Loading...
HomeMy WebLinkAboutPlanning Comm Reports/1985/11/13 AGENDA City Planning Commission Chula Vista, California Wednesday, November 13, 1985 - 7:00 p.m. City Council Chambers PLEDGE OF ALLEGIANCE - SILENT PRAYER INTRODUCTORY REHARKS APPROVAL OF MINUTES - Meeting of October 9, 1985 ORAL COMMUNICATIONS 1. PUBLIC HEARING: (Continued) Conditional Use Permit PCC-84-11: Requests permission to establish a church and day care facility at the northwesterly corner of East 'H' Street and Buena Vista Way - Pilgrim Lutheran Church 2. PUBLIC HEARING: Consideration of request for extension of tentative subdivision map, Woodland Park, Chula Vista Tract 82-1, northwest corner Walnut Drive and Main Street 3. PUBLIC HEARING: PCM-86-7: Consideration of a deviation from the Municipal Code standards in order to provide eight tandem parking spaces for a proposed medical office building at 495 Smith - Dr. Victor Uranga 4. PUBLIC HEARING: (a) PCH-86-5: Consideration of an amendment to the Bonita Long Canyon Sectional Planning Area (b) PCS-86-3: Consideration of tentative subdivision map for 650 acres located north of East 'H' Street between Otay Lakes Road and Proctor Valley Road DIRECTOR'S REPORT COMMISSION COMMENTS ADJOURNMENT AT to the Study Session Meeting of November 20, 1985 at 5:00 p.m. in Conference Rooms 2 & 3 To: City Planning Commission From: George Krempl, Director of Planning Subject: Staff Report on Agenda Items for Planning Commission Meeting of November 13, 1985 1. PUBLIC HEARING: (Continued) Conditional Use Permit PCC-84-11; request to establish a church, day school and preschool at northwesterly corner of East "H" Street and Buena Vista Way - Pilgrim Lutheran Church {Tom Bushfield, a~ent} A. BACKGROUND This item was initially continued from the meeting of September ll, 1985, in order to obtain further information regarding potential noise impacts of the project and allow the Planning Commission to consider development standards for private schools. Private school standards were discussed in a September 18 workshop session and the scheduled rehearing on the subject CUP was again continued from the proposed October 9 Planning Commission meeting to provide additional review of acoustical data. The proposal involves a request to approve a master plan for a church, day school and preschool on 9.5 acres located at the northwesterly corner of East "H" Street and Buena Vista Way. B. RECOMMENDATION 1. Recertify EIR-83-2A per the attached addendum. 2. Based on findings contained in Section "E" of this report, adopt a motion to approve the request, PCC-84-11 to establish a church, day school and preschool on 9.5 acres located at the northwesterly corner of East "H" Street and Buena Vista Way subject to the following conditions: a. The applicant shall be responsible for all street improvements for the frontage along East 'H' Street to include, but not limited to, curb gutter, sidewalk driveway approaches, asphaltic surfacing, road transition, street lights, parking control signs, sanitary sewer facilities and any necessary dedication as determined by the City Engineer. b. Buena Vista shall be improved to a width and length as determined to be necessary by the City Engineer with a minimum 30 ft. width dedication to extend to the northwesterly corner of the property to facilitate possible future access and service to the proposed open space park area designated for the immediate City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 2 vicinity. Note: Buena Vista improvement shall include cul-de-sacing and paving to a sufficient width to provide two-way access in the event that the adjacent property to the east is not developed in conjunction with this project. Such improvements including the location of the cul-de-sac shall be at the discretion of the City Engineer. c. Storm drainage requirements, street trees and the possible signalization at the intersection of East 'H' and Buena Vista shall be put in as required by the City Engineer. d. The master plan shall be revised to reflect a minimum 30 ft. landscaped area to be provided from the edge of the property line to the end of any parking stall after the necessary dedication is determined by the Engineering Department. e. A formal phasing plan shall be submitted subject to the approval of the City Planning Director. f. Each building phase shall be submitted to the City's Design Review Committee for approval of site plan, landscaping, architecture, fencing and signing. g. All development shall be subject to any fees and/or conditions as established by the City Council through the adoption of the E1 Rancho del Rey Specific Plan and any amendments thereto. h. No grading permit, building permit or other construction permit shall be issued for development of this site until the applicant has entered into a development agreement satisfactory to the City insuring that the necessary public improvements are in place in accordance with the proposed public facilities financing and phasing plan. i. The developer shall participate in the East "H" Street Development Program established by City Council. The extent of participation shall be determined by the City Engineer in accordance with criteria established in that program. j. The private school shall be limited to 400 elementary {K-6) and preschool students. k. Phase II {School Construction) and Phase IV {Turfed Open Space) shall be constructed concurrently. C. DISCUSSION Existing Site Characteristics The property is a vacant 9.5 acre site located on the north side of East "H" Street, just west of the proposed extension of Buena Vista Way. The City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 3 site is at approximately the same elevation as East "H" Street and dropping some 75 feet into a canyon floor at the north end. The property is presently designated for residential development at 3-5 dwelling units per acre on the specific development plan for E1 Rancho Del Rey. The proposed amendment to the ERDR Specific Plan will place the property in a public facilities designation for the southerly 2/3's of the property with the northerly 1/3 designated as open space or park. Adjacent property to the east and west are designated for medium density residential development. Proposed Use The proposal includes a total of 46,000 sq. ft. of floor area, including a church with a seating capacity of 435, a K-6 day school and preschool that combined would accommodate no more than 400 students, a gymnasium, living quarters and various other miscellaneous structures. An athletic field and turfed open area would occupy the northerly one-third of the property, and 145 off-street parking spaces would be provided to serve the entire complex. It is the intent of the applicant to build the complex in phases: the first phase would consist of the preschool and parish hall together with a storage/garage structure and a portion of the parking lot to meet City standards; the second phase calls for the construction of the school, the third phase would involve the construction of the main sanctuary; the fourth and final phase would involve the construction of the gymnasium and associated athletic field and turfed open space. Additional portions of the parking area would be added concurrent with the phasing. D. ANALYSIS When the Commission earlier considered this item, the proposal involved a junior high school component which would have increased the student level to 700 rather than the 400 students now contemplated. At that time, the Commission expressed concerns with potential impacts of noise on surrounding residential areas and the lack of City standards for private schools. In the meantime, an acoustical analysis has been prepared which shows that the scaled-down proposal--with just the elementary and preschool and 400 students--meets the standards of the City's Noise Ordinance (see attached study). Furthermore, the Commission expressed general satisfaction with the following draft private elementary school development standards presented in workshop session on September 18, 1985. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 5 Elementary Schools (K through 6) 1. Students per acre (maximum) 85 2. Students per classroom (maximum) 30 3. Building floor area/classroom (minimum) 1,O00 sq. ft. 4. Play area/300 students 2.00 ac. 5. Basic allocation of play area: (a) Turf - 30% (b) Hardscape, courts, walks - 50% (c) Untreated areas - 20% (sand dirt, equipment) 6. Area of the site of a 300 student 3.5 ac. elementary school 7. Off-street parking (minimum) 1.O space/classroom +3 sp. According to these standards, a 400-student school would require a total site area of 4.7 acres, including 2.7 acres of play area, 13 classrooms, and 16 parking spaces. In comparison, the school in question occupies approximately two-thirds of the site or six acres, includes at least three acres of play area (gymnasium, day school and preschool playgrounds, athletic field and turf area), and contains 12,700 sq. ft. of classroom floor area, or approximately 13 classrooms based on the draft standard of one classroom for every 1,000 sq. ft. of floor area. Additionally, if the 124 parking spaces necessary to serve the 435-seat church are subtracted from the 145 space total, this leaves 21 off-street spaces to serve the school, or eight more than would be required under the draft standards. In terms of site development, the location and orientation of the buildings and outside activity areas function well internally and have a good relationship to adjacent properties. The main structures are located along the westerly boundary of the site at a lower elevation than property to the west and oriented to the east, away from adjoining land slated for residential development. The playground areas are located on the far side of buildings on the northerly portion of the site which is designated for park/open space use on the proposed E1 Rancho Del Rey Plan. The site has been reviewed by City staff as well as the adjacent property owner to determine if any possible conflicts could result in approving a master plan for the development of this site independent of adjacent parcels and no problems are foreseen. It's generally been agreed that Buena Vista needs to be extended to provide access to both the proposed church property as well as the residential development planned to the east of Buena Vista. It has been further determined that the adjacent residential development line west of the church property can easily be served by "H" Street or the extension of Paseo Ranchero. There remains an uncertainty at this point as to the length of Buena Vista being extended to provide limited access to the proposed park and open space planned near the north end of the site City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 6 and the location of the cul-de-sac. Staff is confident, however, that the conditions attached in recommending for approval of the master plan are sufficient to cover any contingencies. It is appropriate, therefore, to recommend approval, subject to the conditions listed in Section B of this report. E. FINDINGS 1. That the proposed use at the location is necessary or desirable to provide a service or facility which will contribute to the general well being of the neighborhood or the community. The proposed use will offer church and private school facilities in an area which is not presently served by such facilities. The site has been identified on the proposed E1 Rancho Del Rey Specific Plan as appropriate for public facilities such as churches and private schools. 2. That such use will not under the circumstances of the particular case, be detrimental to the health, safety or general welfare of persons residing or working in the vicinity or injurious to property or improvements in the vicinity. The property in question is nearly 9.5 acres in size, thereby providing adequate land area to accommodate the combination of uses proposed without adversely impacting adjacent residential area with undue levels of noise, activity or on-street parking. 3. That the proposed use will comply with the regulations and conditions specified in the Code for such use. A recommended condition of approval will require review and approval by the City's Design Review Committee to ensure compliance with all City Codes. 4. That the granting of this conditional use permit will not adversely affect the General Plan of the City or the adopted plan of any government agency. The design and conditions as proposed will ensure compliance with the various elements of the General Plan, including circulation, noise, open space and seismic safety. The review by the Design Review Committee and any conditions related thereto will ensure compliance with the Scenic Highway Element of the General Plan. WPC 2286P $ '05 ~-/2 05 ~ LOCATOR PCC-84-11 Nocfhwesferly Corner of' ~asf "H " on~ ~ena V/~fo ~oy ADDENDUM EIR-83-2 EL P, ANCHO DEL REY Prepared in Accordance with Section 15164 of the State CEQA Guidelines i! Section 1. Introduction This addendum to the EnvirJnmental Impact Report for the E1 Rancho del Rey Specific Plan (EIR-83-2) is intended to determine if the development of the subject propert~ could result in any significant environmental impacts that were not evaluate~ in the previous EIR. Section 2. Project Description The property is a vacant 9 1/2 acre site located on the north side of East 'H' Street, just west of the proposed extension of Buena Vista Way. The ~'-site is at approximately the same elevation as East 'H' Street and dropping some 75 feet into a canyon floor at the north end. The applicant is proposing to develop a church sanctuary of nearly 9,000 sq.ft, having a seating capacity for 435. In addition, a school building that would accommodate some 700 students, first grade through junior high, together with a gymnasium, various miscellaneous structures including living quarters, would constitute a total building area of just over 52,000 sq.ft. It is the applicant's intent to build this facility in a phased program; Phase I would consist of the construction of the pre-school and parish hall together with the storage building and garage and a portion of the parking lot to meet the City standards; Phase II would involve the construction of the school excluding the junior high wing, with the third phase to follow calling for the construction of the main sanctuary. The fourth and final phase would involve construction of the gymnasium and junior high wing and the associated atheltic field shown at the north~end of the property. Section 3. Analysis The proposed project is to be developed in accordance with the land use assumptions for the E1 Rancho del Rey EIR. This site is identified in the now certified final EIR as a public facilities location, and it was anticipated that a church type facility would utilize the property. Subsequent to the preparation of the EIR a more detailed biological survey was conducted on the site which concluded: SIGNIFICANT BIOLOGICAL RESOURCES The Inland Sage Scrub vegetation, as seen on-site, is considered to be sensitive due to the extensive destruction of that vegetation type and because of the several sensitive plant or animals often found there. The Scrub vegetation on-site is of moderate to good quality, based on the low level of disturbance, and does contain several sensitive plants. The small size of the site, however, speaks against its sensitivity, Similarly, the low numbers of coast barrel cacti and lack of young plants suggests that the population is declining or static in size. It would be useful if the plants on-site would be salvaged for cultural purposes. Transplantation in the area may be useful, however, receptor sites are becoming filled. One site in Spring Valley is known. That site should be available in late spring of 1986. RECOMMENDED MITIGATION TO REDUCE BIOLOGICAL IMPACT Due to the small size of the parcel, low numbers of rare plants and animals and low sensitivity of those plants and animals, no significant biological impacts appear to be associated with this development project; therefore, no mitigation recommendations are made. All other impacts associated with this project have been evaluated in EIR-83-2 and no further environmental review is required. Enviro~ental 'R~view coOrdinator Date '"' -- R EC:EI~I/ED OOT j ~j SAN DIEGO ACOUSTICS, Inc. Pl-~tq~iO D£1:'AFtTME~T OfllJLA VISTA, CALIFORNIA Report No. 85-0165 October 1, 1985 Environmental Noise Analysis Athletic Field Pilgrim Lutheran Church Chula Vista, California Introduction This environmental noise analysis was made to assess the noise impact of the proposed athletic field, a portion of the Pilgrim Lutheran Church located on East B Street (Parcel 1, Chula Vista Map 7416). The athletic field will be located on the most northern portion of the parcel. It will be used primarily for baseball and soccer. No formal spectator area is planned nor will a P.A. system be utilized. Thus, this analysis is based upon the expected noise from the usual number of participants and a small group of casual observers. Adjacent Conditions At present the adjacent land is zoned Open Space and as such would not be noise impacted as defined by the Chula Vista Noise Ordinance. Bowever, changes have been proposed to the General Plan which could take effect before this development is consummated. A current proposal (Figure 1) could result in single family residential development to the east and multifamily development to the west, with a "park" to the north and a strip of "open space" between the "park" and the two residential areas. As a result, this 1 4414 CARMELO STREET · SAN DIEGO, CAUFORNIA 92107 · (619'~ 225-14,91 environmental noise analysis was requested to indicate Whether the proposed athletic field would still be in conformance with the Chula Vista Noise Ordinance should these zone changes take effect. Noise Analysis The school, which will utilize the proposed athletic field, will consist of 400 students in grades K through 6. There are other areas designated as "playgrounds," therefore it has been assumed that the athletic field will be primarily used by the older children participating in baseball or soccer games. Baseball and softball are not inherently noisy games. Spectators are the major