HomeMy WebLinkAboutPlanning Comm Reports/1991/05/08 AGENDA
City Planning Commission
Chula Vista, California
Wednesday, May 8, 1991 - 7:00 p.m. City Council Chambers
PLEDGE OF ALLEGIANCE
INTRODUCTORY REMARKS
APPROVAL OF MINUTES - Meeting of March 13, 1991
ORAL COMMUNICATIONS
Opportunity for members of the public to speak to the Planning Commission
on any subject matter within the Commission's jurisdication but not an
item on today's agenda. Each speaker's presentation may not exceed five
minutes.
l. PUBLIC HEARING: a) Consideration of Water Conservation Plan
and Air Quality Improvement Plan for
Rancho del Rey SPAs II and III;
b) PCS-90-02: Request to subdivide 404.9 acres
known as Rancho del Rey Sectional Planning Area
III, Chula Vista Tract No. 90-02 located between
East "H" Street and Telegraph Canyon Road,
immediately south of Rancho del Rey SPA I;
Rancho del Rey Partnership.
c) Consideration of Rancho del Rey Sectional
Planning Area III Design Guidelines.
OTHER BUSINESS: Otay Ranch Interjurisdictional Task Force Meeting
DIRECTOR'S REPORT
COMMISSION COMMENTS
ADJOURNMENT AT p.m. to the Study Session Meeting of May 15, 1991
at 5:00 p.m. in Conference Rooms #2 & 3.
City Planning Commission
Agenda Item for Meeting of May 8, 1991
PUBLIC HEARING: a) Consideration of Water Conservation
Plan and Air Oualitv Improvement Plan
for Rancho del Rev SPAs II and III;
b) PCS-90-02: Re(n/est to subdivide 404.9
acres known as Rancho del Re¥
Sectional Planninq Area III, Chula
Vista Tract No. 90-02 located between
East "H" Street and TelearaDh Canyon
Road. immediately south of RanchQ de~
Rev SPA I; Rancho de~ Re¥
Partnership
c) Consideration of Rancho del Re¥
Sectional Plannina Area III Desiqn
Guidelines
A. BACKGROUND
The applicant, Rancho del Rey Partnership, has submitted a
tentative map for the Sectional Planning Area (SPA) III Plan
to subdivide approximately 405 acres into residential lots,
open space areas, a school lot, a park, and a community
purpose facility lot. The project is an "in-fill" project,
bounded on the north by East "H" Street and Rancho del Rey SPA
I, on the south by Telegraph Canyon Road, on the west by
existing development and generally Paseo Ladero, and on the
east generally by Buena Vista Way (Exhibit 1 attached).
Included for your consideration are the Air Quality
Improvement and Water Conservation Plans prepared for Rancho
del Rey SPAs II ~nd III as directed by City Council, the
tentative maps for the three phases of SPA III, and the Design
Guidelines. The Design Guidelines were presented for
informational purposes at the time of SPA Plan review and are
presented at this time for recommendation.
Rancho del Rey SPA III is the final Sectional Planning Area
for the E1 Rancho del Rey Specific Plan. The SPA I plan was
approved in 1987 and is now under construction. The SPA II
plan was approved in 1989 and is also under construction.
Rancho del Rey SPA III was approved in January, 1991.
The Council previously certified EIR-S9-10 and the associated
mitigation monitoring program in its consideration of the
Sectional Planning Area Plan for Rancho del Rey SPA III.
B. RECOMMENDATION
1. Adopt a resolution recommending approval of the Water
Conservation Plan for lancho del Rey SPAs II and III;
2. Adopt a resolution recommending approval of the Air
Quality Improvement Plan for Rancho del Rey SPAs II and
III;
3. Adopt a resolution recommending approval of the Design
Guidelines prepared for Rancho del Rey SPA III; and
4. Based on the Findings in Attachment #1 and Conditions in
Attachment # 2, adopt a motion recommending that the City
Council approve the tentative subdivision map for Rancho
del Rey SPA III.
C. DISCUSSION
1. Rancho del Rev Sectional Plannin~ Area (SPA) III Plan
The Rancho del Rey SPA III Plan is included as Exhibit 2
attached. The plan is intended to show the general location
of all proposed uses and the general circulation system. It
details that within the 405 acres of SPA III, there are
proposed a maximum of 1,380 dwelling units (314 single family
conventional units at 2-4 and 4-6 dwelling units per acre; 250
single family cottage units at 4-6 and 6-8 dwelling units per
acre; 228 townhouse units at 8-12 dwelling units per acre; and
588 specialty housing units at 4-6, 6-8 and 8-12 dwelling
units per acre). Also included in the plan is a 26.1 acre
junior high school site, a 10.8 acre park site, a 1.9 acre
community purpose facility site and 148.3 acres of open space.
This SPA plan was approved with conditions at the City Council
hearing of January 15, 1991. (A more complete analysis of the
subdivision lot designations is found in Section D. ANALYSIS,
following this Discussion section.)
2. Subdivision Structure and Desiqn
Rancho del Rey SPA III is planned to be a residential
community with a diversity of housing types which will become
available to families and individuals with various income
levels and housing needs. Eighty-six acres of Specialty
Housing is located in the northern portion of the plan,
immediately south of East "H" Street. A variety of housing
types will be included in the development of this area as a
retirement community. Precise plan approval will further
detail specific requirements and provisions for this lot. The
single family units in SPA III are generally located in the
center of the plan and have been designed to relate to
existing adjacent single family units. The townhouse area
located in the southeastern portion of the plan will
interface with existing multi family development to the east
and with the park and open space systems to the south and
west. The open space system in Rancho del Rey SPA III
2
includes over 148 acres consisting mostly of canyon and slopes
covered in coastal sage scrub. Trail and pedestrian path
systems will be provided along East "H" Street, in the south
leg of Rice Canyon, along Paseo Ranchero and in the open space
areas north of Telegraph Canyon Road. This will result in an
added beneficial recreational use for the area.
3. Gradina
The E1 Rancho del Rey Specific Plan set the limit for
developable areas and open space areas. In addition, the
Specific Plan included a series of findings acknowledging that
development of the project site under the adopted Specific
Plan would require substantial landform alteration. At the
time of SPA Plan approval, alternative grading concepts that
alleviated amountsof grading in open space areas and reduced
heights of cut and fill slopes were presented and made part
of project approval.
Development areas are located on the higher elevations or
plateaus, while the canyons and slopes remain primarily in
open space with some recreational uses such as trails. The
Rancho del Rey SPA III Plan calls for a balanced cut and fill
grading program of approximately 4.0 million cubic yards.
Typical cuts and fills will range between 10 and 20 feet.
Many slopes will be retained in a natural state in the open
space areas. Those graded slopes that encroach the open space
areas will be revegetated with native species.
Grading shown on the tentative maps is consistent with the
alternative grading concept'plan and maintains the areas set
for development and open space by the Specific Plan. A
condition is recommended for tentative map approval that
requires grading proposals to be reviewed by the City Engineer
for consideration of balanced cut and fill, utilization of
appropriate soil types, effective landscaping and revegetation
where applicable. Grading is to occur in separate phases
unless a single phase operation is approved with'the grading
plan.
An area of potential concern is the grading and drainage
occurring on lots 71, 72 and 89 of Phase 2, Unit 1. In these
areas, the subdivision must meet and interface with existing
developmen~ and grading will need to be accommodated on site.
In order to provide the largest possible pad area and avoid
a difficult terrain situation of open drainage channels on
residential lots, staff prefers that the grading and drainage
plans detailing these lots provide for spot drainage
interceptors to catch the water and carry it underground.
This may require retaining walls and further grade analysis.
A recommended condition of approval requires that no negative
3
grading or drainage impacts occur to the off site properties
adjacent to these lots.
4. Circulation
Access to the subdivision is provided by Paseo Ranchero from
either East "H" Street to the north, Telegraph Canyon Road to
the south, or via East "J" Street from the west. The E1
Rancho del Rey Specific Plan designates Telegraph Canyon Road
and East "H" Street as prime arterials, Paseo Ranchero as a
4 lane collector and East "J" Street as a 2 lane residential
collector.
The proposed tentative map and improvements for these streets
are consistent with the SPA Plan, Specific Plan, and General
Plan designations. Conditions of SPA approval and the Public
Facilities Financing Plan (PFFP) require development of SPA
III to be consistent with any adopted Eastern Chula Vista
Transportation Phasing Plan. This is also made a condition
of tentative map approval. The PFFP also requires completion
of East "J" Street to connect with existing improvements to
the west.
An item of concern raised at the City Council hearing on the
SPA regarded the level of service at the intersection of Paseo
del Rey and East "H" Street. It was determined that a right
turn lane would be required should conditions warrant the
addition. However, given the open space canyon slope that is
located immediately adjacent to the right-of-way and the
substandard street width already established, there may be
substantial impact associated with the addition of the turn
lane. A condition of tentative map approval provides that the
developer enter into an agreement to provide a right turn lane
at the intersection of Paseo del Rey and East "H" Street, to
the satisfaction of the City Engineer, should threshold
standards be exceeded.
The Metropolitan Transit and Development Board (MTDB) has
provided comment on the transit alternatives provided by
Rancho del Rey SPA III (Appendix 3). While the design of the
project creates neighborhoods and is sensitive to natural
topography, the circuitous streets and cul-de-sacs are not as
easily adapted to transit operation as much as the traditional
interconnecting grid system of streets. MTDB recommendations
include pedestrian pathways through ends of cul-de-sacs that
would connect to adjacent streets, and adequate public rights-
of-way at intersections along major arterials for future bus
stops. These have been incorporated into the conditions of
approval.
5. Low and Moderate IDcome HousiDg
The Housing Element requires that subdivisions of over 50
dwelling units provide 5% of the total project unit count as
affordable units for low-income families and 5% of the total
project unit count for moderate-income families. In August
of this year, the City Council approved an agreement
concerning this requirement and how it will be met in the
Rancho del Rey Specific Plan area. The agreement states that
Rancho del Rey has satisfied in full the moderate income
housing requirement:of 322 units by the construction of multi-
family units in the Rancho del Rey Specific Plan area. The
goal for 10w income units has been partially met through the
construction of 299 units in the Terra Nova Apartments, Beacon
Cove, Pinwheel and the navy housing project. The agreement
also states that the additional 23 (minimum) low income units
will be provided in SPA III if a reasonable area for such
units is available. If no such site is available in SPA III,
it was agreed that an alternate site within the City may be
approved. This requirement was repeated in SPA III conditions
of approval. A condition has also been placed on tentative
map approval that prior to first final map approval, the
applicant shall enter into an agreement with the City to
provide the low income housing as defined and approved by the
City's Housing Coordinator.
6. Specialty Housina Area
The Specialty Housing Area, shown on the tentative map as
Phase 1, will be developed as a retirement community, creating
a village atmosphere for residents in a variety of housing
types. The precise design of the development is unknown at
this time. However, the conceptual grading plan, made a part
of SPA Plan approval, provides the basic footprint of the pad
and slope areas and the circulation. The Design Guidelines
discuss the desired concepts to be used in developing the
site. SPA Plan approval requires the adoption of a Precise
Plan prior to development of the parcel. This condition is
also repeated as a condition of the tentative map.
At the meeting of January 15, 1991, Council expressed concern
that there be guarantees in place regarding the development
of this land for senior use. Specific details of financial
arrangements are more properly handled in a development
agreement, which is currently being prepared by the developer
and staff. The requirement for Precise Plan approval will
provide the City adequate review of the density, circulation,
open space and interface of the retirement community with the
surrounding areas. In addition, a condition has been included
that requires an agreement be entered into by the developer
5
and 'the City, prior to recordation of final map, that the
parcel will be developed specifically for senior housing.
7. Community Purpose Facilities
The Community Purpose Facility Task Force was created by the
City Council to study the need for community facilities in the
City of Chula Vista. The Task Force has made specific
recommendations to the City Council for a minimum acreage
requirement of 1.39 acres of Community Purpose Facility land
per 1,000 persons. The City Council has recently adopted the
1.39 acres requirement as a City Standard.
An analysis of the projected population for SPAs I, II and III
combined, based on unit types, yields that 16.12 acres of
community purpose facility land is required. Actual acreage
provided within the boundaries of SPAs I, II and III,
including the 1.1 net acre site proposed in SPA III, totals
11.2 acres. The deficit of approximately 4.92 acres may be
made up by considering an out parcel immediately adjacent to
SPA III at the southeast corner of Paseo Ranchero and East "H"
Street. This property, owned by the Rancho del Rey
Partnership, is currently in negotiations for sale to a church
community. Conditions of tentative map approval include the
requirement that compliance with the Community Purpose
Facility Ordinance be demonstrated prior to final map
approval. The spirit and intent of the Community Purpose
Facility Ordinance is to provide adequate acreage for
religious and non-religious facilities to locate in new
communities. Without specific adopted guidelines defining the
boundaries where a facility needs to be located, the provision
of facilities both within SPAs I, II and III and the adjacent
out parcel associated with SPA III appear to meet this intent.
8. Par~
The Tentative Maps for Rancho del Rey SPA III provide for a
10.80 acre (gross) neighborhood park located on the south side
of East "J" Street adjacent to the junior high school. This
is consistent with the approved SPA Plan for the project. The
Park Land Dedication Ordinance (PLDO) requires 12.5 acres of
park land based on projected population and current PLDO
application. In addition to requiring fees or/or additional
improvements to make up the shortage of park land, joint use
of recreational facilities located on the park and school
grounds will serve the recreational needs of the community.
After subtracting the area with slopes greater than 5:1, the
net useable acreage of the neighborhood park is 10.25. The
design of both the park and school have taken joint use of
facilities into consideration. Facilities located on the
school grounds to be available for public use include tennis
courts, basketball courts, hard courts and ball fields.
6
Facilities on the park property include tot lots, a par
course, soccer fields and picnic areas.
9. Water Conservation Plan and Air Oualitv I~prov~m-nt P%an
The City Council has directed that a Water Conservation Plan
and Air Quality Improvement Plan be prepared for Rancho del
Rey SPAs II and III pursuant to the General Plan and the
Growth Management Policies.
Water
The purpose of th~ Water Conservation Plan is to respond to
the long term need to conserve water in new development. The
conservation plan is intended to be implemented over the life
of the project and to establish standards for future
residents. Since the immediate water crisis has eased, the
two water districts serving the Chula Vista area have adopted
less stringent water cutbacks than what was anticipated at the
time of SPA Plan approval. However, the City Council has
interpreted the need for water conservation to be a zero net
increase of water use. The Water Conservation Plan states
that with water conservation measures implemented on-site,
projected water use for all areas of SPAs II and III,
including the park and school, is 400,000 gallons of water per
day.
Currently, a comprehensive plan is being prepared to be
presented to the City Council regarding City-wide water
conservation requirements. In the interim, the water
conservation measures outlined in the Water Conservation Plan
for SPAs II and III include on-site measures (efficient
fixtures and devices in the units, effecient landscaping and
irrigation, public awareness and education programs) and a
commitment to participate in any off-site mitigation program
adopted by the City. Such a program would be designed to
require new development to off-set all or a portion of their
new water demand by funding or providing new water
conservation improvements in older areas where efficient
plumbing or irrigation fixtures were not installed. Fees
collected could also be spent on studying or acquiring new or
improved sources of water (e. g., expanded water reclamation,
desalinization, etc.). Specific off-site measures required
of SPA III will be brought back along with a revised EIR
Mitigation Monitoring Program implementing water conservation
requirements. Off-site mitigation measures for SPA II can be
addressed in the Development Agreement for that project,
currently being drafted.
Air
As discussed in the Air Quality Improvement Plan, the most
significant air quality improvement measures are those
policies and requlations established at the broadest
7
geographic level, ie. State or Federal. However, measures
implemented on a City or project level can have a positive
impact. The Air Quality Improvement Plan prepared for Rancho
del Rey SPAs II and III includes mitigation measures suggested
by the developer and those recommended by the consultant
reviewing the plan, Stevens/Garland and Associates. These
include pedestrian and bicycle paths, jobs/housing balance,
access to regional travel systems, access to transit,
educational programs to increase awareness, and the provision
of park-n-ride facilities.
Local and regional air quality regulations including the Air
Pollution Control District program are being drafted that will
supersede existing standards. SPA III is being reviewed in
advance of these programs. In addition, it is an in-fill
project, being surrounded by existing and approved
development. The circulation network and land use plan, which
relate to existing topography and surrounding land uses, were
previously approved by the SPA. For these reasons, a major
re-design of the project to incorporate a more transit
oriented design is not feasible. However, the Air Quality
Improvement Plan implements several improvement measures
within the project. In addition, the development will be
subject to on-going monitoring programs inherent in the City's
Transportation Phasing Plan and Growth Management Program.
Specific measures are detailed in the Plan and will be
incorporated in the revised Mitigation Monitoring Program.
10. Design Guidelines
The Design Guidelines are an integral part of the Rancho del
Rey SPA III Plan and development. They are intended to
establish minimum standards for the design and architectural
character of project. They are provided to ensure that the
quality and fundamental concepts established at the master
planning stage are maintained in the final phase of detailed
planning and design.
The Design Guidelines were considered in their draft form to
evaluate the plan layout, lot configuration and open space
treatments found in the tentative map. The majority of the
Design Guidelines encompasses landscape design. Landscape
zones are proposed which promote drought tolerant/naturalized
landscaping as the predominant landscape theme. Other
features of the landscape design program include slope erosion
control, natural open space enhancement, irrigation standards,
fuel modification landscaping and streetscape landscaping.
Revision sheets for the revised Design Guidelines have been
included in the Planning Commission review packet and would
replace those presently in your SPA III binder.
8
11. Recvclina Facilities
Concern has been expressed that provisions for recycling
opportunities be addressed with the approval of subdivisions.
Currently, the City Conservation Coordinator is working on
programs for recycling but has not implemented specific
requirements. Laidlaw Waste System, the waste collector for
the City, provides residential curbside pick up of recycled
materials when the units become occupied and service
established. The applicant's Product Development Committee
is considering ar~as for recycling bin storage within the
single family units to further encourage the program.
Provisions for recycling in the multi-unit areas will also be
pursued with the assistance of the City Conservation
Coordinator and addressed with Precise Plan review.
D. ANALYSIS
The proposal is consistent with the Chula Vista General Plan
and the adopted E1 Rancho del Rey Specific Plan and Rancho del
Rey Sectional Planning Area III Plan. The Rancho del Rey SPA
III Plan is included as Exhibit 2 attached. The plan is
intended to show the general location of all proposed uses and
the general circulation system. The actual tentative maps
detail that within the 405 acres of SPA III, there are
· proposed a maximum of 1,380 dwelling units (289 single family
conventional units at 2-4 and 4-6 dwelling units per acre; 242
single family cottage units at 4-6 and 6-8 dwelling units per
acre; townhouse units at 8-12 dwelling units per acre; and
specialty housing units at 4-6, 6-8 and 8-12 dwelling units
per acre). Also included in the development is a 26.1 acre
junior high school site, a 10.8 acre park site, a 1.9 acre
community purpose facility site and 148.3 acres of open space.
This SPA plan was approved with conditions at the City Council
hearing of January 15, 1991.
According to the Chula Vista Municipal Code, the purpose of
the SPA Plan in a PC Planned Community zone is to provide for
the orderly pre-planning of large tracts of land containing
a variety of land uses which are under unified ownership or
development control. The Rancho del Rey SPA III Site
Utilization Plan contains seven residential planning areas
divided into three development phases: the specialty housing
area is in phase one, the area west of Paseo Ranchero is in
phase two and the area east of Paseo Ranchero is in phase
three. The tentative map submitted for SPA III is consistent
with these development areas and phases. A lot SUmmary of the
tentative map is as follows:
Phase Unit SPA III Lot Area (AC) No. Proposed Use
Desig. No. Gross/Net Lots
1 R-7 1-3 90.6 / - 3 Multi-family res.
A-D 67.3 / - 4 Open Space
2 1 R-3 1-135 30.5 / - 135 Sngl family res.
A-B 8.3 / - 2 Open Space
2 R-4 1-85 13.9 / - 85 Sngl family res.
A 0.4 / - 1 Open Space
3 R-1 1-10 2.8 / - 10 Sngl family res.
CF-1 1 1.7 / 1.1 1 Community Fac.
4 R-1 1-21 5.3 / - 21 Sngl family res.
A-B 40.9 / - 2 Open Space
3 1 R-2 1-144 29.1 / - 144 Sngl family res.
A-B 8.9 / - 2 Open Space
2 R-5 1-157 21.8 / - 157 Sngle f~m~ly res.
A-B 1.1 / - 2 Open Space
3 R-6 1 18.3/16.6 1 Multi-f~m~ly res.
A-B 15.7 / - 2 Open Space
4 S-1 1 26.1/23.4 1 Junior High
P-1 1 11.3/10.0 1 Park
A 1.2 / - 2 Open Space
10
(
1~mi
//Ol.
ATTACHMENT # 1
RECOMMENDED FINDINGS FOR RANCHO DEL REY SPA III TENTATIVE MAP
Pursuant to Section 66473.5 of the Subdivision Map Act, the
tentative subdivision map for Rancho del Rey Sectional
Planning Area (SPA) III, Chula Vista Tract no. 90-02, is found
to be in conformance with the various elements of the City's
General Plan based on the following:
1. The site is physically suitable for residential
development and the proposal conforms to all standards
established by the City for such projects.
2. The design of the subdivision will not affect the
existing improvements -- streets, sewers, etc. -- which
have been designed to avoid any serious problems.
3. The project is in substantial conformance with the CHula
Vista General Plan'Element as follows:
a. Land Use - The project is consistent with the
General Plan, E1 Rancho del Rey Specific Plan and
the SPA III Plan which designates the property PC -
Planned Community, with a variety of land uses and
residential densities.
b. Circulation - All of the on-site and off-site public
streets required to serve the subdivision are
consistent with the circulation element of Chula
Vista General Plan and the circulation proposed
within the E1 Rancho del Rey Specific Plan. Those
facilities will either be constructed or in-lieu
fees paid in accordance with the Rancho del Rey SPA
III Public Facilities Financing Plan.
c. Housing - A low and moderate housing program with
an established goal of 5% low and 5% moderate will
be implemented subject to the approval of the City's
Housing Coordinator. Computation of the
satisfaction of this condition will include the
entire E1 Rancho del Rey Specific Planning Area.
d. Conservation and Open Space - The project provides
148.3 acres of open space, 36% of the total 404.9
acres. Grading has been limited on hillsides and
grading plan approval will require the revegetation
of slopes in natural vegetation. Approval of EIR-
89-10 included the adoption of a mitigation
monitoring program outlining the mitigation measures
required for project impacts on geology, soils,
biology, air, water, cultural resources, land form,
transportation and utility sources.
e. Parks and Recreation The project will be
responsible for the improvement of the 10 acre net
neighborhood park and payment of PAD fees or
additional improvements as approved by the Director
Parks and Recreation. In addition, a trail system
will be implemented through the south leg of Rice
Canyon, connecting with other open space areas.
f. Seismic Safety - The Rancho del Rey site is crossed
by the La Nacion Fault Zone which has one prominent
fault, running north to south, with other potential
traces. The mitigation monitoring program adopted
with EIR-89-10 provides for measures to be taken to
mitigate the impacts of development in association
with the fault zone.
g. Safety - The site will be within the threshold
response times for fire and police services. The
project will increase the need for additional
personnel, however, the city is planning to meet
that need with additional revenues provided by this
project.
h. Public Facilities Element - This project is
obligated in the conditions of approval to provide
all on-site and off-site facilities necessary to
serve this project. In addition to that, there are
other regional facilities which this project (
together with SPAs I and II) is contributing to,
including a public library site, fire station site,
and fire training facility site. The subdivision
is also contributing to the Otay Water District's
improvement requirements to provide terminal water
storage for this project as well as other major
projects in the eastern territories.
h. Noise - The units will be required to meet the
standards of the UBC with regard to acceptable
interior noise levels.
i. Scenic Highway - The project does not affect this
element of the General Plan.
j. Bicycle Routes - Bicycle paths are provided along
Telegraph Canyon Road, East "H" Street and Paseo
Ranchero Road as shown in the Circulation Element.
k. Public Buildings - No public buildings are planned
for the site. The project shall be subject to RCT
and DIF fees.
