HomeMy WebLinkAbout2010/04/13 Item 4 CITY COUNCIL AGENDA STATEMENT ITEM TITLE: SUBMITTED BY: REVIEWED BY: APRIL 13,2010, ItemL RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA (1) ACCEPTING $772,817 IN INCENTIVE FUNDS FROM THE CALIFORNIA SOLAR INITIATIVE TO INSTALL SOLAR PHOTOVOLTAIC SYSTEMS AT MULTIPLE MUNICIPAL FACILITIES (2) APPROPRIATING $772,817 IN INCENTIVE FUNDS TO THE CITY'S ENERGY CONSERVATION FUND (3) AMENDING THE FISCAL YEAR 2009-2010 CAPITAL IMPROVEMENT PROGRAM AND (4) APPROPRIATING $772,817 OF CITY ENERGY CONSERVATION FUNDS TO EXISTINGCIP GG208 (MUNICIPAL SOLAR PHOTOVOL TAlC SYSTEMS) DIRECTOR OF CONSERVATION & ENVIRONMENTAL SERVICES DIRECTOR OF PUBLIC WORKS ~ CITY MANAGER oI1!r- ASSIST ANT CIT~AGER ")") 4/5THS VOTE: YES ~ NO D ~ SUMMARY To lower energy costs and reduce peak energy demand, Chula Vista will be installing approximately 500 kW of solar photovoltaic systems at 11 municipal facilities over the next 8 months. The project's costs are being funded through a low-interest California Energy Commission loan and federal American Recovery & Reinvestment Act funds. In addition, $772,817 of California Solar Initiative incentives have been reserved for the project helping to further reduce net implementation costs. The new solar photovoltaic systems will help to achieve the City's goal of generating at least 20% of municipal facilities' energy demand with on-site renewable energy generation as outlined in the Municipal Building Energy Efficiency Policy (2005). ENVIRONMENTAL REVIEW The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental. Quality Act (CEQA) and has determined that the project qualifies for a Class 8 categorical exemption pursuant to Section 15308 [Actions by Regulatory Agencies for Protection of the Environment] of the State CEQA Guidelines because the energy savings resulting ITom the renewable energy project will contribute to reducing Chula Vista's greenhouse gas or "carbon'" emissions thus improving air quality. Therefore, no further CEQA environmental review IS necessary. 4-1 APRIL 13,2010, Item-A:::- Page 2 of 3 RECOMMENDATION Council adopt the resolution. BOARDS/COMMISSION RECOMMENDATION The proposed solar photovoltaic project was presented to the Resource Conservation Commission (RCe) at their February 22, 2010 meeting as an Information Item. Although the RCC did not take formal action, the Commission expressed general support for the project. DISCUSSION The City of Chula Vista has identified the installation of renewable energy systems as a top priority in its energy and carbon management efforts. Through its Municipal Building Energy Efficiency Policy (2005), the City established a goal of generating at least 20% of its municipal facilities' energy demand with on-site renewable energy. Currently, there are 75 kW of Solar Photovoltaic (PV) systems on a variety of municipal buildings - Nature Center (6 kW), Public Works Household Hazardous Waste Facility (4 kW), Civic Center Building #200 (30 kW), and the Police Headquarters (35 kW) - meeting 1.5% of energy demand. These Solar PV systems produce electricity during peak daytime energy periods when grid-delivered electricity is most expensive and when there is potential for electricity supply disruptions. In addition, the City boasts two Solar Hot Water systems which use the Sun's heat energy to warm pool water at the Lorna Verde and Parkway Aquatic Centers. As part of the Council-approved Climat~ Protection Measures Implementation Plan (Measure #5), staff has developed a capital improvement project to install approximately 500 kW of additional Solar PV systems at 11 municipal sites. The new systems will produce over 715,000 kWh of electricitY annually (equivalent to the yearly energy use of 120 homes), reduce municipal greenhouse gas emissions by 262 metric tons CO2, and increase on-site renewable generation to 11.5% of total municipal energy demand. The $3.2 million project is being financed through a low-interest California Energy Commission loan ($1,579,285) and federal Energy Efficiency & Conservation Block Grants ($874,300). Staff has also applied to reserve incentive funds through the California Solar Initiative (CSI). The CSI is a 10-year program by the California Energy Commission and the California Public Utilities Commission to facilitate the installation of 3,000 MW of solar energy systems statewide by providing cash incentives to residents, businesses, and institutions. As a result of the City's application, the California Center for Sustainable Energy, which administers the CSI program in San Diego County, has reserved $772,817 for the project based on its proposed size and electrical output. The incentives will help reduce the project's net implementation costs and shorten the payback period for the related California Energy Commission loan. DECISION MAKER CONFLICT Staff has reviewed the property holdings of the City Council and has found a conflict exists, in that Councilmember Steve CastaTIeda has property holdings within 500 feet of the boundaries of the property which is the subject of this action. 