HomeMy WebLinkAboutPlanning Comm Reports/1985/08/28 AGENDA
City Planning Commission
Chula Vista, California
Wednesday, August 28, 1985 - 6:00 p.m. Public Services Building
STUDY SESSION (Conference Rooms 2 & 3 - 6:00 p.m.)
1. Discussion of Mello Roos Financing, Montgomery Annexation and
General Revenue Status of the City
Lyman Christopher, Director of Finance
2. Discussion of letter from Safety Commission re Ratio of Parking
Spaces Required for Apartment Developments
Chuck Glass, City Traffic Engineer and Staff
REGULAR BUSINESS MEETING (City Council Chambers - 7:00 p.m.
PLEDGE OF ALLEGIANCE - SILENT PRAYER
INTRODUCTORY REMARKS
APPROVAL OF MINUTES - Meeting of July 24, 1985
ORAL COMMUNICATIONS
1. PUBLIC HEARING: Consideration of tentative subdivision map for
EastLake Lot 457, Chula Vista Tract 85-11,
within the EastLake Planned Community - Lane/Kuhn
Pacific Development Company
ELECTION OF OFFICERS
DIRECTOR'S REPORT
COMMISSION COMMENTS
ADJOURNMENT AT to the Regular Business Meeting of September 11, 1985
at 7:00 p.m. in the Council Chambers
To: City Planning Commission
From: George Krempl, Director of Planning~
Subject: Staff Report on Agenda Items for Planning Commission Meeting of
August 28, 1985
1. PUBLIC HEARING Consideration of tentative subdivision map for EastLake Lot
457 Chula Vista Tract 85-11 - Lane/Kuhn Pacific Development
Company
A. BACKGROUND
1. The applicant has submitted a tentative subdivision map known as
EastLake Lot 457, Chula Vista Tract 85-11 in order to subdivide 10.9
acres into 93 single family lots within the EastLake Planned
Community.
2. EIR-81-3 EastLake Master Environmental Impact Report and EIR-84-1
EastLake I Sectional Planning Area SPA Plan have been prepared and
address environmental impacts of the proposed project.
B. RECOMMENDATION
1. Certify that EIR-81-3 and EIR-84-1 have been prepared in accordance
with CEQA (California Environmental Quality Act of 1970) and that the
Planning Commission has reviewed the information contained in each
EIR prior to making a decision on the project.
2. Based on the findings contained in this report, adopt a motion
recommending that the City Council approve the tentative subdivision
map for EastLake Lot 457, Chula Vista Tract 85-11, subject to the
following conditions:
a. Development of the lots shall comply with the plan conditionally
approved by the Design Review Committee (PCM-86-3).
b. The development standards approved by the Design Review
Committee (reference Exhibit "B" PCM-86-3) shall be recorded
prior to the approval of a final map.
c. Lots 1-25 and 35-45 shall relinquish access rights to the public
streets at the rear of the lots.
d. The southerly property line of Lot #33 shall be realigned so as
to be perpendicular to the street.
e. The developer shall dedicate to the City streets A, B, C, D, E
and the short street connecting the Subdivision to "C" Street as
shown on the Tentative Map for public use.
City Planning Commission
Agenda Items for Meeting of August 28, 1985 Page 2
f. The developer shall be responsible for the construction of full
street improvements in all the streets shown on the Tentative
Map within the Subdivision boundary. Said improvements shall
include, but not be limited to: A. C. pavement, base, curb,
gutter and sidewalk, sewer and water utilities, drainage
facilities, street lights, signs, and fire hydrants.
g. The developer shall be responsible for the construction of the
sewer line connecting manhole 5 to manhole 12 on East "H"
Street. 10' wide sewer easement over said line shall also be
granted to the City on the Final Map.
h. The developer shall grant adequate drainage easements for all
offsite public drainage facilities, if not previously dedicated.
i. All work within the public right-of-way shall be done in
accordance with the Standard Specifications for Public Works
Construction, the San Diego Area Regional Standard Drawings and
the Design and Construction Standards of the City of Chula Vista.
Lots shall be so graded as to drain to the street. Drainage
shall not flow over slopes.
k. The developer shall grant to the City street tree planting and
maintenance easements along all applicable streets within the
Subdivision. Said easements shall extend to a line 10 feet from
the back of sidewalk.
1. The developer shall enter into an agreement with the City
wherein developer agrees to the following:
1) Pay his fair share of the cost of public improvements to be
provided under the "Public Financing Plan," Phasing Plan
and Development Agreement as needed for access.
2) Not protest to the establishment of a Facilities Benefit
Assessment District. Said District will allow the
developer to anticipate future reimbursement by other
benefitting parties.
m. Prior to the issuance of any building permits for development
within EastLake I, the following must occur:
1) The City's requirements for schools must be satisfied.
2) Needed off-site water improvements must be satisfied.
3) Off-site roadway needs, as identified in the Public
Facility Financing Plan, must be guaranteed by a financial
mechanism such as a Facilities Benefit Assessment or other
appropriate financing technique.
City Planning Commission
Agenda Items for Meeting of August 28, 1985 Page 3
4) A purchasing agency concept to be implemented to finance
the reserve fund discussed in the Development Agreement and
Public Facilities Financing Plan.
C. DISCUSSION
Project Setting
The project site is identified as a single family lot subdivision {R-7B
within the EastLake Shores Neighborhood of EastLake I Planned Community)
targeted for a density of l0 dwelling units per acre. The subject
property is just under ll acres in size, is relatively level in area and
is located southeasterly of 'H' Street and northwesterly of the proposed
beach club and lake. The project is served by a public road system
proposed with access from the main loop road serving the EastLake Shores
area. Lower density single family is proposed for the area immediately to
the southwest of the site with higher density residential development
proposed across the loop road southeast of the subject property.
Planned Community District Regulations
Development standards for the property are contained in the EastLake I
Planned Community District Regulations. Many of the standards for the
site in question such as lot coverage and setbacks are listed as SP which
means that the issues are to be addressed at the site plan level. In this
regard the Design Review Committee on August 15, 1985, conditionally
approved the site plan and elevations for the project, including a set of
development standards which will be recorded along with the final
subdivision map (refer to Exhibit B).