4. Pursuant to Section 66412.2 of the Subdivision Map Act,
the Commission certifies that it has considered the
effect of this approval on the housing needs of the
region and has balanced those needs against the public
service needs of the residents of the City and the
available fiscal and environmental resources. The
development will provide for a variety of housing types
from single family detached homes to attached single
family and senior housing. In addition, the addressment
to providing a percentage of low and moderate priced
housing is in keeping with regional goals.
5. The configuration, orientation and topography of the site
partially allows for the optimum siting of lots for
passive or natural heating and cooling opportunities.
p~:~Y.-Oz-~.o~J.! 12:S,E~ Fi~:~Jt'l E~;TIk~D~ LP*ND pLAi4~IhlG TD E>91~1'71 P.02
ATTAChMeNT # 2
RECOM~ENDED CONDITIONS OF APPROVAL FOR RANCHO DEL RE¥ SPA III TENTATIV~
General/Pre~imlnarv
1. The Public Facilities Financing Plan shall be followed with
improvements installed in accordance with said plan or as
rsguired to meet threshold standards adopted by the City of
Chula Vista. In addition, ~he sequence in which improvements
are constructed shall correspond to any future East Chula Vista
Transportation Phasing Plan adopted by the city. The city
Engineer and Planning Director may at their discretion, modify
the sequence of improvement construction ~hould conditions
change to warrant such a revision.
2. All mitigation necessary to avoid significant effects itemized
in the Mitigation Monitoring Program for Environmental Impact
Report EIR-89-10 as required prior to Final Map approval, are
hereby incorporated as conditions of approval. The Director of
Planning may modify the sequence of mitigation at his discretion
should changes warrant such a revision.
3. The developer shall comply with the Community Purpose Facility
Ordinance to the satisfaction of the Planning Director. The
areas proposed to show compliance witah said ordinance shall be
prov%ded p~ior to approval of the first final map. Areas of
consideration for qualification may be within the areas of SPAs
I, II or III or be property owned by ~he applicant in the
immediately adjacent area.
4. Prior to final map approval for Phase 1, a Precise Plan shall
be approved bythe City Council detailing the development of the
Specialty Housing project. The precise plan shall i~clude but
is not limited to= detailing the density of the various portions
of the projectl identifying thee mount of recreational and open
space facilities~ detailing the financial arrangements available
to proposed tenants~ identifying the age limits and any income
requirements of tenants~ and showing the percent of the project
for sale or rent.
5. Prior to approval of the first fine1 map, the developer shall
show compliance with the approved Water Conservation plan for
Rancho del Rey SPA III and shall show compliance with a zero net
increase in water use for all areas of the subdivis~on excepting
the following~ As the developer should not be responsible for
a zero net increase in water used by students attending the
proposed Junior H~gh School from other developments, the
developer shall be responsible for a zero net increase in water
uae within the school site in direct proportion to the
percentage of students attending from said project which is to
be determined to the satisfaction of the Planning Director.
6. Prior to a~proval.of the first fine} map, ~he developer shall
show compliance with the approved A~r Quality Plan for Rancho
del Rey SPA III.
691~171 P. 02
Streets. Riohts-of-Wav and Improvements
7. Prior to any final map approval for Phase 2 or 3 or any unit
thereof, ~he developer shalI obtain all necessary right-of-
way for the construction of the unimproved off site portion
of East #J# Street west of Paseo Ladera, from River Ash Drive
to Red Oak Place.
8. The developer shall construct the unimproved off site portion
of East "J" Street west of Paseo Ladera, from River Ash Drive
to Red Oak Place; to a Class II Collector Standard, except
that the 5 foot sidewalk may be asphalt concrete instead of
~ortland cement concrete. The. const_r~?tion of these
mprovements shall be guaranteed prior to f~nal map approval
for Phases 2 or 3 or any unit thereof. The s~bdivider ~ay
request the formation of a reim~ursement distric~ for these
off-site improvements in accordance with section 15.50 of the
Municipal Code.
9. The developer shall request the vacation of that portion of
Paseo Marguerite as necessary to accomplish the design as
shown on ~he tentative map. Said vacation shall be
accomplished prior to the approval of the final map for Phase
2, Unit 3.
10. The off site portion of East "J" Street adjacent to Buena
vista Way shall be granted in fee to the City for Open Space,
p~blic utilities and other public uses. The grant of this
property shall be completed prior to approval of a final map
for Phase 3, Unit 3. The developer shall enter into an
agreement to not oppose the inclusion of this property in O~en
space District # 20 (Zone 7) prior to approval of any fl#s1
map for Rancho del Ray SPA III.. The developer shall be
responsible for the costs associated with annexing this
property to Open Space Dis=riot # 20.
11. The developer shall he responsible for the con~t=uctlon of
off site improvements at the westerly end of Paseo del Norte
in ~he Casa del Ray subdivision. The construction of these
improvements shall be guaranteed prior to approval of the
final mar for Phase 2, Unit 2. A cash deposit was previously
deposited with the City to pay the cost of this work. The
amount deposited is available to the developer for
construction of these improvements.
12. Prior to final map approval for Phase 1, the developer shall
dedicate additional right-of-way along the frontage of the
property on East #H" Street to provide a 20 foot parkway
(existing curbline to property line).
13. The developer shall be responsible for construction of a
sidewalk and a recreational pathway along the entire frontage
of subjec~ proper~y on East nH# Street from Pasco ~anchero
MAY-~l-199! 1~:17 ~ROM ESTRADA LAND PLANNING TO 6915171
westerly to Paseo del Ray to the satisfaction of the City
Engineer, Director of Planning and ~he Director of Parka and
Recreation. T~e construction of these improvements shall be
guaranteed prior to final map approval for Phaae 1.
14. The developer shall be reaponsible for constr~¢tion of an
expanded 8 to 10 foot wide sidewalk/recreational pathway along
the western side of Pasec Rancharo, to connec~ the trail
systems in the south leg of Rice Canyon and in the Telegraph
Canyon Road open space area. These improvements shall be
installed in conjunction with the oonstruction phaeee of Paseo
Ranchero specified in the Public Facilities Financing Plan.
15. The developer shall be responsible for the construction of
wider aldewalka at transit stops, subject to the approval of
~he City Engineer.
16. The final design of Paseo Ranchero shall include eight foot
wide landscape easement buffers as required by ~he Street
Design Standards or be adjoined by an open apace lot at least
eight feet wide with slopes no greater than 5:1, except in the
following areas where the final design shall be subject to the
approval of the Planning Director, Landscape Architect and
City Engineer:
a. Adjacent to the lots fronting on Cabo Calabazo, Calla
Candelero and Punto Miraleste where a special slope and
retaining wall design will be implemented;
Along the Junior High School site;
c. Along the existing Ladera Villas and Mission Verde
subdivisions where existing conditions shall remain; and
d. Adjacent ~0 the out-parcel'owned by the Chula Vista
School District.
17. The final design of East "J" St~ee~ shal~ include 5.5 foot
wide landscape easement buffers as required by the Street
Design Standards or be adjoined by an open apace lot at least
5.5 feet wide with 5:1 max~um side slopes, except in the
following locations where the final design shall be subject
to the approval of the Planning Director, Landscape Architect
and City Engineer:
a. Along the park site;
b. Along the two cor~er lots at the intersection cf East "J"
Street and Camino Miel (lots 82 and 97 of Phase 2, Unit
1) and the southeast corner lot of East "J" Street and
Cabo Capote (lot 85 of Phase 2, Unit 2)~
c. Adjacent to the out-parcel owned by the Chula Vista
d. Along ~he existing Bel Airs Ridge subdivision where
existing conditions shall remain.
18. All retaining walls which interface wi~h the public street
system shall be constr~c~ed to match the E1 Rancho del Rey
exterior wall standards.
19. The developer shall be responsible for construction of £ull
street improvements for all public and private streets shown
· on the Tentative Map within the subdivision boundary; and for
the construction of off-site improvements to construct Paseo
Ranchero, East "J" Street a~d Pasco Ladera as shown on the
Tentative Map, to the satisfaction of the City Engineer.
Said improvements shall include, but not be limited to,
asphalt concrete pavement, base, concrete curb, gutter and
sidewalk, sewer and water utilities, drainage facilities,
street lights, signs, fire hydrants and transitions to
existing improvements. Street intersection spacing as shown
on the tentative map is hereby approved.
20. All the streets shown on the Tentative Map within the
subdivision boundary, except private streets, shall be
dedicated for public use. Design of said streets shall meet
all city standards for public streets.
21. Ail streets within the multi-family developments shall meet
the City standards for private streets unless otherwise
approved by the City Engineer. Detailed horlzontal and
vertical alignment of the centerline of said streets shall be
reflected on the improvement plans for said developments.
Lots requiring future design review shall have driveway
locations approved by the City Engineer.
22. A temporary turnaround conforming to City standards shall be
provided at the e~d of streets having a length greater than
150 feet, measured from the center line of the nearest
intersecting street to the center of the CUl-de-sac, except
as approved by the City Engineer.
23. Cul-de-sacs a~d knuckles 'shall be designed and built in
accordance with city standards unless otherwise approved by
the City Engineer.
Lot confimuratign
24. Frontage on all lots shallhe e minimum of $$ feet at the
right-of-way line except as approved by the City Engineer.
This condition does not apply to flag lots, as defined in the
Municipal Code.
25. Lot lines shall be located at the top of slopes except as
approved by the City Zngineer. When adjacent to o]~-n space
lots, property lines shall be located a minimum 2.5 feet from
the top of slope.
26. The preparation of final maps and plans for the locations
listed below shall be carried out in accordance with the
following criteria unless otherwise approved by the City
Engineer and Director of Planning:
a. Provide a minimum 50 feet from the corner of Paseo
Ranchero and East "J" Street to lots 6 and 7, Phase 3,
Unit 2, to provide additional buffer and transition area
at the corner.~
b. Provide a pedestrian throughway between lots 130 and 131,
Phase 3, Unit 2, from Camino Calabazo to east "J,, Street
across from the school and park sites.
c. Lot 128 of Phase 2, Unit 1, shall be widened to a minimum
50 foot width to accommodate a combined slope and maximum
5 foot retaining wall. This is to avoid a "tunnel"
effect created at side lot lines.
d. Lots 3 and 5, Phase 2, Unit 3 shall utilize maximum 5
foot high retaining walls, and/or a combination of
retaining walls and crib walls.
e. Provide a different name for each of the portions of
Palazzo Court located to the east and west of East "J"
Street and the portions of Dorado Way located to the east
and west of Camino Miel.
Street Trees/Open Spac~
27. The developer shall grant to the City street tree planting and
maintenance easements along all public streets as shown on the
Tentative Map. The width of said easements shall be as
outlined in the City's Street Design Standards Policy.
28. The developer shall be responsible for street trees in
accordance with Section 18.28.10 of the Chula Vista Municipal
Code. The use of cones shall be included where necessary to
reduce the impact of root systems disrupting adjacent
sidewalks and rights-of-way.
29. Ail open space lots adjacent to public rights-of-way shall
maintain a width so as to provide 10 feet of landscaping
treatment behind the back of sidewalk.
30. Maintenance of all facilities and improvements within open
space areas covered by home owners associations shall be
covered by CC&Rs to be submitted and approved by the Planning
Department prior to approval of the associated final map.
34. Prior final map approval for ~hase 3, Unit 3 and Phase 4, Unit
2 as shown on the Tentative Map, cross sections shall be
submitted to and approved by the Director of Planning and City
Engineer illustrating the interface where the trail is located
adjacent to the drainage ditch along Telegraph Canyon Road.
The fencing of the drainage channel shall be aesthetically
pleasing incorporating the use of plantings, equestrian type
fencing and vinyl clad fencing. These cross sections and
decorative fencing program may be included with the
comprehensive landscape plan. Fence gates shall be provided
at locations approved by the City Engineer to allow
maintenance of the drainage channel.
Parks
35. The developer shall be obligated for 12.5 acres of parkland
as described in the approved SPA Plan, including land, and/or
fees, and/or additional improvements, in accordance with the
Parkland Dedication Ordinance. The actual final acreage will
relate to the number of units approved with the final maps.
36. The park located in Phase 3, Unit 4 shall be a minimum 10 net
useable acres. Design and development of the park shall be
subject to the approval of the City's Director of Parks and
Recreation and shall conform with the master plan as adopted
by the City Council.
37. An adequate buffer and separation of 50 feet shall be provided
between the residential lots at the eastern end of Palazzo
Court and the existing park facilities, to the satisfaction
of the Director of Parks and Recreation. Solution may include
but is not limited to relocating an existing tennis court or
lot redesign.
38. A minimum 20 foot wide access corridor shall be maintained at
the end of Paseo Palazzo where the cul-de-sac abuts the
existing park. Said area shall be made part of the park.
Detail and design of the access shall be submitted to and
approved by the Departments of Planning and Parks and
Recreation prior to final map approval for Phase 3, Unit 1.
GradinG/Drainage
39. An erosion and sedimentation control plan shall be prepared
as part of the grading plans.
40. Specific methods of handling storm drainage are subject to
detailed approval by the City Engineer at the time of
submission of improvement and grading plans. Design shall be
accomplished on the basis of the requirements of the
Subdivision Manual and the Grading Ordinance (No. 1797 as
amended). The developer shall submit calculations to
demonstrate compliance with all drainage requirements of the
Subdivision Manual.
41. Grading proposals shall be reviewed and approved by the City
Engineer and Director of Planning for consideration of
balanced cut and fill, utilization of appropriate soil types,
effective landscaping and revegetation where applicable.
Grading shall occur in separate phases unless a single phase
operation is approved with the grading plan.
42. A letter of permission for grading shall be obtained from
SDG&E prior to any grading within or adjacent to an SDG&E
easement or which would affect access thereto.
43. The developer shall make a reasonable effort to obtain
permission to grade the slopes along Buena Vista Way at the
former intersection of East "J" Street. If permission to
grade said slope is not reasonably attainable as determined
by the City Engineer, the regrading of these slopes shall not
be required. The provisions of this condition shall be
complied with prior to approval of the final map for Phase 3,
Unit 3.
44. Prior to approval of any final map for single family
residential use, the developer shall submit a list of proposed
lots indicating whether the structure will be located on fill,
cut or a transition between two situations.
45. Lots shall be so graded as to drain to the street or an
approved drainage system. Drainage shall not be permitted to
flow over slopes. Lots 71, 72 and 89 of Phase 2 Unit 1 shall
be designed so that there will be no negative grading or
drainage impacts to the adjacent off-site properties.
46. Graded access shall be provided to all public storm 'drain
structures including inlet and outlet structures. Paved
access shall be provided to drainage structures located in the
rear yard of any residential lot or as approved by the City
Engineer.
47. The use of boulders in minor drainage basins and energy
dissipators in the canyon and open space areas in the manner
approved by the City Engineer and Planning Director, is
encouraged to allow water to be captured and to allow trees
to grow naturally.
Sewer
48. The developer shall be responsible for performing sewage flow
metering to monitor three segments of main identified in the
Rick Engineering report dated September 5, 1990 as sections
QR, XlX2 and KL. Metering shall be accomplished at the
locations determined by the City Engineer. Metering shall be
accomplished prior to the issuance of any building permit for
SPA III and be repeated at intervals directed by the City
Engineer. Should any of these segments have metered flows
which fill more than 80% of the pipe diameter, the applicant
shall construct parallel facilities as determined by the City
Engineer. The developer shall enter into an agreement with
the City prior to first final map approval providing for all
items indicated above.
49. An improved access road with a minimum width of 12 feet shall
be provided to all sanitary sewer manholes. The roadway shall
be designed for an H-20 wheel load or other loading as
approved by the City Engineer.
50. The developer shall obtain permission from the City to deposit
sewage in a foreign basin. The developer shall enter into an
agreement with the City relative to the diversion of sewage
prior to final map approval for any phase or unit thereof
proposing said diversion.
51. The developer shall be responsible for the removal of the
existing sewer pump stations (Mission Verde and Candlewood).
Prior to approval of any final map entailing said removal,
the owner and the City shall enter into an agreement to
establish the scope of work and the amount to be reimbursed
by the City to the subdivider for performing said work. The
developer may also request the formation of a special sewer
service area to provide for the cost of connection of the area
currently being served by the Candlewood pump station to the
permanent gravity sewer system.
Unless otherwise approved by the City Engineer, the scope of
work at both sites shall be limited to the removal and
disposal of equipment, grading, landscaping and construction
of new sewerlines and manholes required for connection to the
proposed Rancho del Rey sewer system. Any upsizing of Rancho
del Rey Sewer lines due solely to the flow generated by the
Mission Verde and Candlewood areas shall also be included.
Reclaimed Water
52. Prior to approval of the associated final map, the developer
shall provide on-site infrastructure to accept and to use
reclaimed water when it is available, along Paseo Ranchero
from Telegraph Canyon Road to East "H" Street and along East
"J" Street from Paseo Ranchero to the park site, per the
adopted Public Facilities Financing Plan.
53. Any costs incurred from retrofitting the reclaimed water
system, when reclaimed water becomes available, shall be paid
by the developer. Monies for this shall be held by the City,
through a deposit set up by the developer. The amount shall
be determined by the developer, approved by the City and in
place prior to approval of each associated final map.
Fire
54. Fire hydrants will be required per the Fire Department
standards. Hydrant spacing is 500 feet for single family and
300 feet for multi-family dwellings.
55. Maximum hydrant pressure shall not exceed 150 psi.
56. Fire hydrants and roadway access (paved) shall be installed,
tested and operational prior to any combustible materials
placed on-site.
Aqreements/Covenants
57. Prior to final map approval for Phase 1, Unit 1, the developer
shall enter into an agreement with the City to guarantee the
development of the parcel specifically for senior housing.
58. Prior to the approval of the first final map, the developer
shall enter into an agreement to provide a right turn lane at
the intersection of Paseo del Rey and East "H" Street, to the
satisfaction of the City Engineer, should threshold standards
for this intersection be exceeded.
59. Prior to approval of the first final map, the developer shall
enter into an agreement with the City to provide funding for
the construction of parking spaces in a future park-n-ride
facilty to be located near the intersection of East "H" Street
and Paseo Ranchero.
60. Prior to approval of each final map, copies of proposed CC&Rs
for the subdivision shall be submitted to and approved by the
City Planning Department.
61. Prior to approval of the first final map, the developer shall
enter into an agreement with the City to provide low income
housing as defined by and subject to the approval of the
City's Housing Coordinator. Computation of the satisfaction
of this condition shall include the entire E1 Rancho del Rey
Specific Plan area.
62. Prior to the approval of any map for the subject subdivision
or any unit thereof, the developer shall obtain all off-site
right-of-way necessary for the installation of required
improvements for that unit. The developer shall also provide
easements for all on-site and off-site public storm drains,
sewers and other public utilities prior to recordation of the
final map. Easements shall be a minimum width of 6 feet
greater than pipe size, but in no case less than 10 feet.
63. The developer shall notify the City at least 60 days prior to
consideration of the final map by City if off-site right-of-
way cannot be obtained as required by the Conditions of
approval. (Only off-site right-of-way or easements affected
by Section 66462.5 of the Subdivision Map Act are covered by
this condition.
After said notification, the developer shall:
a. Pay the full cost of acquiring off-site right-of-way or
easements required by the Conditions of Approval of the
tentative Map.
b. Deposit with the City the estimated cost of acquiring
said right-of-way or easements. Said estimate to be
approved by the City Engineer.
c. Have all easements and/or right-of-way documents and
plats prepared and appraisals complete which are
necessary to commence condemnation proceedings.
d. If the developer so requests, the City may use its powers
to acquire right-of-way, easements or licenses needed for
off-site improvements or work related to the Tentative
Map. The developers shall pay all costs, both direct and
indirect incurred in said acquisition.
The requirements of a, b, and c above shall be accomplished
prior to the approval of the Final Map.
All off-site requirements which fall under the purview of
Section 66462.5 of the State Subdivision Map Act will be
waived in accordance with that section of the Act if the City
does not comply with the 120 day limitation specified in that
section.
64. Prior to approval of each final map, the developer shall enter
into an agreement with the City to include the subdivisions
in the Mello-Roos public facilities district or an acceptable
alternative financing program, subject to the approval of both
the Chula Vista Elementary and Sweetwater High School
Districts.
65. Prior to approval of each final map, the developer shall enter
into an agreement with the City wherein he agrees to be in
compliance with the most current Growth Management Program to
the satisfaction of the Director of Planning.
66. The developer shall enter into an agreement with the City
wherein he agrees to be in compliance with the most current
Transportation Phasing Plan and all subsequent revisions as
updated prior to approval of any final map (improvements as
projected in the Eastern Territories Development Impact Fee
System).
67. Prior to final map approval for any phase or unit thereof, the
developer shall enter into an agreement with the City whereby:
a. The developer agrees that the City may withhold building
permits for any units in the subject subdivision if any
one of the following occurs:
1. Regional development threshold limits set by the
East Chula Vista Transportation Phasing Plan have
been reached.
2. Traffic volumes, level of service, public utilities
and/or services exceed the adopted City threshold
standards.
b. The developer agrees that the City may withhold occupancy
permits for any of the phases of development identified
in the Public Facilities Financing Plan (PFFP) if the
required public facilities, as identified in the PFFP or
as amended by the Annual Monitoring Program have not been
completed. The developer may propose changes in the
timing and sequencing of development and the construction
of improvements affected. In such case, the PFFP may be
amended as approved by the City Planning Director and
Public Works Director.
68. The developer shall agree to not protest the formation of a
district for the maintenance of landscaped medians and
parkways along streets within and adjacent to the subject
property.
69. The developer shall enter into an agreement with the City
wherein he holds the City harmless for any liability for
erosion, 'siltation or increased flow of drainage resulting
from this project.
70. The developer shall enter into an agreement with the City
whereby the developer agrees to participate in the monitoring
of existing and future sewage flows in the Telegraph Canyon
Trunk Sewer and the financing of the preparation of the Basin
Plan and, pursuant to any adopted Basin Plan, agree to
participate in the financing of improvements set forth
therein, in an equitable manner. Said agreement shall be
executed by the developer prior to final map approval for any
phase or unit proposing to discharge sewage into the Telegraph
Canyon Trunk Sewer.
71. The developer shall permit all franchised cable television
companies ("Cable Company") equal opportunity to place conduit
to and provide cable television service for each lot within
the subdivision. The developer shall enter into an agreement
with all participating Cable Companies which shall provide,
in part, that upon receiving written notice from the City that
said Cable Company is in violation of the terms and conditions
of the franchise granted to said Cable Company, or any other
terms and conditions regulating said Cable Company in the City
of Chula Vista, as same may from time to time be amended,
developer shall suspend Cable Company's access to said conduit
until City otherwise notifies developer. Said agreement shall
be approved by the city Attorney prior to final map approval.
Fees/Payments
72. The subject property is within the boundaries of Open Space
District #20 (Zone 7), Open Space District #10 (Phase II) and
Assessment District #87-1. Prior to final map approval or
other grant of approval for any phase or unit thereof, the
developer shall pay all costs associated with:
a) detachment of subject property from Open Space District
#10 (Phase II); and
b) reapportionment of assessments for Open Space District
#20 (Zone 7) and Assessment District #87-1 as a result
of subdivision of lands within the project boundary.
73. The developer shall pay:
a. Spring Valley Sewer Trunk connection fees ($130/acre)
prior to final map approval for any phase or unit thereof
contributing flow to the Spring Valley Trunk Sewer.
b. Telegraph Canyon drainage fees in accordance with
Ordinance 2384.
74. PAD fees shall be waived or modified as provided in the
adopted Public Facilities Financing Plan for Rancho del Rey.
