Loading...
HomeMy WebLinkAbout2009/12/08 Item 6 CITY COUNCIL AGENDA STATEMENT ~If~ CITYOF .~ (HULA VISTA 12/08/09, Item~ ITEM TITLE: RESOLUTION OF THE CITY COUNClL OF THE CITY OF CHULA VISTA APPROVING THE FIRST AME0.TDMENT TO THE DESIGN/BUILD AGREEMENT WITH ERICKSON-HALL CONSTRUCTION CO. FOR THE DESIGN AND CONSTRUCTION OF ALL SEASONS PARK (CIP NO. PR279) TO REVISE THE GUARANTEED M~,{IMUM PRIC%~ DIRECTOR OF PUBLIC WORKf'J}' CITY MANAGER~ ASSIST ANT CIT~- a:NAGER ,,>--r 4/STHS VOTE: YES D NO [g] SUBMITTED BY: REVIEWED BY: SUMMARY The City Council previously approved crp Project No. PR279 and the Master Plan for All Seasons Park, which conceptually designed and provided for the construction of a completed and fully functional 7.6-acre parle On May 15, 2007, Council approved a Design Build Agreement with Erickson-Hall Construction Co. for this park. The Design Build Agreement contained a not- to-exceed price of $2,015,343 with the GMP to be set upon receipt of 90% construction drawings. The project is nearing the end of the design phase and ready to start the construction phase. Tonight's first resolution will approve the first amendment that will set the Guaranteed Maximum Price (GMP) at $2,499,438. ENVIRONMENTAL REVIEW The Environmental Review Coordinator has reviewed the proposed project for compliance with the California Environmental Quality Act (CEQA) and has determined that the proposed project was adequately covered in the previously adopted Village Seven Sectional Planning Area Plan and Tentative Maps Final Environmental Impact Report (EIR #04-06). Thus, no further environmental review or documentation is necessary. RECOMMENDATION Council approve the resolution. BOARDS/COMMISSION RECOMMENDATION Not applicable. 6-1 12/8/09, Item~ Page 2 of 4 DISCUSSION On May 15, 2007, City Council approved an agreement with Erickson-Hall Construction Co. by Resolution 2007-114 for the services required to design and construct a completed and fully functional 7.6-acre, All Seasons Park. As part of that agreement, a Guaranteed Maximum Price (GMP) is to be established at 90% construction documents, which would include, but not be limited to, the cost for all labor, equipment, and material to design and build a fully functional park in accordance with all applicable building codes. A not-to-exceed amount of $2,015,343 for the park was established based upon rough schematic drawings in the Design Build agreement. As the design progressed and some of the complexities of this project became known, the actual GMP as determined at the 90% construction drawing stage exceeded the not- to-exceed amount in the original agreement. PROJECT SCOPE A1~ CONTRACTUAL REOUIREMENTS The Design-Build Agreement with Erickson-Hall Construction Co. provides the City with a fully functional All Seasons Park including the facilities and site work required to provide park service to residents of that community as well as other residents of the City. The First Amendment (Exhibit A) to the Design Build Agreement between the City of Chula Vista and Erickson-Hall Construction Co. will include setting the GMP at $2,499,438 which includes the revised Design Fees and General Conditions costs consistent with the project cost (Attachment I) and revise the statement for Substantial and Final Completion dates. The GMP shall include all design and construction services to complete a fully functional park. The GMP is higher than the not-to-exceed amount in the original agreement due to the process of refining the various project elements. Staff has made every effort in value engineering the project and concurs with the Design Builder's GMP amount. The GMP was estimated at $2.9 million in 2007, slightly higher than the original $2.4 million budget. The increase in the GMP was the result of two-year project delay, unanticipated site conditions, increases in the price of fuel and materials, new environmental guidelines, as well as a master plan which at the time (2004) was optimistic when it came to actual construction/management costs whereby the scope of work exceeded the budget. Over the past two years, the Design Build Team (DBT) created a value-engineered scope that was near or at the original budget of $2.4 million, which resulted in a significantly reduced scope. This severely impacted the programming of the Park and was unacceptable. At that point in time, staff directed the DBT to include all the scope of work in the master plan and value- engineer items that did not impact the original scope, which has brought us to where we are today with