HomeMy WebLinkAboutPlanning Comm Reports/1984/05/09 AGENDA
City Planning Commission
Chula Vista, California
Wednesday, May 9, 1984 - 7:00 p.m. City Council Chambers
PLEDGE OF ALLEGIANCE - SILENT PRAYER
APPROVAL OF MINUTES - Meetings of March 28 and April 25, 1984
ORAL COMMUNICATIONS
1. PUBLIC HEARING: Consideration of request for extension of
tentative subdivision map, Bonita Long Canyon
Estates, Chula Vista Tract 81-4, 1700 block
East 'H' Street - The Gersten Company
2. PUBLIC HEARING: Consideration of tentative subdivision map for
Park Vista, Chula Vista Tract 84-5, 54-66 Fourth
Avenue - Starboard Investment Company
3. PUBLIC HEARING: PCZ-84-G, Consideration to rezone 0.65 acres
located at the southeast corner Eucalyptus Court
from R-1-15 to R-l, Frank E. Ferreira
4. PUBLIC HEARING: PCZ-84-H, Consideration to rezone the easterly 293
feet of a 2.95 acre parcel located at the northeast
corner Broadway and Moss Street from C-T to R-3,
Wayne Bienhoff
5. PUBLIC HEARING: PCC-84-16, Request to construct a 136-unit senior
housing project located at the northeast corner
Broadway and Moss Street - Wayne Bienhoff
DIRECTOR'S REPORT
COMMISSION COMMENTS
ADJOURNMENT AT to the Study Session ~leeting of May 16, 1984 at 5:00 p.m.
in Conference Rooms 2 & 3
TO: City Planh...g Commission
FROM: George Krempl, Director of Planning
SUBJECT: Staff report on agenda items for Planning Commission
Meeting of May 9, 1984
1. PUBLIC HEARING: Consideration of request for an extension of tentative
Subdivision map for Bonita Long Canyon Estates, Chula
Vista Tract 81-4
A. BACKGROUND
On May 26, 1981, the City Council approved the tentative map for Bonita
Long Canyon Estates, Chula Vista Tract 81-4 in order to subdivide 81.5 acres
located on the north side of the 1700 block of East "H" Street in the P-C zone
into 199 single family residential lots and one open space lot.
The developer is requesting that the tentative map be extended for the
maximum three year extension period citing the following: l) the processing
of improvement plans and final map has included extensive coordination with
City, County and adjacent property owner; and, 2) on and off site engineering
studies such as water distribution study for the entire SPA area, including a
retention dam and a hydrologic and hydraulic analysis of the water shed.
B. RECO~4ENDATION
Adopt a motion approving a three-year extension of the tentative map for
Bonita Long Canyon Estates, Chula Vista Tract 81-4, the map to then expire on
May 26, 1987.
C. DISCUSSION
There have been no significant changes in the immediate vicinity which
affect the original conditions or findings of approval; therefore, the
extension is appropriate. No further extensions are permitted and a ne~
tentative map will have to be submitted if the map is allowed to expire.
WPC 0913P
//~ ~ 1~-~,,:-~ ~~c~_~, ,~ "
:!-'/.,~i~-~~ L'.. '--- II.II I III ' ' '/J' :
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 2
2. PUBLIC HEARING: PCS-84-5 -Consideration of tentative subdivision map
for Park Vista, Chula Vista Tract 84-5 - Starboard
Investment company
A. BACKGROUND
1. The applicant has submitted a tentative subdivision map known as Park
Vista, Chula Vista Tract 84-5 in order to develop a one-lot 43 unit
condominium project on a 1.43 acre site located at 54-66 Fourth Avenue in the
R-3 zone.
2. Am Initial Study, IS-84-17, of possible adverse environmental impacts
of the project was conducted by the Environmental Review Coordinator on
January 23, 1984. The Environmental Review Coordinator concluded that there
would be no significant environmental effects and recommended adoption of the
Negative Declaration.
B. RECOMMENDATION
1. Find that th is project will have no significant environmental impacts
and adopt the Negative Declaration issued on IS-84-17.
2. Based on the findings contained in Section "E" of this report, adopt
a motion recommending that the City Council approve the tentative subdivision
map for Park Vista, Chula Vista Tract 84-5, subject to the following
conditions:
a. The developer shall remove existing driveway approaches and
replace with monolithic curb, gutter and sidewalk, except at the new driveway
location. The new driveway shall be an alley type driveway of a width
approved by the City Traffic Engineer. A street light will be required.
Location to be determined by the Traffic Engineer. A construction permit will
be required for all work done within the public right of way prior to final
map approval. Note: All vehicular access and parking areas shall be
constructed to City street structural standards and inspected by the
Engineering Department in accordance with the City's Subdivision )~nual.
b. Drainage from the project naturally tributary to Eucalyptus Park
shall be outletted within the Park at a location and in a manner approved by
the City Engineer.
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 3
C. DISCUSSION
1. Adjacent zoning and land use.
North R-3 Eucalyptus Park (YMCA)
South R-3 Apartments
East R-3 Apartments
West R-3 Apartments
2. Existing site characteristics.
The 1.43 acre project site is comprised of three parcels located on the
west side of Fourth Avenue between "C" and "D" Streets. Each lot is developed
with a single family dwelling which will be removed to make room for the
proposed development.
The three parcels combined form a small knoll projecting to the north and
sloping down to the west and north. The elevations of the site range from a
high of 60 feet at the southeast corner to a low of 20 feet at the northwest
corner. The street grade of Fourth Avenue al~ the project frontage is
approximately a 6% downgrade to the north toward Street.