RCT fees and DIF fees shall be paid in accordance with the
applicable regulations. PAD fees shall be guaranteed until
such time as the City waives said fees.
75. Prior to approval of the first final map, the developer shall
deposit $10,000 with the Department of Public Works for future
transit stop shelters within Rancho del Rey.
Miscellaneous
76. The boundary of the subdivision shall be tied to the
California System - Zone VI (1983).
77. The following statement shall be placed on the Final Map:
Please be advised that the City of Chula Vista has to adopted
a Growth Management Element and intends to adopt a
Transportation Phasing Program as well as other related growth
management implementation programs, which may regulate the
location and timing of development in the City. The City
intends that development of property included in the final map
will be subject to the provisions of these programs. Owners
listed on this map shall be responsible for providing
notification to any purchaser or successor in interest to any
portion of this property of the City's intent in this regard.
~. Prior to final map approval for any unit, the developer shall
submit a copy of said final map in a digital format such as
(DXF) graphic file. This Computer Aided Design (CAD) copy of
the final map shall be based on accurate coordinate geometry
calculations and shall be submitted on 5 1/2 HD floppy disk
prior to recordation of the final map.
Code Requirements
79. The developer shall comply with all relevant Federal, State
and Local regulations, including the Clean Water Act. The
developer shall be responsible for providing all required
testing and documentation to demonstrate said compliance as
required by the City Engineer.
80. The developer shall comply with all applicable sections of the
Chula Vista Municipal Code as they exist at the time of
issuance of the building permit. Preparation of the final map
and all plans shall be in accordance with the provisions of
the Subdivision Map Act and the City of Chula Vista
Subdivision Map Act and the City of Chula Vista Subdivision
Ordinances and Subdivision Manual.
RESOLUTION NO. PCS-90-02
RESOLUTION OF THE CITY OF CHULAVISTA PLANNING
COMMISSION RECOMMENDING THAT THE CITY COUNCIL
APPROVE THE TENTATIVE SUBDIVISION MAP FOR
RANCHO DEL REY SECTIONAL PLANNING AREA (spa)
III, CHULA VISTA TRACT 90-02
WHEREAS, a duly verified application for a tentative
subdivision map was filed with the Planning Department of the City
of Chula Vista on November 8, 1989 by Rancho del Rey Partnership,
and
WHEREAS, said application requested the subdivision of
approximately 405 acres into residential lots, open space areas,
a school lot, park and community purpose facility lot, and
WHEREAS, the Planning Commission set the time and place for
a hearing on said tentative subdivision map application and notice
of said hearing, together with its purpose, was given by its
publication in a newspaper of general circulation in the city and
its mailing to property owners within 300 feet of the exterior
boundaries of the property at least ten days prior to the hearing,
and
WHEREAS, the hearing was held at the time and place as
advertised, namely 7:00 p.m., May 8, 1991, in the Council Chambers,
276 Fourth Avenue, before the Planning Commission and said hearing
was thereafter closed, and
WHEREAS, the Commission found that the project is addressed
in the previously certified EIR-89-10, with Statement of Overriding
Considerations, and associated Mitigation Monitoring Program for
Rancho del rey SPA III.
NOW THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION
finds as follows:
Pursuant to Section 66473.5 of the Subdivision Map Act, the
tentative subdivision map for Rancho del Rey Sectional Planning
Area (SPA) III, Chula Vista Tract no. 90-02, is found to be in
conformance with the various elements of the City's General Plan
based on the following:
1. The site is physically suitable for residential
development and the proposal conforms to all standards
established by the City for such projects.
2. The design of the subdivision will not affect the
existing improvements -- streets, sewers, etc. -- which
have been designed to avoid any serious problems.
3. The project is in substantial conformance with the CHula
Vista General Plan Element as follows:
a. Land Use - The project is consistent with the
General Plan, E1 Rancho del Rey Specific Plan and
the SPA III Plan which designates the property PC -
Planned Community, with a variety of land uses and
residential densities.
b. Circulation - Ail of the on-site and off-site public
streets required to serve the subdivision are
consistent with the circulation element of Chula
Vista General Plan and the circulation proposed
within the E1 Rancho del Rey Specific Plan. Those
facilities will either be constructed or in-lieu
fees paid in accordance with the Rancho del Rey SPA
III Public Facilities Financing Plan.
c. Housing A low and moderate housing program with
an established goal of 5% low and 5% moderate will
be implemented subject to the approval of the City's
Housing Coordinator. Computation of the
satisfaction of this condition will include the
entire E1 Rancho del Rey Specific Planning Area.
d. Conservation and Open Space - The project provides
148.3 acres of open space, 36% of the total 404.9
acres. Grading has been limited on hillsides and
grading plan approval will require the revegetation
of slopes in natural vegetation. Approval of EIR-
89-10 included the adoption of a mitigation
monitoring program outlining the mitigation measures
required for project impacts on geology, soils,
biology, air, water, cultural resources, land form,
transportation and utility sources.
e. Parks and Recreation - The project will be
responsible for the improvement of the 10 acre net
neighborhood park and payment of PAD fees or
additional improvements as approved by the Director
Parks and Recreation. In addition, a trail system
will be implemented through the south leg of Rice
Canyon, connecting with other open space areas.
f. Seismic Safety - The Rancho del Rey site is crossed
by the LaNacion Fault Zone which has one prominent
fault, running north to south, with other potential
traces. The mitigation monitoring program adopted
with EIR-89-10 provides for measures to be taken to
mitigate the impacts of development in association
with the fault zone.
g. Safety - The site will be within the threshold
response times for fire and police services. The
project will increase the need for additional
personnel, however, the City is planning to meet
that need with additional revenues provided by this
project.
h. Public Facilities Element - This project is
obligated in the conditions of approval to provide
all on-site and off-site facilities necessary to
serve this project. In addition to that, there are
other regional facilities which this project (
together with SPAs I and II) is contributing to,
including a public library site, fire station site,
and fire training facility site. The subdivision
is also contributing to the Otay Water District's
improvement requirements to provide terminal water
storage for this project as well as other major
projects in the eastern territories.
h. Noise - The units will be required to meet the
standards of the UBC with regard to acceptable
interior noise levels.
i. Scenic Highway - The project does not affect this
element of the General Plan.
j. Bicycle Routes - Bicycle paths are provided along
Telegraph Canyon Road, East "H" Street and Paseo
Ranchero Road as shown in the Circulation Element.
k. Public Buildings - No public buildings are planned
for the site. The project shall be subject to RCT
and DIF fees.
4. Pursuant to Section 66412.2 of the Subdivision Map Act,
the Commission certifies that it has considered the
effect of this approval on the housing needs of the
region and has balanced those needs against the public
service needs of the residents of the City and the
available fiscal and environmental resources. The
development will provide for a variety of housing types
from single family detached homes to attached single
family and senior housing. In addition, the addressment
to providing a percentage of low and moderate priced
housing is in keeping with regional goals.
5. The configuration, orientation and topography of the site
partially allows for the optimum siting of lots for
passive or natural heating and cooling opportunities.
BE IT FURTHER RESOLVED THAT THE PLANNING COMMISSION recommends
that the City Council approve the tentative subdivision map for
Rancho del Rey SPA III, Chula Vista Tract 90-02 subject to the
following conditions:
MAY ~1-1991 12:59 FROM ESTRADA LAND PLANNING TO 691S171 P.05
General/~reliminarv
1. .The Public Facilities F%nancing Plan sh~ll he followed with
improvements installed in accordance with said ~ian or as
require~ to meet threshold standards adppted by t-he City of
Chula Vista. In addition, the sequence In which improvements
are constructed shall correspond to any future East Chula Vista
Transportation Phasing Plan adopted by the City. The city
Engineer and Planning Director may at their discretion, modify
the e~quence of improvement construction should conditions
change to warrant such a revision.
All mitigation necessary to avoid significant effects itemized
in the Mitigation Monitoring Program for Environmental Impact
Repor~ EIR-89-10 as repuired prior to Final Map approval, are
hereby incorporated as conditions of approval. The Director of
Planning may modify the sequence of mitigation at hie discretion
should changes warrant such a revision.
The developer shall comply with the Community Purpose Facility
Ordinance to the satisfaction of the Planning Director. The
areas proposed to show compliance with said ordinance shall be
provided prior to approval of ~he first final map. Areas of
consideration for qualification may be within the areas of SPAs
I, II or III or be owned by the applicant in the
4. Prior to final map approval fo~ Phase. 1! a Precise Plan shall
be approved by th~ City ~ouncll detailing the development cf
the Specialty Housing pro]eot. The precise plan shall include
but ~e not llmlted, to~ detailing the density of the various
portions of the pro)eot; identifying the amount of recreational
and open space facilities; detailing the financial arrangements
available to proposed tenants; identifying the age limits and
any income requirements of tenants; and showing the percent of
the project for sale or rent.
5. Prior to approval of the first final map, the developer shall
show compliance with the approved Water conservation plan for
Rancho del Ray SPA III and shall show compliance with a zero
net in~rease in wate~ use for all areas of the subdivision
exceptlpg the following:' As the developer should not be
responsible for a zero net increase in water used by students
attending the proposed Junior High School from other
developments, the developer shall be responsible for a zero net
increase in water use within the school site in direct
proportion to the percentage of ~tudents attending from said
project which is to be determined to the satisfaction of the
Planning Director.
6. Prior to approval of the first final map, the developer shall
show compliance with the approved Air Quality Plan for Rancho
del Ray SPA III.
Streets, Rights-of-Way and Improvement8
7. Prior to any final map approval for Phase 2 or · or any unit
thereof, the developer shall obtain all necessary right-of-
TOTAL P. 0~
way for the construction of the unimproved off site portion
of East "J" Street west of Paseo Ladera, from River Ash Drive
to RedOak Place.
8. The developer shall construct the unimproved off site portion
of East "J" Street west of Paseo Ladera, from River Ash Drive
to Red Oak Place, to a Class II Collector Standard, except
that the 5 foot sidewalk may be asphalt concrete instead of
portland cement concrete. The construction of these
improvements shall be guaranteed prior to final map approval
for Phases 2 or 3 or any unit thereof. The subdivider may
request the formation of a reimbursement district for these
off-site improvements in accordance with section 15.50 of the
Municipal Code.
9. The developer shall request the vacation of that portion of
Paseo Marquerita as necessary to accomplish the design as
shown on the tentative map. Said vacation shall be
accomplished prior to the approval of the final map for Phase
2, Unit 3.
10. The off site portion of East "J" Street adjacent to Buena
Vista Way shall be granted in fee to the city for Open Space,
public utilities and other public uses. The grant of this
property shall be completed prior to approval of a final map
for Phase 3, Unit 3. The developer shall enter into an
agreement to not oppose the inclusion of this property in Open
Space District # 20 (Zone 7) prior to approval of any final
map for Rancho del Rey SPA III. The developer shall be
responsible for the costs associated with annexing this
property to Open Space District # 20.
11. The developer shall be responsible for the construction of
off site improvements at the westerly end of Paseo del Norte
in the Casa del Rey subdivision. The construction of these
improvements shall be guaranteed prior to approval of the
final map for Phase 2, Unit 2. A cash deposit was previously
deposited with the City to pay the cost of this work. The
amount deposited is available to the developer for
construction of these improvements.
12. Prior to final map approval for Phase 1, the developer shall
dedicate additional right-of-way along the frontage of the
property on East "H" Street to provide a 20 foot parkway
(existing curbline to property line).
13. The developer shall be responsible for construction of a
sidewalk and a recreational pathway along the entire frontage
of subject property on East "H" Street from Paseo Ranchero
westerly to Paseo del Rey to the satisfaction of the City
Engineer, Director of Planning and the Director of Parks and
Recreation. The construction of these improvements shall be
guaranteed prior to final map approval for Phase 1.
14. The developer shall be responsible for construction of an
expanded 8 to 10 foot wide sidewalk/recreational pathway along
the western side of Paseo Ranchero, to connect the trail
systems in the south leg of Rice Canyon and in the Telegraph
Canyon Road open space area. These improvements shall be
installed in conjunction with the construction phases of Paseo
Ranchero specified in the Public Facilities Financing Plan.
15. The developer shall be responsible for the construction of
wider sidewalks at transit stops, subject to the approval of
the City Engineer.
16. The final design of Paseo Ranchero shall include eight foot
wide landscape easement buffers as required by the Street
Design Standards or be adjoined by an open space lot at least
eight feet wide with slopes no greater than 5:1, except in the
following areas where the final design shall be subject to the
approval of the Planning Director, Landscape Architect and
City Engineer:
a. Adjacent to the lots fronting on Cabo Calabazo, Calle
Candelero and Punto Miraleste where a special slope and
retaining wall design will be implemented;
b. Along the Junior High School site;
c. Along the existing Ladera Villas and Mission Verde
subdivisions where existing conditions shall remain; and
d. Adjacent to the out-parcel owned by the Chula Vista
School District.
17. The final design of East "J" Street shall include 5.5 foot
wide landscape easement buffers as required by the Street
Design Standards or be adjoined by an open space lot at least
5.5 feet wide with 5:1 maximum side slopes, except in the
following locations where the final design shall be subject
to the approval of the Planning Director, Landscape Architect
and City Engineer:
a. Along the park site;
b. Along the two corner lots at the intersection of East "J"
Street and Camlno Miel (lots 82 and 97 of Phase 2, Unit
1) and the southeast corner lot of East "J" Street and
Cabo Capote (lot 85 of Phase 2, Unit 2);
c. Adjacent to the out-parcel owned by the Chula Vista
School District; and
d. Along the existing Bel Aire Ridge subdivision where
existing conditions shall remain.
18. Ail retaining walls which interface with the public street
system shall be constructed to match the E1 Rancho del Rey
exterior wall standards.
19. The developer shall be responsible for construction of full
street improvements for all public and private streets shown
on the Tentative Map within the subdivision boundary; and for
the construction of off-site improvements to construct Paseo
Ranchero, East "J" Street and Paseo Ladera as shown on the
Tentative Map, to the satisfaction of the City Engineer.
Said improvements shall include, but not be limited to,
asphalt concrete pavement, base, concrete curb, gutter and
sidewalk, sewer and water utilities, drainage facilities,
street lights, signs, fire hydrants and transitions to
existing improvements. Street intersection spacing as shown
on the tentative map is hereby approved.
20. All the streets shown on the Tentative Map within the
subdivision boundary, except private streets, shall be
dedicated for public use. Design of said streets shall meet
all City standards for public streets.
21. All streets within the multi-family developments shall meet
the City standards for private streets unless otherwise
approved by the City Engineer. Detailed horizontal and
vertical alignment of the centerline of said streets shall be
reflected on the improvement plans for said developments.
Lots requiring future design review shall have driveway
locations approved by the City Engineer.
22. A temporary turnaround conforming to City standards shall be
provided at the end of streets having a length greater than
150 feet, measured from the center line of the nearest
intersecting street to the center of the cul-de-sac, except
as approved by the City Engineer.
23. Cul-de-sacs and knuckles shall be designed and built in
accordance with City standards unless otherwise approved by
the City Engineer.
Lot Confiauration
24. Frontage on all lots shall be a minimum of 35 feet at the
right-of-way line except as approved by the City Engineer.
This condition does not apply to flag lots, as defined in the
Municipal Code.
25. Lot lines shall be located at the top of slopes except as
approved by the City Engineer. When adjacent to open space
lots, property lines shall be located a minimum 2.5 feet from
the top of slope.
26. The preparation of final maps and plans for the locations
listed below shall be carried out in accordance with the
following criteria unless otherwise approved by the City
Engineer and Director of Planning:
a. Provide a minimum 50 feet from the corner of Paseo
Ranchero and East "J" Street to lots 6 and 7, Phase 3,
Unit 2, to provide additional buffer and transition area
at the corner.
b. Provide a pedestrian throughway between lots 130 and 131,
Phase 3, Unit 2, from Camino Calabazo to east "J" Street
across from the school and park sites.
c. Lot 128 of Phase 2, Unit 1, shall be widened to a minimum
50 foot width to accommodate a combined slope and maximum
5 foot retaining wall. This is to avoid a "tunnel"
effect created at side lot lines.
d. Lots 3 and 5, Phase 2, Unit 3 shall utilize maximum 5
foot high retaining walls, and/or a combination of
retaining walls and crib walls.
e. Provide a different name for each of the portions of
Palazzo Court located to the east and west of East "J"
Street and the portions of Dorado Way located to the east
and west of Camino Miel.
Street Trees/Open Space
27. The developer shall grant to the City street tree planting and
maintenance easements along all public streets as shown on the
Tentative Map. The width of said easements shall be as
outlined in the City's Street Design Standards Policy.
28. The developer shall be responsible for street trees in
accordance with Section 18.28.10 of the Chula vista Municipal
Code. The use of cones shall be included where necessary to
reduce the impact of root systems disrupting adjacent
sidewalks and rights-of-way.
29. All open space lots adjacent to public rights-of-way shall
maintain a width so as to provide 10 feet of landscaping
treatment behind the back of sidewalk.
30. Maintenance of all facilities and improvements within open
space areas covered by home owners associations shall be
covered by CC&Rs to be submitted and approved by the Planning
Department prior to approval of the associated final map.
31. Prior to the approval of any final map, the developer shall
request in writing that maintenance of all facilities and
improvements within the open space area associated with such
map shall be the responsibility of the Rancho del Rey Open
Space Maintenance District.
32. Prior to approval of the first final map, a comprehensive
landscape plan shall be submitted for review and approval of
the City Landscape Architect and Director of Parks and
Recreation. Prior to approval of each final map,
comprehensive, detailed landscape and irrigation plans,
erosion control plans and detailed water management guidelines
for all landscape irrigation shall be submitted in accordance
with the Chula Vista Landscape Manual for the associated
landscaping in that final map. These detailed landscape and
irrigation plans shall be for the review and approval of the
City Landscape Architect and Director of Parks and Recreation.
The landscaping format within the project shall be to
emphasize native, drought tolerant plant material. Exceptions
can be made for areas where reclaimed water is exclusively
used. The comprehensive landscape plans shall address:
a. Slope enhancement and landscape treatment for the slope
in Open Space Lot A, Phase 3, Unit 3, beneath the Junior
High School lot. The plan shall address and provide for
mature size plant material, boulder work and/or buttress
work on the slope.
b. A naturalized revegetation program for areas of grading
in open space lots, which may include temporary
irrigation.
c. The disturbed "native" areas within Telegraph Canyon Road
open space corridor. This area shall include tree
groupings or tree groves. These plantings shall be
treated as random plantings and shall be identified in
at least six areas along the corridor with each location
providing plantings of 50 to 100 trees. The exact number
of trees and locations are to be approved by the Planning
Department and Department of Parks and Recreation. The
intent of these grove areas is to provide a consistency
with existing grove areas in the open space corridor west
of the Rancho del Rey SPA III area.
33. Prior to approval of the first final map, details showing the
location and design of the trail system and a sign program
shall be submitted to and approved by the Directors of
Planning and Parks and Recreation. The trail system in the
open space lots shall be a minimum 6 feet wide within an 8
foot horizontal clear space and a 10 foot vertical clear
space. The associated sign program shall identify the trail
network in the open space areas and connecting along Paseo
Ranchero, to the satisfaction of the Directors of Planning and
Parks and Recreation.
34. Prior final map approval for Phase 3, Unit 3 and Phase 4, Unit
2 as shown on the Tentative Map, cross sections shall be
submitted to and approved by the Director of Planning and City
Engineer illustrating the interface where the trail is located
adjacent to the drainage ditch along Telegraph Canyon Road.
The fencing of the drainage channel shall be aesthetically
pleasing incorporating the use of plantings, equestrian type
fencing and vinyl clad fencing. These cross sections and
decorative fencing program may be included with the
comprehensive landscape plan. Fence gates shall be provided
at locations approved by the City Engineer to allow
maintenance of the drainage channel.
Parks
35. The developer shall be obligated for 12.5 acres of parkland
as described in the approved SPA Plan, including land, and/or
fees, and/or additional improvements, in accordance with the
Parkland Dedication Ordinance. The actual final acreage will
relate to the number of units approved with the final maps.
36. The park located in Phase 3, Unit 4 shall be a minim~ l0 net
useable acres. Design and development of the park shall be
subject to the approval of the City's Director of Parks and
Recreation and shall conform with the master plan as adopted
by the city Council.
37. An adequate buffer and separation of 50 feet shall be provided
between the residential lots at the eastern end of Palazzo
Court and the existing park facilities, to the satisfaction
of the Director of Parks and Recreation. Solution may include
but is not limited to relocating an existing tennis court or
lot redesign.
38. A minimum 20 foot wide access corridor shall be maintained at
the end of Paseo Palazzo where the cul-de-sac abuts the
existing park. Said area shall be made part of the park.
Detail and design of the access shall be submitted to and
approved by the Departments of Planning and Parks and
Recreation prior to final map approval for Phase 3, Unit 1.
Gradina/Drainaae
39. An erosion and sedimentation control plan shall be prepared
as part of the grading plans.
40. Specific methods of handling storm drainage are subject to
detailed approval by the City Engineer at the time of
submission of improvement and grading plans. Design shall be
accomplished on the basis of the requirements of the
Subdivision Manual and the Grading Ordinance (No. 1797 as
amended). The developer shall submit calculations to
demonstrate compliance with all drainage requirements of the
Subdivision Manual.
41. Grading proposals shall be reviewed and approved by the City
Engineer and Director of Planning for consideration of
balanced cut and fill, utilization of appropriate soil types,
effective landscaping and revegetation where applicable.
Grading shall occur in separate phases unless a single phase
operation is approved with the grading plan.
42. A letter of permission for grading shall be obtained from
SDG&E prior to any grading within or adjacent to an SDG&E
easement or which would affect access thereto.
43. The developer shall make a reasonable effort to obtain
permission.to grade the slopes along Buena Vista Way at the
former intersection of East "J" Street. If permission to
grade said slope is not reasonably attainable as determined
by the City Engineer, the regrading of these slopes shall not
be required. The provisions of this condition shall be
complied with prior to approval of the final map for Phase 3,
Unit 3.
44. Prior to approval of any final map for 'single family
residential use, the developer shall submit a list of proposed
lots indicating whether the structure will be located on fill,
cut or a transition between two situations.
45. Lots shall be so graded as to drain to the street or an
approved drainage system. Drainage shall not be permitted to
flow over slopes. Lots 71, 72 and 89 of Phase 2 Unit 1 shall
be designed so that there will be no negative grading or
drainage impacts to the adjacent off-site properties.
46. Graded access shall be provided to all public storm drain
structures including inlet and outlet structures. Paved
access shall be provided to drainage structures located in the
rear yard of any residential lot or as approved by the City
Engineer.
47. The use of boulders in minor drainage basins and energy
dissipators in the canyon and open space areas in the manner
approved by the City Engineer and Planning Director, is
encouraged to allow water to be captured and to allow trees
to grow naturally.
Sewer
48. The developer shall be responsible for performing sewage flow
metering to monitor three segments of main identified in the
Rick Engineering report dated September 5, 1990 as sections
QR, XlX2 and KL. Metering shall be accomplished at the
locations determined by the City Engineer. Metering shall be
accomplished prior to the issuance of any building permit for
SPA III and be repeated at intervals directed by the City
Engineer. Should any of these segments have metered flows
which fill more than 80% of the pipe diameter, the applicant
shall construct parallel facilities as determined by the City
Engineer. The developer shall enter into an agreement with
the City prior to first final map approval providing for all
items indicated above.
49. An improved access road with ~ minimum width of 12 feet shall
be provided to all sanitary sewer manholes. The roadway shall
be designed for an H-20 wheel load or other loading as
approved by the City Engineer.
50. The developer shall obtain permission from the City to deposit
sewage in a foreign basin. The developer shall enter into an
agreement with the City relative to the diversion of sewage
prior to final map approval for any phase or unit thereof
proposing said diversion.
51. The developer shall be responsible for the removal of the
existing sewer pump stations (Mission Verde and Candlewood).
