Loading...
HomeMy WebLinkAboutPlanning Comm Reports/1981/04/22 AGENDA City Planning Commission Chula Vista, California Wednesday, April 22, 1981 - 7:00 p.m. City Council Chambers PLEDGE OF ALLEGIANCE - SILENT PRAYER APPROVAL OF MINUTES - Meeting of April 8, 1981 ORAL COMMUNICATIONS 1. PUBLIC HEARING: PCZ-81-F - Consideration of rezoning 290 "H" Street from R-3 to C-O, Jeanne Campbell and Myron & Betty Dalseth 2. PUBLIC HEARING: PCS-81-6 - Tentative subdivision map for Chula Vista Tract 81-6, Otay Valley Industrial park, 30 industrial lots, 500 block of Otay Valley Road 3. PUBLIC HEARING: PCS-81-7 - Tentative subdivision map for Chula Vista Tract 81-7, Pepper Tree Estates, 15 single family lots, 0-100 Pepper Tree Road 4. PUBLIC HEARING: a. Recertification of EIR-79-2 on Bonita Long Canyon Estates b. Consideration of Candidate CEQA findings on Bonita Long Canyon development c. Development plan of Bonita Long Canyon Sectional Planning Area d. Tentative subdivision map for Chula Vista Tract 81-4, Bonita Long Canyon Estates DIRECTOR'S REPORT COMMISSION COMMENTS To: City Planning Commission From: D.J. Peterson, Director of Planning Subject: Staff report on agenda items for Planning Commission Meeting of April 22, 1981 1. PUBLIC HEARING: PCZ-S1-F - Consideration of rezonin9 290 "H" Street from R-3 to C-Os Jeanne Campbell and Myron & Betty Dalseth A. BACKGROUND 1. This item involves a request to rezone a .49 acre parcel located at 290 "H" Street from R-3 to C-O. The Planning Department has also included for consideration the rezoning from R-3 to C-O of two parcels located immediately to the west and continguous to the subject property. 2. An Initial S%udy, IS-81-34, of possible adverse environmental impacts of the project was conducted by the Environmental Review Committee on April 12, 1981. The Committee concluded that there would be no significant environmental effects and recommended that the Planning Commission adopt the Negative Declaration. B. RECOMMENDATION 1. Adopt the Negative Declaration on IS-81-34 and find that this rezoning will have no significant environmental impact. 2. Based on the findings contained in Section "D" of this report, adopt a motion recommending that the City Council approve the request, PCZ-81-F, to rezone the property located at 290 "H" Street from R-3 to C-O-P and that the two parcels included by the Planning Department be rezoned from R-3 to C-O, as shown on the attached Exhibit "A". Precise plan guidelines shall be as follows: a. No building shall exceed three stores or thirty-five feet in height. bo A 25 foot setback shall be maintained from the easterly and southerly property lines for any building exceeding one story or 12 feet in height. The setback for buildings of one story, not exceeding 12 feet in height, shall be 10 feet from the south property line and 5 feet from the easterly property line. c. Development of the property shall take into consideration the existing trees on the site in order that as many specimen trees as practical may be retained. C. DISCUSSION 1. Existing site characteristics. The subject property is a 75' x 290' level parcel developed with a single family dwelling and detached garage. The two parcels included by the Planning Department lie within the boundaries of the Town Centre Redevelopment area and are being used for parking in conjunction with the bank located at the southeast corner of Third Avenue and "H" Street. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 2 2. Adjacent zoning and land use. North R-3 Church South C-O & R-1 Vacant (Town Centre) and single family dwellings East R-3 Apartments (16 units) West C-O Bank, vacant and office (Town Centre) 3. General Plan The frontage along the east side of Third Avenue, south of "H" Street, is designated on the Land Use Element of the General Plan for development as "Professional and Administrative Commercial" and the frontage along the south side of "H" Street, east of Third Avenue, is designated for "High Density Residential (13-26 DU/acre)" development. The subject property, as well as the additional two parcels, is located at a point where the two land use designations meet and, therefore, will be considered consistent with the General Plan if zoned either commercially or residentially. 4. Transitional area. The twQ lots recommended by the Planning Department for inclusion in the rezoning are, in effect, used commercially inasmuch as they form the parking lot for the bank on the corner. However, they are zoned R-3. The lot adjacent on the east to the subject property was developed with an apartment complex in 1977. Thus, the subject property is a transitional property which is suitable either for commercial office use or multiple family development. Inasmuch as the owner also owns the two lots on Third Avenue immediately south of the bank, which are also contiguous with the subject property (in an "L" shaped configuration) and plans to develop the three lots into a mid-rise office complex, it seems appropriate to zone the subject property to C-O. The C-O zone is the city's most restrictive zone and allows office and professional uses which are quite compatible with multiple family uses. D. FINDINGS Section 19.56.041 of the zoning ordinance provides that the "P" Modifying District may be applied to areas only when one or more of the following circumstances is evident: B. The property or area to which the P modifying district is appZied is an area adjacent and contiguous to a zone aZlowing different land uses, and the development of a precise plan will allow the area so designated to coexist between land usages which might other~ise prove incompatible. The subject property is contiguous to single family areas to the south and multiple family residential development to the east. The attachment of the "P" district will permit the development of guidelines to insure compatibility between uses. City Planning Commission page 3 Agenda Items for Meeting of April 22, 1981 C. The basic or unde~lyin~ zone regulations do not alZow the propertU owner and/or the city appropriate contro~ or f~exibility needed to achieve a~ efficient and proper relationship among the uses allowed in the adjacent The multiple family development to the east has the bulk of its open space adjacent to the subject property. The recommended development guidelines will insure that this area is not adversely affected by the development of the subject property by imposing a more restrictive height limitation and greater setbacks than the code would require. I I I I I I I -- A VARADO I I r"' .... I I I I I I I I L i i I I .... I I ! I I I I I I I J ~ LAWN ' I I i I '1 I f I I I PRINT I ;I-K~P STREET MF MF MF MF MF I I I I I I COUNTY OF SAN DIEGO ~HASTA $OUTHI~Y negative declaration-- PROJECT NAME: Dalseth-Campbell Rezone PROJECT LOCATION: 290 H Street PROJECT PROPONENT: M. Dalseth & J. Campbell 525 3rd Ave. Chula Vista, CA 92010 Case No. IS-81-34 Date: April 2, 1981 A. Project Setting The proposed project involves 0.5 acres of property located at 290 H Street in addition to 0.32 acres immediately adjacent to the west. The easterly 0.5 acre (75'x290') parcel presently contains a single family dwelling and detached garage. The westerly parcel (100'x139') is presently utilized as a parking lot for a savings and loan facility located on the southeast corner of Third Ave. and H Street. Multiple family units are located to the east, single family dwellings are located to the south, and a church and H St. are located to the north of the project site. B. Project Description The applicants are requesting the rezoning of the parcel at 290 H Street from R-3 (Multiple family) to C-O (Commercial Office) and the City of Chula Vista is including the westerly 0.32 acre parcel in this request. The westerly parcel is also zoned R-3, although it is presently utilized as a commercial parking lot. C. Ccmpatibility of zoning and plans The proposed rezoning is compatible with the General Plan land use designation of Professional and Administrative Commercial. The Chula Vista Town Centre I Project Area (Subarea Three) encompasses the westerly parcel and designates it as Office/Commercial which is compatible with the proposed zoning. D. Identification of environmental effects The following environmental effects will not occur as a result of the proposed project but rather through future development of the project area which will be authorized by the proposed action. Prior to the consideration of any specific development proposal, additional environmental review will be required. city of chula vista planning department - environmental review section 1. Soils The engineering Dept. has indicated that expansive soils may be present in the project area. The submission of a soils report and incorporation of all recommendations shall be required prior to any construction on this site. 2. Aesthetics Future development plans should provide shielding of exterior lighting to avoid excessive glare on adjacent residential areas. Future development plans should retain any existing mature trees on the project site where feasible. 3. Transportation The projected traffic increase anticipated through future development of the project site will not significantly effect the service level of surrounding streets, although additional H Street right-of-way will be required with future development plans for the property. 4. Noise Due to the existing setbacks of residential units to the east and south, the problem of potentially adverse ambient noise levels appear to be negligible. A 6 ft. high masonry zoning wall will be required as a standard zoning requirement. (Chapter 19.58.360, Municipal Code) E. Findings of insignificant impact 1. Sinc~ the proposed actions will not result in any great physical change, no natural resources nor hazards will be affected. Prior to the review of any development plans, additional environmental review will be required and the extent of any physical damage to the environment fully evaluated. 2. The project is in conformance with the Chula Vista General Plan and associated elements and is not anticipated to achieve short term to the disadvantage of long term environmental goals. 3. No substantial impacts are anticipated which could interact to create a substantial cumulative effect on the environment are anticipated. 4. The project will not have any significant effect on traffic or associated emissions nor will bhe project result in any other hazard which could prove detrimental to human beings. F. Individuals and organizations consulted City of Chula Vista Steve Griffin, Assoc. Planner Roger Daoust, Senior Eng. Dan Waid, Jr. Civil Eng. Shabda Roy, Assoc. Eng. Tom Dyke, Plan Checker Duane Bazzel, Assist. Planner Applicant - Myron Dalseth & Jeanne Campbell Documents Chapter 19, Municipal Code Town Centre I Redevelopment Plan The Initial Study Application and evaluation forms documenting the findings of no significant impact are on file and available for public hearing at the Chuta Vista Planning Dept., 276 4th Avenue Chula Vista, CA 92010 ' ~L REVIEW COOF~INATOR city o! Chula vista planning department ~ environmental review section EN 6 City Planning Commission Agenda Items for Meeting of April 22, 1981 page 4 2. PUBLIC HEARING: PCS-81-6 - Tentative subdivision ,~_for Chu]~_yi~. ~9S~ 81~_, _919J~ ~9] ]~ _~9~_us t r i a 1 _Pa r k~_ ~.~.~ug_~r_i 9.1 lo~s.~ ~0_ b l o_ck of O~ay__V~j 1 e~_ _R_99 d A. BACKGROUND 1. The applicant is requesting approval of a tentative subdivision map known as Otay Valley Industrial Park, Chula Vista Tract 81-6, in order to subdivide 40.76 acres located at the northwest quadrant of Otay Valley Road and Maxwell Road in the I-P zone, into 29 industrial lots. 2. An Initial Study, IS-81-24, of possible adverse environmental impacts of the project was conducted by the Environmental Review Committee on January 22, 1981. The Conlnittee concluded that there would be no significant environmental effects and recommended adoption of the Negative Declaration. B. RECOMMENDATION 1. Adopt the Negative Declaration on IS-81-24 and find that this project will have no significant environmental impact. 2. Based on the findings contained in Section "D" of this report, adopt a motion recommending that the City Council approve the tentative subdivision map for Otay Valley Industrial Park, Chula Vista Tract 81-6, subject to the following conditions: a. Minimum curb return radii for all intersections shall be 30 feet. b. The developer shall grant to the City a 7.5 foot street tree easement along Otay Valley Road. c. The developer shall dedicate to the City, right-of-way for Otay Valley Road within the subdivision; said dedication shall be adequate to provide 50 feet of right-of-way north of the centerline as shown on Chula Vista Drawing 75-109D and 75-110D. The developer shall be responsible for full street improvements within the subdivision. d. The developer shall acquire and dedicate to the City offsite right-of- way along the north side of Otay Valley Road adequate to provide 35 feet of right-of-way north of the centerline as shown on Chula Vista Drawing 75-109D and 75-110D; said dedication shall run from the eastern curb return of Maxwell Road to the southern subdivision boundary. Said dedication shall be accomplished prior to approval of the final map. e. The developer shall be responsible for constructing improvements within the northerly half of Otay Valley Road from the eastern curb return of Maxwell Road to the southern subdivision boundary. Said improvements shall include but not be limited to: A.C. pavement from the ultimate centerline to the northerly line of right-of-way to be dedicated under item "d", A.C. berm and street drainage facilities in accordance with City design criteria. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 5 f. The developer shall acquire and dedicate to the City the following offsite right-of-way for roadway transitions prior to approval of the final map: 1) At the southwestern end of the subdivision from said boundary west, an area as determined by the City Engineer adequate to provide a 20:1 roadway transition (north side Otay Valley Road). 