HomeMy WebLinkAboutPlanning Comm Reports/1987/10/28 AGENDA
City Planning Commission
Chula Vista, California
Wednesday, October 28, 1987 - 7:00 p.m. City Council Chambers
PLEDGE OF ALEEGIANCE - SILENT PRAYER
INTRODUCTORY REMARKS
ORAL COMMUNICATIONS
Opportunity for members of the public to speak to the Planning Commission
on any subject matter within the Commission's jurisdiction but not an
item on today's agenda. Each speaker's presentation may not exceed five
minutes.
1. PUBLIC HEARING: PCM-88-13: Family Density Bonus, 36-54 Woodlawn
T.E.N. Developers
2. Consideration of Final EIR-87-1, Rancho del Rey SPA-I
3. PUBLIC HEARING: Consideration of the adoption of the General Development
Plan, Sectional Planning Area (SPA) Plan (PCM-87-6),
Public Facilities Plan and Financing Analysis, Develop-
ment Agreement, Design Guidelines and Development
Regulation for Rancho del Rey SPA-I - Rancho del Rey
Partnership
4. Consideration of CEQA Findings, EIR-87-1, Rancho del Rey SPA-I
5. Statement of Overriding Considerations - Rancho del Rey SPA I
6. PUBLIC HEARING: PCA-88-1: Consideration of an amendment to the Municipal
Code to exempt service stations on scenic corridors from
State price sign locational requirements - City Initiated
DIRECTOR'S REPORT
COMMISSION COMMENTS
ADJOURNMENT AT to the Regular Business Meeting of November 4, 1987
at 7:00 p.m. in the Council Chambers
October 21, 1987
TO: City Planning Commission
FROM: George Krempl, Director of Planning
SUBJECT: Staff Report on Agenda Items for Planning Commission Meeting of
October 28, 1987
1. PUBLIC HEARING: PCM-88-13: Consideration of density bonus for
apartments proposed at 36-54 Woodlawn Avenue - T.E.N.
Developers
A. BACKGROUND
This item is a request for a 6-unit density bonus under the State-mandated
Density Bonus Program {Government Code Section 65915). Under this law, a
local entity is required to either approve a minimum density bonus of 25%
or grant the developer other incentives of equivalent economic value in
return for affordable housing.
Approval of the request would increase the number of allowable units from
31 to 37 for a proposed apartment project on 1.0 acres at 36-54 Woodlawn
Avenue in the R-3 zone. The Design Review committee approved the 37-unit
project design at their meeting of August 6, 1987, subject to approval of
the density bonus.
An Initial Study, IS-87-47, of possible environmental impacts of the
project was conducted by the Environmental Review Coordinator on May 29,
1987. The Environmental Review Coordinator concluded that there would be
no significant environmental effects and has recommended that the Negative
Declaration be adopted.
B. RECOMMENDATION
1. Find that this project will have no significant environmental impacts
and adopt the Negative Declaration issued on IS-87-47.
2. Adopt a motion recommending that the City Council approve the density
bonus, PCM-88-13, for 37-units at 36-54 Woodlawn Avenue.
C. DISCUSSION
The project consists of 33 2-bedroom/2-bath and 4 1-bedroom/l-bath units
in two 3-story buildings over a 46-space basement parking garage. An
additional 26 open parking spaces will be located just west of the
apartment structure. Overall heigh% of the project is under 40 feet.
With the exception of density, the proposal complies with the standards of
the R-3 zone and the High Density Residential land use designation of the
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 2
General Plan. The six units requested over the 31 units permitted under
this zoning represents a density bonus increase of 19%. As noted above,
the Design Review Committee has approved the site plan and elevations.
In 1985, the City enacted Ordinance 12135 which provides a procedure for
the City to respond to requests by developers for density bonuses under
the provisions of California Government Code Section 65915. Under our
policy, a developer must provide 20% of the total project units prior to
the granting of a density bonus as affordable to low income households
Ihouseholds at or below 80% of the area median income), and 5% of the
pre-density project units as affordable to moderate income households
(households at or below 120% and above 80% of the area median income).
Rents on affordable units are restricted for 25 years.
Affordability is defined as rent levels not exceeding 25% of the monthly
income of households in those low and moderate income categories. If the
density bonus is granted, the developer has agreed to rent one 1-bedroom
apartment for no more than $419 a month, and five 2-bedroom apartments for
no more than $523 a month to low-income households. The developer
estimates that they will rent non-restricted 1-bedroom units for $550 a
month and non-restricted 2-bedroom apartments for $650 a month.
Additionally, one 1-bedroom apartment would have a rent cap of $628 a
month, and one 2-bedroom apartment would have a rent cap of $785 a month;
both for moderate-income households. Since our ordinance sets maximum
rents that can be charged for restricted units, the current market rate
rents are actually below the maximum of $678 and $785 set for these
moderate-income units. The moderate-income restriction would be
beneficial, however, if market conditions change in the future and rents
escalate.
Currently, a family of four would have to have an income of $25,100 a year
or less to be eligible to rent the units reserved for low-income
households and $37,700 a year or less to qualify for moderate-income
restricted units. Rents could increase as the median income figures for
the County increase. The units would be restricted for a period of 25
years. The other units can be rented at market rates. Maximum restricted
rents are calculated using the affordable rent formula described in our
family density bonus policy attached hereto. According to this formula,
monthly rental rates cannot exceed 25% of the gross monthly income of a
four person household whose income falls at 80% and at 120% of the County
median income.
D. ANALYSIS
The issue is whether or not to grant a density bonus of six units or to
agree to offer equivalent financial incentives. According to State law, a
local jurisdiction does not have the option to deny a density bonus
request without offering an equivalent incentive. All land issues have
previously been approved and require no further action.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 3
If the density bonus is approved, the City will gain eight affordable
housing units--six for low-income households and two for moderate-income
households--with a 25 year restriction. The developer would submit a
Housing Cooperation Agreement outlining the terms and conditions of the
density bonus prior to City Council consideration.
Since the proposal has been approved by the Design Review Committee and is
consistent with State law, we are recommending approval of the request.
WPC 4420P
Freeway R/W ~ ~ \
Mobile Home Park
Mobile Home Park
~LOCATOR
PCM-88-13
Density Bonus Request
CITY OF CHULA VISTA
HOUSING DENSITY BONUS POLICY
Adopted by City Council Resolution No. Z2135
on August 13f 1985
OBJECTIVE
To provide a procedure for City response to formal requests by housing
developers for density bonuses under the provisions of California Government
Coae Section 66915, which provides for increases in densities of residential
rental units in exchange for the provision of affordable housing units; to
establish the degree of provision of those affordable housing units required
by the City in granting density bonuses under California Government Code
Section 65915.
CONDITIONS
In order to obtain approval of a density bonus or an incentive of equivalent
financial value, the housing developer must commit to the following provision
of affordable housing:
1. A minimum of 20% of the pre-density bonus unit count to be occupied and
affordable to low-income households and 5% of the pre-density bonus
unit count to be occupied and affordable to moderate income
households. Low-income is defined as at or below 80% of the
HUD-published SMSA median income adjusted for family size and moderate
income as between 81 and 120% of the HUD-published SMSA median income
adjusted for family size. Studios shall be assumed to be occupied by
one-person households, one bedrooms by two-person households, and two
bedrooms by four-person households. Affordability shall be defined as
being a monthly rental rate not in excess of 25% of the monthly income
of the appropriate lower income or moderate income family size.
2. Affordable units to be committed to low-income household occupancy for
a minimum of 25 years.
