual, firm, copartnership, joint venture, association, i
Social club, fraternal organization, corporation, estate, trust, receiver, syndicate,
this and any other county, city and county, city, municipality, district or other
political subdivision, or any other group or co~cting as a unit."/~-----.~
NO ~~'~/')~'~
( TE: Attach additional pages as necessary.)~/~.~~ ~( //
Signature ~1 ican~t~
?~.~701P ~n Barefield, Appel ~pment Corporation
a-~u Print or type name of applicant
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 1
3. PUBLIC HEARING: Conditional Use Permit PCC-89-29; request to construct
a Youth/Community Center on the north side of "L"
Street, east of Fifth Avenue, on the grounds of Chula
Vista I~igh School - Community Development Department
A. BACKGROUND
This application, submitted oy the Community Development Department on
behalf of the Chula Vista Redevelopment Agency, requests permission to
construct a 15,000 sq. ft. Youth/Community Center on the north side of "L"
Street, 290 ft. east of Fifth Avenue, on the grounds of Chula Vista High
School (CVHS).
The Environmental Review Coordinator conducted an Initial Study, IS-88-81,
of potential environmental impacts associated with the implementation of
the project. Based on the attached Initial Study and comments thereon, if
any, the Coordinator has concluded that there would be no significant
environmental impacts, and recommends adoption of the Negative Declaration
issued on IS-88-81.
B. RECOMMENDATION
1. Based on the Initial Study and comments on the Initial Study and
Negative Declaration, find that this project will have no significant
environmental impacts and adopt the Negative Declaration issued on
IS-88-81.
2. ~ased on findings contained in Section "E" of this report, adopt a
motion recommending that the City Council approve PCC-89-29 subject
to the following conditions:
a. '[ne Zoning Administrator shall annually review and approve the
proposed schedule of programs and activities at the Center, as
well as any changes thereto or special events which may occur
from time to time. The Zoning Administrator shall ensure that
the normal operations of the Center can be accommodated with the
available off-street parking. The Zoning Administrator's
decision may be appealed to the Planning Coramission and on to
the City Council if necessary.
b. Provision shall Be made for supervision and security of the
grounds in and around t~e building and parking area for any
proposed evening youth programs, activities, or special events,
subject to the review and approval of the Zoning Administrator.
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 2
~.~ DISCUSSION
Adjacent zoning and land use
North R-1 CVHS Athletic fields
Soutn R-3-P-14 Church and Multi-Family
East R-1 CVHS Football/track field
West R-1 CVHS Athletic fields and Single-family
Existing site characteristics
The site totals 1.24 acres and includes an existing lO0-space parking lot,
and a 150 ft. x 185 ft. building site which adjoins the easterly portion
of the parking lot, just to the west of the CVHS football bleachers and
some 290 ft. east of Fifth Avenue. The project site is presently part of
the athletic fields which extend easterly from Fifth Avenue, between "K"
and "L" Streets.
Proposed use
The proposal is to construct a Youth/Community Center to be used jointly
by the Sweetwater Union High School District (SUHSD) and the City of Chula
Vista or a City lessee. Fhe facility would total 15,000 sq. ft. of floor
area, including a 9,000 sq. ft./2OO-seat ~Lvmnasium, two activity/crafts
rooms totaling 3,000 sq. ft., and associated offices, utility, and storage
rooms. The Center would be served by the existing parking area which is
striped for 100 cars. Some reduction may occur due to restripin§ and
landscaping to conform with City standards.
The operation and i~ours of the Center nave not yet Ween determined. The
Sweetwater Union High School District will use the facility for school-
related activities during certain school hours, limited evening hours, and
certain times during the summer. The City and/or a City lessee will use
the Center primarily during after-school hours. The ~ours reserved for
SUHS District use will De determined on an annual basis by mutual
agreement between the City and the District.
The Center is expected to accommodate the following general types of
youth-oriented activities: 'league oasketball, supervised open-recreation
activities, arts an~ crafts classes, dance classes, and youth activity
meetings such as the Scouts.
D. ANALYSIS
Although the Center is expected to accommodate youth-oriented activities,
there is no specific information at this time on how the SUHS District, or
the City, or a City lessee, may use the facility in terms of programs,
users and hours of operation. On the other hand, the Center is designed
as a multi-purpose building, and the use of the facility could change over
time regardless of what is initially planned. It is appropriate therefore
to look at the Center as one which may accommodate a combination of youth
and adult-oriented programs and activities.
