RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA
VISTA (1) ACCEPTING $772,817 IN INCENTIVE FUNDS FROM
THE CALIFORNIA SOLAR INITIATIVE TO INSTALL SOLAR
PHOTOVOLTAIC SYSTEMS AT MULTIPLE MUNICIPAL
FACILITIES (2) APPROPRIATING $772,817 IN INCENTIVE FUNDS
TO THE CITY'S ENERGY CONSERVATION FUND (3) AMENDING
THE FISCAL YEAR 2009-2010 CAPITAL IMPROVEMENT
PROGRAM AND (4) APPROPRIATING $772,817 OF CITY ENERGY
CONSERVATION FUNDS TO EXISTINGCIP GG208 (MUNICIPAL
SOLAR PHOTOVOL TAlC SYSTEMS)
DIRECTOR OF CONSERVATION & ENVIRONMENTAL SERVICES
DIRECTOR OF PUBLIC WORKS ~
CITY MANAGER oI1!r-
ASSIST ANT CIT~AGER ")")
4/5THS VOTE: YES ~ NO D
~
SUMMARY
To lower energy costs and reduce peak energy demand, Chula Vista will be installing approximately
500 kW of solar photovoltaic systems at 11 municipal facilities over the next 8 months. The project's
costs are being funded through a low-interest California Energy Commission loan and federal
American Recovery & Reinvestment Act funds. In addition, $772,817 of California Solar Initiative
incentives have been reserved for the project helping to further reduce net implementation costs. The
new solar photovoltaic systems will help to achieve the City's goal of generating at least 20% of
municipal facilities' energy demand with on-site renewable energy generation as outlined in the
Municipal Building Energy Efficiency Policy (2005).
ENVIRONMENTAL REVIEW
The Environmental Review Coordinator has reviewed the proposed project for compliance with
the California Environmental. Quality Act (CEQA) and has determined that the project qualifies for
a Class 8 categorical exemption pursuant to Section 15308 [Actions by Regulatory Agencies for
Protection of the Environment] of the State CEQA Guidelines because the energy savings resulting
ITom the renewable energy project will contribute to reducing Chula Vista's greenhouse gas or
"carbon'" emissions thus improving air quality. Therefore, no further CEQA environmental review
IS necessary.
4-1
APRIL 13,2010, Item-A:::-
Page 2 of 3
RECOMMENDATION
Council adopt the resolution.
BOARDS/COMMISSION RECOMMENDATION
The proposed solar photovoltaic project was presented to the Resource Conservation Commission
(RCe) at their February 22, 2010 meeting as an Information Item. Although the RCC did not take
formal action, the Commission expressed general support for the project.
DISCUSSION
The City of Chula Vista has identified the installation of renewable energy systems as a top priority in
its energy and carbon management efforts. Through its Municipal Building Energy Efficiency
Policy (2005), the City established a goal of generating at least 20% of its municipal facilities'
energy demand with on-site renewable energy. Currently, there are 75 kW of Solar Photovoltaic
(PV) systems on a variety of municipal buildings - Nature Center (6 kW), Public Works
Household Hazardous Waste Facility (4 kW), Civic Center Building #200 (30 kW), and the Police
Headquarters (35 kW) - meeting 1.5% of energy demand. These Solar PV systems produce
electricity during peak daytime energy periods when grid-delivered electricity is most expensive
and when there is potential for electricity supply disruptions. In addition, the City boasts two
Solar Hot Water systems which use the Sun's heat energy to warm pool water at the Lorna Verde
and Parkway Aquatic Centers.
As part of the Council-approved Climat~ Protection Measures Implementation Plan (Measure #5),
staff has developed a capital improvement project to install approximately 500 kW of additional
Solar PV systems at 11 municipal sites. The new systems will produce over 715,000 kWh of
electricitY annually (equivalent to the yearly energy use of 120 homes), reduce municipal
greenhouse gas emissions by 262 metric tons CO2, and increase on-site renewable generation to
11.5% of total municipal energy demand. The $3.2 million project is being financed through a
low-interest California Energy Commission loan ($1,579,285) and federal Energy Efficiency &
Conservation Block Grants ($874,300). Staff has also applied to reserve incentive funds through
the California Solar Initiative (CSI). The CSI is a 10-year program by the California Energy
Commission and the California Public Utilities Commission to facilitate the installation of 3,000
MW of solar energy systems statewide by providing cash incentives to residents, businesses, and
institutions. As a result of the City's application, the California Center for Sustainable Energy,
which administers the CSI program in San Diego County, has reserved $772,817 for the project
based on its proposed size and electrical output. The incentives will help reduce the project's net
implementation costs and shorten the payback period for the related California Energy
Commission loan.