PROCEDURE
1. An applicant wishing a density b~us shall submit jointly to the
Planning Director and the Community Development Director the following
preliminary information:
a. A letter formally requesting the density bonus and describing the
project, project location, total units allowable under existing
zoning, total density requested, and number, size, and location of
affordable units proposed.
b. Project financial information, including a pro forma and projected
rent schedule.
c. Land use and design details and drawings which in the judgment of
the Planning Director are sufficient in scope and detail to allow
preliminary evaluation of the proposed project's configuration and
impact.
Housing Density Bonus Policy
August 6, 1985
Page Two
2. The housing developer's request shall be taken to the Planning
Commission and the City Council for preliminary recommendation and
approval or disapproval, subject to all necessary and appropriate City
development approvals based on the standards applicable to the
post-density unit count.
3. The City shall within 90 days of the housing developer's prelimina~
request notify the applicant of:
a. Its intention to allow the requested density bonus, subject to all
necessary and appropriate City development approvals.
b. Its intention to consider incentives of equivalent financial value
in lieu of the density bonus, in which case the City shall inform
the housing developer of the fee for evaluation of those incentives
of equivalent financial value.
c. Its conclusion that the request has been found to be invalid for
articulable reasons.
4. In response to 2a, the housing developer may follow the appropriate
City procedures for housing development approval of the proposed
project including the density bonus.
5. In response to 2b, the developer may submit to the Community
Development Director a letter agreeing to the evaluation of incentives
of equivalent financial value and, in that case, shall submit the
appropriate fee payment. The City shall then submit the project
information to the City Housing Consultant for evaluation and
recommendation to the City Council on appropriate incentives of
equivalent financial value. The City Council shall make its
determination and offer the selected incentives to the developer in
exchange for the appropriate affordable housing provisions.
6. In response to 2a or 2b, the housing developer shall enter into a
Housing Cooperation Agreement with the City Council which identifies
and commits the provision of affordable housing and which is recorded
against the project property.
WPC 1689H
negativ, declaration
PROJECT NAME: Woodlawn Terrace Apartments
PROJECT LOCATION: 36-54 Woodlawn Avenue
PROJECT APPLICANT: T.E.N. Developers
1154 Marshall Avenue
E1 Cajon, CA 92020
CASE NO: IS 87-47 DATE: May 29, 1987
A. Project Setting
The proj'ect site consists of four contiguous rectangular lots with a total
of 1.05 acres. Currently there are five single family dwellings on-site,
two wi th ' detached garages. The property slopes to the west from
approximately 46 feet in the southeast corner adjacent to Woodlawn Avenue
back to 38 feet along a bluff line in the rear portion of the property, at
which point a sharp drop occurs to 18 feet elevation.
Surrounding uses include .two and three story apartment buildings to the
north, Woodlawn Avenue to the east, a mobilehome park to the south and the
trolley line and I-5 corridor to the
B. Project Description
The proposed project includes demolition of existing structures and
construction of a'37 unit apartment complex in two three-story buildings
over a basement garage. Overall height of the three- and four-story
structures total 40 feet. Parking on-site consists of 72 spaces located
at. the rear of the property and within the basement garage. The rear
parking area would be created by filling existing slope areas at the rear
of the property and containing the fill within a 15 foot crib wall
spanning the rear property boundary.
C. Compatibility with Zoning and Plans
The proposed project complies with the R-3 Apartment Residential zone in
effect over the property, as well as the High Density Residential Land Use
Designation outlined for this area by the General Plan. The project
includes a 25% density bonus for low and moderate income family housing
mandated by the State, and implemented by the Community Development
Department for the City.
D. Identification of Environmental Effects
1. Noise
The project would be located with several balconies facing the
trolley line and the I-5 freeway corridor which would subject
~it¥ o! ¢~a vista ~annin~ department
environmental review section CHUbs,VIErA
-2-
residents to noise impacts in access of acceptable noise limits for
residential development as defined by Chula Vista Municipal Code,
Chapter 19.68, (Noise Control). However, a noise analysis, submitted
by San Diego Acoustics, Inc., identifies noise impacts to the
proposed project and outlines mitigation measures needed to reduce
adverse environmental impacts to a level below significance. Those
measures include the following:
a. Mechanical ventilation is required in all rooms with windows
facing north, south and west.
b. Balconies/patios facing I-5 (west) are required to have solid
railings with plexiglass added to a height of 6 feet above the
floor across the full width. This will not be required for
balconies/patios facing north, east or south.
c. Resilient channels are required on ceilings where the rooms
above are not provided with a carpet and pad.
The developer has incorporated these measures into the proposed
project.
2. Aesthetics " ~
The proposed 37 unit apartment complex includes approximately 3,400
cubic yards of fill contained within a 15 foot crib wall facing the
trolley line. The combination of a four-story building poised atop a
15 foot crib wall creates the potential for imposing structures of a
bulk and scale at variance with community standards for aesthetics.
However, the overall effect of building height, bulk and scale of the
building and architectural design are subject to review and approval
by the City's Design Review Committee as a standard development
requirement for all apartment projects within the R-3 residential
zone. Under the Design Review process, appropriate controls over
site design insure that the project conforms to community standards
for aesthetics and reduces this potential adverse environmental
impact to a level of less than significant.
E. Mitigation necessary to avoid significant effects
1. Noise
Mitigation measures previously outlined in the noise analysis
prepared for the proposed apartment and listed in the impacts section
of this report have been incorporated by the developer into the
project.
2. Aesthetics
Since the Design Review process regulates the bulk, scale and design
of the proposed apartment complex as a standard development
requirement, any potential for adverse environmental effects has been
reduced to a level below significance. Therefore, additional
mitigation is not required.
-3-
F. Findinas of Insianificant Imoact
1. The project, by incorporating noise mitigation measures into the
design and construction of the 37 unit apartment complex, will not
degrade the quality of the environment.
2. The'proposed 37 unit complex by utilizing appropriate design controls
to soften bulk and scale achieves both short- and long-term
environmental goals.
3. 3he proposed apartment complex, by reducing all potential adverse
environmental effects to a level less than significant, contains no
cumulative environmental impacts.
4. By incorporation of noise mitigation measures, the proposed apartment
project will not cause adverse effects on human beings.
G. Consultation
1. Individuals and Organizations
City of Chula Vista: Julie Schilling, Assistant Planner Roger Daous~, Senior Civil Engineer
William Wheeler, Building and Housing Department
Carol Gove, Fire Marshal
Chuck Glass, Traffic Engineer
Applicant's Agent: Kelley Minard
7364 E1 Caj6n Blvd.
San ~iego, CA 92115
2. Documents
Title 19 (Zoning) Chula Vist~ Municipal Code
General Plan, City of Chula Vista
"Environmental Noise Analysis - Woodlawn Terrace Apartments"
San Diego Acoustics, Inc., April 29, 1987
The Initial Study application and evaluation forms documenting the findings of
no significant impact are on file and available for public review at the Chula
Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 92010.
EN 6 (Rev. 5/85) '~
city of chula vista planning department CITY OF
environmental review section CHUL~VJ~I
CITY OF CHULA VISTA
DISCLOSURE STATE~NT
I~PLICANT'S STATEMENT OF DISCLOSURE OF CERTAIN O~ERSHIP INTERESTS ON ALL APPLICATIONS
WHICH WILL REQUIRE DISCRETIONARY ACTION ON THE PART OF THE CITY COUNCIL, PLANNING
COMMISSION AND ALL OTHER OFFICIAL BODIES.