Project Description
The project involves the creation of 93 single family residential lots
served by a bisected-loop street system (streets designated A, C, D and E
on the Tentative Map would be named Westport Street, while Street B would
be named Bridgeport Street). The rear yards of lots on three sides of the
project would be exposed to public streets abutting the site.
The lots range in size from 2,767 sq. ft. to 7,456 sq. ft. with an average
lot size of over 3,000 sq. ft. {in conformance with the PC District
Regulations). The project features four floor plans. Two of the plans
are single story, two-bedroom units, ranging in square footage from 936 to
1,034; a third plan features a single story, three-bedroom unit or
two-bedrooms and a study of 1262 sq.ft, and the fourth plan features a
two-story three-bedroom unit of approximately 1371 sq. ft. The two-story
plan is limited to 28 lots. Each of the dwellings will contain a two-car
garage to meet the EastLake off-street parking requirements. Over half
the driveways located within the project will be 20 feet or more in
length, which will provide additional off-site parking; the remainder of
the driveways are located approximately 9-1/2 ft. from edge of sidewalk to
the garage door which will preclude parking in these areas.
City Planning Commission
Agenda Items for Meeting of August 28, 1985 Page 4
Because of the variation in lot size and the square footage variation in
each of the units, lot coverage varies from a little over 20% to nearly
60%. The minimum rear yard setback is 5 ft., however, typically each of
the lots ends up with an area of at least lO' x 40' which can be utilized
for private open space. The minimum side yard on one side is 6 ft. with
the opposite side being a zero side yard design, thus a solid wall with no
window opening is provided on that side yard. The minimum front yard is
set at 5 ft. which, with the public right-of-way sidewalk system, provides
for a minimum of 9-1/2 ft. from the front of the house to the edge of the
sidewalk.
D. ANALYSIS
The various building offsets that are provided in the house designs
together with the limitation on the number of two-story units being
provided within the development, will allow for a fairly pleasant street
scene. Also a modest but adequate area of private usable open space will
be provided on each lot. The combination of lot size, coupled with the
proposed building development and the exposure of the rear yards in this
development to three different public rights-of-way, however, requires a
restricted building program for any future construction.
As noted earlier, both lot coverage and setbacks are established with site
plan review. As a result, a set of development standards has been
proposed which would govern future building additions (refer to Exhibit
B). These standards would, among other things, prohibit any room
additions--providing only for limited open patio construction and a
portable storage shed provided it is properly screened.
The EastLake standards call for a solid theme wall design for the lots
backing up to 'H' Street and the entry coming into the Shores area. The
applicant has an option on the theme wall design facing the "H" Street and
loop area, to use a combination solid wall and wrought iron to allow for
views toward the beach club area, as well as minimizing the impact of the
shorter rear yard areas within the individual lots {see standards
attached). It is the applicant's intent to provide interior fencing to
insure privacy within the individual lots with the proposed fencing to be
finished off on the corner lots in a color scheme and height that would
complement the proposed landscaping in that area. The DRC conditioned
their approval on the requirement that a fencing plan be submitted for
approval to review the aspects listed above.
E. FINDINGS
Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative
subdivision map for EastLake Lot 457, Chula Vista Tract 85-11, is found to be
in conformance with the various elements of the City's General Plan based on
the following:
City Planning Commission
Agenda Items for Meeting of August 28, 1985 Page 5
1. The site is physically suitable for the residential development and
the proposal conforms to all standards established by the City for
such projects.
2. The design of the subdivision will not affect the existing
improvements -- streets, sewers, etc. -- which have been designed to
avoid any serious problems.
3. The project is in substantial conformance with the Chula Vista
General Plan Elements as follows:
a. Land Use - The EastLake SPA Plan designates the area for 5-15
dwelling units per acre. The project density of 8.5 dwelling
units per acre is within this range.
b. Circulation - The public streets proposed within the project
meet the General Plan standards for residential streets.
c. Housing The project will provide detached single family
dwellings at the low end of the price range for this type of
housing.
d. Conservation The project is located on a site which has
already been graded for development.
e. Park and Recreation, Open Space - The project conforms to the
EastLake SPA Plan which will result in the retention of over lO0
acres of natural open space and approximately 150 acres in total
open space plus nearly 24 acres of park land.
f. Seismic Safety - The closest identified fault in the area is the
La Nacion Fault located over 2 miles to the west.
g. Safety - The site will be within an acceptable response time of
fire and police services.
h. Noise - The units will be required to meet the requirements of
the Uniform Building Code as regards to acceptable interior
noise levels.
i. Scenic Highway - The project will be required to establish a
theme wall design for the lots backing up to the "H" Street
scenic route.
j. Bicycle Routes The streets within the project are not
designated bike routes but will accommodate bicycles.
k. Public Buildings - No public buildings are planned for the site.
City Planning Commission
Agenda Items for Meeting of August 28, 1985 Page 6
4. Pursuant to Section 66412.2 of the Subdivision Map Act, the
Commission certifies that it has considered the effect of this
approval on the housing needs of the region and has balanced those
needs against the public service needs of the residents of the City
and the available fiscal and environmental resources.
WPC 2114P
SECTION I
INTRODUCTION AND SUMMARY
1.1 PURPOSE
This environmental document addresses the 3073-acre Janal Ranch property,
located in an unincorporated area of the southern portion of San Diego County,
approximately 7.5 miles east of downtown Chula Vista and 7 miles north of the
U.S./Mexico border. The property is located in the County's Otay Subregional
Planning Area but is also shown on the City of Chula Vista's General Plan Land
Use Map. Although the site is generally considered to be within the City's
Planning Area, the Local Agency Formation Commission (LAFCO) has not
adopted a sphere of influence for Chula Vista.
The applicant is proposing to amend the Land Use and Circulation Elements of
- the Chula Vista General Plan to designate a mixture of residential, commer-
cial, industrial, public and open space land uses. If the proposed project is
approved, other elements of the General Plan would need to be updated where
appropriate to maintain consistency. Additional actions included in the proj-
ect proposal are prezoning of the property to PC (Planned Community) and
'. annexation to the City of Chula Vista from the County of San Diego.