2) At the southeastern end of the subdivision an area as determined by the City Engineer on the north side of Otay Valley Road adequate to provide a 150 foot long roadway transition to the east from the eastern curb return of Maxwell Road. g. The developer shall be responsible for roadway transition improvements to include but not be limited to: A.C. pavement, A.C. dike, and appropriate drainage faciltiies. h. The developer may request that a reimbursement district be formed for those offsite portions of Maxwell Road and Otay Valley Road which provide benefit to other properties. i. The developer shall provide adequate energy dissipators downstream of the proposed outlet south of Otay Valley Road at Maxwell Road to prevent erosion; said improvements shall be approved by the City Engineer. j. The block wall at the rear of lots 1 through 8 shall be extended along the top of slope on the west side of lot 1 and the east side of lot 8 (to within 25' of "C" street). Access shall be provided to the down- slope from the interior of the lots. The wall shall be a minimum of 6 feet in height, however, the precise length and height shall be determined at the time of precise plan review for building construction. k. The developer shall comply with those mitigation measures outlined in the Negative Declaration on IS-81-24 pertaining to the tentative and final map. 1. The developer shall provide a minimum water flow as determined by the Fire Marshal to provide adequate fire protection. M~re definitive information on the proposed uses may require additional flow for protection as part of the building or zoning permit process. m. The developer shall grant to the City by grant deed a one foot control lot from the northerly right of way line of Otay Valley Road north along the western subdivision boundary to the north side of "B" street. n. The developer shall provide three street names for the proposed streets prior to the approval of the final map. o. The developer shall acquire the necessary slope rights to complete street "A" as shown on the tentative map. p. The CC&R's for lots 1-8 shall specify that their owners shall form an association for the purpose of providing permanent maintenance of the landscaping on the slope bank along the south side of the lots. The CC&R's shall specify that the City shall be a party to them for purposes of enforcement. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 6 C. DISCUSSION 1. Adjacent zoning and land use. llorth A-8 County Sanitary land fill South I-P Vacant - Otay Valley Road East I-P Auto salvage - construction storage yard West I-P Omar Rendering plant 2. Existing site characteristics. The project site is a vacant 40.76 acre parcel located on the west side of Maxwell Road north of Otay Valley Road; the southerly three-quarters of the property has been used for agricultural purposes. The property also abuts Otay Valley Road at the southwest corner. The site has an average natural slope of 14% with gentle slopes on the southerly portion of the property rising to steeper slopes on the northerly 400 feet of the property. The property has a difference in elevation of approximately 190 feet. 3. Tentative subdivision map. The developer proposes to subdivide the property into 29 industrial lots with a minimum lot size of 27,000 sq. ft. and a minimum level pad area of 21,000 sq. ft. (the code requires a minimum lot size of 20,000 sq. ft.). The largest lot is approximately 6 acres with level pad area of 117,000 sq. ft. The lots will be served by three new streets, two connecting to Maxwell Road running east and west, and one street extending from Otay Valley Road running south to north along the westerly boundary line. The project will require extensive grading, consisting of 440,000 cubic yards of cut and fill, creating approximately 11 acres of manu- factured slopes. The use of variable slope ratios and horizontal curving slopes, rather than flat planed slopes, will help reduce the aesthetic impact of the proposed grading. The proposed development will also widen and improve the west side of Maxwell Road as well as a portion of the north side of Otay Valley Road. 4. Adjacent properties. The applicant contacted the owner of the triangular lot to the south and attempted to acquire the property and incorporate the area into this subdivision. Their attempt was unsuccessful; therefore, the property will have to be developed independent of this subdivision. A preliminary grading plan for the adjacent property to the west has been submitted for review. In order to coordinate the two projects, the engineer for the adjacent property was contacted by the City to comment on the compatibility of the two projects. At the time of this writing, the engineer on the adjacent property has not responded. However, staff has concluded that the proposed street alignments, street grades, and grading for Otay Valley Industrial Park provides a logical development pattern which will allow the adjoining property to develop appropriately in the future. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 7 5. Sewer availability. The existing lO'~ sewer line located in Otay Valley Road is currently operating at approximately 60% capacity. With projects planned for this industrial subdi- vision, together ~t~h those already authorized to the east, the Engineering Depart- ment has indicated the system will be strained. In order to assure that the level of sewer service in the area will not be adversely affected with the development of this subdivision, appropriate conditions of approval will be established at the time of building permit issuance. This will require examination by the City Engineer based on the type of occupancy and use proposed. D. FINDINGS Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative subdivision map for Otay Valley Industrial Park, Chula Vista Tract 81-6, is found to be in conformance with the various elements of the City's General Plan based on the following: 1. The site is physically suitable for industrial development and the proposal conforms to all standards established by the City for such projects. 2. The design of the subdivision will not affect the existing improvements-- streets, sewer, etc.--which have been designed or conditioned to avoid significant problems. 3. The project is in substantial conformance with the Chula Vista General Plan Elements as follows: a. Land Use - The property is designated for "general industrial" development. The proposed development consists of 29 industrial lots. b. Circulation - The proposed development will be served by public streets constructed to industrial standards. These streets are designed to be extended to serve the adjacent property to the west. The existing streets, Otay Valley Road and Maxwell Road, will be widened to accom- modate the anticipated increase in traffic. c. Housing - The site is not designated for residential use. d. Conservation - The existing vegetation is sparse and no rare or endangered species are found on the site. The slopes along the northerly portion of the site will have variable slope ratios and horizontal curves to resemble the existing contour of the land. The slopes will be planted with native plant materials wherever possible. e. Parks and Recreation - The site is designated for industrial use. f. Seismic Safety - The closest known faults are located a quarter of a mile to the east and west of the subject property. The use of flatter slopes will reduce the possibility of landslides. g. Safety - The subject property is well within acceptable fire safety standards for response time from the fire station located on East Oneida. In addition, the developer will be required to provide City Planning Commission Agenda Items for Meeting of April 22, 1981 page 8 adequate fire flow protection upon the development of each lot. h. Noise - All development will be subject to compliance with the performance standards set forth in the Municipal Code. i. Scenic Highways - The developer will be required to erect a wall at the top of slope of the lots nearest Otay Valley Road. The slopes will be treated with native plant material to blend in with the existing vegetation and minimize the problem of maintenance. j. Bicycle Routes - The right of way width for Otay Valley Road will accommodate a bike lane on each side of the street. k, Public Buildings - No public buildings are designated on the site. CONDITIONED negatiVe declaration PROJECT NA~IE: Otay Valley Industrial Park / PROJECT LOCATION: Otay Valley Rd. & Maxwell Rd. PROJECT APPLICANT: Otay Valley Industrial Park, Ltd. 600 B St., Suite 2310 San Diego, CA 92101 CASE NO. IS-81-24 DATE: January 22, 1951 A. Project Setting The project site totals 40.76 acres in size and is located on the west side of Maxwell Rd., north of Otay Valley Rd. The site has an average natural slope of 14%, sloping down from north to south for a total of 190 ft.+ difference in elevation. Adjacent land uses involve the Count~ sanitary land fill to the north, an animal rendering plant to the west, a construction storage yard to the east, and a vacant triangularly shaped parcel of land to the south. The grading for facilities and land uses in the vicinity of the project has resulted in significant land form and aesthetic impact in the "view shed" from Otay Valley Rd. These projects include the rendering plant west of the project site, Robinhood Pt. homes to the northwest of the project and the Otay Industrial Park to the east of the proposed project. The result is that the project site remains almost as an "island" of agriculture and natural view from Otay Valley Rd. The southern three-fourths of the project site has been utilized for agricultural purposes. The northerly 400 + ft. of the site includes steep slopes and natural terrain. Vegetation is sparse, and no rare or endangered species have been found to be present in the project vicinity. Expansive soils are known to exist in the project vicinity. Special Report 123, published by the Calif. Div. of Mines & Geology, indicates that north/south trending earthquake faults are located approximately 1/4 mile to the west and 1/4 mile to the east; in addition to an east/west trending inferred fault immediately south of the project site. city of chula vista planning department environmental review section 1s-~±-24 (2) -- B. Project Description The applicant proposes to subdivide the 40.76 acre site into 31 industrial lots. The project will consist of the movement of 440,000 cubic yards of cut and 364,000 cubic yards of fill creating a total of 11 acres of slope banks. The industrial subdivision will be served by two access roads from Maxwell Rd. and one road from Otay Valley Rd. Grading of the property would be in conformance with the grading plan depicted on the Otay Valley Industrial Park, tentative subdivision map revised January 19, 1981. C. Compatibility with zoning and plans The project site is zoned for general industrial development (I-P) and the proposed plans are consistent with current zoning and the General Plan designation of General Industrial. D. Identification of environmental effects 1. Geology/Soils The applicant has submitted a preliminary geotechnical study (Southern Calif. Soil & Testing, Ind., 1980) for the proposed project site. The following conditions were found to exist on-site: (a) Compressible alluvial deposits which extend from 3 to over 10 ft. in depth, (b) Moderate to highly expansive soils, and (c) the soils that would be exposed in the major cut slopes include fractured and slickensided mudstones which will not provide a sufficient factor of safety against deep seated slope failure. Each of the preceding conditions have been determined to be mitigable as per the preliminary geotechnical soils study. In addition to adverse soil conditions is the potential for significant soil erosion after grading. Ail slopes shall be planted with erosion resistant plant material immediately upon completion of grading operations. 2. Drainage The applicant has submitted a hydrological study which addresses a complete on-site drainage system for the proposed project. The calculated amount of concentrated flow which will be piped under Otay Valley Rd. approximately 350 ft. south to the Otay River bed, totals 153.24 cubic feet per second. The developer will be required to submit plans for a dissipater system to the City Engineer for approval. The system will be designed to reduce the disruptive impacts related to erosion within the river bed to an insignificant level. In addition, appropriate drainage easements will be required. 3. Land Form The project site was previously utilized for agricultural purposes. A gentle slope now exists, sloping up from Otay Valley Rd. to steep slopes at the northern boundary. These steeper slopes and hillsides are ungraded and are in their IS-81-24 (3) natural condition. The proposed project will create 11 acres of manufactured slope banks, which includes the northerly slope areas now visible from Otay Valley Rd. Projects on each side of the proposed development have effectively destroyed any continuity in the natural terrain that once existed. The proposed grading of the site is similar and consistent with the grading of nearby and adjacent properties which are used for purposes necessitating large single level pads. The utilization of variable slope ratios, curving rather than flat planed slopes and appropriate landscaping materials as depicted on the plan will assure adequate mitigation of the aesthetic impact due to land form alterations and land use changes. 4. Biology A Biological Survey (Collier, 1980) has been submitted by the applicant which places special emphasis on identification of environmentally sensitive species and habitats. The survey indicates that most or all of the Coastal sage vegetation found at the northerly portion of the site will be removed as natural habitat and a limited amount of wildlife will be eliminated and/or displaced. Development of the site will reduce a minor wildlife corridor between the site and natural areas north or south from it. No sensitive species, either plant or animal, will be significantly impacted by the proposed project. Landscaping with native materials will, to some degree, increase the utility of the area to wildlife, as well as diminish the blocking of a wildlife corridor. 