Prior to approval of any final map entailing said removal,
the owner and the City shall enter into an agreement to
establish the scope of work and the amount to be reimbursed
by the City to the subdivider for performing said work. The
developer may also request the formation of a special sewer
service area to provide for the cost of connection of the area
currently being served by the Candlewood pump station to the
permanent gravity sewer system.
Unless otherwise approved by the city Engineer, the scope of
work at both sites shall be limited to the removal and
disposal of equipment, grading, landscaping and construction
of new sewerlines and manholes required for connection to the
proposed Rancho del Rey sewer system. Any upsizing of Rancho
del Rey Sewer lines due solely to the flow generated by the
Mission Verde and Candlewood areas shall also be included.
Reclaimed Water
52. Prior to approval of the associated final map, the developer
shall provide on-site infrastructure to accept and to use
reclaimed water when it is available, along Paseo Ranchero
from Telegraph Canyon Road to East "H" Street and along East
,,J,, street from Paseo Ranchero to the park site, per the
adopted Public Facilities Financing Plan.
53. Any costs incurred from retrofitting the reclaimed water
system, when reclaimed water becomes available, shall be paid
by the developer. Monies for this shall be held by the City,
through a deposit set up by the developer. The amount shall
be determined by the developer, approved by the City and in
place prior to approval of each associated final map.
Fire
54. Fire hydrants will be required per the Fire Department
standards. Hydrant spacing is 500 feet for single family and
300 feet for multi-family dwellings.
55. Maximum hydrant pressure shall not exceed 150 psi.
56. Fire hydrants and roadway access (paved) shall be installed,
tested and operational prior to any combustible materials
placed on-site.
Aareements/Covenants
57. Prior to final map approval for Phase 1, Unit 1, the developer
shall enter into an agreement with the City to guarantee the
development of the parcel specifically for senior housing.
58. Prior to the approval of the first final map, the developer
shall enter into an agreement to provide a right turn lane at
the intersection of Paseo del Rey and East "H" Street, to the
satisfaction of the city Engineer, should threshold standards
for this intersection be exceeded.
59. Prior to approval of the first final map, the developer shall
enter into an agreement with the city to provide funding for
the construction of parking spaces in a future park-n-ride
faqilty to be located near the intersection of East "H" Street
and Paseo Ranchero.
60. Prior to approval of each final map, copies of proposed CC&Rs
for the subdivision shall be submitted to and approved by the
City Planning Department.
61. Prior to approval of the first final map, the developer shall
enter into an agreement with the City to provide low income
housing as defined by and subject to the approval of the
City's Housing Coordinator. Computation of the satisfaction
of this condition shall include the entire E1 Rancho del Rey
Specific Plan area.
62. Prior to the approval of any map for the subject subdivision
or any unit thereof, the developer shall obtain all off-site
right-of-way necessary for the installation of required
improvements for that unit. The developer shall also provide
easements for all on-site and off-site public storm drains,
sewers and other public utilities prior to recordation of the
final map. Easements shall be a minimum width of 6 feet
greater than pipe size, but in no case less than 10 feet.
63. The developer shall notify the city at least 60 days prior to
consideration of the final map by City if off-site right-of-
way cannot be obtained as required by the Conditions of
approval. (Only off-site right-of-way or easements affected
by Section 66462.5 of the Subdivision Map Act are covered by
this condition.
After said notification, the developer shall:
a. Pay the full cost of acquiring off-site right-of-way or
easements required by the Conditions of Approval of the
tentative Map.
b. Deposit with the City the estimated cost of acquiring
said right-of-way or easements. Said estimate to be
approved by the City Engineer.
c. Have all easements and/or right-of-way documents and
plats prepared and appraisals complete which are
necessary to commence condemnation proceedings.
d. If the developer so requests, the City may use its powers
to acquire right-of-way, easements or licenses needed for
off-site improvements or work related to the Tentative
Map. The developers shall p~y all costs, both direct and
indirect incurred in said acquisition.
The requirements of a, b, and c above shall be accomplished
prior to the approval of the Final Map.
All off-site requirements which fall under the purview of
Section 66462.5 of the State Subdivision Map Act will be
waived in accordance with that section of the Act if the City
does not comply with the 120 day limitation specified in that.
section.
64. Prior to approval of each final map, the developer shall enter
into an agreement with the City to include the subdivisions
in the Mello-Roos public facilities district or an acceptable
alternative financing program, subject to the approval of both
the Chula Vista Elementary and Sweetwater High School
Districts.
65. Prior to approval of each final map, the developer shall enter
into an agreement with the City wherein he agrees to be in
compliance with the most current Growth Management Program to
the satisfaction of the Director of Planning.
66. The developer shall enter into an agreement with the City
wherein he agrees to be in compliance with the most current
Transportation Phasing Plan and all subsequent revisions as
updated prior to approval of any final map (improvements as
projected in the Eastern Territories Development Impact Fee
System).
67. Prior to final map approval for any phase or unit thereof, the
developer shall enter into an agreement with the City whereby:
a. The developer agrees that the City may withhold building
permits for any units in the subject subdivision if any
one of the following occurs:
1. Regional development threshold limits set by the
East Chula Vista Transportation Phasing Plan have
been reached.
2. Traffic volumes, level of service, public utilities
and/or services exceed the adopted City threshold
standards.
b. The developer agrees that the City may withhold occupancy
permits for any of the phases of development identified
in the Public Facilities Financing Plan (PFFP) if the
required public facilities, as identified in the PFFP or
as amended by the Annual Monitoring Program have not been
completed. The developer may propose changes in the
timing and sequencing of development and the construction
of improvements affected. In such case, the PFFP may be
amended as approved by the City Planning Director and
Public Works Director.
68. The developer shall agree to not protest the formation of a
district for the maintenance of landscaped medians and
parkways along streets within and adjacent to the subject
property.
69. The developer shall enter into an agreement with the City
wherein he holds the City harmless for any liability for
erosion, siltation or increased flow of drainage resulting
from this project.
70. The developer shall enter into an agreement with the City
whereby the developer agrees to participate in the monitoring
of existing and future sewage flows in the Telegraph Canyon
Trunk Sewer and the financing of the preparation of the Basin
Plan and, pursuant to any adopted Basin Plan, agree to
participate in the financing of improvements set forth
therein, in an equitable manner. Said agreement shall be
executed by the developer prior to final map approval for any
phase or unit proposing to discharge sewage into the Telegraph
Canyon Trunk Sewer.
71. The developer shall permit all franchised cable television
companies ("Cable Company") equal opportunity to place conduit
to and provide cable television service for each lot within
the subdivision. The developer shall enter into an agreement
with all participating Cable Companies which shall provide,
in part, that upon receiving written notice from the City that
said Cable Company is in violation of the terms and conditions
of the franchise granted to said Cable Company, or any other
terms and conditions regulating said Cable Company in the City
of Chula Vista, as same may from time to time be amended,
developer shall suspend Cable Company's access to said conduit
until city otherwise notifies developer. Said agreement shall
be approved by the city Attorney prior to final map approval.
Fees/Payments
72. The subject property is within the boundaries of Open Space
District #20 (Zone 7), Open Space District #10 (Phase II) and
Assessment District #87-1. Prior to final map approval or
other grant of approval for any phase or unit thereof, the
developer shall pay all costs associated with:
a) detachment of subject property from Open Space District
#10 (Phase II); and
b) reapportionment of assessments for Open Space District
#20 (Zone 7) and Assessment District #87-1 as a result
of subdivision of lands within the project boundary.
73. The developer shall pay:
a. Spring Valley Sewer Trunk connection fees ($130/acre)
prior to final map approval for any phase or unit thereof
contributing flow to the Spring Valley Trunk Sewer.
b. Telegraph Canyon drainage fees in accordance with
Ordinance 2384.
74. PAD fees shall be waived or modified as provided in the
adopted Public Facilities Financing Plan for Rancho del Rey.
RCT fees and DIF fees shall be paid in accordance with the
applicable regulations. PAD fees shall be guaranteed until
such time as the City waives said fees.
75. Prior to approval of the first final map, the developer shall
deposit $10,000 with the Department of Public Works for future
transit stop shelters within Rancho del Rey.
Miscellaneous
76. The boundary of the subdivision shall be tied to the
California System - Zone VI (1983).
77. The following statement shall be placed on the Final Map:
Please be advised that the City of Chula Vista has to adopted
a Growth Management Element and intends to adopt a
Transportation Phasing Program as well as other related growth
management implementation programs, which may regulate the
location and timing of development in the City. The City
intends that development of property included in the final map
will be subject to the provisions of these programs. Owners
listed on this map shall be responsible for providing
notification to any purchaser or successor in interest to any
portion of this property of the City's intent in this regard.
'78. Prior to final map approval for any unit, the developer shall
submit a copy of said final map in a digital format such as
(DXF) graphic file. This Computer Aided Design (CAD) copy of
the final map shall be based on accurate coordinate geometry
calculations and shall be submitted on 5 1/2 HD floppy disk
prior to recordation of the final map.
Code Requirements
79. The developer shall comply with all relevant Federal, State
and Local regulations, including the Clean Water Act. The
developer shall be responsible for providing all required
testing and documentation to demonstrate said compliance as
required by the City Engineer.
'8~. The developer shall comply with all applicable sections of the
Chula Vista Municipal Code as they exist at the time of
issuance of the building permit. Preparation of the final map
and all plans shall be in accordance with the provisions of
the Subdivision Map Act and the City of Chula Vista
Subdivision Map Act and the city of Chula Vista Subdivision
Ordinances and Subdivision Manual.
That a copy of this resolution be transmitted to the owners
of the property and the City Council.
PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA,
CALIFORNIA, this 8th day of May, 1991, by the following vote, to-
wit:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
Shirley Grasser Horton
ATTEST:
Nancy Ripley, Secretary
RESOLUTION NO. PCM-90-6 (a)
RESOLUTION OF THE CITY OF CHULAVISTA PLANNING
COMMISSION RECOMMENDING THAT THE CITY COUNCIL
APPROVE THE WATER CONSERVATION PLAN FOR RANCHO
DEL REY SECTIONAL PLANNING AREA (SPA) III
WHEREAS, a duly yerified Water Conservation Plan was filed
with the Planning Department of the City of Chula Vista on January
8, 1991 by Rancho del Rey Partnership, and
WHEREAS, said Plan reviewed the proposed water usage of the
project and conservation measures to mitigate the water use impacts
associated with the development, and
WHEREAS, the Planning Commission set the time and place for
a hearing on associated tentative subdivision map (PCS-90-02) and
notice of said hearing, together with its purpose, was given by its
publication in a newspaper of general circulation in the city and
its mailing to property owners within 300 feet of the exterior
boundaries of the property at least ten days prior to the hearing,
and
WHEREAS, the hearing was held at the time and place as
advertised, namely 7:00 p.m., May 8, 1991, in the Council Chambers,
276 Fourth Avenue, before the Planning Commission and said hearing
was thereafter closed, and
WHEREAS, the Commission found that the Water Conservation Plan
is exempt from CEQA pursuant to Section 15262 of the State CEQA
Guidelines.
NOW THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION
finds as follows:
1. The Water Conservation Plan as submitted is in compliance with
the requirements of the Growth Management Program adopted
April 23, 1991; and
2. The Water Conservation Plan as submitted is in compliance with
Ordinance 2248, the Growth Management Implementation Ordinance
adopted April 23, 1991.
BE IT FURTHERRESOLVED THAT THE PLANNING COMMISSION recommends
that the City Council approve the Water Conservation plan for
Rancho del Rey SPA III.
That a copy of this resolution be transmitted to the owners
of the property and the City Council.
PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA,
CALIFORNIA, this 8th day of May, 1991, by the following vote, to-
wit:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
Shirley Grasser Horton
ATTEST:
Nancy Ripley, Secretary
RESOLUTION NO. PCM-90-6 (b)
RESOLUTION OF THE CITY OF CHULAVISTA PLANNING
COMMISSION RECOMMENDING THAT THE CITY COUNCIL
APPROVE THE AIR QUALITY IMPROVEMENT PLAN FOR
RANCHO DEL REY SECTIONAL PLANNING AREA (SPA)
III
WHEREAS, a duly verified Air Quality Improvement Plan was
filed with the Planning Department of the City of Chula Vista on
January 28, 1991 by Rancho del Rey Partnership, and
WHEREAS, said Plan reviewed the impacts to air quality
anticipated by the project and measures to mitigate the impacts
associated with the development, and
WHEREAS, the Planning Commission set the time and place for
a hearing on associated tentative subdivision map (PCS-90-02) and
notice of said hearing, together with its purpose, was given by its
publication in a newspaper of general circulation in the city and
its mailing to property owners within 300 feet of the exterior
boundaries of the property at least ten days prior to the hearing,
and
WHEREAS, the hearing was held at the time and place as
advertised, namely 7:00 p.m., May 8, 1991, in the Council Chambers,
276 Fourth Avenue, before the Planning Commission and said hearing
was thereafter closed, and
WHEREAS, the Commission found that the Air Quality Improvement
Plan is exempt from CEQA pursuant to Section 15262 of the State
CEQA Guidelines.
NOW THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION
finds as follows:
1. The Air Quality Improvement Plan as submitted is in compliance
with the requirements of the Growth Management Program adopted
April 23, 1991; and
2. The Air Quality Improvement Plan as submitted is in compliance
with Ordinance 2248, the Growth Management Implementation
Ordinance adopted April 23, 1991.
BE IT FURTHERRESOLVED THAT THE PLANNING COMMISSION recommends
that the City Council approve the Air Quality Improvement Plan for
Rancho del Rey SPA III.
That a copy of this resolution be transmitted to the owners
of the property and the city Council.
PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA,
CALIFORNIA, this 8th day of May, 1991, by the following vote, to-
wit:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
Shirley Grasser Horton
ATTEST:
Nancy Ripley, Secretary
RESOLUTION NO. PCM-90-6 (c)
RESOLUTION OF THE CITY OF CHULAVISTA PLANNING
COMMISSION RECOMMENDING THAT THE CITY COUNCIL
APPROVE THE DESIGN GUIDELINES FOR RANCHO DEL
REY SECTIONAL PLANNING AREA (SPA) III
WHEREAS, a duly verified application for a Sectional Planning
Area Plan including Design Guidelines was filed with the Planning
Department of the City of Chula Vista by Rancho del Rey
Partnership, and
WHEREAS, said Design Guidelines constitute a manual to guide
the design of site plans, architecture, and landscape architecture
within Sectional Planning Area III (SPA III) of the Rancho del Rey
Planned Community, and
W~uf~F~%S, the Planning Commission set the time and place for
a hearing on said Design Guidelines and notice of said hearing,
together with its purpose, was given by its publication in a
newspaper of general circulation in the city and its mailing to
property owners within 300 feet of the exterior boundaries of the
property at least ten days prior to the hearing, and
WR~au~AS, the hearing was held at the time and place as
advertised, namely 7:00 p.m., May 8, 1991, in the Council Chambers,
276 Fourth Avenue, before the Planning Commission and said hearing
was thereafter closed, and
WHEREAS, the Commission found that the Design Guidelines are
not a project under CEQA.
NOW THEREFORE, BE IT RESOLVED THAT THE PLANNING COMMISSION
finds as follows:
1. The Design Guidelines for Rancho del Rey SPA III are in
conformance with the E1 Rancho del Rey Specific Plan and the
Chula Vista General Plan; and
2. The Design Guidelines for Rancho del Rey SPA III will promote
the orderly development of the involved sectional planning
area and ensure a consistent quality of development in keeping
with the fundamental concepts established for the approved
SPA.
BE IT FURTHERRESOLVED THAT THE~PLANNING COMMISSION recommends
that the City Council approve the Design Guidelines for Rancho del
Rey SPA III.
That a copy of this resolution be transmitted to the owners
of the property and the City Council.
PASSED AND APPROVED BY THE PLANNING COMMISSION OF CHULA VISTA,
CALIFORNIA, this 8th day of May, 1991, by the following vote, to-
wit:
AYES:
NOES:
ABSENT:
ABSTENTIONS:
Shirley Grasser Horton
ATTEST:
Nancy Ripley, Secretary
CITY OF CHULA VISTA
DISCLOSURE STATEMENT
APPLICANT'S STATEMENT OF DISCLOSURE OF CERTAIN OWNERSHIP INTERESTS ON ALL APPLICATIONS
IWHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL, PLANNING
~COMMISSION AND ALL OTHER OFFICIAL BODIES.
The following information must be disclosed:
1. List the names of all persons having a financial interest in the application.
McMillin Communities, Inc.
Home Capital Corporation
List the names of all persons having any ownership interest in the property involved.
~kzMillin Cc~m3nities, Inc. {privately Hcxne Capital CDrporation, a wholly-owned
held corporation) subsidi~z-y of Hcx~e Federal Savings and
Mc3CillinFaraily Trust - 40% cool, oration listed ontheSPZSE.
~ar~ D. M~t±±ln - ZU~, ~cott M. ~c~il±J_n - 2u~, Lau~ie A. Ray - 20%
2. If any person identified pursuant to il) above is a corporation or partnership, list
the names of all individuals owning more than 10% of the shares in the corporation
or owning any partnership interest in the partnership.
see # 1 above.
3. If any person identified pursuant to (1) above is a non-profit organization or a
trust, list the names of any person serving as director of the non-profit
organization or as trustee or beneficiary or trustor of the trust.
4. Have you had more than $250 worth of business transacted with any member of City
staff, Boards, Commissions, Committees and Council within the past twelve months?
Yes No x If yes, please indicate person(s)
Person is defined as: "Any individual, firm, copartnership, joint venture, association,
club, fraternal organization, corporation, estate, trust, receiver, syndicate,
this and any other county, city and county, city, municipality, district or other
political subdivision, or any other group or combination acting as a unit."
· R~NC~O D~ P~ D.aJ~fI'NE~}~P BY
(NOT[: Attach additional pages as necessary.; Mc~ll~n~niti~s,~n~, Mar~gin~ Partner
Signature/of applicant/date
Virgil E. Elliott
WPC 070lP Senior Vice President August 9, 1989
A-llO F'rint or type name of applicant
P~NCHO DEL REY SPA II i~ND SPA III
WATER CONSERVATION PLAN
SUBMITTAL DRAFT
January 8, 1991
Revision #1 (02/08/91)
Revision $2 (03/25/91)
Prepared for:
Rancho del Rey Partnership
2727 Hoover Avenue
National City, CA 92050
Prepared by;
CINTI & ASSOCIATES
1133 Columbia Street #201
San Diego, CA 92101
(619) 239-1815
Table of Contents
Paqe
I. EXECUTIVE SUMMARY ................................. 1
II. INTRODUCTION ...................................... 4
A. Purpose
B. Planning Context
C. Goals
D. Approach
E. Roles and Responsibilities
III. WATER SERVICE AND SUPPLY .......................... 11
A. Water Sources/Agencies
B. Rancho del Rey SPA II and SPA III Project
Facilities
IV. WATER CONSUMPTION ................................. 19
A. Historical Water Use
B. Water Use in Rancho del Rey SPA II and SPA III
V. WATER CONSERVATION MEASURES ....................... 22
A. Available On-Site Conservation Measures
B. Conservation Measures Implemented in Rancho
del Rey SPA II and SPA III
C. Projected Water Savings
D. Off-Site Conservation Measures
VI. IMPLEMENTATION/MONITORING ......................... 33
VII. REFERENCES ........................................ 34
APPENDIX - Landscape Water Conservation Outline ........ A-1
(partial)
i
I. Executive Summary
The purpose of this Water Conservation Plan for the Rancho del Rey
SPA III project is to respond to the Growth Management Policies of
the City of Chula Vista. The water conservation measures presented
in this plan are intended to respond to the long term need to
conserve water in new development; more stringent short-term,
emergency measures (e.g., water rationing, new meter moratorium,
etc.) responding to drought or water crisis situations are not
included. This plan is intended to be implemented over the life
of the project and to establish standards which will be acceptable
to future project residents regardless of water availability.
As detailed in the report, numerous features have been included in
the project and commitments made by the Master Developer to
minimize the use of water during the construction and habitation
of the Rancho del Rey SPA II and SPA III projects. The estimated
water consumption statistics, with and without conservation
measures are outlined in the table below.
Table 1-1
Rancho del Rey SPA II and SPA III
Water Consumption/Conservation Summary
Water Consumption Percent
w/o Conserv. w/ Conserv. Savinqs
Residential SPA II 0.22 MGD* 0.13 MGD 39%
Residential SPA III 0.42 MGD 0.24 MGD 44%
School/Park/Landscape! 0.10 MGD 0.03 MGD 70%
TOTALS 0.74 MGD 0.40 MGD 46%
Averages2
Per capita 140 gal/day 89 gal/day 37%
Per dwelling unit 378 gal/day 240 gal/day 37%
*MGD=million gallons/day
1Savings based on using reclaimed water for irrigation.
2Does not include reclaimed water savings.
(03/25/91)
1
The water savings summarized above reflect the implementation of
several water conservation measures essentially within the project
boundary. These measures are summarized in Table 1-2. In
addition, the project is committed to fully participate in any off-
site mitigation program adopted by the City. Such a program would
be designed to require new development to off-set all or a portion
of their new water demand by funding or providing water conserva-
tion improvements in older developed areas where efficient plumbing
fixtures or irrigation systems were not installed. Fees collected
could also be spent on studying or acquiring new or improved
sources of water (e.g., expanded water reclamation, desalination,
etc.). Although such a program does not exist at the current time,
considerable work is being completed by several agencies including
the CWA, local water districts, and the city to formulate such a
plan and adoption of a region-wide program is anticipated.
The primary agency responsible for ensuring compliance with this
plan is the city of Chula Vista. Requirements for compliance will
be enforced through tentative map conditions and/or development
agreement provisions, or other appropriate agreements. The
previously approved Mitigation Monitoring Program adopted with
approval of the Rancho del Rey SPA III Plan will be expanded to
monitor compliance with the provisions of this Water Conservation
Plan. Various departments will review and approve plans for
development of these projects. In the course of that review, plans
will be checked for compliance with the provisions of this plan.
The Otay Water District will also have a direct role as the water
provider, both potable and reclaimed, to these developments.
Implementation of reclaimed water use on publicly owned property
will be the responsibility of the City (for park and open space
areas) and the Sweetwater Union High School District (for the
junior high school site in SPA III).
(03/25/91)
2
Table 1-2
Rancho del Rey SPA II and SPA III
Water Conservation Measures
On-Site Measures
Fixtures/Devices
Ultra-low Flow Toilet
Ultra-low Flow Shower Head
Faucet Aerator
Hot Water Pipe Insulation
Pressure Reducing Valves
Water Efficient Dishwasher
Water Efficient Clothes Washer (advise/assist)
Outdoors/Landscaping
Efficient Builder Installed Irrigation
Low Water Use Builder Installed Landscaping
Installation of Reclaimed Water Mains
Water Conserving Practices during Grading/Construction
Public Education/Awareness Program
Homebuyer Information Packets
Water Conservation Coordinator
Public Information seminars
Off-Site Measures
Full participation in a City approved water conservation/
mitigation program designed to off-set additional water demand
associated with new construction through the retro-fit of
older, less efficient water fixtures off-site and/or funding
for new supplies or sources of water.
(03/25/91)
3
II. Introduction
A. Purpose
The purpose of this Water Conservation Plan for the Rancho
del Rey SPA II and SPA III projects is to respond to the
Growth Management Policies of the city of Chula Vista. As
described below, these policies are the culmination of a long
term, comprehensive planning process. In addition, one of the
conditions of approval of the SPA III Plan is the preparation
and approval of a Water Conservation Plan which mitigates
water supply impacts to an insignificant level, as determined
by the City Council, prior to the approval of the tentative
map for SPA III. Approval of this plan will fulfill that SPA
Plan requirement.
The City of Chula vista has looked comprehensively at issues
dealing with development and the additional impacts it places
on public facilities and services. The approval of the
Threshold Ordinance and the General Plan update were the first
steps in the overall process of addressing growth related
issues. The second step in this process was the development
and adoption of the Growth Management Element which set the
stage for the creation of the Growth Management Program.