This document is designed to serve as a Draft Master Environmental Impact
,:, Report (MEIR) for the proposed General Plan Amendment, prezoning and Gen-
eral Development Plan (GDP) and annexation for the Planned Community of
EastLake. The annexation will require approval by LAFCO and the Chula
Vista City Council. Approval of the GPA, draft prezoning and GDP are also
" required from the City Council. The objective of this report is to provide a
~.. base of information regarding the resources and constraints of the project site,
and to discuss the environmental effects of the proposed actions, thus permit-
~-~ ting the City of Chula Vista to complete the Final EIR without additional
major research effort. Both the annexation and the proposed land use designa-
tion changes are analyzed, in conjunction with the general development plan
associated with the prezoning. This document will serve as a master EIR to
expedite the environment review of future specific developments within the
project area by: 1) providing information the City can use to decide whether
certain environmental effects are likely to occur and whether those effects
· , would be significant; 2)providing a central source of information for use in
preparing individual EIRs and/or negative declarations; and 3) identifying long-
~ range, areawide and cumulative impacts of individual developments proposed
in the project area.
As noted above, this Draft EIR is intended to serve as a Master EIR for the
EastLake project. The Administrative Guidelines to CEQA provide in Section
15069.5:
"(a) Where a large capital project will require a
number of discretionary approvals from governmen-
tal agencies and one of the approvals will occur
more than two years before construction will begin,
a staged EIR may be prepared covering the entire
project in a general form. The staged EIR should
evaluate the proposal in light of current and con-
templated plans and produce an informed estimate
of the environmental consequences of the entire
project. The aspects of the project before the pub-
lic agency for approval shall be discussed with a
greater degree of specificity.
(b) When a staged EIR has been prepared, a supple-
ment to the EIR shall be prepared when a later
approval is required for the project, and the infor-
mation available at the time of the later approval
would permit consideration of additional environ-
mental impacts, mitigation measures, or reasonable
alternatives to the project."
As noted in Table 1-1, Sectional Area Plans, Tentative Maps, and Planned Unit
Development must themselves be subjected to environmental review with
respect to the resources and issues listed in Table 1-1 prior to any approval
which may result in a significant effect on the environment. When subsequent
environmental documents are prepared with respect to later discretionary
approvals, further opportunity to recommend further mitigation measures and
project alternatives.
As provided for by the Administrative Guidelines to CEQA in Section 15002(f),
where subsequent environmental review demonstrates that the project under
consideration and its attendant approvals would cause a substantial adverse
change in the environment, the lead agency must respond to such information
by one or more of the following actions:
"(1) Changing a proposed activity;
"(2) Imposing conditions on the approval of the
activity;
"(3) Adopting plans or ordinances to control a
broader class of activities to avoid the prob-
lems;
"(4) Choosing an alternative way of meeting the
same need;
"(5) Disapproving the project, or
"(6) Finding that changes in, or alterations, the
project are not feasible.
"(7) Finding that the unavoidable, significant
environmental damage is acceptable as pro-
vided in Section 15089."
Table 1-!
SUMMAi~Y OF FUTURE ENVIRONMENTAL RI~VIEW FOR EASTLAKE
General
Development Sectional Tentative Map/
Issue Plan Area Plan Precise Plan
Land Use X X X
Agricultural Resources X
Transportatio~ and
Circulation X X
Sewer Services X X
Water Availability X
Schools X X
Police Proteeti~ X
Fire Protectim X X
Energy X X (X)
Parks and Recreation X X
Other Utilities and
Services X X
Biological Resources X X (X)
Visual Resources X X (X)
Geology X X
Soils X X (X)
Groundwater X
Drainage X X
Mineral Resources X
Water Quality X X (X)
Air Quality X
Socioeconomic Factors X X
Archaeology/History X (X)
Paleontology X X
Noise X X (X)
Key
X - issue to be addressed
(X) - issue to potentially be addressed
blank - issue not to be addressed
3
This report is submitted to the City of Chula Vista in accordance with the
California Environmental Quality Act and EIR Guidelines, as amended Janu-
ary 1, 1981.
In des~ing the EastLake Planned Community, the applicant used a planning
process which included environmental studies from the initial stages of the
project. Subsequent to finalizing the General Development Plan for EastLake,
an Environmental Data Base was prepared and submitted to the City of Chula
Vista. This data base was used during preparation of the Environmental Con-
straints Inventory for the project, and, in turn, this EIR. Future planning
studies for EastLake wi]] include Sectional Area Plans, site plans and tentative
maps. The topics for which environmental review may be necessary as these
later plans are submitted are identified on Table 1-1.
1.2 SUMMARY OF FINDINGS
Project Description
The 3073-acre EastLake project site is located in the eastern portion of the
Chula Vista Planning Area in an unincorporated portion of San Diego County.
Upper and Lower Otay Lakes are adjacent to the eastern project boundary, and
Otay Lakes Road traverses the site from west to east. The site's topography is
gently rollings hills, and current land use is primarily agriculture (dry-farmed
barley).
The existing County land use designations are Intensive Agriculture over the
majority of the site, and Very Low Density, non-urban residential uses for the
remaining areas. The Chula Vista General Plan also designates the majority of
the site for Agriculture and Reserve. The northwestern portion of the site is
designated for Medium Density Residential uses.
The EastLake project as proposed would be developed as a Planned Community
including a mixture of residential, industrial, commercial, office, community
educational and open space land uses. The applicant is requesting a prezune to
Planned Community and adoption of a General Development Plan and phasing
schedule to guide development of the site. To allow such development, a
General Plan Amendment for the Land Use and Circulation Elements of the
Chula Vista General Plan would be required. If the GPA and prezone are
approved, a request for annexation to Chula Vista would be made to LAFCO.
Environmental Analysis
The environmental impacts of the proposed project are summarized below.
More detailed discussions of impacts and mitigation measures for each issue
are contained in Section III of this report.
Land Use: The proposed changes in land use designations and ultimate devel-
opment according to the General Development Plan were identified to have a
significant impact on agricultural resources. This is discussed further in the
following paragraph. Conflicts with surrounding land uses are not anticipated,
except for the area adjacent to Otay Lakes Park. This potential impact can be
mitigated through specific site design. Internal land uses would be compatible
4
and no significant impacts would occur. EastLake development would be a
substantial change from City policy regarding land use designations for this
area, and would vary from density assumptions used for Series V population
projections. As a result of this change in policy, there could be secondary
effects on traffic, community services and air quality as discussed below.