5. Sewer Availability Approval of the proposed subdivision would have no direct impact on sewer service in the area, however it would facilitate the location of land uses which could effect sewer services. Because precise development plans are not yet avail- able, estimates for the amount of sewage which would be generated by industrial development on the project site cannot be determined. Development of approximately 40 acres of limited industrial and/or commercial development would be permitted if the proposed project is implemented. A 10 inch sewer line is located in Otay Valley Rd. serving industrial development to the east. The City of Chula Vista Engineering Dept. estimates that this 10 inch line is currently operating at about 60 percent capacity. With the increase generated by this project and additional proposed developments within the project vicinity, the City's ability to provide sewer service to the proposed project and to other develop- ments along Otay Valley Rd. will be strained. Because the existing line is presently at 60 percent capacity, approval of the proposed project and eventual industrial and/or commercial IS-81-24 (4) development of the project site could significantly affect the level of service in the area. E. Mitigation necessary to avoid significant effects 1. Incorporation of the mitigation measures recommended in the Geotechnical Study (Southern Calif. Soil & Testing, Inc.) into the project will reduce adverse soil impacts to a level of insignificance. 2. The developer shall submit plans to the City Engineer for a dissipater system to handle drainage outflow in the Otay River bed. Approval of the plans and the acquisition of drainage easements shll be accomplished prior to final subdivision map approval. 3. Native plant material on slope areas shall be encouraged where appropriate. All landscaping material shall be approved by the City's Landscape Architect. 4a. In order to assure that the level of sewer service in the project area will not be adversely affected with imple- mentation of the proposed project, the following mitigation measures may be required as a condition of approval of any precise plans: 1) Total and/or peak sewage flows which could be generated by the proposed project should be limited to that volume which the city determines to be within the capacity of the serving system. 2) Installation of sewage storage capacity could be required by the city as development progresses with appropriate automatic control and pumping facilities to permit discharge at off-peak times. 3) Current landowners would be required to provide sampling manholes acceptable to the city at each lateral connection of the property to the city's sewer. 4) Current landowners could be required to stipulate that they would not oppose the formation of any assessment district formed for the primary or incidental purpose of providing adequate sewer capacity to the area. IS-81-24 (5) b. In conjunction with the submission of a request for the approval of a precise plan for all or a portion of the project, the project proponent shall submit a sewer availability program which has been previously approved by the City Engineer. The tentative sewer availability program when submitted to the City Engineer for approval, shall include the following: 1) The location of the project within the subdivision and point or points of connection to the city sewer system and, 2) The proposed land uses of the project and the estimated liquid waste generation including the identification of peak hours and their volumes, 3) A description of the waste water being generated, 4) Any other information that the City Engineer finds necessary to evaluate the impact of the proposed project on the ability to provide sewer services. c. The City Engineer shall not approve any sewer availability program unless the program definitively establishes the fact that there will be adequate sewer capacity to serve the project considering existing flows, the project and the impacts of other approved or foreseeable projects within the service area of the Otay Valley trunk line. Fo Findings of insignificant impacts 1. There are no significant natural or man-made resources within the project area which could be adversely effected by project implementation. 2. The proposed light industrial/commercial subdivision is in conformance with the General Plan and will not achieve short term to the disadvantage of long term environmental goals. 3. All potential impacts can be mitigated and none are anticipated to interact and cause any cumulative effect on the environment. 4. The project will not create any source of significant noise or odors, nor will any hazards to human beings result. G. Consultation 1. Individuals Steve Griffin, Assoc. Planner Duane Bazzel, Assist. Planner IS-81-24 (6) Shabda Roy, Assoc. Eng. Roger Daoust, Sr. Eng. Ted Monsell, Fire Marshal E. F. Cook, R.C.E. Applicants agent 2. Documents EIR-80-7 Brandywine Industrial Park Preliminary Geotechnical Study, Southern Cal. Soil & Testing, Inc. Biological Survey Report, Gerald Collier, Ph.D. Hydrological Study, E.F. Cook & Assoc. The Initial Stud,.. ' ~ ' · :qT[?.lc.ntlon and evaluation forms documenting the findings of no sicnif£cant ~mpact are on file and available for public review at the Chu[a V~sta P~anninc Dept., 276 4th Avenue, Chula Vista, CA 92010. ~VIR~/L.~NTAL ~VIEW COOF~INATOR city of chula vista planning department environmental review section City Planning Commission Agenda Items for Meeting of April 22, 1981 page 9 3. PUBLIC HEARING: PCS-81-7 - Tentative subdivision mag for Chula Vista Tract 81-7, Pepper Tree Estates,~ sin~l_e family lots, 0-100 Pepper Tree Road A. BACKGROUND 1. The applicant has submitted a tentative subdivision map known as Pepper Tree Estates, Chula Vista Tract 81-7, for the purpose of subdividing a 7.3 acre piece of property located at the southeast quadrant of Pepper Tree Drive and Jacaranda Drive (private road) into 15 single family residential lots. The subject property, which at present is located in the unincorporated area, has been prezoned R-l-lO (single family residential - 10,000 sq. ft. minimum lot size) and is in the process of being annexed to the City. 2. The Environmental Impact Report, EIR-81-2, was certified by the Planning Commission on March 25, 1981. B. RECOMMENDATION 1. Adopt a motion recommending that the City Council certify that EIR-81-2 has been prepared in compliance with CEQA, the State EIR Guidelines and the Environmental Review Procedures of the City of Chula Vista. 2. Based on the findings contained in Section E of this report, adopt a motion recommending that the City Council approve the tentative subdivision map for Pepper Tree Estates, Chula Vista Tract 81-7, subject to the following conditions: a. The developer shall provide a drainage facility across Pepper Tree Rd. at the location of the existing 15"x27" corrugated metal pipe, arched (CMPA) adequate to handle a fifty year runoff. b. The developer shall provide a storm drain from the eastern boundary within Lot 15 to the existing 15"x27" CMPA adequate to handle a fifty year runoff~ c. A standard cross gutter per Chula Vista Construction Standard 2 shall be installed at the northern end of Jacaranda Drive. d. The developer shall provide an energy dissipator similar to the type shown on Regional Standard Drawing D-41 at the outlet of the 18 inch story drain shown on the tentative map. e. The developer shall provide for sight distance from the inter- section of Jacaranda Drive and Peppertree Road east from Jacaranda Drive a minimum of 250 ft. f. The developer shall dedicate to the City adequate land to provide 28 feet of right-of-way along Peppertree Road adjacent to the subdivision (from existing center line). City Planning Commissi~'~ -- Agenda Items for Meetin~ of April 22, 1981 page 10 g. The developer shall grant a 7.5 foot street tree easement along Peppertree Road south of the right-of-way to be dedicated. h. The developer shall be responsible for constructing the southerly half of Peppertree Road adjacent to the subdivision. The provision for sidewalk is waived. Design for curb and gutter will be predicated on drainage requirements for the area. i. A reciprocal access easement shall be granted between parcels 14 and 15 per Chula Vista Municipal Code requirements. Said access shall not conflict with the use of any sewer or storm drain easement paralleling Peppertree Road. j. The developer shall grant to the City 10 foot sewer easements for all public sewers. k. The developer shall grant the drainage easement across lots 14 and 15. In addition the developer shall obtain and grant the drainage easement offsite from the subdivision boundary to the location of the existing 15"x27" CMPA both as shown on the tentative map. 1. The developer shall submit plans for the improvement of both Jacaranda Drive and Cook Court. Said plans shall also include but are not limited to: l) sidewalk; 2) entry treatment; 3) location and type of textured paving; 4) access to lots 14 and 15; and, 5) planter treatment around the trees within the road easement. The plans shall be subject to the approval of the City Engineer and Director of Planning prior to the approval of the Final Map. m. The entry into the project (Jacaranda Drive) shall identify the road system as private and shall be so treated as to denote that the system is private. This may be accomplished by the use of textured paving, pilasters and walls. The name of the project may be identified at the entry. n. Prior to the approval of the final map, the developer shall provide development standards within the CC& R's for the sub- division which would include but is not limited to: a) maximum percent of the lot which may be graded; b) disposition of existing trees; c) maintenance of the entrance, roads, walks, and trees within the road easement; and d) maintenance of the private sewer main and lift station. The City of Chula Vista shall be named as a party to the CC& R's authorizing the City to enforce the terms and conditions of the CC& R's in the same manner as any owner within the subdivision. o. The ultimate alignment of Cook Court shall be subject to the approval of the City Engineer and Director of Planning who shall review said alignment so as to retain as many trees as is possible. The City's Landscape Architect shall determine which trees are worth preserving. City Planning Commissior~ Agenda Items for Meeting of April 22, 1981 page 11 p. Building permits shall not be issued until letters from both the Sweetwater High School and Chula Vista Elementary Districts are filed with the City indicating that adequate school facilities are available to serve the development. q. Park Acquisition Development fees shall be paid concurrent with approval of the final map and Residential Construction Tax fees shall be paid prior to issuance of building permits. r. Signs shall be posted along Jacaranda Drive prohibiting parking. C. DISCUSSION 1. Existing site characteristics The subject property is the former estate of Hazel Goes Cook and is presently developed with a single family dwelling, detached garage, swimming pool and other miscellaneous accessory structures. The site contains a large number and variety of trees with eucalyptus trees being the most predominant species. The existing house is situated on a small knoll which is higher in elevation than most properties surrounding the site. The steepest slopes are located on the northerly and easterly sides of the property. The westerly portion of the site is a paved road and utility easement which is in direct alignment with Jacaranda Drive to the south. The easement, which is also named Jacaranda Drive even though it is a private road, provides access from Peppertree Road for the existing dwelling as well as 9 other properties (5 lots on the west side of the easement and 4 on the east side~ The property also has 146 feet of frontage along the south side of Peppertree Road at the northeast corner of the property. A natural open drainage channel traverses the property adjacent to and parallel to Peppertree Road at this location. 2. Tentative Subdivision Map a. The developer proposes to subdivide the 7.3 acres into 15 custom built single family residential lots with a minimum lot size of 13,100 sq. ft. and an average lot size of approximately one third of an acre. Two of the lots front on Peppertree Road and are located approximately 30-35 ft. below the other 13 lots which will be served by a private street system consisting of the existing road easement (Jacaranda Drive) and a new cul-de- sac street to be named Cook Court. Because of the elevation difference, the two lots fronting Peppertree Drive will take their access directly from the road. Jacaranda Drive will not be extended to connect with the dedicated portion of the street to the south. The street will instead terminate at the southerly property line with a 40 foot diameter cul-de-sac. b. Several residents of Jacaranda Drive have expressed a preference for the entrance to the tract being located between lots 14 and 15 or at the easterly edge of lot 15, feeling that such a location would offer better sight distance and also preserve their privacy to a greater extent. Staff examined that alternative but concluded that the Jacaranda Drive location for the entrance is preferable for the following reasons: City P'idnnin§ COlmlis~ ,n Agenda Items for Meeting of April 22, 1981 page 12 1. The conditions recommended by Staff will insure reasonable and improved sight distance for the Jacaranda/Pepper Tree intersection. 