DECISION MAKER CONFLICT
Staff has reviewed the property holdings of the City Council and has found a conflict exists, in that
Councilmember Steve CastaTIeda has property holdings within 500 feet of the boundaries of the
property which is the subject of this action.
4-2
APRIL 13, 2010, Item~
Page 3 of 3
CURRENT YEAR FISCAL IMP ACT
The CSI incentive, in conjunction with federal and state grants/loans, will cover all capital costs
associated with installing the Solar PV systems. Specifically, the $772,817 California Solar
Initiative incentive will reduce the net implementation costs for the capital improvement project.
City staff time costs associated with implementing the project will be supported through the
SDG&E Local Government Partnership which is funded by California utility ratepayers under the
auspices of the California Public Utilities Commission.
At this time, staff is recommending appropriating the incentive funds to the following Capital
Improvement Project:
CIPNo.
GG208
Descri tion
Municipal Solar Photovoltaic Systems
$772,817
Total
$772,817
ONGOING FISCAL IMPACT
The project will generate $182,674 in estimated annual energy cost savings which will be used to
repay the debt service for a related California Energy Commission loan (simple payback <11
years). Once the loan is repaid, the City's General Fund would begin to accrue the full annual cost
savings. In addition, the City will realize more incremental energy cost savings sooner as utility
rates increase every few years.
ATTACHMENTS
Attachment A - CSI Incentive Reservation Confirmations
Prepared by:
Brendan Reed, Environmental Resource Manager, Conservation & Env. Services
4-3
ATTACHMENT A
Brendan Reed
From: Jim Filanc [JFilanc@southerncontracting.com]
Sent: Monday, February 15, 2010 8:07 AM
To: Brendan Reed
Cc: Gordon Day; Joe Melin; Matt Hart
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04824, City of Chula Vista- Public Works Yard
From: agnes.stupak@energycenter.org [mailto :agnes.stupa k@energycenter.org]
Sent: Thursday, February 11, 2010 7:28 PM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application 5D-CS1-04824, City of Chula Vista- Public Works Yard
02111/10
To: Brendon Reed
City ofChula Vista- Public Works Yard
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI -04824, City of Chula Vista- Public Works Yard
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic crY)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI-04824
Government 3 Step
City ofChula Vista- Public Works Yard
02/17/2010
4-4
Page 2 of2
Installation Address 1800 Maxwell Rd
Chula Vista, CA 91911
CEC-ACRating 48.117kW
Design Factor 96.330%
CSI System Size 46.351 kW
EPBB Incentive Rate EPBB @#$1.&5 per Watt .
Reserved Incentive Amount $85,749
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ trom the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation ofthe reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: httJ;!s://c>:se.~ow~rclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://energycenter.org/ContentP~e.~?ContentID=377 &SectionID=405&SectionTarget=370 to download the
applicable forms. .
The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org , or (858) 634-4728.
Sincerely,
, . Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative -
CC: Southern Contracting Company
02/17/2010
4-5
Page IoU.
Brendan Reed
From: Agnes Stupak [agnes.stupak@energycenter.org]
Sent: Tuesday, February 16, 2010 9:27 AM
To: Brendan Reed
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04823, -City of Chula Vista-Parkway Community Center
Centerfor
CSuStainabl~energy
Ci'\lJFO-R'wIA.. .
)\gnes Stupak
Associate Program Manager, CSI
8690 Balboa Ave, Suite 100
San Diego, CA 92123-1502
858.244.1177 phone
858.244.1178 fax
www.eneravcenter.ora
Learn the latest in clean energy
developments.
Subscribe to Energy Connections today.
,
From: agnes,stu pak@energycenter.org [mailto:agnes.stupa k@energycenter,org]
Sent: Tuesday, February 16, 2010 9:03 AM
To: breed@ci.chula.vista.ca.us
Cc: jfilanc@southerncontracting.com
Subject: Reservation Reserved Notice, Application SD-CSI-04823, City of Chula Vista-Parkway Community Center
02/16/10
To: Brendon Reed
City ofChula Vista-Parkway Community Center
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04823, City ofChula Vista-Parkway Community
Center
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
02/17/2010
4-6
Page 2 oU.