Agricultural Resources: The majority of the project site contains soils suit-
able for agricultural use which, due to location within the coastal climate,
would be highly productive given imported water. The loss of the current dry
farmed barley production is not considered significant but the loss of resources
for the potential production of coastal dependent crops would be a significant
adverse impact of project development.
Transportation and Circulation: Traffic generated from development of the
proposed project would represent an increase in total area trips of 16 to
18 percent. On a cumulative basis, this traffic would have a significant
impact on the regional circulation system. Mitigation of the impact is possible
with phased improvements to roadways and intersections constructed in con-
junction with need. At the City's discretion, some of these improvements
should be the responsibility of the developer, while other property owners and
various public agencies would need to construct other links. The major road
improvements which will be needed to avoid significant impacts include:
· SR 125 between the project and SR 54 should be constructed as a four-
lane prime arterial; eventual widening to six lanes with selected grade
separations may be required.
® Otay Lakes Road should be extended south of Telegraph Canyon Road
to an intersection with Orange Avenue; Orange Avenue should be
extended from that point to the EastLake property.
· Several roads (see Appendix C) presently designated as collectors will
have to be reclassified as major arterials, including:
Sweetwater Road (SR 54 - Bonita)
Bonita Bridge
Sweetwater Road (SR 54 - Bonita Bridge)
Corral Canyon Road
Brandywine Avenue
· Bonita Road between 1-805 and the Bonita Bridge will need to be
widened to a six-lane divided major artieral.
If project development is phased with needed circulation improvements, poten-
tial impacts would be reduced to insignificance. If improvements are not
made, a significant adverse traffic impact would result.
Sewer Services: Sewage generation from the EastLake project would be sub-
stantially higher than that anticipated under current, lower density General
Plan designations. Sewage disposal facilities do not currently exist onsite, and
full development of the project would require extensive construction of both
on and offsite lines or separate sewage treatment facilities. Such improve-
ments would need to be phased with development to avoid significant impacts.
5
First phase construction would have some allotted capacity in the Telegraph
Canyon trunk line, and pumping into existing lines over a short-term period is
being requested by the applicant. If the extension of sewage lines is the option
selecte4~for sewering the project site, there is a potential for contributing to
growth inducement of adjacent parcels.
Water Availability: Project development would require the construction of
water distribution facilities onsite, which would be the responsibility of the
developer. The Otay Water District has indicated an ability to supply water to
the site. However, the loss of imported water from the Colorado River as a
result of Arizona's withdrawal would have regional water supply implications.
The project as proposed would represent an incremental impact on limited
regional water supplies which could be significant on a cumulative basis. The
use of reclaimed water for irrigation of open space and recreation areas as
well as conservation measures would reduce the demand for imported water
from the community. However, the problem of adequate supply must be
solved on a regional scale.
Schools: Students generated by project development would create a need for
additional school facilities within the project area. The General Development
Plan indicates school sites for 5 elementary, i junior and 1 senior high. Based
on current generation rate and average school capacities, there may be a need
for 2 additional elementary and 1 each junior and senior high schools within
the community. The provision of adequate school facilities should be coordi-
nated with the Districts and provided by the developer in conjunction with
need to reduce potential impacts to insignificance.
Police Protection: Initial emergency response time to development within
EastLake would be below the preferred time. The addition of police staff and
equipment to meet the demands of new development would eliminate the
short-term impact which would occur during the initial phase of the project.
FirewouldProtection: Significantfirst sho~t-termof impacts on the City's Fire Department
occur during the phase development, until a new station is oper-
ational in the project area. A second station may be necessary during later
phases of project buildout. The developer would be responsible for providing a
station site, and construction of the station structure as well as provision of
the necessary apparatus and equipment may also be required to mitigate
potentially significant impacts.
Energy: Project development would result in an incremental increase in
demand for energy. No unique or unusual demands for energy are anticipated
to result from implementation of the project in this area due to the provision
of a mixture of ]and uses which would help to reduce future residents travel
distances. Conservation measures being considered for the development would
further reduce energy demand and consumption.
Parks and Recreation Facilities: The proposed General Development Plan for
EastLake includes the provision of open space and park areas to serve future
project residents. No adverse impacts related to parks would occur.
Library Services: Project development would result in an incremental increase
in demand for library services. Due to the size of the project and distance
from the central library, a signifieant impact could occur .unless mitigation
measure.s~re implemented. Those recommended by the City librarian include
provision of temporary space for a branch library, purchase of books, funding
of staff for 1 year and dedication of a site for a permanent branch library.
Other Utilities and Services: Project development would incrementally
increase the use of and demand for other services including solid waste dis-
posal, telephone service, churches, hospital and paramedic serviees. No signif-
icant impact to these services and facilities are anticipated.
Biological Resources: The majority of the natural vegetation on the project
site has been disturbed through agricultural cultivation. The proposed project
design includes retention of almost all the remaining native vegetation onsite
and associated sensitive species. No significant biological impacts are antici-
pated as a result of project development, although there will be an incremen-
tal reduction in the foraging area for raptors.
Visual Resources: The proposed development of the EastLake Planned Com-
munity would substantially alter the visual character of the site from its pas-
toral appearance to an urbanized community. Specific grading and design
features are not available at this time, but mitigation measures to minimize
visual impacts are included in the proposed PC regulations. These address
grading and architectural design, as well as visual considerations for projects
adjacent to designated Scenic Highways. Site-specific visual impacts should
be addressed during subsequent project review.
Geology: The designation of land uses on the project site has generally been
responsive to geologic eanditions except in several possible minor landslide
areas. Potential impacts related to slope instability can be mitigated by
remedial grading or use of fill to buttress and stabilize the landslides. Poten-
tial seismic activity would be no 'greater at the site than elsewhere in southern
California. Construction in accordance with the Uniform Building Code will
minimize the effects of earthquake shaking. Prior to final project design, a
detailed geologic investigation is required to be conducted to provide grading,
foundation and construction recommendations.
Soils: The project site contains areas with highly expansive soils. Unstable
soils conditions can be mitigated to insignificance by following the recommen-
dations of an engineering geologist.
Groundwater: Development of the project site would not affect local or
regional groundwater conditions in the project vicinity.