The following information must be disclosed:
1. L i~mes of all persons~avinga financial interest in the application.
~i~t~_ a s~2.~~a s o al perso havin ny ownership interest in the property involved.
2. If any person identified pursuant to (1) above is a corporation or partnership, list
the names of all individuals owning more than 10% of 'the shares in the corporation
or owning any partnership interest in the partnership.
If any person identified pursuant to il) above is a non-profit organization or a
trust, list the names of any person serving as 'director of the non-profit ~
organization or as trustee or beneficiary or trustor of the trust.
4. Have you had more than $250 worth of business transacted with any member of City
staff, Con~nisstons, Con~ntttees and Council within the past twelve months?
Yes No__ If yes, please indicate person(s)
Person is defined as: 'Any individual, firm, copartnership, Joint venture, association,
~ club, fraternal organization, corporation, estate, trust, receiver, syndicate,
this and any other county, city and county, city, municipality, district or other
political subdivision, or any other group or combination acting as a unit.'
(NOTE: Attach additt, pag
nature
A-110 Print or type name of appl4cant
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 1
2. Consideration of Final EIR-87-1, Rancho del Rey SPA I
A. BACKGROUND
The Draft of this EIR was before the Planning Commission at the August 12,
1987 meeting, a copy of the transcript along with written comments on the
Draft EIR are included in the final EIR along with written comments and
responses to both.
The Resource Conservation Commission has recommended certification of the
document.
B. RECOMMENDATION
Certify that EIR-83-2 and EIR-87-1 have been prepared in compliance with
the California Environmental Quality Act (CEQA), the State CEQA
Guidelines, the environmental procedures of the City of Chula Vista and
that the Planning Commission has reviewed and considered the documents as
it reaches a decision on the project.
C. ORGANIZATION
The Environmental Review Documents for this project consist of the Master
EIR for the E1 Rancho del Rey Specific Plan (EIR-83-3), t~e technical
appendices on file in the Planning Department, the addendum to EIR-87-1,
Comments & Responses to EIR-87-1, EIR-87-1, and the technical appendices
to EIR-87-1 on file in the Planning Department.
D. PROJECT DESCRIPTION
1. Prior Project Characteristics
The Rancho del Rey development addressed in the circulated Draft EIR
(87-1) was to involve the construction of 982 single-family units and
1212 multi-family units in a variety of density categories on 305.1
acres (see Figure 2-4 on page 2-14 of the EIR). Non-residential
uses, including an employment park 184.5 acres), community facilities
(5.6 acres), neighborhood and community parks (55.7 acres), a school
site (12.6 acres), open space (272.6 acres) and a circulation system
(72.5 acres), aware proposed on the remaining 503.5 acres. The
original proposal incorporated density transfers among residential
density categories within the project site; the concept of such
transfers was introduced in the E1 Rancho del Rey Specific Plan to
allow for site specific adjustment in residential densities as plans
were refined. The density transfers proposed in the SPA I Plan do
not result in an overall increase in the number of residential units
nor does it result in any transfer units into or out of the SPA I
Plan area.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 2
2. Revised Project
In response to public review of the draft Rancho del Rey SPA I Plan
EIR and in conjunction with City of Chula Vista staff
recommendations, the applicant has submitted a revised project
design. The revised design responds to concerns expressed by the
school district regarding the location of a proposed school in
immediate proximity to existing SDG&E transmission lines.
The revised plan retains the majority of the elements of the original
plan, including the circulation pattern and the conceptual grading
plan; additionally, the exception of two of the parcels, the land use
designations and configurations across the site remain the same.
The two parcels which are affected by the revision are the original
school site and the new school site. Under the revised plan, the
school would be located along the internal loop road and the
residential units that are displaced by the school would be relocated
to the original school site. As a result of this change, an
additional 1.4 acres would be developed with residential land uses,
with a corresponding reduction of 1.4 acres in the size of the school
site. As stated above, the total number of residential units on the
project site would remain the same; however, under the revised plan
the number of single-family "cottage" units would be increased by 90,
with a corresponding decrease in the number of duplex units.
E. MAJOR ISSUES
Biological Resources
Investigation of biological resources associated with the previously
considered E1 Rancho del Rey Specific Plan identified significant,
unmitigable impacts related to development of the proposed project. On
the basis of these findings, the SPA I Plan incorporated design
modifications and additional mitigation measures in an attempt to reduce
biological impacts. Specifically, this included the consolidation of open
space in the main canyon systems, specific measures a to prevent impacts
to sensitive species, programs to restore natural habitat to disturbed
areas, and the reduction of impacts to wetlands habitat through
consultation with the California Department of Fish and Game and the U.S.
Army Corps of Engineers. These measures, while realizing a number of
reductions to potential impacts, do not change the original assessment
that significant, unmitigable biological impacts will result from the
proposed project. However, identified mitigation measures are fully and
properly implemented, the overall mitigation plan is considered adequate
with respect to the proposed development. Potential biological impacts
would also be associated with changes in onsite hydrology/water quality
and with proposed alterations in the onsite stream channels.
Specifically, these would be related to loss of sensitive habits and/or
species related to the construction of drainage improvements in Rice
Canyon.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 3
Landform/Aesthetics
Development of the Rancho del Rey project as proposed would substantially
alter the landform and visual character of the site, resulting in a number
of highly visible changes to existing topographic features and the
creation of large manufactured slopes.
Implementation of the grading plan would entail cutting most of the ridges
and filling in the lower elevations, including many of the finger
canyons. Much of the exiting open space in the north and central legs of
Rice Canyon would be preserved, however, pursuant to recommendations
contained in the 1985 Master EIR. A total of 9,500,000 cubic yards of
grading would occur throughout the project site, with maximum cut and fill
slopes of 100 and 130 feet, respectively. The proposed grading would
result in a number of potential adverse visual impacts within and near the
project site, including the alteration of on- and off-site views. Of
particular importance with respect to visual alteration are potential
impacts to designated Scenic Highway corridors along East "H" Street and
Otay Lakes Road.
Mitigation for potential impacts to landform and visual resources are
contained within the specific design guidelines of the SPA I Plan.
Additionally, a design manual is currently being prepared which will
supplement the SPA I Plan design criteria. Project development will
require the implementation of all the above guidelines, including those
related to grading, landscaping, fencing, signing, lighting, parking and
scenic highways. These guidelines are intended to provide flexible
direction through the different levels of project development, rather than
to serve as absolute design standards. The impacts from the proposed
project associated with landform and visual alteration would be mitigated
to a level of insignificance with implementation of the guidelines.
Geology/Soils
Available data from the site specific geotechnical investigation indicates
that there are no major geological constraints on the project site that
would preclude development. Potential identified impacts include the
expansion of surficial deposits, the compaction of alluvial soils, the
effect of bentonitic clay seams and poorly lithified zones on slope
stability, the generation of oversized material from cemented or dense
bedrock, and the presence of the potentially active La Nacion Fault Zone.
A number of mitigation measures were identified in the geotechnical
investigation, including specific guidelines pertaining to grading, soil
and slope stability, fill materials, faulting seismicity, and foundation
design. With implementation of the mitigation measure, no significant
geotechnical conditions would adversely affect the proposed project.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 4
Traffic Circulation and Access
Vehicular use associated with the proposed project is projected to result
in 41,054 ADT for the SPA-I area. This would produce significant traffic
circulation and access impacts within the project vicinity, particularly
along East "H" Street and at the "H" Street/I-805 interchange. A number
of mitigation measures have been developed which would reduce these
impacts below levels of significance. This assumption is contingent,
however, on the proposed development maintaining a maximum volume of
56,500 vehicles per day on East "H" Street east of Hidden Vista Drive
prior to the construction of Route 125 /the transportation analysis notes
that, if development in the vicinity of the project site does not occur a
the rate assumed in the analysis, a greater number of ADT could be
accommodated on local roadways).