The Growth Management Program is the final component in the
City's effort to create a comprehensive system to manage
future growth. This program implements the Growth Management
Element of the General Plan and establishes an orderly process
to carry out the development policies of the City. It directs
and coordinates future growth patterns and rates to guarantee
the timely provision of public facilities and services. The
primary area of focus of the Growth Management Program is east
of 1-805 where most of the remaining vacant land is located,
including the project site.
B. Planning Context
The planning context for this water conservation plan ranges
from state-wide and regional considerations to local, site
specific requirements. SANDAG'S draft Quality of Life
Standards and Objectives, prepared by the Regional Growth
Management Technical Committee, consist of eight factors
including air quality and water, sewage disposal, sensitive
lands protection, solid waste management, toxic and hazardous
waste management, transportation system management, and
housing. These regional standards and objectives are based
on State and Federal law and at a minimum, must be carried out
on a regional level by agencies such as APCD, Regional Water
Quality Control Board, County Water Authority, etc. The
strategies to be included in the Regional Growth Management
(03/25/91)
4
Strategy are of necessity long term in nature and will involve
every city and special district in this county.
At the local level, cities and special districts must carry
out their fair-share responsibilities within a day-to-day
decision making framework to ensure attainment of the regional
standards and objectives. Many of the regional standards and
objectives that will involve Chula Vista and other cities are
the provisions of the California Clean Air Act and the San
Diego County Water Authority (SDCWA) water availability
standards addressing supply, storage, conservation and
reclamation. Chula Vista is actively participating, through
the growth management program and other efforts, in the
regional endeavor to establish effective long term regional
strategies to implement the air quality and water standards
and objectives.
The SANDAG Quality of Life Standards and Objectives regarding
water availability and conservation include four components:
supply, storage, conservation and reclamation. These four
components can be summarized as follows:
1. A sufficient supply of water should be available to serve
the residents, businesses and institutions in the San
Diego Region.
2. Per capita increases in water supply should be stabiliz-
ed. Current daily per capita water use is approximately
196 gallons.
3. Discharge of effluent into the oceans and streams should
be reduced to achieve the reclamation of 100,000 acre
feet of water per year by 2010.
4. The County Water Authority recommends that its member
agencies be able to operate without water service from
the CWA's aqueducts for up to 10 consecutive days in the
event of an emergency.
In addition to water availability, the following standards
and objectives address water quality:
1. Inland service waters should meet the Federal and State
Standards and Objectives for water quality as regulated
by the Regional Water Control Board.
2. Ground water supply should meet the Federal and State's
standards and objectives for water quality as regulated
by the Regional Water Control Board.
3. Reclaimed water shall be treated to meet the objectives
of the State of California and the Regional Water Control
(03/25/91)
5
Board for discharge in receiving waters, i.e., inland
service waters or ground water to protect the existing
and potential beneficial uses, or for direct use for
landscape and agricultural irrigation.
At the local level, within Chula Vista, the City Council is
in the process of implementing the recommendations of the
Chula Vista Water Task Force. The consensus of the Task Force
was that Chula Vista must play a more active role in all water
related issues. To this end the Task Force has offered the
following recommendations:
1. Chula Vista should immediately work to establish a Chula
Vista Interagency Water Commission (IAWC) to deal with
local water related issues.
2. Chula Vista should become more proactive in state and
regional water related issues.
3. Chula vista should provide adequate support staff for
increased attention to water issues.
4. The city's General Plan, Land Use Plan, Growth Management
Program, and the Master Plans from all appropriate water
agencies should be integrated to reflect short term and
long term goals.
5. The City should establish ordinances and guideline
manuals for the implementation of conservation water
related measures.
6. The city should adopt specific policies in regard to
water related issues. These policies would be the
primary guidance for the council representative to the
Interagency Water Commission, and for the staff water
person for all guidelines, manuals, and plans.
7. Chula Vista, through the Interagency Water Commission,
(IAWC) should work to establish a new water use and
conservation ethic in the IAWC planning area as a model
for all San Diego County.
Among the more significant recommendations of the Water Task
Force which will affect growth management in the future is
recommendation #5 regarding the preparation of a guideline
manual to set forth city policy in regard to water use,
conservation and reclamation for new developments.
In addition, recommendation #6 of the Water Task Force speaks
to the City taking a more active role in promoting conserva-
tion efforts in establishing guidelines for itself and all
(03/25/91)
6
future developments within its jurisdiction to conserve water.
Examples of the conservation techniques suggested include:
1. Low flow toilets and low flow shower heads.
2. Require the insulation of hot water systems in all new
developments and/or upon resale of existing homes.
3. Require mandatory use of reclaimed water where the
appropriate water agency (Otay Water District for SPA II
and SPA III) has stated that it either currently has or
will have the ability to develop such water.
4. Require each developer to prepare a water use/conserva-
tion report detailing the programs they propose to
implement to reduce water demand.
The Water Task Force report contains a list of numerous other
recommendations which will be incorporated into the water
conservation program in the future.
In order to implement some of the above, the Planning
Department staff has proposed and Interim Growth Management
Policy with respect to water conservation. In response to #4,
the proposed policy requires that a Water Conservation Plan
be prepared and adopted for all major development projects in
conjunction with SPA Plan approval. This report for the
Rancho del Rey SPA II and SPA III projects has been prepared
to meet that policy requirement, in anticipation of the
adoption of the proposed Growth Management Policy by the Chula
Vista City Council.
At the present time, no guidelines for such plans have been
adopted. As the initial project report, this plan is the
first effort to implement the proposed policy and may serve
as an example/guideline for future project reports. It also
represents the first effort to implement the proposed growth
management policies of the City of Chula Vista.
At the time this report is being prepared (March 1991),
California is facing the fifth year of drought and extreme
water rationing programs are about to go into effect. These
measures require significant changes in the way water is used
by all residents of California, both in homes and industry.
These measures may preclude or substantially restrict new
construction in the short term. Faced with this crisis
situation, long term plans are now being proposed and
formulated to change water policies at many levels of
government to place a greater emphasis on conservation.
It is not the purpose of this plan to incorporate the extreme
short-term measures, rather the plan is intended to represent
(03/25/91)
7
a commitment to the long-term perspective of using water
responsibly while providing for growth, including development
of the SPA II and SPA III projects. Because these long term
programs have yet to be developed, the documentation of
specific provisions, timing, and other requirements cannot be
detailed herein. Only general descriptions and commitments
to implement such plans can be made at this time.
C. Goals
The following are goals of the Rancho del Rey SPA II and SPA
III Water Conservation program:
1. To conserve water during and after construction of the
SPA II and SPA III projects.
2. To comply with the water conservation standards and
policies of the City of Chula Vista and Otay Water
District.
3. To create a comprehensive framework for the design,
implementation and maintenance of water conserving
measures, both indoor and outdoor.
4. To be economically efficient and cost effective.
D. Approach
The approach to water conservation outlined in this plan is
intended to be comprehensive and implemented throughout the
life of the development project. Water conservation during
construction and after occupancy are addressed, as well as
the installation of water conserving landscaping, appliances
and fixtures. Efforts to educate and increase awareness of
the need to conserve water and the opportunities to do so,
will be directed toward future residents. Project participa-
tion in regional or city-wide water conservation/mitigation
programs to provide additional off-site mitigation is also
anticipated. The roles and responsibilities of all affected
parties are described in the following section.
E. Roles and Responsibilities
In order for this plan to be effective, it is necessary to
clearly assign appropriate roles and responsibilities to all
of the participants in the development and occupancy phases
of the SPA II and SPA III projects. There are three primary
groups involved: developer/builders; government/service
(03/25/91)
8
agencies; and future residents. Each has an important role
to play, as described below.
1. Developer/Builders
The community developer, the Rancho del Rey Partnership,
is providing the basic planning, design, and management
of this program. Community level facilities, landscaping
and construction standards will be implemented by the
master developer.
Individual builders will construct homes according to
the standards set by the master developer (and the City)
and will be responsible for water planning and management
within their own project. Builders will also be the
primary communicators with homebuyers. In this role, they
will be responsible for identifying the water conserva-
tion features incorporated in the project, and educating
homebuyers regarding a continuing conservation effort.
The builder/developer will also pay fees or make off-
site water conservation retro-fit improvements to comply
with any city-wide or regional water supply mitigation
or improvement program, if such a program is adopted.
2. Property Owners/Residents
The long term success of the conservation effort rests
with property owners who are the long term water users
within the project. Private homeowners, associations,
and public agencies will be responsible for irrigation
and landscape materials on individual lots. Builders
will incorporate water conserving systems and materials
with initial construction but it will be the responsi-
bility of the property owner to maintain these installa-
tions and use water responsibly on a day-to-day basis.
Land uses which have significant irrigation requirements
(schools, parks, landscaped open space) should utilize
reclaimed water as it becomes available. The decision
to utilize reclaimed water will rest with property
owners, which are public agencies (school district and
city).
3. Government/Service Aqencies
The City of Chula Vista will review project plans and
assist in the monitoring of this plan. Because of its
development approval role, the City can effectively
enforce water conservation standards for new construc-
tion. The City can also be a source of on-going
(03/25/91)
9
education and water awareness through citizen communica-
tion programs.
The City, through the Interagency Water Commission, will
also have a role in formulating and implementing a city-
wide or regional water conservation/mitigation program.
Such a program would require new development to reduce
water supply impacts through an off-site mitigation
program which would reduce water consumption in existing
development or develop new or alternative water sources
such as expanded reclamation or desalination facilities.
The Otay Water District will provide domestic water
service, and potentially reclaimed water service. As
the water purveyor, the District may adopt its own
guidelines or standards for water conservation. The
District now has a water connection allocation program
in effect. The District will also monitor adherence to
policies or requirements of regional water agencies such
as the County Water Authority and the Regional Water
Quality Control Board.
As owners of property with significant irrigation needs,
the City and Sweetwater Union High School District will
have the opportunity to utilize reclaimed water when it
becomes available. In the interim, they have a responsi-
bility to use water conserving plant materials and
irrigation systems.
(03/25/91)
10
III. WATER SERVICE AND SUPPLY
This section describes the sources of domestic water for the Rancho
del Rey SPA II and SPA III projects, identifies the responsible
water agencies, and details current issues regarding the supply of
water to the project.
A. Water Sources/Agencies
Metropolitan Water District
The primary source of domestic water in Southern California
is the Metropolitan Water District of Southern California
(MWD) which serves 27 member agencies from Los Angeles to San
Diego. These agencies include incorporated cities and water
districts along the coast, encompassing over half the
population of California. The purpose of MWD is to provide
an adequate amount of water to each of its member agencies.
To do this, MWD utilizes the California aqueduct system to
convey water from the north and east to southern California.
San Diego County receives up to 95% of its water through this
system. Lake Skinner, the major water storage facility
serving San Diego County, has a 50/50 blend of Colorado River
water and State Water Project (Northern California) water.
Both these water sources are limited. Deliveries of Colorado
River water to the MWD are expected to decline as others
entitled to the water in the river increase their diversions.
Recent drought conditions have drawn attention to the
limitations of State Water Project flows. Given this
situation, increasing attention has been directed state-wide
toward conservation measures to more efficiently utilize this
limited resource.
On December 11, 1990, the MWD mandated water rationing for
member agencies. Delivery quotas for each district will be
established based on reductions which range from 5% for
residential consumption to 20% for agricultural uses for an
overall reduction of 7.8%, beginning February 1, 1991. Any
water delivered to the local water agencies in San Diego in
excess of their quota will cost $394 per ac/ft, 300% more than
water within the quota. For water savings in excess of the
quota, local districts will receive incentive rebates of $99
per ac/ft (1 ac/ft equals 326,000 gallons). It will be up to
each local agency to determine how to achieve water consump-
tion reductions within their district.
The required cutbacks are the second phase of a five-phase
plan to reduce water consumption by 10% in 1991. Phase I was
officially implemented on December 1, 1990 and was designed
to achieve voluntary reductions of 10% for residential and
industrial use and unspecified reductions in agricultural and
groundwater replenishment uses. If the current drought
(03/25/91)
11
continues and Phase II is ineffective, Phase III would be put
into effect. Reductions of 10% for residential and 30% for
agriculture would be required. If conditions continued to
deteriorate, mandatory reductions would increase to 15% and
40%, respectively, in Phase IV and 20% and 50% in Phase V.
San Diego County Water Authority
The San Diego County Water Authority (SDCWA) is the largest
member agency of MWD. In 1988-89, MWD delivered 28.1% of its
water to SDCWA and MWD water constituted 90.1% of all water
delivered by SDCWA. Twenty-four member agencies including
cities, water districts, irrigation districts, municipal water
districts, public utility districts, a federal agency, and a
county water district are served by the Authority. The
individual member agencies, in turn, directly or indirectly
supply over 95% of the San Diego County population. About
half of the member agencies depend completely on supply from
SDCWA, while the other half has some local supply available
through treated surface and ground water. SDCWA purchases and
distributes treated water from various treatment plants owned
and operated by its member agencies.
SDCWA imports water from the Colorado River and the State
Water Project through MWD, their sole supplier of imported
water. Distribution of the water takes place through an
aqueduct system maintained and operated by the Authority.
Each member agency submits a daily request for water and is
responsible for having adequate storage facilities when extra
is ordered, and adequate reserves for those times when not
enough is ordered.
In response to the recent drought conditions, the SDCWA
requested that member agencies enact mandatory water conserva-
tion measures. In response all agencies except the largest,
the city of San Diego, did so. The city of San Diego enacted
a voluntary conservation campaign. Conservation efforts in
San Diego County have been successful in meeting initial
targets, including MWD requirements. No specific plans have
been adopted in response to the most recent MWD mandates, as
current conservation efforts exceed these targets.
Otay Water District
The Otay Water District (OWD) is the local water agency which
delivers water to consumers in the Rancho del Rey project
area. The OWD has no local surface runoff water available
and relies completely on the SDCWA for water supply. There
appears to be little opportunity to develop alternative
sources (i.e., wells, runoff collection, etc.). OWD owns and
operates a local distribution system, but currently lacks
sufficient seasonal/emergency reservoir capacity.
(03/25/91)
12
Because of this lack of storage capacity, the OWD has met peak
demands by increased deliveries from the SDCWA aqueduct during
peak demand periods. This approach has created potential
problems for the SDCWA and other member agencies.
Due to the lack of adequate water availability to meet
regional short-term peak demands in general, the water supply
to OWD has been limited by the SDCWA to 38 cubic feet per
second (cfs) during high peak demand. The two aqueducts
operated by the SDCWA to import water into the San Diego
region reach capacity during peak demand periods; the
infrastructure of the importation system itself is occasional-
ly not adequate to meet peak water demands. To address this
issue, the SDCWA is planning to construct an additional
aqueduct, tentatively to be completed by 1994.
The OWD receives excess water during non-peak periods to meet
the additional demand during peak periods; however, the
District does not have sufficient water storage facilities to
assure year round availability. The District is currently
negotiating with the Sweetwater Authority and the City of San
Diego to increase its storage ability to ensure adequate water
service during peak periods.
The Otay Water District has been experiencing these water
storage problem for some time. As a result, the district
developed and is implementing a water allocation program.
The Otay Water District Report on Allocation of Water Requests
Based on Water Availability was adopted by the Board of
Directors on April 19, 1989 as Resolution No. 2742. Because
of the inability to store adequate water for an unlimited
amount of new development, the allocation system allots 1,900
Equivalent Dwelling Units (EDUs) of water service per year for
the service area. In the Chula Vista, this limit equates to
approximately 700 to 1,000 units per year. This program will
remain in effect until supply and terminal storage conditions
improve, additional sources of water supply are found, or the
SDCWA lifts the limitation of 38 cfs. At that time, the
yearly allotment of connections will be increased or the
allocation program will be eliminated. Necessary improvements
are not anticipated to be completed before 1994-5.
The OWD Water Allocation Program implements actions taken by
the District to allow issuance of water service connections
within the District until the construction of the new Pipeline
No. 4 is complete. The issuance of new water service is
subject to the District's present limited water storage and
water supply. These actions include the approval of guide-
lines which: 1) categorize various water requests; and, 2)
determine if a water service request qualifies for immediate
connection or, future connection based on an allocation of
(03/25/91)
13
water service to the anticipated Equivalent Dwelling Units
(EDUs) requests. The following categories are used in
determining the allocation of water service in the District:
Cateqory I - Water service requests that qualify for
immediate water connection with issuance of an approved
building permit.
Cateqor¥ II - Water service requests that qualify for
water service connection contingent upon completion of
conditions of an agreement with the District entered into
prior to adoption of the allocation program.
Cateqory III - Land Development water service requests
that are allocated water service dependent on contribu-
tion to construction of major water facilities including,
but not limited to, terminal water reservoirs, major
water transmission mains, pump stations, etc., that
directly or indirectly support water service.
After the adoption of the allocation program, the Otay-Triad
Agreement was entered into. This agreement is between the
Otay Water District, EastLake Development Company, Rancho Del
Rey Partnership (developer of the SPA II and SPA III pro-
jects), and Rancho Del Sur Partnership. In essence, the Otay-
Triad Agreement allows EastLake, Rancho Del Rey, and Rancho
Del Sur to request more EDUs per quarter per development for
single family connections than would otherwise be possible.
Without the Otay-Triad Agreement, these developers would not
be able to request more than 200 EDUs per quarter per
development for single family connections. In exchange, the
developers have approved bond financing of terminal storage
faculties in lieu of paying a Reservoir Storage Fee to OWD.
This enables OWD to construct the necessary terminal storage
reservoirs at an earlier date than would have been possible
by collecting fees only.
The OWD also operates a small water reclamation plant (1.3
MGD) which is currently not operated to it's full potential
due to strict water quality regulations, high energy costs and
limited demand. A pipeline between the plant and the EastLake
project (located approximately 3 miles east of Rancho del Rey)
has been constructed and is expected to supply irrigation
water to the golf course and other landscaped areas now being
developed. It is anticipated that the OWD will supply greater
volumes of reclaimed water in the future, either through
expansion of the existing plant or additional facilities.
(03/25/91)
14
Rancho del Rey Project Facilities
Rancho del Rey SPA II and SPA III are the second and third
phases of the Rancho del Rey Planned Community. The previous
phase, SPA I is now under construction north of East "H"
Street and southwest of Otay Lakes Road. SPA II comprises the
northwestern portion of the project site, north of East "H"
Street. SPA III is located south of East "H" Street and north
of Telegraph Canyon Road.
Existing water facilities owned and operated by the Otay Water
District will connect to the proposed facilities depicted in
Exhibit A, Domestic Water Plan SPA II, which will complete the
looped water system north of East "H" Street. Facilities to
serve the SPA III project are depicted in Exhibit B. Also,
in anticipation of the increased availability of reclaimed
water in the future, reclaimed water mains and service lines
will be constructed as a part of the projects. The system
within SPA III is depicted in Exhibit C. The proposed main
in Paseo Ranchero will convey reclaimed water, when it is
available, to SPAs I and II where landscape irrigation systems
built to use reclaimed water are being installed in Rancho del
Rey Parkway to serve SPA II and the middle ridge of SPA I.
A connecting main in East "J" Street will supply irrigation
water for the park and school sites in SPA III.
(03/25/91)
15
IV. WATER CONSUMPTION
This section presents information on historical and projected water
use in the region. The anticipated water demand of the SPA II and
SPA III projects is also quantified.
A. Historical Water Use
The availability of imported water in California led to its
increased use for landscaping and agricultural. The cultiva-
tion of lush ornamental plants and lawns which are typical of
landscape in mid western and eastern states where water is
plentiful replaced the "drought tolerant" native California
vegetation. Agriculture was introduced in formerly arid and
semi-arid areas. As the population of California grew, so
also did urban water demand
In San Diego however, per capita water consumption has not
substantially increased. From 1970 to 1988, per capita
consumption ranged from 169 to 241 gallons per capita per day,
averaging approximately 200 gallons per capita per day, which
is also the current factor. This total is divided among land
uses in the following percentages: 45% residential, 32%
commercial/industrial, and 23% agricultural.
By the year 2000, the San Diego area population is expected
to grow by approximately 16%, with concurrent increases in
water demand. SDCWA is actively working to reduce water
consumption by 15%, primarily through controls on agricultural
uses. This goal should be easily achievable given the results
that were observed during the 1975-1977 drought when reduc-
tions of 25-90% were obtained through more efficient irriga-
tion and changes in maintenance practices. Because of the
on-going drought conditions, water conservation is being
promoted or required throughout the state, including San
Diego, as described in previous sections of this report.
B. Water Use in Rancho del Re¥ SPA II and SPA III
Table 4-2 shows the projected water use in Rancho del Rey SPA
II and SPA III, based on average use rates which do not
reflect significant conservation measures, categorized
according to land use and residential density based on the
population estimates given in Table 4-1. The primary unit of
measure for water quantity used for comparison in this report
is gallons per capita per day (gpcpd). This can be multiplied
by the estimated number of persons per dwelling unit (DU) to
obtain the gallons per day per dwelling unit. The number of
persons per dwelling unit varies with the type of residential
unit (apartment, condominium, single family detached, etc.),
as shown in Table 4-1.
(03/25/91)
19
The total projected average water use, without conservation
measures, for the Rancho del Rey SPA II and SPA III projects
is 0.74 million gallons per day (MGD). The ability to use
reclaimed water to irrigate large areas in SPA II and SPA III
is being built into the project, and is addressed separately,
as it is not directly a part of the residential development.
Approximately 0.07 MGD (10%) of the total water need could be
satisfied by using reclaimed water. The focus of this report
is to describe conservation measures for reducing the
projected 0.67 MGD potable water use within the residential
development.
One additional benefit to decreased indoor water use is the
reduction in sewage volume generated. Although sewage is not
part of this plan, the reductions in volume due to water
conservation measures could have a significant cost savings
impact on related collection and treatment facilities.
Table 4-1
Rancho del Rey SPA II and SPA III Estimated Population
Proposed
Units Household
(DU) Size Population
SPA II
Single Family Detached 567 3.0 1,701
SPA III
Single Family Detached 564 3.0 1,692
Attached Med. Density 522 2.5 1,305
Attached High Density 294 2.0 588
SPA III Subtotal 1,380 2.6 (avg.) 3,585
TOTALS 1,947 2.7 (avg.) 5,286
(03/25/91)
20
Table 4-2
Projecte~ Water Use in Rancho ~el Rey SP~ II an~ SPA III
Land Use Population Rate Use
~MGD)
Residential
SPA II SFD 1,701 persons 130 gpcpd .22
SPA III - SFD 1,692 persons 130 gpcpd .22
Attached Low Density 1,305 persons 110 gpcpd .14
Attached High Density 588 persons 95 gpcpd .06
Sub-total 5,286 persons .64
Jr. High School: Potable 1,400 students 20 gpcpd .03
Irrigation 8.5 acres 3.0 ft/yr .02*
Public Park SPA II 6.5 acres 3.0 ft/yr .02*
SPA III 10.0 acres 3.0 ft/yr .03*
Total Permanent Potable Use 0.67
Total Potential Reclaimed Use .07*
Total Water Use 0.74
Average per capita use 140 gal/day**
gpapd= gallons per acre per day
gpcpd= gallons per capita per day
MGD= million gallons per day
*Areas with potential to be irrigated with reclaimed water.
**Per capita amount is well below regional average because project
does not include commercial, industrial or agricultural uses which
are included in regional per capita statistic.
(03/25/91)
21
V. Water Conservation Measures
Three consecutive years of drought in watersheds supplying San
Diego County have lead to changing attitudes and governmental
policies regarding water. Continued water shortfalls are projected
as growth continues in Southern California. Three possible
solutions are available: increase water supply from non-tradition-
al sources; conserve available water; or, increase production and
use of reclaimed water. The conservation approach is the focus of
this report, primarily because it is a cost effective approach
which can be directly implemented on a project-by-project basis.
Over the long-term, water conservation must become an integral
component of the Southern California way of life with or without
a drought condition in order to avoid drastic lifestyle altera-
tions. The potential impact of water conservation can be see in
Table 5-1.