Drainage: Development of the proposed project would increase runoff from
the site, which would represent an incremental increase in the existing flood
discharge of the Sweetwater and Otay Rivers. Several areas downstream are
currently subject to flooding problems, and the project contribution to peak
runoff could be significant on a cumulative basis.
The portion of EastLake which is drained by Telegraph Canyon represents
14 percent of the total watershed. Development of this site with urban uses,
rather than the assumed agricultural use, would result in an underestimation of
the projected peak diseharge, and could impact drainage facilities. Develop-
ment in the portion of the site drained by Long Canyon could also aggravate
the existing drainage problem southeast of Bonita Road. Measures to control
peak runoff discharge to pre-project levels and provide drainage improvements
could mitigate potential drainage impacts.
Mineral Resourees: No mineral deposits are known or expected onsite.
Water Quality: Development of the site with urban uses would result in a
change in the type of eontaminants contained in surface runoff and would
decrease sediment loads of runoff. No significant impaet on water quality is
anticipated from project implementation. The wastewater reclamation plant
being considered for sewage treatment would involve the use of treated waste-
water for irrigation. Disposal of the treated effluent may be restricted along
the eastern margin of the property which drains into Otay Lakes by the
RWQCB. No significant water quality impact would occur onsite or in down-
stream areas.
Air Quality: The proposed EastLake development would represent a signifi-
cant increase in the planned growth levels within the Chula Vista Planning
Area, with a resultant increase in pollutant emissions from mobile and station-
ary sources. The impact of project implementation would be significant on a
eumulative regionwide level due to the departure from planned growth within
the air basin. Mitigation measures are available to reduce project-related
emissions, but cannot mitigate the impact to insignificance.
Soeioeconomies: Development of the proposed project would result in a redis-
tribution of planned housing units and population within the Chula Vista Plan-
ning Area. This would affect the rate and density of development in other
portions of the Planning Area. Secondary impacts associated with growth of
this property, and the potential induced growth on surrounding parcels are
discussed individually and in Section IV. The proposed development would pro-
vide additional employment o@portunities in the Chula Vista area. The fiscal
analysis for the projeet indicated a net benefit to the City during all phases of
the project.
Archaeological/Historical Resources: Field investigation of the EastLake
property identified three archaeological/historical sites and 14 artifact iso-
lates. Future development of the project area would result in the loss or
impairment of the cultural resources present onsite unless appropriate mitiga-
tion measures are taken, including surface and subsurfaee testing.
Paleontological Resources: There is a potential for paleontological resources
to be present within the extreme southwestern portion of the project site. A
more precise determination of the resource presence can be made through
field examination of future soil and geotechnical borings or cut slopes during
grading operations. Mitigation measures are available to avoid significant
impacts to any paleontological resources onsite.
Noise: Ambient noise levels in the project vicinity would increase as a result
o--~ban development. Significant noise impacts would occur if residential
uses were constructed within the 65 dB(A) CNEL contours adjacent to road-
ways in the project area. Mitigation of noise impacts is possible through
construction techniques or noise barriers. Specific noise impacts would need
to be determined at the time of individual project review.
Growth Inducement: The project as proposed would introduce an urban devel-
opment into a currently rural setting, and would involve the extension of
roads, sewage facilities, and community services. Development of EastLake
could affect both the timing, type and location of growth of adjacent parcels
and could encourage additional annexation requests. Although development of
the project site is planned to be phased over a 20-year period, the project
proposal is considered to have significant secondary impacts associated with
growth inducement. If adjacent parcels were to develop at densities similar to
EastLake, an overload of facilities such as roads, sewers and drainage struc-
tures could result. Other secondary effects would be air quality and commu-
nity service availability.
SECTION I
INTRODUCTION AND SUMMARY
1.1 PURPOS~
This environmental document addresses the proposed 1267.9-acre EastLake I
Sectional Planning Area (SPA). Located in an area zoned as Planned Community (PC)
by the City of Chula Vista on August 24, 1982, the project site is located approximately
7.5 miles east of downtown Chula Vista and 8 miles north of the United States/Mexico
EastLake I is planned to be a functionally complete community within the City
border.
of Chula Vista, and the SPA Plan prepared by the applicant is a refinement and imple-
mentation framework for the Planned Community Zoning (a copy
of
which
is
on
file
with the City of Chula Vista Planning Department). EastLake I is a phased development
project and the SPA Plan projects development of 3683 homes over a period of 8 to
10 years.
This document is designed to serve as a Supplemental Environmental Impact
Report for the EastLake I Sectional Development Plan (EIR-84-1). A Master EIR was
completed for the project in February of 1982, and the project received discretionary
approvals frgm the City of Chula Vista for the requested General Plan Amendment,
prezoning and General Development Plan, and annexation to the City of Chula Vista
from the of San Diego.
County
EastLake I is the designation adopted for the current development area of
EastLake. On August 24, 1982, the City'of Chula Vista adopted the EastLake Policy
Plan for the entire 3073-acre community and the Planned Community Zoning for East-
Lake I. Combined, these constitute the General Plan designation for the property. A
provision of the Planned Community Zoning was that, prior to development, a SPA Plan
would have to be approved for the planning area. This phase of project approvals,
including the preparation of Sectional Development Plans and Tentative Tract Maps is
now in process. The site-specific SPA and Tentative Maps are subject to environmental
review and comprise the primary focus of this EIR. Discretionary action by the City of
Chula Vista will include an amendment to the General Development Plan. Land use
designations for the EastLake I SPA vary from the current General Development Plan in
terms of distribution, but are in compliance with the intent of the Planned Community
designations by type and density.
1-!
The objective of this report is to provide an updated base of information
regarding the resources and constraints of the project site, and to discuss the environ-
mental effects of the proposed actions. This EIR, together with the Master EIR (EIR
81-03), provides an assessment of the probable short- and long-term cumulative
impacts of the project and provides an evaluation of all feasible mitigation measures
necessary to reduce or eliminate adverse impacts. It also analyzes all feasible alterna-
tives to the project as proposed.
Future discretionary action for EastLake I includes the preparation and envi-
ronmental review of a Supplemental SPA Plan for EsstLake Greens and a Precise Plan
for Village Center.