a GMP of $2.499M. By doing this, the City will realize a much nicer, programmable park while maintaining the original scope of work. In addition, moving forward now will provide the City with an opportunity to utilize current financial advantages in construction bids. 6-2 12/8/09, Item~ Page 3 of 4 The Substantial and Final completion dates will be amended to include the revised Substantial Completion date of "no later than twelve (12) months after the Notice to Proceed" and the reviscd Final Completion datc of no later than thirty (30) calendar days from Substantial Completion. The total cost of the project and GMP exceed the amount set forth in the Design Build Agreement as the amount not- to-exceed cost of the project. At the time of thc Design Build Agreement, staff recommended an amount not-to-exceed that was less than the total budgeted cost of the project. This is commonly done, as the costs of the project that are estimated at the master plan level rarely remain consistent through the design process. By establishing a less than budgeted not- to-exceed amount, staff is better able to focus the design builder on designing a project that remains within our budgetary constraints. Staff felt it prudent at that time to establish a conservative cost of the project and be able to respond to unexpected changes in material costs. The final design of the project remains consistent with the adopted master plan. CHAt"JGE ORDERS Under the design/build process, change orders are handled differently than under the design/bid/build process. Change orders are only returned for Council approval if they exceed the approved GMP, or are for additional work requested by City, which results in a significant change to the original scope. Otherwise, change orders are reviewed/approved by staff and the design builder. This practice is commonplace when using the design/build construction technique. DECISION MAKER CONFLICT Staff has reviewed the property holdings of the City Council and has found no property holdings within 500 feet of the boundaries of the property which is the subject of this action. CURRENT FISCAL IMPACT PROJECT COSTS GMP $2,499,438 Master Plan $50,000 paid from ACI90 (00861-2751) - complcted City Staff Costs, Consultant and Oversight $175,000 (including geotech/special inspections) Utilities $125,000 City Contingency $75,562 FF&E $25,000 TOTAL PROJECT COSTS $2,879,438 PROJECT FUNDS Budgeted Amount thru FY 1 0- Park Acquisition and Development Funds $2,449,459 Anticipated FYII Appropriation $450,541 TOTAL PROJECT FUNDS 52,900,000 6-3 12/8/09, Item~ Page 4 of 4 Erickson-Hall Construction Co. has requested the GMP be set at $2,499,438. The GMP includes, but is not limited to, design services, general conditions, insurance, bonds, construction management, the cost for all labor, equipment, and material to design and build a fully functional park in accordance with all applicable building codes. The total project cost is $2,900,000. Approval of tonight's resolution will approve the first amendment to the agreement with Erickson-Hall Construction Co. to incorporate the Guaranteed Maximum Price (GMP) for the design and construction of All Seasons Park (CIP PR279) located south of Birch Road, west of SR-125, east of La Media Road (within the Otay Ranch Village Seven Subdivision) and authorize the Mayor to execute said amendment. ON GOING FISCAL IMPACT Upon completion of All Seasons, the City will incur additional park maintenance costs of approximately $11,400 per acre/year for a total of $86,640 for 7.6 acres. These costs will be included in the fiscal year 2011-12 general fund budget which may result in budgetary tradeoffs in the future or reduced park maintenance services. Given the current economic picture, the City will not likely be able to add additional personnel to maintain the park in the near future but will manage as best as possible with the limited resources available. Prior to acquiring additional acreage to maintain (approximately 26 acres which includes San Miguel Ranch Community Park and All Seasons), staff reductions are over 20%. To assist in mitigating staffing deficiencies, efficiency measures are in place and will be realized such as use of new equipment, scheduling changes, etc. ATTACHMENTS Attachment I - Revised Exhibit 2, Design Build Fee Structure Exhibit A - First Amendment to the Design Build Agreement Prepared by: Merce LeClair, Sr. Management Analyst Public Works Dep Gordon Day, Sr. Building Project Manager, Public Works Dept. IIEngineerIA GENDA ICAS2009\12-08-09IAIl