2. The limited number of lots within the tract does not justify a second intersection with Pepper Tree Drive. The second location also suffers somewhat from limited sight distance and two intersections would be less safe than one. 3. Grading necessary to provide direct access from Peppertree Road would not be in keeping with the applicant's or the City's concern to minimize grading within the area. The grading would create substantial side slopes and reduce the usable land area for the two lots fronting on Pepper Tree. 3. Streets Jacaranda Drive will have a curb to curb width of 24 feet with rolled curbs on each side which will facilitate access to the existing dwellings on the easement without the necessity of a driveway approach which would be the case if a standard curb and gutter were installed. Parking will be prohibited. An existing low spot in the easement, which presently does not drain, will be corrected to drain properly and the road resurfaced. Cook Court will have a curb to curb width of 36 feet and the cul-de-sac portion a radius of 40 feet. 4. Disposition of trees The alignment of Cook Court will require the removal of several trees. In an effort to preserve as many trees as is feasible, Cook Court will follow the existing contour of the land and the typical street section will be tilted so that the south side is higher than the north side. Trees to be preserved which lie near the centerline of the street will be retained and protected by a planter around the base of the tree. The opportunity to preserve more trees may be apparent once more specific information becomes available during the improvement plan review stage. The developer intends to construct a few homes initially with the other homes built at a later date either by the developer or the future property owners. The homes will be designed to retain the maximum number of trees. The proposed CC&R~s will establish guidelines for the retention of trees during the development of the lot. 5. Grading Very little grading is proposed. The grading will consist primarily of providing split level pads for lots 14 and 15 on Pepper Tree Drive because of the existing drainage flow and slope condition in that area. Minimal grading will be required to construct Cook Court. However, additional grading will occur for the individual housing construction. Split level construction will be used on the steeper sloping lots. 6. Sewers A sewer will be installed in both Jacaranda Drive and Cook Court which will serve the existing dwellings on the west side of Jacaranda Drive and south City Pidnning Co~,i~ls Jn Agenda Items for Meeting of April 22, 1981 page 13 side of Cook Court. However, the lots on the north and east side of Cook Court as well as the two lots on Pepper Tree Road will be served by a private sewer system at the rear of the lots which will be pumped into the sewer main on Jacaranda Drive. The existing sewer in Pepper Tree Road flows towards Hilltop Drive. It is anticipated that once a public sewer is provided and installed near lot 14 in Pepper Tree Road flowing north toward Bonita Road, the private sewer will be hooked up to that sewer and the lift station planned for lot 14 can be abandoned. Until the gravity system is in operation the sewer and lift station will be maintained by the Homeowner's Association. 6. Traffic The EIR noted a sig~distance problem at the intersection of Pepper- tree Road and Jacaranda Drive. This is due primarily to the fact that Pepper- tree Road dips into a small canyon east of the intersection coupled with an "S" road curve configuration. In addition, a knoll at the intersection and landscaping on the south side of Peppertree limits the vision of westbound motorists traveling on Peppertree as well as motorists exiting Jacaranda Way. The projected 10% increase (140 trips) in traffic attributed to this project, does not represent a substantial increase to the road system. The EIR has offered mitigation measures to avoid significant impacts. The measures involve the replacement of landscaping along the south side of Peppertree Road, with lower growing plant species. To insure this mitigation will be enforced, the Engineering Department has recommended as a condition of approval, that a 250 ft. long sight distance corridor be established from the intersection (Jacaranda & Peppertree) looking east. This condition could result in the need to condemn land which will result in the need for a homeowners association for proper maintenance and enforcement. D. ANALYSIS 1. The proposed project has been designed to retain as many trees as possible and to necessitate very little grading. The homes will be custom built to conform with the existing topography by the use of split level construction. Existing trees will be preserved wherever possible. 2. The Jacaranda Drive road easement will be improved with rolled curbs which will permit the existing driveways serving the residences, to remain in their present locations. In addition, a condition of approval will require that Jacaranda Drive be identified as a private street which should keep speeds down to an acceptable level. The result will be to reduce any adverse effects on the existing residences by the proposed development. 3. Peppertree Road is a relatively narrow winding road which typifies the rural character of the area. Several years back the City approved a lot split on the north side of Peppertroe Road in the vicinity of lots 14 and 15 in which the requirements for standard city street improvements were waived subject to the developer signing a letter waiving all rights to protest a future improvements act district. The Planning Commission may waive or defer sidewalks in the subdivision, upon recommendation of the City Engineer and subject to the finding that installation would not be in keeping with the character of the area. The City Engineer has recommended such a deferal or waiver. City Planning Commi~_ .n -~ Agenda Items for Meeting of April 22, 1981 page 14 E. FINDINGS Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative subdivision map for Pepper Tree Estates, Chula Vista Tract 81-7, is found to be in conformance with the various elements of the City's General Plan: 1. The site is physically suitable for residential development and the proposal conforms to all standards established by the City for such project. 2. The design of the subdivision will improve traffic flow in the area and will avoid any substantial environmental damage by preserving many existing trees. 3. The project is in conformance with the Chula Vista General Plan Elements as follows: a. Land Use - The General Plan designates the area for low density residential, a range of 1 to 3 dwelling units per gross acre. The tentative map proposes 2 dwelling units per acre. b. Circulation - The development will be served by a private street system. It has been determined that a connection to the existing stubbed section of Jacaranda Drive is not necessary. c. Housing - The proposed project will provide additional quality housing in the community in keeping with the low density character of the area. d. Conservation - The project has been designed to preserve the majority of the trees on the site and the homes will be custom built to the natural topography. Grading will be minimal. e. Parks & Recreation, and Open Space - The proposed development will be required to pay fees in lieu of the dedication and improvements of park lands and no open space is designated for the area. f. Seismic Safety and Safty - No known active faults exist on or within close proximity of the property. The site is well within the response time of the fire stations on "F" and East "J" Streets. The developer will be required to remove the landscaping on the south side of Peppertree Road to improve the sight distance at the intersection with Jacaranda Drive. §. Noise - There are no significant stationary or mobile sources of noise which will affect the project. h. Scenic Highway - The subject property neither abuts nor is adjacent to a designated scenic route. City Planning Commissi~'~ -- Agenda Items for Meeti,_ of April 22, 1981 page 15 i. Bicycle Routes - The subject property will be served by a private street system and there are no designated bicycle routes adjacent to the site. j. Public Buildings - No public buildings have been designated on the site. 4. Pursuant to Section 66412.2 of the Subdivision Map Act, the Commission certifies that it has considered the effect of this approval on the housing needs of the region and has balanced those needs against the public service needs of the residents of the City and the available fiscal and environmental resources and determined that the subject property is well suited for a low density development and that opportunities exist in other locations for moderate income housing. i S~' 5F SF I~ SF SF ~F i ~ I O SF IVAC I Si= SF SF aF · EL RANCHO VISTA EAST EE 14 15 12 COOK I0 £x~sti~ 2 ~ house to r~noin 5 8 6 7 ~PI~'PFERTREE EST.]"'EXHIBIT A PCS- 81- 7' ~ ~le 15 $1NGI.,.~ FAMILY- I~"1~ City Planning Commission Agenda Items for Meeting of April 22, 1981 page 16 4. PUBLIC HEARING: a. Recertification of EIR-79-2, Bonita LonO_Canyon Estates A. BACKGROUND 1. The Environmnetal Impact Report for this project was certified by the Planning Commission on February 28, 1979. The document has not been certified by the City Council because of Council's indication in 1979 that development of large projects easterly of Otay Lakes Road with access on to East "H" Street was premature. 2. The applicant has now submitted a Sectional Planning Area plan and a tentative subdivision map for Phase I of the project for consideration by the City. The plan involves several revisions to the plan presented in the Environ- mental Impact Report. 3. On March 19, 1981 the Environmental Review Committee held a public hearing to determine the adequacy of EIR-79-2 due to the project revisions and possible changes in circumstances during the two year period after preparation of the document. The Conmittee concluded that the project revisions would not result in any significant environmental impact which was not previously evaluated in EIR-79-2, and recommended recertification of the EIR. B. RECOMMENDATION Recertify that EIR-79-2 has been prepared in accordance with CEQA, the State EIR guidelines and the Environmental Review Procedures of the City of Chula Vista. C. PROJECT REVISIONS I. The phasing of the project has been changed as follows: Previous Phase No. Proposed revised Phase No. I I II III III IV IV II V V VI VI The proposed changes in phasing are due to the development of the Bonita Haciendas subdivision to the north of Bonita Vista High School with the related extension of streets and utilities which provide access. 2. The project as previously proposed involved access to Acacia Avenue or Tim Avenue. That access has been deleted in the revised plan. Eventual access was also proposed via "S" Street to a future subdivision to the northwest of the project. Subsequently, the County of San Diego has approved a tentative subdivision map (T.M. 3750) which precludes any access in that area. Therefore, the Sectional Planning Area plan has been modified to delete that access point and Phase V of the project has access via two residential collector streets to Otay Lakes Road and to Corral Canyon Road. City Planning Commission page 17 Agenda Items for Meeting of April 22, 1981 3. The subdivision design in the vicinity of "Q" Street and the SDG&E ease- ment has been modified so that a large portion of the unique stand of Cleveland Sage is retained. 4. The proposed 17 acre equestrian center has been deleted and replaced with 24 dwelling units as a part of Phase II of the project. The elementary school/ park site has been redesigned and a water tank for the Otay Municipal Water District has been added. The overall result has been the addition of about 41 dwelling units. D. ANALYSIS 1. Geology. A detailed geological report was prepared on the first three phases of the project as delineated in the EIR. The revised plan changes the phasing of the project and, therefore, it will be necessary to prepare a more detailed geological report on phases II and V prior to submission of a tentative subdivision map for those phases. 2. Soils. The previously prepared EIR delineates onsite soil conditions which could result in substantial erosion and downstream siltation; also, some onsite soils are highly expansive or compressible. The recommendations in the EIR, including downstream siltation basins, are adequate to mitigate any potential impact. The modifications to the project do not involve major changes in the grading of the project area, therefore, the previous analysis is adequate. 3. Drainage. The EIR identified a potentially significant impact due to a small increase in run-off and the inadequacy of downstream facilities. The project proponent proposes to install retention basins which will reduce the peak downstream water flow and act as sedimentation basins. The maintenance and operation of these facilities would be the responsibility of an open space maintenance district. 4. Land Form. The project revisions do not involve any major alteration in the preliminary grading concept and, therefore, no reevaluation is necessary. 5. Aesthetics. The aesthetic impact of the project was primarily related to the land form alteration and removal of vegetation. The grading concept has not been changed and, therefore, the aesthetic impact has not changed. 6. Schools. The elementary schools serving the project area are shown to be near capacity in the final EIR and it was estimated that the project would generate about 500 elementary school students, roughly the equivalent of an elementary school. These conditions have not changed and the previous analysis is acequate. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 18 The secondary schools serving the project area have experienced a decline in enrollment since certification of the final EIR; therefore, the project wilt have a less severe impact than that which is portrayed in the final EIR. 7. Sewer. The final EIR identified a dispute regarding the capacity of downstream sewer lines due to a very flat grade. It is unclear how Phase V of the project would be provided with sewer service. Previously this area would have been served through offsite sewer line extensions within streets. Because the street extensions are no longer proposed, Phase V may be connected to the Bonita Ridge sewer line which has questionable capacity. A solution will have to be reached prior to approval of the tentative map for Phase V. 8. Archeology. Subsequent to the certification of the final EIR, the recommended mitigation measures were implemented, so there will be no significant impact on cultural resources. 