The following Planned Community District Regulations adopted by the City of
Chula Vista are applicable to the EastLake I project site and are used as guidelines for
development of this EIR. The regulations are intended to:
a. Provide for the orderly preplanning and long-term development of
EastL~ke so that the entire community and subsequent extensions of planning areas will
provide an environment of stable and desirable character;
b. Give reasonable assurance that Sectional Development Plans prepared
in accordance with an approved General Development Plan will be acceptable to the
city;
c. Enable the city to adopt measures providing for the development of
the surrounding area compatible with the planned community zone;
d. Enhance and implement the General Plan;
e. Secure for the citizens of the city the social and economic advantages
resulting from an orderly planned use of its land resources;
f. Establish conditions which will anow land uses to exist in harmony
within the community;
g. Facilitate adequate provisions for community facilities, such as trans-
portation, water, sewage, schools, parks and other public requirements;
h. Provide flexibility in development standards and permit planned diver-
sification in the location of land uses and structures;
i. To recognize the inherent influence that economic conditions and con-
sumer needs will have in the implementation of EastLake I and,
j. Allow a diversity of uses, relationships and heights of buildings and
open space in planned building groups while insuring substantial compliance with the
spirit, intent, and provisions of the Municipal Code. (City of Chula Vista, 1982c.)
1-2
1.2 SUMMARY OF FINDINGS
Project Deseription
The 1267.9-acre EastLake I project site is located in the eastern portion of the
City of Chula Vista. Telegraph Canyon Road and Otay Lakes Road bisect the site,
which is comprised of a topography of gentle rolling hills dry-farmed for barley produc-
tion.
The existing City of Chula Vista General Plan designates the project site as
the Planned Community of EastLake I (Amendment 1982). Development under the
Planned Community (PC) designation requires the preparation of a Sectional Planning
Area (SPA) Plan to guide the sequential implementation of the PC's General Develop-
ment Plan.
The EastLake I SPA Plan as proposed would be developed to include a mixture
of residential, employment park, office, commercial, circulation, recreational, educa-
tional and open space land uses as ~pecified in the General
Development
Plan.
Two
tentative maps, one for residential EastLake Hills and EastLake Shores, and one for
EastLake Village Center and EastLake Business Center, are also proposed. The mixture
of land uses provides for the development of a balanced community.
Environmental Analysis
The environmental impacts of the proposed project are summarized below.
Mitigation measures as listed are required in order to reduce potential impacts to a
level of insignificance. If not applied, significant impacts could be expected to occur.
More detailed discussions of impacts and mitigation measures for each issue are con-
tained in Section III and the associated Appendices of this report.
Land Use: The land uses outlined in the proposed SPA Plan and Tentative
Maps vary slightly from land use designations of the Planned Community Regulations
and General Development Plan in terms of distribution. Types and density of land use
remain the same, however. The project would allow a maximum of 3683 dwelling units
within a total residential area of 619.9 acre~ (49 percent of the total site area). The
remaining 51 percent of the site would be developed for a variety of non-residential
land uses on 648 acres. Although acreage within the non-residential land use categories
will vary somewhat from the General Development Plan designations, the SPA Plan
complies with the intent of the Planned Community Regulations. Even though the
employment park acreage is slightly higher than that designated on the General Devel-
opment Plan, limitations in the Planned Community Regulations will control the scale
of the structures. The SPA Plan's extensive design measures preserve the continuity of
1-3
a well-balanced community with a variety of land uses. No significant land use impacts
are expected to occur with complete implementation of the SPA Plan.
Transpj~rtation and Circulation: The Transportation and Circulation analysis
indicates that a large number of streets in the East Chula Vista area will need to be
constructed or widened to accommodate cumulative growth from projected area devel-
opments. EastLake I, however, will not impact all of these streets. To evaluate which
roads will be impacted, a special SANDAG model was used which separates EastLake I
traffic from the rest of the study area. Results of this information indicated that
EastLake
I,
along
with
existing traffic, will create the majority of traffic on the streets
within the project and on SR125 between the project and San Miguel Road, and East "H"
Street between the project and Otay Lakes Road. Caltrans has indicated that a four-
lane intermediate configuration on SR125 is acceptable, with an ultimate configuration
consisting of eight lanes, diamond interchanges and a truck lane upgrade from the
Sweetwater River Valley. Several existing streets will need to be expanded and the
proposed project traffic will also necessitate a minimum of two lanes for SR125 north
of San Miguel Road, four lanes for SR125 between San Miguel Road and the southern
project boundary, and a minimum of four lanes on Telegraph Canyon Road west of the
project.
Mitigation
measures
to
reduce
significant traffic impacts to a level of insig-
nificance are provided in Section 3.2.
Water Availability: In order to provide water to onsite development, the proj-
ect site will be annexed to Otay Water District's Improvement District 22. Project
development will require the construction of water distribution facilities both onsite
and offsite. Financing of the facilities will be accomplished through the combined use
of Improvement District annexation fees, OWD capacity charges, meter fees and use of
a form of bond funding. The use of reclaimed water for irrigation of open space and
recreation areas as well as conservation measures, are proposed as part of the project
to ultimately reduce onsite water requirements. As indicated in the Planned Commu-
nity Regulations, the developer will construct a dual water system in each phase of
development, such that reclaimed water, when available and where its use is deter-
mined to be feasible and practical, can be used for irrigation of open space, parks and
common areas. Even though the project would incrementally increase regional water
consumption, implementation of the SPA Plan would represent an insignificant impact
to water availability.
Sewer Services: Project development would require the construction of sew-
age facilities as outlined in the Wastewater Master Plan to provide adequate service to
1-4
the project site. Furthermore, negotiations between the developer and the City of
Chula Vista must be continued to ensure the timely provision of future sewer service.
The location and capacity of the Long Canyon sewer has not yet been determined.
Negotiations are currently underway between the applicant and the developer of Bonita
Long Canyon Estates to settle this iSsue. A Supplemental EIR will be prepared for
EastLake I which will address potential constraints associated with offsite improve-
ments such as the Long Canyon sewer line. Development of EastLake I would incre-
mentally reduce the capacity at the Point Loma Metro Sewer System. However, due to
the large area served by the system and the comparatively small increase generated by
EastLake I, the project will not represent a significant effect to sewer services.