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 3
The two issues pertinent to tne conditional use permit are the potential
noise/activity impacts on adjacent residents, and the adequacy of
off-street parking. The design and treatment of the structure ano site
are subject to review and approval of the Design Review Committee, and
ultimately the Redevelopment Agency and SUHSD Board. The building
footprint ano floor plan attached to this report are subject to revision
as a result of preliminary review by the DRC--although the basic space
allocations will not change significantly. Because the footprint and
floor plan are not finalized, building elevations have not yet Peen
prepared.
In terms of noise and activity impacts, tne site is generally well-suited
for the use. The site is within the CVHS complex, and the athletic fields
of whici~ the property is a part are used extensively for uaytime outdoor
recreational activities during Doth weekdays and weekends; the adjacent
foot~all/track facility is used intensively during the evening nours as
well. The supervised activities associateo wit~ the Center are within the
normal expectations of school property use, and ~ould be confined to
inside the building an~ thus would be expected to have less of an impact
than the existing outdoor activities.
A concern of staff is with the potential for unsupervised outside
activities associated with youth programs during the evening hours. The
extent of scheduled evening youth activities at the Center is unknown, but
it does appear that whatever activities do occur in the evening will be
under the jurisdiction of the City or a City lessee rather than school
officials. We ~elieve that evening youth programs have the potential to
generate a significant amount of unsupervised activity outside the
building, and perhaps involving a substantial number of youngsters not
associated with the Center. For the benefit of adjoining residents and
the youngsters themselves, we have included a recommendation that
supervision/security of the grounds oe required for all evening youth
programs and activities.
The Code would normally require 240 parking spaces to serve 12,000 sq. ft.
of assembly area (9,000 sq. ft. gymnasium, and 3,000 sq. ft. of general
purpose rooms). This is ~ased on a standard of one parking space for
every 50 sq. ft. of assembly area (maximum occupancy of assembly areas is
established by the Uniform Building Co~e at one person for every 15 sq.
ft. of floor area). As noted above, the proposal is to serve the Center
with the existing parking lot w~ich, with the a~dition of ~andscaping and
restriping to conform ~ith City dimensional standards, woul~ provide a
maximum of 100 parking spaces, or less than one-half of the Code
requirement.
There are several factors which ameliorate the apparent parking deficiency
in the present instance. First, the parking standard assumes a
freestanding use, while in this case the facility is located on school
grounds and is expected to a large degree to serve students anO youngsters
from the surrounding neighborhoods. Secondly, t~e standard assumes users
City Planning Commission
Agenda Item for Meeting of February 8, 1989 Page 4
will come from a normal cross-section of the population, whereas the
Center is expected to be youth-oriented. Finally, the standard assumes a
fairly high average occupancy with an emphasis on "assembly" such as
meetings and dances, rather t~an on the recreational and crafts activities
which are expected to be the focus of this facility. (NOTE: Seating
within the gym will De limited to 200 seats.)
We believe the parking will be adequate if the primary use of the Center
is for youth-oriented recreational activities as presently envisioned.
The parking will not be adequate, however, if the facility is used to a
significant degree ay adults or for larger scale assembly and meeting
activities. Consequently, a condition has peen recommended w~ich will
require the Zoning Administrator to review and approve or conditionally
approve the regularly scheduled program of activities, as well as any
special events which/ may be scheduled from time to time. It would be the
intent of the Zoning Administrator to ensure that the normal operations of
the Center can be accommodated with the available off-street parking.
E. FINDINGS
I. That the proposed use at the location is necessary or desirable to
provide a service or facility which will contribute to the general well being
of the neighborhood or the conmnunity.
The Youth/Community Center is expected to provide a wide range of
recreational and educational activities for the benefit of the youth
of the co~nunity.
2. That such use will not under the circumstances of the particular
case, be detrimental to the health, safety or general welfare of persons
residing or working in the vicinity or injurious to property or improvements
in the vicinity.
The site is located on the grounds of Chula Vista high School and the
Center's activities will be consistent with the normal range of
school programs. The specifics of the Center's operation will be
subject to review and approval of the Zoning Administrator in order
to ensure no adverse impact with regard to on-street parking.
Supervision and security shall be provide~ for evening youth programs.
3. That the proposed use will comply with the regulations and
conditions specified in the code for such use.