9. Biology. The modifications of the project design at "Q" street and the SDG&E easement have mitigated any significant impact on the stand of Cleveland Sage. Trans- plantation and seedling culture of other onsite sensitive species can be carried out during project implementation to avoid any significant impact. 10. Traffic and Access. The deletion of access to Tim or Acacia Avenues and the access point near the northwest corner of the project would result in the shifting of about 1,740 trips to other access points. A traffic study was prepared on the changes that are currently proposed in the circulation portion of the plan. It was the conclusion of that report that offsite improvements necessary to mitigate some of the significant impacts would become more critical but impacts would be mitigable. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 19 4. PUBLIC HEARING: b. Consideration of Candidate CEQA finding~ on Bonita_~on~ Canyon development A. BACKGROUND The final EIR on this project concluded that there was a potential for signif- icant environmental impact and, therefore, CEQA findings were necessary. Enclosed are the Candidate CEQA findings prepared in accordance with Section 15088 of the State EIR Guidelines. Each potentially significant impact is identified, mitiga- tion measures proposed, and a finding is offered. All impacts can be reduced to a level of insignificance if the specified mitigation measures are implemented. B. RECOMMENDATION Adopt the Candidate CEQA findings. City Planning Commission page 20 Agenda Items for Meeting of April 22, 1981 4. PUBLIC HEARING: c. Development plan of Bonita Lon9 Canyon Sectional A. BACKGROUND 1. The applicant has submitted a Sectional Planning Area plan for the develop- ment of the 650 acre Bonita Long Canyon area located on the east side of Otay Lakes Road and south of the Bonita Highlands subdivision in Bonita. The General Develop- ment Plan adopted in 1971 (Exhibit A) established a density of approximately one dwelling unit per acre for the entire 650 acres. The City's General Plan desig- nates most of the area as "Residential 1-3 DU/acre" with several smaller areas carrying the designation of 4-12 DU/acre. 2. The Sectional Planning Area plan submitted proposes the following uses: ° A 15 acre K-6 site (approximately 7~ acres usable, excluding SDG&E easement) o An ll acre neighborhood park site (approximately 4+ acres usable) o A 4 acre multiple family site (approximately 2 acres usable) o 809 single family lots, ranging in size from 6,000 sq.ft, to over 3 acres. o Approximately 266 acres of dedicated open space, most of which is to remain in its natural state. 3. The environmental review, including CEQA findings, was considered as a previous item. B. RECOMMENDATION Adopt a resolution approving the proposed Sectional Planning Area plan (PCM-81-13) for Bonita Long Canyon, subject to the following conditions: 1. The developer shall be required to dedicate and/or construct all public improvements and facilities, onsite and offsite, determined by the City Council to be necessary to serve the Bonita Long Canyon Sectional Planning Area. Specific requirements will be established with each phase of development in conjunction with the filing of subdivision maps. 2. Prior to the issuance of a grading plan for Phase I, the applicant shall submit and the City's Landscape Architect shall have approved, an overall landscaping plan incorporating a conceptual design for later phases and a detailed design for those phases on which tentative maps are being filed. Said plan shall include such items as supplemental canyon tree planting, slope planting, and an equestrian trails plan for easements, location, grading, signing, and fencing as determined by the Landscape Architect to be necessary to implement the plan. The trails system shall be developed prior to or concurrent with the certification of slopes in the initial grading stages. 3. The developer shall request the formation of an open space maintenance district for the entire 650 acre project prior to the recordation of the final map for Phase I. page 21 City Planning Commission Agenda Items for Meeting of April 22, 1981 4. Prior to the issuance of building permits in each phase, the applicant, working with the school districts, shall furnish evidence to the City that the school districts are able to provide school service to the future residents of that phase. Prior to approval of the tentative map by the Planning Commission for Phase III, the Chula Vista Elementary School District shall notify the City of its intent to require dedication of the K-6 site shown on the Sectional Planning Area plan. Failure of the school district to utilize the site will authorize the developer to submit a revised Sectional Planning Area plan for additional lots within the designated school site. The City will make a similar decision regarding the park site in conjunc- tion with the school district's plan. 5. The park site shall be increased in size to approximately 5 acres by eliminating 8 lots on the north side of street "P". 6. The number of dwelling units shown on the Sectional Planning Area plan shall be limited to the following: Phase I 199 units Phase II 81 units (67 units transferred to Phases III & V) Phase III - 168 units Phase IV - 152 units Phase V 201 units Phase VI - 20 units Total 821 units Further reductions in the number of units or lots may be required predicated on the filing of subdivision maps in accordance with the standards and requirements included as conditions of the Sectional Planning Area and/or the subdivision maps. 7. The developer shall pay P.A~D. and R.C.T. fees for Phases I and II with the remaining phases to be contingent upon the decision during considera- tion of Phase III as to whether or not a park is to be constructed in conjunction with the elementary school. If the city proceeds with the park requirement, adjustments to the P.A.D. and R.C.T. fees will be determined with development plans for Phase III. 8. Phase VI may be developed out of sequence, provided a precise plan is approved and all fees are paid. 9. a. The minimum pad area for units in Phase II and V and the Canyon Drive area of Phase III shall be 8,000 sq. ft. The minimum pad area in Phases III and IV shall be 7,000 sq. ft. (All pad sizes shall be exclusive of the SDG&E easement.) b. Minimum pad width shall be 60 ft. as measured at the front setback line, with the average pad width to be 70 ft. City Planning Comniss~on Agenda Items for Meeting of April 22, 1981 page 22 c. Minimum pad depth shall be 90 ft. for the purpose of computing the required minimum pad area. d. Development standards shall be submitted concurrent with tentative subdivision maps filed for each phase. Said criteria shall include such items as corral locations and special fencing criteria. Setbacks for all phases shall be as follows: Front yard 25 feet Exterior side yard 15 feet One side yard 10 feet Both side yards 15 feet total Rear yard 20 feet (R-1 standards for single story encroachment shall be applicable) 10. The rear 25 feet of each lot abutting open space areas will be evaluated as to the need for fire retardant plant materials. Appropriate conditions will be established with each subdivision map. 11. The developer shall acquire, dedicate, and improve the necessary area to extend street "S" offsite to connect to the county street shown on T.M. 3750 adjacent to the terminus of street "S". 12. The water tank area shown adjacent to the elementary school site shall be relocated unless the school site is not utilized or the school pad area is increased to a minimum of 9 acres in size. 13. The requirement for undergrounding the existing 69 kv line within the 250 ft. wide SDG&E easement shall be waived. 14. The applicant shall file CC&R's with each phase which will prohibit the resubdivision or parcelling of lots in any approved phase which will increase the number of lots in the phase. 15. Prior to the approval by the City Council of Phase I, the applicant shall submit a master list of street names for all five phases of the single family area. 16. The entire 650 acres shall be annexed before final map approval is given to Phase I. 17. Prior to consideration of a tentative subdivision map for Phases II, V and VI, detailed geotechnical reports shall be prepared by the applicant and submitted to the City. All recommendations of the geological and/or soils engineer shall be followed. 18. Mitigation of archeological sites SDi 5829 and 5830, in accordance with Appendix III of the Archeological Survey and Report dated January 25, 1979, shall be carried out prior to the approval of the tentative map for Phase V. 19. Prior to the approval of any final map for the project, the developer shall submit necessary calculations to show that downstream sewer capacity is adequate, or the developer shall provide improvements necessary to assure adequate capacity. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 23 20. Street design: a. All horizontal curves shall have a minimum intervening tangent distance measured in feet equal to four times the design speed of the street (reverse norizontal curves are not acceptable). b. Compound horizontal curves shall be avoided. c. Maximum street grades for residential collector streets shall be 12% (except Via Hacienda).* d. The following streets should be designed to residential collector standards with minimum centerline radii of 380 feet.* "P" street "L" street (from Corran Canyon Road to "K" street) "R" street (between "V" street and Corral Canyon Road) "X" street *Those streets with a 12% grade or minimum centerline radii will be subject to further review at the tentative map submittal stage. e. There are potential sight distance problems at the following inter- sections; these intersections should be studied carefully by the applicant before a tentative map is prepared: Baylor Avenue/"A" street - looking west Canyon Drive/Corral Canyon Road - looking north Cumbre View/Canyon Drive - looking north. f. Maximum centerline grade for cul-de-sac street turning areas shall be 5%. g. The maximum grade at any intersection of two streets shall be 6% within the intersection and for at least 50 feet past the curb lines of the intersecting street. h. All through residential streets shall have minimum centerline radii of 200 feet. Minimum centerline radii shall be 180 feet for cul-de-sacs. i. Grade segments in excess of 12% shall not exceed 300 feet in length. j. Streets within the Sectional Planning Area shall conform to the following (corresponds~to typical sections on S.P,A. plan): (1) 56 foot right of way with sidewalks on both sides: (a) Via Hacienda (b) Street "A" (Via Hacienda to Baylor Avenue) (c) Street "R" (south of street "V") (d) Street "S" except eastern cul-de-sac, Street "K" except cul-de-sac (e) Streets '~I", "P", and "V" (f) Street "S" (except cul-de-sac north of "V'~ street) City Planning Commission Agenda Items for Meeting of April 22, 1981 page 24 (g) Canyon Drive (from Bonita Haciendas subdivision to "X" street and from "0" street to Corral Canyon Road) (h) "X" street (from "Y" street to Canyon Drive) (i) Country Trails Lane (j) "L" street (from Corral Canyon Road to ~'K" street) (2) 56 foot right of way with sidewalk on one side: (a) Canyon Drive (from "X" street to "0" street) (b) "X" street (from "Y" street to "S" street) (3) 56 foot right of way with sidewalk on both sides: (a) Streets "C", "D", "E", "F", "G", "J", ":M", "N", "Q", "T", "U", and "Y" (b) "S" street north of "V" street (c) "R" street north of "V" street (d) "L" street (from "K" street to "M" street) (e) "K" street cul-de-sac south of "L" street (f) Baylor Avenue (g) Cumbre View (4) 52 foot right of way with sidewalk on one side: (a) "Z" street (b) "R" street cul-de-sac (c) "W" street (d) "0" street 21. Drainage: a. Permanent energy dissipators, such as shown on Regional Standard Drawing D-41, shall be used at outlets of drainage facilities. b. The developer shall participate toward improvements within the Long Canyon Drainage Basin as described in the mitigation measures identified in EIR-79-2 for this project. Plans for desilting basins and retention basins within the Long Canyon Basin shall be submitted for review by the City Engineer prior to approval of the final map for each phase. 