3. Proposed development.
The 43 unit project was reviewed and approved by the Design Review
Committee on March 15, 1984 (DRC-84-12). The proposed development is as
follows:
a. Units
Unit No. Bedrooms Size Type
1 2 1 626 s.f. flat handicap (ground floor)
2 2 1 656 s.f. flat (second floor)
3 7 1 815 s.f. townhouse
4 12 2 900 s.f. townhouse
5 20 2 905 s.f. townhouse
b. Structures
Building Units Stories
1 12 1 and 2*
2 8 2 and 3*
3 9 2
4 8 2
5 3 2
6 3 2
* These buildings are step-down buildings with the front of the
building being one less level than the rear. Building 2 has
carports located underneath the units.
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 4
c. Parkin9 and access
There will be a total of 75 parking spaces on-site (18 carports
and 57 open spaces. Access is provided by a two-way driveway
located along the southerly property line.
d. Miscellaneous
l) Other amenities include a sundeck, spa and laundry
facilities.
2) Each unit will have either a patio or balcony with some
townhouse units having both.
3) The townhouse units will have attic storage with access
provided by pull-down stairs. The fiat units will have their
storage adjacent to the patio or balcony.
4) The buildings are of contemporary archi.tecture with a series
of asphalt shingle pitched roofs, stucco exteriors, and wood
trip.
D. ANALYSIS
The proposed development meets the requirements of the underlying
zone as well as the condominium requirements relating to private open space,
storage and parking. The purpose of the tentative map is for the sale of the
units as condominiums.
E. FINDINGS
Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative
subdivision map for Park Vista , Chula Vista Tract 84-5, is found to be in
conformance with the various elements of the City's General Plan based on the
following:
1. The site is physically suitable for the residential development and
the proposal conforms to all standards established by the City for
such projects.
2. The design of the subdivision will not affect the existing
improvements--streets, sewers, etc.--which have been designed to
avoid any serious problems.
3. The project is in substantial conformance with the Chula Vista
General Plan ~ements as follows:
a. Land Use The proposed development at 30 DU's/net acris in
keeping with the land use designation of high density
residential at 13 to 26 DU's/gross acre.
City Planntng Commission
Agenda Items for Meeting of Flay 9, 1984 Page 5
b. Circulation - The project will be served by existing streets and
no streets are required across the site.
c. Housing - The project will provide additional housing and home
ownership opportunity for the residents of the community.
d. Conservation - The site is located within the urbanized area of
the City and there are no significant animal or plant species on
the property.
e. Park and Recreation, Open Space - The developer is required to
pay a fee in lieu of dedicating and improving parks. The PAD fee
for the 43 units is $10,750.00.
f. Seismic Safety - The property is not near any known earthquake
faul ts.
g. Safety - The site is well within the response time of the fire
station located on "F" Street.
h. Noise - The units meet the requirements of the U.B.C.
i. Scenic Highway - The site is not adjacent to a designated scenic
route.
j. Bicycle Routes - The adjacent streets are not designated bike
routes but will accommodate bike traffic.
k. Public Buildings No public buildings are proposed on the
subject property.
4. Pursuant to Section 66412.2 of the Subdivision Map Act, the
Commission certifies that it has considered the effect of this
approval on the housing needs of the region and has balanced those
needs against the public service needs of the residents of the City
and the available fiscal and environmental resources.
WPC 0931P/OO14Z
negative Jeclaration
PROJECT NAME: Chula Vista Condominiums
PROJECT LOCATION: 54, 62, and 66 Fourth Avenue
PROJECT APPLICANT: Starboard Investment Company
CASE NO: IS-84-17 DATE: January 23, 1984
A. Project Setting
The 1.43 acre project site consists of three existing lots fronting on
Fourth Avenue (54, 62, and 66 Fourth Avenue). Each lot presently contains
a single-family dwelling and accessory structures. The front portion of
the project site presently sets approximately l0 feet above the level of
Fourth Avenue, but drops approximately 35 feet to a canyon area to the
west. The Fourth Avenue frontage also drops in elevation from the
southerly property line to the northerly property line approximately 16
feet.
A number of mature trees presently exist on the project site. These trees
include a 26" pine tree; 29", 45", and 47" palm trees; a 25" willow tree;
a 29" eucalyptus tree and a number of smaller trees.
The Sweetwater Valley flood plain encroaches onto the northwesterly corner
of the project site.(up to elevatioun 20.5). An ipferred earthquake fault
(through photographic evidence) is located approximately 600 feet to the
northeast of the project site, and trends in a northeast/southwesterly
direction. However, it is not anticipated that this inferred fault would
cross the project site.
Adjacent land uses consist of ~ YMCA activity center located on the City
of Chula Vista Eucalyptus park grounds to the north, vacant canyon area
and single-family dwellings to the west, multiple-family dwellings to the
south, and multiple-family dwellings across Fourth Avenue to the east.
B. Project Description
The proposed project consists of the demolition or removal of three
existing single-family dwellings and the construction of 44 condominium
units. Site grading will amount to 11,953+ cubic yards of excavation and
2,12B+ cubic yards of fill. The average ~pth of cut will be 8 feet and
the a~erage depth of fill will be 6 feet. -~ ....
city of chula vista planning department
environmental review section
C. Compatibility with Zoning and Plans
The proposes project is compatible with the R-3 zone which will allow a
maximum of 44 units, and the "high density" designation of the General
Plan.
D. Identification of Environmental Effects
{The following measures are standard development regulations and are
advisory only)
1. Sewers
The applicant has not indicated the proposed method of providing
sewers to the project site. Although sewer lines are available in
Fourth Avenue and "C" Street, some difficulty will be experienced in
serving the project since the project site sets below the Fourth
Avenue elevation and any access to "C" Street would require easements
from the City of Chula Vista to traverse Eucalyptus Park to the north.
2. Noise
The project site is located along Fourth Avenue which is designated
in the Noise Element of the General Plan as a "major road"
experiencing ambient noise levels in excess of 70 dBA. Therefore,
the City of Chula Vista Building Department will require that an
acoustical analysis be conducted in conjunction with applications for
building permits to assure that interior noise levels be reduced to
levels below 45 dBA. Exterior noise levels within private open space
areas {balconies and patios) facing Fourth Avenue shall not exceed 65
dBA. The acoustical analysis should include recommendations in these
areas.