The proposal shall De required to comply with all applicable codes,
regulations ano conditions prior to development and on an ongoing
basis thereafter.
4. That the granting of this conditional use permit will not adversely
affect the general plan of the City or the adopted plan of any government
agency.
The granting of this permit is consistent with policies of the
General Plan as they relate to the provision of public facilities and
services for the benefit of Chula Vista residents.
WPC 5917P/2652P
CHULA VISTA HIGH SCHOOL
Easterly Portion of Complex
K STREET o~
::~_~lo
YOUTH/COMMUNITY CENT
BUILDING SITE
· EXH
MAR'CH 1986
negativ= declaration
PROJECT NAME: Chula Vista Youth Center
PROJECT LOCATION: Northeast corner of Fifth Avenue and "L" Street
PROJECT APPLICANT: Redevelopment Agency of the City of Chula Vista
276 Fourth Avenue, Chula Vista, CA 92010
CASE NO: IS-88-81 DATE: June 14, 1988
A. Project Setting
The proposed project site is located on the campus of Chula Vista High
School. The property is in an urbanized area of Chula Vista and has been
used for various school related activities for many years. There are no
biological or cultural resources existing on or near the site. Public
facilities are generally adequate to serve the project, however, the
Engineering Department has indicated that downstream sewer facilities are
to be studied for adequacy. If improvements are made downstream, projects
which would benefit from these facilities would financially participate in
their installation.
This area of Chula Vista typically has moderately expansive soils. This
condition is mitigated through standard development regulations.
B. Project Description
The project consists of a 14,000 sq. ft. youth facility including an 8,000
sq. ft. gymnasium, two 2,500 sq. ft. multi-use rooms, 1,O00 sq. ft. of
office space and parking and landscaping. This would be on about 37,000
sq. ft. of the high school site. The facility would be jointly operated
by the City and the School District.
C. Compatibility with Zoning and Plans
The project conforms to the high school designation of the General Plan
and subject to a Conditional Use Permit the R-1 zoning of the property.
D. Identification of Environmental Effects
The Initial Study on the project identified two potentially significant
impacts; downstream sewer capacity and expansive soils. These issues will
be dealt with through standard development regulations which will avoid
all significant impacts.
E. Findings of Insignificant Impact
1. The entire site has been developed for a number of years and is void
of any significant natural or manmade resources that could be
affected by this proposal.
~' city of chula vista planning department C]'/YOF
environmental review section CHU[.~ Vl~'l-,~,
2. The project conforms to the long-range development and protection
plan for Chula Vista and, therefore, will not achieve any short-term
objectives to the disadvantage of these longer-term goals.
3. This developed project site is within the confines of a larger area.
This minor expansion will, therefore, not have any cumulative effect
which could adversely affect the environment.
4. The project will not result in the emissions of any substances,
noise, vibration, glare, etc. which could adversely impact human
beings.
G. Consultation
1. Individuals and Organizations
City of Chula Vista: Julie Schilling, Assistant Planner Roger Daoust, Senior Civil Engineer
Ken Larsen, Director of Building and Housing
Carol Gove, Fire Marshal
Mike Donnelly, Associate Traffic Engineer
Applicant's Agent: Pamela Buchan
Sr. Community Development Specialist
Community Development Department
City of Chula Vista
276 Fourth Avenue
Chula Vista, CA 92010
2. Documents
Chula Vista General Plan
Chula Vista Municipal Code
This determination, that the project will not have any significant
environmental impact, is based on the attached Initial Study, any comments on
the Initial Study and any comments on this Negative Declaration. Further
information regarding the environmental review of the project is available
from the Chula Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA
92010.
ENVIR~ REVIEW COORDINATOR
EN 6 (Rev. 3/88)
WPC 5280P
city of chula vista planning department (::IIY O~
environmental review sectlon. EHULAVISTA
k C FUR OFFICE USE
Case
Fee
INITIAL STUDY Rec~~' --
Date Rec 'd
City of Chula Vista Accepted by. ~_.~_~.
Application Form Project No.__~_~
A. BACKGROUND
2. PROJECT LOCATION (Street address or description)
Assessors Book, Page & Parcel NO.
' ~ · ~ . . ~ ~ .