4-2 APRIL 13, 2010, Item~ Page 3 of 3 CURRENT YEAR FISCAL IMP ACT The CSI incentive, in conjunction with federal and state grants/loans, will cover all capital costs associated with installing the Solar PV systems. Specifically, the $772,817 California Solar Initiative incentive will reduce the net implementation costs for the capital improvement project. City staff time costs associated with implementing the project will be supported through the SDG&E Local Government Partnership which is funded by California utility ratepayers under the auspices of the California Public Utilities Commission. At this time, staff is recommending appropriating the incentive funds to the following Capital Improvement Project: CIPNo. GG208 Descri tion Municipal Solar Photovoltaic Systems $772,817 Total $772,817 ONGOING FISCAL IMPACT The project will generate $182,674 in estimated annual energy cost savings which will be used to repay the debt service for a related California Energy Commission loan (simple payback <11 years). Once the loan is repaid, the City's General Fund would begin to accrue the full annual cost savings. In addition, the City will realize more incremental energy cost savings sooner as utility rates increase every few years. ATTACHMENTS Attachment A - CSI Incentive Reservation Confirmations Prepared by: Brendan Reed, Environmental Resource Manager, Conservation & Env. Services 4-3 ATTACHMENT A Brendan Reed From: Jim Filanc [JFilanc@southerncontracting.com] Sent: Monday, February 15, 2010 8:07 AM To: Brendan Reed Cc: Gordon Day; Joe Melin; Matt Hart Subject: FW: Reservation Reserved Notice, Application SD-CSI-04824, City of Chula Vista- Public Works Yard From: agnes.stupak@energycenter.org [mailto :agnes.stupa k@energycenter.org] Sent: Thursday, February 11, 2010 7:28 PM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application 5D-CS1-04824, City of Chula Vista- Public Works Yard 02111/10 To: Brendon Reed City ofChula Vista- Public Works Yard 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI -04824, City of Chula Vista- Public Works Yard Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic crY) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI-04824 Government 3 Step City ofChula Vista- Public Works Yard 02/17/2010 4-4 Page 2 of2 Installation Address 1800 Maxwell Rd Chula Vista, CA 91911 CEC-ACRating 48.117kW Design Factor 96.330% CSI System Size 46.351 kW EPBB Incentive Rate EPBB @#$1.&5 per Watt . Reserved Incentive Amount $85,749 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ trom the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation ofthe reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: httJ;!s://c>:se.~ow~rclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://energycenter.org/ContentP~e.~?ContentID=377 &SectionID=405&SectionTarget=370 to download the applicable forms. . The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org , or (858) 634-4728. Sincerely, , . Agnes Stupak California Center for Sustainable Energy California Solar Initiative - CC: Southern Contracting Company 02/17/2010 4-5 Page IoU. Brendan Reed From: Agnes Stupak [agnes.stupak@energycenter.org] Sent: Tuesday, February 16, 2010 9:27 AM To: Brendan Reed Subject: FW: Reservation Reserved Notice, Application SD-CSI-04823, -City of Chula Vista-Parkway Community Center Centerfor CSuStainabl~energy Ci'\lJFO-R'wIA.. . )\gnes Stupak Associate Program Manager, CSI 8690 Balboa Ave, Suite 100 San Diego, CA 92123-1502 858.244.1177 phone 858.244.1178 fax www.eneravcenter.ora Learn the latest in clean energy developments. Subscribe to Energy Connections today. , From: agnes,stu pak@energycenter.org [mailto:agnes.stupa k@energycenter,org] Sent: Tuesday, February 16, 2010 9:03 AM To: breed@ci.chula.vista.ca.us Cc: jfilanc@southerncontracting.com Subject: Reservation Reserved Notice, Application SD-CSI-04823, City of Chula Vista-Parkway Community Center 02/16/10 To: Brendon Reed City ofChula Vista-Parkway Community Center 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04823, City ofChula Vista-Parkway Community Center Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) 02/17/2010 4-6 Page 2 oU. project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer Installation Address SD-CSI-04823 Gove=ent 3 Step City of Chula Vista-Parkway Community Center 373 Park Waf Chula Vista, CA 91910 CEC-ACRating 36.796kW Design Factor 98.484% CSI System Size 36.238 kW EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $67,040 RFP Due Date 04/17/2010 Proof of Project Milestone Due Date 10/14/2010 Reservation Expiration Date 08/18/2011 The reserved incentive amount is detennined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/18/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.coml. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://ener2Vcenter.orvContentPage.asu?ContentlD=3 77 &SectionID=405&SectionTari:!et=370 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting ( Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org, or (858) 634-4728. Sincerely, Agnes Stupak California Center for Sustainable Energy California Solar Initiative 02117/2010 4-7 Page 1 of2 Brendan Reed From: Jim Filanc [JFilanc@southemcontracting.com1 Sent: Monday, February 15,20108:07 AM To: Brendan Reed Cc: Gordon Day; Joe Melin; Matt Hart Subject: FW: Reservation Reserved Notice, Application SD-CSI-04821, City of Chula Vista- Norman Park Center ~..__.__. From: agnes.stupak@energycenter.org [maillo:agnes.stupak@energycenter .org] Sent: Thursday, February 11, 2010 6:59 PM To: breed@cI.chula.vista.ca.us Co: Jim Filanc Subject: Reservation Reserved Notice, Application SD-csI -04821, City of Chula Vista- Norman Park Center 02111/1 0 To: Brendon Reed City of Chula Vista- Norman Park Center 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04821 , City of Chula Vista- Norman Park Center Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI-0482I Government 3 Step City ofChula Vista- Norman Park Center 02/17/2010 4-8 Page 2 of2 Installation Address 270 F St. Chula Vista, CA 91910 CEC - AC Rating 31.135 kW Design Factor 98.666% CSI System Size 30.720 kW " EPBB/ Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $56,832 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ ftom the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/1312011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: httPs://ccse.12owerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit htt;p:/ /ener!!Vcenter.or~/ContentPage.a~?ContentID=377 &Section m=405&SectionTarget=370 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org, or (858) 634-4728. Sincerely, Agnes Stupak California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/20JO 4-9 Page 1 of2 Brendan Reed From: Sent: To: Jim Filanc [JFilanc@southemcontracting.coml Monday, February 15, 2010 8:09 AM Brendan Reed Cc: Gordon Day; Matt Hart; Joe Melin " Subject: FW: Reservation Reserved Notice, Application SD-CSI-D4826, City of Chula Vista- Veterans Park From: agnes.stupak@energycenter.org [mailto :agnes.stupak@energycenter.org] Sent: Thursday, February 11, 20107:33 PM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application SD-CSI-04826, City of Chula Vista- Veterans Park 02/11/1 0 To: Brendon Reed City of Chula Vista- Veterans Park 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04826, City ofChula Vista- Veterans Park Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the CaJifornia Solar Initiative Program. Details regarding your reservation are !istOO below: Application Number Application Type Host Customer SD-CSI-04826 Government 3 Step City of Chula Vista- Veterans Park 02/17/20}0 4-10 Page 2 of2 Installation Address 785 E Palomar St. Chula Vista, CA 91911 CEC-ACRating 48.117kW Design Factor 98.007% CSI System Size 47.158 kW .' EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $87,242 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the inStallation and submit the Incentive Claim package by 08/13/20 II. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://ener~ycenter.org/ContentPa~e.w>p?ContentID=377 &SectionID=405&SectionTarget=370 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org, or (858) 634-4728. Sincerely, Agnes Stupak. California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/2010 4-11 Page 1 of2 Brendan Reed From: Jim Filanc [JFilanc@southemcontracting.com] Sent: Monday, February 15, 2010 8:05 AM To: Brendan Reed Cc: Joe Meiin; Matt Hart; Gordon Day , Subject: FW: Reservation Reserved Notice, Appiication SO-CSI-04816, City of Chula Vista- Animal Shelter From: agnes.stupak@energycenter.org [mailto :agnes.stupak@energycenter.org] Sent: Thursday, February 11, 2010 11:07 AM To: breed@d.chula-vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Appiication SO-CSI-04816, City of Chula Vista- Animal Shelter 02/11/10 To: Brendan Reed City of Chula Vista- Animal Shelter 276 Fourth Avenue Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04816, City ofChula Vista- Animal Shelter Dear Brendan Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI -04816 Government 3 Step City of Chula Vista- Animal Shelter 02/17/20l0 4-12 Page 20f2 Installation Address 130 Beyer Way Chula Vista, CA 91911 CEC - AC Rating 16.983 kW Design Factor 99.369% CSI System Size 16.876 kW .' EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $31,221 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/20 I L Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://energvcenter .0rg/ContentPage.a.