The proposed mitigation measures consist primarily of constructing and/or
improving a number of roads in the project vicinity to accommodate the
projected traffic volumes. Assuming that the referenced maximum ADT ARE
maintained on East "H" Street, no significant impacts related to traffic
would be expected from the proposed project development with
implementation of the mitigation measures.
Noise
Potential noise impacts associated with the Rancho del Rey project were
calculated using the Federal Highway Administration Stamina 2.0 noise
prediction model. To determine the maximum noise levels that could be
experienced onsite, community buildout traffic volumes provided by the
technical transportation analysis were used for East "H" Street and Otay
Lakes Road. Additionally, projected internal traffic volumes and proposed
grade elevations were used to model future onsite noise levels. The
results of the noise analysis indicate that upon buildout of the proposed
project, portions of the site (particularly along East "H" Street and Otay
Lakes Road) would be subject to noise levels exceeding the City of Chula
Vista exterior noise standards. In addition, areas of the site exposed to
noise elves of 65 dBIA) or greater would experience significant interior
noise impacts. Mitigation measures have been developed which would reduce
the majority of identified noise impacts below levels of significance.
These include the use of appropriately sized and located walls, berms, and
building setbacks for mitigating exterior noise levels and the use of
appropriate building design and insulating materials to adequately
attenuate interior noise levels. Impacts which would not be adequately
mitigated by the measures listed above include those associated with the
multi-family areas adjacent to East "H" Street /parcels R-15 and R-14),
and the East "H" Street Park (parcel P2). These areas will require
further analysis and mitigation once detailed development plans are made
available.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 5
Land Use
The proposed project would alter the utilization of the site from
essentially undeveloped open space to a mixed use development containing
residential, industrial, and open space areas. This change would result
in impacts such as increased traffic flows, the alteration of natural
landforms, reduced visual quality, additional public service and utility
demands, increased noise, and the loss of native habitats and sensitive
plant and animal species. The proposed land uses for Rancho del Rey are,
however, compatible with the existing and planned land uses in the project
vicinity, and the project is consistent with all applicable land use
policies. Therefore, no adverse land use impacts are anticipated from the
implementation of the SPA-I Plan, and no mitigation measures would be
required.
Hydrology/Water Quality
The proposed development would require substantial grading, infilling of
drainages, and construction of impervious surfaces to accommodate the
planned community. This would result in impacts to both the quality and
quantity of runoff within and downstream from the site. Specifically,
grading and drainage alteration would change the direction and velocity of
runoff, and increase the potential for erosion by removing vegetation and
creating artificial slopes. The construction of impervious surfaces would
decrease infiltration and increase the runoff from the site. Increasing
the runoff from the site (and the associated increase in erosion) would
increase the potential for a reduction in water quality Iboth onsite and
downstream) due to the associated rise in suspended and dissolved
streamloads. In addition, water quality would be impacted by the proposed
increase in urban development, which generally increases the potential for
runoff contamination. Locally perched groundwater was identified onsite,
and represent a significant potential flooding impact to proposed
structures and facilities, especially during wet climatic periods when
groundwater levels rise.
Mitigation measures regarding hydrology/water quality include guidelines
related to drainage facilities, building pad drainage, soil and slope
stability, runoff control, and revegetation of disturbed areas. The
identified mitigation measures will reduce significant hydrology/water
quality impacts from the proposed project.
Parks/Recreation and Open Space
The Rancho del Rey project proposes to incorporate a series of parks,
community facilities, and hiking and equestrian trails totalling 105.2
acres, as well as 227.1 acres of open space. These proposed acreages
exceed all appropriate dedication standards of the City of Chula Vista,
and would preserve much of the existing open space in Rice and Otay Lakes
Canyons. While the location and size of proposed parks and open space is
not expected to be an issue, the nature and schedule of development of the
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 6
parks and recreational facilities are conceptual and have not been
finalized. Consequently, a number of mitigation measures have been
established relating to the nature and schedule of parks and recreation
development, as well as biological and hydrological concerns within the
major onsite canyons. These measures will reduce or eliminate adverse
impacts related to parks/recreation and open space from the proposed
project.
Water
The proposed water demand for the Rancho del Rey project at full buildout
would be 1.54 million gallons per day (mgd), with nearly 90 percent
utilized by the residential {70 percent) and employment park {19.5
percent) developments. The project proposal includes an internal water
conveyance system capable of meeting the projected onsite water needs, as
well as a umber of offsite improvements designed to offset the project's
impacts to the regional water distribution system. Specifically, the
offsite facilities include a 30-inch water transmission main beneath East
"H" Street, from the proposed Reservoir 22-3 to the intersection of Yuba
and "H" Streets, and, from that point, a 24-inch line to the intersection
of "H" Street and Buena Vista Way. To reduce onsite water demands,
however, it is recommended that the water conservation policies currently
endorsed by the State of California and the City of Chula Vista be
implemented by the Rancho del Rey project. These include various
water-saving techniques such as drought-resistant landscaping, drip
irrigation systems, low-flow shower and faucet restrictors, and toilet
dams.
Sewer
The proposed Rancho del Rey community is projected to produce an average
sewage flow of 0.75 million gallons per day. The proposed project design
includes a wastewater conveyance system to transport project-generated
waste into the San Diego Metropolitan Sewer System via the City of Chula
Vista sewage infrastructure. The Rancho del Rey project would not produce
any significant adverse impacts to the City of Chula Vista sewage
infrastructure. Implementation of the project may, however, require the
developer to contribute either financially or through construction of
appropriate facilities to provide contribution to the regional system.
Additionally, the project proposes the construction of a sewer line
maintenance road in the main leg of Rice Canyon, which could result in
significant impacts to biological and/or hydrological resources.
Mitigation measures have been developed which would reduce these impacts
below levels of insignificance, including maintenance road location,
design, and construction specifications, as well as appropriate
rehabilitation efforts. The above measures would reduce or avoid
significant adverse impacts related to sewer service as a result of the
proposed project development.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 7
Schools
The Chula Vista Elementary School and Sweetwater Union High School
Districts both assume an average generation rate of 0.3 students per
dwelling unit. Based on the proposed 2201 residences for Rancho del Rey,
therefore, 660 elementary and 660 secondary students would be generated
from the proposed project. While these additional students would result
in incremental impacts to existing school facilities, current regional
development plans call for the construction of three elementary schools,
one junior high school, and one high school in the vicinity of the project
site. These facilities would reduce nearly all adverse project-related
impacts related to schools below levels of significance. The exception to
this is related to elementary school capacity, for which a shortage of
classroom space is projected in two local schools if current growth rates
continue. In addition to the three proposed elementary schools in the
project vicinity, a 12.6 acre parcel has been reserved within the Rancho
del Rey site for future development of an elementary school /financing for
the construction of school facilities is proposed via the formation of a
Mello Roos District). While the construction of a new school is not a
portion of the currently proposed Rancho del Rey development plan, the
elementary school facility would be built once a sufficient number of
students were generated. Assuming all of the above measures are
implemented, no significant adverse impacts to schools would be expected
from the proposed project development.