Address ~ ~,~~ ' ~ho~e
City ~,~ V~ State ~ Zip
Address ~ Phone
City State Zip
Relation to Applicant ~~
6. Indicate all permits or approvals and enclosures or documents
required by the Environmental Review Coordinator.
a. Permits or approvals required:
_ General Plan Revision XDesign Review Committee ~ Public Project
_. Rezoning/Prezoning Tentative Subd. Map Annexation
Precise Plan '" Grading Permit -' Design Review Board
Specific Plan ' Tentative Parcel Map ~ Redevelopment Agency
'~] Cond. Use Permit Site Plan & Arch. Review
Variance Other
b. Enclosures or documents (as required by the Environmental Review
Coordinator).
Location Map Arch. Elevations Eng. Geology Report
Grading Plan ~ Landscape Plans Hydrological Study
Site Plan ~ Photos of Site ~ Biological Study
Parcel Map ~ Setting
Archaeological Survey
Precise Plan Tentative Subd. Map Noise Assessment
Specific Plan Improvement Plans ~ Traffic Impact Report
Other Agency Permit or Soils Report Other
Approvals Required
~, 3 (Rev. 12/82)
- 2 -
B. PROPOSED PROJECT
1. Land Area: sq. footage~or acreage
If land area to be dedicated, state acreage and purpose.
2. uompmete this sec~on if project i~_~sid____entia~l. ~
a. Type developme~: Single family Two family
Multi family___~Townhouse Condominium
b. Number of stluctur~d heights ~
c. Number of Units: 1 besom 2 bedrooms
3 bedrooms .___~4 be~ooms Total units
d. Gross densit~_(DU/total acr~) ~
e. Net density {!U/total acres mXk~us any dedication)
f. Estimated project population. ~
g. Estimated sale or rental price ra~e
h. Square footage of floor area{s).~
i. Percent of lot coverage by buildings ~structures
j. Number of on-site parking spaces to be ~N~ovided '
k. Percent of site in road and paved surface.X~.
3. Complete this section if project is commercial or industrial.
a. Type{s) of land use
b. Floor area Height of structure{s)
c. Type of construction used the structure
d. Describe major access points structures and the
orientation to adjoining pro and streets
e. Number of on-site parking spaces
f. Estimated number of employees per shif' , Number of
shifts Total
g. Estimated number of customers (per day) asis of estimate
- 3 -
h. Estimated range~ervice area and basis of estimate
i. ~pe/extent of opera,ohs not in enclosed buildings
J. Hours of operation
mm
k. ~pe of exterior lighting~
4. If project is other than residential, commercial or industrial
complete this section.
a. ~pe of project
b. ~pe of facilities provided
c. Square feet of enclosed structures /~yO00~.~l~'
d. Height of structure{s) - maximum ~.~
e. Ultimate occupancy load of project ~_~
f. Number of on-site parking spaces to be provided
g. Square feet of road and paved surfaces r
C. PR~ECT CHARACTERISTICS
1. If the project could result in the direct emission of any air
pollutants, {hydrocarbons, sulfur, dust, etc.) identi~ them.
2. Is any type of grading or excavation of the property anticipated ~Lo
{If yes, complete the following:) _.
a. Excluding trenches to be backfilled, how many cubic yards of
earth will be excavated?
h. How many cubic yards of fill will be placed?
c. How much area {sq. ft. or acres) will be graded?
d. What will be the - Haximum depth of cut
Average depth of cut
Maximum depth of fill
Average depth of fill
- 4 -
3. Describe all energy consuming devices which are part of the proposed
project and the type of energy used {air conditioning, electrical
appliance, heating equipment, etc.)
4. Indicate the amount of natural open space that is part of the project
{sq. ft. or acres) _.
5. If the project will result in any employment opportunities describe
the nature, and .type of these jobs. ' ' _
6. Will highly flammable or potentially explosive materials or
substances be used or stored within the project
site?
7. How many estimated automobile trips pe~ day, will be generated by
the project? '
8. Describe (if any) off-site improvements necessary to implement the
project, and their points of access or connection to the project
site. Improvements include but not limited to the following:
streets; street widening; extension of gas, electric, and sewer
lines; cut and fill slopes; and pedestrian and bicycle facilities.
D. DESCRIPTION OF ENVIRONMENTAL SETTING
1. Geology
Has a geology study been conducted on the property~
{If yes, please attach) '
Has a Soils Report on the project site been made?
{If yes, please attach) --
2. Hydrology
Are any of the following features present on or adjacent to the
site? -~ {If yes, please explain in detail.)
a.Is there any surface evidence of a shallow ground Water
table?
b. Are there any watercourses or drainage improvements on or
adjacent to the site?