<>P ?Content1D= 3 77 &SectionID=40 5&Section Target=370 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org , or (858) 634-4728. Sincerely, Agnes Stupak California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/2010 4-13 Page I of2 Brendan Reed From: Jim Filanc [JFilanc@southemcontracting.com] Sent: Monday, February 15,20108:05 AM To: Brendan Reed Cc: Gordon Day; Joe Melin; Matt Hart ' Subject: FW: Reservation Reserved Notice, Application SD-CSI-D4818, City of Chula Vista-Heritage Park From: agnes.stupak@energycenter.org [mailto:agnes.stupak@energycenter .org] Sent: Thursday, February 11, 2010 4:10 PM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application SD-CSI-04818, City of Chula Vista-Heritage Park 02/11/10 To: Brendon Reed City of Chula Vista-Heritage Park 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-048 18, City ofChula Vista-Heritage Park Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI -04818 Government 3 Step City of Chula Vista-Heritage Park 02/17/2010 4-14 Page 2 of2 Installation Address 1381 E Palomar St Chula Vista, CA 91913 CEC-ACRating 14.152kW Design Factor 99.859% CSI System Size l4.13} kW EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $26,144 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit ht(p://eneI!zvcenter.org/ContentP~e.asu?ContentID=377 &Section Tl1=405&SectionTarl!et=3 70 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org , or (858) 634-4728. Sincerely, Agnes Stupak California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/2010 4-15 Page 1 of2 Brendan Reed From: Jim Filanc [JFilanc@southerncontracting.com] Sent: Monday, February 15, 2010 8:06 AM To: Brendan Reed Cc: Gordon Day; Matt Hart; Joe Melin Subject: FW: Reservation Reserved Notice, Application SD-CSI-04820, City of Chula Vista- Montevalle Park From: agnes.stupak@energycenter.org [mailto:agnes.stupak@energycenter .org] Sent: Thursday, February 11, 20104:41 PM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application SD-CSI-04820, City of Chula Vista- Montevalle Park 02/11110 To: Brendon Reed City of Chula Vista- Montevalle Park 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04820, City ofChula Vista- Montevalle Park Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI-04820 Government 3 Step City ofChula Vista- Montevalle Park 02/17/2010 4-16 Page 2 of2 Installation Address 840 Duncan Ranch Rd Chula Vista, CA 91914 CEC - AC Rating 48.1 17 k W Design Factor 98.091 % CSI System Size 47.198 kW EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $87,316 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.12owerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://energvcenter.9rg/ContentPage.as1;>?ContentID=377 &SectionlD=405&SectionTarget=3 70 to download the applicable forms. - The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Jeff Wheeland, at jeff.wheeland@energycenter.org. Sincerely, Jeff Wheeland California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/l7/20JO 4-17 Page 10f2 Brendan Reed From: Jim Filanc [JFilanc@southernccntracting.com] Sent: Monday, February 15, 2010 8:05 AM To: Brendan Reed Cc: Gordon Day; Matt Hart f Subject: FW: Reservation Reserved Notice, Application SD-CSI-04817, City of Chula Vista- Civic Center FYI as requested. From: agnes.stu pak@energycenter.org [mailto :agnes.stupak@energycenter.org] Sent: Thursday, February 11, 2010 11:38 AM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application 5D-CS1-04817, City of Chula Vista- Civic Center 02111/10 To: Brendon Reed City of Chu1a Vista- Civic Center 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confinned Reservation Notice, SD-CSI -04817, City of Chula Vista- Civic Center Dear Brendon Reed: . Congratulations! TIris letter confmns that a conditional reservation has been issued for your proposed Photovo1taic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI-04817 Government 3 Step City ofChuIa Vista- Civic Center 02/17/20!0 4-18 Page 2 of2 Installation Address 276 Fourth Ave 100 Chula Vista, CA 91910 CEC - AC Rating 48.117 kW Design Factor 97.599% CSI System Size 46.962 kW EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $86,880 RFP Due Date 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://energycenter.oriYContentPage.asp?ContentID=377&SectionTD=40 5 &Section T arget=3 70 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Jeff Wheeland, at jeffwheeland@energycenter.org. Sincerely, Jeff Wheeland California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/2010 4-19 Page I of2 Brendan Reed From: Jim Filanc [JFilanc@southerncontracting.com] Sent: Monday, February 15, 2010 8:06 AM To: Brendan Reed Cc: Gordon Day; Joe Melin; Matt Hart , Subject: FW: Reservation Reserved Notice, Application SD-CSI-04819, City of Chula Vista-Lorna Verde Recreaction Center From: agnes.stupak@energycenter.org [mailto :agnes .stupa k@energycenter.org] Sent: Thursday, February 11, 2010 4:32 PM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application SD-CSI-04819, City of Chula Vista-Loma Verde Recreaction Center 02/11/10 To: Brendon Reed City of Chula Vista-Lorna Verde Recreaction Center 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-048l9, City of Chula Vista-Lorna Verde Recreaction Center Dear Brendon Reed: Congratulations! This letter confmns that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed beJow: Application Number Application Type Host Customer SD-CSI -04819 Government 3 Step City of Chula Vista-Lorna Verde Recreaction Center 02/17/2010 4-20 Page 2 of2 Installation Address 1420 Lorna Ln Chula Vista, CA 91911 CEC-ACRating 48.1l7kW Design Factor 98.184% CSI System Size 47.243 kW EPBBIPBI Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $87,400 RFPDueDate 04/12/2010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ ITom the amount stated in tbis letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: ht1ps://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit ht1p:/ /enerfi!ycenter.org/ContentPage.asp?ContentID=3 77 &SectionID=405&SectionTarget=370 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Perfonnance Monitoring and Reporting Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Jeff Wheeland, at jeff. wheeland@energycenter.org. Sincerely, Jeff Wheeland California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/2010 4-21 Page 1 of2 Brendan Reed From: Jim Filanc [JFilanc@southemcontracting.com] Sent: Monday, February 15, 2010 8:07 AM To: Brendan Reed Cc: Gordon Day; Joe Melin; Matt Hart ~ Subject: FW: Reservation Reserved Notice, Application SD-CSI-04825, City of Chula Vista- Salt Creek Recreation Facility From: agnes.stupak@energycenter .org [mailto:agnes.stupak@energycenter.org] Sent: Thursday, February 11, 2010 7:27 PM To: breed@ci.chula.vista.ca.us Cc: Jim Filanc Subject: Reservation Reserved Notice, Application 5D-<:5I-04825, Dty of Chula Vista- Salt Creek Recreation Facility 02/11110 To: Brendon Reed City of Chula Vista- Salt Creek Recreation Facility 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04825, City ofChula Vista- Salt Creek Recreation Facility Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI-04825 Government 3 Step City of Chula Vista- Salt Creek Recreation Facility 02/17/2010 4-22 Page 2 of2 Installation Address 2710 Otay Lakes Rd Chula Vista, CA 91915 CEC - AC Rating 48.117 kW Design Factor 99.953% CSI System Size 48.094 kW .' EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $88,974 RFP Due Date 04/1212010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/1312011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ trom the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/1312011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: https://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http://energycenter.orglContentPage.asp ?ContentID=3 77 &SectionID=40 5 &Section Tafl!et=370 to dowuload the applicable forms. The CFUC requires all customers to pay for 5 years of data co=unication and Performance Monitoring and Reporting Services (PMRS), uuless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org , or (858) 634-4728. Sincerely, Agnes Stupak California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02117/2010 4-23 Page 1 of2 Brendan Reed From: Sent: To: Jim Filanc [JFilanc@southemcontracting.com] Monday, February 15, 2010 8:08 AM Brendan Reed Cc: Gordon Day; Joe Melin; Matt Hart Subject: FW: Reservation Reserved Notice, Application SO-CSI-04822, City of Chula Vista-Otay Recreation Center From: agnes.stupak@energycenter.org [mailto :agnes.stupak@energycenter.org] Sent: Thursday, February 11, 2010 7:29 PM To: breed@ci.chula.vista.ca.us cc: Jim Filanc Subject: Reservation Reserved Notice, Application 50-CS1-04822, City of Chula Vista-OIay Recreation Center 02/11/10 To: Brendon Reed City of Chula Vista-Otay Recreation Center 276 Fourth Ave Chula Vista, CA 91910 Re: California Solar Initiative, Confirmed Reservation Notice, SD-CSI-04822, City of Chula Vista-Otay Recreation Center Dear Brendon Reed: Congratulations! This letter confirms that a conditional reservation has been issued for your proposed Photovoltaic (PV) project under the California Solar Initiative Program. Details regarding your reservation are listed below: Application Number Application Type Host Customer SD-CSI-04822 Gove=ent 3 Step City of Chula Vista-Otay Recreation Center 02/17/20! 