3. Drainage
The northwest corner of the project is located within the lO0-year
flood level (elevation 20.5) of the Sweetwater River Basin. The
applicant has designed the project so that the lowest residential
floor level (elevation 25) is well above the potential back water
flood level.
4. Schools
The local elementary and junior high schools are currently operating
at levels above capacity. The additional estimated 9 elementary and
13 junior high school students generated from this project ~ill serve
to exacerbate current enrollment levels. The developer shall comply
with public facilities policies and ensure that adequate classroom
space is available for new students.
5. Transportation/Access
The City's Traffic Engineer has indicated that the proposed parking
designated along the Fourth Avenue curb line will not be permitted
due to the potential elimination of on-street parking along Fourth
Avenue for left turn lanes. Therefore, required guest parking spaces
may be required to be located entirely on the project site.
6. Aesthetics
The applicant proposes to remove approximately 16 trees, 8 of which
are 18-inch diameter or greater and save only one (a 26-inch diameter
pine tree). The applicant should make every effort to retain
existing trees where possible. The City's Landscape Architect should
consider the disposition of all on-site and immediate off-site trees
prior to the removal of any trees.
7. Fire Protection
City of Chula Vista Fire Department has indicated that current
manpower and equipment is available to serve the proposed project but
that a dry standpipe system and one fire hydrant will be required.
The fire hydrant will be required to be located at the street.
F. Findings of Insignificant Impact
I. The project site is void of any endangered plant or animal species
and there are no known earthquake faults immediately on or adjacent
to the property.
2. The proposed residential development is consistent with the General
Plan and associated elements and is not anticipated to achieve short
term to the disadvantage of long term environmental goals.
3. No impacts are anticipated to occur which could interact to create a
substantial cumulative effect on the environment.
4. The project will not cause the emission of any harmful substance or
noise which could prove hazardous to the health and welfare of human
beings.
G. Consultation
1. Individuals and Organizations
City of Chula Vista Steve Griffin, Associate Planner
Duane Bazzel, Assistant Planner
Roger Daoust, Senior Civil Engineer
Tom Dyke, Building Department
Ted Monsell, Fire Marshal
Chuck Glass, City Traffic Engineer
John Bretton - Project Architect
2. Documents
IS-84-1, Severin Apartments
IS-82-32, "F" Street Senior Housing
The Initial Study application and evaluation forms documenting the findings of
no significant impact are on file and available for public review at the Chula
Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 92010.
VIEW COORDINATOR
WPC 0715P
EN 6 (Rev. 12/82)
city of chule vista planning department
environmental review section
EN 6 (Rev. 12/$2)
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 6
3. PUBLIC HEARING: PCZ-84-G - Consideration to rezone 0.65 acres located
on the 200 block of Eucalyptus Court from R-l-15 to
R-l- Frank E. Ferreira
A. BACKGROUND
1. This item involves a request to rezone a 0.65 acre parcel located
immediately south of 279 Eucalyptus Court from R-l-15 (single family
residential, 15,000 sq. ft. minimum lot size) to R-1 (7,000 sq. ft. minimum
lot size).
2. The project is exempt from environmental review as a Class 3(a)
exemption.
B. RECOMMENDATION
Adopt a motion recommending that the City Council enact an ordinance to
change the zone of the 28,436 sq. ft. parcel located immediately south of 279
Eucalyptus Court from R-l-15 to R-1.
C. DISCUSSION
1. Adjacent zoning and land use.
North R-1 Single family dwellings
South R-E-PUD Vacant (approved P.U.D.)
East R-3-D Apartments
West R-l-15 Vacant
2. Existing site characteristics.
The subject property is a 28,436 sq. ft. vacant parcel located at the
southeast side of the elbow of the 200 block of Eucalyptus Court which is a
"dogleg" cul-de-sac street. Topographically, the easterly one-third of the
property is relatively level and the westerly two-thirds is a slope rising 30
feet to the west from an elevation of 75 feet to 105 feet. The three lots
immediately to the west on the south side of the street are essentially a
north facing slope of a hill to the south and rises approximately 50 feet from
the front property line to the southerly line (a 33% slope). A retaining wall
has been constructed along the frontage of these lots making direct access to
the street impossible. A joint access easement road will be required to
develop the properties.
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 7
All of the properties fronting on Eucalyptus Court were originally
subdivided in 1964. In 1968 a parcel map (P.M. 55) was recorded which
adjusted the property lines of eight lots (lots 39 through 46 of the Bonita
Cove Subdivision) located on the south side of Eucalyptus Court and around the
cul-de-sac. The subject property is parcel 1 of that parcel map. ~l of the
street improvements (curbs, gutters, sidewalks and street) have been installed.
3. General plan.
The project site is located in an area of the General Plan where two
land use designations meet (Low Density Residential, 1 to 3 DU's per acre and
Medium, 4 to 12 DU's per acre) and can, therefore, be considered to be in
either classification. In this instance, the proposed R-1 zone is consistent
with the Medium Density Residential designation.
4. Previous rezonings.
The subject property was annexed in 1962 and placed in the R-1 zoning
category. In 1963 the zoning was changed to R-l-B-15 as part of a proposed
subdivision. The 1963 subdivision was replaced with a new subdivision design
in 1964 (Bonita Cove Subdivision) and the zoning of the area was changed to
correspond t~ith the new street and lot pattern. The subject property remained
in the R-l-15 zone while the single family area to the north was rezoned from
R-l-B-9 and R-l-B-12 to R-1.
5. Proposed division of land.
The ap~icant intends to divide the property into three lots. The
lots will be 7,500 sq. ft., 9,500 sq. ft., and ll,500 sq. ft. in size. The
small est lot will be located immediately south of the existing R-1 zoned area
and will be devoid of any slopes. The largest lot will be on the west side of
the property and will have some slope banks. The third lot will be located
between the other two and will also have some slopes. Access to three vacant
lots existing to the west of the rezoning request will be provided across one
corner of the most westerly lot. However, this will not adversely affect the
development of the lot.