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
Installation Address
SD-CSI-04823
Gove=ent 3 Step
City of Chula Vista-Parkway Community Center
373 Park Waf
Chula Vista, CA 91910
CEC-ACRating 36.796kW
Design Factor 98.484%
CSI System Size 36.238 kW
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $67,040
RFP Due Date 04/17/2010
Proof of Project Milestone Due Date 10/14/2010
Reservation Expiration Date 08/18/2011
The reserved incentive amount is detennined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/18/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.coml.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://ener2Vcenter.orvContentPage.asu?ContentlD=3 77 &SectionID=405&SectionTari:!et=370 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting (
Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org, or (858) 634-4728.
Sincerely,
Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative
02117/2010
4-7
Page 1 of2
Brendan Reed
From: Jim Filanc [JFilanc@southemcontracting.com1
Sent: Monday, February 15,20108:07 AM
To: Brendan Reed
Cc: Gordon Day; Joe Melin; Matt Hart
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04821, City of Chula Vista- Norman Park Center
~..__.__.
From: agnes.stupak@energycenter.org [maillo:agnes.stupak@energycenter .org]
Sent: Thursday, February 11, 2010 6:59 PM
To: breed@cI.chula.vista.ca.us
Co: Jim Filanc
Subject: Reservation Reserved Notice, Application SD-csI -04821, City of Chula Vista- Norman Park Center
02111/1 0
To: Brendon Reed
City of Chula Vista- Norman Park Center
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04821 , City of Chula Vista- Norman Park Center
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI-0482I
Government 3 Step
City ofChula Vista- Norman Park Center
02/17/2010
4-8
Page 2 of2
Installation Address 270 F St.
Chula Vista, CA 91910
CEC - AC Rating 31.135 kW
Design Factor 98.666%
CSI System Size 30.720 kW
"
EPBB/ Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $56,832
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ ftom the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/1312011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: httPs://ccse.12owerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
htt;p:/ /ener!!Vcenter.or~/ContentPage.a~?ContentID=377 &Section m=405&SectionTarget=370 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org, or (858) 634-4728.
Sincerely,
Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/20JO
4-9
Page 1 of2
Brendan Reed
From:
Sent:
To:
Jim Filanc [JFilanc@southemcontracting.coml
Monday, February 15, 2010 8:09 AM
Brendan Reed
Cc: Gordon Day; Matt Hart; Joe Melin "
Subject: FW: Reservation Reserved Notice, Application SD-CSI-D4826, City of Chula Vista- Veterans Park
From: agnes.stupak@energycenter.org [mailto :agnes.stupak@energycenter.org]
Sent: Thursday, February 11, 20107:33 PM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application SD-CSI-04826, City of Chula Vista- Veterans Park
02/11/1 0
To: Brendon Reed
City of Chula Vista- Veterans Park
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04826, City ofChula Vista- Veterans Park
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the CaJifornia Solar Initiative Program. Details regarding your reservation are !istOO below:
Application Number
Application Type
Host Customer
SD-CSI-04826
Government 3 Step
City of Chula Vista- Veterans Park
02/17/20}0
4-10
Page 2 of2
Installation Address 785 E Palomar St.
Chula Vista, CA 91911
CEC-ACRating 48.117kW
Design Factor 98.007%
CSI System Size 47.158 kW
.'
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $87,242
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the inStallation and submit the Incentive Claim package by 08/13/20 II. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://ener~ycenter.org/ContentPa~e.w>p?ContentID=377 &SectionID=405&SectionTarget=370 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org, or (858) 634-4728.
Sincerely,
Agnes Stupak.
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/2010
4-11
Page 1 of2
Brendan Reed
From: Jim Filanc [JFilanc@southemcontracting.com]
Sent: Monday, February 15, 2010 8:05 AM
To: Brendan Reed
Cc: Joe Meiin; Matt Hart; Gordon Day ,
Subject: FW: Reservation Reserved Notice, Appiication SO-CSI-04816, City of Chula Vista- Animal Shelter
From: agnes.stupak@energycenter.org [mailto :agnes.stupak@energycenter.org]
Sent: Thursday, February 11, 2010 11:07 AM
To: breed@d.chula-vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Appiication SO-CSI-04816, City of Chula Vista- Animal Shelter
02/11/10
To: Brendan Reed
City of Chula Vista- Animal Shelter
276 Fourth Avenue
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04816, City ofChula Vista- Animal Shelter
Dear Brendan Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI -04816
Government 3 Step
City of Chula Vista- Animal Shelter
02/17/20l0
4-12
Page 20f2
Installation Address 130 Beyer Way
Chula Vista, CA 91911
CEC - AC Rating 16.983 kW
Design Factor 99.369%
CSI System Size 16.876 kW
.'
