Meeting Date
2-3-81
ITEM TITLE: Resolution /o?>8, Approving agreement with pountney & Young
Inc. for the performance of a sewer condition sur.vey and
preparation of a report on the condition of the sanitary
sewer in the Co untr y Cl ub area and between "G" and "J"
Street west of Ba~Boulevard
SUBr1ITTED BY: City Engineer ~{, (4/5th Vote: Yes~lo~)
The City has budgeted funds for two sewer projects in this year's
Capital Improvement Program. project 51-06 budgeted funds to hire a
consultant to investigate the existing sewer lines in the Country Club
area. These sewers have been a continuous maintenance problem and
expense to the City. The second project, 51-07 & BF-l, is the
reconstruction of an existing concrete sewer main between "G" and "J"
Streets along the Coronado branch line of the railroad (west of the 1-5
freeway). We suspect that this main is falling apart. Included in the
$340,000 budgeted for these two projects was approximately $13,000 to
cover the costs of engineering consultant fees to investigate and
prepare a report on the existing condition of the sewers and make
recommendations as to what type of corrective action should be made to
repair and/or replace the sewers. It is my
RECOMMENDATION:
That Council:
1. Authorize the. expenditure for this project in the amount of
$28,000 from the various accounts outlined in-the financial
statement.
2. Approve agreement with pountney & Young, Inc. and the City of
Chula Vista.
BOARD/COMMISSION RECOMMENDATION: Not applicable.
DISCUSS ION:
A letter was sent out to a number of Engineering consultant firms
requesting that they submit letters of interest to 'the City Engineer if
they wanted to be considered by the City for providing engineering
consultant services to investigate the condition of existing sanitary
sewers. in the Country Club area and a trunk sewer west of Bay Boulevard
between "G" and "J" Streets. A total of nine companies responded. In
accordance with Council policy, a selection committee was established to
consider the reponses and interview those firms deemed appropriate and
qualified to do the study. The committee interviewed three firms and
pountney & Young, Inc. was selected for the preparation of the study.
Pountney & Young, Inc. have executed an agreement for the performance of
a sewer condition survey and preparation of a report on the condition of
the san i ta ry sewer in the Coun tr y Cl ub area and between "G" and "J"
Street west of Biy Boulevard. The agreement calls for the engineer of
work to perform the following:
ID?'ff9
Fonn .'\-113 (Rev. 11(79)
Continued
Agreement~ Resolution~
\
'I
\ EXHIBITS
Ordinance Plat
1- _
Notification List
Other
ENVIRONMENTAL DOCUMENT: Attached
Submitted on
"
I'
I'
I
I
I
I
I
!
. ,
~ ..,
Page 2, Item
!1eetinq Date
9
2-3~81
A. Clean, close circuit television inspect and prepare audio
video tapes for the sanitary sewers in the following areas:
1. Country Club area bounded by Hilltop Drive, First Avenue
"L" Street and "K" Street not including the sewer in "K"
Street.
2. Bayfront area between "G" and "J" Streets along the
easterly right-of-way line of Coronado Branch Line,
San Diego & Arizona Eastern Railway.
B. Coordinate the cleaning, television inspection and video
taping, review the video tapes.
C. Prepare and furnish a written report to the City which
evaluates the video tapes, identifies problem areas and
alternatives to solving the problems discovered in the
investigation.
D. Provide the City with ten copies of the final report.
E. If Engineer of Work recommends relining as a method to correct
any problems or defects in the existing sewer, provide the
City with contract special provisions to standard
specifications for material recommended and method of
installation.
In accordance with the terms of the agreement the City will provide the
following:
A. All pertinent record data available in City files.
B. All existing utility information as provided by the various
utility companies.
C. Expose and backfill dead ends of sewers that do not have
manholes or minimum 4 inch diameter cleanouts at both ends of
1 ine.
E. All necessary authorization of enter onto private property and
provide encroachment permits as required for the work within
street right-of-ways.
pountney & Young, Inc. have agreed to provide engineering services for a
total compensation not to exceed the amount of $28,000. For specific
listing of costs please refer to the agreement.
FINANCIAL STATEMENT:
Total maximum cost of sewer study - $28,000
Funds are available for the performance of this sewer survey and
preparation of a report from the following accounts:
t6~rg9
. '
Page 3, Item
Meeting Date
?
'2-3'-31
PROJECT
ACCOUNT
AMOUNT
Sewer Replacement,
Country Club Area
600-6000-SIOfi
$7,%0.80
Replace sewer along SD&AE
Railroad from "G" to IIJ"
995-9550-BFOl
fiOO-6000-SI07
5,000.00
15,039.20
TOTAL FUNDS
$28,000.00
Total funding available for the two projects is $340,000. We
anticipated that a consultant study would cost approximately $13,000.
We originally anticipated that any cleaning necessary would be done by
City crews. In discussion the project with the consultant, we became
convinced that it would be better to have the consultant be responsible
for all the phases of the project (cleaning, T.V. inspection, and
report). That way, the consultant is held accountable that the sewers
will be clean enough for T.V. inspection. If we cleaned the lines'with
City crews, and the T.V. inspection wasn't adequate, excess costs would
be involved. The consultant was unwilling to give us a fixed cost if we
cleaned the lines.