D. ANALYSIS
Except for the lots in the R-l-15 zone and one R-1 lot on the cul-de-sac,
all of the lots on Eucalyptus Court range from 7,000 sq. ft. to 10,300 sq. ft.
with the vast majority being 7,000 sq. ft. or slightly greater (10 lots out of
14). The proposed zoning and division of land is in keeping with existing
development in the area. The 22 trips a day generated by an additional two
lots is not significant and should not affect the existing residences. It is,
therefore, appropriate to recommend approval of the request to rezone the
subject property from R-l-15 to R-1.
WPC 0925P
, BONIT'A
I I I
I I I I I I '1 I I /
I I ~ /
I II
~ANDALWOOD RD.
,EUCALYPTus
~ Y4c VAc I
I L-n
_l FAc
Y~
~F
City Planning Commission
Agenda Items for Moeting of May 9, 1984 Page 8
4. PUBLIC HEARING: PCZ-84-H Consideration to rezone the easterly 293
feet of a 2.95 acre parcel located at the
northeasterly corner of Broadway and Moss Street from
C-T to R-3 - Wayne Bienhoff
A. BACKGROUND
1. This item involves a request to rezone the easterly 293 feet (1.95
acres) of a 2.95 acre parcel located at the northeasterly corner of Broadway
and Moss Street from C-T {Commercial Thoroughfare) to R-3 (Multiple Family
Residential, 32 DU's per acre).
2. The applicant has also submitted an application for a conditional use
permit requesting permission to construct a 136-unit senior housing project on
3.13 acres of property which includes the area of the proposed R-3 rezoning.
This request is the following agenda item.
3. An Initial Study, IS-84-24 of possible adverse environmental impacts
of the project was conducted by the Environmental Review Coordinator on
April 24, 1984, who concluded that there would be no significant environmental
effects and recommended that the Negative Declaration be adopted.
B. RECOMMENDATION
1. Find that this project will have no significant environmental impacts
and adopt the Negative Declaration issued on IS-84-24.
2. Adopt a motion recommending that the City Council enact an ordinance
to change the easterly 2.43 feet only of a 2.95 acre parcel located at the
northeasterly corner of Broadway and Moss Street from C-T to R-3. (This would
leave a commercial depth of 200 feet on Broadway.)
C. DISCUSSION
1. Adjacent zoning and land use.
North C-T and R-3 Restaurant and residential
(single and multiple)
South (Co.) C-36 and RU-29 Commercial and residential
(single and multiple)
East R-3 Storage sheds (Approved 38-
unit condominium)
West (Co.) C-36 Commercial vacant
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 9
2. Existing site characteristics.
The subject property is a 2.95 acre level site developed with a
28-unit motel (Rancho Rego) consisting of three residential structures,
garage, swimming pool, equipment/storage building and an office building. The
buildings set back a minimum of 50 feet from Broadway. Access is provided by
one driveway on each street. Moss Street is paved, but there are no curbs,
gutters or sidewalk. The paving, curbs and gutters are installed on Broadway,
but there is no sidewalk. A natural drainage channel (flowing westerly) runs
along the easterly 265_+ feet of the northerly property line.
3. General pl an.
The subject property is located in an area of the General Plan which
indicates a uniform depth of Commercial Thoroughfare and High Density
Residential (13 to 26 DU's per gross acre) immediately to the east. It should
be noted that the General Plan is not site specific and does not always
reflect an actual zoning pattern. For this reason the depth of the C-T zoning
may be adjusted and remain consistent with the General Plan.
4. Broadway Study.
In 1972 the Broadway Study was conducted analyzing the strip
commercial zoning which existed along Broadway. In 1981 the Community
Development Department conducted another study aimed at determining whether
Broadway and other strip commercial areas ("E" and "H" Streets) should be
included as redevelopment areas. This study did conclude that redevelopment
was in order, but the property owners were not supportive and the matter has
been set aside.
The 1972 Broadway Study, though not adopted, recommended that the
commercial depth along the east side of Broadway between Arizona and Moss
Streets be increased. However, since this study was conducted, there have
been developments in the area which preclude this from happening. The study
did indicate that any increase in commercial depth be done with care, so as
not to adversely affect the adjoining land uses. It also recommended that in
the case of corner lots that the commercial uses be oriented toward Broadway
rather than the side streets.
D. ANALYSIS
The subject property has a lot depth of 443 feet from Broadway. The
Planning Department supports a change in the existing zoning pattern but not
to the extent advocated by the applicant. The depth of the commercial to the
north (City) is 200 feet and to the south (County), it is 132 feet. To the
rear (east) of the commercial, the zoning is for multiple family development
(R-3 and Rd-29 in the County). Thus the easterly 311 feet along Moss Street
is directly opposite residential zoning. The present lot configuration would
likely result in the property being developed with its primary orientation
towards Broadway. However, several access points would logically occur along
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 10
Moss Street impacting the residential land uses. The increase of commercial
traffic on Moss Street would have adverse effects on the residential
properties in that area. Based on the aforementioned, the Planning Department
supports the concept of some decrease in the commercial zoning.
To address the question of what constitutes a proper commercial zoning
depth, the characteristics of the area and proposed development plans must be
examined. The ap~icant is requesting that the C-T zone be established at a
depth of 150 feet and has submitted a conceptual plan which shows how the
property could be developed at that depth. Because the depth of the C-T zone
to the north is 200 feet, there is merit in maintaining the 200' depth as it
would allow added ~exibility. It is, therefore, the Planning Department's
recommendation that the C-T zoning be at a depth of 200 feet from Broadway.