Educational Facilities: Students generated by project development would ere-
ate a need for additional school facilities within the project area. Based on an Elemen-
tary School Draft Master Plan prepared for EastLake I, two elementary school facilities
are required. The site for one elementary school is proposed in the EastLake Hills
neighborhood; the second site will be addressed by the Supplemental SPA Plan for East-
Lake Greens neighborhood. Negotiations for a high school site at the south boundary of
EastLake I (offsite) are currently underway with Sweetwater Union High School Dis-
trict. The establishment of the high school would eliminate the potential incremental
effect of EastLake I and other developments on educational facilities. The provision of
the facilities outlined above would adequately serve students generated by EastLake I.
Assuming that the schools will be developed in the established time frames and in
accordance with need, the potential impacts to existing facilities would be reduced to a
level of insignificance.
Police Protection: An adverse though non-significant impact could occur to
police protection services due to an increased demand in a service area currently oper-
ating above the optimum response time. However, additional police staff is anticipated
to be added with funds generated by EastLake and other similar developments, and no
significant impacts would then occur.
Fire Protection: Development of EastLake I would constitute an adverse
impact initially, as existing facilities and personnel would be required to provide fire
protection services to a larger geographical area and population. This short-term
impact will ultimately be mitigated to a level of insignificance through the provision of
an equipped fire station, which is the responsibility of the developer.
Parks and Recreational Facilities: The proposed SPA Plan for EastLake I des-
ignates 284.4 acres of open space and 47.8 acres of parkland (32.9 acres of neighborhood
1-5
parkland and 14.9 acres of community parkland) to serve future project residents.
Three minor parks at approximately 0.5 acre each are proposed in the residential par-
cels of EastLake ~)res. No adverse impacts related to parks would occur.
Library Services: The proposed project would increase the demand for library
facilities and represents an adverse impact. This impact would be eliminated through
the provision of a temporary community-oriented library or bookmobile; and ultimately
with the development of EastLake II, the construction of a separate library facility
financed by any combination of Mello-Roos, State library funds, grants and/or specially
earmarked City revenues, and acceptable to the Library Director of the Chula Vista
Public Library.
Ener~ Supply and Conservation: Adequate facilities will be available to
transport gas and electricity to the project site. Since the continued availability of
energy supplies cannot be assured, the SPA Plan has incorporated measures to reduce
natural gas and electricity consumption and conserve fuel. Thus, the development of
EastLake I would not adversely affect gas and electric facilities or the conservation of
energy resources.
Other Utilities and Services: Project development would incrementally
increase the use of and demand for other services including solid waste disposal, tele-
phone service, and hospital and ambulance services. No significant impact to these
services and facilities are anticipated.
Visual Resources: The proposed EastLake I development would change the
appearance of the project site as the pastoral character of the existing landscape would
be replaced by urban development. The project site has been designated in the Chula
Vista General Plan for urban development, however, and the SPA Plan does not present
a significant alteration to this commitment. To avoid potential visual impacts the
project has incorporated extensive design measures including designation of open space
and parks, providing a landscape plan with vis~fal buffer zones, landscape zones, a plant
matrix, a street tree plan, trails plan, signage plan, fencing plan and a grading plan.
The plan also seeks to maintain the intent of the Scenic Highways Element. No signif-
icant visual impacts are expected to occur with complete implementation of the SPA
Plan.
Geology/Soils: Based on the preliminary geotechnical investigation of the
project site, it has been determined that development is feasible from a geotechnical
standpoint. There appear to be no significant geotechnical constraints onsite that
cannot be mitigated by proper planning, design and sound construction practices.
1-6
Mitigation measures as outlined in the investigation and provided in the SPA Plan will
reduce the potential impacts to a level of insignificance.
Hydrology~/Drainage: The project site is located within five drainage basins
that are tributary to the Sweetwater and Otay Rivers. Runoff volumes from the site
will increase slightly for each of these basins while total sediment loads would be
decreased after site development. In the Long Canyon basin, there are existing down-
stream flooding conditions improvements are planned, proposed project
for
which
The
would avoid significant impacts to this basin by providing drainage improvements that
reduce the peak flows from the property. In the Telegraph Canyon basin, the minor
increase in surface runoff during a 50-year storm event would not have significant
impacts once the planned downstream improvements are in place. In meetings con-
ducted with the City of Chula Vista and the applicant, downstream improvements have
been addressed. It was resolved that interim drainage facilities improvement on East-
Lake I would include a retention basin in the Commercial Center area, in order that
downstream flows would not increase beyond existing levels. Long-term drainage facil-
ities improvements would be financed under a fee district to be instituted by the City
of Chula Vista. The peak 50-year flows from the project site in the Proctor Valley
basin would decrease after site development and no significant impacts would result.
No adverse impacts would be associated with project development in the Salt Creek or
Poggi Canyon basins, tributary to the Otay River.
Air Quality: Air quality emissions resulting from project implementation
would conform to the regional air quality management plan and the project would not
impede the attainment of air quality standards within the San Diego air basin. East-
Lake I includes several measures to reduce vehicle travel and the consumption of nat-
ural gas and electricity. The corresponding decrease in air quality emissions is consid-
ered a beneficial effect associated with project development. No adverse impacts are
anticipated concerning air quality.
Socioeconomic Factors: The proposed population for EastLake I SPA conforms
to population statistics projected for the EastLake Planned Community and would not
adversely affect socioeconomic factors. Proposed housing for the development meets
and exceeds the requirements of the Planned Community Regulations and General
Development Plan in providing low-and moderate-income housing and manufactured
housing. No adverse impacts to housing are anticipated. The slight increase in employ-
ment opportunity under the SPA Plan is considered a beneficial socioeconomic impact
and no mitigation measures are necessary.
1-7
Fiscal Analysis: Based on the fiscal analysis prepared by Public Affairs Con-
sultants, the EastLake I SPA Plan is estimated to provide net revenues which would
result in a beneficial fiscal impact to the City of Chula Vista. No significant adverse
impacts are anticipated concerning the fiscal issue.
Noise: The noise analysis for EastLake I shows that nearly one-quarter to one-
third of the site development could be potentially impacted by roadway noise levels
above the City of Chula Vista's maximum residential limit of 65 dB CNEL. An even
greater area would potentially be impacted by roadway noise levels of 57 dB CNEL.