0 4-24 Page 2 of2 Installation Address 3554 Main St. Chula Vista, CA 91911 CEC-ACRating 36.796kW Design Factor 99.921 % CSI System Size 36.767 kW EPBB Incentive Rate EPBB @ $1.85 per Watt Reserved Incentive Amount $68,019 RFP Due Date 04/1212010 Proof of Project Milestone Due Date 10/09/2010 Reservation Expiration Date 08/13/2011 The reserved incentive amount is determined by the proposed system listed in the Reservation Request documentation. Please note that the actual incentive payment may differ from the amount stated in this letter if the installed system changes. Please complete the installation and submit the Incentive Claim package by 08/13/2011. Any claims submitted after this due date may be cancelled. Any documentation submitted after the above due dates may result in cancellation of the reservation. Extensions may be available depending on cause of delay at California Center for Sustainable Energy's discretion. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. The Proof of Project Milestone checklist can now be completed online at: httIts://ccse.powerclerk.com. If your Applicant chooses not to complete the Proof of Project Milestone checklist online, please visit http:// energycenter .9rQ:/ContentPa~e.asp?ContentID=3 77 &Section Tf>=40 5&Section T arget=370 to download the applicable forms. The CPUC requires all customers to pay for 5 years of data communication and Performance Monitoring and Reporting Services (PMRS), unless exemption criteria are met. Please refer to the current California Solar Initiative Handbook for specific requirements and exemptions. For questions concerning this notice, please contact the application project manager, Agnes Stupak, at agnes.stupak@energycenter.org , or (858) 634-4728. Sincerely, Agnes Stupak California Center for Sustainable Energy California Solar Initiative CC: Southern Contracting Company 02/17/2010 4-25 RESOLUTION NO. 2010- RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA (I) ACCEPTING $772,817 IN INCENTIVE FUNDS FROM THE CALIFORNIA SOLAR INITIATIVE TO INSTALL SOLAR PHOTOVOLTAIC SYSTEMS AT MULTIPLE MUNICIPAL FACILITIES (2) APPROPRIATING $772,817 IN INCENTIVE FUNDS TO THE CITY'S ENERGY CONSERVATION FUND (3) AMENDING THE FISCAL YEAR 2009-2010 CAPITAL IMPROVEMENT PROGRAM AND (4) APPROPRIATING $772,817 OF CITY ENERGY CONSERVATION FUNDS TO EXISTING CIP G0208 (MUNICIPAL SOLAR PHOTOVOLTAIC SYSTEMS) WHEREAS, the City of Chula Vista has identified the installation of renewable energy systems as a top priority in its energy and carbon management efforts; and WHEREAS, as part of the Council-approved Climate Protection Measures Implementation Plan (Measure #5), staff has developed a capital improvement project to install approximately 500 kW of additional Solar PV systems at II municipal sites; and WHEREAS, the $3.2 million project is being financed through a low-interest California Energy Commission loan ($1,579,285) and federal Energy Efficiency & Conservation Block Grants ($874,300); and WHEREAS, staff has also applied to reserve incentive funds through the California Solar Initiative (CSI); and WHEREAS, as a result of the City's application, the California Center for Sustainable Energy, which administers the CSI program in San Diego County, has reserved $772,817 for the project based on its proposed size and electrical output; and WHEREAS, the incentives will help reduce the project's net implementation costs and shorten the payback period for the related California Energy Commission loan. NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Chula Vista does hereby: 1. Accept $772,817 in incentive funds from the California solar initiative to install solar photovoltaic systems at multiple municipal facilities; and 2. Appropriate $772,817 in incentive funds to the City's Energy Conservation Fund; and 3. Amend the Fiscal Year 2009-2010 Capital Improvement Program; and 4-26 4. Appropriate $772,817 of Energy Conservation Funds to the crp expenditure category for crp GG208. Presented by Approved as to form by ~~ Michael Meacham Director of Conservation and Environmental Services 'f'~ ~. 4-27