The rezoning, if approved, would split zone the property and the boundary
line would go through several existing structures. This would result in the
motel becoming a nonconforming use and subject to those provisions of the
Municipal Code pertaining to nonconforming uses. The applicant is aware of
the situation and is prepared to proceed with the development by clearing the
site in conjunction with the conditional use permit to build the senior
housing project on the residentially zoned lot.
If the Planning Commission supports the recommendation of the Planning
Department, the plans for the senior housing project will have to be revised
accordimgly. Besides a reduction in lot area, a reduction in the number of
units would probably be in order.
WPC 0935P
11 II
I
III
I' ~TOI~-~
· ---i
----t ~l~J ~ ~F
,
I
NA -. I ST. ARIZONA
I I I
I I ~ I I I
~---~ I
_- ~ , ' ' ' P~O~
x I i I .I
/~o , , ~-T. T T-I
~ :s~ ',s~ ,,s~l s,:, s~:~:I
· · MOSS
~ I ~P ~-~-i' IS~l~ I s~ I II Hlff %~ I
I
M~ ~ / I I II I
L M~= I
WYKE~
I ~CZ ~ H.
negative Jeclaration
PROJECT NAME: Chula Vista Senior Housing and Commercial Center
PROJECT LOCATION: Northeast corner of Broadway and Moss Street
PROJECT APPLICANT: Wayne Bienhoff, 444 Camino Del Rio South, Suite llg,
San Diego, CA 92108
CASE NO: IS-84-24 DATE: April 24, 1984
A. Project Settin~
The project site consists of 4.13 acres of relatively flat property'
located at the northeast corner of Broadway and Moss Street. The property
currently'contains a motel and various accessory structures. Adjacent
land uses consist of residential to the east and south, across Moss
Street, residential/commercial to the north and commercial across Broadway
to 'the west.
There are no significant natural or manmade resources present on the
project site and there are no geologic hazards existing on or near the
site. An uncovered unimproved drainage channel exists along the northerly
boundary of the project site, which is a leg of the Telegraph Canyon Creek
drainage course.
B. Project Description
The project consists of: a) the rezoning of approximately 1.96 acres from
CT (commercial thoroughfare) to R-3 (multiple family residential)
resulting in a 150 ft. depth of CT zoned property from Broadway, b) the
construction of 146 senior citizen apartment units and the construction of
ll,O00 sq. ft. of commercial ~oor space.
C. £ompatibilitx withZonin~ and Plans
The project involves a rezoning, a conditional use permit, and design
review for the senior citizen development. A commercial development is
presently permitted in the C-T zone. All proposed elements of the project
are compatible with the General Plan.
D. Identification of Environmental Effects
1. Drainage
The Telegraph Canyon Creek drainage culvert runs east to west along
the northerly property boundary of the project site. The Army Corps
of Engineers is presently studying the entire drainage course, and
the results may dictate the necessary easement width and
improvements. Development of the proposed project will require
compliance with Chapter 18.54 of the Municipal Code, which refers to
ffl oodproofing of developments located within a special ~ood hazard
area (as defined by the Federal Emergency Management Agency). ~
city of chula vista planning department
environmental review section
-3-
2. Documents
Telegraph Canyon Channel Study, U. S. Army Corps of Engineers
Flood Insurance Study, Fed. Emergency Hanagement Agency (April 18,
1983)
City of Chula Vista General Plan
The Initial Study application and evaluation forms documenting the findings of
no significant impact are on file and available for public review at the Chula
Vista Planning Department, 276 Fourth Avenue, Chula Vista, CA 92010.
ENVIRON REVIEW COORDINATOR
WPC 0175P
EN 6 (Rev. 12,/~) city of chula vista planning department
~ environmental review section
EN 6 (Rev. 12/82)
May l, 1984
To: John W. O'Neill, Planning Commission Chairman
From: George Krempl, Director of Planning ~~ ~--~-~
Subject: PCC-84-16 - Senior Housing Proposal
It is requested that this item be continued to an unspecified date. It is antici-
pated that the SANDAG report on senior housing in San Diego County will soon be
completed. Once completed, a Council workshop will be conducted, after which it
is expected that Council will adopt a policy regarding senior housing projects in
the City.
Once this is accomplished, the matter will be readvertised. The applicant has been
informed of this request for continuance.
AL:rms
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 11
5. PUBLIC HEARING: Conditional Use Permit PCC-84-16; request to construct
a 136-unit senior housin~ project on the north side of
the 500 block of Mass Street - Wayne Bienhoff
A. BACKGROUND
1. The applicant is requesting permission to construct a 136-unit senior
housing project on 3.13 acres located on the north side of Moss Street and 150
feet east of Broadway. The subject property is zoned R-3 and C-T and the
applicant has requested that the C-T area be rezoned to R-3. Said rezoning
request is the preceding agenda item. The environmental aspects of this
project are also considered as part of the rezoning application.
2. Based on findings contained in Section "E" of this report, adopt a
motion recommending that the City Council approve the request, PCC-84-16, to
construct a senior housing project at a density of 44 dwelling units per acre
on the project site located on the north side of the 500 block of Moss Street
subject to the following conditions:
a. A parcel map shall be filed and recorded prior to the issuance
of any building permits. The existing buildings shall be
removed prior to the recordation of the final parcel map.
b. Prior to consideration by the City Council, the project shall be
submitted for review by the Design Review Committee which shall
forward a recommendation on the site plan and architecture of
the project to the City Council.
c. The'conditional use permit shall be valid for a period of two
years from the date of approval.
d. Laundry facilities shall be provided on the easterly and
westerly portions of the project. The areas immediately
adjacent to the laundry areas shall be so designed as to promote
interaction among the residents.
e. The project shall not exceed a maximum of 44 dwelling units per
net acre. The actual number of units to be established predicated on site
plan and architectural considerations.