noise source and the noise level generated naturally depends upon the number on onlookers and the excitement of the game. Soccer also has its spectator noise but the participants also contribute to the overall noise. Coaches may shout instructions from the sidelines and the players may yell messages to one another during play. Thus, any noise impact at possible residences will consist of these types of sounds. In order to quantify the above playground noise data (measured by San Diego Acoustics, Inc.) from three different schools is presented as representative of the expected condition. Table 1 Noise Levels Measured at Boundary Fences of Elementary Schools No. of Playground Pupil Hourly School Pupils Area - f2 Density Leq - dB(A) 1 9 2,700 1/300 ft2 56 2 81 25,000 1/309 ft2 63 3 500 100,000 1/200 ft2 58 I 2 Table 1 contains the noise resulting from elementary school children playing during recess or lunch hour. Measurements of the noise resulting from a soccer game conducted at Robb Field, in Point Loma, are not included as automobile traffic noise 160'feet away obscured the soccer noise. However, it was subjectively concluded that playground activity (noise) easily exceeded the noise produced by the soccer game and greatly exceeds that produced at a baseball game. Thus, utilizing the measured values from Table 1 to predict the effect of the Pilgrim Church athletic field noise will result in a conservative conclusion, i.e. the predicted noise will probably be higher than actually will occur. Only the property immediately east and west of baseball diamond is proposed for residential development (Figure 2). As the diamond area is potentially the most densely populated (6 defensive men/women and 3 base runners) it was used as the major noise source location. The infield with its 9 participants has an approximate density of 1 person to 300 square feet, matching two of the school playgrounds noted in Table 1. Averaging the noise levels of schools 1 and 2, a level of 60 dB(A) would occur at the periphery of the "diamond." As the source is not a point source, the reduction with distance would decrease by only 3 dB until one "diamond" width was reached. Further increases in distance would result in source levels decreasing at a rate of 6 dB per doubling of distance. Therefore, the noise level of 60 dB(A) (hourly Leq) occurring at the edge of the "diaMond" will be reduced to 49 dB(A) at the western property line and 50 dB(A) at the eastern property line. The Chula Vista Noise Ordinance states that the permissible noise limit at the receiving land use category may not exceed Leq 55 for single family residences and Leq 60 for multiple dwelling residential use, between the hours of 7 AM and 10 PM. Comparing the calculated noise levels at the western (proposed multifamily) and the eastern (proposed single family) boundaries, 49 dB(A) and 50 dB(A), respectively, with the corresponding Chula Vista limits of 60 and 55, it is seen that the expected levels will be 11 and 5 dB below the ~rdinance limits. Conclusions The proposed athletic field will not result in property line noise levels which will be in violation of Chula Vista Noise Ordinance limits, even though adjacent zoning may be changed to include residential usage. E. C. K s Acoustician for San Diego Acoustics, Inc. City Planning Commission Agenda Items for Meeting of November 13, 1985 2. PUBLIC HEARING: Consideration of two-year extension of the tentative map for Woodland Park, Chula Vista Tract 82-1 A. BACKGROUND On November 3, 1981, the City Council approved the tentative subdivision map known as Woodland Park, Chula Vista Tract 82-1, for the purpose of subdividing 3.25 acres located at the northwest corner of Walnut Drive and Main Street in the R-3-P-8 zone into 29 lots (27 residential and 2 common area lots). The map was extended for one-year on October 24, 1984, and the developer is now requesting a two-year extension. B. RECOMMENDATION Adopt a motion approving a two-year extension of the tentative map known as Woodland Park, Chula Vista Tract 82-1. The map would then expire on November 13, 1987. C. DISCUSSION There have been no significant changes in the immediate vicinity which affect the original conditions or findings for approval; therefore, the approval of a two-year extension is appropriate. No further extensions may be granted, and if a final map is not submitted and approved prior to the expiration date of November 13, 1987, the developer will be required to process a new tentative map. WPC 2284P V,~C City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 1 3. PUBLIC HEARING: PCM-86-7; request to provide eight tandem parking spaces at 495 Smith Avenue - Dr. Victor Uranga A. BACKGROUND This item involves a request to deviate from the standards of the Municipal Code in order to provide eight tandem parking spaces in conjunction with the construction of a medical office building at 495 Smith Avenue. B. RECOr,~ENDATION Adopt a motion to deny PCM-86-7. C. DISCUSSION The proposal involves the construction of a 3,200 sq. ft. medical office building on a 60 ft. by 125 ft. parcel at the northeast corner of Smith Avenue and "H" Street. Parking for medical offices is calculated on the basis of one space for every 200 sq. ft. of floor area, or in this case a total requirement for 16 off-street parking spaces to serve the 3,200 sq. ft. of floor area in question. The applicant proposes to meet the 16-space requirement by elevating the building above a seven-space parking lot with access off Smith Avenue, and by providing nine additional spaces--one single stall and four tandem stalls--to the north of the building with access off the alley. The tandem stalls would thus provide four additional spaces which would not otherwise be allowed. D. ANALYSIS Section 19.62.020(E) of the Municipal Code provides that "Tandem parking shall not qualify as required parking unless specifically approved by the Planning Commission." The reason that tandem parking is undesirable is that when a tandem space is occupied by two cars, the forward car cannot exit the stall. As a result of this inconvenience, such stalls tend to be used for only one car rather than two, and excess parking is forced onto surrounding streets. The applicant's sole justification for requesting approval of the tandem stalls is that the additional square footage of office space that can be supported by the four additional parking spaces thus provided is critical to the economic feasibility of the project. In other words, the tandem stalls would allow 3,200 sq. ft. of floor area, while a conventional parking arrangement would limit the floor area to 2,400 sq. ft. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 2 This justification could be offered in every case involving either retail or office commercial construction--the greater the floor area the greater return on investment. However, the use of tandem parking, would not only tend to overburden on-street parking and thus have a negative impact on adjacent uses, but may be short-sighted in terms of economics in the sense that tenants find that offices are not adequately supported by convenient off-street parking for their customers. In conclusion, we do not support the use of tandem parking in this case. There my be instances where the approval of a limited number of tandem stalls would be appropriate in order to facilitate a change in use of an existing building or some other special circumstance such as valet parking. The present application, however, fails to meet either of these tests. WPC 2299P -2- ST ROOSEVELT ST. , , ~ I I I ~ I I ..J_ ~ I - ---I. I I I OTI-¢ ST. Bonk CHULA VISTA SHOPPING CTR. ~oo' October 3, 1985 Planning Commission City of Chula Vista 276 4th Avenue Re: Parking for proposed medical office building 495 Smith Avenue ( at 'H' St.) Planning Commission, In order to maximize off-street parking for our new office project, we are proposing a tandem parking layout for approval. (See attachment) We have found the additional square footage that these spaces allow us critical to the economic feasibility of the project. The layout provides eight tandem spaces and one regular space to be accessible off the alley to the north of the site. Addi- tionally, seven 90° spaces are provided off Smith Avenue, including one handicap space. We propose that the tandem spaces would be reserved for regular tenants of the building and could be assigned for maximum ease of use. The remainder of the spaces (adjacent to the lobby) would be used for guests and clients. The ratio of guest spaces (43.7%) is suitable to our anticipated usage, and their location provides ideal access. This project will conform to all planning, engineering, and sanitation regulations. We will provide beneficial services, and a pleasant looking addition to the neighborhood. Please review this plan and consider it for approval per section 19.62.020 (E). Sincerely, R ECEI.V ED OCT 1A ~0~ Dr. Vi Orange - ' ~ ' ~ Own e r PLANNING DEPARTMENT CHUI.A VISTA, CALIFORNIA City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 1 4a. PUBLIC HEARING: Bonita Long Canyon Modification to SPA Plan - PCM-86-5 A. BACKGROUND 1. An amendment to the Sectional Planning Area plan for the development of the 650-acre Bonita Long Canyon Area located on the east side of Otay Lakes Road and south of the County area identified as Bonita Highlands Subdivision in Bonita has been submitted for Planning Commission consideration. The General Development Plan which accompanied the original SPA approval in 1981 called for the development of approximately 865 dwelling units on the 650-acre parcel. The final SPA approval was for 829 units. The City's General Plan designates most of the area as residential, 1-3 dwelling units per acre, with several smaller areas carrying the designation of 4-12 du's per acre. 2. The Sectional Planning Area plan which was adopted in 1981 featured the following: a 15-acre K-6 elementary school site approximately 7-1/2 acres usable excluding the SDG&E easement. an ll-acre neighborhood park site approximately 5 acres to be usable. a 4-acre multiple-family site located adjacent to Otay Lakes Road with approximately 2 acres usable. Final density approval was for 20 units on this parcel. 809 single-family lots ranging in size from approximately 6,000 sq. ft. to over 3 acres in size. Approximately 266 acres of dedicated open space, most of which was to remain in a natural state. 3. The amended Sectional Planning Area plan as submitted proposes the following: An ll-acre neighborhood park site nearly 6 acres usable. Two church sites approximately 9 acres total. One community recreation center approximately 1.3 acres. 862 single-family lots with an average lot size of just over 15,000 sq. ft. each. Approximately 280 acres of dedicated open space most of which would remain in a natural state. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 2 4. Environmental Review Background Staff has evaluated the revised project and the previously prepared EIR. It was concluded that the project would not result in any significant impacts which were not identified in the previous EIR and therefore, an addendum to EIR-79-2 was prepared and is attached to this staff report. B. RECOMMENDATION 1. Certify that EIR-79-2 and the addendum have been prepared in accordance with CEQA, the State CEQA Guidelines and the Environmental Review procedures of the City of Chula Vista and further, that the Planning Commission has reviewed and considered the information in the EIR and addendum. 2. Adopt a resolution approving the proposed amendment to the Sectional Planning Area plan {reference PCM-86-5) for Bonita Long Canyon subject to the following conditions: a. The developer should be required to dedicate and/or construct all public improvements and facilities both on-site and off-site determined by the City to be necessary to serve the Bonita Long Canyon Sectional Planning Area plan. Specific requirements will be established with each phase of development in conjunction with the Subdivision Map process. b. Prior to or concurrent to the issuance of a grading plan for Phase 2 through 7, the applicant shall submit and the City's Landscape Architect shall approve an overall landscaping plan incorporating conceptual designs for the later phases and a detailed design for each of the grading phases being proposed. Said plan shall include such items as supplemental canyon tree planting, slope planting, and equestrian trail plans for the easements, location, grading, signing and fencing as deteKmined by the Landscape Architect. It will be necessary to implement the plan. It should be noted that slope planting shall be coordinated with the Chula Vista Fire Department to determine plant species and distances as well as required irrigation systems to satisfy the concerns of the Fire Department. The trail system shall be developed prior to or concurrent with the certification of slopes in each of the proposed grading phases. c. The open space areas shown on the map shall be part of the open space maintenance district for the entire 650-acre project in accordance with the adopted plan. d. Prior to the issuance of building permits in each phase, the applicant working with the school district shall furnish evidence to the City that the school districts are able to provide the necessary school services to future residents of that phase. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 3 e. The park site shall be developed to the satisfaction of the City's Parks and Recreation Director in conjunction with the development of Phase 3 area. The developer shall be responsible for constructing a turn-key park and, therefore, all PAD fees normally required will be waived. In addition, RCT fees required may be waived in an amount equal to $57,500 subject to the review of the proposed construction of the restroom building, backstop, and par course as indicated to be included in the park development. It should be noted that the developer has previously paid both PAD and RCT fees for Phase 1 now under construction. This process shall continue with the addition of Phase 2 with the applicant eligible for a refund on those fees with the completion of the park in Phase 3. f. The number of dwelling units shown on the Sectional Planning Area plan shall be limited to the following: Phase 1 {Note: al ready under construction) - 199 lots Phase 2 - 130 lots Phase 3 -llO lots Phase 4 - 96 lots Phase 5 - 133 lots Phase 6 - 73 lots Phase 7 - 121 lots Any adjustment in the number of lots shall be subject to City Council approval with the recordation of the Final Subdivision Map for the various phases of this project. g. The Bonita Long Canyon Development Standards shall be adopted as part of this amendment as identified as Exhibit B with a modification to Section I of the Commercial Recreation Standards and Section I of the Religious Institution Standards which provide for the approval of the site plan and architectural approval by the City Council after review of the Planning Commission. That section shall be modified to place the responsibility of approval with the Chula Vista Design Review Committee. Also, it should be noted in the Commercial Recreation Standard that the Design Review Committee shall review the proposed hours of operation for any of the commercial recreation uses. h. The developer shall acquire and dedicate and approve the necessary area to extend Street C off-site to connect to the County street proposed on TM 3750; however, if the connection from Street C to the County system proves to be infeasible, the developer shall provide access for emergency vehicles between the ends of cul-de-sac B and L. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 4 i. The requirement for the undergrounding of the existing 69 KV line within the 250-foot wide SDG&E easement shall be waived. j. The applicant shall file CC&Rs with each phase which will prohibit the resubdivision or parceling of lots in any approved phase which will increase the number of lots in that phase. D. ANALYSIS 1. Land use a. Residential The previous plan called for the construction of 826 dwelling units within the 650-acre site. The new plan is proposing 862 units or approximately a 4% increase. The increase has come about based on the applicant's reconsideration of the grading which was proposed and a decision to move the development out of the main canyon floor, in the path of the retention basin, to somewhat higher areas up on to the ridge. The General Plan for this area designated authorizes a range from between 800 to 2400 dwelling units on the property. The requested density is clearly in the lower limits of the City's General Plan. The adjacent residential areas which abut this site to the north and to the west have an average density of approximately 2 units to the acre. The area to the south is primarily traditional single-family, 7,000 sq. ft. lots, and the area immediately to the east is the EastLake Hills area which features 5,000 sq. ft. lots in conjunction with a substantial amount of open space. The project is designed in such a manner that the average lot size increases and the density decreases as the phases proceed from north from south to north. Thus, the larger lot size average in the lower density occurs in the northerly area abutting the typical County half-acre sites whereas the higher density, smaller lots occur in the earlier phases which abut the more traditional City lots in the 5,000 and 7,000 sq. ft. range. b. Community recreation. The applicant is proposing a 1.3-acre parcel located on the west side of Corral Canyon Road abutting the San Diego Gas & Electric easement in the proposed park site which they intend to develop with a swimming pool and tennis courts with options for racquet ball and basketball which would be open to membership and guests only and not the public at large. This facility would be permitted to sell certain on-site items such as food, sporting goods, and accessories and would have the added option of a possible daycare operation as an accessory use. In general, the site is well located away from adjacent residential development and abutting some of the more active recreation activities. Its location on Corral Canyon would make it highly visible and accessible to the residents of this community. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 5 c. Park The park site planned in the original Bonita Long Canyon SPA was for use in conjunction with the elementary school which has now been eliminated. However, the need for the park has not been diminished by the elimination of the school site. The City's Park and Recreation Director has met with the applicant on several occasions and has reached agreement in terms of the general design and facilities to be placed in this park. It is the intent of the applicant and the recommendation of the Parks and Recreation Director that the park be developed in conjunction with the third phase to ensure that residents moving into the area will be well aware of its location and any impacts which it might present. d. Church sites The applicant is proposing two church sites, one at southwest corner of Corral Canyon and "C" Street and the other on the east side of Otay Lakes Road abutting an existing condominium development located to the north. Both sites are located on collector roads and have sufficient area to meet the City's criteria for church sites. Traditionally, the staff has found that the demand for church sites within planned community areas is very high; however, developers have been reluctant to reserve parcels for this purpose. We think both sites are well located and will add to the overall land use mixture to provide a balanced community in the Bonita area. e. Water tank A l-l/2 acre water tank has been shown located on the north side of the San Diego Gas & Electric easement near the terminus of R Street. The Sweetwater Authority has indicated the need for a 1.7 million gallon tank which is needed to supplement storage for their two pressure zones in the area. The water tank is essentially in the same location as proposed in the original SPA plan. It would appear the sufficient space has been provided around the tank to provide for necessary screening and landscaping to minimize its effect in the subdivision. 2. Bonita Long Canyon Development Standards The developer has submitted development standards for both the residential, religious, and community recreational land uses identified as Exhibit B. For the most part, the residential standards have been patterned after the R-1 single-family zone; however, Phases 3, 6 and 7 of the project are proposed to allow equestrian use and therefore the maximum of horses allowed per lot, the distance from the main residence, and distance from neighborhood City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 6 houses present the need to have specific standards adopted. The standards call for minimal lot area of 7,000 sq. ft. for Phases l, 2, 4 and 5 with an increased lot size averaged 8,000 sq. ft. for Phases 3, 6 and 7. Lot coverage and typical setbacks for front, exterior, and rear yards coincide very closely with existing R-1 standards. The exception would be Phases 3, 6 and 7 where the sideyard requirements are increased slightly requiring one sideyard to be 5' and the opposite side to be lO'. It should be noted that horses will be permitted in the equestrian area only on specific lots so designated on the subdivision map. The applicant has looked at these areas very closely in the relationship to the proposed trails plan which meanders through the open space area. It should be noted that while the standards establish certain minimums, the average pad size within the Bonita Long Canyon area is nearly ll,O00 sq. ft. Additional standards are included for the community recreational area as well as the religious institution lots. As stated earlier, the primary review of these areas will be through the design review process involving both site plan and architectural consideration. 3. Circulation The first phase of the Bonita Long Canyon SPA area is now under construction with access available through the completion of East "H" Street extended to Otay Lakes Road as well as Canyon Drive which extends from Otay Lakes Road through the Bonita Haciendas Subdivision Map linking up the north end of Phase 1. The other backbone road of this development will be Corral Canyon Road which will link the project with the Bonita Highlands development as well as EastLake connecting up at "H" Street and Rutgers Avenue. The connection and completion of Corral Canyon Road will occur with Phase 3 of the amended SPA plan. Certain off-site improvements relating to widening along Otay Lakes Road northwesterly of the project and additional construction involving possibly road widening drainage improvements in Central Avenue located well to the north of the project are specific conditions that will be addressed by the Engineering Department in the subdivision map process. 4. Open Space and Landscaping a. Open Space The majority of the ungraded area will be left in its natural state; however, because of the potential of canyon fires, some area beyond each pad abutting the common open space will be cleared and planted with a material which will satisfy the concerns of the City Fire Marshal. Irrigation of these areas will be the responsibility of individual homeowners in some instances; however, for the most part lot lines will coincide with the top of the slope and, therefore, the open space maintenance contract will include weed abatement and brush City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 7 clearance for the purpose of maintaining good fire protection in that area. Supplemental tree planting will be required in specific canyons and/or drainage areas to enhance the overall appearance of the development. An overall landscaping plan has been submitted and is under further review by the City's Landscape Architect. Lots which back up to areas such as Corral Canyon, both in Bonita Long Canyon and at EastLake, will include the construction of a wall with supplemental landscaping which will be under the maintenance contract of the Open Space Maintenance District. Each area will be evaluated as to the amount of native material or decorative plant material involving fire retardant materials to be used on slopes. b. Equestrian trails The plan has a number of equestrian trails which meander through the open space areas and connect to the San Diego Gas & Electric easement, which is the primary east/west trail system. There has also been an attempt to coordinate the trail system with the existing County trails within the Bonita Highlands development. The applicant has developed standards relating to fencing, grading, corral locations, and street entries to help ensure that the equestrians will be good neighbors. 5. Phasing The amended SPA is divided into seven phases as mentioned previously. Phase 1 is presently under construction. Phases 2 and 3 which will follow are located towards the east end of the project and will provide the necessary connection of the project with Corral Canyon tying to Bonita Highlands and "H" Street. Phase 7, which is the last phase of the project, is located towards the extreme north end of the site which is some of the more rugged terrain, wherein the density averages about 1 dwelling unit per acre in that area. Engineering conditions are recommended in the subdivision map approval related to the various phases of construction. 6. Schools At the request of the Chula Vista Elementary School District, the proposed school site has been eliminated and, in general, both districts are working with the developer to secure agreements that will allow for the issuance of building permits with the various phases of construction. 7. Drainage Approximately 3/4ths of the site flows into the Long Canyon Basin which flows northwest and joins the Sweetwater River just north of Bonita Road. The project area within that basin constitutes approximately 43% of the total basin. Reports were previously filed with the City indicating that the proposed development would produce City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 8 only a small amount of run-off, approximately 4% added based on the 50-year storm in the total basin. However, because of the inadequacy of existing downstream facilities that added increase was predicted to cause flooding in an al ready developed housing area along Acacia Avenue. The applicant has moved to solve the downstream inundation by constructing an on-site retention basin within the Long Canyon Area near the north end of the project. The system which is nearly completed should substantially reduce both the present and the projected flows in the canyon area. 8. Street names Several existing street names will continue on through this development; specifically, Canyon Drive, Corral Canyon Road, Cumbre View, and Country Trails Lane. The following street names are being reviewed and will require City Council approval: STREET (2) AA Sunny Crest Lane BB South Point Drive CC Gold Rush Circle X Ridge Creek Drive Z Forester Lane ZZ Thorton Road (3) V Trailridge Drive T Coltridge Lane U Galveston Way W Horseshoe Court (4) DD Canyon Court Overland Court GG Sycamore Court HH Pineridge Circle M Sandy Creek Drive N Maple Court 0 Hickory Terrace P Willow Drive R Cherry Hills Lane RR Oak View Terrace S Pepperwood Court (6) C Country Vistas Lane Q Country Trails Court L Canyon Ridge Drive J White Horse Circle K Chaparral Drive G Trailridge Drive H Laredo Court I Charro Court City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 9 STREET (7) A Ridgeview Terrace B Bonita Canyon Drive D Glen Creek Drive E Evergreen Drive F Rimcrest Court Alternative Street Names (2) Arborcreek Lane Cypress Terrace {3) Bridlewood Court Abilene Way (4) Elkhorn Circle Lariat Court (5) White Birch Drive Red Hill Lane (6) Crestview Circle Creekwood Court (7) Valleyview Drive Woodglen Circle WPC 2300P EXHIBIT B BONITA LONG CANYON RESIDENTIAL DEVELOPMENT STANDARDS Purpose The purpose of these development standards is to outline the standards for appearance and for construction of this low density residential community. The intent shall be to implement the policy of the General an~ Specific Plan with the standards necessary to guarantee public health, safety, and welfare. The standards shall insure adequate light, air, privacy, and open space around each dwelling and shall protect these single family detached homes from excess noise, illumination, unsightliness, odors, smoke, and other objectionable influences. Permitted Uses The uses shall be those permitted by the R-1 Single Family Residential Zone. (Section 19.24) as modified below. Specific lots designated for equestrian uses on the SPA plan shall be permitted in Phases 3, 6, and 7. These standards outlined below shall define the number of permitted horses per lot and the loca- tions of the horse enclosures. KB 9/17/85 BONITA LONG CANYON RESIDENTIAL DEVELOPMENT STANDARDS Page -2- Phase Phase 1,2,4,5 3,6,7 Classification R-l-7 R-l-7 Lot Area (sq. ft.) ~ ~7,000 8,000 ~ width 60 70 Depth 110 120 Front Yard Direct Entry Garage 20 20 Side Entry Garage 15 20 Main Residence 15 20 Exterior Side Yard 10 10 One Side Yard 10 10 Both Side Yards 13 15 Rear 20 20 Lot Coverage 40% 40% Building Height 35' 35' Parking Spaces 2 Garage 2 Garage Equestrian Uses Not Permitted Permitted M~ximum number of horses per lot 2 Distance from Main Residence 20' Distance from Neighbors Main Residence 50' KB 9/17/85 BONITA LONG CANYON RESIDENTIAL DEVELOPMENT STANDARDS Page -3- 1. The developer shall be permitted to produce side to side split lots as long as the minimum standards ~shown above are maintained. 2. Rear yards on lots that have direct access onto an open space area shall maintain a minimum distance of 15~ from top of slope to the m~in structure. 3. Corner lots shall be one story; planning department shall be per- mitted to approve a two story house if the exterior side yard elevation is one story and is compatible with the size and bulk of the neighbor- hood and does not adversely impact the streetscape. 4. Side yard setbacks can be modified by the planning department to permit a reduction in the one side yard setback from the 10' minimum to accommodate three car garages. The total side yard setback of 13' in Phases 1, 2, 4, and 5 or 15' in Phases 3, 6, and 7 shall not be reduced. 5. Equestrian lots. Specific lots in Phase 3, 6, and 7 shall be designated as equestrian lots. The following uses and standards shall apply to those lots in addition to those outlined in the R-1 zone. a) The application of an equestrian designation shall be to lots that are contiguous. The boundaries shall be drawn to coincide as nearly as practical with street alignments or other clearly dis- cernable topographic features. All lots so designated shall abut a permanent open space lot. b) The maximum number of horses that shall be permitted per lot is two (2). The horse(s) must be contained within an enclosure. c) NO stable or paddock shall be located within twenty feet of the owner's residence, nor closer than fifty feet from any neighbor's residence, school, church, or any other building used for human habit- ation on an adjoining lot as shown on the original developer's con- struction plans. KB 9/17/85 BONITA LONG CANYON RESIDENTIAL DEVELOPMENT STANDARDS Page -4- d) Stable or paddock locations shall be submitted to the planning department for approval. e) The sanitary regulations as stated in the animal regulation ordinance, Ordinance No. 774, codified in Title 6, shall be strictly enforced. The director of public health may declare the violator(s) o~f this section as a public nuisance and subject the horse-keeping privilege to the abatement and/or penalty provisions as stated in the animal regulation ordinance. f) CCR's shall be provided to permit an architectural committee to review and approve all corrals, structures or other type of enclo- sures for horses. Included in the CCR's shall be the same design standards implemented with these development standards. BONITA LONG CANYON RESIDENTIAL DEVELOPMENT STANDARDS Page - 5 - BONITA LONG CANYON AVERAGE PAD SIZE · TABULATION UNIT 2 3(A) 3(b) 4 5 i 6 7 I AVG AVG. WIDTH 72' 81.5 89.5' 77' 75' 86' 86.5' 81 10,9! AVG. DEPTH 121' 132' 134.5' 131' 129.5' 144' 1~3' AVG. PAD SIZE in S.F. 8,712 10,758 12,037 10,087 9,712 12,38~ 12,370 NOTE: Unit 3(a) st~%ds by itself Unit 3(b) is inherent to Unit 6 9/17/85 BONITA LONG CANYON COMMERCIAL RECREATIONAL STANDARDS Development of the site designated for commercial recreational uses shall be governed by the: 1. The provisions of Chapter 19.14 (Sections 19.14.420 through 19.14.480) of the Chula Vista Municipal Code related to site plan and architectural approval except that City Council approval, after a review and recommendation from the Planning Commission, sha~ll be required. ~ 2. The provisions of Chapter 19.62 (Off-Street Parking and Loading) of the Chula Vista Municipal Code. 3. The provisions of Section 19.60.310 of the Chula Vista Municipal Code related to requirements for public and quasi- public signs. 4. Uses shall be limi%ed to the following; tennis courts, swimming pool, racquet ball court, basketball court, re- creation building which shall serve the membership and guests and shall not be open to the public at large. This facility shall be permitted to sell on-site the following items: food, sporting goods and accessories as these items shall be available only in conjunction of the use of the facilities by the members and quests. Day-care centers shall be included as permitted use. The intent of this commercial recreation site is not to provide general or neighborhood commercial facilities. KB 9/27/85 BONITA LONG CANYON RELIGIOUS INSTITUTION STANDARDS Development of the site designated for church or religious purposes shall be governed by the: 1. The provisions of Chapter 19.14 (Sections 19.14.420 through 19.14.480) of the Chula Vista Municipal Code related to site plan and architectural approval except that City Council approval, after a review and recommendation from the Planning Commission, shall be required. , 2. The provisions of Section 19.58.110 related to various set- back, landscaping and wall requirements for religious institutions. 3. The provisions of Chapter 19.62 (Off-Street Parking and Loading) of the Chula Vista municipal Code. 4. The provisions of Section 19.60.310 of the Chula Vista Municipal Code related to requirements for public and quasi-public signs. KB 9//27/85 ADDENDUM TO EIR-79-2 BONITA LONG CANYON ESTATES November 1985 A. Back~round Section 13164 of the State CEQA Guidelines provides that an addendum to a previously prepared Environmental Impact Report may be prepared if there is no need for a supplemental EIR as required under Section 15162 of the Guidelines. If an addendum is prepared it need not be circulated for public review but must be considered by decision-making authorities for the project. B. Project Description 1. Approved Project An amendment to the Sectional Planning Area plan for the development of the 650-acre Bonita Long Canyon Area located on the east side of Otay Lakes Road and south of the County area identified as Bonita Highlands Subdivision in Bonita has been submitted for consideration. The General Development Plan which accompanied the original SPA approval in 1981 called for the development of approximately 865 dwelling units on the 650-acre parcel. The final SPA approval was for 829 units. The Sectional Planning Area plan which was adopted in 1981 had the following elements: a. A 15-acre K-6 elementary school site approximately 7-1/2 acres usable excluding the SDG&E easement. b. An ll-acre neighborhood park site approximately 5 acres to be usable. c. A 4-acre multiple-family site located adjacent to Otay Lakes Road with approximately 2 acres usable. Final density approval was for 20 units on this parcel. d. Approximately 266 acres of dedicated open space, most of which was to remain in a natural state. 