HomeMy WebLinkAboutAgenda Statement 1980/10/21 Item 5
.
COUNCIL AGENDA STATEMENT
Item'S
Meeting Date 10-21-80
Resolution ,1t?-?~~ Approving waiver of certain utility undergrounding
within the proposed Hidden Vista Village Subdivision, CVT 80-15
SUBMITTED BY: City Engineer ~~ (4/Sths Vote: Yes___ No~)
On October 7, 1980, City Council conducted a public hearing for consideration of waiving
certain undergrounding requirements within the proposed Hidden Vista Village Subdivision.
City Council accepted Engineering and Planning staffs' written recommendations relative
'to 'the waiver'request\~ith the ,exception of one item and directed that a resolution be
brought back before Counci 1. '
ITEM TITLE:
RECOMMENDATION: That Council adopt the resolution approving the following waiver of
requirements for 69kv lines and 12kv lines.
a) The 69kv lines as shown on Exhibit A along the line A-B-L shall be
converted to underground along line A-B-D.
b) The existing 69kv lines shown on Exhibit A along the line L-C shall
be relocated overhead to lie along the line D-E-C.
c) The existing 69kv lines between Point H and Point I shall be left in
its present location.
i d) All 12kv lines within the project site shall be cOnverted to underground,
except that segment from "F" to "G" (See Exhibit A, lines A-B-F-G and
I J-K). ' ~~ ~.
BOARD/COMMISSION 'RECOMMENDATION: Not applicable. ~,,_~~ G;~.:r
lo-~ 7- R~
DISCUSSION:
On October 7, 1980, City Council conducted a public hearing and approved an Engineering
and Planning staff report rel?tive to waiver of utility undergrounding requirements
within the proposed Hidden Vista Village Subdivision.
The developer requested waiver of the requirement to underground 69kv transmission
lines within the subdivision. Engineering and Planning staff made a proposal which
included undergrounding of a segment of the 69kv line and relocating the other segment.
The developer agreed 'with staff's proposal.
The Engineering and Planning staff report indicated that all 12kv lines would be under-
,grourided. S~bsequent to the writing of the report but prior to the October 7, T980,
public hearing before Council, San Diego Gas and Electric indicated that a segment of
12kv line ("F" to "G" Exhibit A) would require the construction of an access road for
maintenance purposes if undergrounded. The location which the access road would be
constructed upon was unacceptable in that the area is opens pace and on a slope.
Consequent ly, the City Engineer orally changed the repo,rt' s recommendati on to incl ude
waiver of undergrounding that portion of the 12kv line between "F" and "G" Exhibit A.
Council approved the report with a change in item d). Council directed staff to return
with a resolution indicating their approved waiver of requirements to underground
utilities within Hidden Vista Village, CVT 80-15.
FISCAL 1MPAFT: Not applicable. c>
Form A-ll.3 Rev. 11179) / b.:z.... 9 7
,
I
I
"
I
I
I
il
il
II
"
by the City C,,)u,~ii of
Chula VUJ, C:.iifornia
Dnted _d ~ ~_L __i<J
~-----~,....,,~ ....-,... ."..