B. DISCUSSION
1. Existing site characteristics.
The project site is comprised of a 1.18 acre (177' x 290') lot and
the easterly 293 feet (1.95 acres) of a 2.95 acre parcel located at the
northeast corner of Broadway and Moss Street. The two areas combined form a
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 12
3.13 acre level site with approximately 420 feet of frontage along the north
side of Mess Street. A natural drainage channel runs along the northerly
property line. Existing structures include most of the motel buildings on the
westerly parcel and storage buildings on the easterly lot. A subdivision map
(Casa De La Ciudad) has been recorded on the easterly lot for the development
of a 38-unit condominium project.
3. Proposed use.
The proposed senior housing project will consist of 136 one-bedroom
units housed in eight (8) 16-unit two-story structures and one (1) 4-unit
two-story structure. All of the units will have the same ~oor plan which are
~at units designed to be stacked side by side and back to back to each
other. The private open space will be either a patio or balcony located in
front of the unit with access from the living room. The density of the
project is 44 dwelling units per acre.
Parking for 82 cars (80 standard spaces and 2 handicap), a ratio of
one space for 1.6 units, will be provided on-site. Access will be provided by
a two-way driveway at each end of the site. The interior circulation will be
a loop street system with the parking on the private street. The driveway and
parking on the westerly portion of the project is located adjacent to the
property in order to place the buildings away from the commercial area.
Other amenities include a swimming pool and a single story recreation
room attached to one of the residential structures in the center of the
project. The building design will be contemporary Spanish architecture with
mission tile roofs, stucco exterior and wood trim, railings and stairs.
4. Similar establishments.
The City Council has, thus far, approved four other senior housing
projects for a total of 327 units in the City. Two projects located at 436
"F" Street and the 300 block of "C" Street with a total of 266 units are
presently under construction. The two other projects (61 units) are located
on Park Way in the vicinity of Fourth and Fifth Avenues. Preliminary plans
are being developed for another 90 units at Fourth and Mankato (Lion's Club).
Within a one mile radius of the proposed project, there are two other
projects in the Montgomery area of the County. These projects are as follows:
Location: 521-533 Moss Street
Project: 79 units (60 on and two-bedroom units and 19 studios)
senior housing (62 years and older), 40% of which must
be low income
Status: Under construction; 98% complete. Expect to begin
renting in mid-May
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 13
Location: 1260 Third Avenue (Kiku Gardens)
Project: 100 units of Section 202/8 senior housing, all
one-bedroom (all low income)
Status: Full y occupied
C. ANALYSIS
The City Council has expressed a desire to disperse this type of land
use throughout the City rather than have them concentrated in one area. In
this instance, if approved, this would be the only project in the City south
of "I" Street. There are two other projects in the same general vicinity in
the Montgomery (County) area.
From a locational standpoint, the site is suited for the proposed
use. It is situated near public transportation (Broadway) and commercial
facilities to serve the residents. The nearest grocery shopping is a quarter
mile away to the north and south. Based on the aforementioned, the Planning
Department supports the request to construct a senior housing project at this
location.
The plans submitted with this application are predicated upon
approval of the rezoning request to reduce the C-T zoning to a depth of 150
feet. The Planning Department is recommending that the depth of the C-T zone
be reduced to 200 feet. If this recommendation is supported by the Planning
Commission and City Council, the plans will have to be revised. The Planning
Department believes that the development concept is such that it can be
revised and still maintain a density of 44 DU's/acre and that approval be
conditioned upon this maximum density factor subject to more specific review
by the Design Review Committee. This review would have to take place after
Council consideration.
If the Planning Commission recommends that the depth of the C-T zone
be established at 150 feet, the project may proceed as submitted. However,
while a decision can be made on the proposed project regarding the proposed
land use and its location, the plans are not very detailed and the Planning
Department is not comfortable in offering a recommendation on the proposed
site plan and architectural design. The project should, therefore, be
reviewed by the Design Review Committee prior to Council consideration.
The City Council has expressed concern on the number of senior
housing projects in the City, especially as to whether the City of Chula Vista
has provided its fair share for this type of housing. SANDAG is in the
process of preparing a report on senior housing in the County but it has not
been completed at the time of this writing. Until this report is completed,
the Planning Department is not prepared to address this issue.
City Planning Commission
Agenda Items for Meeting of May 9, 1984 Page 14
D. FINDINGS
1. That the proposed use at the location is necessary or desirable to
provide a service or facility which will contribute to the general well being
of the neighborhood or the comm~mtty.
All other approved projects are located within the northern part of
the City. Approval of this request provides this type of housing
within the southern portion of the City in accordance with City
Council objectives.
2. That such use will not under the circumstances of the particular
case, be detrimental to the health, safety or general welfare of persons
residing or working in the vicinity or injurious to property or improvements
in the vicinity.
The proposed residential use is in keeping with the residential
character of the street; therefore, the adjoining uses should not be
affected.
3. That the .proposed use will comply with the regulations and
conditions specified in the code for such use.
Except for the density and parking, the project meets the basic
requirements of the underlying zone. The ratio of one parking space
per 1.6 units is similar to other approved projects as is the density.
4. That the granting of this conditional use permit will not adversely
affect the general plan of the City or the adopted plan of any government
agency.
The proposed use is in keeping with the Omnibus amendment to the
General Plan.
WPC 0937P/001 5Z
II II
STUDY SESSION
City Planning Commission
Chula Vista, California
5:00 p.m. Conference Rooms 2 & 3
Wednesday, March 21, 1984 Public Services Building
1. Sphere of Influence Study - Progress Report - (Mooney-Lettieri)
2. Overview of Land Development Process
3. Adjournment to Marie Callender's for dinner and to the Regular
Business Meeting of May 23, 1984
AGENDA
City Planning Commission
Chula Vista, California
Wednesday, April 25, 1984 - 7:00 p.m. City Council Chambers
PLEDGE OF ALLEGIANCE - SILENT PRAYER
APPROVAL OF MINUTES - Meeting of March 14, 1984
1. Consideration of request for extension of tentative subdivision
map, Chula Vista Tract 77-10, Hudson Valley
Estates #1, 0-100 block Las Flores Drive
2. PUBLIC HEARING: A public hearing to take public testimony on
the adequacy of the Draft EIR-84-4 for the
proposed Otay Small Electric Generating Plant,
Otay Landfill - Central Plants, Inc.