22. Sewers. a. All sewers within cul-de-sacs shall terminate in a manhold. b. Improved access shall be provided to all manholes. c. Sewers serving l0 or less lots shall have a minimum grade of 2%. d. The method of sewering Phase V from the western end of "S" street shall be indicated. The developer shall submit proof that offsite sewers are available and adequate in capacity to handle the added sewage from Phase V. e. Manholes shall be provided at all changes of grade and alignment. City Planning £onmission Agenda Items for Meeting of April 22, 1981 page 25 23. Improvements. a. The developer shall be responsible for the construction of improve- ments in Corral Canyon Road to collector street standards within the Sectional Planning Area and Rutgers Avenue south of the southern boundary of the Sectional Planning Area to the existing improvements shown on Chula Vista Drawings 70-76D and 73-86D. Said improvements shall be constructed in conjunction with the development of Phase III of the Sectional Planning Area. The connection of Rugers Avenue south of "H" Street will not be required if "H" Street is constructed between 1-805 and Otay Lakes Road prior to construction of Phase III. b. The developer shall be responsible for the completion of improvements on the south side of East "H" Street from Corral Canyon Road west to the existing improvements shown on Chula Vista Drawing 68-110D prior to acceptance of improvements for Phase III. c. The developer shall participate in the offsite construction of Central Avenue as determined by the County of San Diego, Department of Public Works and the Chula Vista City Engineer prior to construction of Phase III. Construction must comply with mitigating measures adopted by the City of Chula Vista. d. The developer shall acquire, dedicate and improve Otay Lakes Road from the point where the centerline of the SDG&E easement intersects said road to the improvements shown on Chula Vista Drawing 73-100A-D. Said improvements shall include but not be limited to 41.5 feet of pavement, curb and gutter, and drainage facilities, east of centerline within a 50 foot half-width right-of-way prior to acceptance of improvements for Phase I. e. The developer shall complete construction of the northerly half of East "H" Street from Corral Canyon Road to Otay Lakes Road. Improve- ments shall include two 12-foot traffic lanes and one 8-foot parking lane within a 32 foot curb to curb width. Monolithic curb, gutter and a 5 foot sidewalk shall be provided along the northerly side of the roadway and curb and gutter along the south side. The southerly curb line shall be 9 feet inside the south right-of-way line of a 50 foot half width street right-of-way. Street lights and other normal fur- nishing shall also be included as shall the landscaping and irrigation of one-half the median island. Said improvements shall be completed prior to acceptance of improvements for Phase I. 24. Miscellaneous. a. Add a typical section for Otay Lakes Road. b. Erosion and sediment control plans will be required with grading plans for each of the construction phases. City Planning Commiss,on Agenda Items for Meeting of April 22, 1981 page 26 c. The developer may request that a reimbursement district be formed for those improvements which lie outside the subdivision boundary and provide benefit to other properties. It shall be the developer's responsibility to submit to the City for approval a plan indicating improvements to be included, properties to be assessed, and method of assessment for said district. C. DISCUSSION OF MAJOR POINTS 1. Number of Dwelling Units. The applicant's plan proposes approximately 865 dwelling units (809 single family and 56 condominium units) to be constructed in six phases within the 650 acres. The adopted General Development Plan for E1 Rancho del Rey authorizes a maximum of 653 units, thus, the proposed Sectional Planning Area plan represents a 33% increase in density. The General Plan range for this area designates approximately 609 acres at 1-3 dwelling units per acre and 50 acres at 4-12, allow- ing for a range of 800-2400 dwelling units on the property. The requested density is clearly in the lower limits of the City's General Plan. 2. Land Form Alteration and Natural Open Space. Approximately 50% of the 650 acre site will be retained in dedicated open space largely preserved in its natural state. Grading of 3-1/3 million cubic yards of fill and 2-1/2 million cubic yards of cut occur in a clustering pattern to minimize the grading and provide the ability to link a majority of the natural open space throughout the project. The most intense area of development occurs in Phase I where over 70% of the area is graded for single family lots. Supplemental tree planting in certain canyon areas and planting of fire retardant material will be required as conditions of tentative map approval. 3. Circulation System. a. Some of the existing roads which link the various phases of the Sectional Planning Area are operating beyond their design capacity. In addition, other road segments have not been constructed to accommodate the proposed project; therefore, substantial offsite improvements will be required with each phase of construction. The first phase will require improvements to "H" Street (onsite and offsite) as well as Otay Lakes Road. b. The 148 dwelling units planned for Phase II will rely on Canyon Drive for ingress and egress until the completion of Phase III allows for additional access to the east. Development in this area should be restricted to 81 lots with the remaining lots assigned to later phases of construction. c. The third and fourth phases will involve the connection of Corral Canyon Road to "H" Street with additional improvements on Central Avenue in accordance with concerns expressed by San Diego County. In addition, offsite improvements will be required in Rutgers Avenue south of "H" Street to complete the linkage between Otay Lakes Road and the eastern area of Bonita. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 27 d. Phase V could involve further improvements to Central Avenue as well as a connection to an adjacent tentative subdivision area already approved by the County. 4. Phasing. a. The applicant has divided the project into six phases. The first five phases are limited to single family detached home sites with the sixth phase proposed as a 56 unit condominium development. Phase I, which involves 199 lots adjacent to "H" Street will require regrading and relandscaping of a portion of the existing Tiffany Park. The developer will be responsible for the work with credit given toward payment of P.A.D. and R.C.T. fees. b. The phasing for the development of the park/school site has not been addressed by the developer. Timing for improvements to the school area will be the responsibility of the school district. The park site should be developed with Phase III. c. Although the condominium area is listed as Phase VI, the staff has no objection to allowing its development out of sequence. 5. Drainage. Approximately three-fourths of the site flows into the Long Canyon Basin which flows northwest and joins the Sweetwater River just north of Bonita Road. The project area within that basin constitutes 435 of the total basin. As stated in the environmental impact report, "All of the drainage basins in which the project is located have existing drainage facilities which are inadequate to one degree or another." Reports on file with the City indicate that the proposed development will produce only a small increase in runoff (4% added, based on 50 year storm) in the total basin. However, because of the inadequacy of existing downstream facilities, the added increase will cause flooding to the already developed housing along Acacia Avenue. The applicant is proposing to solve the downstream inundation problem by using onsite retention basins in Long Canyon to control the amou~ of flow. With proper design, the system should substantially reduce the present and projected flows in the canyon. The system will require review and approval by the City Engineer. The applicant has the option of improving the downstream drainage facilities at an estimated cost exceeding $700,000 as an alternative to the retention basin plan. However, with little or no money available from other projects to aid in the construction, such a solution places a very costly burden on this project. 6. Elementary School/Park Site. The Sectional Planning Area plan has an elementary school site designated adjacent to the SDG&E easement near the extension of Corral Canyon Road. Although the nearby elementary schools (Tiffany and Sunnyside) are at capacity and the proposed development will generate an estimated 500 students, the school district is reluctant to make a commitment at this time. A final disposition will be made when a subdivision map is processed for Phase III. The developer is obligated for 6.2 acres of developed park land based on the 865 unit Sectional Planning Area plan. Staff is recommending that the approved maximum density be set at 821 units, ~.~hich would require 6.1 acres of park. Since the City can accept developed park land or in-lieu fees, it is likely that fees will be collected for Phases ! and II with the final decision to construct the park withheld until Phase III. Because of the City's park/school concept, the decision as to whether or not to build the park as shown City Planning Commission Agenda Items for Meeting of April 22, 1981 page 28 on the Sectional Planning Area plan will be predicated in part by the decision of the school district regarding the elementary school site. The 4+ acre usable park shown on the Sectional Planning Area plan needs to be enlarged to a minimum 5 acres by deleting 8 lots on the north side of street "P". D. DETAILS OF SPECIFIC AREA PLAN 1. Land use, density and lot size a. The density established for the property of 650 units on the 1971 General Development Plan for El Rancho del Rey was based on a very superficial analysis of the site without the benefit of a proposed grading or circulation plan. In addition, lot paddin§ and retention of open space were not considered in the earlier plan. The Sectional Planning Area plan presented for consideration seeks approval of 865 dwelling units. This plan contains more precise design information on which to base a decision regarding the increase in density. Adjacent land uses (type, lot size, character) as well as topographic considerations were evaluated by staff in arriving at a recommendation. (1) Phase I is located adjacent to a standard urban design single family detached subdivision and, therefore, reflects a density and lot sizes (typical 7,000 sq. ft.) in keeping with that area. (2) Phases II, III, IV and V abut one-half and one acre county ~ubdivisions to the north and west and for the most part reflect a mixture of lot sizes with the similar urban lots confined to the inner core and easterly periphery of the Phase IV area. The average lot size within these phases varies from 11,000 sq. ft. (Phase IV) to nearly 20,000 sq. ft. (Phase II). (3) Phase V located at the extreme northerly section of the plan has 157 lots on 179 acres, dedicating approximately 89 acres to open space, with an average lot size of 25,000 sq. ft. b. Many of the lots within Phases II, III, IV, and V have pad areas of 6,000 to 7,000 sq. ft., thus the largest portion of the larger lots is devoted to slope banks which have very limited use for the owner. The general character of pad and house construction in this area of Bonita has resulted in an average pad size of approximately 8,000 sq. ft. Staff has concluded that Phases II a~d ', and the Canyon Drive area of Phase III should adhere to that standard. The remaining area of Phase III and all of Phase IV relate to a more urban setting, therefore we have recommended that minimum pad sizes be 7,000 sq. ft. In addition to pad sizes the following standards shall apply: (1) The average pad width shall be 70 feet with a minimum pad width of 60 feet at the front setback line. (2) ~.linimum pad depth shall be 90 feet for the area used in computing the required minimum pad area. (3) Development standards shall be submitted concurrent with the subdivision map filed for each phase and shall include such items as corral locations and any special fencing criteria. City Planning Commist ~ Agenda Items for Meeting of April 22, 1981 page 29 c. The basic density of the project refl~ects what would be expected in the City's standard R-E (1/2 acre) and R-E-40 (40,000 sq. ft.) zones. The set- backs for those zones are 25' front, 15'-20' exterior side, 10'-15' side yards and 25' rear. Since the lots have been clustered with larger expanses of open space combined for common use, the basic lot size is reduced. This reduction in lot size warrants an adjustment to the traditional setbacks in the R-E and R-E-40 zones. Staff is recommending that the front yard standard of 25 feet be retained with reductions to side and rear yards more in keeping with R-l-lO standards (lO,O00 sq. ft. lots). d. Phase VI is proposed as the most densely developed area with plans calling for 56 dwelling units. The 56 units are proposed on a 4 acre site, however, approximately two acres of the site is usable, thereby resulting in a density of 28 units per acre on the developable land. The adjacent condominium development to the north has less than 50 units developed on 5 acres with another 5 acres in open space. To be comparable in character, Phase VI should be limited to 20 dwelling units. 2. Equestrian Trails The plan is criss-crossed with equestrian trails which parallel proposed roads and meander through natural open space and connect to the SDG&E primary east/west trail system as well as adjacent County trails. Minor adjustments to the system, including required protective fencing, limited grading and corral locations, will be addressed with each tentative map filed on the various phases. Phase I, for example, requires an adjustment to the system to cross into Phase IV at the location of the dam for the retention basin. Easements will be necessary to establish trails across certain lots; signing and fencing will be required where deemed appropriate by the City. 3. Landscaping. The majority of the ungraded area will be left in its natural state; however, because of the potential for canyon fires, an area 25 feet wide, beyond each pad abutting common open space, wilt be cleared and planted with fire retardant material. Irrigation of these areas will be the responsibility of the individual homeowner. Supplemental tree planting will be required in specific canyons and/or drainage areas to enhance the overall appearance of the development. An overall tree planting scheme will be required for Phases I-V prior to recordation of the subdivision map for Phase I. Required landscaping adjacent to lots backing up to "H" Street and Corral Canyon will be under the maintenance contract of the open space district. Each phase of development within the Sectional Planning Area will be reevaluated as to the amount of native material or decorative plant materials to be used on slopes. 