2. Proposed Project The proposed project will include: a. 862 single-family lots with an average lot size of just over 15,000 sq. ft. each. b. An ll-acre neighborhood park site nearly 6 acres usable. c. Two church sites approximately 9 acres total. d. One community recreation center approximately 1.3 acres. e. Approximately 280 acres of dedicated open space most of which would remain in a natural state. See the attached Sectional Planning Area plan for additional details. C. Impact Analysis 1. The following issues have been identified as being clearly adequately addressed by the Certified EIR and no further analysis is required: a. Geology (Sec. 3.1) b. Soils (Sec. 3.2) c. Ground Water (Sec. 3.3) d. Mineral Resources (Sec. 3.5) e. Air Quality (Sec. 3.7) f. Water Quality (Sec. 3.8) g. Stationary Noise (Sec. 3.10) h. Paleontological Resources (Sec. 3.13) i. Historical Resources (Sec. 3.14) j. Land Uses (Sec. 3.15) k. Social Factors (Sec. 3.17) 1. Taxes (Sec. 3.18) m. Parks/Recreation {Sec. 3.20) n. Fire/Police (Sec. 3.21) o. Solid Waste (Sec. 3.22) p. Utilities/Energy (Sec. 3.23) q. General Government Support (Sec. 3.24) 2. In addition to the issues noted above, there are eight issues which require a more detailed discussion of why resultant impacts will not be any more significant than those identified in the certified final EIR. They are as follows: a. Drainage ISec. 3.4) - See Exhibit F. Subsequent to the preparation of the final EIR a retention basin was proposed, approved and is currently under construction in Long Canyon. The estimated effects of this floodwater retarding reservoir are summarized as follows: (1) Peak flood flows for the lO0-year return period storm under conditions of ultimate development of 1770 cfs could be reduced to 890 cfs, or by about 50 percent. (2) This reduced peak outflow of 890 cfs is about 70 percent of the estimated peak flood flow for the lO0-year return period storm that would occur under conditions of existing development (1270 cfs). (3) The peak outflow from the Bonita Long Canyon Estates would be reduced to about 540 cfs which is about 55 percent of the peak outflow estimated for conditions of existing development (960 cfs). (4) The reservoir will trap sediment and prevent its deposition in the downstream reach of channel. About 3+ additional acres of land downstream from the retention basin w~uld be added to the development. The development of this area would not result in any substantial increase in runoff. The existing runoff in this area is a sheet flow across residential properties to the existing natural channel. The proposal would collect this sheet runoff, carry it around the residential properties and discharge it into the channel. Therefore, although there is a change in circumstances, there will not be a more substantial and adverse impact than that which was identified in the EIR. b. Land Form (Sec. 3.6) - See Exhibit A. A change in grading of the project site is proposed. The changes in the earthwork are as follows: Cut Fill Original Plan 3,713,295 cu. yds. 4,167,487 cu. yds. Proposed Plan 4,487,300 cu. yds. 4,571,900 cu. yds. -3- Thus there would be an increase in cut by 773,405 cubic yards of earthwork and a 404,413 cubic yard increase in fill. However, the proposed plan can be adjusted to result in a balanced cut and fill operation while the original plan would have required import of 453,592 cubic yards of fill from some unknown location. In te~ms of the grading pattern for the property, the proposed plan would remove development from the main leg of Long Canyon downstream from the retention basin and increase grading at the higher ridge lines. The conclusions of the EIR that the steep slopes of over 30% would not be disturbed and that the basic land form of the property would remain are the same with the proposed plan. So although the amount of grading has increased (not including imported material), the result of moving development out the canyon bottom and increasing grading on the northern ridge lines should not significantly detract from the existing land fom and will result in a more overall aesthetically pleasing project. The conclusions of the Certified EIR are valid. c. Mobile Noise There are two areas of potentially significant acoustical impact from mobile noise sources (automobiles). One is along East "H" Street in Phase I which is not included in the SPA amendment. The other is along Otay Lakes Road which is designated as multiple family on the approved plan. The proposed plan would change the land use to a church which is more compatible with the traffic noise from Otay Lakes Road. Thus this is an improvement over the existing plan. d. Biology (Sec. 3.11) - See Exhibit B. An analysis of the proposed revisions indicates that approximately 64 acres designated as open space or ungraded portions of private lots on the existing SPA would be graded by the revised plan, while approximately 34 acres shown for grading on the existing map would be dedicated open space on the revised plan. While these figures indicate a net loss of ungraded terrain amounting to about 30 acres, much of this area is in private lots which would be subject to disturbance and natural vegetation loss associated with landscaping or horse corrals (i.e., the large lots in the northern and northwestern portions of the property). The proposed revision would actually result in an increase in dedicated open space from 268 acres to 281 acres and would result in the removal of a road in Long Canyon, creating a contiguous open space area greater than 70 acres in size along the length of Long Canyon from the southeast corner of the property to the desilting basin near the western boundary. -4- I made field observations in the principal areas previously shown as ungraded which would be graded by the revised SPA. The northern ridge areas supported populations of San Diego barrel cactus, San Diego sunflower, mesa clubmoss, and variegated dudleya. The other two areas supported populations of all these except the dudleya. All three areas supported excellent habitat for black-tailed gnatcatcher and cactus wren. These sensitive species and their habitats are also well represented in the 24-plus acres of added natural open space in Long Canyon. The previous biological survey report (prepared by M. R. Brand and C. C. Patterson in 1978) contained at least one serious error which should be corrected; the identification of the rare plant Hemizonia conju~ans on the property was incorrect. The populations identified as H. conju~ans should have been assigned to H__~. paniculata. Because the previous report was also in error in not assigning much higher significance to the presence of H. conju~ans, no real change in the assessment of overall impact results from this correction. The proposed revision represents an improvement over the existing SPA in regard to overall biological value and habitat viability. The increase in dedicated open space by about 14 acres, the redistribution of open space to create a large contiguous natural area in Long Canyon, the presence of extensive cactus wren habitat in the new Long Canyon open space, the likelihood of disturbance to the northern ridge areas previously ungraded under the existing plan, and the overall preservation of 43 percent (281 acres) of the SPA in dedicated open space are the factors which support this opinion. Therefore the evaluation in the Certified EIR is adequate and no further analysis is required. e. Archaeology (Sec. 3.12) - See Exhibit C. In October 1985 an extended archaeological testing program was conducted at two small prehistoric sites located within the proposed Bonita Long Canyon Estates property. These sites were first identified during a survey in 1978 and subsequently tested in 1980 by Harris and Perez for MSA, Inc. Their findings indicated the presence of a low density deposit of lithic artifacts occurring to a depth of 50 centimeters, and based on these results, they recommended that further work be conducted as mitigation. Given the nature of their findings, however, an extensive data recovery effort did not seem warranted; in fact, additional testing was deemed necessary to more fully evaluate the significance and uniqueness of the sites in accordance with the recent amendment of CEQA. An extended archaeological testing program was therefore conducted. -5- Between the 1979 and current tests, over 17 square meters were sampled at the two sites. Four single 1-meter square units were excavated at SDi-5830 and some 13.5 meters were dug at SDi-5829 as either 1-meter square units or in blocks of 2 square meters or more. Of the two sites, SDi-5830 yielded far less archaeological material and therefore did not receive as much testing. SDi-5829 was very similar except for one small deposit in the north-central area where an apparent hearth was located. Five units were placed around this feature which yielded a greater density of lithic artifacts. Analysis of the recovered cultural materials indicates that SDi-5829 and SDi-5830 are related sites, probably associated with San Dieguito occupation and use of the area. This occupation was evidently sporatic and of minimal intensity to have resulted in the low-density type of deposit left at the sites. Given the size of the test sample taken to date and the projected redundant, minimal yields of the remaining unexcavated portions, no further data recovery seems warranted, and analysis of the existing materials herein provided is considered sufficient for mitigation. f. Aesthetics (Sec. 3.16) As was noted in Section b. of this Addendum, the landform alteration which would occur with the proposed plan is substantially the same as the approved plan. Therefore the conclusion that the project would have a major aesthetic impact is still valid and no new EIR need be prepared. g. Schools ISec. 3.19) - See Exhibit D. The approved plan includes an elementary school site while the proposed plan does not. Exhibit D includes a letter from the Elementary School District outlining the reasons for the deletion of the site from the plan. This Exhibit also includes letters from the school districts noting the agreements for the provisions of educational facilities. Today's enrollment levels are lower than those listed in the EIR and the school districts have increased their fees as suggested in the EIR. Impacts from the proposed plan would not be as significant as those outlined in the Certified EIR. h. Traffic (Sec. 3.25) - See Exhibit E. Planned improvements for arterial streets in the project area will be adequate because the decrease in average daily traffic from the revised project does not create significant impacts except within the project where impacts are mitigated as the result of the construction of new streets. Corral Canyon Road is proposed to be improved as a four-lane collector road. Curb-to-curb widths on these types of roads will be at least 64 feet and right-of-way widths on these roads will be at least 80 feet. The intersection of Corral Canyon Road and "H" Street will require signalization in the future. However, the contribution of project traffic at this location is relatively minor (2000 ADT). At the intersection of Otay Lakes Road and East "H" Street, the existing traffic signal will have to be modified to accommodate the addition of a fourth (east) leg to the intersection. "H" Street transitions from a four-lane major east of Otay Lakes Road to a six-lane major west of Otay Lakes Road. The contribution of project traffic to "H" Street west of Otay Lakes Road is relatively minor, about 340 p.m. peak hour trips would be added to "H" Street midway between 1-805 and Otay Lakes Road. This estimate is based on a projected cumulative average daily traffic flow of 27,500 and a 10% peak hour factor. Since the project proposes significantly fewer units 1862) than that assumed for the regional traffic study {1587) for the same area, the cumulative impacts on "H" Street will be lower than those projected. Local streets in the proposed project should be two lanes with a curb-to-curb width of at least 36 feet within a right-of-way of 56 feet. With these recommended improvements, the proposed project will accommodate projected traffic flows at a reasonable level of service. WPC 2307P -7- EXHIBIT A REVISED SPA PLAN ~ ~ S.~I DIll-GO 484'5 Ronson Cour~ $~m Di~o, C*liIomita ~211! Tel~phon~,: {~1~ 2~2-1040 ~22 July 1985 Job No. 3177-19 BONITA LONG CANYON ESTATES EARTHWORK SUMMARY (CUBIC YARDS) PHASE CUT FILL EXPORT IMPORT REMARKS ~{i 2 974,000 350,300 623,700 --- Export to Phase 3 _3 550,900 1,434,900 .... 884,000 Import 623,700 fro~ Phase 2, 260,300 from Phase 6 4 256,200 819,700 --- 563,500 Import 23,100 from Phase 8, 540,400 from Phase 6 5 704,900 935,400 --- 230,500 Import 145,900 fro~ Phase 6, *84,600 short 6 1,006,800 60,200 946,600 --- Export to Phase'3, 4 and 5 7 968,000 968,000 ...... Balanced 8 26r500 3r400 23~100 --- Export to Phase 4 TOTALS 4,487,300 4,571,900 1,593,400 1,678,000 '84,~00 SHORT *Adjust grades to make up shortage of 85,000.t All quantities are raw figures with no shrinkage/hulking factors considered. Quan%ities were calculated from the 100-scale grading study. Regional Environmental Consultants 1094 Cudahy Place, Suite 204, San Diego, CA 92110 (6191 275-$732 June 13, 1985 Mr. Ken Baumgartner : McMillin Development, Inc. 2727 Hoover Avenue National City, CA 92050 Reference: Biological Assessment of the Revised Bonita Long Canyon SPA (RECON Number R-1522) Dear Mr. Baumgartner: At your request, I conducted a biological reconnaissance at the 650-acre Bonita Long Canyon Sectional Planning Area on June 7 and 10, 1985, for the purpose of determining whether proposed revisions to the existing SPA would result In significant adverse biological effects. An analysis of the proposed revisions indicates that approximately 6~1 acres designated as open space or ungraded portions of prlvate lots on the existing SPA would be graded by the revised plan, while approximately 3q acres shown for grading on the existing map would be dedicated open space on the revised plan, While these figures indicate a net loss of ungraded terrain amounting to about 30 acres, much of this area is In private lots which would be subject to dis- turbance and natural vegetation loss associated with landscaping or horse corrals (i.e,, the large lots in the northern and northwestern portions of the property). The proposed revision would actually result in an increase tn dedi- cated open space from 268 acres to 281 acres and would result in the removal of a road in Long Canyon, creating a contiguous open space area greater than 70 acres in size along the length of Long Canyon from the southeast corner of the property to the desilting basin near the western boundary. I made field observations in the principal areas previously shown as ungraded which would be graded by the revised SPA. These areas include the ridges in the northwestern area of the SPA, the middle section of the canyon traversed by the proposed "C" street, and slopes in the area of "FF", "GG", and "HH" streets. The northern ridge areas supported populations of San Diego barrel cactus, San Diego sunflower, mesa clubmoss, and variegated dudleya. The other two areas supported populations of all these except the dudleya. All three areas sup- ported excellent habitat for black-tailed gnatcatcher and cactus wren. These sensitive species and their habitats are also well represented in the 2~l-plus acres of added natural open space in Long Canyon. The previous biological survey report (prepared by M. R. Brand and C. C. Patterson in 1978) contained at least one serious error which should be corrected; the identification of the rare plant Hemizonia con|u_qans on the property was incorrect. The populations identified as H. conjucjans should have Mr. Ken Baumgartner -2- June 13, 1985 been assigned to Ho panlculata. Because the previous report was also in error in not assigning m~ch higher signlficance to the presence of H. cOnlugans, no real change in the assessment of overall Impacts results from this correction. It is my oplnion that the proposed revision represents an Improvement over the existing SPA in regard to overall biological value and habitat viability. The Increase in dedicated open space by about 14 acres, the redistribution of open space to create a large contiguous natural area in Long Canyon, the presence of extensive cactus wren habitat in the new Long Canyon open space, the likelihood of disturbance to the northern ridge areas previously ungraded under the exist- ing plan, and the overall preservation of 43 percent (281 acres) of the SPA in dedicated open space are the factors which support this op'nlon. As grading plans are prepared for implementation of the SPA, safeguards should be incorporated that prevent the destruction of natural vegetation on open space slopes. The extensive use of natural canyon slopes in the proposed de-, velopment will enhance the character and aesthetic value of the development and provide a level of drought-tolerant slope protection and erosion control which Is difficult or impossible to achieve with landscaping and revegetationo Manufactured slopes within the development should be landscaped with native vegetation appropriate to the area. Please call if you have any questions. Cameron Patterson Ecologist, ESA CCP:mac ARCHAEOLOGICAL TESTING AND EVALUATION of SDi-5829 and SDi-5830 Withfn BONITA LONG CANYON ESTATES Prepared for: McMillin Development 2727 Hoover Avenue National City, CA 92050 Prepared by: Mooney-Lettieri and Associates 9903-B Businesspark Avenue San Diego, CA 92131 I ~J -Jbh]% ~. Cook S.O.P.A. November, 1985 I. Introduction In October 1985 an extended archaeological testing program was conducted at two small prehistoric sites located within the proposed Bonita Long Canyon Estates property. These sites were first identified during a survey in 1978 and subsequently tested in 1980 by Harris and Perez (1979) for MSA, Inc. Their findings indicated the presence of a low density deposit of lithic artifacts occurring to a depth of 50 centimeters, and based on these results, they recommended that further work be conducted as mitigation. Given the nature of their findings however, an extensive data recovery effort did not seem warranted; in fact, additional testing was deemed necessary to more fully evaluate the significance and uniqueness of the sites in accor- dance with the recent amendment of CEQA. An extended archaeo- logical testing program was therefore conducted and is the subject of this report. Between the 1979 and current tests, over seventeen square meters were sampled at the two sites. Four single one-meter square units were excavated at SDi-5830 and some 13.5 meters were dug at SDi-5829 as either one-meter square units or in blocks of two square meters or more. Of the two sites, SDi-5830 yielded far less archaeological material and therefore did not receive as much testing. SDi-5829 was very similar except for one small deposit in the north-central area where an apparent hearth was located. Five units were placed around this feature which yielded a greater density of lithic artifacts. Analysis of the recovered cultural materials indicates that SDi-5829 and SDi-5830 are related sites, probably associ- ated with San Dieguito occupation and use of the area. This occupation was evidently sporatic and of minimal intensity to have resulted in the low-density type of deposit left at the sites. Given the size of the test sample taken to date and the projected redundant, minimal yields of the remaining un- excavated portions, no further data recovery seems warranted, and analysis of the existing materials herein provided is con- sidered sufficient for mitigation. 