DIRECTOR'S REPORT
COMMISSION COMMENTS
ADJOURNMENT AT to the Regular Business Meeting of May 9, 1984
at 7:00 p.m. in the Council Chambers
TO: City Planning Commission
FROM: George Krempl, Director of Planning
SUBJECT: Staff report on agenda items for Planning Commission
Meeting of April 25, 1984
1. PUBLIC HEARING: Consideration of an extension of the tentative
subdivision map, Hudson Valley Estates No. l, Chula
Vista Tract 77-10 - Sue Hudson
A. BACKGROUD
-On April 17, 1981, the City Council approved the revised tentative
subdivision map for Hudson Valley Estates No. 1, Chula Vista Tract 77-10 in
order to subdivide 3.38 acres located on the west side of the extension of Las
Flores Drive north of "D" Street in the R-1 zone into 15 lots, 7 of which will
be panhandle lots.
Pri~r to the expiration date, the developer requested a three-year
extension of the tentative map citing that the proposed street improvement
district, upon which this development is dependent, has delayed the submittal
of the final map.
B. RECOMMENDATION
Adopt a motion approving a three-year extension of the tentative map for'
Hudson Valley Estates No. l, Chula Vista Tract 77-10, the map to then expire
on April 17, 1987.
C. DISCUSSION
The proposed street improvement assessment district was recently rejected
by the City Council, however, the City plans to submit a new proposal in the
near future.
There have been no significant changes in the immediate vicinity which
affect the original conditions or findings of approval; therefore, it is
appropriate to grant the extension. No further extensions are permitted and a
ne~ tentative map will have to be submitted if the map is allowed to expire.
WPC 0917P
~.~.~1~,~- LOCATORI
PCS-77-10 I ~
~, mm LOT SUBDIVISIOt- I ~' '~'''~
0-100 eLK. %RFUTUREI
O' ~ lO0' 200' '
City Planning Commission
Agenda Items for Meeting of April 25, 1984 Page 2
2. PUBLIC HEARING: Consideration of Draft EIR-84-4, Otay Electrical
Generating Plant
A. BACKGROUND
1. An initial study of possible environmental effects was concluded in
September 20, 1983. At that time a decision was made by the Environmental
Revie~ Coordinator to require that a Focus EIR be prepared on the proposed
project. A number of letters were received which presented various
environmental concerns which should be addressed in the Draft EIR.
2. The EIR was then prepared under an agreement with New Horizons
Planning Consultant, Inc., the project proponent and the Environmental Review
Coordinator. The ERC issued the draft EIR for review on March 6, 1984.
(Draft EIR attached).
3. The proposed project involves a conditional use permit.
4. Written responses that have been received as of the date of this
writing are attached to this report for your information. If additional
repsonses are received prior to the hearing, they will be available at the
meeting.
B. RECOMMENDATION
Open the public hearing and take testimony relative to the adequacy of the
EIR. It is anticipated that a response to written and verbal comments will
have to be prepared; therefore, the hearing should be closed and consideration
of the final EIR set for a future Planning Commission meeting ~hen the
proposed conditional use permit will be heard.
C. PROJECT DESCRIPTION
1. The proposed project will require the approval of a conditional use
permit by both the Planning Commission and City Council.
2. The project will consist of the grading and preparation of a 0.87
acre site near the northerly boundary of the Otay Landfill site for the
construction of a 9,040 square foot, 25 ft. high structure, which will house
initially two engine generators and ultimately four, in addition to three
compressors. A network of gas collection wells and above-ground pipes will
extract methane gas from the existing land fill and transport the gas to the
engine generators which will in turn generate electricity through burning of
the gas. The electricity, initially 1.6 megawatts and ultimately 6.6
mega~atts, uill then be sold to SDG&E and transported through existing power
poles along Maxwell Road and Otay Valley Road.
City Planning Commission
Agenda Items for Meeting of April 25, 1984 Page 3
3. The projected life of the landfill is estimated at 30 years, at which
time the equipment would be moved to another landfill site for similar usage.
D. IMPACT ANALYSIS
1. Geology and Soils
Portions of the proposed structure may be located over a non-active
earthquake fault; although not rquired as mitigation, the structure could be
moved to the westerly portion of the proposed pad to completely avoid the
fault. The stability of an existing cut slope south of the facility, the
proposed cut slope north of the facility and the foundation characteristics
underlying the proposed structure should be determined by a soils engineering
investigation. Compliance with the recommendations of a soils engineer will
assure that potentially significant impacts are mitigated.
2. Vi sual Aesthetics
Although the proposed plant will be recessed against an existing
knoll, the tip of the roofline will be visible from the north and from three
existing residences to the west, approximately 2/3 of a mile away. The
structure will be visible across the landfill site to the south and will not
be visible from vacant property to the east due to existing terrain. All
proposed new power lines will be on-site, avoid the ridge of the knoll, and be
sited to minimize impacts. As there are no residences or roads which have a
direct view of the site, no significant visual impact is anticipated,
therefore no mitigation is proposed.
3. Air Quality
The pollutants of concern from the combustion of landfill gases are
the same for any other fuel. The San Diego Air Pollution Control District
(APCD), the local agency responsible for granting Permits to Operate for the
engines, will require that an Air Quality Analysis be submitted to demonstrate
that there ~ill be no degradation of the air at the property boundaries before
authority to construct is given to the plant.
The APCD conducts a final review of the project once it is
constructed. This review includes requiring testing of exhaust emissions to
make sure that all of their requirements are met. Conformance to the APCD
requirements will provide sufficient mitigation to assure that the project
cannot be implemented until all potential impacts have been reduced or shoun
to already be at a non-significant level. It should be noted that
approximately 972 tons of methane per year is currently seeping from the
site. This proposal will reduce that problem.