Seasons First Amdmt Agenda Draft. doc 6-.4 GMP Cost of Construction All Seasons Park All Seasons Park - GMP Construction Costs 1. GMP Construction Budget ~ including 5% contingency 2. General Conditions - 8 Months 3. Subtotal - Hard Construction Costs 4 Design/Builders Fee - sliding scale Fee on first $1,000,000 of construction cost Fee on next $500,000 over $1,000,000 - 6% Fee on next $500,000 over $1,500,000 - 51/2% 5. Total - Preliminary Cost of Construction Estimate Design and Pre-Construction Fees: 6. Preconstruction Services for Design/Builder - sliding scale Preconstruction fee on first $1,000,000 of construction cost Preconstruction fee on construction cost over $1 mil. - 3/4% 7. AlE Site Design Fees Civil Engineering/SWPPP Tapa Verification of Existing Site - Budget A/E Building/Site Lighting Design Fees Landscape Design I Construction Documents Update City Provided Geotechnical Report Update Structural to new Code (Davy) Re-design as Requested By City (Davy, Cherry, DPA,EHCC) 8. Off-site engineering I design - not included 9. Reimbursables - Budget Total GMP Design & Build Cost 10. Cost of bond premium - sliding scale First $500,000 - $12.00 per 1,000 Premium over $500,000 - $8.00 per 1,000 11 Insurance 12. Building/Utility/Site Fees (by owner) 13. Testing and Inspections (Included in Hard Cost) 14. City staffing! Inspections (by owner) Total GMP Project Cost Design Fees, Pre-Construction Fees and GC Summary: General Conditions (line item 2 above) Design and Pre-Construction Fees (line items 6-9 above) Total Design Fees, Pre-Const. Fees and General Conditions November 19, 2009 $ 1,907,648 $ 208,000 $ 2,115,648 $ 100,000 S 30,000 $ 33,861 $ 2,279,509 $ 20,000 S 9,596 $ 30,500 $ 6,500 $ 17,500 $ 59,294 $ 6,000 S 2,150 $ 16,775 $ S 20,000 $ 2,467,824 $ 6,000 $ 15,743 $ 9,871 $ S $ $ 2.499,438 $ 208,000 $ 188,315 $ 396,315 Erickson-Hall Construction Co. November 19, 2009 6-5 ATTACHMENT I b-K HI f3 II It- First Amendment to the DesignfBuild Agreement between the City of Chula Vista and Erickson-Hall Construction Co. For Design and Construction of All Seasons Park This First Amendment is made and entered into this 8th day of December 2009 by and between the City of Chula Vista ("City"), a municipal corporation, and Erickson-Hall Construction Co. ("Design Builder or D/B"). City and Design Builder are sometimes referred to as Parties ("Parties") RECIT ALS WHEREAS, the City and D/B entered into an agreement ("Original Agreement") dated May 15,2007 and approved by City Council Resolution 2007-114, whereby D/B agreed to provide design and construction services to the City for the construction of a fully functional park, All Seasons Park CProject"), including the facilities and site-work; and WHEREAS, pursuant to the Original Agreement, the guaranteed maximum price CGMP") was not to exceed $2,015,343; and WHEREAS, after design of the Project, the actual GMP, as determined at the 90% construction drawing stage, will not exceed $2,499,438; and WHEREAS, D/B and City staff have value-engineered the Project to provide the best product at the most effective price; and WHEREAS the Parties desire to amend the Original Agreement to increase the GMP to $2,499,438 for a fully functional All Seasons Park. NOW, THEREFORE, in consideration of the Recitals and the mutual obligations of the Parties as set forth in this First Amendment, the City and Design Builder agree as follows: AGREEMENT 1. Section 1: General Scope of Work to be Performed bv D/B' subsection 1.3.1, in the sixth line of the paragraph, delete "$349,459" and replace with "$396,315". 2. Section I: General Scope of Work to be Performed bv D/B' subsection 1.3.2, delete "June 27, 2008" and replace with "twelve (12) months after the City-issued Notice to Proceed". I 6-6 3. Section I: General Scope of Work to be Performed by DIB, subsection 1.3.3, delete "July 31, 2008" and replace with "thirty (30) calendar days after "Substantial Completion" (as defined in 9 I 6.1)". 4. Section II: Insurance, subsection 11.3.1.5, Builder's Risk Property Insurance, in the ninth line of the paragraph, delete "$2,000,000 million" and replace with "2,500,000". 5. Section II: Insurance, subsection 11.3.1.5, Builder's Risk Property Insurance, in the third paragraph in this subsection, delete "$5,000" and replace with "$10,000". 6. Section I I: Insurance, subsection 1104. I .5, delete "$2,000,000" and replace with "$2,500,000". 7. Section 13: DIB GMP for Services and Reimbursements, subsection 13.1. I, in the first line of the paragraph, delete "$2,015,343" and replace with "$2,499,438". 