HomeMy WebLinkAboutAgenda Statement 1980/10/14 Item 15 ., COUNCIL AGENDA STATEMENT Item 15 Meeting Date 10-14-80 ~:.., Resolution/p).1?Accepting bids and awarding contract ITEM TITLE: for construction of box culvert across Third Avenue at Park Way and South of "G" Street east of Third Avenue within the City of Chula Vista, California. SUBMITTED BY: C. t E. 0;)1/ 1 Y nglneer II, At 2:00 p.m. on October 1, 1980, in Conference Room 3 in the Public Services Building, the City Engineer received bids for "Construction of Box Culverts across Third Avenue at Park Way and South of "G" Street east of Third Avenue within the City of Chula Vista, California". The scope of the work includes installation of a reinforced concrete box culvert, storm drain pipes, curb, gutter, sidewalk, driveway apron, retaining walls, grate, concrete slabwork, chain link fencing, drainage manhole, cutoff wall, headwall, inlet struc.ture, box culvert transition, outlet structure, building modifications, asphalt paving and base, property restoration and other miscellaneous work as required. It is my (4/Sths Vote: Yes___ No~) ,. RECOMMENDATION: That Council: 1. Authorize the transfer of funds as outlined in the financial statement. 2. Authorize expenditure for this project from the following accounts; Project ACCOUNT NO. AMOUNT a. Madrona Parking Lot 600-6000-RS220 Extension and Drainage Improvements $ 24,421.74 b. Same as above 632-6320-BG62 20,551. 15 c. Storm Drain - Third G33-6330-BG69 Avenue & Park Way 246,541. 56 d. Same as above 634-6340-BG69 31,835.55 TOTAL $323,350.00 3. Accept bids and award contract to Sapper Brothers, Inc., San Diego in the amount of $307,946.00 for the construction of Al ternate 1. BOARD/COMMISSION RECOMMENDATION: Not applicable. Continued L o~Cr 0 Form A-113 (Rev. 11/79) EXHIBITS Agreement____ Resolution x Ordinance Plat Notification List Other ENVIRONMENTAL DOCUMENT: Attached Submitted on J Page 2, Item Heeting date 15 10-14-80 DISCUSSION: Two separate alternates were bid. Each alternate has a different scope of work. Alternate 1 is for the total project which includes the construction of a box culvert across Third Avenue at Park Way and a box culvert south of "G" Street east of Third Avenue. Alternate 2 includes only the construction of the box culvert across Third Avenue at parkway. Bids were received from five contractors as follows: Contractor Alternate 1 Alternate 2 1. Sapper Brofhers, Inc. - San Diego $307,946.00 $238,845.00 2. P.K. Construction Co. - San Diego 317,660.90 276,425.20 313,441. 00 319,354.00 3. Hetro-Young Construction Co. - S.D. 4. K.E.C. Co. - Corona 380,991.00 387,140.00 5. Gemi, Inc. - Arcadia 419,306.00 331,695.00 The low bid submitted by Sapper Brothers, Inc. is below the Engineer's estimate of $432,798.00 for Alternate 1 by $124,852.00 or 28.8 percent. Sapper Brothers was also the low bidder for Alternate 2. Their bid for Alternate 2 is below the Engineer's estimate of $360,991 by $122,146.00 or 33.8 percent. We have reviewed the low bid and find it to be acceptable. We are very pleased with the low bid received and with the contractor, Sapper Brothers, who has completed other projects for us. The inflationary trend in construction has apparently softened. I believe this could be due to more competition because of lower activity in the private building industry. Staff is recommending the award of the bid for Alternate 1.This alternate provides for: 1. The ul timate drainage improvement across Thi rd Avenue. 2. Expansion of the parking lot (approx. 5 spaces) south of Madrona and east of Third. 3. Elimination of the flooding hazard and ponding south of "G" Street. The Federal Department of Housing and Urban Development has reviewed the low bidder's eligibility to participate in a Federally financed Block Grant project and has approved Sapper for this project. .' FINANCIAL STATEMENT: Adequate funds are available for construction 0 this project of transfers are made from other completed Block Grant projects and from a portion of the Block Grant local option funds. A summary of the proposed funding is as follows: { 07--8 b Page 3, Item Heeting Date 15 10-14-80 1. Funds currently available and budgeted for this project; Project Account Amount a. Madrona Parking Lot Extension and Drainage Improvement 600-6000-RS220 $ 24,421. 74 b. Same as above 632-6320-BG62 20,551.15 c. Storm Drain - Th~rd Avenue and Park Way 633-6330-BG69 193,490.98 SUBTOTAL $238,463.87 2. Funds from which we ".recommend transfers are as follmvs; Project a. Parkway Gym & Pool Exterior Renovation Transfer From Account # to Account # Amount 633-6330-BG66 633-6330-BG69 :$20,000.00 b. Pavement Overlay ,0 Program 633-6330-BG68 633-6330-BG69 15,911. 68 c. Alley Improvements - Landis & Garrett et. 633-6330-BG70 633-6330-BG69 8,521.68 d. Citizen Participation ~ (79-80) e. Local Option (79-80) 633-6330-BG79 633..,6330-BG69 3,687.22 633-6330-BG82 633-6330-BG69 18,000.00 f. Local Option (80-81) 634-6340-BG95 634-6340-BG69 31,835.55 SUBTOTAL $97,986.13 $336,450.00 J - Total funds available to construct proj~ct including Engineering and Inspection costs (assuming fund transfers are made) . Contract amount - $307,946.00 Contingencies (approx. 5%) - $15,404.00 Total funds required to construct project - $323,350.00 FISCAL IMPACT; After construction of the project is complete, the City will assume maintenance of the facilities. The cost of this maintenance is expected to be minimal. , ~l SLH: fpwjA0015 , AOOll ~ .. ! {)2Cf(P by the City Council of Ghula Vista, GiJlifornia Dated /~ - It.! -:- !to