The area of potential noise impacts may be reduced considerably by the use of barriers
(berms and wails) and sensitive land use setbacks from major roadways. However, both
topography and the first "row" of development structures adjacent to a roadway will
have the potential to reduce noise impacts without specific barrier construction or
noise related property development setbacks. At the time of development in poten-
tially noise impacted areas, site (and plan) specific noise studies must be performed to
assess the actual noise environment and provide any engineering designs to mitigate or
reduce potential adverse impacts. In addition to the use of barriers and setbacks for
reducing outdoor noise impacts, sensitive indoor uses may be protected by the acous-
tical engineering design of building exterior walls, windows, doors, roofs and ventilation
systems.
The noise impacts from the initial construction phases of the proposed project
are expected to be minimal since the project is in a relatively unpopulated area with
the exception of the residential area to the southwest of the project area. Construction
of the major roadways and utilities services which will occur either with or without the
development of EastLake Phase I may be exPected to cause Some impacts to existing
residents. Since the proposed project area would not be 'built out" for a number of
years, it can be expected that after initial stages of development, increasing numbers
of "new" residents could be exposed to noise impacts from interim and final stages of
construction. Therefore, the use of quiet equipment and good neighbor work schedules
which would initialiy be important only in the area of existing residents, would in later
stages be necessary throughout the project region.
Biological Resources: The biological resources concentrated in the northern
and northwestern portions of the project site have been placed in designated open
space, retaining the majority of existing native vegetation and the inclusive sensitive
species. As this habitat would be retained as natural, undisturbed open space, no signif-
icant biological resource impacts would occur.
1-8
Archaeological Resources: Archaeological site CA-SDi-7179, composed of
5 loci, is located within the EastLake Business Center. A data recovery program has
been conducted for Locus B of the site to mitigate adverse effects of the SDG&E
Interconnection Project. The four remaining loci of the site would be impacted by
EastLake I development. Mitigation measures involve a two-stage investigative data
recovery program to avoid potential significant impacts of project development.
Paleontological Resources: There is minimal potential for adverse impacts to
significant paleontological resources on the project site. To ensure that significant and
potentially unique fossils and paleontological resources are not destroyed without exam-
ination and analysis, it is recommended that a qualified paleontologist monitor the
initial grading activities in the Sweetwater Formation as it appears in the drainage
walls. The mitigation measures presented would avoid potential adverse impacts to
subsurface resources.
Growth Inducement: The majority of the EastLake I project site is surrounded
by land zoned for urban growth. The western and northwestern portions of the project
site would be contiguous with existing or approved development zoned for low- to
medium-density residential use. The southern and eastern portions of the project site
would be contiguous with land zoned as "future urban." Approval of the EastLake I SPA
would have some growth-inducing effects on the existing undeveloped land southwest
and northeast of the project boundaries; and may encourage surrounding planned devel-
opments to take place sooner than would otherwise occur without the project. Develop-
ment of EastLake I as an urban community in an area projected for future urban growth
does not present a significant adverse growth inducing impact and complies with the
intent of the City of Chula Vista growth management plan.
1-9
EXHIBIT 'B'
PROPOSED DEVELOPMENT STANDARDS
FOR
THE COTTAGES AT EASTLAKE SHORES
SINGLE FAMILY RESIDENTIAL: ZERO LOT LINE UNITS
All lots proposed to be developed for zero lot line units (units
with dwellings, garage structure, and walls constructed on side
lot lines) shall be governed by the provisions of the EastLake !
Planned Community District Regulations (Section II.3, Section A,
Land Use Group RP-13) excepted as specified below:
1. The provisions of Chapter II.3, section relating to lot
area, lot coverage, and yard requirements shall be amended
as follows:
a. Lot Coverage: Except as noted for open patio's, lot
coverage within the subdivision, including buildings,
accessory buildings and structures, shall not cover more
than the percentages listed on the attached chart.
b. Lot Area: 3,000 square feet
30% under 3,000 square feet
c. Lot Width: 52 feet
d. Front Yard: 5 feet: A minimum front yard of 5 feet
or 19.5 feet shall be maintained where driveways extend
from such garages are approximately perpendicular to
the front property line.
e. Exterior Side Yard: 10 feet
f. One Side Yard: 0 feet Opposite Side Yard: 6 feet
g. Rear Yard: 5 feet: A minimum of one half of the width
of the structure must maintain a minimum rear yard setback
of 10 feet.
2. The applicant shall record covenants, conditions, restrictions,
and easements to provide for drainage, roof or eave projections,
access for purposes of maintenance, repair, or remodeling of
lot line structures;compatibility of materials, textures, color,
and related matters. Such deed restrictions and easements, which
shall be recorded concurrently with the recordation of the
subdivision map or maps creating designated zero lot line lots,
shall be subject to the approval of the Planning Commission or,
on appeal, the City Council.
3. Notwithstanding the provisions of Section II, no garage shall be
converted for living purposes and shall be retained at all times
for the purpose of parking motor vehicles.
4. Patio structures (covers) may be located within a rear yard area
only; ~rovided that such structure is located no closer than
three (3) feet from the rear lot line, and does not exceed one
story in height. No other room additions (either single or two-
story shall be allowed).
5. All patio structures shall be limited to the approved patio standards
for the cottages on file with the City of Chula Vista.
6. Each lot shall be allowed one portable storage shed not to exceed
100 sq.ft, in area provided the shed is screened from view of any
public street by combinations of walls and landscaping to the
satisfaction of the City Planning Director.
7. All fencing must conform to Section II.6. Replacement of
existing fencing shall be subject to approval of the Planning
Commission or, on appeal, the City Council. Fencing shall be
limited to the areas shown on the approved site plan on file
with the City of Chula Vista.
8. All areas in front and exterior side yards (building to sidewalk)
shall be limited to landscaping, excepting therefrom driveway
areas shown on the approved site plan filed with the City of
Chula Vista.
SPA PLAN
EASTLAKE HILLS &
EASTLAKE HillS
PROJECT
AREA
P-3
"- R-12
o~-4
RESIDENTIAL NON - RESIDENTIAL
"-'" '~ ~-" '"' '"° "" "-' I '"~ ,-, KEY MAP
---"-" ' "-' ,o, j ,,. .o ,~. E,/ --Y' ~'-~.
1--~
L.&,------ \ <,