8. Section 13: DIB GMP for Services and Reimbursements, subsection 13. I.1, in the second line of the paragraph, delete "$349,459" and replace with "396,315". 9. Section 13: DIB GMP for Services and Reimbursements, subsection 13.2, in the fifth line of the paragraph, delete "$182,000" and replace with "$208,000". 10. Section 13: DIB GMP for Services and Reimbursements, subsection 13.2, in the fifth line of the paragraph, delete "$ 167,459" and replace with "$188,3 I 5". 11. Section 13: D/B GMP for Services and Reimbursements, subsection 13.2, in the sixth line of the paragraph, delete "$349,549", in both places in that sixth line, and replace with "$396,3 I 5", in both places in that sixth line. 12. Exhibit 2: Design Build Fee Structure, delete Exhibit 2, Design Build Fee Structure, to the Original Agreement and replace with the attached Revised Exhibit 2, Design Build Fee Structure. All other terms of the Original Agreement shall remain in full force and effect. [END OF PAGE. THE NEXT PAGE IS THE SIGNATURE PAGE] 7 0'-7 Signature Page to First Amendment to the DesignfBuild Agreement between the City of Chula Vista and Erickson-Hall Construction Co. For Design and Construction of All Seasons Park City ofChula Vista Erickson-Hall Construction Co. By: Name: Title: ~J" ---- By: Cheryl Cox Mayor Mi...l,a<!11:r::1l Chief Ooeratlng Officer ErtcI<&<Jn-H..q eonstruclion CO. Date: ATTEST: Donna Norris, CMC City Clerk Approved as to form: Bart Miesfeld City Attorney J:\General Services\GS Administration\Council Agendu\A11 Seasons Park\A1I Seasons Amendment and Sig Page Draft.doc 3 6-8 RESOLUTION 2009- RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CHULA VISTA APPROVING THE FIRST AMENDMENT TO THE DESIGN/BUILD AGREEMENT WITH ERICKSON-HALL CONSTRUCTION CO. FOR THE DESIGN AND CONSTRUCTION OF ALL SEASONS PARK (CIP NO. PR279) TO REVISE THE GUARANTEED MAXIMUM PRICE WHEREAS, on May 15, 2007, by Resolution 2007-114, City Council approved an agreement with Erickson-Hall Construction Co. for the services required to design and construct a completed and fully functional 7.6-acre, All Seasons Park; and WHEREAS, as part of that agreement, a Guaranteed Ma'{imum Price (GMP) is to be established at 90% construction documents, which would include, but not be limited to, the cost for all labor, equipment, and material to design and build a fully functional park in accordance with all applicable building codes; and WHEREAS, a not-to-exceed amount of $2,015,343 for the park was established based upon rough schematic drawings in the Design Build agreement; and WHEREAS as the design progressed and some of the complexities of this project became known, the actual GMP as determined at the 90% construction drawing stage exceeded the not- to-exceed amount in the original agreement; and WHEREAS, the First Amendment to the Design Build Agreement between the City of Chula Vista and Erickson-Hall Construction Co. will include setting the GMP at $2,499,438 which includes the revised Design Fees and General Conditions costs consistent with the project cost and revise the statement for Substantial and Final Completion dates. The GMP shall include all design and construction services to complete a fully functional park. The GMP is higher than the not-to-exceed amount in the original agreement due to the process of refining the various project elements. Staff has made every effort in value engineering the project and concurs with the Design Builder's GMP amount; and WHEREAS, the increase in the GMP is a result of two-year project delay, unanticipated site conditions, increases in the price of fuel and materials, new environmental guidelines, as well as a master plan which at the time (2004) was overly optimistic when it came to actual construction/management costs whereby the scope of work exceeded the budget; and WHEREAS, the Substantial and Final completion dates will be amended to include the revised Substantial Completion date of "no later than twelve (12) months after the Notice to Proceed" and the revised Final Completion date of no later than thirty (30) calendar days from Substantial Completion. 6-9 NOW, THEREFORE BE IT RESOLVED that the City Council of the City of Chula Vista does hereby approve the First Amendment to the Design/Build Agreement with Erickson- Hall Construction Co. for the Design and Construction of All Seasons Park (CIP No. PR27 0 revise the guaranteed maximum price. Richard A. Hopkins Director of Public Works Presented by 6-10 THE A TT ACHED AGREEMENT HAS BEEN REVIEWED AND APPROVED AS TO FORM BY THE CITY ATTORNEY'S OFFICE AND WILL BE FORMALL Y SIGNED UPON APPROVAL BY THE CITY.COUNCIL _.