4. Noise
Maximum noise levels anticipated with the ultimate operation of four
Superior 16 STGA methane-burning electrical generating engines are estimated
at 65 dBA at the northerly property line 100 feet away. Noise levels
estimated at the nearest residential units, which are approximately 2/3 mile
to the west, will be 36 dBA. Acoustical calculations did not include any
shielding factors for insulation of the plant structure, terrain features
City Planning Commission
Agenda Items for Meeting of April 25, 1984 Page 4
between the plant and potential receptors or prevailing wind directions
(easterly). The estimated noise level at the nearest residential structure
(36dBA) would not be distinguishable from existing residential activity. The
proposed project will also be subject to Chapter 19.66 (performance standards)
of the Chula Vista Municipal Code. Noise levels would be so dramatically
attenuated by the distances involved that no significant impacts are
anticipated, therefore no mitigation is required.
5. Utilities
The project ~ill result in the extension of above-ground utility
lines from the project site to existing power lines at the entrance to the
landfill site. Heavier gauge wires will be extended on the existing 12 KV
power poles between the landfill site and Otay Valley Road. The proposed
project will result in reducing the use of other existing energy sources and
therefore, will have a beneficial cumulative impact to SDG&E customers. No
mitigation measures will be required.
6. Health
The primary health concern is the release of trace amounts of "toxic
air pollutants" into the atmosphere. The existing landfill is presently
emitting these gases over the expanse of the landfill site, therefore, the
question of whether there would be any sigificant increase in amounts
released, and if so, whether these could have an adverse effect on any
population due to project implementation is discussed in the EIR.
Trace components of the landfill gases were taken in December, 1983.
Results of these samples indicate that Benzene and Tetrachloroethylene (TCE),
preliminary candidates for the toxic air pollutant list developed by the State
Air Resources Board, exist in the landfill gases. Based on a conservative
destruction rate of 70% by the proposed generator engines, the exhaust flow
and other output data, estimates were made using the Environmental Protection
Agency's computer model for down-wind concentrations of the two most likely
toxic substances. The overall 24-hour average will result in a decrease in
the release amount for both Benzene and TCE with project implementation over
existing drift conditions. The release amounts for the proposed project and
the existing drift conditions are well below maximum recommended emission
levels and no adverse health impacts are anticipated with project
implementation, therefore no mitigation is proposed. Since no significant
adverse health conditions are anticipated with project implementation, no
additional mitigition is proposed.
7. Transportation
Access to the project site will be via Otay Valley Road to Maxwell
Road. Internal roadways located on the landfill site will be altered
periodically due to landfill operations. No significant impacts related to
transportation or access are anticipated, therefore, no mitigation is proposed.
City Planning Commission
Agenda Items for Meeting of April 25, 1984 Page 5
8. Risk of Upset
The potential risk of fire or explosion has been reduced by the
incorporation of a continuous monitoring system which will detect higher than
normal levels of oxygen caused by a minor leak or rupture. This would
automatically shut down the system and stop the suction at the wells.
Vibrator switches that would shut down the system in the case of seismic
activity have been included in the project. Recommended mitigation includes a
regular on-site periodic inspection and maintenance of all portions of the
system through the life of the project. With the safety features already
designed into the plant and the incorporation of the recommended mitigation
measures, the potential significant impacts would be reduced to a safe and
non-significant level.
E. COMMENTS ON THE DRAFT EIR
1. On April 16, 1984, the Resource Conservation Commission recommended
that the EIR be certified as being prepared in accordance with the law and
expressed a concern about the project {comments attached).
2. A letter has been received from San Diego Gas & Electric. A response
to this letter will be contained in the final EIR (letter attached).
3. A response to oral comments received at the public hearing will be
incorporated into the final EIR. -
DB:fp
WPC 0922P
April 17, 1984
TO: Chairman and Members, Planning Commission
FROM: Resource Conservation Commission j~
SUBJECT: EZR-84-40tayLandfill Electrical Generating Station
On April 16, 1984, the Resource Conservation Commission reviewed the
adequacy of the above noted EIR. It was the conclusion of the Commission
that the EIR has been prepared in compliance with the California Environ-
mental Quality Act, the State CEQA guidelines and the Environmental Review
Procedure of the City of Chula Vista, therefore the Commission recommended
that the EIR be certified.
While reviewing the project itself, there was concern that the project
could result in nuisance noises. Therefore, the Commission also recommends
that the project be conditioned so that any such problem would not result.
The Commission felt it definitely was a positive energy conservation project
and would improve the air quality in the area by using the natural seepage.
HKG:js
cc: Director of Planning
Assistant Planner Duane Bazzel
San Diego Gas & Electric
FILE NO.
March 21, 1984
R~:CEIvED
Environmental Review
Coordinator [~,~]~R 28 1984
-_City of Chula Vista
P. O. Box 1087 ii/: ;:~ r;?, -~- ';,iT
Chula Vista, CA 92012
ATTENTION: Doug las Reid
RE: OTAY LANDFILL ELECTRIC
GENERATING PLANT DRAFT EIR
Dear Mr. Reid:
Thank you for providing San Diego Gas & Electric with
the opportunity to respond on this Draft EIR. SDG&E appre-
ciates having the opportunity to respond.
At this time SDG&E has only one comment to provide.
According to Herb Smith, page 45, 3.5.2 Potential Impacts,
second sentence, should read "The 12kV lines are insufficient
to carry .... " This re-wording justifies the need for
heavier wire as stated later on in the paragraph.
Feel free to call me at 232-4252, extension 1253
should you have any questions.
Sincerely,
Christy ~. Garrison
Land Assistant
CAG:sl
cc: HRSmith
POSTOFFICE BOX !831 .SAN DIEGO CALIFORNIA92112.TELEPHONE 619/232-4252