A. Available On-site Conservation Measures
Several general approaches to water conservation are avail-
able: demand reduction; increased efficiency; increased
supply/reclaimed water use; and, improved water system
management. The measures included in this report are limited
to those which can be implemented in projects of the size and
type of Rancho del Rey SPA II and SPA III.
1. Public Information
Any voluntary or mandatory water conservation effort
requires cooperation of the public. Most consumers have
very little knowledge of the water system that serves
them. Historically, water has been inexpensive in
California; therefore, people have a tendency to assume
that there is an abundant supply and take it for granted.
The purpose of public education is to inform and convince
the consumer that a change in personal water habits is
essential and is in his/her own and the community's best
interest. Generally, long term results are best achieved
through educating children in water conservation.
2. Land Use
The per capita and per dwelling unit water use quantity
changes with the type of residential units, the value of
the residence, and the size of the lot. Table 5-1 shows
typical per capita use for a single family detached
residence in coastal Southern California. Interior per
capita use is similar to other types of residences; the
major difference in use is with outside use, which is
significantly lower for high density developments such
(03/25/91)
22
Table 5-1
Residential Water Use in Southern California
Use w/
Conservation Potential
Typical Use Measures Water Savings
(gpcpd) (gpcpd) (gpcpd) %
Inside Use
Toilet 30.0 20.0 10.0 33
Bath/Shower 22.0 17.0 5.0 23
Laundry 10.0 8.5 1.5 15
Dishwashing 4.0 3.0 1.0 25
Faucet 3.0 2.5 0.5 17
Cooking 3.0 3.0 0.0 0
Total Inside 72.0 54.0 18.0 25%
Outside Use
Landscape 53.0 28.0 25.0 47
Car Washing,
etc. 5.0 5.0 0 0
Total Outside 58.0 33.0 25.0 47%
TOTAL USE 130.0 87.0 43.0 33%
Total Savings:
Single Family Detached - 129 Gallons Per DU Per Day at 3.0
Capita Per DU
Attached Low Density - 108 Gallons Per DU Per Day at 2.5
Capita Per DU
Attached High Density - 86 Gallons Per DU Per Day at 2.0
Capita Per DU
NOTE: Total savings without consideration of reclamation
Source: Luke-Dudek Engineers
(03/25/91)
23
as apartments and condominiums. Table 5-1 also shows the
potential savings for each of the water use areas.
3. Mechanical Measures
Numerous mechanical devices to reduce household water
consumption are available, especially for interior use.
As Table 5-1 indicates, about half the water used in
California is used indoors.
The bathroom is where most inside water is used and
wasted daily. Conventional toilets use from 5 to 7
gallons per flush, as opposed to low-flush toilets, which
use from 3.3 to 1.5 gallons per flush. Since 1978,
California has required that all new toilets installed
use no more than 3.5 gallons per flush. Early on there
was some concern that low flow toilets would cause
clogging problems in sewer laterals, however, this has
not been the case.
Ultra low flush toilets, which have recently been
developed, use about 1.5 gallons per flush. This is a
reduction of about 57% from the low flush toilets used
in new homes, and a reduction of up to 70% from the older
toilets. Since the toilet accounts for about 40% of the
indoor use, this presents a significant opportunity for
reduction.
Standard shower heads have a flow rate of about 4.5
gallons per minute (gpm). California requires that new
shower heads have a flow of no more than 2.75 gpm. The
most water conservative showerheads have a flow rate of
0.5 gpm using a blend of air and water to give the
illusion of a higher flow rate. In addition to saving
water, low flow showerheads save energy too by reducing
the amount of hot water used. Hot water use is the
second largest residential energy consumer; heating and
air conditioning the home is the greatest residential
use. Low flow faucets reduce flow rates from about 5 gpm
to between 2.75 gpm and 0.5 gpm; this can save one gallon
per person per day.
Low water-use appliances can also be large contributors
to water conservation. Certain models of dishwashers use
50% less water than others and can thus save between 7
and 9 gallons per load. Clothes washers use 41 to 74
gallons per load. Front loading washers are more
efficient than top loading, and various options can save
even more water. Water level controls and washers that
recycle rinse water save about 1.5 gallons per person per
day. Table 5-2 shows potential water use reduction due
to water saving devices installed in an average home.
(03/25/91)
24
Table 5-2
Summary of Typical Household Water-Saving Devices
Water Use Reduction
Device gpd percent
Toilet improvements 7.5-17 5 12-27
Faucet aerators 0- 0 5 0- 1
Shower flow limiting 0- 7 5 0-12
Pressure-reducing valves 0-16 0 0-20
Improved clothes washers 0- 8 0 0- 5
Improved dishwashers 0- 8 0 0- 4
Hot water pipe insulation 0- 8 0 1- 4
Approximate Total 35.0 gpd 25%
From: Water Conservation Strategies, AWWA, 1980.
4. Landscape
Approximately 50% of water used in California is for
landscapes. Typical landscape efficiencies are between
50% and 80%; therefor, savings of 20% - 50% are possible
through better watering techniques and maintenance.
Trickle/drip irrigation applies water exactly where it
is needed at an efficiency of 85% - 90%, and results in
a total water savings of more than 4% alone. Generally,
sprinklers are between 60 and 75% efficient. Watering
at night, or in the early morning, using automatic
sprinkler systems can save 20% of outside water. Daytime
irrigation is inefficient because much water is lost to
evaporation. Through the use of drought tolerant plants,
water consumption can be reduced by 40% to 60%.
Moisture sensors are another way to increase irrigation
efficiencies. Residential customers, on the average,
over water their landscaping by about 20% while parks and
recreational areas are over watered by nearly 80%.
Moisture sensors are not considered economical for
residential use, but would save millions of gallons of
water and thousands of dollars each year if used for
parks and recreational areas. Polymers and wetting
agents in the soil can also increase irrigation efficien-
cy.
(03/25/91)
25
B. Conservation Measures Implemented in Rancho del Rey SPA II and
SPA III
Implementing water conservation measures before a project is
constructed provides an opportunity to include measures which
might not otherwise be practical. Many of the measures
described here could be prohibitively expensive to retro-fit
to existing residences, but can be cost effective if included
with the initial construction. In addition, moving in to a
new home provides a major opportunity to change habits and
attitudes while adjusting to the new home/environment.
The potential water savings for each of the conservation
measures to be implemented in Rancho del Rey SPA II and SPA
III are shown in Table 5-3 in units of gallons per capita per
day (gpcpd), and can be multiplied by the number of people per
dwelling unit (DU) to determine the water savings for each
household. Water savings are relative to other newer homes
without water conservation devices; much higher water savings
can be shown if the proposed measures are compared to older
residential units.
1. Fixtures/Devices - Indoors
Ultra-Low Flow Toilet The ultra low flow toilet uses
1.6 gallons per flush, compared to the current require-
ment of 3.5 gal/flush, or the older standard of 5 to 7
gal/flush. Tests have shown that the new 3 1/2 gallon
toilets actually use 4 to 4 1/2 gallons. Since the
toilet is the largest single inside use of water (40%),
large savings can be realized by using the ultra-low flow
toilets. Although the ultra-low flow toilets can cost
$50 more than a standard model, the savings more than
make up for the additional cost.
Ultra-Low Flow Shower Head The ultra-low flow shower
head reduces the flow from the current standard of 3.5
to 2 gpm. Older shower heads flow from 3 to 5 gpm. The
ultra-low flow shower head saves about 5 gpcpd for a
minimal extra cost of approximately $3.00.
Faucet Aerator - Faucet aerators give the appearance and
feel of greater flow, so less water is used. Many new
homes already come with aerators, so the actual savings
is shown ranging from 0 to 0.5 gpcpd. Although the
savings is small, the additional cost is low, so their
use is economical. There is also potential savings in
energy through reduced use of hot water.
Hot Water Pipe Insulation - By insulating the hot water
pipes and separating the hot and cold lines to reduce
heat exchange, the time the faucet is allowed to flow
(03/25/91)
26
while waiting for the water to become hot is reduced.
The cost for insulating the pipes exceeds the value of
water saved, but the cost is relatively low, and it is
simple to do while the unit is under construction. The
potential energy savings with insulation can be signifi-
cant.
Pressure Reducinq Valve - A pressure reducing valve at
the water hook-up for each residence can reduce the flow
rate by reducing the pressure in the lines. Normal
pressures for residential use range from 40 to 80 psi;
the optimum is a range of 50 to 60 psi allowing a normal
flow of 3 gpm. The amount of potential savings depends
on the line pressure available, and ranges from 0 to 3
gpcpd.
Water Efficient Dishwasher - New water efficient
dishwashers can save as much as 6 gallons per cycle over
older models. Newer models tend to be more efficient,
so the actual amount of water saved will depend on the
type of dishwasher proposed. Since there is a relation-
ship between cost and water efficiency, more expensive
homes would probably already be planned for the most
efficient dishwashers.
Water Efficient Clothes Washers - The relationship
between water efficiency and cost of the appliance for
the clothes washer is the same as with the dishwasher.
Since the clothes washer uses more water, the potential
savings is greater. The major difference with the
clothes washer is that it is normally supplied by the
owner, and would therefore be difficult to mandate the
use of more efficient and costly machines, especially
since the cost increase exceeds the value of the water
saved. Rancho del Rey will advise and assist homeowners
in their selection of an efficient machine.
2. Outdoors/Landscaping
Efficient Irriqation System - As much as 50% of total
water use is outside the home for a single family
detached residence with large turf areas. Most residen-
tial landscaping is over-watered, so the potential
savings with efficient, timed sprinklers and micro
irrigation systems is very large. Builder installed
xeriscaped front yards with efficient irrigation systems
are now provided in Rancho del Rey SPA I. All builder
installed irrigation in SPA II and SPA III will be water
efficient. Drip irrigation systems will be utilized
where appropriate. The installation of correspondingly
efficient systems by homeowners in rear yards will
require eduction programs and a project Water Conserva-
(03/25/91)
27
tion Coordinator to provide advice and assistance. A
water coordinator is now serving Rancho del Rey SPA I,
and will also serve SPA II and SPA III projects. A
Homeowner's Guide to Drought Tolerant Landscape will be
distributed to all new home buyers to provide information
on irrigation systems and low water use landscaping.
Low Water Use Landscapinq - The largest potential for
reducing outside water use is to decrease the water
demand by using low-water use, drought-tolerant landscap-
ing. Turf areas require large amounts of water, so
restricting the area of turf will have a significant
impact. Builder installed front yards will have reduced
turf areas and utilize drought-tolerant plant materials.
A Homeowner's Guide to Drought Tolerant Landscape will
be distributed to all new home buyers to educate and
encourage similar homeowner installed landscape design
and materials.
3. Education
General Water Conservation - In addition to the physical
measures to reduce water consumption, a general water
conservation program will enforced to reduce waste.
Guidelines and educational materials will be distributed
to all new homeowners. Water waste may be monitored by
the local homeowners' associations, where available, or
the Water Conservation Coordinator.
McMillin Communities has sponsored and will continue to
sponsor weekend seminars on water conservation and
xeriscape options for homeowner landscaping.
4. Reclaimed Water
Water Reclamation Water reclamation conserves large
amounts of potable water used for irrigation. The major
opportunities for irrigation with reclaimed water are the
neighborhood parks and the field area of the junior high
school. Reclaimed water mains will be installed to
deliver water to these sites when it becomes available.
The decision to utilize reclaimed water will lie with the
respective property owners, the City of Chula Vista and
Sweetwater Union High School District. The use of
reclaimed water on these three sites could result in a
10% reduction in potable water use in the SPA II and SPA
III projects (see Table 4-2).
In SPA I (units 5 & 6) and SPA II, a reclaimed water main
has been installed in the loop road and landscape
irrigation systems approved for reclaimed water use have
been installed in the public open space areas. These
(03/25/91)
28
will be charged with potable water until reclaimed water
is available (expected within 5-10 years). At that time,
a single disconnection/connection is all that will be
required to utilize reclaimed water for open space
irrigation. Similar installations will be made in SPA
III by the Master Developer, where appropriate. The city
and school district should consider such an approach for
the irrigated areas for which they are responsible.
5. Water Use Durinq Construction
Water conservation measures can also be implemented
during the construction/grading process. The three
primary uses are: dust abatement; soil compaction; and,
street washing. Grading and construction which is now
going on in SPAs I and II serves as an example of the
techniques which can be implemented in SPA III. Since
the imposition of Stage 2 water conservation requirements
by the Otay Water District, water conservation has been
incorporated in Rancho del Rey construction activities,
as appropriate. Water use has been limited to that
necessary for proper soil compaction; soiled streets have
been swept instead of washed. Reclaimed water could be
used for these grading activities, however it is not
currently available.
The use of native/naturalized plant materials on graded
slopes in open space will reduce the need for irrigation
in the future. The "Rancho del Rey Revegetation Method"
(modified Tyson method) is being utilized to re-vegetate
some graded areas. The method involves scraping and
saving native topsoil and then reinstalling it on top of
non-irrigated graded areas. With rainfall, the seeds of
the native plants in the top soil sprout and re-vegetate
the graded area with the same species that were original-
ly present, eventually re-establishing the same natural
habitat.
The use of dry grains to stabilize/landscape temporary
slopes is also being evaluated. This approach avoids
the use of water to irrigate temporary landscaping which
has traditionally been used in such areas.
C. Projected Water Savings
As indicated in Table 5-3, a total water savings of 0.340 MGD
or approximately 46% is projected with full implementation of
the water conservation measures specified in this plan.
(03/25/91)
29
Table 5-3
Rancho del Rey SPA II and SPA III
Water Conservation Mnasure~
Water Savings
Per For Project Per
Conservation Capita (MGD) Residence
Measure Function (gpcpd) (gpd/DU)
Inside
Ultra-low flow Reduced Flush 10 0.053 27
Toilet; 1.6 Volume
gal/flush
Ultra-low flow Reduced Shower 5 0.026 14
shower head; 2 GPM Flow Rate
Faucet Aerator Appearance and 0-0.5 0.003 1
Feel of Greater
Flow
Hot Water Pipe Reduces Warm-Up 0-~ 0.011 5
Insulation Time
Water Hook-up Reduces Pressure 0-~ 0.016 8
Pressure Reducing and Flow Rate
Valve
Water Efficient Reduced Water 0-~ 0.005 3
Dishwasher Requirement
Water Efficient Reduced Water 0-1.5 0.008 4
Clothes Washer Requirements
Outside
Efficient Increased 10 0.053 27
Sprinklers & Drip Irrigation
Irrigation Efficiency
Low Water Use Low Water Demand 15 0.079 41
Landscaping
General Reduce Waste 0-~ 0.016 8
Conservation
Water Reclamation Replace Potable -- 0.070 --
Irrigation Water
PROJECT TOTALS 51 0.340 138
(03/25/91)
30
D. Off-Site Mitigation Measures
Because of the crisis created by the multi-year drought in
California and the extreme short-term water rationing/use
restrictions adopted to respond to the situation, new
attention is being given to formulating new policies which
will conserve water and allow for long-term growth.
As noted in the preceding sections, although the SPA II and
SPA III projects implement a variety of water conserving
practices, the construction and occupation of these projects
will result in an increased demand for water. The drought has
demonstrated that water is a finite resource and that current
supplies cannot reliably support current demands and continued
growth. However, growth is major component of both the
State's and, especially, the local San Diego area economy.
In order to accommodate growth, while long term water supply
options are evaluated and implemented, new programs to more
efficiently use the available water are being proposed.
An initial area of focus is the retro-fit of plumbing fixtures
and landscape irrigation in existing development. According
to statistics compiled by the Construction Industry Federation
(CIF) retro-fitting the shower and toilet fixtures in
approximately 2.8 older homes would save the amount of
interior-use water required by one new home (additional older
homes would be required to offset outdoor water use at the new
home). Thus a mitigation program which collected fees to
complete such conversions, or directly required equivalent
conversions, could allow a limited amount of new development
to occur without creating a net increase in water demand.
Comparable water savings could also be achieved by retro-
fitting irrigation systems of schools, parks, golf courses,
etc., where significant conservation of irrigation water could
be achieved. This type of water consumption off-set program
has been conceptually approved by the San Diego County Water
Authority. Additional studies to determine the exact
specifications, scope and implementation process are now
underway. In order to avoid conflicting regulations and to
maximize fairness, such a program would need to be implemented
on a wide basis, preferably county-wide. The city and local
water district would provide input in the establishment of the
large scale program and would probably provide local implemen-
tation.
As indicated earlier, the approval of the Rancho del Rey SPA
III Plan was conditioned to require a Water Conservation Plan
which reduced any impacts to the local water supply to an
"insignificant" level, as determined by the City Council.
This is the first and, so far, the only project to be so
conditioned. At the time the condition was drafted, it was
interpreted to require a zero net increase or complete water
(03/25/91)
31
consumption off-set, because no program, adopted policy or
city-wide criteria existed to be used as a standard. However,
as additional projects request approvals and/or a broad based
mitigation/conservation program is developed, "insignificant"
is expected to be defined as full implementation of on-site
conservation measures and full participation in an off-site
mitigation program endorsed by the City. The SPA II and SPA
III projects will fully comply with the requirements of a
City-approved and/or sponsored water conservation/mitigation
program.
(03/25/91)
32
VI. IMPLEMENTATION/MONITORING
Implementation of the Water Conservation Plan shall primarily be
the responsibility of the Master Developer. The Master Developer
will establish requirements and guidelines for merchant builders
and provide educational materials and guidance to new homeowners.
The Master Developer will also install drought tolerant landscap-
ing, approved by the City, in streetscapes and open space areas.
The Master Developer will also require the inclusion of drought
tolerant plant materials and efficient irrigation systems in any
builder installed landscaping. Portions of an outline for
Landscape Water Conservation, to be implemented on a project-by-
project basis within the community, is provided in Appendix A.
This approach, prepared for SPA I (units 5 & 6) and SPA II, has
been approved by the City's Landscape Architect and will also be
implemented in SPA III.
A substantial responsibility will also rest with the City of Chula
Vista to ensure/enforce the provisions of this plan, specifically
the Planning, Building, and Park and Recreation Departments. The
Planning and Building Departments will review plan submittals to
ensure that water conservation measures are properly included. The
Parks and Recreation Department will approve planting and irriga-
tion plans for public parks and open space.
Mains and laterals for reclaimed water will be installed with the
major road and infrastructure improvements. The provision of
reclaimed water is the responsibility of the Otay Water District,
which will also be responsible for enforcing water quality
regulations. The determination to use reclaimed water for
irrigation purposes rests with the city Parks and Recreation
Department for parks and open space areas, and the Sweetwater Union
High School District for the junior high school site.
In order to ensure that all provisions of this plan are met, the
Mitigation Monitoring Program for the SPA III project, utilized to
ensure the mitigation measures specified in the project EIR are
implemented, will also incorporate the provisions of this Water
Conservation Plan. This approach will allow for a formal deter-
mination by the City that each of the required measures are
implemented. Future discretionary or administrative actions with
regard to Rancho del Rey SPA II and SPA III (e.g., tentative map,
development agreement, building or grading permit, etc.) may be
utilized to address or ensure compliance with the prescribed water
conservation measures.
(03/25/91)
33
VII. REFERENCES
ERC Environmental and Energy Services Co.; Draft Supplemental EIR
EastLake III/Olympic Training Center. August 1989.
Cinti & Associates; Draft SPA Plan Rancho del Rey SPA III.
August 1990.
Luke-Dudek civil Engineers; EastLake Planned Community Water
Conservation Study. September 1989.
Luke-Dudek Civil Engineers; Water Conservation Recommendations
for EastLake Greens. November 1989.
Metropolitan Water District of Southern california; Final Draft
Reqional Urban Water Management Plan. July 1990.
P&D Technologies; Final Supplemental EIR Rancho del Rey SPA III
Plan. November 1990.
"Water Rationing Plan Includes S.D. County"; Los Anqeles Times,
San Dieqo County Edition, page A-i, December 12, 1990.
Willdan Associates and Bud Gray; Draft Growth Manaqement Proqram
- City of Chula Vista. August 1990.
(03/25/91)
34
APPENDIX A
A-1
RANCHO DEL REY SPA II and SP~ III
Landscape Water Conservation Outline
REVIEW PROCESS AND PROCEDURE
A. The creation of the Rancho del Rey irrigation and
landscape will consist of the meshing of numerous
projects into a pre-established pattern. To monitor
this effort, routine review during the planning and
implementation states of a project is a necessity.
This review will occur as a normal part of the total
landscape planning effort.
In addition to this master developer review process and
procedure, the City of Chula Vista requires review.
The following is recommended:
1. Prior to commencement of design of a specific
project within Rancho del Re¥ a meeting should be
conducted with the Rancho del Rey Partnership
{RDRP) to thoroughly understand:
a. The project's relationship to overall
landscaped water management program.
b. Specific processing procedures and submittal
requirements.
2. During the Schematic Design Phase, closely adhere
to the principles of the program, General
Landscape Plan, the Design Manual, the City of
Chula Vista Landscape Manual, and the Otay Water
District Water Conservation program. Indicate
which areas will be irrigated by future reclaimed
water.
3. The Schematic Design must be approved by the
Rancho del Rey Design Review Committee.
4. During the Design Development Phase, the project
manager should incorporate applicable Landscape
and Irrigation standards.
5. The final working drawings must be approved by the
RDRP and the City of Chula Vista.
A-2
Two separate sets of landscape, planting and irrigation
plans may be required:
a. Slope erosion control plans required as part
of the Grading Permit process;
b. Project Landscape and Irrigation Plans.
B. The formats for landscape submittals are as follows
(may be subject to change; verify latest requirements):
1. Schematic Submittal
This plan should be at the same scale as the site
plan and should clearly illustrate the landscape
architectural design including type of landscape
and plant materials. The plan shall include a
legend indicating all plant materials and sizes
and irrigation materials. A water conservation
program should also be included.
2. Final Submittals
a. Slope erosion control plans.
Plan shall be on City of Chula Vista "D"
sheets and conform to all applicable City
requirements.
b. Final Project Irrigation and Landscape Plans.
NOTE: As previously mentioned, this is one component of
the total landscape planning effort, therefore,
separate drawings for the purpose of indicating
the Water Management Program do not have to be
prepared. Schematic and final submittal plans
will be the customary irrigation and landscape
plans, unless these plans do not cover specified
requirements.
IRRIGATION
The irrigation for Rancho del Rey shall be controlled by an
automatic irrigation system. The project landscape archi-
tect, water manager and his staff shall be familiar with
optimum use of the system, so that monitoring and response
to climate conditions can be achieved in the most expedient
and efficient manner.
A-3
The following steps shall also be taken to insure efficient
water use and conservation:
A. Analysis
1. Review and confirm projected water quality and
effects on proposed plant list. Develop plant
palette. Emphasize drought tolerant plant
materials and xeriscape.
2. Develop "ET zones" for project based upon
marketing, low water goals and plant material
3. Meet with City to confirm design standard requests
in general.
4. Meet with RDRP to review desired product.
5. Review design standards for Otay reclaimed water
irrigation approval. Also, adhere to the District
Water Conservation program.
6. Establish construction phasing and timing with
respect to available water.
7. Review RWQCB and Health Standards.
8. Establish water use plan (master plan), meters,
peaking, average use, etc. Review potential of
supplementing reservoir during peaking.
9. Establish time of use for irrigation. Note any
restrictions mandated by the Water District.
10. Formulate maximum flows, maximum reach and
limitations of current and proposed reclaimed
system.
11. Review Rancho del Rey needs, check with Otay on
additional user needs promised.
12. Check future expansion needs.
13. Establish priority list of which areas receive
water first, etc., down to the cost priority.
14. Review and confirm most efficient mainline
distribution system to service irrigation needs
and goals.