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $31,221
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/20 I L Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://energvcenter .0rg/ContentPage.a.<>P ?Content1D= 3 77 &SectionID=40 5&Section Target=370 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org , or (858) 634-4728.
Sincerely,
Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/2010
4-13
Page I of2
Brendan Reed
From: Jim Filanc [JFilanc@southemcontracting.com]
Sent: Monday, February 15,20108:05 AM
To: Brendan Reed
Cc: Gordon Day; Joe Melin; Matt Hart '
Subject: FW: Reservation Reserved Notice, Application SD-CSI-D4818, City of Chula Vista-Heritage Park
From: agnes.stupak@energycenter.org [mailto:agnes.stupak@energycenter .org]
Sent: Thursday, February 11, 2010 4:10 PM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application SD-CSI-04818, City of Chula Vista-Heritage Park
02/11/10
To: Brendon Reed
City of Chula Vista-Heritage Park
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-048 18, City ofChula Vista-Heritage Park
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI -04818
Government 3 Step
City of Chula Vista-Heritage Park
02/17/2010
4-14
Page 2 of2
Installation Address 1381 E Palomar St
Chula Vista, CA 91913
CEC-ACRating 14.152kW
Design Factor 99.859%
CSI System Size l4.13} kW
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $26,144
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
ht(p://eneI!zvcenter.org/ContentP~e.asu?ContentID=377 &Section Tl1=405&SectionTarl!et=3 70 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org , or (858) 634-4728.
Sincerely,
Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/2010
4-15
Page 1 of2
Brendan Reed
From: Jim Filanc [JFilanc@southerncontracting.com]
Sent: Monday, February 15, 2010 8:06 AM
To: Brendan Reed
Cc: Gordon Day; Matt Hart; Joe Melin
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04820, City of Chula Vista- Montevalle Park
From: agnes.stupak@energycenter.org [mailto:agnes.stupak@energycenter .org]
Sent: Thursday, February 11, 20104:41 PM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application SD-CSI-04820, City of Chula Vista- Montevalle Park
02/11110
To: Brendon Reed
City of Chula Vista- Montevalle Park
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04820, City ofChula Vista- Montevalle Park
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI-04820
Government 3 Step
City ofChula Vista- Montevalle Park
02/17/2010
4-16
Page 2 of2
Installation Address 840 Duncan Ranch Rd
Chula Vista, CA 91914
CEC - AC Rating 48.1 17 k W
Design Factor 98.091 %
CSI System Size 47.198 kW
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $87,316
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.12owerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://energvcenter.9rg/ContentPage.as1;>?ContentID=377 &SectionlD=405&SectionTarget=3 70 to download the
applicable forms. -
The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Jeff Wheeland, at
jeff.wheeland@energycenter.org.
Sincerely,
Jeff Wheeland
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/l7/20JO
4-17
Page 10f2
Brendan Reed
From: Jim Filanc [JFilanc@southernccntracting.com]
Sent: Monday, February 15, 2010 8:05 AM
To: Brendan Reed
Cc: Gordon Day; Matt Hart f
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04817, City of Chula Vista- Civic Center
FYI as requested.
From: agnes.stu pak@energycenter.org [mailto :agnes.stupak@energycenter.org]
Sent: Thursday, February 11, 2010 11:38 AM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application 5D-CS1-04817, City of Chula Vista- Civic Center
02111/10
To: Brendon Reed
City of Chu1a Vista- Civic Center
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confinned Reservation Notice, SD-CSI -04817, City of Chula Vista- Civic Center
Dear Brendon Reed:
. Congratulations! TIris letter confmns that a conditional reservation has been issued for your proposed Photovo1taic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI-04817
Government 3 Step
City ofChuIa Vista- Civic Center
02/17/20!0
4-18
Page 2 of2
Installation Address 276 Fourth Ave 100
Chula Vista, CA 91910
CEC - AC Rating 48.117 kW
Design Factor 97.599%
CSI System Size 46.962 kW
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $86,880
RFP Due Date 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://energycenter.oriYContentPage.asp?ContentID=377&SectionTD=40 5 &Section T arget=3 70 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Jeff Wheeland, at
jeffwheeland@energycenter.org.