-5-
c. Does runoff from the project site drain directly into or toward
a domestic water supply, lake, reservoir or bay?
d. Could drainage from the site cause erosion or siltation to
adjacent areas?
e. Describe all drainage facilities to be provided and their
location.
3. Noise
a. Will there be au noise generated from the proposed project site
or from points of access which may impact the surroundin§ or
adjacent land uses? ~ ~~_~-~.~
4. Biolo~
a. Is the project site in a natural or partially natural state?
b. Indicate ~pe, size and quanti~ of trees on the site and which
(if a~)will be removed ~ the project. _~
5. Past Use of the Land
a. Are there any known historical resources located on or near the
project site? ~
b. Have there been any hazardous materials disposed of or stored on
or near the project site? ~
6. Current Land Use
a. Describe all structures and land uses currently existing on the
project site. ~~~~
- 6 -
b. Describe all structures and land uses currently existing on
adjacent property.
South /Y~zz~7~ ~Z~/. ~ ~~ z
East ~ ~~ ~~
West ~~ ~~ ~~~
7. Social
a. Are there any residents on site? (If so, how many?) ~
b. Are there any current employment opportunities on site? {If so,
how many and what type?) ~
Please provide any other information which could expedite the evaluation of
the proposed project.
- 7 -
E. CERTIFICATION
or
Owner/owner in escrow*
~~ ~/y or
/ Consultant or Agent*
HEREBY AFFIRM, that to the best of my belief, the statements and information
herein contained are in all respects true and correct and that all known
information concerning the project and its setting have been included in
Parts B, C and D of this application for an Initial Study of possible
environmental impact and any enclosures for attachments thereto.
DATE: /~ ,,,'~/,~,¢'
/ ~'
*If acting for a corporation, include capacity and company name.
-8-
Case No. IS- -gl
CITY DATA
F. PLANNING DEPARTMENT
1. Current Zoning onNorthSite: ./~--/!~ ·
South ~,~
East
West
Does the project conform to the current zoning?
2. General Plan land use
designation on site:
North ~ c~ i~
South ~ /~ ~
East ~ t~
West // ~/
Is the project compatible with the General Plan Land Use Diagram?
Is the project area designated for conservation or open space or adjacent
to an area so designated?
Is the project located adjacent to any scenic routes? ~
(If yes, describe the design techniques being used to pr6te~ or enhance
the scenic quality of Chula Vista.)
How many acres of developed parkland are within the Park Service District
of this project as shown, in the Parks and Recreation Element of the
General Plan?
What is the current pa~ acreage requirements in the Park Service
District?
How many acres of pa~k!ay~d are necessary to serve the proposed project?
(2AC/lO00 pop.) ~.//~.
Boes the project site provide access to or have the potential to provide
access to any mineral resource? (If so, describe in detail.)
- 9 -
3. Schools ----/V//K~-
If the proposed project is residential, please complete the following:
Current Current Students Generated
School Attendance Capacity From Project
Elementary
Jr. High
Sr. High
4. Aesthetics
Does the project contain features which could be construed to be at a
variance from nearby features due to bulk, form, texture or color? (If
so, please describe.) ~
5. Energy Consumption /~ ~ ~ ~
Provide the estimated consumption by the proposed project of the following
sources:
Electricity (per year)
Natural Gas {per year)
Water {per day)
6. Remarks:
APA/: ~7~-3o0 lZ/
- l0 -
Case N0.
G. ENGINEERING DEPARTMENT
1. ~rainage
a. Is the project site within a flood plain? /~Jo.
b. Will the project be subject'to any existing flooding hazards?
] ·
c. Will the project create any:flooding hazards?
d. What is the location and description of existing on-site
drainage facilities? ~-7. ~co~ --to
, e. Are they adequate to serve ~he project?
\ f. What is the location and description of existing off-site
drainage facilities? ~]~ ~6o~ ~L~(q ~u~7~:22~
S~'4v ~ & ~r,
g. Are they adequate to serve the project?
2. Transportation
a. What roads provide primary access to the project? ~
b. What is the estimated number of one-way auto trips to be
generated by the project (per day)?..
c. What is the ADT and estimated level of service before and after
project completion?
Before After
- ~ /%7 /~?o z_ ~-~- / ~¥.~z/
d. Are the primary access roads adequate to serve the project? Y~.