A-4
B. Irrigation Installation
In order to appropriately conserve water, the following
general procedure will be followed:
1. Permanent areas where immediate construction is
planned will be irrigated in accordance with
approved plans. Systems may include:
a. Low precipitation sprinkler heads
b. Moisture sensors
c. Check valves to prevent drainage out of low
heads.
d. Separation of different types of landscape
areas, elevations and climatic conditions and
exposures.
e. Common areas to be automated systems to
maximize conservation.
2. Temporary areas (to be altered by future
construction).
a. No irrigation to be installed.
b. Straw punching.
c. Water shall be natural rainfall. (Landscaping
installed during rainy season).
3. Interior minor slopes landscape areas
a. May be treated in a temporary manner with no
irrigation, (non-irrigated hydroseed mix),
and straw punching.
b. Once construction occurs, the permanent
irrigation will be installed.
Subject to approval by City Landscape Architect.
4. Exterior slopes adjacent to native areas.
a. Initially no irrigation will be provided.
The "Rancho del Rey Revegetation Method" will
be used. Plant material establishment will
be monitored for 3 to 5 years. If satis-
factory results do not occur, the City may
A-5
require that a permanent irrigation system be
installed.
LANDSCAPING
Landscaping will be carefully planned to provide erosion
control and stabilization, energy and water conservation,
visual aesthetics and overall enhancement to the community.
This will be achieved through appropriate plant material
selection, soil analysis and amendment, and landscape
installation.
A. Plant Material Selection
Landscape areas have been classified based on their
intensity of maintenance and water requirements. These
classifications are generally described as follows:
1. Native Areas - These are existing vegetated areas
undisturbed by construction operations. Natural
rainfall only is required for irrigation.
Periodic clean-up and grubbing of seasonal growth
may be required for fire brush management.
2. Naturalized Areas - These are newly planted areas
adjacent to native areas. Temporary irrigation
may be provided. The "Rancho del Rey Revegetation
Method" will be used. During the rainy season,
supplemental trees and shrubs will be planted at
the ratio of 115 plants per 1,000 square feet (30%
shall be trees and 70% shrubs).
NOTE: Plant material selections will be coordinated with
the City Landscape Architect.
B. Soil Analysis and Amendment
1. To assist in plant material designation, careful
analysis of the Rancho del Rey soils will be
completed by an independent soils laboratory.
2. Recommendations for soil amendment will also be
given by the laboratory.
3. Soils in the general area appear to possess these
characteristics:
a. Unbalanced nutrients
b. High in salt content
A-6
c. High clay content
4. The amendment program will:
a. Add organic matter and nutrients for healthy
plant growth, where required.
b. Chemically treat the soil to reduce salt
content, increase permeability, establish
correct pH and alleviate any harmful elements
such a boron.
c. May include amendment to improve the water
retention capabilities of the soil, i.e.,
"agricultural polymers.
MAINTENANCE
Once the irrigation and landscape are installed, proper
maintenance shall be the key to efficient water use.
A. Irrigation/Landscape
1. The irrigation system shall be systematically
adjusted and monitored to provide optimum moisture
without over-water or runoff.
2. Expertly trained personnel shall operate the
system to its maximum efficiency and benefit.
3. Routine field observations shall be made to review
irrigation operation and landscape conditions.
Adjustments, if.necessary, shall be made in an
expedient manner.
4. On a periodic basis, the irrigation and
landscaping shall be re-evaluated to determine how
efficiency and conservation can be improved.
5. Once drought tolerant landscape areas are
established, the frequency of watering shall be
reduced.
6. Temporary irrigation to be removed by Developer at
turnover to Open Space Maintenance District.
A-7
RANCHO DEL REY SPA II an~ SPA III
AIR QUALITY IMPROVEMENT PLAN
SUBMITTAL DRAFT
January 28, 1991
Revision #1 (4/25/91)
Prepared for:
Rancho del Rey Partnership
2727 Hoover Avenue
National City, CA 92050
Prepared by;
CINTI & ASSOCIATES
1133 Columbia Street #201
San Diego, CA 92101
(619) 239-1815
Table of Contents
Page
I. EXECUTIVE SUMMARY ................................. 1
II. INTRODUCTION ...................................... 3
A. Purpose
B. Planning Context
C. Goals
D. Approach
E. Roles and Responsibilities
III. AIR QUALITY LEGISLATION AND PLANS ................. 8
A. Background
B. Air Quality Plan Requirements
C. Transportation Control Measures
D. Indirect Source Regulations
E. Other Planning Programs Affecting Air Quality
IV. AIR QUALITY IMPACTS ............................... 15
A. Existing Climate/Air Quality Conditions
B. Project Air Quality Impacts
V. AIR QUALITY MITIGATION MEASURES ................... 24
VI. MONITORING/CONCLUSIONS ............................ 26
VII. REFERENCES ........................................ 27
i
I. EXECUTIVE SUHI~h~Y
The purpose of this Air Quality Improvement Plan is to respond to
the Growth Management Policies of the City of Chula Vista. The
most significant air quality improvement measures are those
policies and regulations established at the broadest geographic
level, ie. State and Federal. However, there are measures that can
be applied on a City or project level which can have a positive
impact. This report presents an overview of these issues, and
offers the following improvement measures which are to be imple-
mented at the local level.
1. Pedestrian and Bicycle Paths: The Specific Plan, and
subsequent SPA Plans, adopted by the City have emphasized the
use of an extensive trail system, connecting activity centers,
to enable non-vehicular travel. There has also been a
suggestion that programs to encourage pedestrian and bicycle
travel could be applied, such as reduced parking availability
at retail centers. These concepts would require City-wide
debate to fully appreciate competing goals, and are not
applicable at the project level.
2. Jobs/Housinq Balance: The Specific Plan adopted by the City
has included job opportunities within this community. While
intensification of the Business Center could meet some local
opposition, the implementation of this employment base should
be encouraged to facilitate local employment opportunities.
3. Access To Reqional Systems: The LOS requirements applied to
Rancho del Rey will encourage free-flow travel, which reduces
air emissions. However, there are those who argue that
transit use is actually enhanced by congestion. These
competing approaches to air quality improvements needs to be
reviewed as City-wide policy to determine the appropriate
balance.
4. Transit Access: The project circulation will improve routes
for transit, especially by connecting Telegraph Canyon Road
to East "H" Street via Paseo Ranchero. Transit stops can be
incorporated where desired at key intersections without
significant plan modification. The Specialty Housing Area,
envisioned for senior housing, is especially well suited for
transit stops and includes an extensive trail access system.
5. Educational Proqrams: The developer will participate in an
educational program for residents of Rancho del Rey. This
program could also be coordinated as part of a larger City-
wide program to inform residents of the services and alterna-
tive transportation options available to them.
(04/25/91) 1
6. Park-and-Ride Facilities: The potential for providing a Park-
and-Ride facility in proximity to the project exists. Cal
trans currently has a site in Terra Nova. However, the vacant
City owned parcels, at Terra Nova at East "H" Street and Paseo
Ranchero at East "H" Street, are in the preferable A.M. west
bound location. Such a Park-and-Ride facility could also
provide a staging area for carpools, vanpools, and transit
vehicles.
7. Local and Reqional Air Quality Regulations: A new Air Quality
Plan will supersede the 1982 SIP. This plan, which is
projected for adoption prior to the implementation of SPA III
development, will include increased standards and regulatory
measures to mitigate this as well as other anticipated growth
in the San Diego Air Basin. Rancho del Rey will be subject
to compliance with these regulations and mitigation measures
as they evolve.
8. Development Monitoring: The Design Review process provides
a point for monitoring the inclusion of on-site transit stops
and trail linkages. In addition, this development will be
subject to the ongoing monitoring programs inherent in the
City's Transportation Phasing Plan and Growth Management
Program.
These local mitigation measures might have a minimal impact on Air
Quality in quantifiable terms, but their enhancement of future
transit options and public awareness should have a greater long
term public benefit.
(04/25/91) 2
II. INTRODUCTION
A. Purpose
The purpose of this Air Quality Improvement Plan for the
Rancho del Rey SPA II and SPA III projects is to respond to
the Growth Management Policies of the City of Chula Vista.
As described below, these policies are the culmination of a
long term, comprehensive planning process.
The City of Chula vista has looked comprehensively at issues
dealing with development and the additional impacts it places
on public facilities and services. The approval of the
Threshold Ordinance and the General Plan update were the first
steps in the overall process of addressing growth related
issues. The second step in this process was the development
and adoption of the Growth Management Element which set the
stage for the creation of the Growth Management Program.
The Growth Management Program is the final component in the
City's effort to create a comprehensive system to manage
future growth. This program implements the Growth Management
Element of the General Plan and establishes an orderly process
to carry out the development policies of the City. It directs
and coordinates future growth patterns and rates to guarantee
the timely provision of public facilities and services. The
primary area of focus of the Growth Management Program is east
of 1-805 where most of the remaining vacant land is located,
including the project sites.
B. Planning Context
The planning context for this air quality plan ranges from
state-wide and regional considerations to local planning
requirements. SANDAG'S draft Quality of Life Standards and
Objectives, prepared by the Regional Growth Management
Technical Committee, consist of eight factors including air
quality and water, sewage disposal, sensitive lands protec-
tion, solid waste management, toxic and hazardous waste
management, transportation system management, and housing.
These regional standards and objectives are based on State
and Federal law and at a minimum, must be carried out on a
regional level by agencies such as APCD, Regional Water
Quality Control Board, County Water Authority, etc. The
strategies to be included in the Regional Growth Management
Strategy are of necessity long term in nature and will involve
every city and special district in this county.
At the local level, cities and special districts must carry
out their fair-share responsibilities within a day-to-day
(04/25/91) 3
decision making framework to ensure attainment of the regional
standards and objectives. Many of the regional standards and
objectives that will involve Chula Vista and other cities are
the provisions of the California Clean Air Act and the San
Diego County Water Authority (SDCWA) water availability
standards addressing supply, storage, conservation and
reclamation. Chula Vista is actively participating, through
the growth management program and other efforts, in the
regional endeavor to establish effective long term regional
strategies to implement the air quality and water standards
and objectives.
The SANDAG Quality of Life Standards and Objectives regard-
ing air quality, transportation system management (TSM) and
transportation demand management (TDM) incorporate Federal
and State Air Quality Standards. The California Air Resour-
ces Board (ARB) has classified the San Diego region as having
a severe air pollution problem because the region will not
comply with State standards until some time after 1997.
According to the San Diego Air Pollution Control District
(APCD), the major sources of air pollutants in the region are
motor vehicles and pollution blown in from Los Angeles. Given
this situation, local air quality improvement efforts are
focused on transportation issues. To address air quality
problems related to transportation, level of service standards
for arterials, highways and transit are being developed, as
are goals for reducing solo auto trips.
Actions necessary to achieve state and federal clean air
standards, and TSM and TDM objectives include:
· reducing solo auto trips by carpooling and using transit
· promoting telecommuting and staggered work schedules
· improving transit service
· building additional high occupancy vehicle lanes
· coordinating traffic signals and implementing other
circulation system improvements
· reducing trip lengths through jobs/housing balance, mixed
use development and focusing development near transit
stations
The regional plans required by State law are now being
prepared by SANDAG and the APCD. Although the areas of focus
are well known, specific guidelines and standards are not
currently available. Thus a direct comparison or evaluation
of the measures included in this plan with the regional
standards cannot be made at this time. However, because of
the residential nature of these projects and the transporta-
tion focus of the specific measures expected to be adopted in
the regional plan, project level consistency is very likely
(04/25/91) 4
(i.e., specific requirements for residential projects are
expected to be minimal). The following chapter will more
fully detail the basis for this conclusion.
At the local level, within Chula Vista, there is no local air
quality plan. However, the City Council is in the process of
implementing the Growth Management Program which requires Air
Quality Improvement Plans for major development projects (50
residential units or commercial/industrial projects with
equivalent air quality impacts). Because no local plan exists
or is in preparation, project compliance will need to be
measured against the requirements of the regional plan.
This report for the Rancho del Rey SPA II and SPA III projects
has been prepared to meet that policy requirement, in
anticipation of the adoption of the proposed Growth Management
Policy by the Chula Vista City Council.
At the present time, no guidelines for such plans have been
adopted. As the initial project report, this plan is the
first effort to implement the proposed policy and may serve
as an example/guideline for future project reports. It also
represents the first effort to implement the proposed growth
management policies of the City of Chula Vista.
C. Goals
The following are goals of the SPA II and SPA III Air Quality
Improvement Plan:
1. To minimize air quality impacts during and after
construction of the SPA II and SPA III projects.
2. To comply with the air quality standards and policies of
the City of Chula Vista and San Diego County APCD.
3. To create a framework for the design and implementation
of air quality mitigation measures in these residential
development projects.
4. To be economically efficient and cost effective.
D. Approaoh
The approach to air quality mitigation outlined in this plan
is focused on the strategies and measures available to
residential development projects. As will be described in
the next chapter, few transportation/air quality improvements
measures in the State and regional plans are addressed to
these projects. The majority address transportation system
efficiency, alternative transportation modes, heavy vehicle
(04/25/91) 5
restrictions, and increased vehicle occupancy. None of these
are directly influenced or effected by residential develop-
ment. Some measures are available however, and these are
described and incorporated into the project as appropriate.
These include integration of land uses, construction of
facilities to support public transportation, and the provision
of private group transportation where feasible. Efforts to
educate and increase awareness of the need to minimize air
quality impacts and the opportunities to do so, will be
directed toward future residents. The roles and responsibili-
ties of all affected parties are described in the following
section.
E. Roles and Responsibilities
In order for this plan to be effective, it is necessary to
clearly assign appropriate roles and responsibilities to all
of the participants in the development and occupancy phases
of the SPA II and SPA III projects. There are three primary
groups involved: developer/builders; government/service
agencies; and future residents. Each has an important role
to play, as described below.
1. Developer/Builders
The community developer, the Rancho del Rey Partnership, is
providing the basic planning, design, and management of this
program. Community level transportation facilities, vehicu-
lar and non-vehicular, will be implemented by the master
developer.
Individual builders will construct homes according to the
standards set by the master developer (and the City) and will
be responsible for energy planning and management within their
own project. Builders will also be the primary communicators
with homebuyers. In this role, they will be responsible for
identifying the energy conservation features incorporated in
the project, and educating homebuyers regarding a continuing
conservation effort.
2. Property Owners/Residents
The long term success of the air quality mitigation effort
rests with residents who choose their own modes of transporta-
tion, driving habits and lifestyles. In the aggregate,
choices by residents affect the air quality in the region more
than any effort by the City or developer.
Generally, commercial and industrial are the land uses which
have significant opportunities to incorporate air quality/
transportation mitigation measures because of the concentrated
(04/25/91) 6
number of automobile trips associated with them. The decision
to utilize public transit or non-vehicular transportation will
rest with future residents, influenced by the availability
and convenience of such facilities.
3. Government/Service Aqencies
The City of Chula Vista will review project plans and monitor
this plan. Because of its development approval role, the City
can effectively enforce transportation phasing and other
standards for new construction. Some local public transporta-
tion systems are operated under authority of the City, in
cooperation with regional operators. The City can also be a
source of on-going education and air quality awareness through
citizen communication programs.
The San Diego APCD will adopt regional air quality plans which
will implement measures to meet State and Federal standards.
Although these plans will focus primarily on transportation
issues, land use and indirect source guidelines will also be
included. State law prohibits the intrusion of the APCD on
the land use decision authority of the City, so it will be up
to the City to implement any such guidelines.
To a certain extent, the local school districts also have a
role to play based on the transportation they offer to
students. Bussing of students to school facilities, instead
of parent auto trips, can have beneficial effects in the same
way that using public transit for employment commuting reduces
total trips, improving air quality and traffic congestion.
(04/25/91) 7
III. AIR QUALITY LEGISLATION ~ND PLANS
A. Background
Based on air quality data from the regional air quality
monitoring network, the California Air Resources Board
classified San Diego County as a non-attainment area for the
State Ozone (03) and inhaleable particulate matter (PM10) air
quality standards. In addition, the western portion of the
County was classified non-attainment for the State Nitrogen
Dioxide (NO2) and Carbon Monoxide (CO) standards. The eastern
portion of the County is classified attainment for these
standards.
Ozone is the principal pollutant of concern in San Diego
County. Despite considerable reductions in ozone levels
during the past ten years, in 1988 San Diego County exceeded
the federal standard on 45 days and the state standard on 160
days. Pollution transported from the greater Los Angeles area
was responsible for two-thirds of the days over federal
standards and one-half the days over state standards. By
comparison, the state nitrogen dioxide standard was violated
in downtown San Diego on only one day each in 1988 and 1987.
In Escondido, there was also one violation in each of these
years.
Because violations of the CO and NO2 standards are marginal
compared to the significant 03 problem, the principal focus of
the regional air quality effort will directed toward reducing
reactive organic gases and oxides of nitrogen, which are ozone
precursors.
The ARB motor vehicle pollution control program will continue
to provide significant reactive hydrocarbon, oxides of
nitrogen, and CO reductions from motor vehicles. Transporta-
tion control measures will also reduce these emissions. Since
80% of the region's CO and 50% of the NO2 pollution is from
on-road motor vehicles, this combination of measures will
substantially contribute to attaining and maintaining these
two standards. While transportation control measures and
motor vehicle emission controls will be major elements in the
CO and NO2 control program, additional stationary source
control measures may be necessary to control oxides of
nitrogen.
B. Air Quality Plan Requirements
1. Involved Aqencies
The four agencies involved in the air quality planning process
are the Environmental Protection Agency (EPA), which is
(04/25/91) 8
responsible for the administration of the federal Clean Air
Act; the State Air Resources Board (ARB), which is responsible
for the implementation of the California Clean Air Act of
1988; the San Diego County Air Pollution Control District
(APCD), which is responsible for the development of the Air
Quality Plan mandated by the State Clean Air Act and for
regulating the emissions in the region; and SANDAG, which is
responsible for the preparation of the transportation control
measures component of the Air Quality Plan. The Plan is to
be consistent with the traffic congestion management and
regional growth management plans also being prepared by
SANDAG. Within this context of a long term strategy to be
carried out by the State and the APCD, Chula Vista can also
do its fair share, although it does not have a formal role in
formulating the plan. State law does provide for the
delegation of administration of APCD Regulations to local
agencies if the following conditions are met:
· Measures adopted and implemented are as stringent as the
District's measures.
· The local agencies submitting an implementation plan have
sufficient resources and the District approves the plan.
· The District adopts procedures to audit local agency
performance to insure compliance. The District can
revoke the delegation for inadequate performance.
Any land use provisions of the adopted plan will ultimately
be the responsibility of the City as state law prohibits the
APCD from intruding in this area.
2. Air Quality Standards
Attainment of air quality standards is based on federal and
state law which establishes such standards, with the state
standards more strict than federal standards (see Table 1).
Given this situation, compliance with state law will generally
lead to conformance with federal law.
The California Clean Air Act of 1988 requires that each air
district develop and submit a plan by July 1991 showing how
the district will achieve the mandated standards. In their
plans, the districts must consider all emission sources,
independent of transport into the air basin. Each district
not in attainment of the standards by 1994 must reduce non-
attainment pollutants or their precursors by an average of 5%
per year, beginning from the 1987 levels. The plan must also
demonstrate that improved air quality will be maintained after
attainment; thus, the plan must have provisions for continued
air quality improvement to accommodate growth. The plan must
(04/25/91) 9
TABLE 1
AMBIENT AIR QUALITY STANDARDS
Pollutant Averaging California National
Time Standards Standards
Ozone 1 Hour 0.09 ppm 0.12 ppm
Carbon 8 Hour 9.0 ppm 9 ppm
Monoxide 1 Hour 20 ppm 35 ppm
Annual
Nitrogen Average - 100gg/m3
Dioxide 1 Hour 0.25 ppm -
Annual
Sulfur Average - 80 gg/m3
Dioxide 24 Hour 0.05 ppm 0.14 ppm
1 Hour 0.25 ppm -
Suspended
Particulate Annual Mean 30 gg/m3 50 gg/m3
Matter
(PM 10) 24 Hour 50 gg/m3 150 gg/m3
Sulfates 24 Hour 25 gg/m3
30 Day Average 1.5 gg/m3 -
Lead Calendar -
Quarter 1.5 gg/m3
H~udr°gen 1 Hour 0.03 ppm_ -
lfide
Vinyl Chloride 24 Hour 0.010 ppm -
(chloroethene)
Visibility Visibility of 10 -
Reducing 1 Observation miles when
humidity is
Particles <70%.
(04/25/91) 10
contain transportation control measures, transportation system
measures, and direct source regulations.
3. Mandated Measures
Because the San Diego region is classified "severe", specific
controls are required by State law. These are: the best
available retrofit control technology for existing sources;
a permitting program that mitigates emission increases from
all new and modified sources; reasonably available transporta-
tion control measures; indirect and area source control
measures; and, specifically, transportation control measures
to hold vehicle emissions constant after 1997 and achieve an
average commute-time ridership of 1.5 persons per vehicle by
1999, and measures to achieve use of a significant number of
low-emission vehicles by fleet-operators.
If the region cannot meet the 5% annual reduction standard,
then the next best level of reduction is to be achieved. The
Act authorizes the ARB to adjust the emission reduction target
for individual areas, if two legal conditions are met. First,
the Plan must include all feasible measures and the region
must be expeditiously implementing the Plan. Based on the
currently available data, the APCD believes that the 5% annual
reduction will not be met and thus the "all feasible measures"
standard will be applied.
C. Transportation Control Measures
In November 1990, the APCD Board adopted criteria for
developing a transportation control measures (TCM) plan. The
plan is being prepared by SANDAG according to the criteria of
APCD, and, once completed (first draft due in March 1991), the
plan will be implemented through district regulations and
transportation system improvements.
The TCM criteria addressed six major areas: transportation
demand management (reduction in number vehicle trips & heavy
duty vehicle restrictions); alternative transportation mode
capacity expansion (public transit, park and ride, high
occupancy vehicle facilities & bicycle/pedestrian facilities);
transportation system management (traffic signals & incident
management); land use (jobs/housing balance, mixed use
development & focused development); market based incentives
(fees & taxes); and, driving restrictions.
Regulations which will be proposed to meet these criteria
could include:
1. Ride sharing and van pool programs.
(04/25/91) 11
2. Employer subsidized transit ticket passes.
3. Flexible work schedules to accommodate ride sharing and
transit.
4. Telecommuting and teleconferencing.
5. Parking incentives to support ride sharing.
6. Trip management education.
7. Limiting heavy duty truck traffic during peak commute
periods and reducing the number of trips through better
fleet management.
8. Measures to reduce trips to large facilities.
In addition, the Air Quality Plan will contain transportation
system measures to attempt to reduce motor vehicle pollution
utilizing some of the following measures:
1. Adding more high occupancy vehicle by pass ramps and
lanes.
2. Improving transit services.
3. Special bridge toll rates for drivers who ride share.
4. Increase bus fleets and upgrading of vehicles.
5. Development of long range policies supporting vehicle
trip reduction.
D. Indirect Source Regulations
A residential development is considered an indirect source in
that it generates/attracts motor vehicle trips, although the
homes themselves do not directly impact air quality. Because
all feasible measures will be required, indirect source
measures will be included in the Plan. The focus of these
provisions will be to reduce motor vehicle-related emissions,
although measures addressing aspects of development such as
improved energy conservation could be included. Key elements
for indirect source regulation would include the following:
1. New source review and approval prior to construction.
2. Determine if the project is consistent with the APCD Air
Quality Plan.
(04/25/91) 12
3. Analysis of the location, distance, time of day, vehicle
occupancy and mode split.
4. Assess the quantity of air pollution which could result
from the project.
5. Require the best available design to reduce trips,
maintain or improve traffic flow, reduce vehicle miles
traveled and implement appropriate transportation control
measures.
6. Define the means for monitoring results.
7. Issue a permit specifying air quality construction and
operating requirements to provide a basis for determining
on going compliance.
8. Incorporate energy conservation measures/opportunities
in new construction.