1 II. Testing_Methods The initial step consisted of selection of test unit place- ment. The Harris and Perez (1979) report was reviewed and field conditions checked in an attempt to delineate areas within each of the sites which might be of the greatest potential. Based On the report, two one-meter square units were selected for excavation (see Figures 2 and 3). Preliminary analysis of the results of these tests were then used to guide the placement of the remaining units. In the case of SDi-5830 the results corraborated the earlier findings, and given the marginal amount and variability of the data recovered it was decided that no further excavation would be conducted. Similar findings also resulted from testing SDi-5829. Upon examination, the only area of relatively high yield was that in the vicinity of the 1979 test pit 1 and unit 2 of the current investigation. The decision was therefore made to continue excavation in this area, and specifically in and around a scatter of thermally altered rock and cobble which had been exposed during a recent regrading of the dirt road. As will be explained below in the Results section, all of the remaining test units were ultimately placed in this area. All test units were one-meter square and aligned to true north. Excavation proceeded in arbitrary ten centimeter levels with all soil passed through 1/Sth inch mesh hardware screen. In general, sterile was reached between 45 and 55 centimeters at which point a compacted clayey substratum occurred. The recovered materials were returned to the laboratory for washing and cataloguing. Each artifact was assigned a cata- logue number for future reference which was written on the arti- fact with indelible ink. Catalogue data recorded include: site, unit, level, number, type, material, length, width and thickness. The artifacts will be curated at the Mooney-Lettieri lab facili- ties until placement with a permanent repository. 3 III. Results and Interpretation A. SDi-5830 This site is situated on a high knoll (461 feet AMSL) over- looking Long Canyon to the south in the northwestern portion of the project. Harris and Perez describe it as crescent-shaped and measuring 160 meters north-south by 75 meters east-west. The lithic scatter observed by them was sparse, consisting mostly of flakes with one chopper/knife and two utilized flakes. Two test pits were excavated confirming the existence of subsurface material to approximately 40 centimeters. Twenty-eight artifacts were recovered from unit 1, of which 25 were waste flakes, two were groundstone fragments and one was a utilized flake. Unit 2 resulted in 13 artifacts of which all but a mano fragment were flakes. (Reexamination of these collections has shown the mano and groundstone to be mere cobble fragments, i.e., unutilized pieces of stone.) During the current investigation the entire site surface was scrutinized in an attempt to delineate areas of subsurface potential. This resulted in the identification of but three artifacts, and thus was of little use in determining unit place- ment. Nevertheless, both units were positioned near surface finds, adjacent to and outside of the units dug during the 1979 test. Unit 1, the northernmost of all the tests, resulted in the recovery of three artifacts: two metavolcanic waste flakes and a core. Excavation ended at 50 centimeters; soil throughout was a compacted sandy loam without visible strata. Unit 2, on the southern side of the site, resulted in the recovery of 15 artifacts: level 0-10 cm. had three metavolcanic flakes, level 10-20 cm. had five flakes, a piece of shatter and a core, level 20-30 cm. had two quartzite flakes and level 30-40cm. had a core, a flake and a piece of shatter. Soil condi- tions were essentially those of the previous unit, and excavation ceased at 50 centimeters. B. SDi-5829 Situated some 150 meters southeast of SDi-5830, this site was described by Harris and Perez (1979) as a flake and tool scatter measuring 60 meters east-west by 40 meters north-south. They observed that the site was located on the leeward side of knoll as evidenced by flakes and tools including a domed scraper, convex sidescraper, knife fragment and several choppers. Based on surface indications and exposed material eroding from a road cut along the northern boundary of the site, two test pits were selected for excavation: test pit 1 was a 2 by 2 meter block (4 square meters) and test pit 2 was a 1 by 2 meter unit. 4 Summarizing their results, test pit 1 was positioned just south of the dirt road and produced the highest yield of the areas sampled with 92 artifacts being recovered. (Average density for pit 1 was nearly three times that of unit 2.) In total, 86 flakes of basalt, felsite, quartzite and metavolcanic stone were found along with one utilized flake, a core, a possible mano fragment and two scraper fragments. Test pit 2 was placed · in the south-central area of SDi-5829 and yielded a total of 13 artifacts including 11 flakes of basalt and felsite, one core and one scraper. During the current test, a total of seven units were exca- vated. The first of these was placed on the far western boundary - of site and yielded but two metavolcanic flakes in the upper ten centimeters. Unit 2 was then placed in the east-central region near the high point of the knoll. This test unit produced 15 artifacts, all waste debitage consisting of 14 metavolcanic flakes and a piece of metavolcanic debitage. Both of these initial units were selected based on surface indications, i.e., the presence of artifacts suggesting subsurface potential. However, given the relative paucity of recovered material it was readily apparent that either the areas tested were peripheral or the entire deposit was of low density similar to that at SDi-5830. Given the results of test pit 1 from the 1979 investigation, the latter does not seem indicated however. To determine if the findings were anomalous or in fact a more dense deposit, a third unit was placed adjacent to the earlier test pit in the northern region of the site. Examination of this area revealed that the grading of the dirt road had exposed a concen- tration of thermally altered cobbles which now lay scattered along the road bed. Inspection of vertical profiles indicated the cobbles originated from a small (approximately five meter long) area immediately west. This area was then selected for excavation of test unit 3 and, ultimately, units 4, 5, 6 and 7. On average these units yielded cultural debris throughout the 40 to 50 centimeters of the deposit; sterile was indicated by the occurrence of a reddish clayey substrate. Soils were similar to those at SDi-5830, being a compacted sandy loam without stratigraphic distinctions. Rodent disturbance appeared minimal to moderate, and may have been partially responsible for the vertical distribution of the artifacts. Based on available evidence the deposit seems to be a single component without definable temporal divisions and therefore should be analyzed from a synchronic perspective. Thermally altered rock was recovered from the northern portions of units 3, 4, 5 and 7, demarcating the southern edge of the probable hearth feature. Road grading appears to have destroyed what may have been another three-quarters of the feature 6 LU CL LU judging from the quantity of thermally fractured stone scattered throughout the road bed. No charcoal or ash was found during the excavation of the test units, although numerous cobbles had embedded black stains indicative of use in fire. The estimated size of the feature would seem to suggest an earth-oven or large hearth type feature, similar to that found at the Great Western Site and other early sites. Artifacts recovered from the five unit block excavation on the southern edge of the feature are Summarized below (all flaked lithics are metavolcanic unless otherwise noted): UNIT 3 0 - 10 cm. level 10 - 20 cm. level 0 Flakes 20 - 30 cm. level 5 Flakes - one basalt and one chalcedony 11 Shatter -one basalt 30 40 cm. level 5 Flakes - one porphyry and one chalcedony 12 40 - 50 cm. level Flakes - one porphyry and one chert 6 Total 39 UNIT 4 0 - 10 cm. level Flakes two porphyry and one quartzite 8 10 - 20 cm. level Flakes Shatter 14 Core - porphyry 3 20 - 30 cm. level 1 Flakes - one porphyry, one basalt, two chert and six chalcedony 16 Shatter - two chalcedony and one chert 3 30 -40 cm. level Flakes - one chalcedony 12 Tools - two unifacial sidescrapers 2 40 - 50 cm. level Flakes - one porphyry 1 Tools - one sidescraper and one endscraper 2 Total 62 UNIT 5 0 - 10 cm. level Flakes - one porphyry 10 - 20 cm. level 9 Flakes Tools - one sidescraper 15 1 Groundstone - one possible mano fragment 1 20 - 30 cm. level 8 Flakes - one porphyry, one chert, one chalcedony 20 Tools - one scraper 30 - 40 cm.~level Flakes one basalt 2 Tools - one sidescraper 1 Total 50 UNIT 6 0 - 15 cm. (stratum A) Flakes Shatter 8 1 15 - 40 cm. (stratum B) Flakes - one basalt and one chalcedony 18 Shatter - one basalt 5 40 50 cm. (stratum C) Flakes - one porphyry 4 Total 36 UNIT 7 (this unit 1.0 x 1.5 meters) 0 - 15 cm. (stratum A) Flakes - two porphyry and one quartzite 16 15 - 40 cm. (stratum B) Flakes - one quartzite, one chalcedony and nine porphyry 46 Shatter - one porphyry 4 Tools - one porphyry sidescraper 1 40 - 50 cm. (stratum C) Flakes 3 Total 70 Generalizing from the results of the combined testing programs, it would appear that there is significant horizontal spatial differentiation. Artifact density is greatest in the immediate vicinity of the feature, decreasing as distance from the feature increases. For example, note that the density for unit 6 is less than that for those units adjacent to or dissecting the hearth. It can thus be inferred that this area was the center of activity, with other activities being performed with less intensity away from the feature. Unfortunately, all that remained of this feature was excavated during the current investigation, the remainder having been destroyed by road grading. What the nature of these activities was is somewhat difficult to ascertain. The presence of a hearth and a variety of scraping tools would seem to indicate food processing, and possibly even on-site consumption. As mentioned, it has been suggested by other investigators that features such as that at SDi-5829 may have been earth-ovens related to the processing of floral re- sources - from agave or other cacti to pine seeds - though evi- dence is still mostly inferential. Analysis of the waste debitage provides some additional information. Tool r~sharpening and edge rejuvination flakes were recovered i~ comparatively high quantities indicating that whatever was being processed required substantial tool main- tenance. The presence of biface thinning flakes also suggests the reworking of broken or dulled knife blades. While thinning flakes are likewise indicative of the final stages of biface manufacture such as would be occurring at a workshop site, the absence of other diagnostic debitage argues more strongly for tool reworking, an inference clearly corroborated by the presence of uniface (end and side scraper) resharpening and rejuvination flakes. Given the kinds of activities occurring, SDi-5829 probably functioned as a field camp where a small group (nuclear or ex- tended family) resided on a temporary basis while exploiting the food resources within the vicinity of the site. Tool types are typical of those associated with the San Diequito, and the paucity of groundstone would seem to confirm this temporal desig- nation. 10 IV. Recommendations With completion of this extended testing program the two sites within the Bonita Long Canyon Estates project have been subjected to subsurface investigations of sufficient degree so as to allow evaluation of their research potential and 'unique- ness' A total of 17.5 square meters have been excavated re- sulting in the recovery of representative samples from the low density deposits of SDi-5830 and SDi-5829, and the remaining portion of a probable hearth feature area was excavated in tote. Except for the hearth area, given the nature of the deposits little additional information can be expected with any further data recovery, and therefore mitigation measures are considered unnecessary. Monitoring during grading is however recommended given the possibility for other as yet undetected features which have the potential to yield important information on San Dieguito settlement-subsistence behavior. EXHIBIT D Sweetwater Union High School District DIVISION OF BUSINESS SERVICES October 31, 1985 Chula Vista Planning Department 276 Fourth Avenue Chula Vista, CA 92010 Gentlemen: The Sweetwater Union High School District has been contacted by Ken Baumgartner of McMillin Development relative to Bonita Long Canyon. We have agreed, based upon 'McMillan's long-standing relationship with the Sweetwater Union High School District, to enter into separate secured agree- ments for each unit being developed prior to the issuance of building permits. Because of this agreement, it is the district's position that it can assure that facilities will be available to Bonita Long Canyon. Sincerely, · awrence L. Hendee Administrator/Business Services LLH:bc c: McMillan Development ~ECEIVED DISTRICT  84 EAST"J" STREET · CHULA VISTA, CALIFORNIA 92010'6199 · 619425-9600 October 29, 1985 Mr. George Krempl Director of Planning City of Chula Vista P.O. Box 1087 Chula Vista, CA 92010 Dear Mr. Krempl: RE: SCHOOL SITE - BONITA LONG CANYON The SPA plan of Bonita Long Canyon indicates a 15 acre elementary school site on the east side of Corral Canyon Road north of the SDG&E transmission line. Please be advised that this site is inappropriate because of its location creating an isolated school in which most students would have to be bussed. This in turn diverts education funds into transportation funds. The District will be working with the developer to mitigate the impacts of new students from this development. If you have any questions, please feel free to contact mc. /John E. Linn J Assistant Superintendent for Business Management RECEIVED dEL: dt 8¥ ................................................... cc: Ken Baumgartner, McMillan Development OCT ~ 0 1985 CHULA VISTA, CA~.h BOARD OF EDUCATION ~ ALLEN, MEMBER e JUDITH L* BAUERI EXHIBIT E BONITA LONG CANYON ESTATES TRANSPORTATION ANALYSIS PREPARED FOR I,~:~ILLIN DEVELOPmeNT SEPTEMBER 9, 1985 URBAN SYSTEMS ASSOCIATES, iNC. TRANSPORTATION ENGINEERING & PLANNING CONSULTANTS TO BUSINESS AND GOVERNMENT 4540 KEARNY VILLA ROAD, SUITE 106 SAN DIEGO, CALIFORNIA 92123 (619) 560-4911 TABLE OF CONTENTS SUBJECT PAGE INTRODUCTION. 1 THE PROPOSED PROJECT. 2 TRIP GENERATION, DISTRIBUTION AND ASSIGNMENT. 3 IMPACT ANALYSIS 6 CONCLUSIONS B IIST OF FIGURES ~ SUBJECT PAGE FIGURE 1 PROJECT LOCATION. 1-A FIGURE 2 TRAFFIC DISTRIBUTION AND ASSIGNMENT 3-B FIGURE 3 TWO WAY PM PEAK HOUR TRAFFIC. 3-C FIGURE 4 TRAFFIC FLOW MAP. 3-D FIGURE $ PROPOSED STREET IMPROVEMENTS. 6-A FIGURE 6 GEOMETRIC CROSSECTIONS. 7-A II TABLE 1 PROPOSED LAND USE SECTIONAL AREAS, 2-A TABLE 2 COMPARISON OF TOTAL TRAFFIC GENERATION REVISED PLAN-ADoPTED PLAN 3-A APPE ND I gFg APPENDIX SUBJECT P_.A.G.E APPENDIX A BONITA LONG CANYON ESTATES. 9 APPENDIX B SANDAG TRAFFIC GENERATION RATES 10 APPENDIX C CHULA VISTA TRANS, SURVEY 11 APPENDIX D CHULA VISTA TRANSPORTATION STUDY TRAFFIC ANALYSIS ZONES. 12 APPENDIX E CHULA VISTA TRANPORTATION 1995 ASSIGNMENT DAILY TRAFFIC VOLUMES 13 IV BONITA LONG CANYON ESTATES TRANSPORTATION ANALYSIS MCMILLIN DEVELOPMENT, INC,, RETAINED URBAN ASSOCIATES, INC,, (USA, INC.) TO REASSESS POTENTIAL TRANSPORTATION IMPACTS FOR THE 650 ACRE BONITA LONG CANYON PROJECT. TO ACCOMPLISH THIS OBJECTIVE, THE PREVIOUSLY APPROVED SPA PLAN AND THE MODIFIED PLAN WERE COMPARED, THEN A NEW TRAFFIC GENERATION DISTRIBUTION AND ASSIGNMENT FOR THE MODIFIED PLAN WAS COMPLETED. NEXT PROJECT IMPACTS AND MITIGATION WERE IDENTIFIED AND EVALUATED. BOTH CUMULATIVE AND PROJECT PHASING TRAFFIC IMPACTS WERE EVALUATED. THIS REPORT SUMMARIZES THE RESULTS OF THE PROJECT IMPACT AND MITIGATION ANALYSIS. FISURE ~ SHOWS THE APPROXIMATE PROdECT BOUNDARY AND LOCATION. AS CAN BE OBSERVED FROM THE FIGURE, THE PROJECT IS GENERALLY LOCATED EAST OF 0TAY LAKES ROAD AND NORTH OF H STREET. IN ORDER TO ADDRESS PROJECT CHANGES, IMPACTS AND MITIGATION. THIS REPORT IS DIVIDED INTO THE FOLLOWING SECTIONS: THE PROPOSED PROJECT TRIP GENERATION. DISTRIBUTION AND ASSIGNMENT IMPACT AND MITIGATION ANALYSIS CONCLUSIONS - 1 BONITA ~,,~ ~, ,~ .-'CT 33 FIGURE 1 PROdECT LOCATION ~CE: B, sr ~ r.