Fire
The proposed development would incrementally increase demand for fire
protection services within the project vicinity. In addition, it would
contribute to the cumulative impact of growth in eastern Chula Vista on
fire facilities. Existing Fire Station No. 4 is scheduled for relocation
to the east of the project site to meet fire protection demands associated
with new development in that area. This move is proposed to occur within
approximately 4 to 5 years, and would affect the ability to efficiently
respond to fire suppression needs in the project area. The Rancho del Rey
development plan, however, includes a proposal to construct a fire station
onsite. If the fire station is constructed in a timely manner li.e.,
relative to the relocation of Fire Station No. 4), this action would
reduce impacts related to onsite fire suppression efforts below levels of
significance.
A related impact of the Rancho del Rey project related to fire services is
the site design of the project. The Fire Department has expressed concern
over the number of ~omes which are proposed to be located adjacent to the
open space chaparral areas of Rice Canyon. Because the chaparral is
highly flammable, certain site-related, landscaping, and architectural
design features would need to be incorporated into the final design of the
lots to insure that a significant hazard was not created upon project
implementation.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 8
Mitigation measures necessary to counteract the onsite fire potential
include adequate backyard setbacks and flame resistant vegetation combined
with a low fuel firebreak; these measures should be incorporated into the
final design of the lots adjacent to open space areas, such as Rice
Canyon, to the satisfaction of the City Fi re Department. In addition,
adequate water pressure must be provided to meet the City's fire flow
requirements. No significant adverse impacts related to fire would be
expected from the proposed project development upon implementation of the
mitigation measures.
F. ALTERNATIVES
There are various alternatives which are discussed in the environmental
documents for this property. They include:
1. The previous specific plan for the property (EIR-83-2) which proposed
a lower density, no employment park, and no filling of the main leg
of Rice Canyon.
2. The revised specific plan {EIR-83-2) as proposed which included a
higher density, an employment park with a different configuration and
grading in main leg of Rice Canyon.
3. The staff recommended Specific Plan Amendment {Addendum, EIR-83-2)
which provided for an employment park with a different configuration,
lower density residential and no grading in main leg of Rice Canyon.
4. The no project alternative EIR-83-2 and EIR-87-1).
WPC 4429P
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 1
3. PUBLIC HEARING: PCM-87-6 - Consideration of Rancho del Rey SPA I Plan,
Public Facilities Plan, Development Agreement, and Pu
Regulations; Rancho del Rey Partnership
A. BACKGROUND
This item involves the consideration of the Rancho del Rey I Sectional
Planning Area {SPA) Plan and related items for a 808-acre portion of the
E1 Rancho del Rey Specific Plan. The Specific Plan was approved by the
City Council in 1985 and this submittal represents the first phase
implementation of that project.
Included in your consideration is the Rancho del Rey General Development
Plan, Sectional Plan Area Plan, the Public Facilities Plan and Financing
Analysis, the Planned Community Regulations, Development Agreement, and
Preliminary Design Guidelines.
B. RECOMMENDATION
1. Based on the findings attached to this report {Attachment 1), adopt a
motion recommending that the City Council approve the Rancho del Rey
General Development Plan; and
2. Based upon the findings attached to this report {Attachment 2), adopt
a motion recommending that the City Council approve the Rancho del
Rey Sectional Planning Area (SPA) I Plan, subject to the conditions
of approval listed in this report; and
3. Adopt a motion recommending approval of the Public Facilities Plan
and Financing Analysis and the Development Agreement; and
4. Adopt a motion approving in concept the preliminary residential,
landscape, and employment park Design Guidelines; and
5. Direct staff to continue reviewing with the applicant the preliminary
design guidelines for resubmittal to your Commission with the
consideration of the first tentative map within Rancho del Rey SPA I.
C. DISCUSSION
1. The Rancho del Rey General Development Plan
The Rancho del Rey General Development Plan (SPA-I Plan, Exhibit #2)
is a required exhibit for any planned community zone and is intended
to show the general location of all proposed uses and the general
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 2
circulation system. Its main purpose is to serve as a bridge
connecting the land use and density categories of the Specific Plan
and the more detailed descriptions proposed in the Sectional Planning
Area. The General Development Plan map is detailed as Exhibit 2 in
the SPA Plan document. It details that within the 808 acres of
Rancho del Rey SPA I, there is proposed 2,201 residential dwelling
units, a 102.4-acre employment park, an elementary school site, 66.8
acres of park and recreation facilities, and 292.2 acres of natural
open space.
The E1 Rancho del Rey Specific Plan contains both general and
specific criteria for the implementation of sectional plans. It also
permits deviations when the more detailed planning justifies it. As
that relates to Rancho del Rey SPA-I, that relates to circulation,
public facilities and housing products.
a. The Rancho del Rey loop road which connects all of the
residential areas and public facilities to the main access roads
is proposed to be altered in alignment to connect the road to
Rice Canyon. This serves to open the project up to the natural
features on the site as well as to separate the specific
neighborhoods within the project. The goal with this change is
to create a more natural setting while accenting the major
amenities contained on-site.
b. The elementary school site has been moved from north of the
community park to an area more centrally located within the
project. The reason for the relocation is based on input from
the school district concerning the proximity to the SDG&E, power
lines. Based on State of California standards, the location
shown on the Specific Plan was too close to those power lines.
c. The Specific Plan proposed approximately 220 more single-family
cottage and small-lot products than will be proposed within this
SPA Plan. To accommodate the mix of land uses, there has been a
reduction in the cottage and townhouse product with an increase
in the single-family conventional and multi-family units {SPA-I
Plan, Exhibit #6).
2. Rancho del Rey Sectional Planning Area (SPA) I Plan
The E1 Rancho del Rey Specific Plan requires the preparation and
approval of a Sectional Planning Area plan before subdivision maps
and site plans are considered. The purpose of the SPA Plan is to
more fully define the various land uses, circulation system, and
housing types proposed for this project area. In addition to that,
the SPA Plan provides the planning framework (land use, density, open
space, circulation, public facilities, and design guidelines) to
guide the preparation of individual project plans. The details
contained in the SPA Plan would not only assist the City in requiring
conformance with the E1 Rancho del Rey Specific Plan, but also assist
in implementing the purpose and intent set forth in the SPA Plan.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 3
The following discussion is a more detailed description of the E1
Rancho del Rey SPA I Plan.
Plan Structure and Design
There are many factors influencing the design of Rancho del Rey SPA-I
ISPA-I Plan, Exhibit #4). The main natural feature is Rice Canyon.
In addition to being a major visual feature, Rice Canyon serves as a
primary drainage way within the project area and contains several
sensitive biological resources. These existing landform
characteristics serve as the basis for the physical planning of the
SPA Plan. Basically, residentially developed areas are located on
higher elevations, while the canyons remain as natural open space
with a passive system of trails. The one exception to that is in the
eastern portion of Rice Canyon where a community park will be located
with active recreational uses.
On the southern edge of SPA I and adjacent to East "H" Street is the
employment park. That park will primarily feature industrial uses
with support commercial and office development. As with the
residential development on the ridges, the employment park design
will attempt to orient itself and take advantage of Rice Canyon,
which runs along the northerly boundary of the park. Adjacent to
East "H" Street, primary consideration will be the visual impacts
from the employment park to the passing motorists. Special setbacks
and design standards are contained in the project to mitigate and
enhance the visual features along East "H" Street.
