Loading...
HomeMy WebLinkAboutReso 2009-287RESOLUTION NO. 2009-287 RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA ACCEPTING BIDS AND AWARDING THE CONTRACT FOR THE "ADA CURB RAMPS FISCAL YEAR 2008/2009 (STL348p' TO ASAP GENERAL ENGINEERING IN THE AMOUNT OF $150,585 AND AUTHORIZING THE EXPENDITURE OF ALL AVAILABLE FUNDS IN THE PROJECT WHEREAS, on November 25, 2009, the Director of Public Works received sealed bids for the "ADA Curb Ramps Fiscal Year 2008/2009 (STL348)" CIP Project; and WHEREAS, the work to be done consists of the installation of ADA pedestrian ramps and other concrete improvements at various locations within the south-west region of the City of Chula Vista, California; and WHEREAS, the work for this project also includes some removal and replacement of displaced curbs, gutters, sidewalks and portions of cross gutters; and WHEREAS, the Director of Public Works received twelve (12) bids as follows: CONTRACTOR BID AMOUNT 1. ASAP General Engineering -Perris, CA $150,585.00 2. YBS Concrete -Chula Vista, CA $154,600.00 3. Tri-Group Construction -Poway, CA $164,950.00 4. PAL General Engineering -San Diego, CA $178,178.00 5. New Century Construction-Lakeside, CA $181,150.00 6. Pave Fros Construction-Chula Vista, CA $185,890.00 7. HTA Engineering &Construction-Poway, CA $187,700.00 8. Crest Equipment, Inc. - El Cajon, CA $194,300.00 9. Heffler Company-National City, CA $195,000.00 ] 0 . HAR Construction -Chula Vista, CA $208,899.50 11 . Scheidel Contracting & Engineering - La Mesa, CA $220,752.50 12 . MJC Construction-National City, CA $280,900.00 WHEREAS, the low bid by ASAP General Engineering is below the Engineer's estimate of $210,000.00 by $59,415.00 (28% below the Engineer's estimate); and Resolution No. 2009-287 Page 2 WHEREAS, staff has contacted the Project Engineer for the last three construction projects that this contractor has performed for local agencies and has found that ASAP General Engineering has performed the work satisfactorily; and WHEREAS, staff has reviewed the low bid and recommends awarding the contract to ASAP General Engineering of Perris, California; and WHEREAS, in order to approve change orders as necessary and to construct the maximum number of pedestrian ramps possible, staff is requesting City Council waive Council Policy No. 574-01. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Chula Vista does hereby accept bids and awazd a contract for the "ADA Curb Ramps Fiscal Yeaz 2008/2009 (STL348)" to ASAP General Engineering in the amount of $150,585 and authorize the expenditure of all available funds in the project. Presented by ~chazd .Hop ' s Director of Pub is Works Approved as to form by ti~~ ~~~ C. Miesfeld City Attorney Resolution No. 2009-287 Page 3 PASSED, APPROVED, and ADOPTED by the City Council of the City of Chula Vista, California, this 15th day of December 2009 by the following vote: AYES: Councilmembers: NAYS: Councilmembers: ABSENT: Councilmembers: ABSTAIN: Councilmembers: Castaneda, Ramirez, Thompson and Cox None None Bensoussan e Cheryl Cox, yor ATTEST: ~0 onna R. Norrts, CMC, City Clerk STATE OF CALIFORNIA COUNTY OF SAN DIEGO CITY OF CHULA VISTA 1, Donna R. Norris, City Clerk of Chula Vista, California, do hereby certify that the foregoing Resolution No. 2009-287 was duly passed, approved, and adopted by the City Council at a regular meeting of the Chula Vista City Council held on the 15th day of December 2009. Executed this 15th day of December 2009. ~~ ~.~,c~ Donna R. Norris, CMC, City Clerk