~ BONITA LONG CANYON ESTATES AERIAL PHOTO-~P ~K, ~E d~u*n~ 1, 1984 7/e~ ~ (l-A) BONITA LONG CANYON _STATES URBAN SYSTE,-,~ ASSOCIATES, INC, SEPTEMBER 9, 1985 THE PROPOSED PRO,JFCT THE BONITA LONG CANYON ESTATES PROPOSED SPA REVISION IS VERY SIMILAR TO THE ADOPTED PLAN, BOTH PLANS HAVE 650 ACRES OF GROSS AREA, THE SPA PLAN REVISION PROPOSES 862 RESIDENTIAL UNITS AT BUILD OUT, THE REVISED SPA PLAN, HOWEVER, AT THE REQUEST OF THE CHULA VISTA SCHOOL DISTRICT, DELETES A 15 ACRE SCHOOL SITE. SINGLE FAMILY RESIDENTIAL USES ARE PROPOSED FOR THE SITE, EACH PLAN HAS APPROXIMATELY THE SAME ACREAGES FOR PARKS, 11 ACRES, AND THE REVISED PLAN HAS 9 ACRES ALLOCATED FOR SEMI-PUBLIC FACILITIES (CHURCH). THE ADOPTED PLAN HAS NONE. TABL£ ~ SUMMARIZES PROPOSED LAND USES FOR THE PROJECT. AS AN ALTERNATIVE USE FOR THE SCHOOL SITE, THE PROJECT PROPOSES RESIDENTIAL DWELLING UNITS GIVEN A DENSITY SIMILAR TO THE SURROUNDING AREA, THIS EVALUATION ASSUMES THAT DWELLING UNITS ARE CONSTRUCTED ON THE SCHOOL SITE. APPENDIX A SHOWS THE SECTIONAL AREAS AND PROPOSED STREET SYSTEM FOR THE PROJECT. DETAILS FOR LAND USES, HOUSING TYPE AND MIX, COMMUNITY FACILITIES, UTILITIES, OPEN SPACE, DESIGN IMPLEMENTATION AND CONFORMANCE WITH THE COMMUNITY PLAN MAY BE FOUND IN THE PRECISE PLAN AND ARE NOT REPEATED HEREIN EXCEPT FOR THOSE FACTORS AFFECTING THE TRANSPORTATION SYSTEM AND ITS IMPACT OR MITIGATION. 2 - BONITA BONITA LONG CANYON LSTATES URBAN SYSTEMS ASSOCIATES, INC, SEPTEMBER 9, 1985 TRIP GENERATION. DISTRIBUTION. AND ASSIGNMENT TRIP GENERATION RATES USED FOR THIS PROJECT ARE BASED UPON THE MARCH, 1985, "RECOMMENDED WEEKDAY TRIP GENERATION RATE SUMMARY" SUGGESTED BY THE SAN DIEGO ASSOCIATION OF GOVERNMENTS, SEE .~PP£NDIX B, BASED UPON THESE RATES AND THE PROPOSED USES, THE PROPOSED PROJECT WILL GENERATE APPROXIMATELY 9035 TRIPS PER DAY. SEE ~ABL£ 2. OF THESE 9035 TRIPS, 8620 TRIPS ARE FROM RESIDENTIAL AREAS AND 415 TRIPS ARE FROM PUBLIC FACILITIES. THE GENERATED TRAFFIC WAS THEN DISTRIBUTED AND ASSIGNED TO THE LOCAL STREET SYSTEM, FiGUrE ~ SHOWS THE RESULTS OF THIS EFFORT, THE ADOPTED PLAN GENERATES 9064 TRIPS PER DAY WHICH IS 29 TRIPS MORE THAN THAT GENERATED BY THE MODIFIED PLAN, THE PRIMARY CAUSE OF THE REDUCTION IN TRIPS GENERATED FOR THE PROPOSED PROJECT, WHEN COMPARED TO THE ADOPTED PLAN, IS THE CHANGE OF A PROPOSED SCHOOL TO VERY LOW DENSITY RESIDENTIAL USES, ~AB[£ 2 ALSO SHOWS A TRIP GENERATION COMPARISON OF THE ADOPTED AND PROPOSED PLANS FOR EACH LAND USE TYPE. THE PROPOSED PLAN IS NOT SIGNIFICANTLY DIFFERENT FROM THE ADOPTED PLAN, FIGURE 3 SHOWS THE PM PEAK HOUR TRAFFIC ON CORRAL CANYON ROAD, "H" STREET AND OTAY LAKES ROAD. THE "H" STREET EVALUATIONS AND CUMULATIVE ANALYSIS IN THIS REPORT ARE BASED ON THESE PM PEAK HOUR FIGURES, FIGURE 4 SHOWS THE EXISTING ADT ON "H" STREET AND OTHER STREETS IN THE VICINITY OF THE PROdECT. ON "H" STREET WEST OF 0TAY LAKES ROAD, THE ADT IS 8600 TRIPS; 7500 ADT ON "H" STREET MIDWAY 3 - BONITA TABLE E COMPARISON OF TOTAL TRAFFIC GENERATION REVISED PLAN - ADOPTED PLAN BONITA LONG CANYON ESTATES REVISED PLAN UNITS RATE ADT RESIDENTIAL LOT 1 TO 7 862 DU 1O/DU 8620 PARK SITE llAC 5/AC 55 PUBLIC FACILITY (CHURCHES) 9,0 AC 40/AC 360 9035 TOTAL ADOPTED PLAN UNITS BATE ADT RESIDENTIAL LOT 1 TO 6 826AC 10/DU 8260 SCHOOL 15AC 50/AC 750 PARK SITE 10,8AC 5/AC 54 TOTAL 9064 9/e~ (I <' (3-A) Baylor S t r e et._t. FIGURE 2 '°sc~[tTRAFFIC DISTRIBUTION AND ASSIGNMENT BONITA LONG CANYON EStaTES .. I \1 ~f FIGURE 3 TWO WAY PM PEAK HOUR TRAFFIC BONIYA LONO CANYON ESTATES PROJECT 16.1 NO OC&L£ ~ ~'~" FIGURE 4 lAN ~E~ TRAFFIC ~OW .MAP ~OL~AN AR~ ~,~ ' MONITA LONG CANYON ESTATES ~'::m':..o.. ~..,,.,.o~,..~-, [USA] ~ ~/e~ ~ (3-D) BONITA LONG CANYON ~STATES URBAN SYSTE,.,5 ASSOCIATES, INC. SEPTEMBER 9, 1985 BETWEEN 1-805 AND OTAY LAKES ROAD; AND 8900 TRIPS EAST OF 1-805. AS PREVIOUSLY DISCUSSED, FI6UR£ ] SHOWS THE EXPECTED PM PEAK HOUR TRAFFIC FLOW ON "H" STREET WHICH IS GENERATED BY THE PROJECT. TO ESTIMATE PEAK HOUR TRAFFIC FLOW ON "H" STREET FOR EXISTING TRAFFIC, A 10% PEAK HOUR FACTOR WAS USED. BASED ON "H" STREET PEAK HOUR TRIPS GENERATED BY THE PROJECT, (225), AND EXISTING TRAFFIC, ONE CAN CALCULATE THE PM PEAK HOUR LOAD AT "H" STREET TO BE 1085, 975, AND 1115 AT OTAY LAKES ROAD, THE MIDWAY POINT, AND 1-805, RESPECTIVELY. IN THE FOLLOWING SECTION OF THIS REPORT, THE SIGNIFICANCE OF THIS LEVEL OF TRAFFIC FLOW ON "H" STREET IS DISCUSSED. ACCORDING TO THE CHULA VISTA TRANSPORTATION STUDY, IN 1995 THE PROJECT AREA TRAFFIC ANALYSIS (ZONE 216) WAS ASSUMED TO HAVE APPROXIMATELY 1422 DWELLING UNITS, (SEE ~PP£NDICES C & D). THIS NUMBER INCLUDES AREAS (A) AND (B) AS SHOWN ON APPENDIX D, WITH A TOTAL OF 101 DWELLING UNITS AND EXCLUDES SECTION (C) WITH 66 DWELLING UNITS. THEREFORE, FOR THE PROPOSED PLAN AREA THERE WILL BE 1387 TOTAL DWELLING UNITS (1422-101+66) IN 1995 WHICH IS 35 DWELLING UNITS LESS THAN FOR THE ADOPTED SPA PLAN. CORRAL CANYON ROAD, OTAY LAKES ROAD, AND "H" STREET WILL ALL BE ABLE TO ACCOMMODATE THE PROJECTED CUMULATIVE AVERAGE DAILY TRAFFIC IN 1995. THIS IS DUE TO THE FACT THAT 1422 DWELLING UNITS WERE ASSUMED IN THE CHULA VISTA CUMULATIVE TRANSPORTATION STUDY (CVCTS) AND THE PROJECT PROPOSES FEWER UNITS (862). ALSO, AS 4 BONITA BONITA LONG CANYON LSTATES URBAN SYSTEMS ASSOCIATES, iNC. SEPTEMBER 9, 1985 SHOWN IN J&d~PE#OIX D, FOR THE AREA WITHIN THE TRAFFIC ANALYSIS ZONE (TAZ) 216, AREAS A, B, WHICH ARE NOT A PART OF THE PROdECT WERE INCLUDED IN TAZ 216, BUT AREA C, WHICH IS A PART OF THE PROJECT, WAS NOT. THEREFORE, TO COMPARE THE CUMULATIVE STUDIES AND THE PROPOSED PLAN, THESE DIFFERENCES MUST BE TAKEN iNTO ACCOUNT. THE TOTAL NUMBER OF UNITS FOR THE CVCTS ASSUMED IN TAZ 216 EQUALS 1422. AREAS A AND B (42 DU PLUS 59 DU EQUALS 101 DU) SHOULD BE SUBTRACTED, AND AREA C (66 DU) ADDED TO THE CVCTS TOTAL BEFORE COMPARING WITH THE PROPOSED PLAN. THE DIFFERENCE IN THE NUMBER OF UNITS ASSUMED FOR THE CVCTS VERSUS THE PROPOSED PLAN IS THEREFORE 1422 - 101 + 66 1387. THIS REPRESENTS A SIGNIFICANTLY HIGHER ESTIMATE OF DEVELOPMENT FOR THE AREA WHEN COMPARED TO WHAT IS ACTUALLY BEING PROPOSED, I.E. 1387 862 525 FEWER uNITS. BONITA BONITA LONG CANYON .STATES URBAN SYSTL. J ASSOCIATES, INC. SEPTEMBER 9, 1985 PLANNED IMPROVEMENTS FOR ARTERIAL STREETS IN THE PROJECT AREA WILL BE ADEQUATE BECAUSE THE DECREASE IN AVERAGE DAILY TRAFFIC FROM THE REVISED PROdECT DOES NOT CREATE SIGNIFICANT IMPACTS EXCEPT WITHIN THE PROdECT WHERE IMPACTS ARE MITIGATED AS THE RESULT OF THE CONSTRUCTION OF NEW STREETS SEE FIGUR£ 5. CORRAL CANYON ROAD IS PROPOSED TO BE IMPROVED AS A FOUR LANE COLLECTOR ROAD, CURB TO CURB WIDTHS ON THESE TYPES OF ROADS WILL BE AT LEAST 64 FEET AND RIGHT-OF-WAY WIDTHS ON THESE ROADS WILL BE AT LEAST 80 FEET. THE INTERSECTION OF CORRAL CANYON ROAD AND "H" STREET WILL REQUIRE SIGNALIZATION IN THE FUTURE. HOWEVER, THE CONTRIBUTION OF PROdECT TRAFFIC AT THIS LOCATION IS RELATIVELY MINOR (2000 ADT). AT THE INTERSECTION OF OTAY LAKES ROAD AND EAST "H" STREET, THE EXISTING TRAFFIC SIGNAL WILL HAVE TO BE MODIFIED TO ACCOMMODATE THE ADDITION OF A FOURTH (EAST) LEG TO THE INTERSECTION. "H" STREET TRANSITIONS FROM A FOUR LANE MAJOR EAST OF OTAY LAKES ROAD TO A SlX LANE MAJOR WEST OF OTAY LAKES ROAD. THE CONTRIBUTION OF PROJECT TRAFFIC TO "H" STREET WEST OF OTAY LAKES ROAD IS RELATIVELY MINOR. AS DISCUSSED EARLIER IN THIS REPORT, ABOUT 340 PM PEAK HOUR TRIPS WOULD BE ADDED TO "H" STREET MIDWAY BETWEEN 1-805 AND OTAY LAKES ROAD. THIS ESTIMATE IS BASED ON A PROJECTED CUMULATIVE AVERAGE DAILY TRAFFIC FLOW OF 27,500 (SEE 6 - BONITA .. I \1 NO SCALE FIGURE ~ PROPOSED ~TREET IMPROVEMENTS ~ ~ L~ BONITA LONG CANYON ESTATES ~ L~ O~ector o/e,¢C, (6-A) BONITA LONG CANYON ~STATES URBAN SYSIEmS ASSOCIATES, INC, SEPTEMBER 9, 1985 JI~J~PENDIX E) AND A 10% PEAK HOUR FACTOR. SINCE THE PROJECT PROPOSES SIGNIFICANTLY FEWER UNITS (862) THAN THAT ASSUMED FOR THE CVCTS (1387) FOR THE SAME AREA, THE CUMULATIVE IMPACTS ON "H" STREET WILL BE LOWER THAN THOSE PROJECTED. LOCAL STREETS IN THE PROPOSED PROJECT SHOULD BE TWO LANES WITH A CURB TO CURB WIDTH OF AT LEAST 36 FEET WITHIN A RIGHT-OF-WAY OF 56 FEET. WITH THESE RECOMMENDED IMPROVEMENTS, THE PROPOSED PROJECT WILL ACCOMMODATE PROdECTED TRAFFIC FLOWS AT A REASONABLE LEVEL OF SERVICE. FIGUR~ 6 SHOWS RECOMMENDED GEOMETRIC CROSS SECTIONS FOR MAJOR, COLLECTOR AND LOCAL STREETS. 7 - BONITA (7-A) BONITA LONG CANYON LSTATES URBAN SYSTEMS ASSOCIATES, INC. SEPTEMBER 9, 1985 BY COMPARING TRIP GENERAIlON FOR THE REVISED PLAN AND ADOPTED PLAN, THE REVISED PLAN GENERATES 29 FEWER DAILY TRIPS. THEREFORE, THE AVERAGE DAILY TRAFFIC FLOW FROM THE REVISED PLAN WILL NOT VARY SIGNIFICANTLY FROM THAT GENERATED FROM THE ADOPTED PLAN. CONSEQUENTLY. IMPACTS AND MITIGATION FOR THE PROJECT REMAIN UNCHANGED. OVER THE LONG TERM, BASED ON THE CVCTS. IMPACTS OF THE PROdECT ON MAdOR STREETS WILL BE MUCH LOWER THAN THOSE PROdECTED. 8 BONITA QSECTIONAL AREAS - ! APPENDIX A , BONITA LONEI CANYON ESTATES 9/85CC -9- _ CHUL.A VIB?A TRANSPORTATION BTUDY LAND U~E D~TA Z~ L~D ~E 1995 2005 ~ER(a) CODE LAND ~E ~ITB(b) UN]TB(b) 130 HULT[FAH~LY ~ZTB ~27.0 227.0 · 30 OTHER RETAIL 3.7 3.7 212 23 E~E~NT~RY-~ SCHOOL 10.0 10.0 110 ~[NQLE F~H[LY UNITE 8~4.0 8&4,0 7~ P~RKS 10.0 10.0 213 23 ELEHENT~Y-~ BC~ tO. 0 10.0 110 SINGLE FAH[LY UN~TB ~.0 64B. O 765 PARKS 10.0 tO.O 2t5 110 SINGLE FAHILY UNIT~ 515.0 515.0 2t6 23 ELEHENTARY-~ ~CHOOL 10.0 10.0 110 ~ZNG~ FA~]LY UNITE 1422.0 1422. 0 7~5 PARKS tO.O tO.O 2lB 110 ~[NQLE FAMILY ~[T~ 470.0 470.0 219 110 8INGLE FAH[LY ~[TE 646.0 646.0 220 110 ~INGLE FAH]LY UNITS 5680 5680 221 110 EINOLE FAHILY UNITS 72.0 72.0 130 MULTIFAMILY UNITS 262.0 262.0 530 OTHER RETAIL 11,0 11.0 765 P~KS 196.5 196.5 223 110 SINGLE FAMILY UNITS 740.0 740.0 224 110 ~INOLE FAMILY UNITS 389.0 389.0 520 ~H~PINQ CENTER &7.2 &7.2 765 PARKS 159.8 159.8 225 110 8INOLE FAMILY ~ITS 228.0 228.0 22& 110 ~INGLE FAMILY UNITS 533.0 ~33.0 720 COMMERCIAL REC. 73.5 73.5 765 P~KS 110.2 110.2 227 23 ELE~NTARY-~ SCHOOL 10.0 100 110 ~I~LE F~ILY ~ITS 1~.0 100.0 ~30 OT~R RETAIL 11,9 11.9 765 PARKS EO.O 228 110 SINGLE FAMILY ~IT8 422.0 422.0 (a) Chula Vista studu zones net containing tzip geneeatlng tUpe land use net be the~ In this table, (b) Fe~ ~estdentlal lind ule the units a~e d~elling~, tOT non-~elidenttel Z~nd ule the u~its refer to ac~es. Vlcant lind, f~ee~a~ ind It~elt schlage, epen 7/e~ ~ . ) ] EXHIBIT F HYDROLOGIC AND HYDRAULIC ANALYSIS LONG CANYON WATERSHED BONITA LONG CANYON ESTATES PREPARED FOR THE GERSTEN COMPANIES AUGUST 1981 (REVISED MARCH 1982) TABLE OF CONTENTS Page No. 1 Authorization ......... 1 Purpose and Scope ........ Characteristics of the Study Area 2 Drainage Basin Boundaries 4 Hydrologic Procedures · 6 Hydrologic Parameters · 6 Soil Characteristics 6 6 Land Use ..... 7 Curve Numbers · · Precipitation Zone 8 Rainfall Intensities 9 9 Storm Patterns · . Time of Concentration 9 Peak Flood Flow Computations 9 12 Discussion ........ Conclusions and Recommendations - Hydrology 14 ~ Evaluation of Proposed Floodwater Retarding Reservoir · 15 TABLE OF CONTENTS (CONT.) Page No. TABLES No. 1 Areas of Subbasins ............... 4 2 Curve Numbers (AMC 2) .............. 8 3 Conversion of AMC 2 Curve Numbers to AMC 2.5 ..... 8 4 Estimated lO0-Year Peak Flood Flows - (6-hr. Duration Storm) .............. lO. 4A Estimated lO0-Year Peak Flood Flows - (24-hr. Duration Storm) ........... 10 5 Estimated Runoff Volumes - lO0-Year Flood Flows (6-hr. Duration Storm) .............. ll 5A Estimated Runoff Volumes - lO0-Year Flood Flows (24-hr. Duration Storm) ............. ll 6 Comparison of Estimated lO0-Year Peak Flood Flows . . . 14 7 Floodwater Retarding Reservoir - Elevation-Capacity-Surface Area ........... 17 8 Emergency Spillway Peak Flows (Stage 3 Development, C.P. 2) ........... 18 9 Peak Flood Flow Reductions With -'~ Floodwater Retarding Reservoir ......... 19 FIGURES No, 1 Vicinity Map .................... 3 2 Drainage Basin Boundaries ............ 5 3 Elevation-Capacity-Surface Area ......... 16 Floodwater Retarding Reservoir 4 Principal Spillway Hydraulic Design ...... 21 PLATES No. 1 Bonita Long Canyon Estates Development Plan HYDROLOGIC AND HYDRAULIC ANALYSES iF LONG CANYON BASIN FOR BONITA LONG CANYD~ ESTATES Authorization. The hydrologic analysis was authorized by an a~reement between Boyle Engin- eering Corporation and the Gersten Companies, ~e developers of Bonita Long Canyon Estates, dated March 20, 1981. Additim-al studies were authorized by supplemental agreements. P_urpose and Scope. The purpose of the hydrologic analysis is to e~cimate the peak flood flows that will occur in Long Canyon Basin under th-~e stages of development. This will provide a basis for estimating the ~-creases in runoff that will be caused by development. The three stages c~ ~evelopment considered are: a. Existing development b. Existing development plus the development :f Bonita Long Canyon Estates c. Full development Peak flood flows and design hydrographs for t-e lO0-year return period flood were developed at critical points in the basi- for each of the three stages of development. Volume estimates were made o- the bases of these hydrographs. . Hydraulic analyses were made to evaluate the effectS of floodwater retarding reservoirs in reducing peak flood fl~ws at various concentration points in the watershed. -1 Characteristics of the Study Area The Long Canyon basin is located in the South Bay area of San Diego, approxi- mately two miles south of the Sweetwater Reservoir dam. The basin is partly within the city limits of Chula Vista and the parts not in the city are with- in Zone 3 of the County of San Diego Flood Control District. The location of the basin is shown on the Vicinity Map (Figure 1). The basin encompasses a drainage area of 1.72 square miles. It is known as Long Canyon because the major stream extends the full length of the basin's relatively narrow valley for a distance of 3.3 miles. The oldest existing development in the basin is in the canyon bottom along. Acacia Avenue which extends 1.1 miles upstream from the basin mouth. In recent years, development has occurred on the valley slopes in the lower portion of the basin adjacent to the older development. Presently, the areas adjacent to Acacia Avenue are fully developed on both sides of the valley. The remainder of the basin is undeveloped except for small areas along the southwest slope on the ridge line. The Gersten Company's development plan, Bonita Long Canyon Estates, is a proposed residential community that will occupy 520 acres of the Long Canyon Basin immediately upstream of Acacia Avenue. The development plan is shown on Plate 1. It occupies a gross area of 650 acres. The 130 acres of the development not in Long Canyon Basin are located in small unnamed basins northeast of Long Canyon. The development includes 865 dwelling units with average lot sizes varying from lO,O00 to 25,000 square feet. With large OCEANSIDE VISTA CARLSBAD SAN F-SCONDIDO LEUCADIA ENCINITAS CARDIFF SOLANA BEACH SAN DIEGO COUNTY DEL MAR LA JOLLA PACIFIC BEACH EL CAJON PACIFIC 0 VlST FIGURE VICINITY MaP I open spaces left natural, flood plain reserves, park, and school areas in- cluded in the development, the overall density is 1.33 dwelling units per acre. ~raina~e Basin Boundaries The drainage basin boundaries used in this analysis are shown on Figure 2, including the boundaries of subdrainage areas contributing to runoff at each concentration point. Basin boundaries within Bonita Long Canyon Estates are also shown on Plate 1. The boundaries of the total basin follow the natural geographic divide around the perimeter of the basin except along the northeast ridge of subbasin 4. It was assumed that runoff from this area would not enter Long Canyon but would be conveyed to a separate discharge point into the Sweetwater River. The only runoff from this area included in this analysis is that which falls directly on the slope banks i~ediately adjacent to Long Canyon. The subbasin boundaries also follow natural geographic features generally. They are modified somewhat by development patterns such as street align- ments and drainage paths. Areas of the subbasins are shown in Table l. TABLE 1 AREAS OF SUBBASINS Subbasin No. Area (Square Miles) 1 0.60 2 0.65 3 0.13 4A 0.25 4B 0.09 Total 1.72 - 4 - Hydrologic Procedures The hydrologic procedures used in this analysis are in accordance with the standards of the County of San Diego, Department of Sanitation and Flood Control as described in their Hydrology Manual (November, 1975). The hydrologic computations for this analysis were performed on a digital computer with the use of a program developed by the U.S. Department of Agri- culture, Soil Conservation Service (SCS). The computer program is entitled "Project Formulation - Hydrology." It is described in publication TR-~O and is based on hydrologic procedures described in the SCS National Engineer- ing Handbook, Section 4. Hydrologic Parameters Soil Characteristics Soil characteristics were determined from "San Diego County Soils Interpre- tation Study" maps published by CPO (1969) which are based on SCS data. The maps used are from the series entitled, "Hydrologic Soil Groups - Runoff Potential." Based on these maps, soils within the basin are generally in hydrologic soil groups C and D which have high to very high runoff potential. Land Use Land use in the basin was also determined from the "San Diego County Soils Interpretation Study" maps. The maps used for this purpose are entitled "Ground Cover-Vegetative and Man Made." It was necessary to update these 1969 maps to reflect current development in the basin. Otherwise, the maps were considered representative of existing conditions. - 6 - Curve Numbers The amount of direct runoff to be expected from a specific storm is dependent upon soil characteristics and the surface use of the land. An evaluation of these two characteristics is the basis for assigning curve numbers to watershed areas. The numbers are an index to the runoff potential from each area. The higher the number, the greater the amount of direct runoff to be expected from a storm. In addition to soil and cover combinations, curve numbers are affecte~ by antecedent moisture conditions. The greater the amount of rainfall occurring within about three days prior to a storm, the higher the antececent moisture condition will be. Three levels of antecedent moisture condition are identi- fied as: AMC 1 - lowest level of preceeding rainfall AMC 2 - average level of preceeding rainfall AMC 3 - highest level of preceeding rainfall Curve numbers for the Long Canyon basin were selected from the charts in the San Diego County Hydrology Manual on the basis of soil and cover combinations and antecedent moisture condition 2 (AMC 2). The curve numbers selected for each of the stages of development are shown in Table 2. -7- TABLE 2 CURVE NUMBERS (AMC 2) I Stage of Development ~m Subbasin Area (SQ. MI.) Stage I Stage 2 Stage ~ I 0.60 83 85 86 2 0.65 82 86 86 3 0.13 82 86 86 4A 0.25 87 87 87 4B 0.09 87 87 87 Notes: lo Stage 1 indicates existing development. 