Circulation
The uses mentioned above are supported by publicly maintained
internal and external circulation roads. There is only one road
proposed on the north side of SPA I in the estate area that would be
a private road with controlled access. Based on the uses depicted in
the SPA Plan, this project will generate 39,634 trips per day onto
the local and regional street system. That is more fully described
in Chapter 3 of the SPA Plan document and the improvements that are
needed to serve this project are defined in the Public Facilities
Plan.
As noted in the previous EIR discussion, traffic circulation is a
major consideration with this project. To mitigate traffic impacts,
Rancho del Rey proposes that lO,O00 ADTs (average daily trips) that
are projected to be generated primarily by the employment park will
be "held in reserve" until the commencement of a roadway in Route
125. With this stipulation, the projected level of service on all
roads, especially East "H" Street, will be at least Level of Service
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 4
Public Facilities
The Public Facilities Plan and Financing Analysis has three major
features. It describes in detail the proposed public facilities that
are impacted by this project and the measures being taken to respond
to that impact. In the case of impacted facilities, the developer
will either be required to construct those facilities in their
entirety, or participate in the construction/financing of those
facilities if this project does not fully warrant said construction.
Secondly, the Public Facilities Plan also addresses the phasing of
the required improvements. In the case of facilities that affect
public health, safety and welfare such as roads, sewer and drainage
facilities, those improvements need to be completed prior to
occupancy of a given phase. For example, if a road is required in
~then before any units could be occupied in that phase, the
road must be completed. In the case of park and recreation
facilities, those improvements must be completed prior to the end of
the development allocated for any phase and prior to the start of
development in a subsequent phase.
A third feature of the Public Facilities Financing Plan is the
regional transportation phasing program. The EastLake Development
Impact Fee Program adopted by the City in February 1986 and currently
applying to EastLake and Bonita Long Canyon identifies the required
regionwide transportation facilities, develops cost estimates, and
calculates an impact fee. As a part of the Rancho del Rey Public
Facilities Planning Program, this project will be required to
participate in that regional transportation facility phasing
program. This plan proposes development thresholds set for the
regional improvements that will outweigh any limits for the local
phasing of Rancho del Rey. Therefore, for example, if regional
development dictates that Otay Lakes Road, between East "H" Street
and Bonita Road, be constructed before development can proceed it
must be improved prior to future development occurring within Rancho
del Rey, even though SPA I's local phasing limit for Otay Lakes Road
may not have been reached.
In addition to the above, other facilities impacted by this project
and the measures undertaken to respond to that impact are as follows:
a. Parks and Recreation - There are 45.7 acres of public park uses
included in SPA I. This includes a community park, two
neighborhood parks, a staging area for pedestrians and
equestrians at the east end of Rice Canyon, and a trail system
which links all of the major open space and residential areas to
the park facilities. All of the parks and recreation facilities
will be dedicated and maintained by the public. In the case of
the natural open space features, those will be maintained by an
open space maintenance district.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 5
b. Fire Protection - The E1 Rancho del Rey SPA I has reserved up to
three acres within the East "H" Street Park for a fire station
and training facility. Until the City Fire Department
determines the need for construction of a fire station on this
site, the Southwestern College Fire Station will serve the needs
generated by this project.
c. Library - Based on the City-approved Public Library Master Plan,
a need for a sub-regional library facility is identified in this
area. To assist in implementation of that study, a parcel of up
to two acres is shown adjacent to the proposed fire station
within the East "H" Street Park. If the City determines a need
to build the library at this location, then the site would be
available.
d. Schools - T~e project proposes the dedication of a school site
to the Chula Vista Elementary School District. Since the
capacity of an elementary school is projected to be 730 students
and approximately 594 students will be generated from SPA I
alone, the School District is requiring that the developer
assist in the construction of a school site within the timeframe
of SPA I.
Relative to the middle school and high school requirements of
the Sweetwater Union High School District, that District has
presently indicated that they are at or over capacity in many of
their facilities. Since the School District does not desire a
school site within this project area, the developer will be
required to financially assist the District in providing school
facilities to serve Rancho del Rey SPA I.
Design Guidelines
A major feature of Rancho del Rey SPA I is the preliminary design
guidelines for residential, landscape, and employment park areas.
The guidelines are provided to your Commission as a preliminary draft
to obtain any input you may have prior to the consideration of the
first tentative map for this project. The design guidelines will
serve as a bridge between the Sectional Planning Area criteria and
the approval of subsequent projects. In many cases, they are quite
detailed relative to the specific development of neighborhoods and
industrial uses. The purpose is to graphically illustrate the
proposals of the SPA plan to assist staff, the Commission and the
City Council in review of future discretionary permits.
Implementation
In addition to the standard implementation techniques utilized for
this project such as tentative map considerations and site plan
approvals, there are several programs unique to this project that
should be noted.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 6
1. Development Agreement - When the Rancho del Rey Specific Plan
was approved, it was intended that a development agreement be
executed between the City and the developer. The development
agreement is a part of this project and is a tool which assists
the public agency and large scale developer to identify the
rules inherent in the approval of a project before major
investments of public and/or private monies are expended. The
development agreement certainly does not take the place of
zoning or subdivision considerations. It does, however, set
forth developer and City obligations commensurate with the
approval of the project. In summary, the development agreement
acknowledges that the Rancho del Rey Partnership agrees to
provide the facilities and improvements identified in the SPA
plan and its support documents while the City agrees on certain
approval parameters contained in the same documents.
2. PC Development Regulations - The Planned Community {PC) District
Regulations adopted as a part of this approval provide site
specific standards and regulations to guide the development of
E1 Rancho del Rey SPA I. These development regulations,
although they are specific in nature, should be utilized
hand-in-hand with the design guidelines for both the residential
and employment park uses. The PC District Regulations provide
the parameters and with utilization of the design guidelines
will provide the precise implementation standards for this
project.
3. Monitoring Program - As a part of any project, there are certain
assumptions that are made when considering the impacts that
project will have on the city. These assumptions are based on
the best information available at the time the plan is prepared,
but it is the actual location, amount, type, and timing of
development that will determine the need for specific
facilities. With that in mind, there are two areas that need to
be monitored relative to E1 Rancho del Rey. Those are fiscal
and traffic impacts.
Each year the developer should submit updated development
summaries, forecasts, and development data, such as actual
traffic counts, and building permit information to the City for
evaluation and comparison to the Public Facilities Plan as
adopted. This annual update and re-evaluation will allow the
City to more accurately predict public facility needs and if
necessary, restrict building activity to prevent adverse impacts
on existing facilities. Specifically, relative to traffic
circulation Rancho del Rey will need to monitor daily trips
along East "H" Street to identify the on-going impact of this
project prior to the commencement of a roadway along Route 125.
A total of lO,O00 ADT will need to be "held in reserve" until
such time as that route is constructed. In addition, a maximum
of 56,500 ADT's will be permitted on East "H" Street to maintain
a Level of Service "C."
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 7
The annual monitoring program should also review the fiscal
impacts on the City's Operating Budget. The fiscal impact
analysis prepared as part of this project detailed an overall
positive fiscal impact to the City. That fiscal impact analysis
was based on the timely development of the employment park as
well as the residential areas. Should the development phasing
of the project change, then the fiscal impact to the City may
change. With that in mind, an annual update and re-evaluation
will allow the City to more clearly determine its fiscal
impact. Similar to traffic impact, should the fiscal impact to
the City be negative, then Rancho del Rey will be required to
contribute an amount necessary to cover the short fall.