Sincerely,
Jeff Wheeland
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/2010
4-19
Page I of2
Brendan Reed
From: Jim Filanc [JFilanc@southerncontracting.com]
Sent: Monday, February 15, 2010 8:06 AM
To: Brendan Reed
Cc: Gordon Day; Joe Melin; Matt Hart ,
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04819, City of Chula Vista-Lorna Verde Recreaction Center
From: agnes.stupak@energycenter.org [mailto :agnes .stupa k@energycenter.org]
Sent: Thursday, February 11, 2010 4:32 PM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application SD-CSI-04819, City of Chula Vista-Loma Verde Recreaction Center
02/11/10
To: Brendon Reed
City of Chula Vista-Lorna Verde Recreaction Center
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-048l9, City of Chula Vista-Lorna Verde
Recreaction Center
Dear Brendon Reed:
Congratulations! This letter confmns that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed beJow:
Application Number
Application Type
Host Customer
SD-CSI -04819
Government 3 Step
City of Chula Vista-Lorna Verde Recreaction Center
02/17/2010
4-20
Page 2 of2
Installation Address 1420 Lorna Ln
Chula Vista, CA 91911
CEC-ACRating 48.1l7kW
Design Factor 98.184%
CSI System Size 47.243 kW
EPBBIPBI Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $87,400
RFPDueDate 04/12/2010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ ITom the amount stated in tbis letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: ht1ps://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
ht1p:/ /enerfi!ycenter.org/ContentPage.asp?ContentID=3 77 &SectionID=405&SectionTarget=370 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Jeff Wheeland, at
jeff. wheeland@energycenter.org.
Sincerely,
Jeff Wheeland
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/2010
4-21
Page 1 of2
Brendan Reed
From: Jim Filanc [JFilanc@southemcontracting.com]
Sent: Monday, February 15, 2010 8:07 AM
To: Brendan Reed
Cc: Gordon Day; Joe Melin; Matt Hart ~
Subject: FW: Reservation Reserved Notice, Application SD-CSI-04825, City of Chula Vista- Salt Creek Recreation Facility
From: agnes.stupak@energycenter .org [mailto:agnes.stupak@energycenter.org]
Sent: Thursday, February 11, 2010 7:27 PM
To: breed@ci.chula.vista.ca.us
Cc: Jim Filanc
Subject: Reservation Reserved Notice, Application 5D-<:5I-04825, Dty of Chula Vista- Salt Creek Recreation Facility
02/11110
To: Brendon Reed
City of Chula Vista- Salt Creek Recreation Facility
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04825, City ofChula Vista- Salt Creek
Recreation Facility
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI-04825
Government 3 Step
City of Chula Vista- Salt Creek Recreation Facility
02/17/2010
4-22
Page 2 of2
Installation Address 2710 Otay Lakes Rd
Chula Vista, CA 91915
CEC - AC Rating 48.117 kW
Design Factor 99.953%
CSI System Size 48.094 kW
.'
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $88,974
RFP Due Date 04/1212010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/1312011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ trom the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/1312011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http://energycenter.orglContentPage.asp ?ContentID=3 77 &SectionID=40 5 &Section Tafl!et=370 to dowuload the
applicable forms.
The CFUC requires all customers to pay for 5 years of data co=unication and Performance Monitoring and Reporting
Services (PMRS), uuless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org , or (858) 634-4728.
Sincerely,
Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02117/2010
4-23
Page 1 of2
Brendan Reed
From:
Sent:
To:
Jim Filanc [JFilanc@southemcontracting.com]
Monday, February 15, 2010 8:08 AM
Brendan Reed
Cc: Gordon Day; Joe Melin; Matt Hart
Subject: FW: Reservation Reserved Notice, Application SO-CSI-04822, City of Chula Vista-Otay Recreation Center
From: agnes.stupak@energycenter.org [mailto :agnes.stupak@energycenter.org]
Sent: Thursday, February 11, 2010 7:29 PM
To: breed@ci.chula.vista.ca.us
cc: Jim Filanc
Subject: Reservation Reserved Notice, Application 50-CS1-04822, City of Chula Vista-OIay Recreation Center
02/11/10
To: Brendon Reed
City of Chula Vista-Otay Recreation Center
276 Fourth Ave
Chula Vista, CA 91910
Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04822, City of Chula Vista-Otay Recreation
Center
Dear Brendon Reed:
Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV)
project under the California Solar Initiative Program. Details regarding your reservation are listed below:
Application Number
Application Type
Host Customer
SD-CSI-04822
Gove=ent 3 Step
City of Chula Vista-Otay Recreation Center
02/17/20! 0
4-24
Page 2 of2
Installation Address 3554 Main St.