2. Stage 2 indicates existing development plus Bonita Long Canyon Estates. 3. Stage 3 indicates ultimate development. Precipitation Zone Precipitation zone values are used by the county to represent the antecedent moisture condition expected in a given area. A chart in the county manual shows that Long Canyon basin lies in Precipitation Zone 1.5, indicating an antecedent moisture condition half way between levels AMC 2 and AMC 3. To convert the AMC 2 curve numbers given in Table 2 to represent AMC 2.5, another chart in the county manual was used that shows conversions of AMC 2 values to AMC 1 and AMC 3. Values in this chart were averaged between the AMC 2 and AMC 3 conditions to obtain values representative of AMC 2.5. The conversions are shown in Table 3. TABLE 3 CONVERSION OF AMC 2.CURVE NUMBERS TO AMC 2.5 AMC 2 AMC 2.5 82 87 83 88 84 89 85 90 86 90 87 91 - 8 Rainfall Intensities Rainfall intensities were determined from charts in the County Hydrology m Manual. Values for storms with both 6-hour and 24-hour durations and a return period of 100 years were obtained. Storm Patterns Storm patterns were determined from charts in the County Hydrology Manual. The 6-hour pattern "B" and 24-hour pattern "B" were used in accordance with the instructions in the manual. Time of Concentration The time of concentration was estimated for each subbasin using the Corps of Engineers empirical equations described in the county manual. This value represents the time it takes for water to travel from the hydraulically most remote point in the watershed to the watershed outlet. Peak Flood Flow Computations The various hydrologic parameters were determined in accordance with the above-described criteria for use by the SCS Computer program. Drainage areas, times of concentration, storm pattern, rainfall amounts, and curve numbers were entered into the program. Peak flow rates and runoff volumes computed are shown in Tables 4, 4A, 5, and 5A. Stage 1 indicates existing development, Stage 2 indicates existing development plus Bonita Long Canyon Estates, and Stage 3 indicates ultimate development. TABLE 4 ESTIMATED PEAK FLOOD FLOWS-IOO-¥EAR RETURN PERIOD (6-Hour Duration Storm) Stages of Development ii Accumulative St---age IStage 2 Stage Subbasin Area (sq. mi.) (cfs) (cfs) (cfs), I 0.60 440 570 640 2 1.25 910 ll80 1300 3 1.38 960 1270 1430 .... 1680 4A 1.63 .... 4B 1.72 1270 1590 1770 TABLE 4A ESTIMATED IO0-YEAR PEAK FLOOD FLOWS (24-Hour Duration Storm) Stages of Development Stage 2 Stage Subbasin Accumulated ~tage 1 No. Area (sq. mi.) (cfs) (cfs) (cfs) 1 0.6 340 360 370 2 1.25 700 760 770 3 1.38 770 830 850 .... lO00 4A 1.63 --- 4B 1.72 980 1040 1060 TABLE 5 ESTIMATED RUNOFF VOLUMES.- IO0-YEAR RETURN PERIOD (6-Hour Duration Storm) Stages of Development Su'~basin Accumulated Stage 1 Stage 2 Stage 3 No. Area (sq. mi.) (In.) (Ac. Ft.) (In.) (Ac. Ft.) (In.) (Ac. Ft.) 0.60 1.73 55 1.89 60 1.89 60 1.25 1.69 113 1.89 126 1.89 126 1.38 1.68 124 1.89 139 1.89 140 ~A 1.63 .............. 1.90 166 ~ 1.72 1.72 160 1.91 178 1.91 175 TABLE 5A ESTIMATED RUNOFF VOLUMES - IO0-YEAR RETURN PERIOD (24-Hour Duration Storm) Stages of Development Subhasin Accumulated Stage 1 Stage 2 Stage 3 N~. Area (sq. mi.) (In.) (Ac. Ft.) (In.) (Ac. Ft.) (In.) (Ac. Ft.) 1 0.6 3.04 97 3.26 104 3.27 105 2 1.25 3.00 200 3.26 217 3.27 ~18 3 1.38 3.00 221 3.26 241 3.26 242 4A 1.63 .............. 3.28 286 41~ 1.72 3.06 282 3.28 301 3.29 302 Discussion The Long Canyon Basin has been a recognized flood problem area for many years. It has been studied separately, or included in the study areas of larger anal- several times in the last decade. There are no stream gages in the yses, basin or other measured flow data. Two previous studies performed by Boyle Engineering Corporation included the Long Canyon Basin. One study was prepared in 1975 for Zone 3 of the San Diego County Flood Control District. It was entitled "Comprehensive Plan for Flood Control and Drainage." The other study was prepared in August 1980 for the city of Chula Vista and was entitled "Chula Vista Golf Course Drainage Study." The results of both of these previous studies can only be compared indirectly to this study. The "Comprehensive Plan for Flood Control and Drainage" did not consider Long Canyon as an individual hydrologic unit but rather as a part of a larger unit. Peak flow rates were not computed for Long Canyon by itself so consequently, there isn't any flow data in the report to use for comparisons. There are, however, other hydrologic relationships that can be compared as the analyses were made similar to this study. The curve number value used was 94 under an AMC 3 condition which corresponds to a curve number value of 86 under an AMC 2 condition. This value was selected to represent 1990 development as described in the report. Table 2 shows that curve numbers selected for "stage 3" develop- ment level in this report are 86 for subbasins 1, 2, and 3, and 87 for subbasin 4. As 1990 development levels roughly correspond to "stage 3" development levels considered in this report, there is very close agreement between this report and the "Comprehensive Plan for Flood Control and Drainage" report on the curve number value. - 12 - In the "Chula Vista Golf Course Drainage Study" peak flood flows estima~ to occur on an average of once in 2, 5, and 10 years were computed for tributaries of Sweetwater River below Sweetwater Dam, including the Lone Canyon basin. The peak flood flows computed are not directly comparabl~ to the results obtained with this study because this study estimates thc flood flow expected to occur on an average of once in 100 years. The ¢~ '~ number value used was 86 under AMC 2 condition which corresponds to the values used in this study as shown in Table 2. The curve number used w~, intended to also represent 1990 level development, corresponding to "~t~.~' 3" level development considered in this report. Another study was prepared in 1975 for the San Diego County, Department Sanitation and Flood Control by The Barbour Engineering Company, Inc. "~' study was entitled "General Plan for Flood Control and Storm Drainage im~'~,e- ments for Long Canyon Basin (Bonita Area) Zone 3." It included estimate~ peak flows expected to occur on an average of once in 100 years along wiS' recommendations for flood control improvements. The method of analysis ~"~ for the hydrology is known as the Modified Rational Method. That method basically different from the SCS method used in this analysis and involve' entirely different hydrologic parameters. However, the peak flow rates computed can be compared to the peak flows computed in this study as the) are both lO0-year return interval values. Table 6 shows the lO0-year peak flood flows estimated in the Barbour report compared to those estimated in this study. It was assumed that these estimates were based on condi- tions with ultimate development. The "stage 3" level of development in report is for conditions with ultimate development. - 13 - TABLE 6 COMPARISON OF ESTIMATED IO0-YEAR PEAK FLOOD FLOWS  Stage 3 (Table 4) "1975 Barbour Study" Subbasin (cfs) (cfs) 1 640 834 2 1300 1389 3 1430 1747 4A 1680 2004 4B 1770 2096 Conclusions and Recommendations - H~drolo~ 1. The analyses performed in this study are in close agreement with similar analyses performed in previous studies. The hydrologic parameters corre- lated very closely and if the earlier studies had required the development of lO0-year peak flood flows in Long Canyon, values very close to those presented in this report would have been generated. 2. The modified rational calculations in the 1975 Barbour Report do not correlated closely with the results obtained in this study but are con- sistently higher. The modified rational method represents a simplified analysis from which conservatively high values of runoff are obtained. 3. The lO0-year return period peak ~low rates estimated in this current anal- ysis and summarized in this report are recommended for use in planning flood control improvements for this area. - 14 - Evaluation of Proposed Floodwater Retarding Reservoir The opportunities for reducing peak flood flows in the watershed downstream from concentration point 2 by floodwater retarding reservoirs were evaluated. A floodwater retarding reservoir located at concentration point 2, as shown on Figure 2, appears to be feasible and desirable as a component of a flood control system for the lower part of the watershed. The total drainage area above this concentration point is 1.25 square miles. The estimated peak flood flows and volumes for the lO0-year return period flood (24-hour and 6-hour duration storms) are shown on Tables 4, 4A, 5, and 5a). The elevtion-capacity-surface area curves for a floodwater retarding reservoir at concentration point 2 are shown on Figure 3 and these relationships are tabulated on Table 7. With a 57-inch diameter principal spillway outlet from the floodwater retarding reservoir, the 1300 cfs peak flow for the lO0-year return period 6-hour duration storm could be reduced to 420 cfs at concentration point 2. The peak flows would be reduced at all concentration points downstream. This would require 49.1 acre-feet of storage capacity in the reservoir to provide a reduction to 710 cfs from the 24-hour duration storm. A lesser capacity of 39.2 acre- feet would reduce the peak flow at concentration point 4B from 1770 cfs to 890 cfs for the 6-hour duration storm. o 15 - 0 TABLE 7 FLOODWATER RETARDING RESERVOIR ELEVATION-CAPACITY-SURFACE AREA Storage Surfaqe Elevation Capacity Area (feet) (Ac-Ft) (Acres) 280 84.5 5.23 78 74.4 4.85 65.2 4,42 76 74 56.8 3.99 72 49.1 3.65 270 42.1 3.38 68 35.6 3.10 66 29.7 2.85 64 24.2 2.59 62 19.3 2.36 260 14.8 2.14 58 10.7 1.93 56 7.1 1.72 54 3.9 1.50 252 1.1 1.27 251 --- .96 (Revised Feb. 1982) A roadway will pass over the top of the dam. This roadway will be graded to the cross section of the emergency spillway which will have the shape of a highway vertical curve. The low point in the spillway section (crest) is at elevation 272.0 feet. Since the dam is located in an urban area it must be designed to Class C structure standards. The emergency spillway and freeboard hydrographs were estimated for a Class C structure in accordance with procedures specified in San Diego County Flood Control Districts "Design and Procedure Manual.;' Table 8 tabulates the estimated peak flows and volumes for these hydrographs along with the lO0-year 6-hour duration storm precipitation amounts and the water surface elevations that would occur in the emergency spillway section. TABLE 8 EMERGENCY SPILLWAY PEAK FLOWS (STAGE 3 DEVELOPMENT, C.P. 2) Emergency Precip. Runoff Water Surface Spillway 6-Hour Volume Elevation Peak Flow Hydrograph (In.) (Ac. Ft.) (ft.) (cfs) Spillway 5.55 297 275.7 2,400 Freeboard 13.10 789 278.4 7,100 Table 9 su~narizes the Stage 3 peak flood flow reductions with a floodwater retarding reservoir. The table also'shows the estimated peak flows under' conditions of existing development (stage l) for the 24-hour and 6-hour duration storms. TABLE 9 PEAK FLOOD FLOW REDUCTIONS WITH FLOODWATER RETARDING RESERVOIR 57" Diameter Peak Flows Unretarded Principal Spillway Stage 1 Stage 3 Basin No. 2 24-hr. 6-hr. 24-hr. 6-hr. 24-hr. 6-hr. Basin No. Storm Storm Storm Storm Storm Storm c.P. (cfs) (cfs) (cfs) (cfs) (cfs) (cfs) I 340 440 370 640 370 640 2 700 910 770 1300 455 420 3 770 960 850 1430 510 540 4A 1000 1680 650 800 4B 980 1270 1060 1770 710 890 Water surface elev. in reservoir (feet) 272.0 269.1 Storage capacity required (ac. ft.) 49.1 39.2 Emergency spillway crest elev. (feet) 272.0 272.0 Reservoir capacity at emerg, s.w. crest (ac. ft.) 49.1 49.1 Excess capacity (ac. ft.) None 9.9 Figure 4 shows the hydraulic design dimensions required for the principal spillway. At the time of structural design of the principal spillway, trash rack requirements should be considered. To drain the bottom two feet of the reservoir below the low-stage inlets a subsurface drainage system in the reservoir with an outlet into the principal spillway riser below elevation 251 may be a practical solution. An alternative solution could be to con- struct small weep holes in the riser at elevation 251. The weep holes must be protected from allowing sediment to pass through or plug them. The estimated effects of this floodwater retarding reservoir are summarized as follows: 1. Peak flood flows for the lO0-year return period storm under conditions of ultimate development of 1770 cfs could be reduced to 890 cfs, or by about 50 percent. 2. This reduced peak outflow of 890 cfs is about 70 percent of the estimated peak flood flow for the lO0-year return period storm that would occur under conditions of existing development (1270 cfs). 3. The peak outflow from the Bonita Long Canyon Estates (concentration point 3) would be reduced to about 540 cfs which is about 55 percent of the peak outflow estimated for conditions of existing development at this concentration point (960 cfs~. 4. The reservoir will trap sediment and prevent its deposition in the downstream reach of channel. - 20 - City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 1 4b. PUBLIC HEARING: Consideration of tentative map for CVT-86-3, Bonita Lon9 Canyon, Units 2 through 7 A. BACKGROUND The Developer has filed a tentative map identified as Bonita Long Canyon, CVT-86-3 and is proposing to subdivide approximately 569 acres as follows: 663 single family lots (average lot size 17,253 sq. ft.) 2 lots (for religious use), approx. 9 acres 1 community recreation lot, approx. 1.3 acres 1 park site, ll acres 1 water tank site, l-l/2 acres B. RECOMMENDATION Based on the findings contained in Section D of this report, adopt a motion recommending that City Council approve the Tentative Subdivision Map for Bonita Long Canyon Area, Units 2 through 7, reference CVT-86-3, subject to the following: 1. The developer shall make the following revisions to the map. a. Include CVT-86-3, Units 2 through 7 in the title of the cover sheet. b. Following pages 23 of the Subdivision Manual in regard to general notes #3, #15, #16, #19, and #21. c. In the legal description of the cover sheet, add "all of Quarter Section 20" before the last paragraph. d. On the typical cross sections for internal streets shown on the cover sheet, the correct dimensions are 36 feet and 56 feet only. Remove the 32 ft. and 52 ft. dimension shown and the word "or." e. On the typical cross section show the property lines, 2% cross slopes and the level lines and appropriate stations as marked on the cover sheet. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 2 f. Add the following notes on the cross sections. l) 5.5 ft. tree planting and maintenance easement adjacent to the property lines. 2) 6 inch monolithic curb, gutter, and sidewalk. 3) Pavement and base thickness per City requirements. 4) Remove the word "Rutgers" below Corral Canyon Road. 2. The following comments shall apply to sheets 2 through 7. a. Give the centerline radii for all curbs along the streets. b. Change the 52 ft. right-of-way width to 56 feet. c. For street grades 7% or more, show the proposed grade within the street intersections. d. Show the outlines of all sanitary sewer and drainage easements on all the streets. e. Make all existing contour elevations clear so they may be easily read. f. All lots should be perpendicular radial to the street center lines unless otherwise approved by the City Engineer. g. Show a typical cross section (including the median for streets z-z shown on Sheet 2. 3. The following are Conditions of Approval for the Tentative Map. a. The developer shall grant to the City 5.5 ft. street tree planting and maintenance easement on both sides of all internal streets b. The developer shall acquire and grant to the City off-site drainage and sewer easements as determined by the City Engineer as determined by the City Engineer prior to the approval of the affected final map. c. Metal beam guard rails shall be provided in the fill slopes over 10 feet in height adjacent to Corral Canyon Road and Otay Lakes Road. d. The minimum width of any residential street should be 56 feet and the minimum width for residential collector streets should be 60 feet both as shown on Chula Vista Sign Standards #1. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 3 e. The minimum centerline radius for a residential street in moderate terrain shall be 200 feet. Corral Canyon Road should have a minimum radius of 500 feet. Between M Street and D Street, the design of C Street should be based upon a stopping distance for a speed of 40 miles per hour. f. The developer will need to satisfy all the requirements of the San Diego Gas and Electric within the 250 ft. easement before any grading is permitted in this area. The City has received a letter of concern from SDG&E dated September 25, 1985, in regard to grading in the new Corral Canyon Road. g. There should be a maximum 6~ street grade at intersections for each street within 50 ft. of the nearest curb line. h. The minimum radius from the center of any cul-de-sac to the face of curb shall be 40 feet. The minimum radius to property line should be at least 50 feet. i. Compound horizontal curbs and reverse curbs shall not be used unless approved by the City Engineer. j. Corral Canyon Road should be superelevated as determined by the City Engineer. k. All recommendations included in the soils report for this project should be incorporated into the project plans. 1. The developer should be responsible for dedication for right-of-way and construction of improvements in Corral Canyon Road within the project boundaries to collector street standards. Said improvements shall include but not be limited to A.C. pavement, base, monolithic curb, gutter and sidewalk, street lights, and street trees, and the right-of-way should be 84 ft. in width, or fully within the project boundaries. m. All off-site grading and off-site improvements within private property shall require a letter of permission from the property owners allowing the work to be done. m. Otay Lakes Road should be improved prior to the occupancy of any dwelling units within Unit #2, the Bonita Long Canyon Subdivision. The 5 ft. wide concrete sidewalk shall be constructed and 250 watt HPSV street lights shall be installed along the approximately 1,400 ft. length. The exact number will be determined by the City's Traffic Section. n. The lot shall be so graded as to drain to the street. Drainage shall not flow over slopes. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 4 o. The developer shall provide access for emergency vehicles between the ends of the cul-de-sac B and L as mentioned in the Conditions of Approval of the 1981 SPA plan. p. The developer shall grant a l0 ft. minimum sewer easement for all off-site public sewers prior to the approval of the final map. q. The maximum centerline grade for cul-de-sac street turning areas shall be 5%. r. Grade segments in excess of 12% shall not exceed 300 ft. in length. s. The developer shall participate in the off-site construction of Central Avenue as determined by the County of San Diego Department of Works and Chula Vista City Engineer. Said participation shall occur with Unit 3 of the development. t. The developer may request the reimbursement district be formed for these improvements which lie outside the subdivision boundary and provide benefit to other properties. It should be the developer's responsibility to submit to the City for approval a plan indicating improvements to be included, properties to be assessed, and method of assessment for said district. u. The developer shall participate in the construction of downstream sewer facilities as needed to ensure adequate capacity for sewage flows from the ultimate development within the Long Canyon Sewer Basin. v. In conjunction with development of Unit 2, the developer shall be responsible for off-site improvements of Otay Lakes Road northwest of this project to the extent of widening the east side to the ultimate width of 48 ft. from centerline and the construction of improvements per City Drawing #T599. Benefitting properties under Condition 21 shall be limited to those which front upon this unit. w. The developer shall enter a Development Agreement with the City wherein the developer agrees to the following (prior to approval of the first final map): 1. To pay his fair share of the cost of public improvements to be provided under the public financing plan and development agreement. 2. Not to protest the establishment of a facilities benefit assessment district. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 5 x. As specified in the Condition of the SPA plan, the developer shall be responsible for constructin§ a turn-key park totalling 6.5 acres in size. The park site shall be developed to the satisfaction of the City's Parks and Recreation Director and shall be completed with Phase III Subdivision Map development. It should be noted that a minimum one year maintenance program will be required of the applicant in conjunction with the park construction. All PAD fees normally required will waived. In addition, RCT fees may be waived in an amount equal to $5?,500 subject to the review of the proposed construction for the restroom building, backstop, and par course, as indicated to be included with this park development. As noted in the SPA plan, fees previously paid both PAD and RCT fees for Phase I now under construction will be included in this total program for consideration of waiver and credit towards the park construction. y. A minimum distance of the rear 25 ft. of each lot abutting the open space shall be evaluated for the need for fire retardant plants and irrigation systems. Said area may increase in size based upon final decision of the City subject to consultation with the City Fire Marshal. z. The requirement for under§rounding of the 69 KV line within the 250 ft. SDG&E right-of-way shall be waived. aa. The applicant shall file CC&R's to prohibit the resubdivision or reparcelling of lots within any given phase. bb. The development standards submitted by the applicant and adopted with the SPA plan shall constitute the basic height and bulk regulations to be utilized for construction within the Bonita Long Canyon subdivision. cc. Prior to construction of the water tank within the development, a landscaping plan should be submitted to the City Planning Department for approval. dd. A decorative block wall shall be installed for those lots backing up to Corral Canyon Road. Said wall to be coordinated with the design proposed for the adjacent EastLake Subdivision. Note: The wall should be located within the common open space area so as to provide for the retention and maintenance of said wall by the open space district. ee. Bollards shall be installed at the end of Acacia Street on the subject property and designed in such a manner as to allow for pedestrian and equestrian access but to preclude general vehicular access. Said design shall include reflectors facing Acacia to satisfy traffic safety needs. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 6 ff. Street C shall be modified to provide a connection to the adjacent County area identified as TM 3750 subject to working with the County to provide the necessary connection. Note: Should this connection prove to be infeasible, the developer shall provide access for emergency vehicles between the ends of cul-de-sac Street B and L. gg. The developer shall include in the development standards and record in the CC&Rs stipulation that individual property owners shall be precluded from grading the natural areas located on any individual parcel which interfaces with the common open areas dedicated on this map. Said grading shall be precluded with the exception of those lots designated as equestrian lots where an approved grading plan has been submitted to the City and approved in accordance with the adopted standards. hh. The developer shall dedicate all open space areas as identified on the tentative subdivision map and request the formation of open space maintenance district to cover the maintenance of said dedicated areas. Note: The district shall be established prior to the recordation of the final map. The neighborhood park area shall not be included within the maintenance district responsibilities since it will be part of the City's overall park maintenance program. Landscaping review of all native areas shall be required for consideration of a final landscape palette to be approved by the City's Landscape Architect. ii. The City's standard split-rail fence design shall be used where fencing is required by the City Engineer adjacent to public right-of-way areas for safety purposes adjacent to the sidewalk. jj. The City's Planning Director shall be responsible for architectural review of the rear elevations facing Corral Canyon Road for all two-story buildings. kk. A qualified paleontologist monitor shall be present during the grading activities of any Sweetwater member soils which appear in the southwestern portion of the property. A paleontologist will have the authority to temporarily halt or divert grading in and around exposed areas that contain significant natural resources. All field notes, photographs and fossil resources will be deposited at a recognized museum or repository. C. ANALYSIS 1. Existing Site Characteristics The subject 569 acre site for Phases 2 through ? of the Bonita Long Canyon development, represents the major part of the 650 acre Bonita Long Canyon SPA plan which is now under construction with Unit 1 City Planning Commission Agenda Items for Meeting of November 13, 1985 Page ? being built adjacent to East "H" Street and Bonita Vista High School. The remaining areas are located in relatively rough topography featuring a series of ridges and canyons which are bisected in the northwesterly direction by the main leg of Bonita Long Canyon which extends through to Acacia Avenue towards the north end of the development. For the most part, each of the six remaining phases are designed to set primarily on the ridge tops in an attempt to retain the canyons in this area. Part of the development towards to the northwest corner of the project drops into the canyon floor as it interfaces with the proposed retention basin which is now being constructed in that area. The property is further bisected in the opposite direction by the 250-ft. wide SDG&E power easement which extends from Otay Lakes Road through east end of the project. Much of the easement will be left in its natural state, however, small portions towards to the east end will be incorporated in the proposed park development. Lots at the east end of the project set over 100 feet above the lowest part of the canyon in that area while lots near Corral Canyon Road sit nearly 150 ft. above the main leg of Bonita Long Canyon. 2. Phasing Unit 2 which is the first phase of this development program will involve a total of 130 lots located at the east end of the project with access provided through the extension of Corral Canyon connecting with East "H" Street. Phase 3 which will follow involves llO lots will provide for the completion of Corral Canyon extending to the north and tying in with Bonita Highlands development located in the County. Thus, the completion of Phases 2 and 3 will link Telegraph Canyon Road via Rutgers Avenue and Corral Canyon with the Bonita community to the north. Phase 4 which involves some 96 lots is located towards the west end of the project and will take its access through Canyon Drive connecting over to Otay Lakes Road. Phase 5 which involves 133 lots will connect Phases 4 and 3 providing for a complete link with the circulation system looping from "H" Street to Otay Lakes down Canyon Drive and back to Corral Canyon Road. Phases 6 and ? which will follow totalling some 194 lots are more isolated towards the north end of the project. 3. Lot Size As specified in the Residential Development Standards, the minimum lot areas for Phases l, 2, 4, and 5 will feature 7,000 sq. ft. lots with phases 3, 6, and 7 increased to 8,000 sq. ft. The typical width will be 60xllO for the phases l, 2, 4, and 5, with phases 3, 6, and 7 using a 70x120 lot. The average pad sizes for the various phases in the development averages nearly ll,O00 sq. ft. and varies from 8,700 sq. ft. in phase 2 to well over 12,000 sq. ft. for phases 3, 6, and 7. Specific lots within phases 3, 6, and 7 have been designated for City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 8 equestrian lots which will provide for horses under certain circumstances listed in the standards. It should be noted that approximately 150 lots have been designated as potential equestrian parcels. However, our records indicate that in the adjacent Bonita Highlands development where some 240 lots were approved for horse ownership, only 18 lot are utilized in this manner. Thus the number of horses and corrals provided within this subdivision will be determined by the marketplace. Several areas within the subdivision where parcels are located on relatively steep terrain, substantial side slopes are created between lots which could be minimized by using a slit-house design. Examples of this would be Lots 348 through 350 and 379 through 381. The applicant has included in his development standards the option to produce side-split lots as long as the minimum standard setbacks are maintained as specified in the development standards. We are hopeful that the applicant will put forth a full fledged effort to develop the house plans which will reduce these side slopes resulting in a building design which fits more closely to the terrain. It should be noted that the applicant is also proposing to use one-story house designs on the corner lots which will make the units more in keeping with the size and bulk of the neighborhood. 4. Equestrian Trails Equestrian trails are depicted in the Bonita Long Canyon SPA Plan and should be developed in accordance with specific standards submitted by the applicant. All trails are located within the designated open space area and will be the responsibility of the open space maintenance district. 5. Parks In accordance with the City's adopted Park Standards, the applicant will be responsible for the development of a 6-1/2 acre park located adjacent to Corral Canyon Road. The total park site is approximately ll acres in size and is being designed for passive and active areas in accordance with design criteria outlined by the Director of Parks and Recreation. The applicant has submitted preliminary designs to the Parks and Recreation Commission and at present is working in concert with that group as well. As the Parks and Recreation Department as stated in the SPA Plan and in the conditions of Approval, the park will be completed with the construction of Phase 3 of the Subdivision Map. 6. Schools As noted in the SPA Plan the previous development plans proposed in 1980 for the Bonita Long Canyon area featured an elementary school site located adjacent to Corral Canyon Road. After further evaluation of the site, the Chula Vista Elementary School District City Planning Commission Agenda Items for Meeting of November 13, 1985 Page 9 has concluded that they do not wish to build a school in this location and are satisfied with the sites they have now available outside of the Bonita Long Canyon area. Both the Sweetwater High School District and the Chula Vista Elementary School District have indicated that the developer is working in good faith and is agreeable to paying the required school fees in conjunction with their present policies. 7. Miscellaneous Code Requirements a. The developer shall pay traffic signal participation fees and accordance with the City Council policy prior to the issuance for building permits. b. Developer shall pay all applicable sewer fees prior to the issuance for building permits. c. Developer shall plant street trees along Corral Canyon Road and all internal streets. Species, location, and number as determined by the City Engineer and the City's Landscape Architect. d. The developer shall underground all existing overhead facilities lying within the subdivision with the exception of the 69 KV line as noted in previous conditions. All utilities serving the subdivision shall be undergrounded. e. All grading work shall be done in accordance with the City of Chula Vista Landscape Manual and Grading Ordinance 1797 as amended. Brow ditches shall be provided at the top of slopes. f. The easements for drainage and service facilities shall be provided as determined by the City Engineer as all other roads shall be constructed for access to all off-site sanitary manholes. g. The developer shall comply with all applicable sections of the Chula Vista Municipal Code. Preparation of the final map and all plans shall be in accordance with the provisions of the Subdivision Map act, Subdivision Ordinance, and Subdivision Manual of the City of Chula Vista. D. FINDINGS 1. Pursuant to Section 66473.5 of the Subdivision Map Act, Tentative Map for Chula Vista Bonita Long Canyon (reference CVT-86-3) is found to be in conformance with the various elements of the Chula Vista General Plan based on the following: a. The site is physically suitable for the residential development and the proposal conforms to all standards established by the City for such projects. Such determination is based upon the approval of the SPA plan which is identical to the proposed tentative map. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page l0 b. The design of the subdivision will not affect the existing improvements, street service, etc. which have been designed to avoid any serious problems. The subdivision has been designed to tie into and complement existing streets and drainage systems and the sewers have been designed to handle the proposed capacities. c. The project is in substantial conformance with the Chula Vista General Plan Elements as follows: 1) Land Use - The proposed development is in keeping with the low density residential designation for which the applicant is requesting. 2) Circulation - The proposed route connections and off-site street improvements as required as Conditions of Approval will provide the necessary grid pattern to link this project to complement existing developments which abut it on all sides. 3) Housing - The proposed development is designed to provide housing in the upper-middle income range and represents an extension of the existing low density Bonita Valley development. Small lot sizes located toward the south end of the project are in keeping with the existing developments adjacent to Bonita Vista High School. 4) Conservation - The conservation element does not note any natural resources on the site. 5) Park and Recreation Open Space - The developer is retaining over half of the area in either natural or manufactured open space and is providing an ll-acre park site adjacent to Corral Canyon Road. The park area being provided is in keeping with the formula adopted by the City of Chula Vista to satisfy the City's park needs. 6) Seismic Safety - The subject property is not traversed by any known earthquake faults or traces. 7) Safety The development is located within the response time of the Chula Vista Fire Station located in Otay Lakes Road just south of "H" Street. The proposed phasing plans outlined in this subdivision will provide for direct access at all times as well as securing alternate entries to the project with the completion of the final phases. 8) Noise Those portions of the development which are adjacent to the major road will have walls provided to reduce sound attenuation. Proposed units will meet the standards specified in the Unified Building Code for noise criteria. City Planning Commission Agenda Items for Meeting of November 13, 1985 Page ll 9) Scenic Highway Site does not abut a scenic route or gateway entry, however, the combination of wall and landscaping proposed along Corral Canyon Road will tie in with the adjacent EastLake to provide an attractive linkage to the Bonita area. 10) Bike Routes The proposed project does not require any special provisions for bicycle travel. Standards adopted by the Chula Vista Engineering Dept. provide for bicycle lanes along major street routes. ll) Public Buildings -Public buildings are neither proposed nor required on the project site. WPC 2304P