~-- Dated: /1_1 ()? /00; J J FIRST AMENDMENT TO THE DESIGN BUILD AGREEMENT BETWEEN THE CITY OF CHULA VISTA AND ERICKSON-HALL CONSTRUCTION CO. FOR DESIGN AND CONSTRUCTION OF ALL SEASONS PARK . , ':' 6-11 ~_, _.........,'"'~,~...-,~-k-.."..,-....,...,'~."-..- First Amendment to thc DesignfBuild Agreement between the City of Chtila Vista and Erickson-Hall Construction Co. For Dcsign and Construction of All Seasons Park This First Amendment is made and entered into this 8th day of December 2009 by and between the City of Chula Vista ("City"), a municipal corporation, and Erickson-Hall Construction Co. ("Design Builder or D/B"). City and Design Builder are sometimes referred to as Parties ("Parties") RECIT ALS WHEREAS, the City and D/B entered into an agreement ("Original Agreement") dated May 15,2007 and approved by City Council Resolution 2007-114, whereby DfB agreed to provide design and construction services to the City for the construction of a fully functional park, All Seasons Park ("Project"), including the facilities and site-work; and WHEREAS, pursuant to the Original Agreement, the guaranteed maxim'um price ("GMP") was not to exceed $2,015,343; and WHEREAS, after design of the Project, the actual GMP, as determined at the 90% construction drawing stage, will not exceed $2,499,438; and WHEREAS, D/B and City staff have value-engineered the Project to provide the best product at the most effective price; and WHEREAS the Parties desire to amend the Original Agreement to increase the OMP to $2,499,438 for a fully functional All Seasons Park. NOW, THEREFORE, in consideration of the Recitals and the mutual obligations of the Parties as set forth in this First Amendment, the City and Design Builder agree as follows: AGREEMENT 1. Section I: General Scope of Work to be Performed by DfB, subsection 1.3. I, in the sixth line of the paragraph, delete "$349,459" and replace with "$396,315". 2. Section 1: General Scope of Work to be Performed by D/B, subsection 1.3.2, delete "June 27, 2008" and replace with "twelve (12) months after the City-issued Notice to Proceed" . I 6-12 3. Section I: General Scope of Work to be Performed bv DIB, subsection 1.3.3, delete "July 31, 2008" and replace with "thirty (30) calendar days after "Substantial Completion" (as defined in 916.1)". 4. Section II: Insurance, subsection 11.3.1.5, Builder's Risk Property Insurance, in the ninth line of the paragraph, delete "$2,000,000 million" and replace with "2,500,000". 5. Section II: Insurance, subsection 11.3.1.5, Builder's Risk Property Insurance, in the third paragraph in this subsection, delete "$5,000" and replace with "$10,000". 6. Section II: Insurance, subsection 11.4.1.5, delete "$2,000,000" and replace with "$2,500,000". 7. Section 13: D/B GMP for Services and Reimbursements, subsection 13.1.1, in the first line of the paragraph, delete "$2,015,343" and replace with "$2,499,438". 8. Section 13: DIB GMP for Services and Reimbursements, subsection 13.1.1, in the second line of the paragraph, delete "$349,459" and replace with "396,315". 9. Section 13: D/B GMP for Services and Reimbursements, subsection 13.2, in the fifth line of the paragraph, delete "$182,000" and replace with "$208,000". 10. Section 13: DIB GMP for Services and Reimbursements, subsection 13.2, in the fifth line of the paragraph, delete "$167,459" and replace with "$188,315". II. Section 13: DIB GMP for Services and Reimbursements, subsection 13.2, in the sixth line of the paragraph, delete "$349,549", in both places in that sixth line, and replace with "$396,315", in both places in that sixth line. 12. Exhibit 2: Design Build Fee Structure, delete Exhibit 2, Design Build Fee Structure, to the Original Agreement and replace with the attached Revised Exhibit 2, Design Build Fee Structure. All other terms of the Original Agreement shall remain in full force and effect. [END OF PAGE. THE NEXT PAGE IS THE SIGNATURE PAGE] 2 6-13 Signature Page to First Amendment to the DesignlBuild Agreement between the City of Chula Vista and Erickson-Hall Construction Co. For Design and Construction of All Seasons Park City of Chula Vista Erickson-Hall Construction Co. By: Name: Title: ~1 ~ By: Cheryl Cox Mayor M;,J'<Jd1 lall Chief Ooerating omcer ~H Construction eo. Date: ATTEST: Donna Norris, CMC City Clerk Approved as to form: Bart Miesfeld City Attorney J:\General Services\GS Administration\Council Agenda\AlI Seasons Park\All Seasons Amendment and Sig Page Draft,doc 3 6-14