4. Additional Development Impact Fee Programs - There are certain
facilities identified in the Rancho del Rey Public Facilities
Plan that serve development on a regional level. Those
facilities identified in this plan include the police
communication facility, the fire training facility, the City
library, and the City corporation yard. Those facilities are
not required simply by Rancho del Rey SPA I, but are required by
the cumulative development occurring in the region. This
development as well as others point out the need for other
financing methods to allow the construction of needed regional
facilities without burdening existing developed areas. To
assist in that implementation, the Public Facilities Plan
recommends the consideration of additional Development Impact
Fee Programs or Facilities Benefit Programs to assess new
development for the provision of these facilities. The
development agreement for Rancho del Rey will require their
participation in any future program that may be adopted by the
city.
5. Design Guidelines - As stated above, the design guidelines are
an integral part of the approval of this project. They are
presented to your Commission in preliminary to assist staff
additional time to review those guidelines as well as to obtain
input from your Commission prior to consideration of the first
tentative subdivision within SPA I. Those guidelines will
assist in the review of not only the residential and employment
park uses, but also the review of any open space, park, and
recreational improvements contained within the very large
network of open space and park uses. The guidelines will be
administered by the Planning Department and will not be adopted
by ordinance. By this means, the guidelines will serve as a
detailed measure to review future projects while at the same
time promoting innovative techniques.
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 8
Conditions of Approval of Rancho del Rey SPA I
The Rancho del Rey SPA I and supporting documents are approved
subject to the following conditions.
1. Residential areas adjacent to open space system should provide
both visual and pedestrian access to those systems.
Specifically, R-11b and R-13b should provide pedestrian access
to the community park via the SDG&E right-of-way.
2. The final lot and street design shown within the SPA Plan for
the remaining residential areas may be modified by the Planning
Commission and City Council during tentative subdivision map
consideration.
3. With City consideration of the Master Plan for the community
park, detailed plans should investigate the feasibility of
widening the entrance to the park adjacent to the loop road by
extending into the open space area described as 0S-4. The
purpose of this widening is to provide a more usable and
visually attractive setting for the proposed community park
facility.
4. The public facilities plan and financing analysis and the
conditions contained therein will further govern the subsequent
approval of any tentative maps or other projects within SPA I.
WPC 4411P
ATTACHMENT 1
RANCHO DEL REY GENERAL DEVELOPMENT PLAN
RECOMMENDED FINDINGS
1. THE PROPOSED DEVELOPMENT AS DESCRIBED BY THE GENERAL DEVELOPMENT PLAN IS
IN CONFORMITY WITH THE PROVISION OF THE CHULA VISTA GENERAL PLAN.
The General Development Plan is consistent with the original intent and
purpose of the Rancho del Rey Specific Plan, and is therefore, in
conformance with the provisions of the General Plan. The General
Development Plan proposes minor modifications in the circulation system
that enhance the visual appearance of the project. The plan also proposes
density allocation changes which will reduce the number of lots within the
small lot cottage development while dispersing those numbers to the
multiple family and single family detached products.
2. A PLANNED COMMUNITY DEVELOPMENT CAN BE INITIATED BY ESTABLISHMENT OF
SPECIFIC USES OR SECTIONAL PLANNING AREAS WITHIN TWO YEARS OF THE
ESTABLISHMENT OF THE PLANNED COMMUNITY ZONE.
The applicant has submitted tentative subdivision maps to be processed
within 30 days of approval of this Sectional Planning Area plan.
3. IN THE CASE OF THE PROPOSED RESIDENTIAL DEVELOPMENT, THAT SUCH DEVELOPMENT
WILL CONSTITUTE A RESIDENTIAL ENVIRONMENT OF SUSTAINED DESIRABILITY AND
STABILITY; AND THAT IT WILL BE IN HARMONY WITH AND PROVIDE COMPATIBLE
VARIETY TO THE CHARACTER OF THE SURROUNDING AREA AND THAT THE SITES
PROPOSED FOR PUBLIC FACILITIES SUCH AS SCHOOLS, PLAYGROUNDS, AND PARKS ARE
ADEQUATE TO SERVE THE ANTICIPATED POPULATION IN APPEAR ACCEPTABLE TO THE
PUBLIC AUTHORITIES HAVING JURISDICTION THEREOF.
The General Development Plan proposes a mixture of housing types,
providing housing opportunities to a wide range of community residents.
In addition to that, those housing units will be served to buy significant
amounts of a natural and manmade open space and park systems. All public
facilities have been responded to and the needs generated by this project
have been met by the standards and requirements stipulated in the public
facilities plan and financing analysis.
4. IN THE CASE OF PROPOSED INDUSTRIAL AND RESEARCH USES, THAT SUCH
DEVELOPMENT WILL BE APPROPRIATE IN AREA, LOCATION, AND OVERALL DESIGN TO
THE PURPOSE INTENDED; THAT THE DESIGN AND DEVELOPMENT STANDARDS ARE SUCH
AS TO CREATE A RESEARCH OR INDUSTRIAL ENVIRONMENT OF SUSTAINED
DESIRABILITY AND STABILITY; AND, THAT SUCH DEVELOPMENT WILL MEET
PERFORMANCE STANDARDS ESTABLISHED BY THIS TITLE.
The General Development Plan proposes the establishment of an employment
park adjacent to East "H" Street with circulation and access standards
consistent with City requirements. The overall quality of the employment
park area will be controlled by the Planned Community District Regulations
as well as the design guidelines contained in the SPA Plan.
5. IN THE CASE OF INSTITUTIONAL, RECREATIONAL, AND OTHER SIMILAR
NON-RESIDENTIAL USES, AND SUCH DEVELOPMENT WILL BE APPROPRIATE IN AREA,
LOCATION AND OVERALL PLANNING TO THE PURPOSE PROPOSED, AND THAT
SURROUNDING AREAS ARE PROTECTED FROM ANY ADVERSE EFFECTS FROM SUCH.
The General Development Plan proposes the maintenance and enhancement of
two major le§s of Rice Canyon which traverse the site. In addition to
this preservation, the plan provides for active recreational needs of the
residents of this project by providing two neighborhood parks, a community
park, and a system of trails that will connect all major uses to these
open space areas. Master Plans will be required prior to the development
of these parks to ensure the high quality development of these parks as
well as protection of adjacent areas.
6. THE STREETS AND THOROUGHFARES PROPOSED ARE SUITABLE AND ADEQUATE TO CARRY
THE ANTICIPATED TRAFFIC THEREON.
The conditions contained within the public facilities plan and the SPA
Plan will require the timely improvement of all necessary streets and
thoroughfares serving this project.
7. ANY PROPOSED COMMERCIAL DEVELOPMENT CAN BE JUSTIFIED ECONOMICALLY AT THE
LOCATION(S) PROPOSED AND WILL PROVIDE ADEQUATE COMMERCIAL FACILITIES OF
THE TYPES NEEDED AT SUCH PROPOSED LOCATIONIS).
The amount and location of proposed support commercial development is
depicted on the site utilization plan. There is adequate commercial
development in the vicinity of this project to serve the general needs of
the area residents.
8. THE AREA SURROUNDING SAID DEVELOPMENT CAN BE PLANNED AND ZONED IN
COORDINATION AND SUBSTANTIAL COMPATIBLITY WITH SAID DEVELOPMENT.
The General Development Plan will not alter the planned land use of
adjacent areas. With respect to those adjacent areas, considerable effort
has been made to coordinate development of SPA I in such a way to ensure
compatible development within close proximity to any adjacent
neighborhood.