4. Schools/Parks. The elementary school site designated on the plan as 15 acres has approximately 7½ acres of usable area located outside the SDG&E easement. The school district has indicated a need for a minimum of 9 acres, excluding the easement. Therefore, if the district requires dedication of the site, it appears the water tank shown abutting the east side of the school would have to be relocated. The three acres City Planning Commission Agenda Items for Meeting of April 22, 1981 page 30 of land encumbered by the SDG&E easement is only partially usable since existing towers supporting 238 kv lines and poles for 69 kv lines are located within this right of way. In addition, officials of SDG&E have indicated that future plans call for additional overhead structures and lines within the right of way. The park site contains approximately 4+ acres of usable land, whereas, the proposed 865 dwelling units would require over 6 acres of park land based on present ordinance standards. As mentioned earlier in this report, the extension of "H" Street will require regrading and relandscaping a portion of Tiffany Park for which credit will be given to the developer. It is estimated at this time that reworking approximately one acre of Tiffany Park will likelyresult in the developer being obligated for 5+ acres of additional developed park land on the site. The expansion of the park site will require the elimination of 8 lots shown on the north side of street "P".. The uncertainty of the school district as to whether 'or not they are going to require en elementary school site within the development leaves doubt on the city's part as to whether or not the park should be located within the project. Parks developed independent of schools are more typically 10 acres in size, whereas, joint park/school projects providing for some common use of facilities allow the park to function with 5 acres. The city will collect fees with the first two phases of development and withhold a final decision on the park construction until subdivision plans are filed for Phase III. 5. Circulation and Phasing. The 650 acre site is divided into six phases of development, using "H" Street, Otay Lakes Road and Corral Canyon as major access points serving the various phases. Phase I will be served by "H" Street and Otay Lakes Road, therefore, improvements to those streets are essential to the subdivision. Via Hacienda cannot be connected to Otay Lakes Road until improvements are installed in the adjacent Bonita Hacienda subdivision, therefore, building construction in that phase of development within Unit #1 will be limited until the connection can be physically made. Phase II is planned for 148 dwellings which will utilize Canyon Drive connected to Otay Lakes Road. Until Phase III is developed, Phase II is virtually one long cul-de-sac with only partial relief provided by another street (Cumbre View) which connects back to Otay Lakes Road and "H" Street by way of Via Hacienda. Staff has concluded that the approximately 67 lots shown east and south of the intersection of street "X" and Canyon Road should be included in Phase III and/or Phase V, rather than Phase II. Construction of Phases III and IV will create the need to connect Corral Canyon Road with "H" Street and Rutgers. In addition, substandard improvements further to the north along Central Avenue, which provides the linkage of Corral Canyon to Bonita Road, are inadequate in dedicated road width and improvements for certain segments of the road. Improvements will be required to satisfy both the county and the city to avoid aggravating the existing traffic problems in that area. (This may require the widening of Central Avenue to four lanes with the construction of Phase III.) The City Engineer is also recommending that Rutgers Avenue (two travel lanes) be extended from "H" Street south to connect to existing City Planning Commission Agenda Items for Meeting of April 22, 1981 page 31 developments in Southwestern College Estates concurrent with construction of Phases I~I and IV. Phase V, which includes 157 lots, was originally planned with a loop system involving streets "S", "V" and "R". The system was modified to leave street "R" as a cul-de-sac, however, this solution is workable only if street "S" can be connected through to a loop street with a County approved tentative subdivision map for property to the west. If street %" is not extended to the county road system two cul-de-sac areas of 2000 foot to 2400 foot lengths are created with streets "S" and "R". The City Engineer, Director of Planning, and the City's Fire Marshal all agree that providing a connection from street "S" to the county helps the overall circulation pattern in both the county and the city for residents living in the area. The primary problem in extending the road is that the County has already approved a subdivision which eliminated any road connection in this area because of objections raised by nearby residents in the county. In its place a secondary access road was required by the developer of the county subdivision to Oonnect northerly to Central Avenue. A requirement placed on this developer to provide for the extension of "S" street to the county subdivision would necessitate condemnation or purchase of an approved subdivision lot, together with approval from the County. Conditions could possibly change if the subdivision map expires without the recordation of a final map. It should be noted that the school s.ite, water tank area, and the park are not clearly shown in any phase. The scheduling of this construction should be established with the filing of a tentative map for Phase III. Both "H" Street and Corral Canyon Road have adequate width to accommodate bike lanes and are included in the road design. Phase VI is dependent only upon improvements along Otay Lakes Road, therefore, construction could occur independent of the other phases. 6. SDG&E Easement. The SDG&E easement is encumbered by both existing and proposed towers, poles and overhead lines, which limits activity within to limited trails, open space, roads or parking. At present the City requires developers to underground 69 kv lines which exceed 1500 feet in length. Such a line exists near the southern extreme of the 250 foot SDG&E easement, however, with lines and towers for the 238 kv lines, which also extend along the easement, and other overhead systems planned, the benefit of undergrounding the 69 ~v line would appear minimal at best. The staff would, therefore, support a waiver or deferral of the requirement as part of the Sectional Planning Area plan approval. The proposed access road to the water tank and the K-6 elementary school has not been approved by SDG&E and, therefore, should be considered schematic at this time. 7. Fencing. A decorative block wall will be required along "H" Street and Corral Canyon Road in keeping with current subdivision regulations. Additional fencing for equestrian areas as well as slope protection fencing need to be addressed in subsequent filings of tentative maps. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 32 8. CC&R's. The applicant will be required to file CC&R's with the City which will prohibit the splitting or resubdivision of any approved phase which would cause an increase in the number of lots. This condition is necessary because of the wide variety of lot sizes within the property. 9. Street names. The applicant has recently submitted a master list of street names which will be submitted for Planning Commission approval after adequate review by staff. 10. Annexation. The applicant has made inquiries regarding annexation, however, no application has been filed as of this date. Because of the inter-relationship of the various phases, staff is recommending that the entire 650 acres be annexed before final map approval is given to Phase I. ll. Development Standards. The development standards submitted by the applicant are confusing, incomplete, and inconsistent with the latest Sectional Planning Area plan filed with the City. Revised development standards should be filed with each tentative map on a phase by phase basis to insure that standards will relate more clearly to each phase of construction. 12. Low/Moderate Income Housing. In general, the 865 unit Sectional Planning Area plan is not designed to accommodate low or moderate income housing. The 56 unit condominium or apartment area, designed for the Phase VI area, could provide an isolated and limited area for moderately priced units. However, as outlined early in this report, staff cannot support the density requested and recommends authorization of no more than 20 units for the site. Under present policy, the applicant is required to "address the need" to develop 10% of his units at prices affordable by low or moderate income families. In the past, applicants have "addressed the need" by preparing a letter which outlines their review of various subsidy programs and states their conclusion as to the appropriateness of such housing in the subject location. The applicant should provide such a letter or make an affordable housing proposal prior to consideration of the first tentative map by the City Council. PCS-81-4 8, PCM--~I- 13 ................. ::::: :::::: L E G E N D :::::::::::::::::::::::::::::::::::::::: ::::::::::::::::::::::::::::::::::: . ~iiii.:!~i~iiii~ii.'-.'i!iiiiiiiF:::::::--~:::::::: W4Acres (~ I0.0 DUZ~c 40 DU. ~ ........................................,---T~A*L ACRES" 650 ........................................ : TO DWELUMG UNI'~S .................................. :.~ T.,~L :::::::::::::::::::::::::::::::::::~.-~'"'"'"'"'"'" -'*: : .~Ot,*~l'~,N::::::: ........ i:.'~:::: ===================== ,, JR.HIGH I I HIGH SCHOOL r ~:-.,~ ::::::::::::::::::::::: APT~ I ~O D.U. ,:..;, APPROVED ' I [ S OUTH'V~'ESTERN f . A N N E DGEtVERA PI_,4 N /PCS-e1-4 '& ' - i - LEGEND 29 Acres SCHOOL/PARK/WATER TANK ::: O 617Acres 1.71DU/Ac :- 809 UU ill 0 4Acre, s 14DO/Ac= 56 eu TOTAL ACRES 650 TOTAL DWELLING UNITS 865 JR, HIGH SCHOOL I._ 80NITA VISTA HIGH SCHOOL EAST "H" ST. PROPOSED GENERAL DEVELOPMENT PLAN ITA LONG CANYON EXHIBITB PCS-81-4  PCM-81-1$ City Planning Commission Agenda Items for Meeting of April 22, 1981 page 33 4. PUBLIC HEARING: d. Tentative subdivision map for Chula Vista Tract 81-4, Bonita Lon~ CanNon Estates A. BACKGROUND 1. The applicant has submitted a tentative subdivision map known as Bonita Long Canyon Estates, Chula Vista Tract 81-4, in order to subdivide 81.5 acres located north and east of Bonita Vista High School into 199 single family residential lots and one open space lot (see locator). The subject property is zoned P-C and lies at the southeast corner of the Bonita Long Canyon Equestrian Estates Sectional Planning Area of the E1 Rancho del Rey General Development Plan. 2. Consideration of the Bonita Long Canyon Equestrian Estates Sectional Planning Area and recertification of the EIR on the proposed projects are earlier agenda items. B. RECOMMENDATION Based on the findings contained in Section"E" of this report, adopt a motion recommending that Council approve the tentative subdivision map for Bonita Long Canyon Estates, Chula Vista Tract 81-4, subject to the following conditions: 1. Lot 171 shall have a minimum lot width of 60 feet at the 15 foot front setback. 2. Lots 173 and 174 shall have a minimum lot frontage of 35 feet along the cul-de-sac right of way line. 3. The bench at rear of the lots adjacent to the open space area shall have a minimum level width of 7 feet. 4. Building permits for lots 15 through 83 shall not be issued until the connection from Via Hacienda to Otay Lakes Road is completed. 5. The developer shall pursue off-site grading in all areas where a berm would result between existing and proposed lots. 6. A 6 foot high block wall shall be placed on the property line between Bonita Vista High School and abutting properties on the west side of Baylor Avenue. 7. The proposed fill within Tiffany Park shall daylight at variable elevations between 475 and 500 feet subject to the approval of the City's Landscape Architect. 8. A minimum 10 foot level area landscaped, irrigated,and dedicated to the City shall be provided along East "H" Street, Corral Canyon Road, and along both sides of "I" Street at the curb return nearest East "H" Street reducing down to 7.5 feet at a point 30 feet south of the curb return nearest "G" Street. The lot width of each lot on either side of "I" Street shall be 65 feet at its narrowest point. A 6 foot high decorative wall shall be placed near the property line on the dedicated open space as well as along the north property line of lot 189. The maintenance of this wall will be the responsibility of the maintenance district. City Planning Commission page 34 Agenda Items for Meeting of April 22, 1981 9. The restoration of Tiffany Park, including walkways, lighting, irrigation, lawn, shrubs and tree planting of area involved in the proposed fill shall be completed as part of the grading plan. Verification of the costs incurred by the developer shall be provided to the City's satisfaction for P.A.D. funds to be refunded or credited for restoration. 10. The development standards shall be revised to incorporate rear yard setback and construction criteria for those lots abutting the open space areas prior to the approval of the final map. 11. Prior to the approval of the final map for the project, the developer shall submit the necessary calculations to show that downstream sewer capacity is adequate or the developer shall provide improvements necessary to assume adequate capacity. 12. The property shall be annexed to the City of Chula Vista prior to approval of the final subdivision map. 13. Street names shall be submitted to the Planning Commission and a recommenda- tion forwarded to the City Council prior to Council action on the tentative map. 14. Prior to City Council action on the tentative map, the developer shall provide evidence of addressing the provision of the low/moderate income housing within the subdivision. 15. Prior to the issuance of building permits, the applicant working with the school districts shall furnish evidence to the City that the school districts are able to provide school service to the future residents of the subdivision. 16. All work within:the public right-of-way shall be done in accordance the standard specifications for Public Works Construction, the San Diego Area Regional Standard Drawings and the Design and Construction Standards of the City of Chula Vista. 17. Specific methods of handling storm drainage are subject to detailed approval by the City Engineer at the time of submission of improvement and grading plans. Design shall be accomplished on the basis of the require- ments of the subdivision manual and the grading ordinance (#1797 as amended). Drainage easements shall be provided as required by the City Engineer. 18. Lots shall be so graded as to drain to the street. Drainage shall not flow over slopes. 19. The maximum grade at any intersection of two streets shall be 6% within the intersection and for at least 50 feet past the curb lines of each street. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 35 20. The sewer line between manhole #13 and manhole #18 shall be realigned to provide a straight alignment between manholes, and not lie under and parallel to slope, or permanent access shall be provided to the manhole between lots 92 and 93. 21. The developer shall provide street lights as determined by the City Engineer. 22. Energy dissipators shown on the Tentative Map shall be permanent devices such as shown on Regional Standard Drawing D-41 or similar. 23. The developer shall grant 10 foot sewer easements for all offsite public sewers prior to approval of the Final Map. 24. The maximum tangent grade for Via Hacienda shall be 14%. 25. Sewers within cul-de-sacs shall terminate in a manhole. 26. The compound horizontal curve on "A" Street between "E" Street and Via Hacienda shall have an intervening tangent of at least 120 feet. 27. Sewer manholes shall be provided a{ all changes of alignment and grade. 28. Sewers serving I0 or less units shall have a minimum grade of 2%. 29. The turn-around area for the cul-de-sac at the end of "F" Street shall have a maximum grade of 5%. 30. The developer shall dedicate to the City right-of-way 80 feet wide for Corral Canyon Road within the subdivision. 31. The developer shall grade Corral Canyon Road within the subdivision adequate to facilitate roadway improvements for a collector street, 32. The developer shall acquire and dedicate offsite right-of-way adequate to provide half street width improvements (50 feet north of centerline) for missing segments of East "H" Street from Corral Canyon Road to Otay Lakes Road prior to approval of the Final Map. 33. The developer shall complete construction of the northerly half of East "H" Street from Corral Canyon Road to Otay Lakes Road. Improvements shall include two 12-foot traffic lanes and one 8 foot parking lane within a 32 foot curb to curb width. Monolithic curb, gutter and a 5 foot sidewalk shall be provided along the northerly side of the roadway and curb and gutter along the south side. The southerly curb line shall be 9 feet inside the south right-of-way line of a 50 foot half width street right-of-way. Street lights and other normal furnishing shall also be included as shall the landscaping and irrigation of one half the median island. 34. Developer shall participate in the cost of providing drainage facilities for the Long Canyon drainage basin under a future special assessment or reimbursement district or by constructing a portion of the Long Canyon City Planning Commission, Agenda Items for Meetin~ of April 22, 1981 page 36 drainage basin occupied by the project as determined by the County of San Diego, Department of Public Works prior to approval of the Final Map. 35. The developer shall grant to the City street tree easements as indicated on the Tentative Map. In addition, the developer shall grant to the City street tree easements along the future alignment of Corral Canyon Road within the subdivision. 36. The developer shall dedicate to the City a 6.5 foot strip of land along East "H" Street and Corral Canyon Road. Additional dedication on both sides of "I" Street will be required to extend the wall per Planning requirementS. Said dedication will be included in an open space maintenance district and be in the same location as a street tree easement would have occupied. 37. The developer shall acquire, dedicate and improve Otay Lakes Road from the point where the centerline of the SDG&E easement intersects said road to the improvements shown on Chula Vista Drawing 73-100A-D. Said improve- ments shall include but not be limited to 41.5 feet of pavement, curb and gutter and drainage facilities, east of centerline within a 50 foot half- width right-of-way. 38. The developer shall acquire, dedicate and improve a portion of the Corral Canyon-East "H" Street intersection as determined by the City Engineer. 39. The developer may request that a reimbursement district be formed for those portions of East "H" Street improvements which lie outside the subdivision boundary which benefit other properties. The SPA plan conditions require that offsite street improvements be provided. All of those offsite improvements may be included in the Reimbursement District. It shall be the developer's responsibility to submit to the City for approval a plan indicating improvements to be included, properties to be assessed and method of assessment for said district. 40. An erosion and sedimentation control plan shall be prepared as part of the grading plans. C. DISCUSSION 1. Existing site characteristics. The subject property, which is vacant, is located at the southeast corner of the Bonita Long Canyon Equestrian Estates Sectional Planning Area and is bounded by the Bonita Hacienda subdivision, Bonita Vista High School, Southwestern College Estates Unit 3 and the extension of East "H" Street on the south and west sides. The northeasterly property line follows the bottom of Long Canyon. The property abuts the 250 foot SDG&E easement on the north side and includes a portion of Corral Canyon Road extended on the easterly portion of the site. The property has an average natural slope of between 10 to 20 percent with most of the existing slopes being in the 20 to 30 percent range. The property ranges in elevation from approximately 300 feet to a high of 527 feet. City Planning Commission Agenda Items for Meeting of April 22, 1981 page 37 2. Tentative subdivision ma~ a. The developer proposes to subdivide the 81.5 acres of land into 199 single family residential lots with an average lot size of 9,500 sq. ft. and one 25.3 open space lot for a density of 2.44 dwelling units per gross acre. The lots will be developed with conventional single family detached dwelling units. The project will be served by a public street system which will extend 3 existing stubbed streets which are: !) East "H" Street; 2) Baylor Avenue; and, 3) Via Hacienda. In addition, a portion of Corral Canyon Road (in the same alignment of Rutgers Avenue) will be graded and extended, but not improved. b. The subdivision is essentially divided into two areas. The largest area containing 133 lots and abutting Bonita Vista High School will receive its access from Baylor Avenue at the south end and Via Hacienda at the north. The smaller area containing 66 lots, is located on the north side of the extension of East "H" Street on the easterly portion of the subdivision. This area will be served by a single entry road splitting into two cul-de-sac streets. None of the lots will front on East "H" Street or Corral Canyon Road. 3. Grading. The project will require extensive grading consisting of approximately 700,000 cu. yds. of cut and fill. The proposed grading will fill a portion of Tiffany Park in order to provide for the extension of East "H" Street. The developer will be required to restore the disturbed portion of the park, approximately one acre. The cost of restoration will be deducted from the Park Acquisition and Development fees collected for the subdivision. The majority of the open space lot will remain natural with some fill slopes created. Unless off-site grading approval is obtained, the proposed grading will create a berm between lots 142 and 143 and the abutting lots to the west. The developer should actively pursue permission to grade to eliminate or reduce the berm which could benefit the existing lots by providing them more usable area and a view to the east. 4. Adjacent development. The Bonita Haciendas subdivision located to the west has been graded but has not been improved at this time. Until the streets within that subdivision are improved, all of lots in the vicinity of Bonita Vista High School will have to use Baylor Avenue for ingress and egress. The interim traffic solution will leave all of the traffic from the subdivision utilizing Baylor Avenue with the area becoming a long cul-de-sac. To reduce the impact staff is recommending that construction not be allowed on lots 15 through 83 until a connection is made to Otay Lakes Road either by the adjacent development or by the developer of this project. 5. Open space and maintenance. In addition to the large open space lot adjacent to long Canyon, the developer will be required to dedicate and improve a level 10 foot area adjacent to East "H" Street and Corral Canyon Road as well as a return area on both sides of "I" Street. The majority lots abutting the open space will have lot lines extending horizontally 25 feet down the slope. The property line will be defined City Planning Commission page 38 Agenda Items for Meeting of April 22, 1981 by a level terrace drain 7' in width which will include a bench drain and access for the maintenance of the open space. Maintenance of the slopes within the property lines will be the responsibility of the homeowners, whereas, all the other areas will be maintained by the open space maintenance district. 6. Off-site improvements. The developer will be required to provide a connection between Otay Lakes Road and the westerly end of the improved section of East "H" Street. This connection will reduce the amount of traffic using the streets extending southerly of East "H" Street. In addition East "H" Street will be extended from its easterly improved terminus to Rutgers Avenue/Corral Canyon Road intersection. Also required will be the improvement of the east side of Otay Lakes Road north of the SDG&E easement to the existing improvements to the north. Another off-site improvement will be an extension of the sewer main from the northerly boundary of the subdivision to the existing sewer main in the Bonita Ridge subdivision. 7. Street names. Street names were ~ubmitted for staff review on April 14, 1981 and therefore no recommendation can be included at this time. They will be considered by Council, at the time of their review of the Tentative Map. 8. Code requirements. The following are code requirements; a. The developer shall plant street trees along all dedicated streets within the subdivision. The species, location and number shall be determined by the City Engineer. b. The developer shall pay Traffic Signal Participation fees in accordance with City Council Policy prior to issuance of building permits. c. The developer shall pay all applicable sewer fees prior to issuance of building permits. d. The developer shall underground all existing overhead facilities lying within the subdivision. All utilities serving the subdivision shall be undergrounded. e. All grading work shall be done in accordance with the City of Chula Vista Landscape Manual and Grading Ordinance 1797 as amended. f. The developer shall comply with all applicable sections of the Chula Vista Municipal Code. Preparation of the Final Map and all plans shall be in accordance with the provisions of the Subdivision Map Act, Subdivision Ordinance and the Subdivision Manual of the City of Chula Vista. City Planning Commission page 39 Agenda Items for Meeting of April 22, 1981 D. FINDINGS Pursuant to Section 66473.5 of the Subdivision Map Act, the tentative subdivision map for Bonita Long Canyon Estates, Chula Vista Tract 81-4, is found to be in conformance with the Bonita Long Canyon Equestrian Estates Sectional Planning Area of the E1 Rancho del Rey General Development Plan and the various elements of the City's General Plan, based on the following: 1. The site is physically suitable for residential development and the proposal conforms to all standards established by the City for such projects. 2. The design of the subdivision will not affect the existing improvements-- streets, sewer, etc.--which have been designed to avoid any serious problems. 3. The project is in substantial conformance with the Chula Vista General Plan Elements as follows: a. Land Use - The subject property is located in an area designated for low and medium density residential and the proposed density is in keeping with the combined number of units of the two land use designa- tions. The plan also conforms with the proposed modification to the sectional planning area plan. b. Circulation - The development will extend 3 existing stubbed streets and will provide for the extension of Corral Canyon Road adjacent to the subdivision. In addition, East "H" Street will be connected to Otay Lakes Road. A portion of the development dependent on the extension of Via Hacienda will not be allowed to develop until a connection is made to Otay Lakes Road. c. Housing - The development will provide needed housing in the community. d. Conservation and Open Space - The proposed project will result in 25 acres of permanent open space. The proposed grading will be primarily limited to the areas of development which will leave most of the open space in a natural state. e. Parks and Recreation - The developer will be required to restore the disturbed portion of Tiffany Park. The restoration will result in more level area within the park. The developer will be required to pay fees in lieu of dedication and improvement of park lands for which credit will be given for restoration of Tiffany Park. f. Seismic Safety and Safety - No known active fault exists on or within close proximity of the project site. The subject property is well within the response time of the fire station located at Elmhurst and Fordham. g. Noise - No lots will front on either East "H" Street or Corral Canyon Road and those lots which back up to these streets will be buffered by a 6 foot high wall and landscaping. A 6 foot high wall is also required City Planning Commission Agenda Items for Meeting of April 22, 1981 page 40 at the rear property line of those lots on Baylor Avenue abutting the high school property. h. Bicycle Routes - East "H" Street and Corral Canyon are designed to accommodate bicycle lanes. io Scenic Highways - East "H" Street will have a landscaped medium and a landscaped area adjacent to the right-of-way. j. Public Buildings - No public buildings have been designated on the subject property. 4. Pursuant to Section 66412.2 of the Subdivision Map Act, the Commission certifies that it has considered the effect of this approval on the housing needs of the region and has balanced those needs against the public service needs of the residents of the City and the available fiscal and environmental resources.