I~ not. explain briefly.
e. !/ill it be necessary that additional dedication, widening and/or
~mprovement be made to existing streets? /~JO.
If so, specify the general nature of the necessary actions.
- ll - Case No.
3. G~eology
a. Is the project site subject, to:
Known or suspected fault hazards?
Liquefaction?, i j/kl~ I/-,w~,e- -Tz>
Landslide or slippage? : ~/~ ~o/Z.~ ~7~0~7
b. Is an engineering geology report necessary to evaluate the
project? ~Y¢.
4. Soils
a. Are there any anticipated adverse soil conditions on the project
site? AJaT-~uovuxy. ~yo ~oiLS 1~6-PO~T
b. If yes, what are these adverse soil conditions?_~J~
c. Is a soils report necessary? y~.
5. Land Form
a. What is the average natural slope of the site? ~-~m
b. What is the maximum natural slope of the site? ~-~
6. Noise
Are there any traffic-related noise levels impacting the site that
are significant enough to justify that a noise analysis be required
of the applicant? /T~.
-12-
Case NO.
7. Air Quality
If there is any direct or indirect automobile usage associated with
this project, complete the following:
Total Vehicle
Trips Emission Grams of
(per day) Factor Pollution
co c~4~ x 118.3 :
Hydrocarbons ~ ~ X 18.3 :
NOx (NO2) ~ ~ X 20.0
Particulates ~X 1.5 :
s.~ ~x .78 : ~.~
8. Waste Generation
How much solid and liquid (sewage) waste will be generated by the
proposed project per day?
Solid
14hat is the location and size of existing sewer l~nes on or adjacent
tothe site? ~u~~U~ ~ ~
9. Public Facilities/Resources Impact
If the project could exceed the threshold of having any possible
significant impact on the environment, please identify the public
~acilities/resources and/or hazards and describe the adverse impact.
Include any potential to attain and/or exceed the capacity of any
public street, sewer, culvert, etc. serving the project area.)
Remar~s/necessar~ ~it~gat~on measures ~" ~ '
l~YL~/gln~er or Representative Date ~ '
- 13 -
Case No. ~ ~
FIRE DEPARllqENT
1. What is the distance to the nearest fire station and what is the Fire
Department's estimated reaction time? / ~/~ .~ ~,.~
2. Will the Fire Department be able to provide an adequate level of fire
protection for the proposed facility without an increase in equipment
or personnel? ¥.F
Project Name Youth Facility Date 6-7-88
Project Address Northeast Corner of "L and Fifth Avenue
To: Planning Department
Environmental Review Coordinator
John Hardesty, Engineering
Engineering, Subdivisions
Building and Housing
From: Fire Prevention Bureau
This department has reviewed the information or plans referred to us by you. Please
note the following comments:
1. Project shall be considered an Assembly occupancy, with all the requirements
thereof.
2. Project will require the installation of a fire hydrant at the curb and
one toward the rear of the building at the fire lane.
CITY OF CHULA VISTA
DISCLOSURE STATEI~NT
IAPPLICANT'S STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS
WHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL, PLANNING
COMMISSION AND ALL OTHER OFFICIAL BODIES.
The following information must be disclosed:
l. List the names of all persons having a financial interest in the application.
Community Development Dept. of the City of Chula Vista
276 Fourth Avenue
Chula Vista, CA 92010
List the names of all persons having any ownership interest in the property involved.
Sweetwater Union High Schoo! District
il30 Fifth Avenue
Chula Vista, CA 92011
If any person identified pursuant to (1) above is a corporation or partnership, list
the names of all individuals owning more than 10% of the shares in the corporation
or owning any partnership interest in the partnership.
N/A
3. If any person identified pursuant to (1) above is a non-profit organization or a
trust, list the names of any person serving as director of the non-profit
organization or as trustee or beneficiary or trustor of the trust.
N/A
4. Have you had more than $250 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and Council within the past twelve months?
Yes__ No X If yes, please indicate person{s)
IPerson is defined as: "Any individual, firm, copartnership, joint venture, association, |
~ club, fraternal organization, corporation, estate, t. rust, receiver, syndicate,
this and any other county, city and county, city, municipality, district or other
political subdivision, or any other group or comb/~nation acting//as a unit."
{NOTE: Attach additional pages as necessary.) ~
S'9nature of applicant/~ate
WPC 0701P Community Development Department
A-110 Print or type name of applicant