WPC 4412P
ATTACHMENT 2
RANCHO DEL REY SECTIONAL PLANNING AREA PLAN
RECOMMENDED FINDINGS
1. THE PROPOSED SECTIONAL PLANNING AREA PLAN IS IN CONFORMITY WITH THE RANCHO
DEL REY GENERAL DEVELOPMENT PLAN OF THE PC ZONE AND THE CHULA VISTA
GENERAL PLAN.
The Rancho del Rey Planning Area Plan reflects the land uses, circulation
system, open space and recreational uses, and public facility uses
consistent with the Rancho del Rey General Development Plan.
2. THE PROPOSED SECTIONAL PLANNING AREA PLAN WILL PROMOTE THE ORDERLY
SEQUENTIALIZED DEVELOPMENT OF THE INVOLVED SECTIONAL PLANNING AREA.
The SPA Plan and the Public Facilities Plan and Financing Analysis contain
provisions and requirements to ensure the orderly, phased development of
the project. The Public Facilities Plan and Financing Analysis responds
not only to the improvements required because of SPA I, but also the
regional facilities needed to serve this project.
3. THE PROPOSED SECTIONAL PLANNING AREA PLAN WILL NOT ADVERSELY AFFECT
ADJACENT LAND USE, RESIDENTIAL ENJOYMENT, CIRCULATION, OR ENVIRONMENTAL
QUALITY.
All of the land uses within Rancho del Rey SPA I have taken into
consideration existing land use and topographical constraints in order to
protect those features and areas from adverse intrusion. The Supplemental
Environmental Impact Report has reviewed not only the development
contained within SPA I but also the offsite impacts to ensure that all
impacts generated by this project would be responded to in a manner not
detrimental to existing uses.
WPC 4413P
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 1
4. Candidate CEQA Findings Rancho del Rey SPA I EIR-87-1
A. The EIR for this project concluded that there would be potentially
significant environmental impacts. The CEQA findings conclude that with
one exception impacts can be mitigated to below a level of significance.
The one significant impact is because of the biological resources on the
property.
The findings provides a more detailed evaluation of the project impacts
and feasibility of mitigation or alternatives.
B. RECOMMENDATION
Adopt the CEQA findings for Rancho del Rey SPA I.
WPC 4430P
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 1
5. Statement of Overriding Considerations - Rancho Del Rey SPA I
Attached is a draft Statement of Overriding Considerations prepared by the
project applicant. This statement is required because there is an impact that
has been infeasible to mitigate. Staff will comment on the statement at the
Planning Commission meeting.
WPC 4431P
STATEMENT OF OVERRIDING CONSIDERATIONS
(TITLE 14 CAC SECTION 15093)
This Statement shall constitute the specific benefits
associated with the approval of the Rancho Del Rey Sectional
Planning Area I Plan ("SPA") and associated maps and permits
(collectively, "Project") even though Environmental Impact Report
(#EIR#) No. 87-1, prepared pursuant to the California
Environmental Quality Act, identified significant, unmitigated
impacts to biological resources upon development of the Project.
The identification in the EIR of significant impacts to
biology resulted in design modifications to the Project in an
effort to reduce the adverse impacts. These modifications
included the consolidation of open space in the main canyon
systems, specific measures to prevent impacts to sensitive
species, programs to restore natural habitat to disturbed areas
and the reduction of impacts to wetlands habitat through
consultation with the California Department of Fish and Game and
the U. S. Army Corps. of Engineer. These measures reduced the
adverse impacts, even though the resulting impact remains
unmitigated.
The Project proposes the construction of a wide range of
housing types which will provide opportunities for home ownership
and shelter for the entire economic spectrum. The proposed
housing will be located in an area of Chula Vista served by a
public transit system and access to the freeway system. This
location will provide residents with access to a variety of
employment opportunities. This increase in the range of housing
types is a substantial benefit to the City of Chula Vista.
The Project includes the development of an employment park
which will provide a variety of employment opportunities for
residents. The construction and operation of the employment park
will generate significant revenues in the form of taxes for the
benefit of the City of Chula Vista. These revenues will exceed
the operating costs associated with Project development.
The location of the Project will result in the construction
of significant roads and other infrastructure which will serve
existing development to the east. This "infill# development of
vacant land will result in construction of needed public
facilities which would otherwise be delayed.
The benefits described above provide the specific reasons to
support the approval of the Project despite the findings relating
to biology.
10/23/87
City Planning Commission
Agenda Items for Meeting of October 28, 1987 Page 1
6. PUBLIC HEARING: PCA-88-1; Consideration of an amendment to the
Municipal Code to exempt service stations on scenic
corridors from State price sign locational
requirements - City initiated
A. BACKGROUND
On August 25, 1987, the City Council adopted a 90-day urgency ordinance to
exempt service stations located along specified scenic corridors from State
regulations requiring price signs to be clearly visible from an abutting
street or highway. The matter now before the Commission is the permanent
ordinance.
The proposed amendment is exempt from environmental review.
B. RECOMMENDATION
Adopt a motion recommending that the City Council amend the Municipal Code to
exempt service stations located along specified scenic corridors from State
price sign locational requirements as shown on Exhibit A.
C. DISCUSSION
The State regulation that stations shall advertise the price of their three
major grades of fuel in a manner clearly visible from the public street or
highway adjacent to the premises is designed as a convenience for the
motorist. Service stations located along a scenic corridor may be exempted
from the requirement by local ordinance provided the specific areas of
exemption are identified.
The Shell station within Terra Nova Plaza was cited by the State for failing
to display price signs along East "H" Street--a designated scenic route.
Their price signs are not oriented toward the public street but rather toward
the interior of the center in conformance with City sign regulations and the
Terra Nova Precise Plan. Motorists entering the center can easily view the
signs prior to entering the Shell site.
There are alternate'locations for price signs along scenic routes subject to
staff review of sign types and locations through the precise plan and CUP
process, and existing sign regulations. It appears appropriate therefore to
exempt such areas from the State regulation. The amendment would initially
specify only the scenic route adjacent to the Terra Nova site. Additional
areas may be specified in the future if necessary.
WPC 4366P
EXHIBIT "A"
19.60.360 Service station price signs.
One service station price sign on each street frontage shall be allowed
subject to the following:
A. The maximum sign area shall be fifteen square feet, and the sign shall not
exceed five feet in any dimension. Such sign shall not be in conflict
with the provisions of the city's traffic code relating to visual
clearance. The sign shall be used to advertise gasoline prices only and
shall be posted with the correct prices at all times. The signs shall be
designed as a permanent structure, rigidly attached to a building, wall,
or adequately anchored in the ground to resist wind pressure as specified
in Title 15 in the currently adopted Uniform Building Code. A
freestanding structure shall be architecturally compatible with the
building and shall not exceed a maximum height of six feet.
B. A sign may be attached to a freestanding sign if designed to be
architecturally part of the sign.
C. Price signs may be displayed on the main body of a pole sign but shall not
exceed twenty-five percent of the main sign area or fifteen square feet,
whichever is the least amount.
D. Notwithstanding the above provisions, no price signs otherwise required by
-- '~he provisions of Business and Professions Code Section 1353) shall bo
.placed along the following areas which have been designated on the City'q
General Plan as scenic corridors or historic preservation area: That area
along East "H" Street between its intersection with Interstate 805 and its
intersection with Ridgeback Road.
{Ord. 1575 § 1 (part), 1974: Ord. 1356 § 1 (part), 1971: Ord. 1212 § 1
{part), 1969: prior code § 33.950{G)(10).)
WPC 41 95P