Chula Vista, CA 91911
CEC-ACRating 36.796kW
Design Factor 99.921 %
CSI System Size 36.767 kW
EPBB Incentive Rate EPBB @ $1.85 per Watt
Reserved Incentive Amount $68,019
RFP Due Date 04/1212010
Proof of Project Milestone Due Date 10/09/2010
Reservation Expiration Date 08/13/2011
The reserved incentive amount is determined by the proposed system listed in the Reservation Request
documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the
installed system changes.
Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this
due date may be cancelled.
Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be
available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the
current California Solar Initiative Handbook for specific requirements and exemptions.
The Proof of Project Milestone checklist can now be completed online at: httIts://ccse.powerclerk.com.
If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit
http:// energycenter .9rQ:/ContentPa~e.asp?ContentID=3 77 &Section Tf>=40 5&Section T arget=370 to download the
applicable forms.
The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting
Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for
specific requirements and exemptions.
For questions concerning this notice, please contact the application project manager, Agnes Stupak, at
agnes.stupak@energycenter.org , or (858) 634-4728.
Sincerely,
Agnes Stupak
California Center for Sustainable Energy
California Solar Initiative
CC: Southern Contracting Company
02/17/2010
4-25
RESOLUTION NO. 2010-
RESOLUTION OF THE CITY COUNCIL OF THE CITY
OF CHULA VISTA (I) ACCEPTING $772,817 IN
INCENTIVE FUNDS FROM THE CALIFORNIA SOLAR
INITIATIVE TO INSTALL SOLAR PHOTOVOLTAIC
SYSTEMS AT MULTIPLE MUNICIPAL FACILITIES (2)
APPROPRIATING $772,817 IN INCENTIVE FUNDS TO
THE CITY'S ENERGY CONSERVATION FUND (3)
AMENDING THE FISCAL YEAR 2009-2010 CAPITAL
IMPROVEMENT PROGRAM AND (4) APPROPRIATING
$772,817 OF CITY ENERGY CONSERVATION FUNDS
TO EXISTING CIP G0208 (MUNICIPAL SOLAR
PHOTOVOLTAIC SYSTEMS)
WHEREAS, the City of Chula Vista has identified the installation of renewable
energy systems as a top priority in its energy and carbon management efforts; and
WHEREAS, as part of the Council-approved Climate Protection Measures
Implementation Plan (Measure #5), staff has developed a capital improvement project to
install approximately 500 kW of additional Solar PV systems at II municipal sites; and
WHEREAS, the $3.2 million project is being financed through a low-interest
California Energy Commission loan ($1,579,285) and federal Energy Efficiency &
Conservation Block Grants ($874,300); and
WHEREAS, staff has also applied to reserve incentive funds through the California
Solar Initiative (CSI); and
WHEREAS, as a result of the City's application, the California Center for
Sustainable Energy, which administers the CSI program in San Diego County, has
reserved $772,817 for the project based on its proposed size and electrical output; and
WHEREAS, the incentives will help reduce the project's net implementation costs
and shorten the payback period for the related California Energy Commission loan.
NOW, THEREFORE BE IT RESOLVED that the City Council of the City of
Chula Vista does hereby:
1. Accept $772,817 in incentive funds from the California solar initiative to
install solar photovoltaic systems at multiple municipal facilities; and
2. Appropriate $772,817 in incentive funds to the City's Energy Conservation
Fund; and
3. Amend the Fiscal Year 2009-2010 Capital Improvement Program; and
4-26
4. Appropriate $772,817 of Energy Conservation Funds to the crp
expenditure category for crp GG208.
Presented by Approved as to form by
~~
Michael Meacham
Director of Conservation and
Environmental Services
'f'~
~.
4-27