E. Other Planning Programs Affecting Air Quality
As noted earlier, other planning programs are currently
underway which should be coordinated with the Air Quality
Plan. Currently, the City of Chula Vista is participating in
the regional effort to implement the transportation demand
ordinance. City staff is evaluating the model transportation
demand ordinance prepared by SANDAG. The near term focus of
the regional transportation demand program will be on the
largest components of the principal traffic stream including
employment travel, college and university student travel, and
goods movement. The objectives for each of the larger traffic
components are as follows:
1. The objectives of the freeway traffic element policies
and programs shall lead to the achievement of a 1.4
average vehicle occupancy rate for all area freeways
during the principal travel period by the year 2000 and
a 1.5 average vehicle occupancy rate by the year 2010.
2. The objectives of the employment traffic element policies
and programs shall lead to the achievement of a 50% drive
alone ratio for region wide employment traffic during the
principal travel period by the year 2000 and 40% drive
along ratio by the year 2010.
3. The objectives of the college and university traffic
element policies and programs shall lead to the achieve-
ment of a 50% student drive along ratio by the year 2000;
and a 40% student drive along ratio by the year 2010.
(04/25/91) 13
4. The objective of the goods movement traffic element
policies and programs shall lead to the achievement of
a 25% reduction in goods movement traffic during the
principle travel period by the year 2000; and a 35%
reduction by the 2010.
Violation of the transportation demand management ordinance
as currently proposed may constitute a violation of the
Regional Air Quality Plan.
The basic requirements of the transportation demand management
ordinance will be to require employers to prepare plans to
carry out the objectives of the program and to file annual
reports showing the degree of compliance with said standards.
In addition, each college and university will develop,
implement and promote student commute alternatives in order
to achieve the regional college university student drive along
targets.
Finally, with respect to the goods movement/trucking traffic
element, each business providing goods movement/traffic
trucking services shall develop, implement and promote a non-
peak period delivery program as well as other measures to
further reduce truck traffic during the principal travel
period which is to defined as between 6:30 a.m. to 8:30 a.m.
through 1995 after which time it shall be 6:00 a.m. to 9:00
a.m.
(04/25/91) 14
IV. AIR QUALITY IMPACTS
This chapter discusses the Air Quality Impacts associated with the
Rancho del Rey SPA II and SPA III projects. This type of analysis
is typically included in the Environmental Impact Report (EIR)
prepared for each project. This discussion is based on information
provided in the Supplemental EIR for SPA III prepared by P&D
Technologies and is also applicable to SPA II. The Air Quality
topic was not required to be addressed in the Supplemental EIR for
SPA II. This indicates that the Initial Study for SPA II, prepared
by the City, determined that no significant air quality impacts
would be associated with the project.
A. Existing Climate/Air Quality Conditions
The climate of the Chula Vista area, as with all of Southern
California, is controlled largely by the strength and position
of the subtropical high pressure cell over the Pacific Ocean.
It maintains moderate temperatures and lower humidities, and
limits precipitation to a few storms during the winter "wet"
season. Temperatures are normally mild with rare extremes
above 100 degrees Fahrenheit (F) or below freezing. The
annual mean temperature is 62 degrees F.
Winds in the City of Chula vista are almost always driven by
the dominant land/sea breeze circulation system. Regional
wind patterns are dominated by daytime on-shore sea breezes
up to 20 miles per hour with an average of 7 miles per hour.
At night, the wind generally slows and reverses direction,
traveling towards the sea. Wind direction is altered by local
canyons, with winds tending to flow parallel to the canyons.
Chula Vista is dominated by the coastal type climate with a
significant amount of oceanic influence on relative humidity.
The relative humidity ranges from 40 percent to 80 percent in
the winter and 30 to 60 percent in the summer. There is an
average of 250 clear (not overcast) days a year.
The on-shore flow of air provides the driving mechanism for
both air pollution transport and dispersion. The winds
described above control the horizontal transport in the
region. The interior valleys of San Diego County also have
numerous temperature inversions that control the vertical
extent through which pollutants can be mixed. When the on-
shore flow of cool, marine air undercuts a large dome of warm,
sinking air within the oceanic high pressure area, it forms
a marine/subsidence inversion. These inversions allow for
good local mixing, but act like a giant lid over the larger
area. As air moves inland, sources add pollution from below
without any dilution from above. The boundary between the
cool air near the surface and the warm air aloft is a zone
(04/25/91) 15
where air pollutants become concentrated. As the air moves
inland and meets elevated terrain, inland foothill communities
such as Alpine are exposed to many of the trapped pollutants
within this most polluted part of the inversion layer.
A second inversion type forms when cool air drifts into lower
valleys at night and pools on the valley floor. These
radiation inversions are strongest in winter when nights are
longest and air is coldest. They may lead to stagnation of
ground-level pollution sources such as automobile exhaust near
freeways or major parking facilities.
The proposed project is located in the San Diego Air Basin
and, jurisdictionally, is the responsibility of the San Diego
Air Pollution Control District (SDAPCD) and the California Air
Resources Board (ARB). The SDAPCD sets and enforces regula-
tions for stationary sources in the basin. The ARB is charged
with controlling motor vehicle emissions.
The SDAPCD, in coordination with the San Diego Association of
Governments (SANDAG), has developed and updated the "1982
State Implementation Plan Revision for the San Diego Air
Basin" (SIP). The 1982 plan had the goal of achieving
healthful levels of air quality by 1987, mandated by state and
federal laws; however, with the passage in time of the 1987
attainment deadline, a call for a new post-1987 SIP has been
issued by the Environmental Protection Agency. Included in
the SIP plan are new stationary and mobile source controls;
carpooling, vanpooling, and other ride-sharing programs; and
energy conservation measures. The air plan is designed to
accommodate a moderate amount of new development and growth
throughout the basin. This air quality planning document is
based on SANDAG's adopted series V regional growth forecasts.
The document is being revised using the Series VII regional
growth forecasts and to meet the requirements of the State
Clean Air Act, as described in the previous chapter.
To assess the air quality impact of the proposed project, that
impact, together with the baseline air quality levels, must
be compared to the Ambient Air Quality Standards (AAQS).
These standards are the levels of air quality considered safe,
to protect the public health and welfare.
The Clean Air Act Amendment of 1970 first established national
AAQS. States retained the option to adopt more stringent
standards or to include other pollution categories. Because
California already had standards in existence prior to 1970
and because of unique meteorological problems in California,
there is considerable diversity between state and federal
clean air standards. The standards currently in effect in
California are shown in Table 1.
(04/25/91) 16
Air quality at any site is dependent on the regional air
quality and local pollutant sources. Regional air quality is
determined by the release of pollutants throughout the air
basin. Within the San Diego Air Basin, it has been calculated
that mobile sources are the major source of regional emissions
and are responsible for approximately 73 percent of the smog
emissions in San Diego County ("Climate and Smog in San Diego
County", SDAPCD).
The air monitoring station closest to the project sites,
operated by the SDAPCD, is on H Street in Chula Vista. The
data collected at this station is considered to be representa-
tive of the air quality experienced in the vicinity of the
projects. Air quality data for 1983 through 1988 for the
Chula Vista station is provided in Table 2.
The air quality data indicate that ozone is the air pollutant
of primary concern in the project area. Ozone is a secondary
pollutant; it is not directly emitted. Ozone is the result
of the chemical reactions of other pollutants, most important-
ly hydrocarbons and nitrogen dioxide, in the presence of
bright sunlight. Pollutants emitted from morning rush hour
traffic react to produce the oxidant concentrations experien-
ced in Chula Vista. Ozone is the primary component of the
photochemical oxidants and it takes several hours for the
photochemical process to yield ozone levels which exceed the
standard. All areas of the San Diego County Air Basin
contribute to the ozone levels experienced at Chula Vista,
with the more significant areas being those directly upwind.
The ozone levels at Chula Vista have not significantly
increased or decreased over the last six years. On occasion
the wind and weather patterns are such that oxidants produced
in Los Angeles County are blown southward contributing to the
smog level readings in San Diego County.
Particulate matter (PM10) refers to suspended particulates
which are respirable. PM10 levels in the area are due to
natural sources, grading operations, and motor vehicles. The
federal standards for particulates have not been exceeded at
the Chula Vista station since before 1982.
The carbon monoxide standards have not been exceeded over the
past several years, although no clear trend in maximum carbon
monoxide concentrations is evident. Carbon monoxide is
generally considered to be a local pollutant. That is, carbon
monoxide is directly emitted from several sources (most
notably motor vehicles), and the highest concentrations
experienced are directly adjacent to the source.
(04/25/91) 17
Table 2
Air Quality Levels Measured at Chula Vista
~m~ient Air Monitoring Station 1983-88
Max. Days Fed. Std.
Pollutant CA Std. Fed. Std. Year Level Exceeded
Ozone 0.1 ppm* 0.12 ppm 1983 0.21 6
for 1 hr. for 1 hr. 1984 0.15 4
1985 0.20 4
1986 0.14 2
1987 0.16 2
1988 0.22 4
Suspended 50 ~g/m3 150 ~g/m3 1983 103 0
Particulate for 24 hr for 24 hr 1984 88 0
1985 96 0
1986 119 0
1987 100 0
1988 109 0
CO 9 ppm 9 ppm 1983 9 0
for 8 hr for 8 hr 1984 7 0
1985 7 0
1986 7 0
1987 7 0
1988 8 0
NO2 0.25 ppm 0.05 ppm 1983 .18 0
for 1 hr annual avg. 1984 .20 0
1985 .16 0
1986 .14 0
1987 .15 0
1988 .21 0
*ppm = parts per million
Source: P&D Technologies (1990)
(04/25/91) 18
Lead and sulfur oxide levels are also well below state and
federal standards. Sulfur oxide levels are not exceeded
anywhere in the San Diego Air Basin, primarily because of the
lack of major industrial sources. Due to the introduction and
increased usage of unleaded gasoline, lead concentrations are
now well below the federal and state standards throughout the
basin.
B. Projeot Air Quality Impacts
The development of the SPA II Project would generate approxi-
mately 5,670 daily automobile trips while the SPA III project
would generate approximately 11,405 daily trips. These trips
would result in increased air emissions on new and existing
roadways. Institutional facilities such as schools could also
increase project related emissions. Short-term emissions from
construction activities would generate dust and diesel
emissions resulting in short-term emissions impacts.
1. Construction Impacts
Soil disturbance to prepare the project site would generate
fugitive dust during the construction phase. Soil dust is
typically chemically inert and much of the dust is comprised
of large particles that are readily filtered by human
breathing passages and also settle out on nearby surfaces.
It comprises more of a potential soiling nuisance than an
adverse air quality impact.
Construction activities for large development projects are
estimated by the U.S. Environmental Protection Agency to add
1.2 tons of fugitive dust per acre of soil per month of
activity. If water or other soil stabilizers are used to
control dust, the emissions can be reduced by up to 50
percent. However, fugitive dust control using water must be
balanced against the need to conserve water resources.
Currently, water conservation has taken priority. While there
would be project related dust emission levels during construc-
tion, the air quality impact would be minimal.
In addition to fugitive dust, construction activities would
also cause combustion emissions to be released from on-site
construction equipment and from off-site vehicles hauling
materials. Heavy duty equipment emissions are difficult to
quantify because of day-to-day variability in construction
activities and equipment used. Typical emission rates for a
diesel powered scraper are provided in Table 3, and were
obtained from the San Dieqo Air Quality Management Division
Air Quality Handbook (April 1987). A diesel powered scraper
is the most common equipment used for grading operations.
(04/25/91) 19
Table 3
Emission Rates for Grading Scraper
POLLUTANT EMISSION RATE (Grams/8 Hr.)
Carbon monoxide 5,280
Nitrogen oxides 22,560
Hydrocarbons 2,272
Sulfur oxides 1,680
Particulates 1,472
The emission rates above are provided in grams per 8-hour day.
To provide a regional perspective of construction emissions
generated by projects, the projected emissions for San Diego
County (Year 2000) have been provided for comparison. These
emissions are based on construction of planned land uses and
regional transportation facilities consistent with the input
data for the forthcoming Air Quality Plan, and are given in
units of tons/day (Table 4). [909,091 grams = 1 ton]
2. Mobile Source Impacts
Impacts to air quality result primarily from automobile
emissions. The proposed project would result in an increase
in air emissions. If future development has been anticipated
in the 1982 SIP then air quality impacts are considered
mitigated by adherence to the measures as outlined in the SIP.
The proposed projects are consistent with SANDAG Series VII
projections, while the 1982 SIP is based on Series V projec-
tions. Typically, Series VII projections are higher than
Series V. Adherence to the policies and measures in the 1982
SIP may result in some residual impacts as not all growth has
been anticipated. However, the air quality planning process
now underway utilizes the Series VII projections and will
result in a new Air Quality Plan that will supersede the 1982
SIP. With adoption of the new plan, the projects will be in
conformance with the regional air quality plan. This plan
will include increased standards and regulatory measures based
on the anticipated growth. Because the new plan includes the
projects in its baseline information, project impacts would
no longer be considered significant.
Although not included in the EIR analysis, project air quality
impacts can be estimated. Emissions associated with the SPA
II and SPA III are presented in Table 5. The figures can be
compared with the regional daily totals provided in Table 4
earlier. The calculation is utilizes per dwelling unit
factors from Guidelines for the Preparation of Air Quality
(04/25/91) 20
Table 4
San Diego &ir Basin Emission Inventory Summary
(tons/day)
(Preliminary Data)
SOURCES 1987 2000
Reactive Orqanic Gases (ROG)
Solvent Use 73.81 (27%) 106.63 (43%)
Other Stationary Sources 27.54 (10%) 36.23 (15%)
Lt. Duty Passenger Vehicles 107.10 (39%) 49.38 (20%)
Other On-road Vehicles 47.98 (18%) 29.86 (12%)
Other Mobile Sources 18.07 (6%) 24.70 (10%)
Total ROG 274.50 246.80
Oxides of Nitrogen N0x
Ail Stationary Sources 36.47 (15%) 55.97 (22%)
Lt. Duty Passenger Vehicles 76.52 (31%) 41.49 (16%)
Other On-road Vehicles 65.50 (26%) 64.92 (25%)
Ships 51.98 (21%) 71.42 (28%)
Other Mobile Sources 18.08 (7%) 24.15 (9%)
TOTAL NO 248.55 257.94
Carbon Monoxide (CO)
Fuel Combustion 46.03 (3%) 60.25 (6%)
Other Stationary Sources 10.52 (1%) 13.22 (1%)
Lt. Duty Passenger Vehicles 870.33 (61%) 519.66 (51%)
Other On-road Vehicles 402.64 (28%) 290.94 (29%)
Other Mobile Sources 97.08 (7%) 134.29 (9%)
TOTAL CO 1,426.60 1,018.37
Nitroqen Dioxide (NO21
Fuel Combustion 42.16 (17%) 63.55 (25%)
Other Stationary Sources 1.50 (1%) 2.00 (1%)
Lt. Duty Passenger Vehicles 70.63 (29%) 38.43 (15%)
Other On-road Vehicles 57.30 (24%) 56.11 (22%)
Ships 52.83 (22%) 72.59 (28%)
Other Mobile Sources 17.59 (7%) 23.47 (9%)
Total NO2 242.01 256.15
(04/25/91) 21
Impact Analyses (October 1989) adopted by the Ventura County
APCD.
Table 5
Estimated Project Emissions
(Year 2000)
Emission Rate
(lbs./day)* Project Emissions
Residential Units ROC** NO ROC** NO
X X
SPA II
567 du SFD 0.180 0.188 102 lbs. 107 lbs.
SPA III
792 du SFD 0.180 0.188 143 lbs. 149 lbs.
588 du Retirement 0.094 0.066 55 lbs. 39 lbs.
TOTALS 300 lbs. 295 lbs.
*Emissions from vehicular and non-vehicular sources associated with
residential land uses.
**~eactive ~rganic ~ompounds
Localized air quality impacts can also result from vehicle
emissions. The volume of carbon monoxide released when a
large volume of slow moving vehicles are contained in one
small area can create air pollution "hot spots". Often such
"hot spots" can occur when intersection congestion is LOS D
or below. If traffic on East "H" Street deteriorates to these
levels, potentially significant "hot spots" could result.
3. On-Site Impacts
Emissions from residential activity including painting,
household cleaning, fumigation, gasoline powered lawnmowers,
chemicals associated with swimming pools, wood burning
fireplaces and barbecues, while not considered significant,
would have a cumulative impact on regional air quality.
Emissions from the Junior High School site including the use
of gasoline powered lawnmowers, chemicals associated with
maintenance activities and classroom activities are not
considered significant on a project level, but could have
cumulative impacts on regional air quality. Within the South
Coast Air Basin (Los Angeles area), regulations to prohibit
or restrict these types of air impacts are being adopted. If
similar regulations are adopted in the San Diego region, the
(04/25/91) 22
SDAPCD (or its designee) will enforce compliance, including
the subject projects.
(04/25/91) 23
V. AIR QUALITY MITIGATION MEASURES
The primary route to air quality mitigation and reduction of
project impacts to an insignificant level is conformance to the
adopted regional air quality plan. As discussed, the new Air
Quality Plan is now being prepared but specifics are unknown at
this time. To decrease project level emissions, the City of Chula
vista will adhere to recommendations made by the 1982 SIP and the
forthcoming San Diego Air Quality Plan regarding local participa-
tion in air emission reduction measures.
As is evident from the preceding discussion, the focus of local
air quality improvement measures are local sources (industrial
uses) and transportation behavior. The SPA II and SPA III
projects, as residential developments, are not direct sources.
Thus the project approach is to provide alternative transportation
routes, and in some cases facilities, and encourage and/or educate
residents to use them. Measures currently incorporated in the
project to decrease project-related emissions include:
The project facilitates the use of alternative transportation
modes by promoting non-vehicular transit usage by project
residents by providing bicycle and pedestrian trails connect-
ing to all local activity centers (e.g., schools, parks,
etc.). Ail levels of schools (elementary to community
college) are within or adjacent to the Rancho del Rey
Community. A city library, a YMCA, two day care/church
facilities, and a full range of public parks are included
within the community to minimize travel distance and encourage
non-vehicular modes. Community commercial centers are located
within walking distance to the east and west of Rancho del Rey
on East "H" Street.
· The land use plan for Rancho del Rey also includes a signifi-
cant business center to potentially reduce commute distances
and maintain an appropriate jobs/housing balance.
· The location of the development projects is in close proximity
to existing major transportation facilities: East "H" Street
and 1-805. Both are essentially in-fill projects, utilizing
land which can be most efficiently served by existing
infrastructure, including public and private transportation
(as opposed to "fringe" development which requires extensions
of facilities and does not have support services/land uses in
place).
· The project area is bisected by East "H" Street which is
expected to become a significant public transit corridor. The
business center and other uses fronting this corridor will
make provision for transit stops (bus turnouts, shelters,
etc.) The seniors project may also provide a private transit
(04/25/91) 24
service (mini-bus, etc.) for the convenience of residents of
the retirement community.
· To avoid creation of air pollution "hot spots" at intersec-
tions, transportation phasing measures included in the Growth
Management Plan will be implemented to reduce potentially
significant impacts to air quality. Maintaining the LOS to
C or better will minimize the number of idling cars that are
releasing carbon monoxide into the air. The projects will be
required to comply with the threshold standards adopted by
the City which will maintain acceptable traffic flow. Fee
contributions by the projects will also help fund transporta-
tion system management improvements (signal synchronization,
etc.) planned by the city and funded through development
impact fees.
· To minimize air quality impacts from energy generation plants,
the project will incorporate energy conservation measures as
required by the State. Measures associated with reducing
energy for hot water heating will also contribute to water
conservation efforts.
· As a component of the project water conservation program, an
on-going program of homeowner education/assistance will be
provided by the master developer (or designee). This program
can be expanded to include air quality issues; to provide
education and information to new homeowners who may be
receptive to changing their habits in conjunction with their
move to a new environment.
· In addition, should new or more definitive measures be adopted
for residential development projects, either as a component
of the new regional Air Quality Plan or local regulations,
these measures will be incorporated into the projects.
Because air quality is an issue which can be effectively
addressed only on a regional (air basin) basis, the most
effective approach will be for each and every project to
implement the Air Quality Plan. The Master Developer of SPA
II and SPA III is committed to implementing this Plan in both
projects and expects such provisions to be fully implemented
and/or enforced by the city of Chula Vista.
(04/25/91) 25
VI. MONITORING/CONCLUSION
&. Monitoring
To assure compliance with project mitigation measures, City
staff will require compliance with the forthcoming San Diego
Air Quality Plan. The City General Plan also includes
policies encouraging adherence to these measures. Prior to
or as a condition of approval of the tentative map, the
project design plan would be reviewed by the City Planning
Department to insure that there are adequate bicycle faciliti-
es on-site, and that area(s) to accommodate mass transit
vehicles are reserved.
Transportation control systems and development/transportation
improvement phasing is also controlled by the City of Chula
Vista through the forthcoming Growth Management Plan. These
measures will address the potential impacts associated with
congested traffic on East "H" Street. The mitigation measures
included in the Transportation Phasing Plan will be imple-
mented before issuance of the occupancy permit per the Public
Facilities Finance Plan.
B, Conclusion/Analysis of Significance
Development of the projects will result in increased traffic
on new and existing roadways and additional air emissions.
Fugitive dust released from construction a short-term nuisance
and would not constitute a significant impact. The develop-
ment of the proposed project is consistent with SANDAG Series
VII projections and not the Series V projections associated
with the 1982 SIP which is considered a significant impact.
The SIP revision, which are currently being initiated using
Series VII projections and which is due by July 1, 1991, will
be completed and adopted prior to build-out. Both projects
will be in compliance with the provisions of the new Air
Quality Plan and impacts are expected to be minimized.
Compliance with the air quality plan would define project
impacts as less than significant.
(04/25/91) 26
VII. REFERENCES
California Air Resources Board; Answers to Commonly Asked Ques-
tions About the California Clean Air Act's Attainment Planning
Requirements (CCAA Guidance Paper ~1); August 1989.
California Air Resources Board; California Clean Air Act Trans-
portation Requirements Guidance (CCAA Guidance Paper ~2);
February 1990.
California Air Resources Board; Executive Summary - California
Clean Air Act Guidance on the Development of Indirect Sourcp
Control Proqrams; July 1990.
Cinti & Associates; Draft SPA Plan Rancho del Rey SPA II;
November 1988.
Cinti & Associates; Draft SPA Plan Rancho del Rey SPA III; August
1990.
P&D Technologies; Final Supplemental EIR Rancho del Rey SPA III;
November 1990.
SANDAG; 1991 Air Quality Plan Development Process (Aqenda Report
R-74); September 28, 1990.
SANDAG; Air Quality/Transportation Control Measure Criteria
(Aqenda Report R-92); November 16, 1990.
SANDAG; Reqional Quality of Life Factors, Standards and Objec-
tives (Aqenda Report RB-19); November 16, 1990.
San Diego County Air Pollution Control District; Memorandum:
Transportation Control Measure Criteria; November 21, 1990.
San Diego County Air Pollution Control District; California Clean
Air Act - Air Quality Strateqy Development Workplan; n/d.
Ventura County Air Pollution Control District; Guidelines for the
Preparation of Air Quality Impact Analysem; October 24, 1989.
Willdan Associates and Bud Gray; Draft Growth Manaqement Proqram
- City of Chula Vista; August 1990.
(04/25/91) 27
April 29, 1991
To: Chairman and Members of the Planning Commission
From: Bob Leiter, Director of Planning~
Subject: Otay Ranch Interjurisdictional Task Force Meeting
The Planning Commission previously requested that when the next
Interjurisdictional Task Force meeting was scheduled on the Otay
Ranch that Commissioners be made aware of the time and place in
case any members were interested or able to attend. The next
meeting is scheduled for May 23 at 1:00 p.m. in the City Council
Chambers where the Task Force will be discussing an issue paper as
it relates to the Otay Ranch proposed river crossings in Otay
Valley.
If you are planning to attend and you wish to have a copy of the
issue paper in advance of the meeting, please contact Nancy Ripley
at your earliest convenience.
RAL:KL/nr